Peabody Energy Corporation (BTU) Earnings Call Transcript
November 4, 2026
Earnings Call Speaker Segments
Thanks, operator, and good morning to everyone. We're glad you could be with us for Peabody's third-quarter 2026 earnings call. With me today are Jim Grech, Peabody's President and CEO, Mark Spurbeck, Chief Financial Officer, and Malcolm Roberts, Chief Commercial Officer. Once our prepared remarks are done, we'll open the line for questions. Before we start, I'd like to note that today's remarks will contain forward-looking statements. Please take a look at the statement in our earnings release and consider the risk factors cited there, as well as our filings with the SEC. I'll hand the call over to Jim now.
Thanks, Kala, and good morning, everyone. For Peabody, the third quarter represented a significant move in the right direction. We're still making progress at Centurion, we produced positive adjusted EBITDA in every operating segment, and we gained from better seaborne markets. Safety sits beneath all of it as our commitment. Our teams stayed focused on executing safely while also delivering the strategic priorities that should help put the company in a stronger position as we head toward year-end. Centurion is our top priority, and it hit its third-quarter sales volume target; even so, late in the quarter and on into October, the longwall ran into faulting in several locations that turned out to be more troublesome than we had expected and held production back. October output came in at just over 45,000 tons, and we've changed our fourth-quarter sales volume guidance to a range of 300,000 to 500,000 tons. This isn't one fault or a lone geological event. Across the tailgate, face, and headgate areas, the longwall has hit multiple, complex geological structures, and that combination was more complicated than our mine plan had assumed. Mechanical downtime while we worked through those faulted zones let extra ground pressure and roof conditions build up ahead of the face. In those circumstances, parts of the existing longwall design handled the changing conditions less effectively than we had expected, which slowed progress further. Importantly, we don't see these difficulties as a matter of resource quality, reserves, or the long-term mine plan. Faulting and structural complexity are typical features of Bowen Basin operations. What this first panel has taught us is where our equipment and operating practices must adapt so we can operate efficiently in these conditions. In the panel we're in now, we have roughly 110 meters left before the longwall gets past the major fault structure. We still anticipate some geological interruptions for the rest of the panel. Our team has pinpointed targeted engineering modifications and operating adjustments that will give us more flexibility when we mine through comparable conditions in panels to come. For every longwall shield, two key equipment upgrades are being scheduled around planned downtime so disruption to production is limited. The first is a base lift power increase, estimated at $1.5 million to $2 million in total for all shields, which we intend to finish in the current panel during scheduled maintenance. The second involves improvements to the shield extension flipper, estimated at $5 million to $10 million in total for all shields, which we intend to install during the next longwall move in 2027; we've also worked to reduce the risk in the next panel with an extensive preconsolidation plan for the faulted zone. Wherever we do hit faulting, we'll be better prepared, with improved longwall positioning, both equipment upgrades in place, and steps to stabilize and strengthen the ground ahead of the fault. Taken together, these steps are designed to deliver more consistent longwall performance at Centurion, while our focus remains on safe execution. Beyond our current operating priorities, responsible stewardship is still central to how we manage our assets throughout their life cycle. Peabody earned the Office of Surface Mining Reclamation and Enforcement's National Award for Excellence in Reclamation — the top honor in the field — for its work at the former Seneca II West Mine in Colorado. Reclamation has reshaped that site since the mine closed in 2009. This national recognition highlights how our dedication to responsible reclamation leaves a lasting mark. That same emphasis carries over to Peabody Development, which is exploring fresh avenues for generating value from our land and resources. Given encouraging germanium concentrations, we're close to finalizing agreements with a major customer along with a processing partner. Through our R3 joint venture alongside RWE, we're moving forward with solar and battery storage projects on reclaimed mine land, with potential success fees starting in 2027. We're additionally assessing ways to pair mine mouth generation with data centers. Our strategy stays capital-light and built around partnerships, which sets us up for new revenue streams and growth over the long term. Shifting to the US regulatory picture, with the nation confronting growing electricity demand, EPA's partial repeal of the power plant carbon rule — which mandated unproven and uneconomical technology — and its proposal to rescind the endangerment finding are significant steps toward bringing back a more common-sense energy policy for our country. I applaud the DOE, EPA, and the Trump administration for acknowledging the vital role of reliable, dispatchable, and affordable energy; with that view of our operations and the regulatory landscape, I'll hand the call to Malcolm to cover US and global market fundamentals.
