Home / Transcripts / Duos Technologies Group, Inc. (DUOT) · November 16, 2026

Duos Technologies Group, Inc. (DUOT) Earnings Call Transcript

November 16, 2026

NASDAQ US Information Technology Software earnings 36 min

Earnings Call Speaker Segments

Doug Recker executive
#1

Thank you. Good afternoon, everyone, and welcome — I appreciate all of you being here today. I'll spend most of my time this afternoon on where Duos is headed instead of going line by line through the quarter. Chris will walk you through the numbers, but this quarter reflects a snapshot of a company in the midst of change. The more valuable conversation concerns who we are, where we're going, and what we're building. Here are the headlines. In the third quarter, we completed Duos' transformation into a colocation compute center company. We build, own, and run compute centers based on our modular architecture. Across the U.S., we're aiming at locations ranging from 1 MW to 20 MW, and going forward our main emphasis will be on sites of 5 MW to 10 MW. We provide the building, power, cooling, connectivity, and security. The compute itself comes from our customers. That's the business today. During the year we completed three big transformations, starting with divesting our legacy rail business. We also wound down asset management work for the new APR Energy; and on September 30 we sold our GPU-as-a-Service entity to Axe Compute. All of our capital and every bit of management attention is now directed toward a single priority: compute centers. Let me take a moment on that final step, since it reflects a deliberate decision on our part. Our GPU business accomplished what it needed to. It demonstrated our ability to locate sites, get power up and running, and deploy high-density AI infrastructure for demanding customers. Still, holding GPUs is a distinct business from holding the compute center itself. GPUs may depreciate and come with technology risk. Compute centers provide us with long-term contracts and assets that retain value; through the GPU-as-a-Service SPV sale announced at quarter's end, Axe covered roughly $87.8 million in debt associated with the GPU fleet. Axe is going to pay us another $42.9 million, delivered in monthly installments of $715,000, and the rest of the balance is due by September 30, 2027 at the latest — or sooner if Axe or one of its affiliates lands financing backed by the GPU cluster. On the Duos side, we're still serving that end customer from our Columbus campus, same as we always have; the difference now is that under a five-year agreement we've extended, we've signed a lease of the GPUs with Axe to handle servicing that customer. And because GPU risk is off our balance sheet anymore, our capital is free to go toward developing compute centers. Which raises the question: why compute centers, and why concentrate on the 5 to 10 MW band? High-performance computing demand just keeps rising, yet the constraint has shifted—it isn't chips anymore; it's electricity and scheduling. Getting a big hyperscale campus permitted, tied into the grid, and constructed may stretch across multiple years. At the same time, cloud companies, AI platforms, and enterprises require capacity immediately. This level of capacity goes past ordinary daily experience. You notice it after dark through streaming volume, through the online game your children play, through the AI tool students use when preparing for exams, and through telehealth visits with doctors located in other cities. More and more, that capacity must be spread across additional sites closer to the consumers and companies using it. That shortfall is precisely the purpose we were created to serve. Something in the 5-to-10-megawatt range hits a sweet spot for a cloud provider: it's substantial enough to be worth their attention, yet compact enough that we can find stranded power and avoid multi-year waits in a utility queue. That opens up markets the