Sigma Lithium Corporation (SGML) Earnings Call Transcript
November 13, 2026
Earnings Call Speaker Segments
Thank you for joining us for the conference call on our earnings for the third quarter of 2026. With me today are Ana Cabral, who serves as Co-Chair and CEO of Sigma Lithium, along with Felipe Peres, Sigma Lithium's CFO. I want to remind everyone that certain statements we make on this call could be considered forward-looking statements, including any guidance on production, anticipated company performance, updates regarding mining operations, the timing of our projects, and conditions in the market. Please take note of the cautionary language regarding forward-looking statements that appears in our presentation and press release, both of which can be found on the Sigma Lithium website. At this point, I'll hand the call over to Ana Cabral.
Thanks, Ana. We're now on our third earnings presentation for 2026. There are disclaimers to cover, because we'll be making several forward-looking statements, so let's get straight into the presentation. For those listening who don't know us, Sigma is the largest producer of mineral industrial concentrate in the Americas. Our costs are low, and we've funded ourselves from the day production began in July 2023. Three main points make Sigma stand out as fairly unique. The first is resilience, which the third quarter showed clearly. Financial discipline keeps us near the bottom of the cost curve, giving us a low-cost advantage. Strong cash flow generation has kept us self-funded since July of 2023. That's what resilience looks like. Now consider scale: based on the capacity we have in place today, we expect to produce 330,000 tonnes in 2027. Our team has demonstrated the ability to execute and brings a wealth of experience, and we have just primarized our mining operations. We also have a substantial growth profile. Doubling and then tripling capacity is within reach at fairly low capex. We have incremental industrial capacity left to build. Two additional plants are still to be constructed. One more mine needs to be opened. Each incremental industrial line requires capex of approximately $100 million, and no existing capex is involved. Very low capex to double and then triple industrial capacity, with the added support of one more mine supplying material to those two plants. Three defining traits; on top of those, we've kept costs down from day one, and that provides major durability when lithium prices swing. In Q3, the company was run with measured discipline; it showed how well we bounce back. We brought operations back online successfully on two occasions in the quarter; that reflects operating skill, since we had to stand down and then bring back 1,700 personnel along with equipment twice. We also secured major wins on our ESG standing, which shines a favorable light on the prosperity wave and has earned us a reputation in our state as too big to stop. Even more significant is the pivotal refinancing of our debt that we completed: a $125 million, 5-year convertible issue priced at the money. This substantially reduces leverage and extends the maturity profile of our borrowings, which creates breathing room as we move into the next stage of growth. At the same time, we have kept up tremendous financial discipline. Net revenue margins came in high at 32%, and our CIF cost stayed low at $518 per tonne, even in this quarter. Even more significant, our full attention is now on executing the production growth strategy for 2027 and 2028. Across the quarter, we held our top global safety record: 1,190 days with zero accidents and fatalities. We continue to lead the global rankings for employee safety and health, and that reflects rigorous safety protocols. The engagement of our employees, together with rigorous processes, guarantees a direct link to the factory floor, and that gives us better performance because we receive real-time feedback from our own team on improving efficiencies and on keeping safety intact. Our TRIFR stands at zero, a result that makes us very proud and shows our operational prowess. With no more delay, I will move directly to the financial highlights for the third quarter of 2026; this slide shows the financial discipline we delivered in the third quarter of 2026. Robust net revenue margins came from our low-cost leadership. To begin, we completed a total debt refinancing that cut our short-term debt by 85%. For the next 12 months, the only items remaining are trade finance lines and development bank debt. We held our margins high. Net revenue margins stayed in the 30s at 32%, and we preserved the 57% net revenue margin for the 9 months ended in the quarter. Our adjusted EBITDA margins were also very robust for the 9 months ended in the quarter, which shows the remarkable resilience of Sigma even in the third quarter, when we were mostly stopped. Keeping our low-cost leadership also depended on that discipline. We are still delivering in Asia at a $518 CIF. Our all-in sustaining cost stands at $642. When you set that against lithium prices right now at roughly $1,200, it makes clear there's still an enormous amount of headroom for us on