Vestas Wind Systems A/S (VWS) Earnings Call Transcript
November 5, 2025
Earnings Call Speaker Segments
Good morning, everyone, and welcome to Vestas' Q3 report, where we're also closing out and looking ahead to wrapping up a very solid 2025. I'd like to take this chance as well to say a big thank you to our customers, our colleagues, and not least our external stakeholders for the great support and commitment shown through the current environment—through the first 9 months of this year—to the execution we're discussing and will discuss a lot more today. So with that, let me go to the key highlights. Key highlights: revenue of EUR 5.3 billion. That's a 3% increase year-on-year, driven by higher deliveries, despite negative foreign exchange development. Looking at the EBIT margin of 7.8%, earnings were achieved through improved Onshore project execution and lower warranty costs, partly offset by our manufacturing ramp-up, which continues and is also progressing well. Looking at order intake of 4.6 gigawatts, up 4% year-on-year, driven by the U.S. and Germany, and Onshore is up more than 60% quarter-on-quarter versus last year. On the manufacturing ramp-up, the driver cost and also the investments, the Onshore and Offshore ramp-up is progressing as we focus on delivering a very busy fourth quarter but also, just as importantly, getting a strong start to 2026.
So with that, we also chose to give value back to shareholders — I think most importantly, consistent with our capital structure strategy and our solid liquidity position — a share buyback of EUR 150 million will be initiated, starting tomorrow morning. Then on the outlook: we narrowed it for turnover EBIT, reflecting the lower Service EBIT as well as the stronger Onshore execution. With that, I'll discuss the market environment we're in. And again, here, wind energy is key to affordability, security and sustainability. That is our narrative, and we can see it actually working across many of our markets, as you've also seen in our order intake and not least in our delivery table. When we look at our global environment, no doubt, inflation, raw materials and transport costs are stable, but tariffs will increase cost over time for the end user. When we look at the ongoing geopolitical and trade volatility leading to a regularization — we've spoken about that now in many of the previous quarters, and I'll almost say the previous years — and we are seeing it's continuing, and we are dealing and planning and executing well in it.
Looking at the market environment, there's growing emphasis on energy security and affordability in a lot of our main markets. Grid investment is being prioritized in our key markets, and we can see it moving forward in a number of markets, though in others the numbers are probably holding at status quo. On the permitting side, some markets are improving, but overall permitting auctions and market design remain challenging. This may be the perfect spot to voice a bit of concern about Europe's ongoing introduction of rules such as CSRD, CBAM and others, while the rest of the world is chasing competitiveness. But when we look at the project level, I'd say that at Vestas we see strong project execution in the quarter and also year-to-date. From time to time we see some regional disruptions, but we're coping very well with it. And of course, that then leads to the result we're also seeing in Power Solutions today, which I'm sure Jakob will walk us through in much more detail. When we look at Power Solutions in Q3 2025, it was a strong quarter across all key markets. So, when we look at the Q3 order intake of 4.6 gigawatt, that's up 4% compared to the last year.
The rise came primarily from solid order intake in the Americas, particularly the U.S., along with ongoing positive momentum in EMEA, above all in Germany. No Offshore orders landed in Q3, which means this is a clean quarter for Onshore order intake. ASP fell to EUR 1.01 million per megawatt in Q3, versus EUR 1.11 million per megawatt in the previous quarter. That drop reflected a shift in the order mix toward a larger proportion of supply-only orders in the U.S. On the whole, we feel very good about the favorable pricing and price discipline we continue to demonstrate, as well as our customers' backing and their understanding of it. Turning to the order backlog in Power Solutions, it rose to EUR 31.6 billion. That represents an increase of EUR 3.3 billion versus 1 year earlier, since our energy solutions keep gaining good traction with customers throughout our core markets. Further details are visible in the chart on the right. That brings me to Service. The Service outlook has been revised, and the recovery plan keeps moving forward as we progress — we are now three quarters in. Service order backlog grew to EUR 36.6 billion, up from EUR 35.1 billion a year ago, even with a EUR 1.5 billion headwind from foreign exchange rate movements year-to-date.
Looking at Service, we hit 159 gigawatts under Service. That's flat versus Q2, since additions got offset by a higher level of expiries and also deselecting during the quarter as the commercial reset carries on. These are some of the consequences we've discussed in prior quarters as part of our Service turnaround. And I think we can now begin to see that some of it also shows at least in the Service under -- the gigawatt under Service as such. Turning to the Service recovery plan, which runs through the end of 2026, it's progressing, and we're seeing early signs of operational improvements and also a reduction especially in our overdue work orders and the backlog of the same. That's very healthy, and it's very positive to see. And of course, we'll keep working on that, and we look forward to talking more in detail over the coming days. However, earnings in Service are also affected by foreign exchange rate headwinds as well as some costs related to some specific Offshore sites, which has led to a revision of the 2025 outlook of Service. You'll see here to the right, the breakdown of the Service order backlog, EUR 36.6 billion overall, of which EUR 31 billion is Onshore, 159 gigawatts under active Service contracts and then an average duration of 11 years.
The regional split is shown below. And as you'd expect, in Asia Pacific, without fresh order intake, there's a ceiling on how much you can grow gigawatts under Service. With that, let me walk you through development. Development is not a big item, so I'll be quick about it. Discipline is the same. We put a lot of emphasis on sourcing projects and moving them forward. But as you can see, the current environment has a strong focus in the key markets on pushing projects ahead, and nothing much moved in Q3. So I'm quite sure that from a performance standpoint, they feel the same way about Q4. During Q3 2025, our development project pipeline held steady at roughly 27 gigawatts, with Australia, the U.S., Spain and Brazil accounting for the biggest opportunities. Our strategic focus is on maturing and expanding a quality project pipeline, along with converting mature projects into project sales and the related turbine order intake. The regional breakdown appears below. Now I'll move to sustainability. In Q3, Vestas ranks as the most sustainable energy company globally, and we maintain that emphasis together with our customers and stakeholders.