large developers pass by — Tier Three and Tier Four among them. Because our architecture is modular, we can energize capacity in months instead of years, then expand in stages as additional customers commit. Just as important is how we build. Closed-loop cooling is what our compute centers use, which means they avoid the millions of gallons of water that many big facilities consume. We site where power is already available and switch on capacity that's currently going unused. The power we're using is stranded, so we're not putting extra load on the grid that local families and businesses depend on. What we aim for is to leave each community in better shape than we found it. That means better connectivity where service has been lacking, local jobs in engineering, construction, and operations, and additional tax revenue for schools, roads, public services, and local infrastructure. In many of the towns where we operate, this makes a genuine difference. Columbus, Georgia is the proof. We acquired the campus in July of this year. In roughly 75 days, we had installed more than 7 MW of new infrastructure, all with local workforce, and the campus began full operation in October. As of today, that facility is running a 2,304-GPU cluster of NVIDIA B300s, and we now hold a 5 MW deal spanning five years. What customers are really buying from us is how quickly we can bring power online, and Columbus proves we can do that. It also serves as our blueprint. Everything we accomplished in Columbus is exactly what we plan to replicate at each of our sites. The second piece of evidence is the caliber of customers signing on. During the past month, we closed a 20 MW colocation contract running 10 years with a well-established, publicly traded cloud service provider. Total contract value on that deal exceeds $400 million, with deployment slated to kick off in Q2 of 2027. That contract demonstrates three things. The new agreement runs for ten years, which is double the length of the contracts we signed before. It was a sophisticated counterparty that performed its due diligence and picked Duos. The 20 MW matches precisely the site size we are designed to deliver. So what comes next? I want to give you specifics on the coming 12 months. Number one, power and land. We are working to secure roughly 100 MW of additional powered compute center zoned land across several U.S. markets. Approximately 25 MW of that already sits under contract, and active negotiations are underway on the remaining 75 MW. Number two, delivery. Much like the situation in Columbus, work has already started at the 20 MW location for our newest cloud client, with operations slated to kick off during Q2 of 2027. We're still tracking to meet that ready-for-service target—possibly ahead of it. Beyond that, we're developing an additional Georgia site that could come online as early as Q1 of 2027, and we'll share further specifics down the road. On top of all this, we're seeing stronger demand from a customer base that's bigger, has better access to capital, and is more varied than it was half a year back. It really shows how much ground we've covered in a short time, and it points to what lies ahead. Next, financing. We'll fund our expansion primarily with non-dilutive capital, both at the project level and at the corporate level, in line with the contracts we've already signed. Chris will go into that further in a moment. I also want to update you on the status of the other agreements we've announced; the 10 MW site we announced earlier this year continues to progress, but obtaining the extra power delivery from Georgia Power has delayed the project. That said, the hardware has already been delivered to the location, and we anticipate having a working fix operational during the second quarter of 2027. Beyond that, the 55 MW project continues to move forward, and we are busy evaluating locations that could accommodate that amount of capacity.

