Home / Transcripts / Aegis Logistics Limited (AEGISLOG) · November 7, 2025

Aegis Logistics Limited (AEGISLOG) Earnings Call Transcript

November 7, 2025

National Stock Exchange of India IN Energy Oil, Gas and Consumable Fuels earnings 54 min

Earnings Call Speaker Segments

Operator operator
#1

Good day, everyone, and welcome to the Q2 and H1 FY 2026 earnings conference call for Aegis Logistics Ltd. Just a reminder that every participant line is listen-only, and once the presentation wraps up, you'll have a chance to ask questions. If you require any help while the call is underway, press star followed by zero on your touch-tone phone to signal an operator. Please be aware that this conference is being recorded. Before we get started, here's a brief disclaimer. Some forward-looking statements may be made on this call, and those rest entirely on our beliefs and expectations as of today. Such statements should not be taken as a guarantee of future performance, and they carry unforeseen risks and uncertainties. With that, I'd like to turn the conference over to Mr. Raj Chandaria for his opening remarks. Thank you, and the floor is yours, sir.

Raj Chandaria executive
#2

Good day, everyone, and thank you for joining our Q2 FY 2026 conference call. With me this evening are our CFO, Mr. Murad, and Ms. Payal Dave from the investor relations team. We truly appreciate that you've made time to be with us today as we go over the company's results for the quarter and talk through the strategic developments we currently have underway. We're delighted to report that Aegis Logistics has maintained its robust growth trajectory, powered by gains in volumes as well as operational efficiencies throughout our main business segments. During Q2 of FY 2026, consolidated revenue for the company rose 31% year-on-year, climbing to INR 2,294 crore from INR 1,750 crore. Normalized EBITDA advanced 46%, going from INR 237 crore up to INR 347 crore, while profit after tax was up 61%, moving from INR 152 crore to INR 244 crore. These results demonstrate the gains from operating leverage and better utilization at the terminals, and the company continues to concentrate on cost optimization and on raising throughput at every one of the ports. I'll now walk you through the major operational and project updates, port by port, so you get a thorough picture of the infrastructure work in progress under Aegis Logistics Ltd. At Mumbai Port, liquid storage capacity currently totals 334,000 kiloliters, while LPG static capacity is at 21,000 metric tons.

Raj Chandaria executive
#3

As we mentioned earlier, we're building an extra 64,000 kiloliters of liquid capacity, and that's slated to come online by Q1 of FY 2027, with the whole project costing INR 125 crore. At JNPT, we currently have 101,900 cubic meters of liquid capacity in operation, and there's another 318,100 cubic meters of liquid capacity plus 77,286 metric tons of LPG capacity being developed, together with an LPG bottling plant of roughly 35,000 metric tons per annum. This is a large-scale project carrying a total CapEx of INR 1,625 crore, and INR 75 crore of it is moving along well, with a portion of the liquid capacity anticipated to be commissioned before FY 2026 closes. We're also looking into adding a 36,000 metric ton cryogenic LPG tank at this site, which would further reinforce our West Coast presence. Over at Kandla Port, our liquid capacity is 952,276 cubic meters and our gas capacity is 48,000 metric tons. That port is running at better utilization levels right now, and we've secured PNGRB approval for the Kandla-Gorakhpur pipeline connection, and we anticipate that the hookup to the JLPL pipeline will also be operational by Q3 FY 2026. Once these pipelines are up and running, we expect a substantial lift in volumes.

Raj Chandaria executive
#4

Also, we expect VLGC berthing to begin in Q3 FY 2026, which will allow bigger cargoes to be unloaded and improve operational efficiency. At the CRL-4 plot, a new liquid terminal is planned with 94,148 cubic meters of capacity, and it should be operational next year. I'd like to remind everyone that we've already announced signing a non-binding memorandum of understanding with Larsen & Toubro to develop an ammonia terminal for their upcoming green ammonia project at Kandla. At Cochin Port, our liquid capacity of 82,545 cubic meters is still running at higher utilization levels, and on newly allotted land we intend to develop an additional 60,000 cubic meters of capacity, which will further support growth and optimize terminal efficiencies. At Pipavav Port, our liquid capacity stands at 116,620 cubic meters, LPG capacity at 70,800 metric tons, and ammonia capacity expected to be 36,202 metric tons. Utilization at our liquid terminal remains high, and plans are underway to set up a rail gantry for efficient evacuation of liquid products. Construction of India's first ammonia terminal, with, as I mentioned, 36,000 metric ton capacity, is progressing well, and it is expected to be completed before Q1 of the next fiscal year, or during Q1 of the next fiscal year.

