Good afternoon, and thanks for being with us on Soluna's third-quarter 2026 earnings call. You can find our earnings release and the presentation that goes with it in the Investor Relations section of solunacomputing.com, and this call is being webcast along with the presentation. Joining me today are John Belizaire, our Chief Executive Officer, Ryan Carver, our Chief Development Officer, and Michael Pici, our Chief Financial Officer. Before management gives their formal remarks, we want to remind everyone that certain statements we make today may count as forward-looking statements under securities laws and carry a number of risks and uncertainties. So we caution you that many factors, a lot of them outside our control, could cause actual results and events to differ materially from what those forward-looking statements describe. For a more detailed look at the risks, uncertainties, and assumptions tied to our forward-looking statements, please see the disclosures in our earnings release and in the public filings we make with the Securities and Exchange Commission; except as required by law, we disclaim any obligation or undertaking to update forward-looking statements so they reflect circumstances or events occurring after the date those forward-looking statements are made. We'll also be discussing non-GAAP financial metrics, and we encourage you to read our disclosures carefully, along with the reconciliation tables to applicable GAAP measures in our earnings release, as you consider these metrics. We point you to our filings with the Securities and Exchange Commission for detailed disclosures and descriptions of our business, as well as uncertainties and other variable circumstances, including, but not limited to, the risks and uncertainties identified under the caption Risk Factors in our annual report on Form 10-K for the year ended December 31st, 2025, and our other SEC filings. One reminder before we begin: starting last quarter, we present pass-through electricity costs on a gross basis instead of net. That change raises both reported revenue and reported cost of revenue by the same amount, and it has no effect on gross profit, operating loss, or net loss. Prior periods are not revised, and year-over-year revenue comparisons include the change. The affected slides carry footnotes. With that, I'll hand it over to John.
Thanks, Mike. Hello, and welcome to Soluna's third-quarter results and business update. I want to begin by acknowledging the environment. The market has been difficult, and many of you are feeling it. So are we. Today we'll keep our focus on what we're doing and where we stand on what matters most, which is converting our AI campuses into signed leases. The thesis remains the same. In the AI era, power is the primary constraint. Soluna secures long-term behind-the-meter access to power at scale, and we build data centers directly on renewable generation sites. Four numbers frame where we stand. Revenue grew by 80% year-over-year, our sixth straight quarter of sequential growth. If you factor out the presentation change that Mike talked about, revenue was up 29%. With Kati 1 finished in September, capacity under management now totals 206 megawatts. Across our two campuses, Kati 2 and Dorothy 3, which are in early construction, we have over 650 megawatts of planned AI capacity. Our development pipeline, which is renewably powered, is now above 6.3 gigawatts. Turning to the quarter, on the business side there are three points. The first is the team. Ryan came aboard as Chief Development Officer in July, and in the time since, he has added Neil Robinson as Vice President of Construction and Michael Stark as Vice President of Planning. We're putting money into this team right now so that construction, engineering, planning, and procurement leadership sit in-house while we grow the AI business, and so we're ready to move as our campuses progress. Next, the balance sheet. In August we prepaid our Generate facilities at Dorothy 1A and Dorothy 2. After the quarter closed, we paid off the remaining Generate balance at Briscoe Wind. Now that Briscoe's debt is cleared, we can redirect power from the Briscoe wind farm to the Dorothy 3 AI campus that's currently under construction. We closed the quarter with $109 million in cash. Third, power. In September, through its Batch Zero process, ERCOT designated 266 megawatts across our Kati and Dorothy campuses as baseload. With these classifications, every campus keeps the interconnection capacity it already has, and none of them will face additional reliability review or megawatt allocation in the Batch Zero study. At Dorothy, a request for another 50 megawatts is now being studied. Turning to projects, Kati 1 is finished at 83 megawatts, while Kati 2 and Dorothy 3 each moved further along in construction after the quarter closed. On the commercial front, at Dorothy 3 we signed a subscription agreement with Applied Digital on October 20th to create a joint venture for a planned 50 megawatts, and ChronoScale has signed a non-binding letter of intent to lease that facility. At Kati 2, we decided against renewing the exclusivity of our prospective tenant and started remarketing the site. We've just signed a fresh non-binding LOI with another prospective tenant. Later on, Ryan will walk everyone through the two campuses. Now a brief note about policy. Austin is getting new leadership in Texas, and officials across every level are scrutinizing data center growth more closely. We built our approach with their concerns in mind. Renewable computing draws on clean power—wind and solar among the sources—that is already available and could otherwise be curtailed, instead of placing additional strain on the grid; it is meant to safeguard the communities we belong to while linking them to the jobs and investment that accompany the future of innovation; we have been presenting that argument face to face. In October, we held public open houses for Dorothy 3 in Briscoe County, and in November, for Kati 2 in Willacy County. Ryan will provide more detail in our community update coming up. With that, I'll turn it over to Ryan to go through our pipeline and AI development. Ryan?
