Good morning, everyone, and welcome to Vestas's Q2 investor presentation. First, I want to say a very big thank you to our customers, to our other stakeholders, and not least to colleagues all around the globe. This has been a busy quarter, and one with a fair amount of policy uncertainty as well, especially for our more than 5,000 valued colleagues in the U.S. I'd also like to give Jakob a warm welcome — and you'll need to hold your patience a little until the financials come up before you hear from him. Welcome, Jakob. So with that, let's move on to the quarter's key highlights. Revenue for the quarter came in at EUR 3.7 billion. That represents growth of 14% compared with the same period a year earlier. Our EBIT margin landed at 1.5%. Better onshore project performance along with reduced warranty costs were offset by the cost of ramping up offshore. We'll go into more detail on that. Order intake came to 2 GW. That's lower than a year ago, since customers have been waiting for policy clarity, most notably in the U.S. We'll say more about that as well. The manufacturing ramp-up is pushing up both costs and investments. Ramp-up across onshore and offshore is moving forward, and the first V236 nacelle has been assembled at the facility in Poland. We finished with a return on capital employed of 11.5% for the last 12 months.
Higher profitability over the past 12 months gives us the best ROCE return since 2020, and that is of course very pleasing. Last but not least, guidance for our 2025 outlook stays as it is. We'll cover that at the close of this presentation. So with that, let's briefly look at the markets and which markets we compete in. Wind energy — and this is grounded in facts — is wind, and it is affordable. There is a security dimension, and there is definitely a sustainability dimension as well. Looking at the business environment we face now, inflation, raw materials, and transport costs are stable. Tariffs, though, will raise costs over time, which we view as imminent and also a link. For us, long lead time with the backlog. Ongoing geopolitical and trade volatility is driving regionalization. We, of course, say that. We also see it in everything we've done over the previous years. Moving to the market environment, the heightened focus on energy security and affordability — you'll also see that in the most recent wording from the U.S., where there is detailed discussion around how FEAC and components will be addressed and also viewed going forward. Grid investment is prioritized across many of our key markets.
It's also becoming a really key element in successfully bringing the solution to market. If we look at permitting, things are getting better in certain markets. Still, on the whole, permitting, auctions, and market design remain difficult. At times we even see a very successful government with an auction that goes unsubscribed, purely because the same principles used in neighboring countries aren't being applied. Looking at the project level, I'd call it a really, really pleasing quarter. We've seen genuinely good execution in onshore across the markets where our deliveries have shown up. We're positive going toward the end of the year, provided we can maintain the same discipline and the same level of execution we saw in Q2. That also brings us to Power Solutions. For Power Solutions in Q2, I'd say the order was lower — perhaps a bit disappointing in Q2 relative to where we'd like to be, both versus last year and from our own standpoint. We're seeing good activity in EMEA. Order intake came in at 2 GW. That was down 44% versus last year. The decline was mostly driven by a shortage of orders in Americas, particularly in the U.S., since customers have been waiting for policy clarity.
As noticed, Q2 had no offshore orders. In Q2, ASP fell to EUR 1.11 million per megawatt, versus EUR 1.24 million per megawatt in the prior quarter. A change in order mix drove that decline, and underlying pricing for Vestas remains both stable and positive. As you also noticed, Q3 has gotten off to a very good start. It is wrong to treat the two quarters as disconnected. Look at it alongside the policy changes that took place around the quarter end. Several orders have been announced, including in the U.S., as the policy outlook has become clearer. That also means that year to date, or quarter to date in this quarter, we are already well beyond what we saw in Q2, including approximately 1.5 GW so far in the U.S. Serial manufacturing has now begun at the nacelle facility in Poland. The first 236 nacelles left the factory in June. Actually, Jakob, we were there in June when that happened. It is really nice to see the ramp-up our team has been working on for what I would now call years coming to fruition. Of course, it also means that our offshore ramp-up cost at the Polish factory is around the top of what we have seen, because we now have more than 500 employees working in the nacelle factory in Poland.
This is a busy stretch for offshore, since we have turbines heading out to EMBW and to Baltic Power in Hywind as well. So we're now seeing our 15 MW units being installed on both sides. Naturally, we're in close dialogue and communication with our customers and partners about that. Ramp-up is at its peak, and I'm sure we'll discuss it further later in this call and in the days ahead too. With that, I'd like to turn to service. Another solid quarter as the recovery plan keeps progressing. Looking at the service order backlog, it rose to $36 billion from $35 billion a year ago, though it fell versus Q1 because of how foreign currency translation developed. That pattern really applies across most of the businesses. Jakob will share a few more details on it later. Service stands at 159 GW compared with 151 GW a year ago. The commercial reset — covering contract trimming and stepping away from contracts with unattractive terms — is still underway. Even so, the gigawatts under service this quarter show that our solutions matter to our customers, partners, and investors alike. Turning to the other piece, standardized cost control — lowering direct costs and cutting unscheduled maintenance — remains among the top priorities for improving our service operations.
I truly appreciate the huge number of colleagues—so many, many of them—who are engaged in this effort and who are also getting better every single day. Thank you for that. Looking at Vestas, we're now two quarters into the service recovery plan, which is expected to run through the end of 2026. Here I just want to show you—you can see the figures—the breakdown of our 159 GW over on the right. And let me also remind you that our average contract duration is 11 years. With that, I'd also like to remind you this is a slide we shared with you at the start of the year. Just to highlight: in the service recovery plan, we've boxed in the two main headings here, where most of the resources go and where a lot of dedicated leadership time is also spent. The commercial resetting, where we push commercial excellence with a focus on price, scope, billing profiles, and contract trimming. We're seeing wage inflation that, at least in Europe, is settling nicely at around 2.5%. As for standard cost control, that means hard day-to-day work for the regions. They are the ones driving it and creating the right ownership.
I think we need to acknowledge shortcomings as we look across 2024. That's a new reality starting from 2025. Let me move quickly to development. I'll go through that fairly fast. There isn't much news to report. Development is about focus, focus, focus on the projects we're seeing. In Q2 2025, our development project pipeline was stable at 27 GW, with Australia, U.S., Spain, and Brazil holding the largest opportunities. Our strategic focus is on maturing and growing a quality project pipeline, as well as converting mature projects into project sales and the related turbine order intake. During the quarter, Vestas development firmed one project for 102 MW of order intake in one of our markets globally. You can see the breakdown here. There isn't a lot of change. Business as usual. You'll also appreciate that in the environment, there's a lot of focus on getting the full solution done rightly in development and therefore shared and sold to our partners in good state. With that, we go to sustainability. Vestas remains the most sustainable energy company in the world. We are proud of it. We also keep our relentless focus on putting more energy up available, but also a focus on keeping the sustainability of it.