Doug Recker executive
#2

And lastly, our technology solutions group is expanding at a fast clip. This year, Duos Technology Solutions turned into our biggest revenue line, and that incredible team shows no sign of slowing down. Customers constructing data center and AI infrastructure nationwide are served by this group. It also provides us with sourcing scale plus supply chain assets for the compute centers we build ourselves. When it comes to deciding who delivers on time for long-lead equipment, that is a genuine advantage. Before handing things to Chris, I want to express thanks to our team. What this team accomplished this year is remarkable. Within a span of less than a year, the legacy rail division was divested, the new APR arrangement was terminated, more than $120 million was brought in, a Columbus campus was purchased and made operational, the GPU unit's sale was completed, and a decade-long contract was executed with a cloud service provider that trades publicly. For an organization of our scale, any one of these alone would represent an enormous, truly exceptional year. Every one of those things was accomplished by this team while still operating the business day to day. Our field and construction crews in Columbus deserve particular recognition. Roughly 75 days was all it took for them to install in excess of 7 MW, and that is precisely the level of execution our customers require. I'd also like to give credit to the Duos Technology Solutions group — in roughly twelve months they took our biggest revenue line and grew it from nothing. My thanks go out to our board and to our shareholders, who stood behind us throughout a year filled with major decisions. We've also made our leadership team stronger for the phase ahead. In recent months, Dipan Patel has come on board as Chief Operating Officer and is overseeing the development of our sites, and Matt Polimeni joined us in September as Chief Legal Officer. I'm also pleased to have Chris DeAlmeida serving as our new CFO. Chris is in fact assisting with shaping how we approach raising capital and concentrating on financing the company while keeping equity dilution as low as possible; given that, I'll hand things over to Chris. Chris?

