TransAlta Corporation (TA) Earnings Call Transcript
February 27, 2026
Earnings Call Speaker Segments
Good morning, everyone. I'm Josh, and I'll be handling the operator duties for today's call. Right now, I'd like to extend a welcome to all of you joining TransAlta Corporation's Fourth Quarter 2025 and Full Year Results Conference Call. <<operator_script>> Thanks. Ms. Paris, the conference is yours to start.
Thank you, Josh. Good morning, everyone. I'm Stephanie Paris, Vice President of Investor Relations and Corporate Strategy at TransAlta. I'd like to welcome all of you to TransAlta's Conference Call for the Fourth Quarter and Full Year 2025. Joining me on the line today are John Kousinioris, our President and Chief Executive Officer; Joel Hunter, EVP, Finance and Chief Financial Officer; and Nancy Brennan, EVP, Legal and External Affairs. This call is being webcast, and if you're listening by phone, I encourage you to pull up the supporting slides, which are available on our website. A replay will be accessible later today, and the transcript will be posted on our website soon after that. Everything shared on this conference call carries the forward-looking statement qualification described on Slide 2, which is set out in more detail in our MD&A and incorporated in full for today's call. Unless otherwise noted, all amounts referenced are in Canadian dollars. The non-IFRS terminology we use, including adjusted EBITDA and free cash flow, is reconciled in the MD&A for your reference. During today's call, John and Joel will walk through an overview of TransAlta's quarterly results. Following those remarks, we'll open the line for questions. With that, I'll hand the call over to John.
Thank you, Stephanie. Good morning, everyone, and thanks for being with us on our conference call covering the fourth quarter and full year of 2025. TransAlta put up a strong showing in 2025 while making meaningful headway on our business and strategic priorities. Over the course of 2025, adjusted EBITDA reached $1.1 billion, free cash flow totaled $415 million, or $1.73 per share, and average fleet availability was 92.3%. Softer power pricing in Alberta, muted market volatility and weaker wind resources weighed on our operating environment that year. Consequently, adjusted EBITDA landed at the low end of what we had expected, whereas free cash flow finished a bit above the midpoint of our 2025 guidance. Safety results in 2025 were the best we have recorded, with a total recordable injury frequency rate of 0.12, versus 0.56 in 2024 and our target of 0.37. We signed a tolling agreement with Puget Sound Energy covering the redevelopment of our Centralia facility. We amended and extended committed credit facilities amounting to $2.1 billion alongside our syndicate of lenders, which markedly strengthened our financial flexibility and our capacity to carry out project financing — a strategic priority for us. We also acquired Far North Power, which added 315 megawatts of dispatchable generation in Ontario, our core market.
We made a strategic choice to place Sundance 6 and Sheerness 1 into a mothballed state as part of optimizing our Alberta portfolio, which keeps the long-term optionality of those units intact while holding near-term costs down. Heartland, which we picked up late in 2024, has now been fully folded into our company, bringing in added contracted cash flows and delivered synergies. Our ERP system was brought to completion successfully, on time and on budget, and we moved three natural gas generation projects in Alberta substantially forward, giving us optionality to back data centers and grid reliability across the province for decades ahead, and we'll cover that at our upcoming Investor Day on March 23. Today we're also delighted to report that a memorandum of understanding has been signed with CPP Investments in Brookfield to push ahead with our data center opportunity at Keephills, and Joel will go into more detail on that shortly. In addition, our Board of Directors has approved raising our common share dividend by 8%, to $0.28 per share on an annualized basis, marking our seventh consecutive annual dividend increase and affirming our company's commitment to returning value to our shareholders. Before I hand the call to Joel, I want to note that this will be the last quarterly conference call I have with all of you.
Serving as TransAlta's leader from 2021 onward has been both a privilege and an honor, especially alongside such a dedicated and capable team. I'd also like to express my appreciation to all of you for your partnership as we strive to move our company forward for the benefit of our shareholders. I give Joel my full backing as TransAlta's next President and CEO, and I have every confidence that he is the right individual to carry its strategy forward in this exciting period of opportunity. Joel, I'll hand things over to you now so you can discuss our financial performance in 2025 and our strategic priorities for 2026.