If we consider the turbines that were manufactured and shipped during the past 12 months, over their lifetime they should prevent 461 million tonnes of greenhouse gas emissions. You can see that over on the right. And naturally, since we are ramping up, we anticipate that figure will keep rising. Emissions from our own operations rose by under 1% during the last 12 months, which is in fact a very positive achievement, given that our activities are growing. So keeping Scope 1 and 2 at their present level is therefore a testament to the focus and execution of our operations across the board. It also means that when we ramp up Offshore, that is a significant shift in business mix. So there will be upward pressure on carbon emissions, because we are using and spending more time at sea, on vessels and through other transport measures. Looking at recordable injuries per million working hours, that number rose from 2.8 to 3.3 year-on-year. Safety remains a top priority for us as we work tirelessly to improve our safety performance across our value chain. I think also, from a personal point of view, I would say this is not good enough.
Looking at the year as a whole, we've had fewer serious injuries and no fatalities — that's a positive. But the higher frequencies, particularly in Northern Europe and North America, as we onboard many new colleagues, mean that when we ramp up Offshore, we're seeing some of those frequent injuries that we shouldn't be seeing. So that's why we've highlighted it. We spoke directly with our colleagues about how we keep our colleagues and their family members safe on sites in this regard. So we're taking it extremely seriously that it hasn't come down — in fact, it has gone up over the last 12 months after Q3. With that, I'll hand over to the financials. Jakob, take it away.
Thanks, Henrik. Let me walk everyone through the details. I’m just going to flip the slides here. Let’s go through the income statement details and the highest third quarter gross profit we’ve ever had. Revenue was up 3% year-on-year, driven by growth in Power Solutions, offset by slightly lower revenue in Service, mainly because of negative foreign exchange rate developments. Gross profit, which I just mentioned, rose to a record-breaking EUR 772 million in the quarter — the highest ever in a third quarter. That record came from improved profitability in Onshore and lower warranty costs, partly offset by manufacturing ramp-up costs. And the EBIT margin before special items was 7.8% in the third quarter. As I’ve said throughout the year, ’25 is a backend-loaded year. The third quarter we’re just coming out of was a strong start to a busy second half, and compared with previous years, we expect a better balance between earnings in the third and fourth quarters. Diving into the segments, starting with the strong performance in Power Solutions, as Henrik also alluded to: revenue increased by 4% year-on-year, driven by higher megawatt delivered at stable average selling prices. The EBIT margin before special items improved by 3.9 percentage points year-on-year to 8.1%.
That gain came from reduced warranty provisions, sustained solid profitability on onshore projects and, crucially, execution, partially offset by expenses tied to manufacturing ramp-up in Offshore in Europe and Onshore U.S. Turning to the Service segment. Service revenue fell 3% year-on-year on lower transactional sales versus last year, while contract revenue held steady. Revenue growth in the quarter was hit by a 3% currency headwind. Service posted EBIT of EUR 153 million, an EBIT margin of 17%. That profit level matches recent quarters, though we anticipate extra costs in Q4 linked to certain specific Offshore sites. The Service recovery plan is ongoing and time will be needed before the benefits show up in the financials. Net working capital came down in Q3, largely from an inventory reduction driven by high project deliveries during the quarter and ongoing emphasis on working capital management. Worth noting, versus Q3 last year, we have recorded a EUR 1.4 billion improvement in net working capital. That brings us to the cash flow statement, where notably, and as you have also observed, we announced a share buyback supported by strong cash flows and our net cash position.
Operating cash flow for the quarter came in at EUR 840 million, which is a big step up from last year. That gain came from stronger profitability and a favorable move in net working capital, as you just saw. Adjusted free cash flow for the quarter was EUR 508 million, another substantial improvement, and it stems from the same drivers I mentioned above. And then finally, we closed the quarter with a net cash position of EUR 0.5 billion. Total investments in quarter 3 were EUR 274 million. That spending is mainly tied to tangible investments like transport equipment and tools, plus property plans and equipment across our turbine portfolio, including the Offshore 15-megawatt EnVentus and our 4-megawatt platform in the U.S. Importantly, we are also very pleased to welcome more than 400 new Vestas colleagues at the Onshore blade factory in Poland, which we took over in September from LM Wind Power. The factory will deliver blades for our EnVentus platform and expand our industrial competitiveness in Europe. Turning to provisions and our lost production factor, we see signs of stabilization. The repairs at the sites mentioned in previous quarters are now largely completed.
Setting those sites aside, the underlying LPF has moved lower over the course of '25. In the quarter, warranty costs came in at EUR 160 million, which equals 3% of revenue — a substantial gain versus the 6% recorded in Q3 of last year. Warranty consumption for the quarter was EUR 206 million. That elevated consumption figure this quarter ties back to the repairs mentioned earlier. And last, finishing on a strong note, we can report our best EPS and RoCE in 5 years. Net debt-to-EBITDA closed the quarter at minus 0.2x, versus 0.9x twelve months earlier. We continue to hold an investment-grade rating from Moody's, with a stable outlook. Earnings per share on a 12-month rolling basis rose to EUR 0.9, helped by stronger profitability. Our return on capital employed, which crossed the 10% threshold last quarter, climbed further to 13.6% as the earnings recovery carries on. And finally, our solid financial position and better key metrics let us return cash to shareholders. So we are launching a share buyback of EUR 150 million that begins tomorrow. Now I'll hand things back to Henrik, who will walk us through the outlook.
Thank you very much. So, Jakob, thank you, and that's a really nice slide to wrap up with. And if we got a little out of sync there, I'll need to keep up with your slide changes going forward. But we'll practice that. Turning to the outlook, the outlook for the year: revenue narrowed to EUR 18.5 billion to EUR 19.5 billion, from the previous EUR 18 billion to EUR 20 billion. Of course, there's some negative foreign exchange in there that you noted. On the EBIT margin before special items, 5% to 6%, narrowed from 4% to 7%, and Service is expected to deliver EBIT before special items of around EUR 625 million. And total investments stayed stable at EUR 1.2 billion, same as in our prior outlook. With that, I'll simply say thank you for listening in. I'll hand things to the operator, and we'll move to the Q&A. Also on that slide, you'll be able to see the financial calendar for 2026. Over to you, operator.
<<operator_script>> Our initial question is from Sean McLoughlin of HSBC.