Chris DeAlmeida executive
#3

Thank you, Doug, and I’m glad everyone could join us today. Since this marks my initial call with Duos, I’ll take a moment to introduce myself briefly. I joined as CFO toward the end of August, and prior to that I spent most of my professional life working as a CFO within publicly traded construction and infrastructure companies. My goals are simple: provide investors with a clear, consistent understanding of how this business makes money, finance our expansion in a way that safeguards shareholders, and put in place the financial discipline and reporting framework that a company at our stage needs. Since the business has shifted so much in this quarter, I want to start with three things that should help you make sense of the results. First, the rail business we sold off on August 5 shows up as discontinued operations. Second, what this quarter captures is a company in transition. The asset management revenue that drove last year's third quarter has tapered off. Technology Solutions is our biggest revenue line now, and recurring colocation compute center revenue has barely gotten going — the Columbus site only reached full operations in October, once the quarter had already ended. Third, several items tied to the GPU sale sit inside this quarter, including a gain on that sale and a loss from retiring the associated debt. Turning to our top line, third quarter 2026 total revenue reached $10.5 million, representing growth of more than 100% compared with $5.2 million in the third quarter of 2025. Technology Solutions brought in $6.8 million, whereas a year earlier that figure was essentially zero. Services and consulting revenue totaled $3.5 million, mostly from work performed for a new colocation customer. Related party services and consulting revenue in the third quarter of 2026 was roughly $70,000, a decline from $5.2 million in the prior year period as the asset management agreement was winding down. Third quarter 2026 gross profit was $4.4 million, an increase of 150% versus the same period last year. For Q3 2026, gross margin came in at 42%, versus 33% in the same period last year. The gain was driven by our revenue mix moving away from asset management work. Technology Solutions posted roughly a 15% margin, which is normal for a sourcing and integration operation. Margins on the professional services side were considerably higher. Looking ahead, we anticipate recurring colocation revenue will increasingly become the primary margin driver, and that should keep pushing gross margin higher as additional megawatts are brought online. Operating expense in Q3 2026 totaled $6.2 million, up from $2.6 million in the year-ago quarter. That rise was driven primarily by greater non-cash stock-based compensation, plus spending on business development and the staffing we require to scale. For the third quarter of 2026, stock-based compensation totaled $2.3 million. As a result, we posted an operating loss of $1.9 million in the third quarter of 2026, versus an operating loss of $900,000 a year earlier. Other income reached $1.4 million in the third quarter of 2026, a number that included a $4.7 million gain tied to deconsolidating the GPU-as-a-Service business as well as $740,000 in interest income. Partly offsetting those items were a $2.8 million loss on extinguishment of debt and $1.6 million of interest expense, and both of those relate to the GPU facility that actually paid at closing. Our loss from continuing operations before income taxes was $500,000, versus a loss of $800,000 in the same period a year earlier. Net income for the third quarter 2026 totaled $864,000, or $0.02 per fully diluted share, compared with a net loss of $1 million, or a loss of $0.06 per diluted share — fully diluted share, sorry — in the prior year period. Adjusted EBITDA for the third quarter 2026 came to roughly $500,000. The company didn't report any adjusted EBITDA for the same period a year earlier. For the first nine months of 2026, revenue came in at $18.8 million, up 36% compared with the prior-year period, while gross profit during that same stretch was $8.9 million, an 87% increase year over year. Income from continuing operations before tax totaled $50.1 million, and that figure includes a one-time $53.5 million gain recorded in the second quarter from realizing our interest in the parent of new APR Energy. Excluding that gain, the first nine months of 2026 produced a loss from continuing operations before income tax of $3.4 million, versus a $3.3 million loss in the same period last year. Cash at quarter-end stood at $44.8 million, up from $15.5 million at the close of 2025. Over the quarter, a substantial amount of cash went toward ordering long lead items for both current and future projects, as well as toward locking in additional sites for development and finishing the Columbus build-out. At September 30, 2026, we carried essentially no debt, and we remain confident that operating cash flow and existing receivables will continue to fund the business's ongoing operations, apart from future site developments. For those of you who are building models for the company, I want to walk through how revenue is generated. We monitor each site through three phases: signed, in service, and billing. Recurring revenue does not begin when the contract is signed; it starts only after a customer's capacity has been delivered and accepted. As a result, recurring colocation revenue will begin to appear in a meaningful way during the fourth quarter, because the Columbus site will have been operating for a full quarter. A number of you have requested clarity on what a site earns, so I will take this chance to lay out the details of the framework going forward. I know several of these figures differ from what we shared before, but this business has evolved rapidly and sharpened both its focus and its operating model on the fly. Because of that, we've simplified how we go to market and cut the operating costs we expect at future sites. From here on, our total CapEx per megawatt built—land and site work included—comes to roughly $6.5 million. For any given site, that per-megawatt CapEx number covers every megawatt available there, not just the critical IT load; so let's now think about each megawatt in terms of returns. At the contract rates in place today, one billable megawatt generates roughly $2 million to $2.5 million in annual revenue. A billable megawatt refers to the capacity we're contractually able to charge a customer for, and typically that's the critical IT load. Now on the cost side, going forward we expect to pass power costs through to the customer, and that takes the power expenses tied to the critical IT load out of our operating site expenses. So once site operating costs are covered, each megawatt should generate about $1.5 million in site-level EBITDA per year. I also want to touch on the payback question. Some of our earlier materials referenced a payback of roughly under three years, and that figure compared revenue to build cost. If you look at site-level EBITDA—leaving out financing costs while including non-critical IT power costs, because we'd carry those ourselves—the payback period is a little less than five years. Should project debt be brought in, or should those non-critical IT power costs come in lower, then the return on our own equity shortens quite a bit. Site to site, though, returns will vary. Contract rate, power pricing, and how much extra work a given site needs before it's fully up and running are the biggest variables.