Thanks, Jim, and good morning, everyone. Building on Jim's overview, I'll take you through the market conditions that are shaping customer demand. During the third quarter, seaborne pricing was stronger, helped by supply constraints that persist and demand that held steady. China remained the primary driver of metallurgical coal pricing. Seaborne thermal coal markets strengthened mainly because of healthy demand in North Asia, together with supply constraints that continue in Indonesia and inside China. In the US, thermal demand improved over the quarter; even so, on a year-to-date basis it remains below year-over-year levels. Turning to seaborne metallurgical coal: in Q3, premium hard coking coal averaged $248 per metric ton — 35% higher than a year earlier and the best quarterly average since early 2024. Spot index prices reached a peak of $285, as weaker Chinese output drove Chinese metallurgical coal imports up 25%. Supply of high-quality coking coal has been especially impacted by Chinese safety inspections and output curbs in Shanxi that came after May's major mine accident. An estimated 70 million tons of Chinese domestic metallurgical coal production have been taken out of the market so far this year. For context, the global seaborne metallurgical coal market is roughly 80 million tons per quarter. We expect supply to stay tight through 2027, which supports seaborne pricing. In India, metallurgical coal purchasing has been steady, though buyers remain selective. Steel prices have firmed after the monsoon-season slowdown, leaving room for higher imports in the fourth quarter, and with Russian PCI supply having tightened, Indian buyers have shown fresh interest in Australian supply. For the period through September, premium coking coal prices increased 31% and PCI prices increased 19% versus 2025. Against that backdrop, we closed additional spot sales to major Chinese steel producers, moved forward our 2027 term negotiations, and completed an initial Centurion cargo delivery to an Indian public sector steel producer. This year has brought improved prices for US High-Vol A coal, yet the discount to Australian premium hard coking coal remains substantial, since extra supply and freight costs hurt delivered competitiveness in Asia. Once anticipated lower Chinese import tariffs take effect, renewed Chinese access could bolster demand. Under recent US-China trade talks, China has committed to importing no less than 11 million tons of US origin material in '27 and 2028; that volume is expected to be mostly coking coal. Resulting shifts in trade flows are projected to be roughly neutral for Australian pricing. Newcastle pricing averaged approximately $135 per ton during Q3, trending higher to finish the quarter above $145 per ton. elevated LNG prices, slower Chinese production, and lower Indonesian exports. China has continued to show interest in Australian thermal coal, especially mid-calorific, higher-ash products, seeking to replace constrained Russian and Indonesian supply. As a result, API 5 pricing rose during the quarter, and in October spot API 5 pricing accelerated further, hitting $115 per ton, the highest level for the index since May 2023. Now looking at the US: our Powder River Basin sales in Q3 fell short of guidance, because cooler temperatures early in the quarter, robust renewable output, and cheap natural gas all pressured coal demand. An extended outage at a customer plant that wasn't planned also reduced shipments. How demand shakes out this winter hinges mainly on El Niño, gas prices, and how much renewable generation is available. Longer term, data centers, manufacturing, and electrification each point to continued growth in electricity demand; even so, that potential hasn't yet translated into materially bigger coal purchases. Project timing will remain a risk. In summary, seaborne markets are still constructive, as supply constraints and energy security concerns are propping up both metallurgical and thermal coal. US thermal fundamentals appear more mixed, but coal continues to provide a dependable supply of electricity when demand peaks. With that, I'll pass the call to Mark, who will go through the financial results and the fourth-quarter outlook. Newcastle pricing averaged roughly $135 per ton in Q3 and trended higher, finishing the quarter above $145 per ton.