Thanks, John, and good afternoon. I'll walk you through where our AI projects stand this quarter. Within our current pipeline we have projects set aside for AI, and the AI HPC development portfolio we hold now comes to roughly 1.7 gigawatts. This chart lays out the position of every project, all the way from site control and power through design, financing, and construction. Today I want to focus closely on the pair of projects in development, Kati 2 and Dorothy 3. Kati 2 is located across the street from Kati 1 in Willacy County. At full build the plan calls for more than 350 megawatts. In Q3, we engaged the general contractor and advanced phase one design into construction documents. Long-lead equipment orders were placed. Engineering is underway for a 100-megawatt expansion of the Las Majadas substation, and we signed an agreement for gas pipeline access. Following the quarter's close, civil and earthworks began in October, and our sales and use tax exemption was secured. A public open house for Willacy County residents took place in Raymondville on November 12th. Regarding the tenant, we mentioned last quarter that a letter of intent for Kati 2 had been executed. This quarter, we decided against extending that tenant's exclusivity because we didn't think they'd meet the credit standards we require for a lease of this size. We returned the site to the market, and it attracted a lot of customer interest and demand. A new letter of intent is now signed with a different customer, and we anticipate they'll satisfy our credit requirements. We'll share an update with the market as soon as we have a definitive agreement to announce. Now I'll turn it to Dorothy 3, starting with the partnership we announced in October. We reached a definitive agreement with Applied Digital to create a project company owned jointly for a planned 50-megawatt AI data center, and that facility will serve as the first phase of Dorothy 3. When the deal closes, Applied Digital is expected to hold 51% and Soluna 49%. Each partner puts in development funding in line with its ownership share, and Soluna additionally contributes land and power assets. Applied Digital brings AI data center experience. Soluna brings a wind-powered site plus power generation that we own. ChronoScale has signed a non-binding letter of intent to lease the facility, and lease talks are underway. Closing is anticipated by early December, contingent on the remaining conditions. The planned capacity for Dorothy 3 exceeds 300 megawatts, situated across 397 acres next to our Briscoe wind farm. Land closing was finalized in August during the third quarter, and we kicked off master planning along with long-lead procurement, while finishing studies covering environmental, water, survey, and fiber. After the quarter ended, a public open house took place in Silverton on October 2nd, and October also saw construction get started. Our sales and use tax exemption came through, and a tax abatement agreement for the project won approval from Briscoe County on November 9th. Now that the Generate debt at Briscoe has been repaid, we're able to send power from the wind farm to the campus; this slide covers both campuses together: what we finished in the third quarter, what's done or underway since then, and what lies ahead. At Kati 2, the third quarter centered on design and procurement; we engaged our general contractor, advanced phase one into construction documents, placed orders for long-lead equipment, began the Las Majadas substation expansion, and signed a gas pipeline access agreement. Since the quarter ended, civil and earthworks have gotten underway, we obtained our sales and use tax exemption, and on November 12th we held a public open house in Raymondville as part of the property tax abatement process. With a signed LOI in hand, we anticipate the next milestone announcements will be a signed lease and project financing. At Dorothy 3, we closed on the land during the third quarter, kicked off master planning and long-lead procurement, and finished site studies. After the quarter closed, we signed a definitive agreement with Applied Digital covering phase one; construction is now underway; we secured our sales and use tax exemption; Briscoe County approved the property tax abatement on November 9th; and we paid off the Generate debt, which releases Briscoe's power for the campus. The Applied Digital joint venture is in the process of closing and is expected by year end, contingent on the remaining conditions. Turning the ChronoScale letter of intent into a signed lease and delivering the first RFS tranche are the upcoming milestones. As John noted, both campuses run on power we already possess. Kati 2's first phase is part