The turbines we built and delivered over the past 12 months should prevent 480 million tons of greenhouse gas emissions across their operating life. That gain of 65 million tons came about because we produced more during the last 12 months. Likely tied to that, emissions from our own operations rose by 8,000 tons compared with a year earlier, as activity grew, particularly in offshore construction and service. Recordable injuries per million working hours — TRIR — climbed from 2.8 to 3.0 versus the prior year. Safety stays our highest priority, and we work relentlessly to strengthen our safety results and records throughout the value chain. It's also obvious that, given how many full-time employees we have now, we must keep devoting constant, constant effort to this as we bring on so many new colleagues, above all in our own factories but also at the new sites where our solutions are being deployed. With that, I'm glad to pass things to Jakob and welcome him to our investor presentation here.
Thank you, Henrik. It's a pleasure to be here. Let's begin with the income statement. For the quarter, we have three main highlights. Revenue rose 14% compared with a year earlier, thanks to greater turbine delivery volume and higher service revenue. It's worth noting here that service revenue in the comparison quarter took a hit of over $300 million from last year's planned cost adjustments. Gross profit climbed to $417 million this quarter, mainly on account of the factors just mentioned plus improved onshore profitability, which ramp-up costs in offshore partly offset. EBIT margin before special items came in at positive 1.5% for the second quarter. As we've said before, 2025 will be a back-end loaded year, with the bulk of our activity and earnings anticipated in Q3 and Q4, much like the last several years. Turning to the segments, starting with Power Solutions: revenue was up 7% versus a year ago, chiefly on greater onshore delivery volumes in the U.S. The interim report on page 10 actually shows these details best, where you can see the U.S. is up 500 MW. EBIT margin before special items was -0.4%, a decline of 1.1 percentage points year on year.
The reduced profit is a result of ramp-up costs offshore plus increased depreciation and amortization. Partially balancing that out was stronger profitability in onshore, which keeps delivering very strong results. Within the Service segment, if you set aside the planned cost adjustment taken in Q2 of last year, service revenue fell 4% year on year, driven largely by a 3% currency headwind. Transactional sales came in level with last year. Service delivered EBIT of $163 million, an EBIT margin of 17.2%, consistent with recent quarters. The service recovery plan is ongoing — Henrik has already covered this — and some time will pass before the benefits show up in the financials. Turning to cash flow, starting with net working capital. Net working capital came down in Q2 thanks to a rise in customer down and milestone payments, partly offset by larger inventories as we gear up for more activity during the rest of the year. Versus Q2 of last year, net working capital has improved considerably. Improving it remains a focus for us. Our cash flow statement, comparing Q2 2024 with Q2 2025, showed positive operating cash flow of $120 million for the quarter — a decline versus last year.
The year-over-year decline came mainly from a favorable net working capital development in Q2 2024, partially offset by improved profitability this year. Adjusted free cash flow for the quarter was -EUR 220 million, lower than Q2 last year, once again because of the reasons just mentioned. To close the quarter, we had a net debt position of EUR 7 million, after both paying dividend and repurchasing shares. Our investments are on track with our plans and consistent with prior months. Total investments came to EUR 288 million in Q2. These investments mostly concern tangible assets like transport equipment and tools tied to our offshore ramp-up. The recent rise in LPF stems from a handful of sites, among them the offshore sites referenced earlier that have been undergoing repair. Excluding those sites, the underlying LPF, or lost production factor, keeps trending downward. Warranty costs were EUR 115 million in the quarter, equal to 3.1% of revenue, an improvement from 4.3% in Q2 last year. Warranty provisions consumed totaled EUR 188 million. This quarter's higher consumption level relates to the repairs mentioned above. For me, finishing on the capital structure slide, as shown previously, we have zero net debt.
On a rolling 12-month basis, our earnings per share rose to EUR 0.8, supported by stronger profitability. And lastly, as Henrik said at the start, return on capital employed climbed to 11.5% as earnings keep recovering. As you pointed out, Henrik, this marks the first occasion since 2020 that we have come in above 10%. With that, I'll hand the mic to Henrik.
Thank you, Jakob. And thanks to everyone, first of all. Doing your first presentation is always exciting—not least when you're sort of wrapping up on the first couple of months. I think at this point, since we're talking about Q2, I'll also take the chance to give a somewhat special thank you to Rasmus, because he has, of course, been holding things together very much alongside the rest of the organization. So for many of you, you'll also see both Rasmus and Jakob sort of forming a bit of a pairing here across this quarter. You get a proper chance to say cheerio to Rasmus. Rasmus stays on as our CFO for the global service business, which we're hugely excited about. We look forward to that. With that, I'll move to the outlook for the year. As we said, it remains the same. Revenue EUR 18 billion-EUR 20 billion. The EBIT margin before special items 4%-7%. Services are expected to generate EBIT before special items of around EUR 700 million. When we look at total investments of approximately EUR 1.2 billion. This outlook is also based on the current foreign exchange rate. As you'll clearly have both noticed and appreciated, it is putting some pressure on a couple of the absolute numbers that are in here because, of course, with the dollar declining towards the euro, we see that effect from the U.S.
Plus a handful of our markets where local currencies track the dollar. So with that, we truly appreciate your time in joining us. Having said that, I'll open it up to questions and hand things back to the operator.
We're moving into the Q&A portion now. If you'd like to pose a question, you can do so by pressing star and one on your phone. A tone will sound to let you know you've joined the queue. Should you want to drop out of the question queue, press star and two. Those calling in are asked to turn off loudspeaker mode when posing a question. To keep things moving, please stick to two questions. At this point, anyone with a question can press star and one. Our first question is from Sean McLoughlin of HSBC. Go ahead, please.