Thanks, Malcolm, and good morning, everyone. Keeping that context in mind, we'll walk through our financial results, the capital structure actions we've taken, and our outlook for the remainder of the year. Peabody recorded a third-quarter net loss attributable to common stockholders of $32.8 million, or $0.27 per diluted share — a loss much narrower than the $90.6 million, or $0.74 per diluted share, posted in the second quarter. Adjusted EBITDA climbed to $97.5 million, which remains below the steady-state mid-cycle run rate as we await the completion of Centurion's full ramp-up. Stronger results were driven by higher production at Centurion, improved average realized seaborne prices, and greater US thermal volumes. Costs per ton exceeded our expectations, mirroring lower-than-expected third-quarter US thermal volume and higher-cost faulted conditions that curtailed output at Centurion. Now I'll walk you through the segment results. Seaborne Thermal shipped 3.1 million tons, surpassing expectations by 100,000. Export shipments totaled 2 million tons, also beating guidance. The average realized export price exceeded $100 per ton, further widening margins. Compared with the prior-year period, revenue per export ton increased nearly $24, while costs rose roughly $7 per ton. The segment posted adjusted EBITDA of $65.5 million, up 26% from the second quarter and 60% from the prior-year period. We expect a stronger fourth quarter still, with additional production from both Wilpinjong and Wambo sold into very strong seaborne energy coal markets. Seaborne Metallurgical shipped 2.2 million tons, ahead of company expectations, aided by higher output at Metropolitan following a longwall move that progressed faster than planned. Revenue per ton rose 11% from the second quarter to $165. Costs exceeded target at $162 per ton, primarily because of higher-cost faulted conditions and lower production at Centurion. The segment delivered its first positive EBITDA quarter of the year, and with greater volume at Shoal Creek and Coppabella, we anticipate a stronger fourth quarter. Our US thermal business produced $40.5 million of adjusted EBITDA, more than double the second-quarter result; in the Powder River Basin, shipments rose to 19.6 million tons. Along with cost-focused management, costs improved 8% to $12.94 per ton, but stayed above target because of lower-than-anticipated volume resulting from lower coal burn. The segment generated adjusted EBITDA of $15 million. The other higher-calorific-value US thermal business shipped 3.4 million tons, 300,000 less than anticipated. Lower shipments at Bear Run stemmed from lower coal burn, and a 20-mile customer had a generation unit down for an extended period. The resulting mix pushed average cost per ton above expectations in the quarter, partially offset by higher average realized revenue per ton. The segment generated $25.5 million of adjusted EBITDA, broadly consistent with the second quarter. For Seaborne Thermal, we expect volume of 3.6 million to 3.8 million tons. Now looking at our balance sheet, we closed out the quarter holding $434 million in cash along with $887 million in total liquidity. In Q3, we bought back $39 million of the outstanding 2028 convertible notes, paying $58 million for them, and we issued a call on the remaining $40 million, choosing cash settlement with a closing expected around mid-November. That Q3 cash repurchase continued our habit of giving capital back to shareholders — the $19 million cash premium worked out to an additional 700,000 shares repurchased, which brought the year-to-date figure up to 5.7 million shares. When you factor in $27.4 million in cash dividends, we had returned $192 million to shareholders through September 30 of 2026. Moving to Q4, Seaborne Thermal volume is expected to be 3.6 million to 3.8 million tons, and 2.5 to 2.7 million tons of that should be export tons. About 1.6 million tons of Newcastle product and 0.8 million tons of higher-ash Wilpinjong product remain unpriced. We're looking at costs between $46 and $51 per ton. The significant increase from Q3 reflects substantially higher volume at Wambo as a result of mine sequencing, which shifts the quality mix to roughly 65% Newcastle and 35% higher-ash coal. Thanks to our solid performance over the first nine months, we lifted our full-year Seaborne Thermal export volume guidance by 200,000 tons. Seaborne Metallurgical volume should land between 2.2 and 2.4 million tons, as increased volume at Shoal Creek and Coppabella makes up for reduced volume at Centurion while we work through the difficult faulted conditions Jim described. Realizations should come in at approximately 70% of the premium hard coking coal index, with costs of $150 to $160 per ton. Weaker Q4 expectations at Centurion reduced full-year Seaborne Metallurgical volume by 600,000 tons and added $15 per ton to costs. Powder River Basin shipments should reach 19.5 to 21.5 million tons at an average price of around $13.75 per ton and costs of $13 to $13.50 per ton; reflecting lower coal burn in Q3 and modest Q4 forecasts, we reduced full-year volume by 7.5 million tons, which adds $1 per ton to full-year costs. Other US thermal volume — with an average calorific value above 11,000 BTU — should be 3.6 to 4 million tons at an average price of roughly $59 and costs of $48 to $52 per ton. Just as with the PRB, we lowered full-year volume guidance by 200,000 tons because we expect lower coal burn. Capital expenditure guidance decreased by $40 million, largely from opportunistically deferring development at Centurion North; in closing, Peabody finishes the quarter in a strong financial position, prepared to leverage our diversified assets to generate free cash flow from robust seaborne markets. I'll now turn the call back over to Jim.