Chris DeAlmeida executive
#4

So that's why we go after locations with stranded power first, and we get the customer signed before construction begins. Heading into the fourth quarter, Duos has essentially finished its transformation into a colocation compute center company. Our operating model now centers on long-term recurring contracts, along with our technology solutions infrastructure business, which is growing quickly. Taking into account contracts already performing, a full quarter of colocation revenues, and orders slated for delivery in the fourth quarter, we expect revenue for fourth quarter 2026 to reach at least $30 million. Consequently, we remain confident that total revenue for 2026 will be above $50 million, and we expect positive adjusted EBITDA for the full year. I should note that the sale of the GPU-as-a-Service transaction will have an impact on EBITDA going forward, the fourth quarter included. To be specific, we no longer pay interest on the GPU financing, but we now pay GPU rent that flows through cost of revenues; naturally, this shifts the expense from an EBITDA add-back into a site-specific operating expense. So selling the GPUs alters how EBITDA is calculated and will affect Q4, yet as I just mentioned, we still expect positive adjusted EBITDA for the full year 2026. Regarding our 2027 full-year outlook, I've only been in this role for slightly less than three months, and I'm still in the process of pinning down every plus and minus in a business that shifts very quickly. Beyond that, my aim is always to offer guidance that is pertinent and easy to grasp, so investors can see where we are and what we're trying to accomplish. On that note, the $160 million of full year 2027 revenues we stated before remains unchanged. That being said, given some of the recent shifts in the business, it's too early to provide a full year 2027 EBITDA range. Even so, we expect strong EBITDA growth in 2027 and intend to share full year guidance during our year-end 2026 earnings call. With the business transformation now essentially finished, our short-term goals are straightforward. We'll complete site agreements covering about 100 MW of powered land, and we'll prepare to begin the 20 MW cloud deployment during Q2 of 2027. So let's turn to what shareholders ask us about most often: what's the funding plan? First, the scale. At close to $6.5 million for each megawatt, the upcoming 75 to 100 MW represents a roughly $480 million to $650 million initiative constructed across multiple years. For a business of our scale, that figure is substantial. Still, we won’t construct everything simultaneously—we’ll proceed location by location, in stages, and keep allocating construction funds to a given site only after a customer has committed. Going forward, here’s the approach for financing each location. Our aim is to cover most of every site’s cost through non-dilutive project-level debt and instruments that resemble debt, backed by the site and its customer agreements. Contracts running ten years with creditworthy clients—like the 10-year cloud service agreement we have—are exactly what lenders are keen to finance. The rest of what's needed to finish construction at the site will come from equity, and we have several places to draw that from: the cash we hold on the balance sheet, receivables that are already on our balance sheet as of today, cash flow that keeps coming in from sites in operation, and—when it makes sense—partners who put money in alongside us at the project level. Beyond that there's financing at the corporate level, which gives us flexibility across the whole portfolio. What does that capital cost us? I'm not going to quote rates before the terms are final, but I can explain how we think about returns. Any site needs to earn a yield that is well above what it costs to finance it. Unlevered returns are running in the mid-20s, around the 20% mark, and that spread gives us headroom at current debt rate levels while we continue to create shareholder value. When it comes to dilution, our strong preference is to avoid issuing common equity as a way to fund the business. That said, we're looking at a variety of structures, and while no tool is off the table, each financing decision goes through the same test: does it grow megawatts and recurring cash flow per share? Equity is still among the tools we have, and any use of it would be aimed at funding growth with returns we see as clearly accretive to shareholders over time. Let me make one thing clear: our single biggest focus and highest priority is financing that doesn’t dilute shareholders, both at the project level and at the corporate level. That said, here is the current situation. Columbus has been funded off our own balance sheet. For the 20 MW cloud deployment and our upcoming sites, we are in active talks with multiple prospective lenders and capital providers, at both the project and corporate level, and once agreements are signed we will update the market; even so, we are not standing still. We have already started work on locking in sites and placing orders for equipment tied to forthcoming contracts. You can see this in the cash we spent during the third quarter, and that spending is aimed entirely at advancing site development and growing future EBITDA. As I mentioned before, the cash we have plus the ongoing cash flow we expect from operations will cover the commitments we currently have that aren't tied to sites. What allows us to construct upcoming sites at the speed our customers desire is external financing. In summary, the business model has become simple. We bring the customer on board, construct in stages, and fund each site using the contracted cash flows it generates, and we clearly favor capital that isn't dilutive. Megawatts in service and recurring cash flow per share will be how we gauge our success, and we'll continue reporting our progress on that basis. Looking ahead, my responsibility is to ensure that each dollar we deploy delivers a return for shareholders; with that, I'll hand the call back to Doug.

Doug Recker executive
#5

Thanks, Chris. I'll wrap up with three points. First, Duos is now a colocation compute center company. The model is straightforward. We build and operate the compute center, and the compute comes from our customers. Second, the model delivers results. In Columbus, we installed over 7 MW in roughly 75 days, and the campus is running at full operation. On top of that, a publicly traded cloud service provider recently selected us as a partner for a 10-year deal. What's the reason? They have witnessed what we are capable of delivering. Third, the runway ahead of us is about 100 MW of powered land in development, concentrated on distributed sites ranging from 5 MW to 10 MW in markets and communities where we partner and where others look past. And every site is funded individually against signed contracts. That matters. We are building something lasting, and we appreciate your support. Operator, please open it up for questions.

Scott Buck analyst
#6

Hi, good afternoon, guys. I really appreciate the extra detail you gave beyond the prepared remarks, particularly regarding the financing. First question, I'm curious, Doug, about the 20 MW CSP contract: does the 2Q start mean the full 20 MW, or is that a phased ramp?