Thanks, John, and good morning to all of you. First, I want to congratulate John on his upcoming retirement and express my gratitude for the leadership, guidance, and strategic vision he has brought to TransAlta, along with his active backing of my appointment. I'm eager to collaborate with the team as we keep advancing our strategic priorities, and I'll be naming the next CFO within the coming months. As John noted, we're happy to share today that we've signed an MOU with CPP Investments and Brookfield aimed at moving forward with data center development in Alberta, where TransAlta will serve as the exclusive site and power provider. Under this MOU, a framework is set for phased development at our Keephills site in Parkland County, covering an initial long-term power purchase agreement of roughly 230 megawatts plus assessment of further phases totaling as much as 1 gigawatt of demand. Our Keephills site offers a strategic platform, drawing on its extensive zoned land holdings, existing transmission, natural gas and water infrastructure, and on-site generation to enable long-term project scale. We're glad to be partnering with CPP Investments and Brookfield and to act as the exclusive site and power provider for this project. As seasoned global infrastructure investors, they possess the ability to deliver projects of this magnitude and complexity.
We’re eager to move forward with expanding digital infrastructure capacity and opening the door to future investments in Alberta. In December, we announced that we had signed a long-term tolling agreement with Puget Sound Energy, or PSC, to convert Centralia Unit 2 from coal to natural gas-fired generation. That agreement includes a fixed price capacity payment and gives PSC the exclusive right to the capacity, energy and ancillary service attributes and dispatch rights of the 700-megawatt facility. After conversion, the unit will be fully contracted through 2044, delivering continued reliable power to the region well past its original retirement date and with an emissions profile roughly 50% lower. Capital expenditures of approximately USD 600 million will be needed to extend the facility’s useful life and convert it from coal to natural gas-fired generation, delivering an anticipated build multiple of 5.5x. The target commercial operation date is late 2028, and we expect to declare a final investment decision after receiving all required approvals, which are currently targeted for early 2027. In December 2025, the U.S. Department of Energy issued a temporary order requiring that the Centralia Unit 2 facility remain available if called upon to operate for a period of 90 days through March 16, 2026. As required, TransAlta is complying with the order and continues to advance the conversion in alignment with PSC in order to achieve the targeted commercial operation date.
Back in November, we announced that we would be acquiring Far North Power Corporation, and I'm happy to report that deal closed earlier this month. Far North's portfolio is made up of four natural gas-fired generation facilities with 310 megawatts in total, including Aqua Falls at 120 megawatts, Kingston at 110 megawatts, North Bay at 40 megawatts and Campus casing at 40 megawatts. Those assets, bought for $95 million, should contribute roughly $30 million of average adjusted EBITDA annually, with about 68% of the portfolio's gross margin contracted through 2031. Past that contract period, the assets sit in an attractive spot for recontracting opportunities and strengthen our reliable and increasingly diversified portfolio. This deal shows progress on our priority of pursuing strategic M&A. In the quarter, we brought in $247 million of adjusted EBITDA, which came in $35 million below the fourth quarter 2024, mainly because of weaker Alberta and Mid-C power prices and softer market volatility that weighed on energy marketing results. Adjusted EBITDA for the hydro segment fell to $39 million from $57 million last year, driven by lower spot power and ancillary prices in Alberta and lower merchant volumes. The wind and solar segment delivered adjusted EBITDA of $102 million, up quarter-over-quarter thanks to stronger wind resource and availability across the fleet.
For Gas, adjusted EBITDA came in at $96 million, down from $116 million in 2024. The main driver was weaker realized power prices in Alberta, plus increased carbon pricing, though that was partly offset by the Heartland assets we added, greater output at Sarnia, and gains from favorable hedges that settled. On the Energy Transition side, adjusted EBITDA reached $16 million, which is a $10 million drop compared with a year earlier, reflecting softer mid market prices, partly offset by reduced purchase power costs and settled favorable hedge positions. Energy Marketing's adjusted EBITDA fell by $5 million to $21 million, largely because market volatility across North American natural gas and power was comparatively muted. Corporate costs came in below last year at $27 million, mainly on lower incentive costs. Free cash flow totaled $93 million, an increase of $47 million versus the same period a year ago, thanks to the items I just mentioned plus lower overall sustaining capital expenditures. Now turning to our full year 2025 results. Hydro delivered adjusted EBITDA of $285 million, consistent with what we expected. The year-over-year decline stemmed from weaker spot ancillary power prices, partly mitigated by positive hedging contributions, increased production, and greater use of environmental and tax attributes against the Alberta gas fleet's carbon obligation.