of the 166 megawatts of baseload capacity at Kati, while Dorothy 3's initial phase sits within the 100 megawatts at Dorothy. Those milestones we've marked "targeted" aren't tied to firm dates—we'll share updates whenever they occur. Before I turn things over, one additional item deserves mention, given that investors have raised the question and because it shapes our construction approach: across Texas, communities and policymakers are paying closer attention to data center projects. Our strategy is to get involved early and do so openly. During the last six weeks, we've held open houses in both counties, offering bilingual materials and staffing a dedicated lead for community engagement. Here are a few supporting details. On power: sustainable wind power is located at both campuses, and they link to the high-voltage grid rather than the neighborhood distribution lines that feed residences. On water: the cooling setup is engineered as a closed-loop design consuming very little water. On sound and light: under the Dorothy 3 agreement, noise caps apply at homes in the vicinity, verified by a third-party consultant, together with downward-shielded lighting requirements. On economic opportunity: once fully running, phase one should generate roughly 21 full-time positions at Dorothy 3 and approximately 40 full-time positions at Kati 2, with priority given to nearby workers and suppliers. That said, I'll turn it over to Mike Pici for the financial section. Mike, the floor is yours.
Thank you, Ryan. I'll walk through the balance sheet, the P&L, and how capital was deployed during the quarter. Starting with the balance sheet versus year-end 2025, we closed Q3 with $109.3 million of cash available for project development and operations, a 43% increase from $76.4 million at year end. Our current ratio strengthened to 2.5 times from 1.9 times, and working capital stands at a positive $76.9 million, up from $42.9 million at year end. Turning to assets, net property, plant, and equipment nearly doubled to $147.4 million, compared with $74.8 million at year end. That increase reflects the April acquisition of the Briscoe wind farm for $54.4 million, $10 million for the Dorothy 3 land acquisition, and $28.9 million in build-out capex and equipment deposits—mainly tied to completing Kati 1 and advancing Kati 2—partly offset by depreciation expense during the year-to-date period. Soluna has been investing capital in hard assets that will generate future returns. Total assets reached $297.7 million, up from $187.9 million at year end. On the liability side, total liabilities fell to $67.1 million from $75.7 million at year end. Debt net of issuance costs fell from $26.8 million at year end to $16.7 million. On last quarter's call, I mentioned that we had moved our Generate debt into current liabilities since we planned to repay it, and that's exactly what happened. We prepaid the Generate facilities at Dorothy 1A and Dorothy 2 during August. Once the quarter closed, we settled the rest of the Generate debt associated with the Briscoe wind farm and retired those Generate loan facilities. As a result, although debt as of September 30th stood at $16.7 million net of issue cost, with the final Generate repayment completed in October, total debt now sits below $8 million. There are three advantages to using Soluna cash to retire debt. To start, reducing leverage during uncertain times in the AI market is wise. Next, since the Generate liens tied to the Bitcoin and wind farm assets have been released, Soluna is now able to move forward with redeploying those assets toward AI projects. Also, Soluna now has the financial flexibility to reset the capital structure for the new AI programs that we will need to fund once we succeed in signing new leases; on the equity side of the balance sheet, we raised $170.1 million year-to-date through the ATM and SEPA programs. Here is how that money was used: $51.4 million in net cash went toward the Briscoe acquisition, $28.9 million went to capex and equipment deposits, $20.1 million was used to buy out the JV partners at Dorothy 1A and Dorothy 1B, and $40.5 million went to debt repayment, which includes the $19.1 million Generate prepayment in August. The rest of the equity raises went toward operations, with $32.9 million returning to the balance sheet as growth in the cash balance. In short: our infrastructure holdings are larger, our debt is lower, and our cash position is higher than at the start of the year. Moving to the P&L, revenue came in at $15.1 million, an 80% increase year-over-year and about flat sequentially — our sixth consecutive quarter of sequential growth. Excluding the shift in presentation of pass-through electricity