Doug Recker executive
#7

Megawatt on when it's delivered, whether the customer is installed or not.

Scott Buck analyst
#8

All right. So if you actually deliver the entire 20 MW by the second quarter, they're still paying for the whole 20 MW?

Doug Recker executive
#9

That's right.

Scott Buck analyst
#10

Yeah. All right. That's great. So that CSP deployment, is it at the current flagship campus, or does it sit at a new site?

Doug Recker executive
#11

Sorry, I couldn't quite hear you. Are you asking about the 10 MW? The extra 10 MW?

Scott Buck analyst
#12

No, no—the 20 MW contract.

Doug Recker executive
#13

No, no. That 20 MW isn't located in Columbus. It isn't; that's a brand-new facility.

Scott Buck analyst
#14

Okay. All right, that's great. So I suppose the final thing I have relates to the land pipeline — that 100 MW land pipeline. You mentioned roughly 25 MW is contracted right now, with 75 MW being negotiated. How long until those close? And do any of those sites connect to demand from a particular customer, or is this more of a speculative build?

Doug Recker executive
#15

Sure. On the 75 MW, most of it is actually under LOI with hard money down, so deposits have been made. I'd expect we'll have a majority of that wrapped up by the end of this year or into January. But those sites — there are several of them, obviously, averaging roughly 10 MW to 20 MW apiece — will be chosen according to customer worthiness, essentially creditworthiness. So we're now in a position where we can pick and choose. Our backlog is huge, and six, eight months ago it would have been a different story. But at this point we're looking toward the future. We're after longer-term deals and customers with high creditworthiness.

Chris DeAlmeida executive
#16

Something to remember, Scott, is that speculative work isn't something we do, so before we build, we look for signed contracts with customers.

Scott Buck analyst
#17

Great, that wraps things up on my end, everyone. Thanks for your time. Appreciate it.

Chris DeAlmeida executive
#18

Thanks.

Doug Recker executive
#19

Thanks, sir.

Ed Woo analyst
#20

Yeah. Congrats on everything you've accomplished. You're clearly very near the center of what's happening with data centers and AI trends. Have you noticed any major shifts yet, especially given the recent political changes?

Doug Recker executive
#21

Yeah. Good question, actually. What sets us apart today is, clearly, if you've tracked us over the past year, you can see where we build in Tier Three and Tier Four markets, correct? We've really refined our approach. We enter these markets first, and we sell the community first before we ever get involved with the land. Because the last thing we want is to buy property or put money down and then discover the community doesn't want us. Every property we're discussing now and going forward, we've already vetted the community. Their support is secured. There's one site where I still need final approval. I think that's mid-December in Ohio, and it's among our larger sites. But yeah, the important thing is educating the market. When we arrive in a market today, the first reaction you get is, "We don't want data centers." And we get that. We completely get that. What we do — and Dipan has been terrific at this, along with our marketing team — is they go into the market and essentially do a show and tell; they'll head to the community center and set up booths so the community can come in, and we show them what we're building. We also show them what a mega campus looks like, since that's what they imagine everyone is building when you mention data center. Once they actually see our layout and how we build, and that we don't use water, and that we're in the community to help them grow their connectivity and everything, they actually like it. What's really interesting, what's really cool about our approach is, most of our sites, I'd say nine out of 10 of them, they come to our Columbus facility. Just last week, one of the towns came with their Chamber of Commerce, with their elected officials. And they came in and toured the facility. We've had a couple other folks do that as well, and we welcome that because they can see the size of the facility we're building. It's completely different. They actually bring They calculate the noise, they look at the water intake; so it's not we're just saying it, they're actually, we're willing, "Hey, come look at it. Come see what we're doing," and we actually educate the community. That's worked out huge for us. Plus, we're going to where the power is already, right? They aren't putting up new infrastructure out in the town; we aren't drawing and consuming electricity that the community already relies on; basically, it's stranded power, which is what we call it. It sits at the transformer level, right there at the substation. That's the way we approach it.