margin and on generating cash flow, and that's a competitive edge nobody else has. Gross revenues came down since we were halted for about 65% of the quarter. Even so, looking at the nine months through 2025, revenues got to $115 million, a 20% gain over the same stretch a year earlier, which again demonstrates how remarkably resilient we are. This slide is all about our low costs, and it demonstrates how that discipline gave us the competitive advantage of low production costs. Plant gate costs came in at $424. Moving to Asia port figures, our CIF cash cost stands at $518. On the right side, we set all-in sustaining costs against realized lithium prices for the quarter, and that reveals a very wide opportunity for generating cash. If you compare those two figures at current prices, the benefit of low costs would still be evident. All-in costs came in at $642, while average realized prices as recently as yesterday were $1,200. Once more, that leaves considerable room for cash flow; this slide demonstrates our position as cost leader; we remain resilient against downward price pressure coming from new processing regions in Africa, as well as from brine innovation. Sigma is the floor. When you look at our costs—whether measured on a CIF basis or as all-in sustaining costs—they sit below those in Africa, and that hands us a major competitive edge when lithium prices swing around. Guidance has come in essentially on track, just as we indicated in the third quarter earnings preview. We shifted the line on the chart so it demonstrates that, at today's prices—taking yesterday's prices and measuring them against our CIF costs—there's $662 of headroom. In effect, that's resilience expressed in numbers. The next slide walks through our earnings and results. If you look at us sequentially, it's clear our margins came in above the prior year's comparable period, reaching 32% net revenue margins. That really stems from a flexible cost of goods sold and our capacity to modify variable costs. The same holds true for cash flow. We are generating an enormous amount of cash. Put the third quarter ’25 side by side with the third quarter ’26, and the figures make the point on their own, plus we closed the third quarter ’26 holding more cash than we had a year earlier in that same quarter. Cash generated from operations totaled $24 million—once more, an enormous figure for a quarter during which we were halted for the bulk of it. Looking at the right-hand side, comparing the nine-month periods side by side is where those numbers truly become striking. Net revenue margin for the first nine months of ’26 versus the matching stretch in ’25 is shown essentially leaping to 56%. Turning to cash flow and how much cash we generated, the results are enormous. Operating cash flow comes in at $51 million alongside a cash position of $10 million, which once more shows enormous resilience given that we were halted for the bulk of the quarter.
On the next page, we give you a breakdown of how cash flow was generated. In the third quarter of '26, compared with the nine months ended in the third quarter, we brought in net inflows of $4 million during the third quarter itself and ended that period holding $10 million US dollars in cash. Turning to the entire nine-month span, the picture is similar, although net operational cash flow generation looks stronger at $51 million. Going forward, our pipeline of contracted sales is very comfortable. Our high-grade sales came to roughly $10 million; we still have low-grade material sitting unsold in inventory, and on top of that, installments remain due to us under the offtake agreement for high-grade deliveries we've already made. We're quite confident about our current position, and once again this shows how resilient we are — we wanted the two periods side by side to illustrate how the company got through the third quarter largely thanks to the strength of what we achieved in the first and second quarters. This slide shows the substantial cash flow the company is capable of generating at today's installed capacity. For the next twelve months, we project 240,000 tonnes. At those price levels, even with lithium where it is today, we can generate roughly $128 million US dollars in cash flow. Looking at forward production, our forecast for 2027 is 330,000 tonnes. At today's prices, we'd expect to deliver about $191 million of cash flow — robust levels, and once again a direct outcome of our low all-in sustaining cost. That's another illustration of operational resilience that the low costs make possible. This slide shows how the pivotal 5-year debt refinancing affected our balance sheet; we issued a $125 million convertible note, and it transformed the company's debt profile. Basically, this convertible note also sets up the possibility of deleveraging, since it's almost at the money. We mainly used the proceeds to pay down debt coming due in December of this year, and that debt was essentially moved to November of 2031. It smoothed out our debt maturity profile and matched it with upcoming cash flows. On the right, looking at the third quarter static picture, you can see that pro forma operating