Let me turn to Offshore. The ramp appears to be moving along as planned, but the investment in the blade plant in Poland has been postponed. I'd like to get your latest thinking on this market. What risk is there that we could see an early peak in deliveries in '26 and '27, with possible underutilization after that? And in the end, what would it take, in your view, to get that blade expansion back on track?
Thank you, Sean. There's a slight risk of using an expression here and throwing a good colleague under the bus. I'll sort of say here that the blade factory that is so-called stopped in Poland was never built in Poland either. It's actually an old decision that was paused 18 months ago. It got interpreted a bit and probably got its own life, and I will use a bit also to say to everyone here on the call and others listening in: it seems like Offshore is getting an unreasonable bashing everywhere in the day-to-day press or among analysts. Yes, there have been headwinds and others. But from us, we don't see that. It is a piece of land we have. So if we, at some point in time, wanted to do a further capacity expansion, then it's an opportunity and option for us. And right now, we are working well. We are progressing well with our own capacity plant upgrade, and that we will just wait and see. This is a dependency on what happens in the backlog when we look 4 years plus ahead — that's where we will adjust capacity. Currently, we don't see any reason for raising the question or question too, if we need to adjust capacity downwards.
Absolutely, Sean. So we're increasing output. And because of that, on a call such as this one, you might expect us to begin discussing capacity in a downward direction. That isn't the case — our project backlog exceeds EUR 10 billion, and across this year, the next one, and on into '27, we'll arrive at what we'd describe as a steadier state of full capacity utilization.
And just to follow up on Offshore — when you look at the pieces, why aren't you effectively raising the midpoint of guidance after that strong Q3 surprise? I mean, does Offshore play a part in that? Or is Service really what's driving it?
As I mentioned here, looking at the midpoint, you can sort of see that with three quarters now behind us, it was hard for us to take on the Offshore ramp and the ramp-up cost in general when we were sitting at roughly EUR 2.5 billion in turnover. Today we're above EUR 5 billion. This has been a very good quarter for us. But once more, absorbing that is much easier when turnover is higher. So we're happy with where things stand; this is probably close to the peak of the ramp we're seeing in the second half of the year. That means as we move into '26, we should begin to see it ease and fade away with time. That's roughly how we think about the timing. And then, as I said, in the mid-range as well, Sean, naturally the business is still absorbing things like tariffs and other shifts occurring around the world. So we're not -- in fact we're very pleased with what's included here, and we're equally pleased with how Onshore execution is backing our ongoing investment into Offshore.
Our following question is from John Kim at Deutsche Bank.
I have two questions, if I can. Looking at the revised guidance and factoring in the Service headwinds, it seems to me that it still points to a sequential — a softer margin in Q4 for Power Solutions. Could you give us some color on that — is it more a matter of the cadence of Onshore deliveries, or possibly a larger drag in Q4 coming from Offshore? How should we think about it?
I'd say this is once more the busiest quarter, in Q4. As we head into Q4 — you'll have noticed it. We said from the start of the year that it would be back-end loaded, but it's the second half of the year. Let me put it this way, John: when you look at that, I'd far prefer to see that we've managed to even out Q3 and Q4 much better. We didn't do that last year. So relative to last year, we're heading into a Q4 that looks pretty much like an execution of Q3. And after that, there can be some variation on the theme of what sits in the backlog there. You shouldn't read anything more into that. Beyond that, it is a busy quarter. We have 56 days left, and in Q4 we'll always be exposed to the usual variables. So that — yes, we won't try to make it worse, that's for sure, in the Onshore execution, where we've had a really good run so far this year.
All right, that’s useful. And regarding the Service guidance, the updated figure is EUR 625 million. I’d note there’s an FX headwind of a bit less than EUR 20 million. As for the rest of the gap between EUR 700 million and EUR 625 million, is that attributable to the Offshore item you referred to in the commentary?
I'm not going to weigh in on the FX math you've done. My sense is it'll likely come in a touch above that, but like I said, let's leave it there. What we're really pointing to is this: if a couple of items land in a Q4 where we've committed plenty of vessels and plenty of people are involved, that will pull the number down somewhat. So picture that in a Q4 for a Service business that, just between us, may finish with turnover around EUR 1 billion — in that case it's quite easy to put EUR 20 million into some of those Offshore sites within a single quarter, and that is the reason our guidance sits at EUR 625 million.
Our following question is from Kristian Tornøe, who is with SEB.
I've got two questions. The first one concerns the production ramp-up in Offshore and Onshore too. So, you've been quite clear in saying that it has a material earnings dilution impact this year. Given the progress you've made so far, how confident are you that this will have a materially lower dilution next year?
How material are we? We had listed. We know it's an ordinary ramp. So that means the longer you get in, the better we get added, Kristian. But it's also here for both the Onshore U.S. and Offshore. We see a tendency too that we are further into the Onshore U.S. So that should definitely be disappearing over the coming 2026. And then, as I said, in the Offshore ramp, listen, we opened these nacelle factory less than 6 months ago. So therefore, we are at a maximum of both onboarding and running the education and training there. So I can't give you a date where it maxed out and then it starts coming down, but we do everything we can to actually having coming out gradually over '26. Will it be totally done in '26? I don't know, because there always be things. So that we will talk more about when we get to 2026 outlook in February. But we are comfortable with it, and that's probably the main reason here. We have more than 0.5 gigawatt I see now in the Baltic Sea and the North Sea. So we see that progressing. But of course, we are into the winter season where it's a slightly different environment to construct and install Offshore.
Got it — that's fair. My second question then concerns order intake in the APAC region, which once again came in fairly low this quarter. So do you have any commentary on the outlook, and how optimistic are you that APAC orders will actually pick up?
My only comment is that he ought to be performing better. There's an entire region across Asia Pacific, and we're urging them to deliver. In markets like the ones they operate in throughout Asia Pacific, results tend to be lumpy. They depend somewhat more on the timing of when something actually closes. I'm quite confident it's the whole region and not any wish to make us or you think they're doing well. They won't post zero in the fourth quarter, since that isn't the plan. So we'll watch where they finish on 31st of December, but the region is fully in play to build a proper FOI in the fourth quarter.
Dan Togo Jensen with DNB Carnegie has the next question.
My apologies—are you able to hear me at this point?
Correct.