Morning, and thanks so much for taking my questions. First, on the U.S. and the situation there: clearly, customers aren't waiting for final clarity on how to qualify for construction-ready status. Maybe you could give a bit more clarity on how significant the near-term order rally could be in the U.S., and whether you see this, let's say, as a short-lived rally, or whether we could be looking at a one to two-year period of very robust onshore U.S. demand. That's the first question. The second question, I wanted to touch on the change of CTO. I think it's quite significant. I guess under the six years of Anders Nielsen, you've pushed for more standardization in onshore. You've developed a 15 MW offshore turbine. Given the incoming CTO's background at ZF, it looks like maybe a deepening of the focus on the gearbox. Can you talk about the incoming CTO's priorities? Thank you.
Thanks, Sean. I’d say the U.S. comes first. On the demand side there, it’s obvious, and I believe we addressed that too—nobody wants to place orders in any market worldwide absent policy clearance. You could argue that if a project is already well permitted, has an offtake, and also has clearance on the other parts, then waiting for what may arrive in IRS guidance under the Safe Harbor ruling later isn’t necessary. We’ll have to wait until next week for that. That also now positions us. Looking back at the wording, I think it’s fair to say it was vulnerable and perhaps somewhat volatile wording during May and June. Where we landed at the start of July was, I have to say, pleasing to see, because that creates a structured program that also permits build-out of U.S. energy assets when it comes to wind. It won’t surprise you, unlike a few others, that I’m a strong believer in wind and I see wind’s positives. So, looking at this, significant activity will be coming toward that.
You can also observe that when people have a chance to do things, they won't necessarily hold off for the IRS to update its guidance. Let me say here that work is underway. People are generally pretty happy with it. For a number of customers, they've also locked in some of the Safe Harbor, likely already before the 4th of July. In the U.S., I don't view this as a couple of years. I view it as heading toward the end of this decade. So there will be substantial activity. We know that from speaking with the U.S. customers. I know how rarely I've succeeded in predicting some of this. I'll try again, Claus Almer, you'll be listening in. I'll go to the U.S. and I'll go to Australia. We'd better see what happens in the next year then. When it comes to the CTO chain, anyone can see when you end a press release with that probably Anders expected to retire from operating executive jobs six years ago. When I was out with him and Felix last night, it's fair to say he thinks he's had six years, maybe the best of his working life, lots of challenges, but also a fantastic footprint to leave behind.
He's going to remain here so that Felix gets properly integrated. We have several tasks to complete in the autumn, particularly as we approach year-end. Felix begins today — so that's his first day on the job. There's no gap, no running around hunting for a reason to halt or depart. With Felix joining, he's an industry veteran. He's also a veteran who likely knows Vestas in both its good and bad aspects, naturally on the gearbox side. For us, it's not as if we're saying, oh, now it's gearbox time, because gearbox and drive train have been among the areas where Felix was assisting us. That isn't tied to any individual. It's actually tied to the ZF partnership, which is where Felix comes from. Felix hasn't reached 50 yet. He still has mileage left. It's also a genuine pleasure for me to see that we can draw global leadership executives into this leadership team. I'm just looking here. At least on my birthday I can see that I have 10 years on Felix. It's good to have some of these people in. If you look at Jakob, it's similar. It's a normal, good succession.
I'm hoping that the majority of those who know Anders will join in giving him a proper send-off, since he's earned it. It's business as usual, with no pause whatsoever. We'll carry on just as we have been doing during Anders's time leading us. Thank you.
Our following question is from John Kim at Deutsche Bank. John, you have the floor.
Morning, thanks for having me. I want to zero in on what we ought to expect for order intake through the remainder of the year. Someone could make the case that 2025 represents a peak market in Germany. What I'm curious about is this: across the broader European scope, which other places should we be watching for orders this year and next on the onshore side? And I'd ask the same thing regarding offshore, please.
Sure, John — it's really tough to sit here in August and give you all of this, but I'll say the building blocks aren't a surprise. Look at Europe today: a lot of onshore interest is flowing into Germany. What did Germany do to reach the position it's in now? Germany keeps going. We're among those working closely with partners in Germany to build it up. Very short lead time, very short permitting time, very short auction time. Listen, many of the EU 27 are now looking directly at what can be learned from Germany. It wouldn't shock me to see European policymakers converging around similar rules for the EU. So people are taking the positive lessons from it. One of the real fundamentals anyone can grasp is that if you go from six, seven years of permitting down to 12 months of permitting, you get access to the newest technology on any project. That alone is a huge upside. We're seeing repowering in Europe. I'm fairly certain it will have more legs. Europe, yes. U.K. — you'll see the U.K. as well.
Part of this is about how we get permitting completed in the U.K. under the new framework. There are concrete levers aligned with what the government is seeking in the U.K., and not least at Miliband. Credit for that. In the U.S., yes, it's a wait-and-see situation. I mean, that's the best way I can put it. Naturally, if there are adjustments to the Safe Harbor in terms of %, we could approach a point where certain Safe Harbor orders essentially turn into small orders in that sense, should the % required to clear rise. Beyond that, in Asia Pacific, you'll see 76 megawatts in Q2. That quarter wasn't the busiest they've had. It's a solid signal that they've been working on plenty of items that didn't land in Q2, which brings me back to my point: please don't separate quarters or pair them with four, because that won't work. As of this date, we're already well beyond Q2 order intake. We still have considerable time remaining in Q3. No concerns there.
Alright, that's quite useful. Anything you can share on offshore?
No. I’ll simply state that offshore remains the key area. As you’re also aware, much of offshore has a different rhythm when it comes to order intake, since you begin with the PSA and afterward move to order intake. I can’t really claim that, because in a few offshore areas here, a great deal depends on the outcome. Take AR7, for instance. Could some of that occur this year or next year? So offshore is generally—and we don’t, I know this week everyone is trying to locate and stick a finger into some gap in offshore, and that’s not right. If something is project specific, you have to get used to that. Across offshore, it is in fact working. So just follow that. When we get a chance to convert some offshore PSAs because the customer and the partner are ready, we will do so.
Alright, thank you so much.
Our next question comes from Colin Moody at RBC Capital, on the line. Go right ahead.
Hello. Thank you for allowing me to ask my questions as well. Perhaps first, on capital allocation. This is a topic that has come up for the first time in a little while. Clearly, you've seen solid cash flow progress, and net debt stands where it does at present. How do you view the possible future utilization of cash, particularly regarding potential buybacks down the road, additional CapEx, or investments? Is there anything available to acquire? Also, just a quick accounting question. It appears that your incremental D&A rose by roughly $33 million this quarter. In Q1, it was up incrementally by about $30 million. As I remember, I believe the full-year guidance called for a step up of approximately EUR 200 million year over year. I wanted to confirm whether expectations have shifted regarding that EUR 200 million, or is it the case that D&A will be somewhat more weighted toward the backend? Thank you.