cash flow for the year, assuming we annualize the 9-month 2026 cash generation, would still give us a low leverage ratio, but the current issuance brought it down even further. On this slide you can see how much the 5-year convertible note changed our growth plans going forward. It produces low leverage ratios, basically letting us build borrowing capacity. Here we present those low leverage ratios even with lithium prices where they are today. Tying that to the cash flows we presented earlier under the two forecasted production levels, you can see in yellow the leverage ratios with the convertible note left unconverted, and in green the ratios with it converted. It becomes negligible. Whether we're looking at 240,000 tonnes over the next 12 months or 330,000 tonnes for 2027, both output levels we project leave us with fairly low leverage at $1,200 per tonne. Here's the next slide, which illustrates the borrowing capacity this important refinancing makes available. Again, we treat the convertible note on a pro forma basis, in both its converted and unconverted forms. Even in the converted case at low lithium prices, once cash flows are averaged out, we get to 2 times with extra borrowing room — roughly another $170 million at 2027 forecasted production levels — and at 3 times leverage, $330 million at 2027 forecasted production levels. We've reduced leverage on the balance sheet, and even counting the convertible note at standard leverage ratios of 2 times or 3 times, we still have ample borrowing capacity. Naturally, we wouldn't borrow at a rate that doesn't fit the nature of our business. Should we decide to restructure our balance sheet, the method would involve what we refer to as adjusted debt—namely, project finance or development-related borrowing. Even so, these figures are the unvarnished ones, and we felt it important to highlight them since they demonstrate just how crucial that note was. What this slide really does is speak to the fundamental variable that will shape lithium's trajectory from here on. On demand, there is consensus. The entire market broadly agrees that lithium demand keeps expanding and expanding strongly; yet pricing isn't set by demand—it's set by cheap supply originating in regions that aren't necessarily formal. For those of us who produce, the difficulty lies in staying resilient enough to keep pace with such prices. Sigma has shown this across the whole presentation. If you examine what African production does, three main factors matter. The first is vertical integration with the supply chain — it keeps producing and delivering even when prices fall, almost as if price doesn't matter. Then there's the low-cost DSO phenomenon, or low-concentrate DSO, where material reaches the client at nearly cost, since the client is the one financing production. The only thing holding it back is downward pressure from high logistics costs. And then you have full concentrate output from countries such as Zimbabwe and Mali. Those operations are formal and integrated into the supply chain. Those arrive at roughly 7,000 to 13,000 kilotonnes per tonne on an LCE basis — put differently, pricing that's highly competitive. As we've explained, Sigma sits at the floor. Such prices don't concern us, since even in this pricing climate we're able to compete and still generate meaningful cash flow. Take today: pricing stands near $1,200, leaving us plenty of headroom for cash flow delivery. That's what resilience matters for — the fact that, looking ahead, lithium prices will stay volatile as demand shows enormous growth over the coming couple of years. Now let's turn to production and capacity, and to what we see in the 2026 to 2027 operational outlook. This slide demonstrates how Sigma will deliver the forecasts. The way we see the 2027 year in our forecast isn't any different from what's already been achieved since we upgraded the industrial plant in the fourth quarter of 2024. There are two circuits at that plant, the reprocessing circuit along with the main circuit, and combined production capacity comes to roughly 82,000 tonnes. During the fourth quarter of 2024, 77,000 tonnes were delivered by us, which reflects that industrial capacity. Since that point, roughly 68,000 tonnes have been delivered in each individual quarter. Annualizing the third quarter, when the contractor was decommissioned by us, gives exactly the same figure. We then moved into the primarization phase in 2026, and the targets were reached quickly by us in the second quarter. In the third quarter we were halted, yet once more we showed enormous resilience by bouncing right back and resuming from exactly where we had stopped on two occasions. Our whole contingent was remobilized and demobilized by us twice. Looking at how the third quarter picture stands, it's basically a company that is in motion, since 21,000 tonnes sit in inventory alongside 7,000 tonnes of production; and as we now enter the fourth quarter, a further 11,000 tonnes of high-grade production is in hand. Looking ahead, as removal of overburden is caught up on by us, we will be well along the path toward delivering on the projections we have made.