All right, good. I have a few questions of my own too. On warranty provisions, they were low this quarter, but how should we think about that level both in absolute terms and, of course, relative terms as you add more on the Offshore side? Is this level sustainable, or is there a risk that we'll begin to see that ratio hold or rise? And then a question about the share buyback, the EUR 150 million. Could you elaborate a bit on the math that gets us to the EUR 150 million? I mean, cash flow -- free cash flow generation came in above EUR 0.5 billion, and you have nearly EUR 0.5 billion in cash by the end of Q3, and how should we think about it by the end of Q4? Might you again be in a position where share buybacks could carry over into the current program, be released by a new program?
Dan, Jakob here — I'll handle the opening portion, and after that Henrik will weigh in on the rest. On warranty, here's what we should keep in mind, and I'm certain these are the same figures you're reviewing. In '23, we were above 5%. In '24, that came down to 4.3%. And this year, we're sitting at roughly 3%. So that's something we take real pride in, and it results from our emphasis on quality. We're also seeing the underlying LPF come down, as we've said, apart from a few sites. And our goal is to keep moving that lower. And again, regarding next year, we'll address it following Q4, but that is definitely our ambition. We aren't content with where we stand at 3%. We believe there's more potential, and our ambitions run higher.
All right, that sounds fine. And then, what about the share buyback?
Regarding the buyback, whenever we undertake something like this, we consider it within a broader context. As Jakob noted, we've posted our highest EPS and our highest return on capital employed across 5 years. You're all quite familiar with our Chairman. For most of the 10 years, it's likely also the highest EPS. So with that in mind, we believe it's quite sensible to tell shareholders they'll receive cash back. Might we have done more? Yes. Might we have done less? Yes. But we landed on EUR 150 million, since this is also the point in the year when we can complete it before the 17th of December. After that, naturally, we'll reconvene at the start of February. And as you correctly point out, we're not interested in accumulating cash in a setting where we feel quite confident about the investments we've made and continue to make in Offshore — but that also means that if people are finding it hard to recognize value in Vestas shares, then a share buyback is the strongest way for us to say that we, at least, have faith in the Vestas share.
Our following question is from Akash Gupta at JPMorgan.
Let me start with Service. So I think if we look at your Q4 — the implied Q4 — it comes to a bit more than EUR 140 million in adjusted EBIT, which is a lower figure than we've seen since 2020. Could you perhaps tell us how much of that is structural versus how much is more like temporary items? And could you also address the growth rates for Service in Q4, considering that a year ago we saw 30% year-on-year growth in the Service top line. So that's my first one.
Thanks, Akash. Let me start with the headline figures, if I may. Looking at the Service top line, repowerings can occur — and indeed some took place last year as well. So on a quarter-over-quarter basis, there may be variations in that top line tied to special items of that kind. You'll also recognize that transactional sales form part of the picture, and those can fluctuate. We tend not to say much on that subject and would rather not say much about it. But, as we've also discussed in recent quarters since we began this Service reset, it matters to us that we also improve at stating — for this quarter, we already know what we will be doing during the quarter, particularly at some of these Offshore sites. So because of that, we need to provide a little more guidance on certain of these items. That isn't something that recurs. So when you get into next year, you should probably view the year-to-date figures and what we delivered in earlier quarters as the underlying run rate for the business. So I'm not overly nervous about that, but we need to go through it with you now that we're already a month into Q4.
That explains why we're seeing it. And like I mentioned, it has to do with something specific in Offshore that falls within the quarter and is pulling it down.
Do these offshore sites match the ones where you were addressing certain quality problems and recorded provisions, or are they separate?
They're partly—partly distinct. So because of that, none of that applies here, and the 236 doesn't apply either. So this is a case where we simply recognize that during this season, when you've got to have it, it becomes a priority for us, and it's a priority for the customers too, and very few customers are involved as well.
My second question concerns the turbines produced and shipped during the quarter. You posted slightly over 3 gigawatt, a 17% year-on-year decline, and we'd seen growth in the first half, so at this point we're flat year-to-date. What's behind that? Is it supply chain trouble, maybe magnet sourcing, or some retooling at facilities? So could you expand on what's behind the Q3 produced and shipped turbines and what you expect for Q4?
No, let me address that here, and I believe Jakob touched on it, if I may highlight one favorable point. Together with our partners, we keep improving at achieving straight-through flow in production as well as in the supply chain. As a result, we've gained firmer command over inventory. And so, if we manage that, then are we also, to some degree, in certain quarters, unable to fully align it with what will be delivered and built in the following quarter. So, we've gotten better at this, and there have been no — we have not yet observed any effect from supply chain shortages, otherwise we would not have described Onshore execution as very good. So, in fact, once more, as we head into Q4, we will be only a few weeks from having everything we need at the site. Thus, Akash, we are — we're seeing solid momentum in execution as '25 draws to a close as well.
Our next question is from Colin Moody with RBC.
Turning to the really robust margin results in Power Solutions for this quarter — the warranty and volume drivers are clear. But on that project execution item: is my understanding correct that this is basically a release of contingencies? And can you help us get a sense of how big a contributor it was, and broadly, should we expect more of that in Q4? More generally on contingencies, do you book the gains from such a release each quarter as projects near completion, or is it more toward the latter part of the year?
I'm not sure if I'm addressing some sort of new, special approach here. We simply follow the same process we've always used. When we take on a project, we perform a pre- and post-calculation of capital, and once the customer's final payment arrives, it goes into our P&L. That being the case, I can't speak to what other companies do regarding contingencies or anything like that. With any project we handle, we proceed the way you'd expect us to, and there's invariably a provision in a project for the possibility that something goes wrong. Naturally, that gets released once the project is finished as well. So this is a quarter in which Onshore execution has come through and delivered these results. And naturally, even in this quarter within Power Solutions, we've also spent a substantial sum on continued ramping and on investing in the Offshore and Onshore ramp. So from our standpoint, this is a normal quarter. That said, I think you should refer back to what I said at the outset — it's hard to absorb our ramp investments when your turnover and top line are considerably lower, as you witnessed in Q1 and Q2. That's the takeaway you should draw from it.
That's it—nothing further. From there, it comes down to solid execution along with profitability, and that is exactly what we're aiming for across the entire year.