And Colin, I’ll address your capital allocation question first. To begin with, we’ve covered that fairly thoroughly in the quarterly report as well. The first thing we do is put money into the business. After that, we consider dividends. We were quite pleased to be able to distribute a dividend this spring. You’ll also have noticed that we carried out some share buybacks there. It’s our intention to keep doing that as free cash flow is generated. We’re reaffirming what we’ve stated before. That’s visible in the documents too. On depreciations and amortizations, we previously provided guidance of up to EUR 200 million. We are seeing the increase. As you correctly point out, it may be lower than what you’d have expected at this stage. There were a few small delays. Broadly speaking, we’re on track. The figure we guided to earlier is the one you should use in your model.
Thanks so much.
Dan Togo Jensen of DNB Carnegie is next in the question queue. Go right ahead.
Thank you. I'd like to ask about the onshore business. Where does it stand now, relatively speaking, compared with its historical position, just so we can grasp what remains to be done for onshore to raise it toward the 10% EBIT margin? Is it purely a question of operational leverage? Are there still some ramp-up problems in the U.S., and so on? Then maybe on offshore, the loss that clearly hits you here in Q2 — how should we think about that in absolute terms over the coming quarters? Will it grow? Just reflecting on your comment, Henrik, that the peak, or the ramp-up, is peaking here in Q2 — will offshore losses grow further in the coming quarters as you deliver more at a bigger loss, so to speak? How should we think about the absolute level of offshore losses over the coming quarters? Thanks.
Thanks, Dan. I believe where onshore is concerned, you're completely correct. Take onshore in the U.S., which has, naturally, still caused us a few headaches. You'll notice that deliveries are rising in Q2 as well. As Jakob said, I think an additional 500 MW left the door in the U.S. during the second quarter, compared with—no, we are making headway on onshore. If I may give credit to the five regions that are carrying out the onshore work, there isn't much I would change in onshore this quarter when I consider both profitability and execution. You know, we determine how we set the price. We also know how we assess when a project gets delivered, and what the post-calculation was too. We're genuinely pleased with that. That probably gives you just one signal that it also shows quite a lot about how much of that positive we're currently putting into the offshore ramp. As I mentioned, I know you'd love a date or a quarter when this either peaks or ramps. I can't state that as such. What it certainly is, is that the ramp-up cost gets diluted by two factors.
To begin with, once we begin producing a volume of assets from a facility such as the one in Stettin, Poland, that helps, because at that stage you have assets rather than simply over 500 colleagues running around. That drives costs out of the picture. So, if we look toward the close of this year, we ought to have moved beyond the offshore peak in ramp-up costs. That also means that at that moment, we are watching one another quite closely internally regarding how that is then coming down. The ultimate ramp-up cost should approach zero. I simply cannot yet say on a quarterly basis when that will occur. There were plenty of high fives around the onshore business this quarter and considerable focus on how the ramp-up costs are not only being spent but also adding to the success of offshore. Let's keep in mind, we now have a fair number of turbines standing offshore at sea. We are genuinely pleased about that.
Got it, thank you.
Max Yates from Morgan Stanley has the next question. You can go ahead.
Hello, and thanks. Good morning. I'd like to revisit the offshore business once more. This was a rather small-profit quarter, so I suppose it's genuinely difficult to grasp. Did the offshore losses and the build-out of that business come in roughly as you expected, or did they turn out somewhat worse? Perhaps, just in qualitative terms, you could walk us through the ramp-up—what's working well? Which particular pieces of it might be going less well? Where do the problems sit, and where are the wins? Just qualitatively, in terms of how that is actually progressing, where are the challenges, so we can better understand, in a mechanical sense, what is actually happening there. Thank you.
Thanks, Max. On the offshore side, I'd say the ramp-up plan — or the ramp-up itself — is on plan, so to speak, because when we looked at it, could it be that we're one week behind the plan at a factory in Stettin, Poland? Probably. When I look at Stettin, Poland, and walk around to the employees there and see how we're now exchanging between Lindø and Stettin on the nacelle, that feels really, really good, because first of all it gives us flexibility in production and manufacturing going forward. It also gives us a bit of a backup in reality — what happens if something occurs in Lindø or in Stettin? We have at least two sites where we're well underway with the nacelles. When we look at the two projects, we knew anyone who was ramping up in offshore, and let's not forget, we've done that before. It's more than 10 years ago, but we've done that before. So it is costly, because you have two projects. The two projects as such aren't here to cover what we're spending to get the technology and the factories up and running.
You witnessed a bit of that as well when we were also in a near-idle situation in the U.S. The inflection point arrives once we reach 2026 and 2027, primarily because there's additional volume and a greater number of projects to deliver. Secondly, naturally, certain of those ramp-up expenses won't persist. What exactly am I referring to? You added a substantial number of extra personnel in there to make it happen. Part of it also relates to the moment you move a technology from prototype into serial production — you encounter a certain count of nonconformities that you run through a finish line. That finish line is a hectic spot when new technology is in operation. I cannot commend the team enough for carrying it out. Naturally, I'd prefer that no finishing were required at all, since that would signal we had zero nonconformities. That isn't how things work in the industry we're in, no matter where on the globe you operate. So, perform the diligent finishing. It matters enormously to the partners, who are able to observe that when walking around our factories too. Close collaboration with the partners is genuinely valued. As I mentioned, the finishing ought to begin declining during the second half of this year.
That alone will begin bringing down the ramp-up expense we're carrying. As you can pretty much hear in the voice here, this represents a significant drag on EBIT within Power Solutions for the quarter. So with that, I won't put a percentage on it, since that isn't the point in a small quarter.
All right, so turning to the second question, which is about those lower warranty costs — that's a pretty meaningful year-over-year gain, after all. I realize you've mentioned this sort of gradual improvement as time goes on. Does it seem like this is the new baseline we can hold onto? Or was there something in particular that was somewhat one-off, which could mean we see that go back up again in the second half?