costs, which we adopted last quarter, revenue rose by $2.4 million, or 29% year-over-year, on the strength of higher hosting and leasing revenue. On a sequential basis, reduced site availability cut volumes at our Bitcoin sites by roughly $700,000. That decline was offset by revenue recognized from a leasing contract termination at Sophie. Looking at specific revenue lines, data hosting revenue came in at $12.4 million, up $5.3 million from a year ago. Wind generation contributed $594,000, net of intercompany elimination. On the other side, proprietary mining revenue fell $916,000, or 33%, as average hash price dropped 37%. Gross profit was a loss of $1.9 million, versus a profit of $2.3 million a year ago and $766,000 last quarter. Several things drove that result: the Briscoe wind farm incurred $3 million of unscheduled turbine repairs and maintenance during the quarter. Absent those repairs, gross profit would have come in at $1.1 million, equal to a 7.5% gross margin. Underneath the consolidated number, data hosting produced $1.7 million in segment gross profit, which made it the biggest contributor. Demand response contributed $251,000 in gross profit at what amounts to full margin. Proprietary mining posted a gross loss of $508,000, driven by hash price compression. Wind generation showed a gross loss of $3.3 million, including the repairs I referenced. The net loss came to $34.3 million, versus $25.8 million in Q3 2025. This year we didn't have the $22 million fair value adjustment loss we recorded a year ago, but that benefit was more than outweighed by several other items: G&A came in $17 million higher, including $14 million of non-cash stock compensation expense; we took a $15.8 million unfavorable charge related to debt extinguishment; and we had a loss on the Generate prepayment this year, whereas last year we had a gain on the New York Digital Investment Group settlement. Financing costs were $4.7 million lower, which partly offset a $4.2 million decline in gross profit. Adjusted EBITDA came in at a loss of $7.5 million, versus a loss of $1.6 million in Q2 and a loss of $6.4 million in Q3 2025. On a sequential basis, adjusted EBITDA dropped $5.9 million. The causes were $3 million for Briscoe repairs and $2.5 million tied to AI high-performance computing business development work, which covered legal and advisory expenses as well as assessing new power and data center locations. Compared with a year earlier, adjusted EBITDA was down $1.1 million. Excluding the $4.7 million financing cost in Q3 2025, the decline was $5.8 million. What drove that: $3 million for Briscoe wind repairs, $3.1 million more in cash G&A stemming from legal and consulting costs plus additional headcount, and weaker mining margins—partly offset by greater hosting revenue and margin contribution. You can find full reconciliations in the appendix and the earnings release. Turning to capital—the topic I concentrate on and hear the most questions about. Earlier, during my discussion of the equity portion of the balance sheet, I noted the $170.1 million raised so far this year via the ATM and SEPA. In Q3, sources and uses came to $46 million; we brought in $37.7 million under the ATM program by issuing 30.4 million shares. Cash covered the remaining $8.2 million, and cash plus restricted cash fell from $131 million as of June 30th to $123 million as of September 30th. In Q3, the uses were as follows: $22.5 million went to debt repayment, primarily the Generate prepayment; $13.8 million went to net capex and equipment deposits, primarily the Dorothy 3 land and Kati 2 deposits; and $9.7 million went to working capital and other, primarily HPC-driven G&A. After the quarter closed, on October 22nd, we paid off the remaining Generate balance at Briscoe Wind. That facility is now terminated, and Generate's liens on the project assets have been released. Combined with the August prepayment, this brought total debt down from $37.9 million at June 30th to $7.7 million. During our 2026 annual meeting on October 16th, shareholders gave the green light to increase authorized common stock from 375 million shares up to 1 billion shares, and they also approved issuing shares beyond Nasdaq's 20% cap under our Yorkville SEPA. Now, to wrap up, I'll explain how we intend to finance the things Ryan outlined. Securing an AI contract requires spending ahead of time, before any contract is in place: fiber studies, environmental and geotechnical work, deposits on long-lead equipment, site design, forming joint ventures, and lining up power. When a customer runs diligence on a site, what they're assessing is work already finished. There's no way to sit back until a contract is awarded and only then begin.