Got it. Maybe one more question, if I may. Regarding trends in the U.S. market, U.S. order intake year-to-date is clearly very strong. I'm just thinking about the July safe harbor that arrives in 2026. How are you viewing order developments from here? And is my understanding correct that one shouldn't really anticipate a large peak or ramp before that deadline, but that in fact you might keep seeing very strong order momentum even past 2026, into 2027 and beyond?
Yes. Thank you. Like I mentioned, forecasting any single quarter is always tough. You know what my track record on that is like — it's been fairly weak, and Claus Almer will be happy to remind me. So here, I think what we're saying is that we pursue whatever orders we can secure. It's also fair to say that we're happy with what we're seeing. Our order backlog in the U.S. is well covered, and customers are building out and making plans to build out. What's driving that? It comes down to the fact that wind in the U.S. also offers a very attractive levelized cost of energy. It stacks up well when combined against gas and others. So that's a build-out ROCE we expect to keep seeing in the U.S., regardless of when PTC expires or doesn't. I think we'd probably have booked more orders if we hadn't faced some uncertainties on the tariff side. Apart from that, no — we enjoy staying close to our customers in the U.S. and continuing to develop that plan for the years ahead. So, we're in a good state. I won't comment on the timing of orders because that's just too difficult to predict.
But keep in mind, when it comes to tariffs, we have an extremely extensive domestic supply chain that’s been in place for over 20 years. And naturally, we’re well supported in that regard, and customers are able to come and see both where components are sourced and how the supply chain feeds into U.S. factories, which creates a very comfortable and confident situation between us and our customers in the U.S.
Our next question is from Claus Almer with Nordea.
To start, nice work on the solid Q3. Rather than asking about orders, I'll focus on tariffs. So first, did tariffs during Q3 affect profitability in power? That's my first question.
Right, so it's always going to include that now, because when you're the one paying, sourcing, and constructing — Claus, you can see the deliveries listed in the table in our interim report — naturally, a portion of that already sits under the tariff's influence. And of those, well, that will be entirely booked under it, and also divided between the customer and ourselves in that ratio.
So that's the quote you're counting on to help offset some of these impacts. Could you perhaps put a number on what the headwind was in Q3 that might disappear over the next quarters or years?
That leaves us in a somewhat tight spot. So we have a P&L that we need to optimize, both for ourselves and for our customers, and that is something we do very well. We cannot mitigate 100% of tariffs, because there is no opportunity for 100% local sourcing in the U.S. So therefore, a tariff will exist, and it will land either on projects or on components, and therefore be booked against the projects when we execute them. We have no interest in sharing that. Why is that? It is not a market for many. So therefore, we retain that execution with us and our customers. They understand what we are doing and they support what we are doing, and I think we are doing the best possible job, trying to mitigate what we can mitigate, but mitigating all of it is not possible.
Okay, that's reasonable. My follow-up is also about tariffs. So, some comments from you came out today, Jakob, saying that customers in the U.S. are pulling back because of tariff uncertainty, and that was also brought up on this call. I take it this is mostly the continuing U.S.-China situation, which could go on for quite a while. So is there any way for you to lessen that uncertainty and in doing so unlock some of those projects in the pipeline?
I'll say maybe Jakob should speak to his own situation here. On that point, we're in complete agreement. As I mentioned to the earlier questioner, we likely would have booked more absent the tariff, and that is certainly true. On top of that, there's probably a backlog that keeps sitting there awaiting clearance on a handful of these items. So let's watch how that develops. But like I said, I'm not attempting to forecast macroeconomics and geopolitics right now, since that simply can't be predicted. So we just keep doing what we do. When clarity exists and whatever offtake is present, there are even instances today where demand for the offtake is so strong that you'll move ahead with it regardless of whether the tariff is small, low, or even high, because that's what you require for your electricity and energy supply. Thus, year-to-date, we've booked over 2 gigawatt of orders, and our U.S. team is performing brilliantly on that front. So we support them however we can, Claus. I'd say the progress here is really, really good.
Regarding the 1.8 gigawatts from the U.S., there's really no question — what the U.S. player did this quarter was quite amazing. That's everything from my side.
Our following question is from Ajay Patel at Goldman Sachs.
I have a couple of questions, if I may. First, on Offshore — we're mostly through this year, and I'm thinking about that business, which has been held back this year by several issues: fixed cost absorption, ramp-up costs, and perhaps lower margins on the contracts. And I'm looking further out, because that's a sizable share of what drives Vestas's profitability. Can you give any kind of guidance on the ramp-up costs this year, so we can model better how that profitability might develop? My second question: you're doing really well on the Onshore side. You can see the green shoots of Offshore improving substantially. You mentioned Service margins getting better by the end of the Service plan. It looks like the significant profit improvement is set to come over the next 2 to 3 years. I'm thinking about today's buyback. Can we infer that with that sizable amount of cash flow, buybacks will very much be part of that debate? And that really, we're looking at a picture in which returns of value make up a sizable proportion of the investment case?
You've packed a lot of questions into that one question. So I'll try to, sort of — we have a lot of faith in our three business areas. Onshore is very mature and very well developed. And you could say Onshore has been — if I were a colleague inside Vestas, it has been paying a lot for some of the investments we've kept making in Offshore. We are absolutely convinced, and we are adamant, that Offshore will be a really great business area, not only for Vestas, but for a few around and also for our customers. So we are not being caught by the same — I call it a bit the frustration or depression over Offshore. But the great days of Offshore in the P&L for Vestas will rightly so come when you look beyond the further ramp-up in terms of projects in '26. So therefore, second half '26 into '27, you're right, Offshore would start looking much more like what we're also seeing in the Offshore profitability. That comes together with the fact that we are doing the right things in Service. So yes, you can definitely come into a higher EBIT margin when you do the future years. It's not why we are looking at a share buyback in an individual quarter.
But I think the Board and management are showing something here—we feel sure about what we're doing and where we stand, and that confidence is something you should be seeing. Because if there's one thing we've likely talked about over the last 4 quarters, it's this: when did the business turn around, when exactly was it that we felt comfortable with the turnaround we've done? And is it working? And I think today we can say to people with certainty that this is the first sign it's working, and then, naturally, everyone can make their own predictions. The more cash we have available, the more we will likely redistribute back. Because the biggest part of the investment we needed to get done in Offshore is actually behind us.