That isn't what we'd anticipate. As you're well aware, Max, we follow a process. Sometimes we handle cases within that quarterly figure. What 3.1% shows here, I think, is how we're operating and what we're observing in the business. There was nothing out of the ordinary, which you can likely also tell from the breakdown of what we provided versus what we used. We used a bit more than we provided for, and that's partly the instruction too — get it done and get it fixed — regarding the lost production factor. No major new cases have come up. So 3.1% is a solid current run rate for where we stand and how we see things going. It ought to keep heading that way from the 4.3 we saw for the full year of 2024.
Understood, that's very clear. Thanks a lot.
Our next question comes from Casper Blom at Danske Bank. Your line is open.
Thank you. To start, I have a question about the U.S. onshore business. Clearly, it looks like you're facing a busy remainder of 2025 as well as 2026, I think, as things stand right now. I saw that TPI filed for Chapter 11 earlier this week. Can you offer any indications on whether you perceive any risk to blade deliveries from that side? Perhaps also discuss, if for whatever reason you can't obtain blades from that side, what the backup plan would be. Second, Henrik, you mentioned that overall you expect the offshore industry to keep going. Those kinds of hiccups are perhaps somewhat more project specific. It's quite obvious, of course, being in Denmark, that some hiccups have occurred this week. Could you provide any kind of comments regarding pricing discipline from an OEM standpoint in that sector? Are you able to maintain pricing on offshore while some developers are struggling? Do you need to sort of assist them in getting back on their feet? Thank you.
Thanks, Casper. There are really two big questions there, in a sense. When we look at U.S. onshore and the outlook, I see the world almost splitting into two sets of beliefs right now. I'm probably trying to see whether we can arrive at a merged understanding of it. If you dig into it, this policy sets a clear path, at least toward the end of the decade. To put it as briefly as possible, I can hint that this might be guided a little by the personal interest of either Vestas or the industry's share position or undervaluation, whereas I think it leans very much toward what is fundamentally happening in the U.S. Energy prices are trending upward, whatever is being said, factually. Electricity demand is higher than it has been before. Electricity coming especially from the tech sector is going up, not down. So some of the fastest and some of the cheapest things to get access to right now, and therefore the most value for any investor's money on the offtake side, are actually renewables. So wind is a priority. That's what you've seen in just a few weeks here starting in Q3.
Nobody can forecast, and I won't forecast, where order intake lands this year, since it's just too lumpy. You can see as well that a number of these orders—this isn't Europe, Germany, where it goes unannounced—run above 200, 300, 400 MW and higher. So there's more ahead. All I can say here is: fantastic, we have such a commercial team, and we have such an experienced leadership team in the U.S., both on public affairs and on the commercial side. On TPI, I'm fairly certain they didn't enter chapter 11 in order to go out of business, because in that case there'd have been no reason to enter chapter 11. Now it's for TPI to work out what they wish to do with their prime customers around the world. Naturally, we are among them. Let's see when they come. I think it's fair to say here that it's 48 hours, and I assume that 48 hours in, plenty of other things are happening within that debate. Speaking personally, I feel for the leadership team at TPI—these are difficult conditions. I also know that if you're able to bring it out, TPI has been a good partner to us for a long time.
I'm fairly confident there's every reason to think operations will carry on, and that the solid partnership will keep going somewhere within this. We'll see how things play out in the chapter if they emerge from a Chapter 11 as a single unit, a single partner, and a single TPI, or whether they come out with a different set of assets. We'll be watching that. Should they require assistance, they're aware they can reach out to us at any time. On the offshore side, seriously, nobody can price a project and make up for needing additional capital on the order of EUR 8 billion. So that isn't a pricing matter, Casper, if I may be somewhat blunt and direct about it. It's something different. It's likely project financing rather than pricing. I believe our segment of the industry endured a rather tough period, and part of that caused auctions to be withdrawn. I still saw some countries globally continuing to struggle in finding the offtake price at which they still feel or believe offshore will be cheaper than any other energy assets out there, and that simply isn't true. I think what I saw most recently with the AR7, which we've observed, we collaborate closely with the U.K.
Government. They have gone through their own ordeals, including unsuccessful ARs auctions. AR7 is likely among the more current examples, and here's the thing: consultation with industry involving both developers and OEMs and others. At that point you'll have what amounts to a preset of who will enter here and how value gets created. Once again, a bit of a flag up and a positive for Ed Miliband. He is pursuing a sound approach, and we can see part of it is in fact compared and shared into the EU setting too. Offshore isn't a matter of pricing in the case you were discussing this week. As a broad point, don't take it as more than a project problem and a financing issue.
Thanks, Henrik. I appreciate you giving such thorough responses.
Our next question comes from Claus Almer at Nordea. Go right ahead.
Thank you, and first off, a warm welcome to you, Jakob. There are two questions I have. This time I won’t bring up Australia; instead I’ll focus more on offshore and the ramp-up. Perhaps you could shed some light on what was actually baked into the 2025 guidance back in February—not the absolute number, obviously, but how does that stack up against what has actually taken place during the first half of this year? That would be the first one.
Thank you, Claus. I do appreciate that you personally held back from asking about Australia. I'm grateful for that. I'm certain we'll discuss it further later this week. I think if we look at the guidance we set out at the start of the year, I'd say that within that range, there are always certain items that perform a little better. Looking at it right now, I'd say the onshore execution year-to-date and what we're seeing for the second half of the year appears likely to add positively to that guidance range. As for the offshore ramp, I think we're spending a bit more than we had at the beginning of the year. In some ways, that's a precaution so we don't close out the year saying we could have done better or we could have done something else in the ramp-up. There's no room for mistakes here. Everyone internally understands that spending money in ramp-up isn't a freebie. So spend it wisely, investing in it. Those are the two areas. I'd say that since February, if we just look at some of the external markets, some of the external developments that have occurred, whether that's been in, as I mentioned here, some of the nominal items on FX, but you've also seen tariffs.
Finding a stable reference point has been difficult in any of the weeks we've been in. With certain tariffs, we're performing quite well on two fronts: holding our ground and observing the tariff, and also locating mitigations. Simultaneously, throughout all of this, price levels globally are going to be elevated, since tariffs will reach the end customer, no matter which value chain you're part of.
Okay, that's fair. On the second question, which concerns the commercial reset in the Service division: how far along is that effort when it comes to ending or repricing the contracts that aren't profitable? And did that repricing or termination affect Q2? That's my second question.