Raj Chandaria executive
#5

The KGPL pipeline connection should likewise be up and running by Q4 of this fiscal year, which will further boost throughput and make logistics more efficient. At Mangalore Port, as you'll remember, we operate an LPG terminal that has 82,000 metric tons of static cryogenic capacity; it was commissioned in June of 2025, and the first LPG vessel discharge was completed successfully with our new loading arm. Liquid capacity at Mangalore is 194,382 cubic meters, and we intend to add a further 60,000 cubic meters of capacity on newly allotted land in the next phase. At Haldia Port, our liquid capacity comes to 226,890 cubic meters, while gas capacity is 25,000 metric tons, and these are now proposed to be consolidated under Aegis Vopak Terminals Limited, along with a proposed acquisition of our 75% stake in Hindustan Aegis, which is proposed to be divested from Aegis Gas LPG Private Limited. Both Aegis Gas and Gopak India, of course, and this is subject to shareholder approval. Operations are still running at higher utilization levels, and we have acquired roughly three acres of new land so we can expand terminal capacity at Haldia. The LPG terminal at Haldia keeps performing well, with utilization rising steadily. When it comes to new ports, we are still exploring expansion opportunities at two new ports.

Raj Chandaria executive
#6

We've signed a non-binding memorandum of understanding to put money into the proposed Vadhavan Port, and the possible project outlay comes to INR 20,000 crore. Right now we're waiting on land allotment and the formal approvals, and once those come through, work on new liquid and gas capacity will get underway. Turning to the strategic overview, at this point Aegis Logistics and AVTL combined — Aegis Vopak Terminals combined — have reached a capital expenditure outlay of $1.2 billion, and the long-term plan is to get to $5 billion by 2030. Funding for our capital expenditure plan will keep coming from a mix of internal accrual and prudent debt, and we'll hold a conservative debt-equity ratio of 0.6x, capped at 3.5x EBITDA. We stay committed to our long-term strategy of building world-class infrastructure across India's key ports, while keeping operational excellence and strong financial discipline in place. Our integrated value chain, supported by a robust balance sheet, puts Aegis in a good position for sustainable growth and long-term shareholder value creation. With that overview done, I'll now hand things over to our CFO, Mr. Murad Moledina, who will present the financial highlights in detail. Murad?

Murad Moledina executive
#7

Thanks. Now, on the business's operational metrics: during the second quarter of FY 2026, both the Aegis segment, LPG, and liquid delivered robust growth. Revenue from operations for that quarter rose 31% year-on-year, reaching INR 2,294 crore. Normalized EBITDA for Q2 FY 2026 came in at INR 347 crore, a solid 46% year-on-year increase. Profit after tax for this year's second quarter climbed 61% to INR 244 crore, compared with INR 152 crore in Q2 of last year. Across the first half of the financial year, revenue from operations was INR 4,013 crore, a 20% year-on-year gain. H1 FY 2026 normalized EBITDA reached INR 602 crore, a strong 24% year-on-year rise. Profit after tax in H1 grew 35%, to INR 419 crore from INR 310 crore in H1 of FY 2025. Turning now to the individual segments: liquid revenue in Q2 FY 2026 was INR 155 crore, versus INR 130 crore year-on-year, up 19%. Liquid division EBITDA for Q2 FY 2026 was INR 116 crore, a 25% increase year-on-year. The LPG business's revenue posted strong 32% growth, to INR 2,139 crore. Gas EBITDA rose sharply by 60%, to INR 231 crore, driven by record volumes.