Our following question is from Alex Jones, who is with Bank of America.
Thanks. Two things, if I could. First, a quick follow-up on tariff costs. How much of that was already affecting the P&L this quarter? Or is there still some incremental rise in tariff costs coming as you work through inventory that was imported before the various tariff measures took effect? And then my second question, if I may, on Offshore. Apologies if I missed it, but could you explain precisely what's going on at the Offshore sites — whether due to technology or due to your customers' demand — that's driving additional costs in Service in Q4?
Starting with Offshore, I can leave the tariff topic a bit more to Jakob. I believe we've already discussed the tariff. On Offshore, though, it's about specific sites. That's where we're adding manpower. It isn't tied to our 236, and it isn't tied to what happened back in Q3 and Q4 of last year, when a component failed on one of the platforms. So this concerns what I'd probably rather call hyper care at a couple of Offshore sites, something we agreed on with the customer. And because of that, naturally, we're investing in it as well. So that comes in winter, and a high season for Offshore is also our way of saying we're investing while prioritizing cost here too. That's what we've done, and that's what we're pre-guiding you on for Q4.
Regarding the tariff question, that impact is already showing up in our financials at this moment. As Henrik mentioned when responding to the earlier question, it will keep affecting us in Q4. What matters, though — and this is what we're conveying through the narrowed guidance — is that we're able to absorb it inside that narrowed guidance, and once you run the numbers you'll notice our midpoint remains the same as it has essentially been from the start of the year. So from that standpoint, yes, it's captured in there, and it's going to stay captured in there.
Our following question is from Max Yates at Morgan Stanley.
I have just one question. It concerns the Services business specifically. Would you be able to update us on the progress of the turnaround program? To what extent are customers accepting the renegotiated terms? And perhaps you could help me understand how long it will really take before this shows up in the numbers. My understanding is that you are running at a 16% to 18% margin. I realize you will not want to provide guidance for '26, but do we still view '26 as a year in which the groundwork is laid for future margin improvement? Or do you truly see it as a year when we will begin to see some of the improvement actually coming through in growth and margins in the Service business as we move into 2026? I am just trying to get a sense of this, so that we do not expect it to happen earlier than we actually see it in the numbers.
Max, I genuinely appreciate you framing it that way, since I couldn't agree more. This is a worldwide operation with 159 gigawatts under Service. And we employ over 15,000 people. So when you carry out a reset and a turnaround of the business, it will take more time. So please don't start building in 22% or 25% Service margin in '26. We've stated that it takes those 2 years. We're 5 quarters away from completing this work, because it does take some time. I'm really pleased with where we stand in the Service team, and Christian Venderby, who leads it, has done a really good job. We know the details of what we're going through, but I think also as we're hinting here. When we looked and talked about this 2 or 3 quarters ago, when we said we probably would foresee that we'd have some flat gigawatt under Service, then surprisingly it didn't happen in the first 1 or 2 quarters. Now it does happen, because we're getting to some of the gigawatts where, as I think we also spoke about, for instance, something like multi-brand, it doesn't create an awful lot of value for shareholders, and it doesn't make an awful lot of sense for us, unless we have customers that ask us specifically to do it more on a cost-plus basis.
So what you'll notice is that we now truly have a solid handle on what's going on quarter by quarter. So momentum is good. We've got good momentum in fixing the areas where we wanted a stronger operational environment. And we also have good momentum in being straightforward with customers, and that even includes escalations coming to me. So we're actually quite pleased with where the commercial reset stands, and we're not finished with it. It would be wrong to say that. But that's because you can't fix that much in 1 or 2 quarters. Still, the run rate through the third quarter is the run rate. I'd say that's, for me, the middle of the road path we're on.
Our following question is from Lucas Ferhani at Jefferies.
I want to follow up about Offshore. What's your booking horizon at this point? You mentioned EUR 10 billion of projects sitting in backlog, which carries you through 2027 and even into 2028. Then, considering the recent unsuccessful auctions across several European countries, and perhaps AR7 in the U.K., which may have come in a bit under expectations — it depends who you ask — how do you view the ability to get those redone, rebid, and then have orders reach the turbine suppliers roughly on schedule?
Yeah. No, like I mentioned, it's a solid 10 gigawatt. We're sitting there and working the angles. There are additional PSAs on our side, though discussions are also underway for more PSAs. So that part doesn't worry me much. Then, looking at the near term at present, there's plenty on our plate over the next 3 to 4 years. That's just how the cycle works. So, depending on where you're coming from — and I'll keep this in currency terms — don't compare. Do compare, but don't set the backlog against the process we're running, Offshore versus Onshore. Offshore processes take longer, and so I'm not so nervous about that. If there's one thing that concerns me — and I touched on this a bit here — it's that we, at least in Europe, where Offshore ought to be among the biggest solutions for getting what I'd call reduced energy dependence on friends outside Europe. We depend on energy imports for 50%, and Offshore should be among the things we scale up faster. But it seems every country in Europe opts to go through a failed auction before getting it right. And naturally, that takes time. We've seen a number of countries — including the Danish government, which went through it, I believe last year — but that also means now you have a CFD backed.
And even with the CFDs, that's going to meaningfully better the Danish power price too. So it works, and it works across the board. So that doesn't make us particularly nervous. And looking at AR7 in the U.K., all I can offer is praise. Perhaps I'm also among those who'd have liked a somewhat bigger budget committed. On the other hand, the government and the Secretary of State — Ed Miliband, who knows a great deal about this — yes, he has set himself up so that he can pull individual projects out and potentially move those forward as well. So I think we've just got to work through it. And if someone wants to label it an Offshore crisis, I don't put myself in that camp. So I think it's proven technology. It's proven market access that works, and so now is the moment to demonstrate leadership, from both developers and OEMs, to get it built out. So we're more positive on that. We see '25, '26 to some degree — I'm glad we're doing what we're doing at this moment, because with more strain on the factories and the ramp-up, that would only — that would in fact only generate additional worries at Vestas.
So that's not something we have. So we feel good about carrying it out. And what probably encourages me the most is that our customers also like the conversations, and the in-depth conversations, that we're having as we head toward 2030 and even past that.