Okay, I follow what you're asking. There are a couple of moving pieces here. You've got two buckets in play. Naturally, you're working through your entire set of contracts there, which is completely expected. You have an inherent stream of renewables coming in, so you handle both of those the same way. That said, it's obvious that from a contractual standpoint, renewables are considerably simpler to reach, since with those you'll find some that are simply there naturally. Is it an extension or isn't it? Like I mentioned before, we probably would have anticipated a somewhat more negative impact on gigawatts in the service area. That hasn't materialized, and that's likely a solid example of nobody being broadly confused about our internal costing at all. So when you observe that, it also indicates customers have real visibility into the way we price and the way we cost this, and that has resulted in us renewing at probably a greater percentage than we initiate for the service business, for the service leadership team. I certainly would say that two quarters back. On the further resetting of certain parts, I'd frame that more as a partnership portfolio conversation that we hold, but one we hold around the globe.
A portion of that produces certain adjustments already baked into the runway. We’re not looking to open a Pandora’s box here, where you begin permitting one-offs and other items in service, because at that point things get a bit out of hand — then you’re dealing with one-off termination costs and other stuff. It’s inside the runway. It’s inside the operations. That is exactly how the instruction goes out to the global service team around the world.
Alright, thank you for that response. Putting that into an Excel spreadsheet won't be easy, but I suppose that's just the way it is.
You can certainly pick up from what I'm saying that this exercise offers no positive upside where runway is concerned. That much you're able to know. What you simply have to determine is which negative number you'd like to attach to it.
Appreciate it, Henrik.
Tore Fangmann from Bank of America has the next question. Go ahead, please.
Good morning, and thanks for taking my two questions. First, during Q2, one of the European operators talked about price pressure coming from Chinese competitors in the European countries. What are you seeing in the region? How would you describe how protective governments in the European countries are when it comes to Chinese competition in wind? I'll take the second one after that. Thank you.
I believe the situation looks quite different now compared with 24 months or 48 months back. People tend, on the whole, to approach these matters with somewhat greater maturity. Looking at today's geopolitical picture, everyone is entirely supportive of what relates to cybersecurity as well as protective steps for critical infrastructure. We take a substantial part in that. What I would say is that numerous other considerations exist at present beyond merely haggling over price. So if the conversation turns into pressure on pricing, my sense is you are likely facing a different issue where the actual solution hasn't been properly discussed. Should someone take that bait, I'd say that's the mistaken angle. The EU, in my view, is reasonably mature. Also, if I speak for Wind Europe, Wind Europe is advancing quite well in sharing which items and which components we are able to collaborate on closely, and which components — and likely electronics — warrant real caution. That fits within the usual three categories we mention and that we also hold to. Namely, it is affordable, it is independent and secure, and it is sustainable.
That's the solution we've got. I see plenty more out there. There will always be opportunists attempting to find something. If it isn't hooked up to the grid, or if it's a build-and-sell situation, then it may not hold up later on.
Thank you. For my second question, I'd like to follow up on the service contract renegotiations. Could you perhaps talk about how receptive your customers and partners are to these renegotiations? If I understood you correctly, during previous quarters you mentioned that you will try to renegotiate all the contracts by the end of 2026 — so basically over the coming one and a half years. How easy is this to do if you want to cancel a contract? Aren't they simply legally binding? Can you just cancel out of a contract if you're not willing to agree to the new terms? Thank you.
No, I think there are several questions bundled into that one. I don’t believe a commercial reset can be completed by a set date. I also think it’s a way of operating when you examine it and as we look ahead. Since contract duration averages 11 years, roughly a bit under 10% of your contract portfolio will come up for renewal, with the typical construction-related increases that are formally tied to the service agreement. So you view this as something ongoing. On your question, more specifically about how easy it is: I don’t think anyone would call it easy when someone calls and says we need to discuss something here that doesn’t work very well for us but probably works quite well for you. If that were the only topic, it might be a brief conversation. Because all of this relates to partners we’ve had for perhaps decades, we have partners where you need new orders, new capacity, different solutions, or even repowering. Some of these service contracts are now being discussed, and for the customer and for us it might be much better and smarter to repower some of those older turbine makes.
A lot of things are up. So I'm saying here, of course, we can't handle it on our own if that's kind of what you're getting at. We can't just say we'll walk away solo and cancel. We're not foolish enough to pay a cancellation LD or anything that opens that up. On the other hand, nobody wants to impose penalties on one another when a good partnership and a solid commercial settlement can be found.
All right, thanks.
Our next question comes from Kristian Tornøe at SEB. The line is yours.
Yes, thanks. I’ve got two questions too. The first one is also about the offshore ramp-up. Now that you have serial manufacturing in Poland, are all the offshore sites at serial production? And at this point, are you fully staffed in offshore?
I believe we're staffed just as we intended to be — take, for example, the Polish factory and where we stand with it at the moment. Naturally, that Polish factory also holds extra capacity, and we intend to make use of it, Christian. We won't get ahead of ourselves by adding shifts or anything of that sort until we've confirmed that we're up against that capacity constraint too. My sense is that we're at the point we want to be. Without question, if I were to walk into one of the factories today, I'd say we're making strong headway on takt time and on other items coming down in the clear manufacturing and the serial manufacturing of the standard sort. What I think still needs more work on our side is the finishing of the assets before they head off to harbor and ultimately ship out.
Got it, that’s clear. My next question is about what you said regarding the LPF. I’m just wondering: are the locations you referred to where you’re carrying out major repairs the same ones you brought up in Q1? Or have some new sites come up that need these major repairs?
The sites are the same.
Excellent. Thank you.
Our following question is from Akash Gupta with JPMorgan. You may proceed.
Yes, hello. Good morning, and thank you for taking my questions. I'll ask them one by one. My first is about the U.S. Henrik, I believe you said early on that the U.S. market is attractive, given growth in electricity demand and with data centers providing a boost. What I'd like to ask concerns how competitive wind is in the U.S. absent subsidies. Looking at some of the data that's out there, studies by third parties, we find that wind, even with no PTC, beats a new CCGT or nuclear on competitiveness. Such projects can also be built fairly quickly. Intermittency is of course the issue, and some backup generators can address that. My question is this: given what we observe on the demand side in the U.S. market, with electricity demand so high and demand for green electrons even more so, what kind of discussions are you having, not only near term but perhaps over a longer horizon, on projects where essentially customers might not care which subsidies you receive, but instead care more about when, how soon, some of these projects can be built. I want to begin with the U.S.