Murad Moledina executive
#8

For H1 of FY 2026, liquid revenue came in at INR 298 crore once again, versus INR 273 crore on a year-on-year basis, which works out to a 9% rise. Liquid EBITDA for H1 was INR 222 crore, up 11% year-on-year. Revenue from the LPG business during H1 posted 21% growth, reaching INR 3,715 crore. Gas EBITDA in H1 climbed 33% to INR 380 crore, driven, as I mentioned before, by record volumes. Now for the volume specifics. We achieved all-time high throughput volumes. At every one of our terminals, LPG volume handled came to 1.41 million tons, compared with 1.06 million tons in Q2 of FY 2025 — a 32% increase. Distribution volume rose 49%, hitting a record all-time high of 1.92 lakh metric tons in Q2 of FY 2026, against 1.29 lakh metric tons in Q2 of the prior year. Sourcing sales volume also increased, to 2.08 lakh metric tons from 1.94 lakh metric tons in the same quarter a year ago, a gain of 7%. On the half-year volume side, again, it was 2.57 million tons versus 2.08 million tons in H1 FY 2025, up 24%. Distribution volumes in H1 FY 2026 grew 31% to 3.3 lakh metric tons, compared with 2.58 lakh metric tons in H1 FY 2025.

Murad Moledina executive
#9

For H1, sourcing sales volume came in at 3.27 lakh metric tons in FY 2026 H1, compared with 3.18 lakh metric tons in H1 FY 2025 — that's 3% growth. The company's financial position stayed robust, with low debt, strong cash flow, and a solid balance sheet. Carrying on with our trend of doing many firsts, we also posted the highest-ever Q2 revenue and EBITDA in both the liquid and gas segment. With that, I'll hand this line over to the moderator so we can begin the question and answer session. Thank you.

Operator operator
#10

Thanks. We’re moving into the Q&A portion now. If you’d like to ask something, you can press star and one on your touchtone phone. To take yourself out of the queue, press star and two. We ask that participants use their handsets when posing a question. Ladies and gentlemen, we’ll pause briefly while the queue is put together. Our first question comes from Mr. Vibhav Zutshi at JPMorgan. Please go ahead.

Vibhav Zutshi analyst
#11

Yes, hello. Thank you for taking my question, and well done on a very strong quarter. My first question is essentially about profitability in the gas division. If I simply look at EBITDA per ton, it appears quite high at roughly INR 1,280. Clearly, distribution volumes have risen, which I believe reflects better profitability. It does have better profitability. Could you help explain this? Is it sustainable? What caused profitability to be so high? Thank you.

Murad Moledina executive
#12

Yes, I’ll take that question. Gas distribution EBITDA came in stronger than in earlier quarters. Naturally, when volumes rise, you gain a cost advantage as well. This time it was roughly INR 4,000, and I think we expect to keep that level in the quarters ahead too.

Vibhav Zutshi analyst
#13

Understood, that's really useful. I just have one quick follow-up: with the 30% volume growth and the 1,800, would it be reasonable to describe that as largely sustainable, considering the expansion that's coming?

Murad Moledina executive
#14

Yeah, I believe distribution volumes would continue to rise. As I've mentioned before, we now have the capacity, along with spare capacity. Two new cryogenic terminals are up and running in Mangalore and Pipavav, and we're also in the process of consolidating our Haldia LPG terminal into AVTL. There will be plenty of synergies, and there's always room now to increase distribution volumes going forward.

Vibhav Zutshi analyst
#15

Thanks. My second question concerns the new projects, and if my memory serves me right, the Vadhavan Port you mentioned. Are there any timelines — broad ones — that you could share? And on ammonia, aside from Pipavav, you also brought up Larsen & Toubro. A few timelines around the ammonia projects and Vadhavan Port would be really useful. Thank you.

Murad Moledina executive
#16

I'd say Vadhavan Port is really only getting underway — likely a 5-year horizon — though not all of it will materialize right at the close of that 5-year window. As that port gets built out, we'll likewise be readying ourselves to bring our own facilities online in step with its progress. We're quite enthusiastic about it. It sits right in our backyard, in the Western region, and I'd argue it's poised to become India's biggest port down the road. We're genuinely thrilled to be involved there in delivering some substantial infrastructure work. Turning to ammonia, I'd say we're off to a strong start with Pipavav ammonia. Let's take that one first and handle it in stride. Within the next 6 to 8 months, quite swiftly, Pipavav ammonia will be operational and running. Everything else, I believe, will then fall into place after that. It also affords us excellent scope to become vertically integrated within the ammonia business, much as we've previously done with LPG. That means not merely storage, but sourcing, storing, and distributing ammonia as we move ahead. Shipping too. We're very enthusiastic when it comes to ammonia. This isn't solely about green — nor must we sit around waiting for green ammonia to arrive. We're beginning with gray, but we're prepared to shift gears rapidly should green gain momentum.