Thanks, Mark. We're going to capitalize on how strong our thermal operations are, bring out Centurion's potential over the long run, and extract further value from the assets we hold. Making the most of that chance begins with running things safely and dependably while keeping tight control over costs. We know the effort Centurion requires and are staying committed to showing better results as we go. It falls to us to turn this portfolio's strengths into enduring worth for our investors. With that said, operator, we're glad to take questions now.
Okay. Hi, everyone. Appreciate you letting me ask. My question is about Centurion. Originally the idea was to first get past that complicated faulted zone, and the hope was to have that done by the middle of October; now you've run into further faulting issues, and they appear to be distributed across the whole mine. It sounds as though the situation has shifted from clearing the complex faulting and then more or less following your earlier mine plan to now needing to work out how to operate through this faulting, since it's more likely to be, in essence, a permanent characteristic of the mine. Have I got that interpretation right?
Chris, the faulting we're dealing with remains confined to this localized zone that we're working through, which we discussed earlier. After we move past this 110 meters in this panel, most of that faulting disappears. Our view of the faulting and the geology in this panel and across the rest of the mine is unchanged, and so is our view of our ability to mine the coal once we reach the subsequent panels. Faulting exists throughout the mine, just as it does in every mine in the Bowen Basin. As we work through this first panel, we're figuring out what changes our equipment needs so it copes with the faulting more effectively, along with adjustments to certain operating procedures. Our view of the mine and of the faulting hasn't shifted at all. We always knew that faulting existed—it had been mapped out. The only development is that it's proven more intricate than our original expectations.
Regarding the faulting in the remainder of the mine, what makes us sure it isn't more complicated than you first thought? Given that you've run into trouble in this specific area, how can we be confident the same thing won't occur with other faulted zones in the longwall?
From what we've picked up through the equipment we now have as well as the modifications we've made, and then the preconsolidation in places where faulting has occurred and we've applied preconsolidation, our success rate mining through those areas has improved considerably. In this particular area, though, preconsolidation wasn't carried out, but we do have it across the rest of this panel where faulting exists, and we'll apply it in the panels ahead. With preconsolidation plus the equipment changes made to deal with the conditions when we hit them, our confidence is much greater that we can mine through them efficiently going forward.
All right. Even with the issues you're running into at this moment, your confidence about reaching full capacity at this mine hasn't changed? That's my final question.
That is right. 100 per- Yeah. Chris, we are still 100% going to reach full capacity, and once more, this first panel has taught us a lot about what needs to be done to get there. With the planned equipment modifications I described in my comments, the preconsolidation, and the experience we're gaining in this first panel, we remain 100% confident we will reach the full output capacity of this mine.
Thank you.
Thank you, Chris. Yeah.
Hello, and thanks for taking my question. Perhaps to follow up on Centurion, Jim, you said you're confident about reaching full capacity, but could you elaborate a bit on when that might happen? What's the timeline?
Sure. As we work through these faults during this quarter and into early next year, while we're wrapping up this panel, we'll carry out the equipment modifications I mentioned. A portion of them can be handled while we're in this panel, and others will be done during the upcoming longwall move. After that, we'll handle the preconsolidation in the panel ahead before we get there. Once we're through this panel, and certainly when we move into the next one following this longwall move, we'll have the potential for that full capacity, but we still need to work through things right now as we complete these equipment modifications while mining through this panel. With the next panel, we should be ready to go.
So if I'm following you right, the longwall move in 3Q of next year is when you'd be able to hit that 1 million ton run rate — or how should we be thinking about that?
Right, that's the point where, with the modifications in place, we'll be running consistently and reaching that run rate. Now, while we're in this panel and once we're through this faulting area, we'll hit those higher run rate levels after we get past the faulting in the 110 meters we have left, but those modifications won't be there yet, Katja. To keep that run rate consistently, whether faulting is present or not, we need to have these modifications completed.