Great. And a quick follow-up regarding tariffs. My sense is that much of what we've observed and what has affected you up to now relates more to Section 232, perhaps on steel or certain components. However, a probe has also been initiated in the U.S. focused specifically on wind. Could you explain how you're interpreting that? Clearly, there isn't much information available out there. Still, how do you view the risk of what this probe might produce?
I’m aware there are sections, plus EU tariffs and other tariffs that appear to shift each quarter. So our basic stance is that we’ll handle whatever gets put in front of us, and that means we’re addressing this as well. I can’t forecast outcomes, but what both of us are guiding for, for the remainder of the year, reflects what we know and what we’re facing, so it’s priced in. And I think that’s the best approach for us and the best way to be served. Because otherwise, we’d have to start revising things every time legislation changes. It could be that a tariff rises, it could be that it goes — I think last week we saw initiatives that seem perhaps to suggest tariffs heading back toward zero again in some areas. But let’s see. I don’t comment on that, because it’s far outside the area where I can have any effect. What we can affect is how we execute and how we handle them. And that’s where we have a fantastic team in the U.S. and North America that is absolutely on top of the details there.
The following question is from Henry Tarr at Berenberg.
Well done once more on a solid quarter. My first question concerns Onshore and the margins for that segment as we head into 2026. That business is plainly performing very strongly at the moment. When I think about next year, what would you point to as the main drivers — volumes appear fairly steady, and pricing looks to be flattening out. How do you view cost trends and mix? Do you believe there is additional room — a bit more upside — in the onshore margin going forward? Or would you say we are already doing about as well as could be expected?
Thanks, Henry. I guess there's some juice left, so maybe I should take a different angle here. On '26, we'll give our commentary on the 5th of February — I've picked up that lesson over the years. At the moment, nothing we're doing in Onshore is aimed at making things run worse, and honestly we're performing reasonably well. So what we've seen so far — expect more of the same. If we're able to do more and get more, that's probably where we have more concurrent projects, which lets us avoid change cost and other issues in Onshore. But I'm genuinely just pleased with what's happening in Onshore. And of course, we don't do that. I think that's only fair as well, since there are limited players. So there's no need for them to sit and read the P&L of individual business segments between Onshore and Offshore. Onshore is doing really well, and we'll see whether we can do more of the same next year. And we will try very hard.
Okay, that's reasonable. And staying with Onshore in terms of the orders outlook — you've addressed the U.S. to some degree. What about the other regions, looking at Europe and elsewhere? I know you mentioned somewhere in the materials that you foresee potential for high single-digit growth in Onshore wind globally through 2030. Do you still feel comfortable with that outlook, and do you still expect considerable momentum and activity in European Onshore Wind over the coming few years?
I believe there are a couple of factors at play in Europe. Some nations, in my view, are really setting the pace. Take Germany, or take a few countries such as Romania and others — I think they're showing the way forward, essentially saying this is how we can accomplish more and get things built. And those countries, I'd say, are definitely models worth following. Beyond that, I think there's increasingly detailed discussion about how repowering can be carried out across Europe, which ties back to the fact that Wind was very much founded and invented out of Europe. So we also have an aging fleet, and that naturally creates room for European repowering that could represent a genuine business opportunity for companies like ours. It could equally be an enormous business opportunity for the owners and the developers. And second, it's a tremendous means of boosting energy production in Europe. So there are two levers there. I'll steer clear of — I would steer clear of commenting on countries that potentially haven't got it right. But let's just say we're very pleased with our Spanish colleagues and our factory in Spain.
On the permitting front and the pace of projects in Spain, I'd say there's likely still room for improvement. So because of that, in Europe we're seeing genuinely encouraging fundamentals. And Germany, of course, is one example — if we'd had this conversation 3 years ago, Henry, we wouldn't be at the figure we're seeing now. That's down to both the current and the previous government in Germany. Turning to Asia and Asia Pacific, plenty is underway. Plenty is also under consideration. A few of those countries are relatively new entrants coming into this. But as I mentioned, our colleagues in Asia Pacific still have some firm order intake to demonstrate. Then in Latin America, much the same — Brazil has probably dropped very low on PPAs. So we'll watch for when Brazil comes back to that. Still, we have good feelings that Latin America will begin showing some strength again too, since some of the data centers and others are moving into LatAm across the board. So I'd say we're probably somewhat disappointed in where we stand year-to-date in Asia Pacific and LatAm, and very encouraged by where we stand in North America and in Europe.
And I believe that's a pattern we'll keep seeing.
Casper Blom from Danske Bank has the next question on the line.
Here's a slightly different kind of question from me. I believe it's been roughly 7 years now since the EnVentus turbine platform was launched. And at this point, we're seeing a growing share of your incoming orders going to these bigger 6, 7-megawatt Onshore turbines. Meanwhile, you've also spoken about pricing being stable for around the last 3 years, following that significant material price increase a few years back. Would it be fair to say there's an opportunity here for you folks—by, in a sense, staying with the current technology, holding pricing level, and then essentially just benefiting from, how would you put it, operational efficiency stemming from the fact that you've by now built up very, very substantial experience in developing this turbine? And as a follow-up, do you have any sort of plans to add new platforms in the foreseeable future?
To start with, platform launches have never taken place during an analyst call—so Casper, that’s a first. Another point: with EnVentus, we’re extremely happy. You could say you’re exactly right. As we increase production and add more to the backlog, we keep improving at it, and the same applies to our supply chain. So when I began by offering a big thank-you, that also extends to our supply chain partners, since they assist us in taking some of those costs out. And I think today, compared with a time when inflation sat very near zero or even at par, and then interest rates—everyone has witnessed cost inflation which, naturally, for certain projects has potentially put the project at risk of being built. Now it’s also a matter of getting it back and getting it built, so reducing cost is absolutely the name of the game for all of us. That runs through the supply chain and into our factories. And the greater the volume you have, the better you become at it. So that’s an overarching point. And I think you saw some of that.
If you look at the V163, 4.5 megawatts, which is now being sold across most of the world—especially North America and the U.S.—that was created using roughly an 80% component from a 4-megawatt platform. And that also means we're running aggressive cost-out programs on it. So of course, that's a textbook example of how we also want to build the EnVentus. So, you're right, Casper. And I think part of it will go toward continuing to improve our profitability. Part of it, we will definitely also give back to the customer. So, we make sure that projects are being built and aren't being halted because the investment case isn't attractive enough with local governments.