Thank you, Akash. No, I believe your perspective is quite accurate. Naturally, nobody would construct extra assets absent a need, nor without the offtake being required. I also believe the demand side remains largely unchanged as we look toward the close of this decade. That view is one I share. Conversely, it's also the situation where you find a known, rather well-structured incentive to add more capacity within the U.S., which, as we both are aware, has been in place since 1992. That has propelled a tremendous amount of capacity. Additionally, when capacity is ramped up, you lower the levelized cost of energy, since you possess a complete supply chain. You have construction, you have supply chain, you have harbors, you have railways, and other elements that are very much — and incidentally, we have factories in that location. That likewise means your levelized cost of energy will, by the conclusion of the PTC cycle, also demonstrate competitiveness. Naturally, it will be exposed there to competitiveness and comparison against certain other assets. You are bringing up nuclear.
We should also address just the basic realities. Nobody can get a new nuclear plant built in 36 or 48 months. As you're aware, in the U.K. we're likely looking at 15, 20 years at best. When you're talking 15, 20 years ahead, predicting the levelized cost of energy that far out is extremely, extremely hard. It's far simpler with something you know as a fact is tangible within 36 to 48 months. I believe we've got some strength here that we're certainly deploying. The positive side is that our customers, our long-standing partners, are witnessing the same thing. Naturally, they're supported in that, since these customers and partners are likewise selling power to their own customers or end users. We're seeing the same. I can't state as a fixed point what the offtake will look like or what the levelized cost of energy will be in the U.S. three or four years from now, because there are a couple of variables we've obviously had to contend with over the past couple of quarters. If tariffs are affecting some of these items, and if the industry keeps experiencing this, which appears to be more of a shorter-term stop and go again, that doesn't help.
That's the piece I spoke favorably about in the IRA. It was a 10-year horizon. At this point it looks like we've come down to what we've also coexisted with for many decades — three or four years of execution. As for how it shakes out, it's plainly a good thing that we have a sound structure and a sound approach to both the ramp-up and the ramp-down of U.S. policy as it currently stands.
Thanks. My second question concerns the guidance. You began this year with a 300 basis point wide range, which was 100 basis points wider than last year. Seven months have already passed, yet you are still reiterating guidance of 300 basis points wide, meaning there is a broad range of scenarios for the five months that remain. Could you perhaps discuss what uncertainty remains out there and what opportunities lie ahead of you? Can you say whether the midpoint of guidance is still a realistic outcome for the year? Thank you.
Like I mentioned, when guidance is in place, that entire guidance represents a possible result for the year, I suppose. I'll put it this way — it may be somewhat out of the ordinary that we maintain our 300 basis points right through this quarter too. Honestly, if we look at just the last six to eight weeks, there's still some variability relative to what we anticipate for the year, particularly since, as you can tell, the ramp-up in the U.S. is taking place right now. You still observe a pause in something, which helps, and after that something new gets brought in. At this point, we simply need to work our way through it. Now, the U.S. is certainly an extremely, extremely active market for construction during the second half of the year. Let me add — we discuss this constantly, and I believe we stated it very, very explicitly in February, and Jakob also addressed it here. The first half of the year is, well, it's below what's possible, including when measured against the second half of the year. I'd frame it this way: we did really well in onshore during the first half of the year.
Maintain that momentum, since it’s also part of what lets us keep the guidance range as it is in that sense—because that, of course, is what can move the guidance toward the upper end. If not, it’s fine to have guidance where you use the midpoint, and that’s what you work with. As I mentioned here, there are also, as you’ll appreciate, a couple of FX factors that have affected some of the nominal items in the guidance, but we haven’t changed it. That’s pulling somewhat the other way. So far, we’re very pleased with it. We are where we are, and we can see that. Of course, if we reach that point, anyone can see it will be a strong EBIT half year—the second half of the year—and it will be a strong cash second half of the year, which is a good sign for when we get to the November release of Q3. Probably in November Q3—not hinting at anything—but we should be able to perhaps narrow it somewhat from the 300 basis points when we speak again in November.
Our next question comes from Ajay Patel at Goldman Sachs. Your line is open.
Morning, and thanks for the presentation — welcome, Jakob. I'd like to begin with Service, if I may. You laid out this plan and all the initiatives you're pursuing, and you stressed that it's a strategic priority for 2025 and 2026. When I look at consensus, I think it's roughly 17%-19% EBIT margins across the coming three years, out through 2027 as well. So I was wondering: when you say these benefits will take time to materialize, do you mean that eventually, as we reach the back end of 2026, we ought to begin seeing some financial improvements? Perhaps not all the way to 25%, but movement versus that 18%-19% range. I'd just like a bit more granularity on what those statements of yours mean. My second question is on U.S. tariffs. Is there any indication of the size? Obviously, when you set guidance back in February, tariffs weren't there, and now we have them as an additional cost. Clearly, the offshore ramp-up will vary quite widely depending on where you land on that consensus, but that number would be helpful even if it's a fairly broad order of magnitude.
Okay, so I think first, if I go in reverse order this time — on the U.S. tariff, I'd love to tell you I had a fixed point, but I don't. The reason is that U.S. tariffs have just been something of a moving target across this half year. What I'd rather say is that we do everything we can, together with customers, to mitigate it. When we find ways of doing it, we lock it down and then we take it. As you'll appreciate, we have, in this case, most of those tariff impacts for 2025 covered in and around with the customers. That we are working through in that sense. There are also — with that, when you have special components or special countries taken with us where we have the factories, but we still have things that come into the factories that will be influenced by it. I think it's manageable. Maybe it gets a bit tense, but that's always the case, because if you open the television, there is tariff is a good thing, but I can't find any good consequences of tariffs generally, even though somebody else is saying it. It will go negatively for trade and it will go negatively for the end consumer, period.
On the service recovery plan, I think Jakob is making a fair point here — we were already being asked earlier this quarter whether the next quarter would be the one that improves. What we're saying right now is that we have a plan running through the end of 2026, and the services team is working hard through it. This quarter came in under 17.2%. That reflects quite a few net movements from individual contracts and other items, but the final figure was 17.2%. You can be sure that as soon as we see momentum, we won't hold back on our side when it comes to pushing this above 20% and getting back to starting with a 2. We simply can't — and we don't have visibility on when it would be right to tell you that, Ajay. Beyond that.