This page goes into more detail on the reprocessing circuit we discussed on the prior page, where we've demonstrated the ability to produce roughly 15,000 tonnes of high-grade material out of that circuit. That circuit operates independently of the main high-grade circuit; it comes with dedicated cyclones and its own DMSs, and in an automated process it basically upgrades the fines into higher-grade material, which lets us reach 100% circularity and, more importantly, deliver additional lithium within the same mining footprint. The lithium industrial facility upgrade was key to this—taking us from roughly 60,000 tonnes per quarter on average up to 77-plus, and even as high as 82,000 tonnes per quarter, through the reprocessing circuit. That's the 100% circularity we were after, and it lets us meet the European Union's recycling criteria, because recycled material is present in our lithium. More lithium from the same mining footprint. This page essentially shows how the cleantech plant upgrade enables 100% circularity. With that one plant alone, the concentrate volume is basically larger; to put it another way, the plant produced 920 tonnes a day during the fourth quarter of 2024. Going forward, we expect about the same level—950 tonnes a day—which is no different from what we've been delivering. To reiterate, that additional 15,000 tonnes comes from the reprocessing circuit—which means more lithium concentrate out of a single plant. Now, on the mining side: our priority for the fourth quarter is pushing volumes higher to compensate for overburden that wasn't removed and remained in place during the third quarter. We're aiming at the same area within the pit shell design so that we can access this greater amount of high-grade material. This is located south of our south pit. In other words, approximately 200,000 tonnes of concentrate equivalent is sitting here, representing roughly 1.1 million tonnes of ore. Here's what we're aiming to accomplish over roughly the coming month: getting to that material, extracting it, and turning it into concentrate — and this page sets out the plan for how we'll pull that off. A second phase of fleet upgrades is now underway, bringing in bigger excavators and bigger trucks. With those excavators, loading capacity for the trucks rises by an additional 40%, and the trucks in turn deliver 25% more capability when hauling material. Putting this larger equipment into place as a second stage is essentially a result of the mining operations having been primarized and upgraded. To put it again: fewer pieces of equipment move more material, burn less diesel, and achieve greater efficiency — and that stems from our partnership with Sany China along with our equipment provider. Equipment lead times have shortened, and we can now access bigger machinery. As we close out this part on operational delivery, we'd like to look at how we secured landmark wins in our flawless environmental and social record. Minas Gerais handed down the ruling that Sigma cannot be halted. We gained this institutional prominence for the economic footprint we have at Vale do Jequitinhonha. Our licenses and operations have been safeguarded by the rule of law; the decisive factors were the institutional resilience of Minas Gerais and Brazil, adherence to the rule of law, and a quick end to the stoppages. We got the TAC approved faster than anyone expected. The ruling came back saying we're too big to stop, and our financial exposure was limited because no extra royalties were imposed and basically no burdens were put on the company. What matters even more is that we came out of this with constructive relationships with the state administration and the federal courts, and we made clear how many jobs were on the line and how many family members would be hurt if Sigma weren't running. Over 19,000 jobs are tied to us directly — it's a shared prosperity model — and 80,000 people rely on those jobs. That's really what too big to stop means. These are Sigma-fueled jobs. Half of those originate from our social engagement and social inclusion initiatives. The TAC is the subject of one such conversation. In the end, what we show here is that we hold to the highest mining standards worldwide through our quintuple zero, fully traceable lithium. Other G7 nations, if you examine them, clearly have high standards. One country has a tailing dam constructed to high standards, and another G7 country has overburden rock piles constructed to high standards. When you consider Sigma and our rock piles, they satisfy the same standards as a G7 country's rock pile, and they feature grass and active germination, which was our delivery element together with the TAC. We reached an agreement on one million dollars for active germination, to be provided over the coming year. As I wrap up the presentation, let me lay out our priorities. Our intention is to keep executing and secure the rerating. To start, the 2027 milestones: we'll keep ramping up Mine 1, we'll deliver on the growth, and we'll unlock Phase 2's full potential in stages, with disciplined and organized execution. First, the ongoing ramp-up of Mine 1. Over the next 12 months we expect to deliver 240,000 tonnes; a second