Murad Moledina executive
#17

Kandla would lean more toward green ammonia. Right now, that arrangement is a non-binding MoU. If it eventually becomes a binding agreement — assuming we can get there and both sides can work toward that — then you'll see another avenue open up for building infrastructure in green ammonia too, alongside the gray ammonia we're beginning with at Pipavav. At Pipavav, we're basically there, almost there. We're very excited to move into this new business, which carries huge potential. That's our belief as we go forward. You'll see substantial investments flowing into this as things progress. As you know, our approach is always to follow demand rather than simply do flat planting. We take our time, but once we see the demand and feel confident about it, we'd move very quickly to set up the infrastructure.

Vibhav Zutshi analyst
#18

That's great. Thanks very much, and best wishes to you.

Murad Moledina executive
#19

Appreciate it.

Operator operator
#20

Thanks. Our next question comes from Mr. Vishal Mehta at IIFL Capital. Go ahead, please.

Vishal Mehta analyst
#21

Hi, and congrats on the solid results. So first, I have a couple of questions about the business, and after that, two on the accounting side. From what APM Terminals said on its call this quarter, it sounds like they've hit the ceiling on liquid berth capacity handling at Pipavav Port, and their new berth likely won't arrive until around November or December of next year. Does that cap how much volume we can handle at that port? I'd just like to get a sense of that.

Murad Moledina executive
#22

Yeah, Vishal, I believe I covered this on earlier calls — it all hinges on how a port views a jetty's capacity and how we, as a terminal company, view that same jetty's capacity. We're very particular about how we set up our ancillaries. It isn't only the tank. What's my pipeline connecting me to the jetty, the MLA, the pumps? Given that VLGCs, even if partly loaded as of today, if they arrive, how fast can we discharge and get the vessel away? If we can, say, discharge at a rate of 1,000 tons an hour, then in a day a partly loaded VLGC can be discharged and sent off. A new VLGC can arrive the following day. Using that as the basis, 20,000 tons times 365 — you do the math on what a jetty's capacity can be. I'm not claiming that's how it will actually play out, but it all comes down to how you look at things and how. We take great care in how we build our ancillaries, which lets us discharge and clear as quickly as possible so that turnarounds happen.

Murad Moledina executive
#23

We feel sure no bottleneck will arise before the new jetty is available to manage the larger volume. Following the cryogenic step, we have already raised throughput by 10%-15% even though the KGPL hookup has yet to take place. Honestly, I would say we are genuinely awaiting that KGPL hookup, since it will remove the obstacle — and that obstacle is evacuation, not unloading. Unloading is not a concern for us at this point. Evacuation is what we are truly, truly concentrating on.

Vishal Mehta analyst
#24

Alright, alright, understood, sir. Sir, the second question concerns the land allotment we have at Haldia. So, what are the plans there? Is there anything you would like to elaborate on further?

Murad Moledina executive
#25

Yes, regarding the Haldia plan on those 3 acres, liquid is the only option for us. That's what this allotment was granted for—liquid. Clearly, on 3 acres, roughly somewhere near 60,000 metric tonnes to 100,000 metric tonnes, based on which products we intend to handle, ought to be developed quite fast, though it hasn't yet gone to the board. We've only just received the land allotment. The handover process will take place, and after that we'd move on it right away. Yeah, we keep growing. This will make it the sixth terminal at Haldia. Five are already running there, and we anticipate further land allotments in Haldia along with additional capacities being added. There are plenty of opportunities when it comes to eastern India.

Vishal Mehta analyst
#26

All right. Sir, moving on to the bookkeeping questions — other income appears to have risen quite sharply this quarter. Is there anything one-off in there, or is that just normal treasury income?

Murad Moledina executive
#27

No, of course — if you look at the segment results, you'll see the interest received. From the other income, interest, I believe, if I recall correctly, must be INR 520 million-odd. The rest would be other income. Those include quite a lot of income that is actually also related to the business. Most of it is expected to continue, yeah.