That's not where it's coming from. Right.
Alright.
Yeah, that's fine. Just on the tariff question, would it be alright if I go over something again? Offshore, correct? It comes down to a mix of ramp-up costs we have to get our heads around, absorption of fixed costs, partly driven by volume, I suppose, that's the issue, and then perhaps the margins on those contracts. You've got a fairly sizable backlog in offshore at this point. You're indicating that offshore ramp-up costs might peak near the end of the year. Does that kind of suggest a fairly material rise in profitability, or considerably lower losses as we head into 2026?
I'd rather not say anything about '26 while we're still in '25. My thinking is that you don't have to carry those ramp-up costs if they aren't needed, correct? So, when we look at it that way, some ramp-up costs will be there, and we'll still have some finishing line in '26, but it will be a lot lower.
Thanks.
Deepa Venkateswaran from Bernstein has our next question. The line is yours.
Thank you. I’ve got two questions. First, on the U.S.: as you said, next week Treasury is expected to issue guidance about what counts as the start of construction. I’d just like to know how much uncertainty that creates for your customers when they place orders, or whether there are already enough projects with safe-harbor protection. When you said you expect orders to continue not only for the next two years but through the end of the decade, I’m assuming you meant deliveries through the end of the decade—could you clarify that? Second, on offshore, obviously this is taking time. Can you give us any sense of whether there are delays for the wind farms, or whether there are any financial consequences tied to those delays? Are you six months behind schedule, or just any indication of whether there’s any consequence of this for you?
Thank you, Deepa. Regarding the U.S. IRS guidance, I suppose what I took away here is that it's wiser to hold off until the 18th of August, or whichever date near that it actually lands. I'm fairly confident they're doing their thorough work on it. We understand what the current rules are. Typically, across many decades under ordinary administrations, we've observed that when guidance changes, it applies from that date forward. So we've also witnessed some of that where orders are already allowed, already taken off, already have grids completed. That's why you see those orders not waiting on IRS guidance on this point specifically in construction. Naturally, you'd understand that if you wish to qualify in construction beyond a certain date, I'm quite sure that's where the IRS guidance will arrive. My guess might be that with the new IRS guidance, there could be a somewhat narrower window to build out before being in service, or perhaps the customary rule of thumb of a certain %, a smaller % of safe harbor, that % could rise, which was my hint in saying it may be that some safe harbor orders begin to look like small normal orders in the sense once we reach the back end of 18th of August.
Naturally, if you're already out there and have completed that, you're likely still under the old rules. Once whatever date arrives here in August, you'll be operating under the new rules. That's roughly how I'd interpret where things stand. In a week, we'll find out whether that was a decent directional answer. Regarding offshore, I believe delays will always be a talking point, since they affect the entire project. They also affect access, and they affect grids. They affect all of these things. Broadly, what we observe offshore is that it isn't as mature. I think that applies to all of us doing it. So there's also just a simple fact that sometimes the weather means you can't do what you normally would. As a result, there will be financial consequences if we are the cause of a delay. On the other hand, at present, we are working diligently through it with respect to the two projects we are working with. So for us, we have two eyes on the two projects, and we give them absolutely and full attention.
We also have really strong attention, and also how we have the capacity available for the further ramp-up of capacity that happens from 2026 and onwards. For us, this is the important thing. Getting the two projects right is important. It is probably important from a Vestas point of view and also from an industry point of view and partners' point of view that we get the right capacity mustered from when we look in 2026 and beyond.
All right, thanks.
If I could just take the final question for this round, since we're now at quarter past 11.
Our final question comes from Martin Wilkie at Citi. The line is yours.
Good morning. This is Martin from Citi. I appreciate you fitting me in. I have just one last question. It relates to tariffs and how that ties into the service business. A competitor of yours did record an adjustment to its long-term service margin expectations in the U.S. as a result of higher tariff costs. Clearly, looking at your U.S. business, there is a sizable service backlog. That doesn't appear to have hurt your profitability, or perhaps it was offset somewhere else. Have U.S. tariffs had an impact on gross margins in the service backlog, or have they been offset? How should we think about any risk or anything along those lines within service profitability as a result of tariffs? Thank you.
To start, as usual, please respond to rivals' remarks about certain of these matters by explaining what they themselves are observing. In the U.S., we have quite a lot established in wind. Within the wind sector there, we also have a supply chain that is heavily localized. So we aren't seeing the same principles that someone else brought up. I'd leave it to them, more or less, to debate that point. On our side, it comes down to a mix of the backlog portfolio and the localized supply chain we maintain in the U.S. Apart from that, I would simply describe the U.S. business as a great business, with long contracts, and a good business. I don't foresee any imminent pressure from certain of the tariffs spreading into that portion of the U.S. business.
Good. That's great to hear. If I could just clarify one other question as well. Obviously, the ASP this quarter at 111, that's a pure onshore number. You mentioned in your opening remarks both the word stable and positive. Just to understand, if we do sort of normalize for a mix between EPC and all the rest of it, is pricing still effectively flat, or is there still some slight positivity in because of some lingering effects of raw materials, labor, and these kinds of things?
I think it's reasonable to say at this point that, since we operate in some markets where our mix differs, we actually had no U.S. orders in Q2. So what we've observed here is a solid market, mainly across EMEA, where there's a healthy blend of that margin. I think at this point we'd simply say we're genuinely pleased with it. You're right to point out that this is one of those quarters where the ASP is purely onshore and comparable with other quarters. Now that we have the U.S. up and running, and we also have some of the other markets, for example in Asia-Pacific, pricing will be different. We're very pleased with this. The discipline that goes into the commercial setting and pricing here remains more than intact. We're genuinely pleased and positive about that.
Excellent. That's nice to know. Thanks so much.
That's fine with us. Our reader simply wants to wrap up and express thanks to everyone for their interest, and to many of them as well. To those who weren't able to get in here on the Q&A, we hope to see you over the next few days, when you'll also have far more time one-on-one or in the groups with Jakob and Rasmus. From the entire Vestas team, we look forward to spending more time together in the days ahead. Many thanks, and stay well.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Vestas Wind Systems A/S transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Vestas Wind Systems A/S earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.