For wind and solar, adjusted EBITDA came in at $338 million, up 7% versus 2024. That was mainly driven by a full year of contributions from the Oklahoma wind assets, greater revenues from environmental and tax attributes, and stronger wind resource in Eastern Canada and the U.S. The Gas segment kept up solid availability and posted adjusted EBITDA of $438 million. The drop from last year was mostly attributable to weaker power prices in Alberta, elevated fuel and operating costs, and more dispatch optimization from our Alberta gas fleet, partly offset by the Heartland addition and our favorable hedge position in Alberta. Energy Transition generated $100 million in adjusted EBITDA, rising year over year on lower purchase power costs and better availability at Centralia. Our Energy Marketing segment performed in line with the 2025 guidance range for gross margin, adding $85 million of adjusted EBITDA. Energy Marketing results faced a year-over-year impact from muted market volatility across North American natural gas and power markets. Lastly, corporate costs rose slightly versus last year, chiefly reflecting higher spending to support our strategic growth initiatives and costs tied to the Heartland acquisition, partly offset by cost-saving initiatives. Taken together, adjusted EBITDA reached $1.1 billion and free cash flow totaled $514 million, or $1.73 per share, which sits above the midpoint of our guidance.
Now let's look at our Alberta portfolio. In 2025, the spot price came in at an average of $44 per megawatt hour, which was considerably below the $63 per megawatt hour average seen in 2024. This year-over-year decrease stemmed mainly from additional generation thanks to new gas, wind and solar supply coming online in the province, along with the effect of milder weather across the year. Our gas fleet beat what we had expected, achieving an average captured price of $66 per megawatt hour — a 50% premium over the average spot price. Significant merchant upside was also captured by our hydro fleet, which delivered an average realized price of $58 per megawatt hour, a 32% premium over the average spot price. Our merchant wind fleet achieved an average realized price of $24 per megawatt hour, which was affected by greater intermittent wind and solar generation within the Alberta merchant power market. Even though weather was relatively benign last year, pushing power prices lower on average, we picked up extra margin by meeting a portion of our higher priced hedges through purchased power at times when prices sat below our variable cost of production. We benefited from roughly 8,600 gigawatt hours of hedges at an average price of $70 per megawatt hour, which represents a 59% premium over the average spot price.
In addition, during the past year we supplied roughly 3,900 gigawatt hours in ancillary service volumes, priced at a modest 14% discount relative to the average spot price. Through optimizing the fleet across the year and meeting hedges via purchase power, we could address greater demand from AESO, and from our Alberta portfolio we achieved a 9% rise in ancillary service volumes versus the year before. Moving on to Q4. Spot prices came in at an average of $43 per megawatt hour, below the $52 per megawatt hour average in 2025. Our hedge position was robust, averaging $73 per megawatt hour, a 70% premium over the average spot price. From our hydro fleet, the average realized merchant price was $53 per megawatt hour, a $0.23 premium over the average spot price, whereas the gas fleet achieved an average merchant price of $65 per megawatt hour, a 51% premium over the average spot price. Our merchant wind fleet, which is non-dispatchable and depends on wind resource, achieved an average price of $26 per megawatt hour. During the quarter, hydro ancillary service pricing for us settled at an average realized price of $35 per megawatt hour, a 19% discount relative to the average spot price.
For this year, roughly 8,500 gigawatt hours of our Alberta generation sits hedged at an average of $65 per megawatt hour — considerably higher than the present forward curve of $44 per megawatt hour. As we move ahead, we anticipate continuing to optimize the fleet and to cut output during low-priced hours with abundant supply, meeting our financial hedges and customer requirements through open market purchases. When it comes to 2027, the team has grown our hedge position to about 4,000 gigawatt hours at an average of $71 per megawatt hour, a level that stays well above current forward pricing. In our view, forward prices fail to fully reflect the effect of the REM or the 1.2 gigawatts of data center load set to come online. We anticipate that this expected load increase will rebalance the province's present generation oversupply later in the decade and create long-term growth opportunities. Our dispatchable thermal and hydro fleet already has the capacity to deliver reliability and serve anticipated load growth, and we'll discuss that further at our upcoming Investor Day. Moving to our 2026 outlook, we expect adjusted EBITDA between $950 million and $1.1 billion, with free cash flow between $350 million and $450 million, or $1.18 to $1.51 per share.
A few things are shaping how we see 2026. The first is that Centralia stopped operating at the close of 2025, and that will hit adjusted EBITDA and free cash flow considerably until the plant returns after its conversion to natural gas. We haven't factored in any effect from the 202(c) order, since we anticipate recovering those costs. The second is Alberta spot power prices, which we expect to stay under pressure in a $40 to $60 per megawatt hour range, and that weighs on our Alberta merchant portfolio. The third is hedging: we're well hedged financially and through our commercial and industrial business, but the average hedge price is down from 2025 levels. And last, Sarnia will contribute less because of a step-down in contracted pricing, along with the contract expiring and the decommissioning of our Ada facility in Michigan. We expect larger contributions to our Alberta portfolio from realizing carbon credits against in-year carbon compliance costs, plus the 2025 carbon compliance costs in Alberta. Our confidence in the EBITDA and free cash flow guidance rests on how the contracted fleet performs and on our hedging and optimization strategies, which account for roughly 80% of the revenue we expect from our generating facilities.