Vishal Mehta analyst
#28

Alright. Regarding the other expenses line in EBITDA on our P&L, as shown in the presentation — those other expenses appear to have dropped fairly significantly. Is there any particular reason? They went from INR 72 crore down to INR 51 crore this quarter?

Murad Moledina executive
#29

No, possibly. I mean, I honestly can't recall, though my sense is that during the previous quarter, that might explain it. I believe in the same quarter a year ago, other expenses probably weren't that elevated.

Vishal Mehta analyst
#30

Apologies, I didn’t catch that. The quarter a year ago came in at INR 72 crore. For this year, the figure is INR 51 crore.

Murad Moledina executive
#31

The prior quarter was the June quarter, in case you have that in front of you.

Vishal Mehta analyst
#32

For the June quarter, that figure came in at INR 75 crore once more.

Murad Moledina executive
#33

No, I wouldn’t say anything unusual happened this quarter that caused a decline. There could have been a one-off event somewhere, but no, nothing out of the ordinary is going on.

Vishal Mehta analyst
#34

Right, right. Since that figure has dropped from around INR 700 million down to somewhere in the INR 500 million range, that's the position I'm at.

Murad Moledina executive
#35

No, there's nothing out of the ordinary.

Vishal Mehta analyst
#36

Sure, sure, yeah, thanks, thank you — those were all the questions I had.

Operator operator
#37

If you'd like to ask a question, participants, you can press star and one on your touchstone phone. Our next question comes from Mr. Anil Sarin of K16 Advisors. Please go ahead.

Anil Sarin analyst
#38

Good afternoon, gentlemen. Congratulations on the fantastic performance. I had a few questions. Before I ask the question, I just had a kind of a request. I've been tracking your company from calendar 2016 onwards. Always, there has been a challenge before the company. How do we explain the business? The format of the presentation has been changed in order to provide greater clarity, and things have moved along quite a bit. There is much more understanding now. My request would be that when you give capacities and capacity increases, you give it port-wise or you give it location-wise. In addition to that, my request would be if you could give a console, like, "Total liquid is so much, and this much has increased in this quarter," or, "This much we plan to increase it over the next X, whatever, time period." That is a one-shot kind of an understanding where people, without getting into Pipavav, Kandla, Haldia, Mangalore, etc., just one shot, we can know, "Okay, liquid is growing by this much %, and gas is growing by that much %." That would be a request you may consider.

Murad Moledina executive
#39

Understood.

Anil Sarin analyst
#40

Thanks. And clearly, distribution has come in better than expected—both the quantum and the margin per ton. If you could advise, is this margin sustainable, INR 4,000?

Murad Moledina executive
#41

My view is that continued growth in sales would allow margins to remain sustainable. We anticipate—and have strong confidence and a bullish stance regarding—distribution margins, along with volumes, carrying on.

Raj Chandaria executive
#42

If I could just make one additional point — during our previous earnings call, or perhaps even the one before that, we noted that bringing the Mangalore LPG terminal into operation, together with the ongoing capacity expansions at the Kandla and Pipavav LPG terminals, would provide a substantial lift to the distribution side. That has in fact come through this quarter, as we have genuinely stepped up our performance on logistics efficiencies and similar areas, and this has produced both higher volume and what we believe is a lasting improvement in margin. It is truly the addition of these two large cryogenic terminals, combined with the shipping efficiencies and so on, that has brought this about.

Anil Sarin analyst
#43

Right, okay, good, good. Appreciate the extra detail there. I had a question about Mangalore specifically, and thanks for partly addressing it already. What's left is this: look, the capacities at Mangalore aren't like those at any other port. They're extremely large capacities. Given that the prior quarter was one affected by rain, is it fair to expect a pretty solid jump in distribution volumes excluding Mangalore, and as a result, for the entire country to see a meaningful rise in distribution over the next few quarters?