When it comes to our large build-outs, the approach we take is debt at the project level. Take a 100-megawatt build-out, which we peg at $1.2 to $1.3 billion: our target would be 70% to 80% project-level debt, sized against the contracted tenant cash flows under the lease. The other 20% to 30% would be funded through a blend of contributions from Soluna, third-party project equity, and prepaid rent provided by the tenant. Our joint venture with Applied Digital at Dorothy 3 illustrates that partnership structure, where each partner funds according to its ownership share. We would anticipate that debt and equity formation happening within the 8- to 12-week period after we announce a signed lease. Having capital ready to start construction inside that window is one more use of the cash sitting on our balance sheet. Our existing operations and our AI projects are capitalized separately at the project level, so each gets access to capital suited to its risk profile; that is the way we intend to underwrite an AI lease. At the lease rates being struck in this market right now for critical IT capacity on long-duration, triple-net terms, a 100-megawatt, 15-year contract would produce enough revenue and net operating income to service and retire the project-level debt and to deliver a strong multiple on the equity invested. The illustrative case on this slide shows about $180 million of stabilized annual net operating income against an estimated $1.2 to $1.3 billion build-out, based on the assumptions disclosed here. Once we do reach an agreement, results may differ materially. I offer it to explain why we are investing ahead of a contract. It is not a forecast, and keep in mind that this is only the first 100 megawatts of our AI pipeline, with expansion possibilities at every campus and additional projects to layer on top. To sum up, Q3 was a quarter of execution and deleveraging. We completed Kati 1, repaid our Generate facilities at Dorothy 1A and Dorothy 2, and after quarter end, at Briscoe Wind; we closed the quarter with $109.3 million in cash and kept investing in Kati 2 and Dorothy 3; with that, I will hand it back to John.
Thank you, Ryan and Mike. I'd like to wrap up by describing where this puts us. Consider what Dorothy 3 looks like today. The land belongs to us, the adjacent wind farm is also ours, and the debt on it has been fully paid off. In their Batch Zero process, ERCOT has designated the campus's power as baseload. Building work is already underway, we've entered into an agreement with Applied Digital for a joint venture, and ChronoScale has put its signature on a letter of intent to lease the facility. Land, power, construction, a partner, and a prospective tenant: those are the components of an AI campus, and at Dorothy 3 they're all present. What comes next is finalizing the JV and getting a lease signed. Kati 2 is progressing too, with earthworks now in motion and a fresh tenant LOI signed during this month. We designed this company to execute: construction and procurement leadership kept in-house, $100 million in cash, and a financing strategy that Mike took you through, structured to act fast once a lease is inked. That's the way we convert power into AI campuses. Everything rests on clean energy that might otherwise go to waste through curtailment. We call that renewable computing, and it's our mission: to make renewable energy a global superpower using computing as a catalyst. Thank you for your time. Operator, we're ready for questions now.
Hey, guys. Congratulations on everything you've accomplished in rolling out your AI strategy. That's really impressive; it seems you can draw in a prospective tenant of higher credit quality for Kati 2, which is excellent. To start, where do things stand with the negotiations there? Could you give us a bit more detail on what the new potential tenant looks like? Would that be a hyperscaler, an AI lab, or an enterprise customer? Any further detail would be useful there.