Let me add something here. I think if you look back historically, there was a rough general guideline that prices would decline by perhaps 3% or 5% annually, thanks to technological gains and passing those along to customers. So isn't it reasonable to think that, provided you can hold your present pricing and keep improving, that works in your margin's favor? Or is that putting it too simply?
I think that might be a bit of a simplification, coming from an industrial company worth almost EUR 20 billion. But let me say this: now you're introducing 5% as a price cut, along with other things. I believe we at Vestas are once again in a profitable position. So it's not like we woke up this morning and decided we need to reduce prices. As I mentioned, we appreciate commercial discipline. We have to earn money. Without earning money, we won't invest in future technology either. So it's a combination, therefore. But as I said, we'll share it with our partners and customers in a sensible proportion. Come on, nothing beats getting a signature and winning business with a customer. That's the main objective, then, and it funds everything else. So, Casper, what you've witnessed today is that we can now state with certainty and demonstrate that we've emerged from the dark days of '22. And I think that's truly the message we want to convey to you and to the rest of the market through what we're doing today.
Our next question is from Deepa Venkateswaran at Bernstein.
I had a couple of questions. First, Henrik, I'd like to follow up on a point you raised that probably doesn't get much attention from many investors, namely your CapEx. This year, more than 6% of revenues is going toward CapEx. You've also mentioned that the large investment program in Offshore is close to completion. So on a continuing basis—especially since cash is king and could fund buybacks down the road—what would be a more sensible CapEx level for the business going forward, whether in absolute terms or as a share of revenues, assuming, of course, that there are no major investments and additional platforms? That was my first question. Second, on demand, especially in the U.S., there's a great deal of hype about AI-driven demand. People talk about wanting to build a gigawatt a week and so forth. So what are you seeing in terms of the opportunity for Vestas to capture, and what are your customers telling you about the impact of this new AI demand?
To start with, one gigawatt every week — well, I definitely won't be getting much sleep, that's certain.
Perhaps that figure was worldwide.
All right. But like I mentioned here, the reality is genuine. And perhaps that's how you keep it from happening. Speaking in AI terms, the reality is genuine. It's occurring, and electricity demand keeps rising. After that, we can debate at times whether demand and supply are out of sync. Then naturally, that leaves just one outcome, an underlying rise in electricity prices, which sadly, you're witnessing in parts of the U.S. And I believe, on that point, it will reach Europe too. So I think there's a bit to this AI where we, as mentioned, form part of the underlying base load. So because of that, we're the ones who must build part of the baseload alongside many others. So because of that, energy in demand is certainly it. And I think if we consider a nation that typically plans very long term, specifically China, you can see how they've built out energy sources over the last 3, 4 years. And specifically, last year, they built as much renewable. They built as much coal. They built as much of some of the nuclear as the remainder of the world did combined. So, someone is making bigger upfront decisions than probably the rest of the world is making.
So for me, being a pretty fact-based person, I like seeing that we make some of these decisions perhaps a bit faster, and that applies to the U.S. as well. So the U.S. has demand for energy and electricity. And so we will keep seeing that build-out, and Wind is part of it. Maybe we ought to call it something other than wind, but in fact it has a low LCOE, and it does local manufacturing, and so it's supporting the U.S. in its energy supply. So that's really. On the CapEx side, don't underestimate — there will still be tools and there will still be factories and other stuff that from time to time will affect the CapEx. But I think Jakob is nodding that when we look at EUR 1.2 billion, that's probably roughly where we spent a great deal this year. But if a factory or other footprint comes in, that will then vary and deviate from the theme. But as we've said all along, it should begin going slightly lower, but we won't give a guidance for it until we are in February for the coming year. And then, as you can see, we are not nervous about actually using the cash for buybacks.
Since we aren't being pushed to put more money into investments, using that capital to repurchase our own stock actually delivers a pretty solid return given the multiples we're seeing right now. Operator, could we take the final question?
And our next question is from Martin Wilkie at Citi.
I just want to add a quick follow-up on the data center question. Whenever we examine a number of those hyperscalers and the places where they are inking renewable PPAs, a great deal of that activity appears to sit in Latin America and Europe, and honestly not a whole lot of it is in the U.S. So as you consider the outlook and the potential for data center orders, do you view it the same way — that they are in fact more realistic in those regions? Or is there really a sort of pent-up demand opportunity in North America, where clearly the volume of data center is probably much higher? I'm just trying to understand, regionally, how we should think about that.
Martin, I’d say no. When you look at other regions, such as Europe and Latin America, wanting to announce data centers, I think that’s really because they want a piece of the action. The two primary locations for these data centers, in my view, will be China and the U.S. That’s where the AI balancing act is taking place. Europe is behind. So if we get a data center somewhere in Europe and we’re building it, then yes, of course. We’ll applaud that. But I think the underlying point is the U.S., though they probably aren’t just announcing it to the same degree as what you’re seeing. Because as much as you look at demand and supply, the demand side currently exceeds the supply side of potential build-outs. And that’s likely why you’re seeing fewer of those announcements in the U.S. But working for an American bank, I’m quite sure you’ll know a lot about what happens in the U.S. as well. So thanks, Martin.
Mind if I ask one separate follow-up specifically about Service? You clearly addressed those costs in Q4. To make sure I have it right, though — they'll essentially be a one-time impact in the fourth quarter. And of course, previously, when you have percentage of completion, you're able to amortize those costs across the life of service contracts, but nothing should be inferred from the updated Q4 outlook regarding what it might imply for '26. I realize you aren't giving guidance for '26 yet, but just so we understand, those costs should stay contained within the fourth quarter?
You're absolutely right. That should be in the fourth quarter, and that's not our intention, and it also falls outside any POC for the service contracts in Offshore. So you're absolutely right — your assumption is correct, Martin. Okay. With that, thank you very much. Thank you for listening in. Thank you for all your interest and the question. Really look forward to meeting many of you over the coming days. And so, thanks again year-to-date, and see you soon.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Vestas Wind Systems A/S transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Vestas Wind Systems A/S earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.