Ed Woo analyst
#22

Excellent; that answers my questions really well. Thanks, and I wish all of you continued good luck going forward. Thank you.

Doug Recker executive
#23

Thank you, sir.

Bill Papanastasiou analyst
#24

Yeah, good evening, and thanks, gentlemen, for taking my questions.

Doug Recker executive
#25

Yes, sir.

Bill Papanastasiou analyst
#26

Yes, thanks. I'd like to pick up where that previous question left off. Doug, could you share what you're seeing on the ground regarding supply and demand for data center colo capacity, and where you expect that to go? I'm also wondering how the pipeline of powered land opportunities is shaping up and whether the regulatory headwinds are changing market dynamics. Do you think new players will start pursuing smaller-scale deployments, and how do you expect competition to play out? Thanks very much.

Doug Recker executive
#27

Yes, Bill. Good question. It would be crazy if we didn't start seeing others move into that space, since the demand is clearly there. The demand wasn't something we created—it already exists, and now they're realizing that hitting the 5 MW to 20 MW range is more achievable, and that applies not only to inference but even to enterprise and ordinary compute. Clearly, we're in the process of deploying 5 MW of B300s at this moment—or 7 MW—so the need is real, and they're able to take advantage of it. Everyone keeps asking whether that segment will get hit the way the large players have been. Speaking from firsthand experience on the ground—I visit each of those communities before we engage—the 20 MW figure doesn't really change their thinking. So they're curious and they want to get a handle on it, but deploying at 5 MW to 20 MW is considerably simpler. I don't mean it's simple, but clearing the political hurdle is simpler, and locating that 5 MW to 20 MW range is simpler. You notice plenty of Bitcoin mining operations, correct, that existed out there, and folks are getting really excited about them. There's 5 MW and 10 MW up for grabs. The trouble with many of those locations is that typically they aren't in heavy industrial zones, and you can't install generators. Right now there's abundant land available with 5 MW to 10 MW that people could purchase tomorrow. When you actually check things out properly, you discover generators can't go in that spot. And if they can't go there, then it's useless to me. Those sites exist—you've got to locate them—and you need to confirm the zoning is right and that the community remains aware of your plans. People absolutely resent being blindsided, and they'll stop you cold. We watched that happen to somebody else who's deploying. So our approach is to show up early and find out whether we're even wanted before we commit.

Doug Recker executive
#28

Thanks, operator. I appreciate everyone’s support and for being with us today; we look forward to speaking with you down the road. Have a wonderful evening. Thank you very much.

Operator operator
#29

Thanks. Prior to concluding today's call, I want to go through Duos' safe harbor statement, which has key cautions regarding the forward-looking statements that were made on this call; forward-looking statements under the Private Securities Litigation Reform Act of 1995 are part of this earnings call. Words with a forward-looking character — believes, expects, may, will, should, anticipates, plans — as well as their negatives or comparable expressions, are intended to flag forward-looking statements. We need to warn you that these kinds of statements can't promise what will happen down the road, either in performance or in events, and they're exposed to various uncertainties, risks, and other forces—lots of them outside our control—that might shape how correct the statements turn out to be and the forecasts they depend on, and that could make Duos Technologies Group Inc.'s real results come out substantially different from what those forward-looking statements expect. Among these risks and uncertainties are those covered in Item 1A of Duos' yearly report on Form 10-K, which is explicitly incorporated here by reference, along with additional factors that Duos' SEC filings may describe from time to time. On this call, Duos additionally discussed adjusted EBITDA, a metric that isn't calculated under GAAP. Today's press release includes a reconciliation to the closest comparable GAAP figure, and you can find it in the investor relations area of the company's website. Thanks for being with us for Duos Technologies Group's Q3 2026 earnings call. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Duos Technologies Group, Inc. transcript - plus 131,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Duos Technologies Group, Inc. earnings transcripts and 131,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.