With the MOU for Alberta data centers now signed and a definitive tolling agreement in place at Centralia, we're happy to share that our Investor Day will take place in Toronto on Monday, March 23. The presentation gets underway at 9:00 a.m. Eastern Time. We'll walk through the company's strategic priorities, long-term plan, financial outlook and growth opportunities. The Investor Day is open to the investment community and will be run in a hybrid format, with options to attend in person or via live webcast. For 2026, our priorities are as follows: strengthening both our leading and lagging safety performance indicators while delivering strong fleet availability; achieving adjusted EBITDA and free cash flow inside our 2026 guidance ranges, which at the midpoint are $1 billion and $400 million, respectively; maximizing the value of our legacy thermal sites by moving the Alberta data center project forward and progressing the coal-to-gas conversion at Centralia toward FID; chasing strategic M&A opportunities; and preserving our financial strength and flexibility. As I step in as CEO next quarter, I believe TransAlta presents a compelling investment opportunity. We're a safe and reliable operator with resilient cash flows, supported by a diversified hydro, wind, solar and thermal generation portfolio spanning three countries, along with our leading asset optimization and energy marketing capabilities.
Our legacy thermal sites hold substantial value that keeps increasing, and our team is working actively this year to repurpose them to serve the rising demand for dependable generation in the jurisdictions where we operate. We also continue to lead across a range of technologies centered on responsible generation. We cut our greenhouse gas emissions substantially, hitting our 2026 emissions reductions target sooner than planned. We stay disciplined in how we pursue growth, concentrating on delivering value to shareholders, and we strive to diversify our portfolio within our core geographies while making our earnings and cash flows more stable and more contracted. Our company also rests on a solid financial footing. The balance sheet gives us flexibility, and we have plenty of liquidity to pursue and deliver numerous growth opportunities, as well as the capacity to return capital to shareholders. Last and most important, we have our people. Our employees are our greatest asset, and I want to thank each of our employees and contractors for their dedication and for positioning the company for success this year and beyond. Thank you. I'll now hand the call back to Stephanie.
Thanks, John and Joel. Josh, could you go ahead and open the line so the analysts can ask their questions?
<<operator_script>> Our initial question is from Mark Jarvi at CIBC.
Could you give us a bit more color on the data center opportunity, say for 2027 and beyond? Is the expectation that load begins ramping in 2027, and how long would it take before the 230 megawatts reaches full capacity?
Mark, honestly, providing much more detail on the MOU is hard for us, simply because its terms leave us quite limited in what we can actually say. What I can tell you is that speed to power remains a priority for both of our customers there. We're excited about the partnership we have with them. Our focus at the moment — and I know it's theirs as well — is getting our definitive documents finished. And once those documents are complete, which we expect to happen within the year, I think they'll move ahead with starting the kinds of investments they need to make up at our Keephills site and get us moving forward. And it will be a gradual ramping up.
Could you talk at all about how risk sharing works in terms of who bears the gas price risk and the carbon pricing risk, and the sort of structure of the net back to TransAlta — whether it's more of a capacity or tolling structure for you?
Yes. Again, I don’t believe I’m able to provide those kinds of terms, given the arrangements in place. What I can say is that we view the commercial framework we’ve built with CPPIB as well as Brookfield as a suitable one. And I think it reflects the worth of the Keephills unit we have there. So we’re happy with the arrangement overall and consider it a very sound one from a commercial standpoint.
I'd also like to mention that this arrangement features a long-term PPA, which effectively locks in merchant cash flows too.
And have the approximate terms of the PPA been finalized at this point, even if there's nothing you're able to share about it?
What I'd say is that the MOU sets out the main components of the PPA.
All right. Then it mentions increasing gradually over time. I'm just wondering where things stand in your discussions. We've seen some of the engagement feedback regarding Phase 2 with the AESO. Are there bridging opportunities there to leverage your coal-to-gas assets as you move past 230 megawatts, before you'd be in a position to potentially enable a large repowering?
Yes. So, the AESO along with the provincial government are still working through their Phase 2 deliberations. As you'd expect, we're heavily engaged in that work. From our standpoint, I can say that it will be absolutely essential for the province to have the ability to count on underutilized generation — essentially a bring-your-own-power model, which is among the central features of what the government has discussed to allow a data center industry to grow meaningfully in Alberta. I believe our point has been registered. And I think we're particularly well positioned to scale up, given the breadth of generation we have across Alberta, to actually serve that need. And frankly, with both Sundance 6 and Sheerness I having been mothballed, those 2 units by themselves offer a fairly clear route by which we could definitely scale up and satisfy the up to 1 gigawatt we're considering under the terms of the MOU we've signed with our 2 partners.