All right. Appreciate it.
Thank you, operator. Morning, everyone. Perhaps focusing just on 4Q, I believe 45,000 tons in October still suggests roughly 175,000 tons each month. Could you paint a picture of precisely where we are today — is the longwall operating, and if it is, how many passes can you manage with the faulting problems, and then what portion of sales volumes would be drawn from inventory sitting on the ground? Thanks.
At present the longwall is operating, though not at the rates we'll reach once we're past this faulted area here, which we anticipate exiting later this week, this troublesome area, and we still need to get through the 110 meters remaining to us. Entering the quarter we had roughly 50,000 tons of inventory, and we have a further 125,000 tons that we know we'll obtain from our CM units. The balance would come from the longwall, and we feel fairly confident about those figures reaching that guidance range with the tonnage from the longwall over the remainder of the quarter.
Got it. I was hoping you might share an early read on how you plan to guide at Centurion for 2027. Clearly, there have been quite a few challenges, and guidance keeps getting downgraded; you still sound confident about reaching full capacity, but would you be willing to set the bar lower just in case some of these problems continue?
Morning, Nick. This is Mark. We aren't ready to say yet what we'll do with 2027 guidance at any of our mines. We'll take a look at it as we go through our budgeting process. Obviously, we want to see our progress here in the fourth quarter. I think the key point is what Jim said earlier — our long-term outlook hasn't changed. We'll work through those equipment modifications that Jim mentioned, and we'll provide guidance on our next call.
Thank you for that, Mark. Perhaps we could pivot slightly — I was wondering whether you might help us understand seaborne thermal costs, the direction you see them moving, what added effect the elevated diesel prices are producing in the fourth quarter here, or the sorts of operational gains you've managed to achieve so as to hold those costs within a tighter band?
I take it you mean the US. At PRB, you definitely saw us lift the cost outlook because of costlier diesel and weaker anticipated volumes. That's roughly $0.50 per ton at PRB. With that guidance, we feel at ease. Diesel has eased somewhat compared with our expectation. For seaborne thermal coal, we recorded a fairly large quarter-over-quarter cost decrease as we entered Q4. As the volumes show, Wambo and Wilpinjong are running much higher, and that is the main reason costs came down. Diesel plays a role too, though only a modest one. Reaching the 46 to 51 range reflects those greater volumes, partly offset by somewhat elevated sales-related expenses tied to stronger pricing.
Understood. All right, thanks for clearing that up, Mark. I'll hand it over.
Thank you, Nick.
Thank you, operator. Good morning, all. I suppose I have a quick clarification. Regarding the additional 200,000 seaborne thermal export tons now anticipated for this year, it sounded as though you said, Mark, that those mostly would come from Wambo. Do those tons meet Newcastle quality?
Correct. Increased Wambo output means more Newcastle. You observed that we shifted the weighting to roughly 65/35 from what used to be 50/50 for us.
Understood. Thanks for that. Turning to production and the US thermal sales you expect this year, my assumption is that the bulk of those tons simply carries over into next year; could you also give us a sense of how much you have under contract for '27 in the US thermal segments, and any view on pricing?
Nate, good morning. This is Malcolm. Look, we have not issued guidance for next year. We would expect the contract position we hold from this year to carry into next year, probably with an expectation of a few additional tons in the PRB and similar volumes in the other segment. That is still going to depend on guidance, which we will update on the next call.
Thanks for that, Malcolm. Perhaps if we return to Centurion briefly. I believe during the previous quarter, Jim, you said your team was exploring options to reduce how long the longwall move takes, and that move is now anticipated in Q3 of '27. Any headway on that front? What duration would you anticipate for that longwall move?
Nathan, we're focused on the scheduling of it, along with the advancement work underway at present. For the upcoming longwall move, the seven seven panel, development is firmly established. Progress there has been quite strong. In fact, on development for the next panel, we're running ahead of schedule. Once we issue guidance for next year, we'll address the longwall move's timing and when it will take place.
All right. Thanks for that, Jim. I'll stop there and hand things over. Good luck.
Thanks, Nate.