Mike, John Belizaire here, and I'll handle that question. Thanks for being on the call and for asking it. Once we remarketed the site, we took it to a broad set of hyperscalers and neoclouds; we aren't able to share precisely who the customer is. We generally avoid that. What you should take away is that this potential tenant will align more closely and precisely with our credit criteria. That's among the main things we screen for. Plenty of parties are interested in our site, but saying yes to all of them is difficult until they satisfy our credit criteria. As for negotiations, we're moving into diligence with them alongside the lease talks and the structuring of that agreement. The good part is that we already had a fairly strong document to work from with a new tenant, and we expect that to speed things up; we're also discussing some expansion opportunities with them.
Got it. Appreciate the thorough rundown, John. Mike, this question may be yours. I recall you went through the illustrative example about the yield on cost these projects might generate. What I'd like to know is whether you can elaborate a little on what you're targeting, given where the two lease contract negotiations currently stand. Based on what you're seeing, would it be reasonable to expect a yield on cost somewhere around the mid-teens?
Yes. Earlier in the year — let's say Q3, early Q, sorry, Q2 — we were aiming for a 13% to 14% yield on cost. With borrowing costs having risen across the sector now, our target yield on cost is rising as well. We're tracking that spread between what financing costs were six months ago and what we believe they'll be now at lease signing. Our yield on cost targets are going up.
Understood. Just one more if I may squeeze it in. From your prepared remarks, Mike, it sounds like you expect, if I'm not mistaken, project-level financing potentially to close 8 to 12 weeks following lease signing. Can you share any color on how discussions with potential lenders are going given the current environment?
Simply to stay flexible across different options. The high-yield market has been extremely tight and shut, but other private credit deals exist, plus investment grade offerings too. Staying nimble and heading where the market permits you to get financing done during these harder times.
I appreciate you taking my questions. Thank you.
Hi, thanks. Good evening, and thank you for fielding my questions. I'd like to start with one of the obvious topics, the election outcomes and what those might potentially mean for a few of your sites. I realize the Governor-elect has made some positive remarks regarding existing sites, particularly if you're an owner of baseload facilities, but I'd like to get your view on what's happening and what's planned at both Kati and Dorothy. Thank you.
Appreciate the question, Chris. Happy to take that one. Texas has been our home for quite some time, and we fully grasp the emphasis on affordable power, responsible water usage, and making sure communities have a seat at the table. Our approach, I'd say, pairs colocation with existing generation; we rely on closed-loop cooling systems, and we've invested heavily in continuous community engagement. A worry in certain states has been that data centers go up without the community having any voice. In Briscoe and Willacy Counties over the past few months, we've run public open houses to lay out our plans and listen to residents' concerns, and that engagement will carry on as our projects move forward. We genuinely believe the Soluna approach might work as something of a blueprint for developing these projects in those states. The reason is that we draw on power that would otherwise go to waste. We place no strain on the grid or on prices. A light environmental footprint is built into the design of our data centers. We spend a tremendous amount of effort in dialogue with the communities we serve, collaborating with them to determine how our spending can most effectively expand their tax base, generate employment, and establish an entire sector that elevates those areas. As policy development unfolds across the months and years ahead in Texas, we very much hope to have the opportunity to present our work as a model for the proper way to handle data center development.
That's great news. Thanks. For my second question, I want to ask about the APLD agreement and how likely it is that the deal closes. It sounds as though the timeline has moved forward. The tax abatement is finished, and I believe you mentioned a closing in early December, then before the end of the year. What remains to be done? Which items are still outstanding? Can you say anything about the possible reimbursement in the event it doesn't close, and how much of the $45 million cap they have spent so far?
I'll handle the first part, and you can take the second part, Pici. On the work streams, you're correct that the tax abatement and the sales and use tax work stream is complete, I would say on schedule or a bit ahead of schedule, and we're progressing quite well there. The bulk of our efforts is going into finalizing the PPA with the Briscoe wind farm and the JV agreement itself, where we're wrapping up a few details, along with the EPC contract with the contractor, which we're finalizing, and the land-related contribution agreement we're working on; it's really a set of documents that need to be integrated and fit together properly, and that's where our attention is concentrated at the moment. As you said, construction is underway and investment is being made to move the project forward. I can hand it to Mike Pici to comment a little on that. APLD hasn't made any public comments about its investment in the project, so we need to be careful about what we disclose here, but over to you, Pici.