round of fleet upgrades is underway to allow more haulage, and for the full year of 2027 we plan to deliver 330,000 tonnes. Second, growth. Our intention is to restart the Phase 2 growth plan by opening a new mine. To put it differently, Phase 2 will begin again from the ground up with a new mine; the capital expenditure needed to open it is fully covered by cash flow the existing industrial line currently generates. Why did we begin with the mine? The reason is that it creates the most jobs. That is how we deliver the greatest prosperity to Vale do Jequitinhonha. One new mine brings another 25,000 people connected to Sigma and 6,400 indirect jobs. That figure does not include the social programs tied to it. After that, we will restart construction of Plant 2. So with that, we intend to reach 580,000 tonnes of capacity, and that will generate additional jobs in the region. Unlocking Phase 2's full potential. If we begin at the mine, and if you were to add that many jobs on top of the ones we already have, then essentially, after a second mine opens, we would have 100,000 people tied to our operation at Vale do Jequitinhonha. Put another way, the prosperity potential here is enormous, which explains why we enjoy enormous backing from Brazil's newly elected government and from Minas Gerais. This is where the magic lies. Low cost combined with cash generation. We sit in a very strong position for a rerating. Some companies with production matching ours trade at twice our value; we firmly believe that as we keep executing, the rerating will arrive step by step, and that is exactly why we remain so focused and keep our discipline. That said, I will wrap up and hand things over to Q&A. I will take questions one at a time. First, the question concerned the costs. They were neither capitalized nor excluded; they appear as an expense line alongside other operating expenses. A note addresses this specifically, namely note 24. Those costs total $13,376,000, and basically they are what we term idle capacity costs.
That note addresses this quite thoroughly, and that's the method IFRS requires for these costs. As for your second question, it concerns the convertible bond. Right — early redemption and early payback provisions are indeed included. This is a non-call, non-put 3. Once year 3 arrives, we would truly be able to call for conversion and redemption of the bonds. Our real intention is to let conversion happen, since we haven't diluted anything since 2021. We are very deliberate about how dilution gets planned. Beginning at the twelve-month point, investors may convert, and our view is that, given the share price level before versus now, they could well convert those bonds into equity. That would relieve pressure on the balance sheet, as one of our slides showed when we modeled leverage ratios assuming conversion. To repeat, conversion is possible after the first twelve months have elapsed, and the bond has an investor put in year three, matching the call we hold in year three. Exactly. The convertible bond note I referenced in my earlier answer is what addresses that question, and it carries USD 120 million. At the time of our Australian listing, we committed that every later issuance by the company would be delivered, or executed, on the ASX. Upon conversion, the convertible bond turns into CDIs — the shares listed on the ASX. Our belief is that once conversion happens, beginning initially twelve months from today, that CDI security will begin to see fairly substantial liquidity coming from the bond's converted shares. To reiterate, dilution was roughly 14%. Should the bond convert, a certain number of shares will find their way onto the ASX market — ideally starting the trading activity you mentioned. We're doing our part to support that listing in order to encourage liquidity and trading, and the note served as proof of it. Our inaugural instrument was already issued in Australia. Katie, thanks for the question — good to see you. Yes, that's exactly the plan. We chose to go ahead with the conversion because refinancing the debt frees up a meaningful amount of cash for us. Once the debt is reset and SOFR rate hikes are applied, that obligation would come to nearly 14% after the December reset. We've decided to retire the debt right away once the convertible bond issuance closes. Payment will occur immediately after that convertible bond closing, which is coming very soon. In effect, Synergy will be fully repaid and removed from our balance sheet, so the balance sheet becomes unencumbered, since Synergy holds secured creditor status. Going forward, as we've said many times, our strategy involves relevering the balance sheet to back growth, and we'll do that through what we call adequate-type financing. Put another way, when we take on extra debt to support expansion, the aim is to secure long-term financing at a low cost, similar to the BNDES debt already on our books, alongside the 7,293 tonnes figure. When this new growth phase likely begins in 2027, we will probably draw on that credit facility to fund the expansion. Yes, we intend to start opening Mine 2 soon — quite soon. Most likely that happens in Q1 of next year, or maybe later in the current