Good morning, and thank you for taking my question. Staying with Centurion for a moment — I realize the expectation is that Centurion will reach nameplate capacity, but given that the mine conditions have perhaps been a bit more persistent, should we anticipate Centurion being a higher-cost producer than what was originally expected when it came online? For instance, even if mining conditions stabilize, I know you've incorporated some equipment modifications to better address those challenges. Do those modifications inherently raise mining costs compared with what was originally expected when you broke ground on that asset?
Matt, this is Mark. The equipment modifications Jim mentioned involve very modest capital. They will not raise this mine's operating costs going forward. Certainly, the geological conditions in this panel have been more problematic than we anticipated. Those equipment modifications are intended to address that, along with the learnings from the additional drilling and and and and and consolidation work we've completed in this panel. We believe we know how to operate this mine. Jim confirmed that we still anticipate reaching that full production. Our long-term view of costs has not changed. Again, that was $105 a ton in 2024 dollars, you know. You inflate that up, and we should be at that 125 range or whatever next year. We have a lot to learn; we're still working through this. Give us another quarter here, and we'll provide full guidance on our next call.
Understood. That's useful detail. I appreciate it, and it's good to hear. Just regarding Seaborne Thermal — I realize we'll get more guidance next quarter, but at a high level, on the production outlook there, could you remind me of the major moving pieces directionally on the production side for Seaborne Thermal? I just want to be sure I'm modeling everything correctly.
I believe we've already shared our view of what Wilpinjong will do, correct? We have a transition involving a couple of pit extensions. Output declined somewhat this year, and it will decline somewhat further next year. How much we must deliver next year depends on where we end the quarter and on domestic ton deliveries. I think we're again in that range of 4.4 million tons on the domestic side. You may see export tons fall year-over-year next year, somewhere in that range of 5 to 700,000. I would view Wambo as fairly steady at 3 million plus annually. As we said at the time, that domestic delivery from Wilpinjong drops significantly in 2028 to just 2, 2.5 million tons and disappears entirely afterward. We aim to ramp those export tons from Wilpinjong from slightly above 5 million this year to more than 10 million by 2030.
Understood. That’s really useful. Thanks for spending the time, and best of luck.
Thank you, Matt.
Hi there, and thanks for letting me ask a follow-up. I believe you said you'd given an update on a few of those opportunities beyond your traditional business — as we'll call it — and specifically regarding germanium. Could you take us through what the gating items are for moving that opportunity forward, and likewise for the mine mouth generation opportunities? Thanks.
Nick, regarding germanium, like I mentioned in the remarks, we're working toward an agreement with a partner covering the offtake and the processing on that. With luck, that announcement might come sometime in the near future. Given some of the commercial sensitivity involved, we don't want to disclose many details of that deal until everything is buttoned up and we make the announcement. Once again, we consider the opportunity for germanium production along with the offtake and the processing to be very promising. As for the mine mouth power plants you're asking about, what we're seeking there is partners, and the way we'll see revenue from that is through either land sales, the sale of coal to the mine mouth generation, or from helping with project development fees. We're looking for partners to build and operate the asset. Again, we're only in the early days of that. There's a lot of interest in mine mouth generation in the state of Wyoming, and we're into those conversations in case that potential develops further. At present, it's very early days with that.
Oh, thanks for that, Jim. Perhaps just one more on the legacy operations side, and at Coppabella specifically. Low-vol PCI prices have been creeping higher, and I believe, Mark, you noted some increased output from that mine in 4Q — but could there be opportunities to push that mine a bit harder and capitalize on some of the spot strength? Thanks.
Nick, I think we've more or less transitioned from a two-mine operation with Moorvale and shifted a lot of equipment into Coppabella; that's where our focus is, and stabilizing that production going forward; we've been mining through some higher-ratio coal; we're getting through that as well to some lower ratio. We look forward to strong production, but there isn't a step change in production that's kind of on our vision today.
Understood. Okay. Thanks for clarifying.
Thanks, Nick.
Yes, I appreciate everyone taking the time to join us today, and thank you for your ongoing support. We’re eager to share updates on how we’re progressing during upcoming calls. Thanks again.
This call is now finished. We appreciate your participation in today's presentation. You're free to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Peabody Energy Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Peabody Energy Corporation earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.