Do you have any idea when the AESO might give us some clarity on that?
Yes, we do anticipate receiving it, and my expectation is that it comes during the first half of this year. I can't say with confidence that it will arrive by the close of this quarter, though I genuinely believe they are quite focused on providing clarity to the marketplace. As you can imagine, they have a great deal on their plate, what with the REM and the efforts underway between Alberta and the federal government regarding the MOU the two parties have signed. So plenty is happening, but I am aware that work is proceeding, and we are fully engaged in it.
Robert Hope from Scotiabank has our next question.
Let me circle back to that MOU. You noted alongside Q3 that you were hoping a number of the key items would be mostly hammered out, and that this could speed up the route from an MOU toward signing the contract. Looking ahead, is nailing down those details the main thing holding up the shift from the MOU to a binding contract? Or are there several parallel tracks with your customers on the data center side that would also factor into the timing and the process there?
What I can tell you is that this MOU is quite extensive. A great deal of discussion took place, and many terms were settled regarding the key commercial elements of the arrangement — both for the first phase involving the 230 megawatts allocated to us and for the pathways through which we could reach an aggregate of a gigawatt going forward. As you can imagine, a number of definitive agreements still need to be finalized and settled before we can move forward, and they cover everything from a definitive PPA with all of its terms to even just lease arrangements tied to the actual land on site. Getting that done takes time. We're motivated to move quickly, and our team is ready. So are they. And I think we'll proceed with that in a very orderly way going forward. Both proponents also have work underway behind the scenes concerning who their offtakers are and simply finalizing their offtake strategy, which keeps moving ahead. And our view is that, given their capabilities and the scope of reach they possess, they're going to be really successful on that front as well.
There's a great deal of work ahead for us, and for them too, but I believe it can all be carried out in an ordinary fashion. Our confidence is very much intact. I can't express how delighted we are to have made this announcement today.
Great. Now I have a question that isn’t about data centers. Could you update us on the M&A market, share your perspective on gas assets and renewable assets, and discuss M&A as a possible avenue for growth?
Absolutely, Robert. Joel, would you like to kick things off?
Yes, I'll begin. Robert, I'd describe the M&A landscape as still quite active. We're reviewing numerous opportunities across a range of sizes, so to speak. I'd note that we're seeing a mix of renewable assets up for sale, including both wind and solar. In the same way, plenty of possibilities are showing up in thermal generation too. So once more, we stay quite active and highly focused, with our eye on delivering shareholder value. Obviously, that has to line up with our strategic priorities as we move forward. A solid illustration, again, is the Far North acquisition we closed just earlier this month, which we're very pleased about, but we keep seeing numerous opportunities in both Canada and the United States, and even a few in Western Australia too.
The one other thing I'd tack on there is that — and you're aware of this — purchasing is considerably less expensive than building at the moment, especially when you take into account the sort of timelines involved in getting a project operational.
Congratulations on the MOU and on the upcoming retirement.
John Mould from TD Cowen has our next question.
I want to apologize and return briefly to the data center MOU. I'd just like to find out whether you can share anything regarding the key gating items that would take it from an MOU to a binding agreement. And might you provide possible timing for when a binding agreement could appear? Sorry if I missed that. If not, could you give us a sense of what you're broadly aiming for on a mining agreement with respect to time line?
Specific dates aren't something we can provide, John. What I can say, though, is that we expect definitive agreements to be wrapped up within the year and, honestly, for our engagement to start quite soon. Our team is prepared for that. And it's our hope that over the next few months we'll manage to get those signed, and at that point we'll be able to share more detailed terms with the market once those definitive agreements are finalized.
All right, that's useful. Next I want to touch on the development side for gas—or really, brownfield development. You've reinstated the Keephills 1 and Sundance 6 repowerings, at least from a regulatory standpoint. You also have the Flipi project. And earlier you mentioned the cost gap between buying and building. Could you rank some of those repowering opportunities by attractiveness relative to what you're seeing in the M&A market? And what conditions would need to be in place for us to possibly see you reach FID on one or more of those repowering opportunities?
Yes. Let me begin, and then Joel, feel free to chime in. So you're correct. We've moved forward with repowering for both Keephills 1 and Sundance 6, as well as the Flipi project. And from where we sit, it was essential to accomplish that — particularly on the regulatory and permitting side — ahead of the close of last year, since our aim was to have all three projects qualify under the current rules for new gas-fired generation capable of operating unabated prior to year-end. And from our standpoint, that goal has been met. So I'd say uniquely, at least within Alberta, we now hold options to actually construct flexible gas-fired generation in the province to serve its needs going forward through the 2030s and beyond. Frankly, all the way to 2050, before the CER provisions would affect that new-build generation. It's possible we succeed under the federal and provincial MOU and the CER disappears, but we definitely didn't want to gamble on that, and we worked through things to ensure that no matter what the regulatory regime looks like, those options were ready.