I'm certain they'd rather we didn't weigh in on or put a figure on how much they've started spending. Part of what made the joint venture attractive was Soluna giving access to power and land, so things could scale up really fast. Applied Digital brought construction know-how — Ryan mentioned the 900 megawatts they've already built out — plus access to capital, which meant this project could get funded. As for that $45 million, if the joint venture weren't intended to close, Soluna views it this way: should the joint venture fall through for any reason, we'd still hold real value because the pre-work construction is already underway, and we'd pivot to a different customer; it wouldn't be $45 million of sunk cost down the drain, it would simply be an investment in getting that data center built quickly for whoever stepped into Applied Digital's shoes if we didn't reach completion on the joint venture.
To be clear, we feel pretty good about bringing that to a close.
Yeah.
Since early December isn't all that distant, I simply wanted to confirm — that's a valid observation regarding being able to reuse that should circumstances deteriorate. The environment is difficult, yet you folks appear to be concentrating on the correct levers, and I look forward to hearing about further progress. Thanks very much.
Thank you.
Hi, guys. Congratulations — you got a lot done in the quarter and so far in the fourth quarter. I suppose I just had a few follow-ups. Regarding your debt discussions and that 80% debt level target, in the current market environment, do you still feel fairly confident that's realistic?
I'll handle that one, John. We're certainly staying on top of the debt markets, which have clearly been disrupted over these last few months. Lending ratios might have dropped somewhat, perhaps to permit 70% to 80% debt funding; we're seeing customers who are willing to make prepaid rent payments as part of the lease. These customers are motivated. They understand the build-out has to get funded. What terms make that possible, whether it's the credit package or prepaid rent. We can use a portion of that prepaid rent to begin funding the build-out. The readiness to discuss prepayments shows the value customers place on securing power and delivering capacity, and could eventually lower the upfront equity required.
That's great. Then just the last question I had — you made a lot of progress on the balance sheet. You finished the quarter with a fair amount of cash. Just how should we think about cash levels going forward? Your desire to keep using the ATM? Are there any targets or minimum cash targets you're comfortable with?
Do you want to go first, John?
No, you can take this one, Mike. Thank you.
Okay. I think we're quite proud of what we did on the capital-raising front this year, and of how that money has been deployed into tangible, hard assets that set the company up to succeed in the coming years. Of that $109 million as of September September 30th, we allocated a portion in October to pay off the rest of the Generate debt, and some of that cash will go toward long-lead equipment as well as site or early site works at Kati 2. We've set targets and thresholds, and we don't want cash balances dropping below them. We weren't particularly active with the ATM in Q4, considering the current price level, though several financing options remain open to us, including the ATM and the SEPA. What excites me is the chance to bring in bigger debt capital amounts at the project level once we secure a lease at Kati 2 and collaborate with Applied Digital on the lease that the joint venture will hold with ChronoScale.
As a reminder for shareholders, one way to frame how we think about capital is that the parent company holds a range of tools. At the parent company level, we rely on three main tools: our ATM, our shelf, and our SEPA. Beyond those, we have project-level options that let us raise debt and or equity at the project level to fund activities ranging from pre-construction and early works through full construction; the lease itself also gives us tools for financing construction activities. Along with Mike and the team, Ryan and I examine which tool fits best at each stage of a project's life cycle, determine what the lowest cost of capital is at that moment, and deploy capital accordingly. Mike noted earlier that we keep certain cash thresholds in place so the balance sheet stays healthy. You can see we've paid down debt, which gives us room to move as we bring some of these new tools online.
Okay. Thank you.
That brings us to the close of the Q&A portion, and today's call ends here. We appreciate your participation. You're welcome to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Soluna Holdings, Inc. transcript - plus 131,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Soluna Holdings, Inc. earnings transcripts and 131,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.