quarter. That will serve as the foundation for planning the second plant. Development of the second plant started in December 2024. A meaningful share of our liquidity went into it. We carried on through Q1 of 2025. What remains is purchasing equipment. We have a procurement list, and per its most recent revision, we estimate roughly $80 million US dollars of equipment still needs to be ordered. Placing those orders right now is not our plan. Our plan is to take care of that, in all probability, during the early part of 2027. At present there is a government transition here, both at the state level and in certain key federal positions, and once everyone has settled into their roles, we will move ahead with restarting Mine 2 and Plant 2. Both of those; a sale is a possibility. Right now the lithium tailings market looks very much the way it did almost a year ago, which is when we decided to proceed with primarizing the mine. The ex-works price for that material currently sits in the $30 to $50 range, which means it represents a net profit. The ex-works price would differ depending on how much lithium the material contains, I would say. What we obtained on the plant will likely command a higher price, around $50-ish, perhaps even more. We usually steer clear of selling tailings when lithium prices are declining, as we have seen over the past two weeks; we will hold back and wait further into contract season before deciding on the tailings. It may sound strange, but that is in fact the period when offers arrive most heavily, since the product delivers strong profits for the client. In practice, the client simply hauls it away and feeds it into a flotation facility, where it becomes a very high-grade lithium concentrate. One example is what is happening across large parts of the African continent, where material comes out in a comparable form and, on a fully integrated basis, becomes highly profitable for battery manufacturers. A number of these producers can tolerate figures down to roughly $500 per tonne, which, converted back to the lithium content present in the tailings, works out to around $30 to $50 US dollars on a benchmark basis, and that aligns well with lithium sourced from Nigeria, for instance. In fact, we are currently in quite a few discussions with numerous partners, because we are one of the few large producers that still has material not yet committed for 2027. Typically, our offtake arrangements get signed each year. We sign agreements annually, and at the moment we're looking at putting a multi-year offtake agreement in place that would cover 2027. In the past, selling the material on what we call a quarterly contract on a maximum basis has given us really strong commercial results. For instance, in the prior quarter, the third quarter, we achieved a price of $1,485, which was notably strong considering the falling lithium price environment; when it comes to achieved realized prices, we've consistently beaten peers. Why is that? Since no offtake holds us captive, our products aren't priced by formula; we depend on the market quote taken directly from Shanghai Metals Market for concentrate, and that basically gives us a more favorable financial position. We're considering a multi-year offtake extending into 2027, but signing one isn't required — we could carry on just as before, selling material on a one-year basis, and we'd be perfectly fine. Felipe, the whole Sigma team and I thank you for your support this quarter. We're truly proud of how we moved from the third quarter into the fourth. We emerged from it stronger, with excellent visibility into our business — the sort of visibility that led the new governor of Minas Gerais to say he'll take office from our region. Separately, USD 120 million in convertible notes and 7,293 tonnes remain part of the picture.
In January, he will in fact take office as governor of our region in Vale do Jequitinhonha, and that makes us enormously proud, since we managed to shine a light on the transformational shared prosperity effort we have carried out there for nearly a decade. That work has led to Sigma becoming a pivotal company within the Western and Eastern global supply chains, delivering at large scale, at low costs, with traceability. Looking ahead, that choice by the newly elected government has left us enthusiastic about pursuing our growth strategy at full strength. Once again, beginning from the bottom up, since the mine is the source of the greatest number of jobs. Consequently, we intend to welcome another 25,000 people into Sigma's prosperity fold. An undertaking like this is a partnership involving the public powers, society, and the company. As a good citizen company, we very much look forward to helping lift the people of Vale do Jequitinhonha; for that, I wish to thank all of our stakeholders and our shareholders for accompanying us on this journey.
That wraps up the Sigma Lithium conference call for the third quarter of 2026. For additional details, please go to the company's website at www.sigmalithiumresources.com. You may disconnect at this time.
For developers and AI pipelines
Programmatic access to Sigma Lithium Corporation earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.