When it comes to new build, I think it's genuinely difficult, given the generation fleet we already have in the province, to use or pick up legacy assets of that kind to serve incremental load growth. So our view is that the 2030s are going to call for new build to satisfy the needs and, frankly, to replace some generation that's retiring. As a company, I'd say our preference, Joel, would be to see contracted generation. We're certainly not building merchant gas-fired generation — that's much harder for our company to wrap its head around here in the province of Alberta. But we believe we can make the math work on those projects. We're starting to ramp up our supply chain arrangements when it comes to executing them. And there's development and design work underway to achieve the maximum optionality we can get under those. So hopefully that gives you a sense. Joel, I don't know if you'd like to add anything to that.
The one point I’d make is that we rely on our current generation as a bridge toward new generation, whether for Phase 2 of a data center or other opportunities we may see here in the province. That’s given how long new build takes and what new build costs in this environment. And if we do pursue new build later this decade or early next decade, it would need to be backed by long-term contracts so that we earn a full return of and on capital within the contract.
And the truth is, John, the supply chain being what it is, it would probably take about five years before you could obtain turbines, the power island and similar equipment. So you more or less have to start the work now so that you can have something installed and reach a COD in the early 2030s.
Maurice Choy of RBC Capital Markets is up next with a question.
I just want to follow up on those three natural gas generation projects you have underway. If I understand correctly, their combined capacities clearly exceed the 1 gig Phase 2 and MOU, and on top of that, the two other sites probably aren't even located at Keephills. So is the plan here for you to help provide solutions to the two counterparties beyond Keephills alone? Or are there additional data center customers you might be aiming to serve and secure?
Yes. Maurice, to be honest, I think the answer to what you asked is all of the above. Look, our partners at Keephills are examining a major investment in that region, which will mean we have to supply them with dependable generation over a very long horizon. That isn't only about the 2030s. It's something that will require us to support them well into the 2040s and beyond. So, given the timeline for our current generation to actually satisfy those specific needs, we have to consider how we obtain newer, more efficient generation. Discussions about other possible opportunities haven't ceased. So we keep getting inbounds, and we keep doing additional work to bring further opportunities for load growth within the province, as well as other data center opportunities. And we're mindful of that. And by advancing the three projects, we're simply attempting to maximize our flexibility. And remember, with K1, we would be using existing infrastructure, with the aim of getting a build cost for that new generation lower than it would be if we were doing a pure greenfield site.
Maybe as a quick follow-up to all this MOU discussion. I understand MOUs typically aren't legally binding. If the project doesn't move forward, is there a termination fee?
Yes. Again, I'm not able to discuss the specific terms. But here's what I'd say. We see this MOU as a genuine statement of intent — very firm intentions on the part of the parties to proceed. We have complete confidence in CPP Investments and Brookfield and their ability to carry it forward. They are, after all, extraordinarily seasoned global infrastructure investors. They've demonstrated the capabilities needed to advance this. And honestly, I believe they share our enthusiasm about building a nascent Canadian data center industry in this country. So while the MOU's terms mattered a great deal and required weeks upon weeks and months of negotiation to finalize, we have total confidence and faith in the counterparties we're working with to keep things moving forward.
That's clear. Let me just wrap up with one question about funding. Since you do have several funding requirements for Centralia, Keephills, Phase 1 and possibly Phase 2 too. Could you talk about what you view as your remaining investment capacity, let's say, through the end of the decade once you account for some of these projects on an equity self-funded basis?
Sure. Here's what I'd say, Maurice — look, I'll hand things over to Joel, but as a company we have plenty of levers available to us to satisfy the funding needs of our future growth. Joel, perhaps you could share your view.
Yes. And Maurice, I’d just add that, first of all, Phase 1 really doesn’t come with a substantial funding need for us. Of course, when we look ahead to Phase 2, there could be one. But again, when we think about leveraging our current generation as a bridge to new generation, that shouldn’t call for a lot of meaningful capital spending either. Regarding Centralia, it’s spread out across a couple of years, based on reaching an FID at some point early next year. So picture that as spending in '27 and '28, with an in-service date somewhat later in 2028, which would be quite manageable given our existing free cash flow generation as well as the incremental debt capacity we have today. So we stay quite confident in our capacity to fund these opportunities, whether that’s data centers here in Alberta or Centralia. And we do have a number of levers at our disposal, such as asset rotation and similar options, to the extent that further opportunities arise. So again, we remain quite confident in our ability to fund this growth going forward.
Joel, I recall you previously saying you expected the Brookfield debt and hybrids to convert into hydro equity. Does that remain your current assumption?
Yes. So how it works, Maurice — and this is really for everyone's benefit — is that the option can be converted right up until the close of 2028. And so, again, whether to exercise it lies with Brookfield. If they choose to raise their stake in the hydro assets, they're able to go as high as 49%. But there are particular conditions that must be met for that to happen. And if it did happen, then obviously there would be extra cash coming into the company because of it. So, as I said, that option stays available through the end of '28, but it's Brookfield's option to take.
Nice work, Joe and Joel, both of you over at RBC — congratulations.
Benjamin Pham from BMO has our next question.
We've had quite a few questions already. Perhaps I can just pick up where we left off on Keephills. You brought up Phase 1 and said you don't anticipate a funding requirement there. But could you verify whether, under the MOU, you might have to put capital toward it?
First off, Ben, my apologies — I should have led with that. The honest answer is that we can't really speak to the capital investment needed to carry out Phase 1 from TransAlta's side, because it's negligible, I think that's the fair way to put it. Keep in mind that it will be grid connected. So a small amount of capital is needed to make sure the data center gets connected to the grid. That means a substation and some transmission have to be built out. But it sits very close to the site we have and to the interconnection we already have with the transmission line. So I'd call it very, very modest. When we look at the opportunity, we generally view K3 as essentially the facility that is tied to that opportunity. And K3 itself is in very good shape operationally. We've maintained that facility very well. We're very pleased with its reliability, and its sustaining capital requirements going forward are very manageable. So it's not a burdensome requirement at all. And I'd say even when we think about bridging generation, Joel, to the point where we potentially get new generation built, which really is in the 2030s, capital expenditures from TransAlta's perspective going forward are relatively modest.
Okay, I understand. I'm curious — I know you've spent the past two years moving negotiations forward with customers. You ended up at Brookfield CPP, which are established customers and counterparties. Could you maybe just walk through, perhaps qualitatively — I don't know — the process, the level of demand you've seen over the last couple of years, and the puts and takes you ultimately face when choosing the counterparty? And then, as part of those negotiations, do you also consider simply going direct with the hyperscaler?
Yes. So we actually carried out a fairly thorough process regarding the data center opportunities. And one factor that, I'd say, consistently influenced how we approached or shaped our strategy on data centers was essentially the recognition that, at least at the outset, only a limited quantity of new data center capacity would arrive in the province — whether that's a gigawatt or 2, somewhere around that range. And as you observed with Phase 1, the AESO and the province arrived at 1.2 gigawatts, a kind of gradual, I think, feathering in — adopting, you might say, a TransAlta-style mindset for data centers going forward. So that really did shape how we approached things in terms of what scale was on hand to satisfy the requirements of the parties we were talking with. So our thinking was that it would be excellent to have hyperscalers, and we definitely anticipate and hope they ultimately enter the jurisdiction. When we started our conversations, it was excellent to begin talks with CPP Investments and Brookfield. They had the sort of ramping profile and load expectations that we considered reasonable and that fit within the envelope we expected to receive.
It lined up really well, honestly. And as you pointed out, both of them are exceptional infrastructure investors—not only within Canada but around the world. Each has a strong grasp of the Alberta market. They bring broad experience—and beyond experience, relationships—in digital infrastructure on a global scale. We were fully confident they possessed the expertise, the capital depth, and the execution capability needed to complete this. So even though we cast a fairly wide net at the outset, we were delighted to bring them on as partners, since their expectations matched, more or less, how we saw the development path in the province playing out. We feel very lucky to be working alongside them, and for them.
That gives us a solid backdrop. I'll see you in roughly a month.
The following question is from Julien Dumoulin-Smith at Jefferies.
Tanner here, filling in for Julien. Congratulations on the announcements, and congratulations to you as well, John. Many of my questions have already been raised and addressed during this call, but I wanted to check whether you might set out expectations regarding what will feature in the long-term financial plan that's coming next month. Will you aim to give guidance that assumes the base business as it currently sits within the portfolio? Or is the baseline guidance more likely to assume some progress on the MOU or on other items? And beyond that, how do you plan to address or flag the uncertainties around the AESO process?
Yeah, this is Joel. Yeah, what we're aiming to do is probably give a bit of an outlook through 2029 that reflects our assumptions about Alberta power prices and the effect that'll have—obviously on our merchant portfolio—and obviously also taking into account some of what we're seeing from Phase 1, along with Centralia entering service at some point later in 2028. So we intend to give you some building blocks to see what that might look like going forward at our Investor Day on March 23.
And as for what people are expecting when it comes to pricing, and how we think the market in the province will develop — that's certainly part of it.
We move now to Patrick Kenny of NBCM, who has our following question.
There's been a growing amount of discussion about Alberta wanting to strengthen its interties with adjacent power markets. I'm curious what you think about how that could affect your view of the Alberta power market as time goes on, and also how TransAlta could take part, whether directly or indirectly, in those shifting dynamics?
Honestly, I'd say our outlook on this is quite positive. We're honestly still early in working through some of those conversations, but we genuinely believe it opens up a significant amount of opportunity — definitely for our company, and frankly for the entire province. What we're observing — and when I consider the opportunity, candidly, I tend to think of it less in east-west terms and more north-south. We believe that load growth needs across the Pacific Northwest down into the Rocky Mountain states, and frankly all the way to the Desert Southwest and even California, are going to stay elevated. In our view, reliability will keep being a genuine priority in that region. The capacity to construct new firming generation, roughly in the western portion of the continent, will, I think, stay constrained at times, and so will transmission in general for moving it around. So we genuinely see a chance in Alberta — not merely to satisfy the continuing data center demand needs, certainly from a Canadian standpoint, but additionally to serve somewhat as a reliability agent, if that term works, for the WEC ideally, as a kind of opportunity set that we're identifying.
Look, making that happen is going to require effort and capital. Even so, I'm genuinely enthusiastic about it. And Joel, I believe it bears significantly on the 3 new plants we're also trying to build out. So perhaps you could share your thoughts.
Yes. No, Pat, I’m with John on this. It’s a really exciting opportunity for us here—we’re able to leverage existing generation in the interim, and then there’s a genuine possibility for new generation down the road, whether that’s east-west or North-South. What we’re seeing in neighboring jurisdictions, again, is demand for firming power—a growing need, actually. A growing one. And what I also really like here is that you have strong policy support within the province to be something of an energy superpower, where we could see additional gas generation being developed in the province for export to neighboring markets. So we view it as a very exciting opportunity. That said, as a bridge, again, making use of our existing generation is going to be very important to that, to the extent that we see opportunities in the future.
Yeah, Patrick, I think that's a key point.
All right, that's really helpful context — I appreciate it. Maybe I could just ask a quick follow-up about Centralia. I realize this is a fluid situation, but I wanted to check whether you've gained any further clarity regarding the 90-day order, or whether you'd have any recourse should things get extended — and would that perhaps cause you to delay your FID decision on the conversion?
Yes. Let me begin, and then perhaps I'll hand things over to Nancy to see whether there was anything I failed to address. So, look, that first 90-day order runs out in mid-March. And we're in complete compliance with it, in the sense that we're available if we're asked to run. We don't anticipate that, given how flush the hydro situation is in Washington state at the moment. I think our main focus is more on getting clarity regarding the existing order, and we do have the ability to recoup our expenses, which is why we aren't especially concerned about that from a 2026 perspective. But certainly, Nancy and her team and our commercial team are focused on getting clarity around the mechanics of that going forward. With respect to the coal-to-gas conversion at Centralia, we continue to work that through in a very uninterrupted sort of way. Our general sense is that the conversion -- not our general sense, but the reality is the conversion is supported by Washington State. They need it. They're accepting of that facility being converted, and they see that the need for that facility to provide reliability into the mid-2040s is critically important.
And at the same time, the U.S. Department of Energy is doing likewise — the federal government in America backs our efforts there and has a clear understanding of them. So no matter how things unfold with 202(c) at the facility, we expect it will not stand in the way of the coal-to-gas conversion work we are pursuing. And as I can tell you, from a regulatory and planning standpoint, it is full speed ahead for us and frankly for Puget as well, as they aim to secure the rate base. Nancy, I’m not sure whether you have anything further to add on that.
Thanks, John. John has done a good job covering that. The only thing I might add — perhaps a small nuance to some of his remarks — is that communication and collaboration have been very strong for us at both the state and federal levels. And on the point of whether we'll get another order, we can't predict that. But if it happens, I think the building blocks are in place, in terms of the work we're doing right now to keep moving forward and keep proceeding with the conversion. And as we said at the start, we're working very, very closely with our customer, PSC as well. So at this point, if that occurs, we don't foresee any obstacles.
That brings us to the end of the question-and-answer session. At this point, I'll hand things back to Stephanie Paris for any closing comments.
Thanks to all of you. That brings today’s call to an end. Should you have any additional questions, please reach out to the TransAlta Investor Relations team.
Thanks. That brings us to the end of today's call. You're free to hang up now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete TransAlta Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to TransAlta Corporation earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.