Murad Moledina executive
#44

Yes, we're genuinely pushing toward that. And once more, I believe another key point for every one of these LPG terminals—particularly Pipavav, Kandla, and Mangalore—is the five crucial multimodal evacuation routes we're attempting to connect with. First is KGPL at Kandla and Pipavav, then JLPL at Kandla, followed by the Mangalore-Hassan-Cherlapalli pipeline at Mangalore, the rail gantry for LPG at Mangalore, and Kandla being made capable of berthing very large gas carriers. These developments will truly change the game, and they're anticipated within the very near term. I think that will likewise translate into greater volumes and additional business, naturally, on the throughput side. Distribution should benefit too once these are in place, since the quicker product evacuation happens, the more room you have for the distribution business. It's extremely important. We anticipate every one of these coming online within the very near term. Beyond that, we're also bringing an LPG bottling plant into operation at Mangalore. And don't overlook JNPT. JNPT isn't far away either. That would bring one more LPG terminal, one more bottling plant, one more pipeline hookup, and so on. We're putting in a lot of effort to turn ourselves into a highly dominant and highly essential participant when it comes to LPG logistics.

Raj Chandaria executive
#45

I want to underscore something Murad said — specifically, the new rail gantry at Mangalore that he brought up. I hope folks are paying attention, because when a rail gantry was added at Pipavav, it totally changed how that terminal performed. Those who track the company as closely as you do might recall this. It genuinely revolutionized the LPG business at Pipavav. Work on the rail gantry at Mangalore got underway not long ago, and my guess is that 12 months from today, we'll be telling anyone who'll listen just how fantastic that Mangalore rail gantry is.

Anil Sarin analyst
#46

Great. And on top of that, the capacity in that region is genuinely substantial, plus the south is completely new ground for us.

Raj Chandaria executive
#47

That's right. Yeah, thanks for asking that.

Anil Sarin analyst
#48

And then, only one final item. Hassan-Cherlapalli, at what point will we have the connectivity?

Murad Moledina executive
#49

All of this requires time. This is infrastructure we're talking about. As I mentioned, it isn't very far off. We're working toward it, and you can expect it to be operational by the end of next year.

Anil Sarin analyst
#50

So that would be the end of next year — meaning fiscal 2027?

Murad Moledina executive
#51

Correct.

Anil Sarin analyst
#52

Yes. Excellent. Thanks so much, and best wishes.

Murad Moledina executive
#53

Thanks.

Operator operator
#54

Thank you. Participants, if you would like to pose a question, you can press star and one on your touchtone phone. Our next question comes from Mr. Vineet Jain with Sidd Capital. Please go ahead, sir. Yeah. Thank you so much. I have just a couple of questions. First, again, regarding distribution, just like the discussion you had last time, I want to get a sense of the present surge in volumes. Is it still primarily coming from Gujarat and Morbi? Are we only just beginning elsewhere, or is it the reverse?

Murad Moledina executive
#55

No, Morbi wouldn't account for more than 15%-20% of this. It's spread out everywhere. It's all over the place at this point.

Raj Chandaria executive
#56

Right now it's a bit scattered. All right. So. Regarding what you brought up about ammonia distribution, which could arrive perhaps 2 years from now, will that once again sit within the current distribution operation, or?

Murad Moledina executive
#57

Yes, definitely. It’s part of the Aegis Logistics distribution business. Okay. Sir, my second question concerns the Vadhavan Port CapEx, which you mentioned earlier and which is expected to be roughly INR 20,000 crore. Has that already been included in the $5 billion CapEx plan, or does it sit separately from that? Part of it, yes. Okay. Fine. Thank you very much. Thank you.

Operator operator
#58

For those of you who would like to ask a question, you can do so by pressing star and one on your touchtone phone. Our next question comes from Dr. Amit Vora, calling from the Homeopathic Clinic. Please proceed.

Amit Vora analyst
#59

Good afternoon, everybody.

Murad Moledina executive
#60

Good afternoon, everyone.

Amit Vora analyst
#61

Good afternoon, Murad sir. Good afternoon, Mr. Chandaria. Good afternoon. My question concerns the proceeds we receive from Aegis Vopak related to the sale of Hindustan Aegis and the earlier sales. In what way do you intend to deploy those proceeds at Aegis Logistics?

Murad Moledina executive
#62

We keep building up cash because of the opportunities we're seeing. Right now, I can't tell you that this is where we'll deploy it, but what I can tell you for certain is that we're looking at plenty of opportunities. When they do materialize, that cash is going to be very helpful. You saw Vadhavan Port, INR 20,000 crore. There's another new port we're trying to get into. There's new energy called ammonia that we're expanding. LPG expansion and liquid expansion are already underway. There are industrial terminals. There are jetties to do. We have a lot on our hands and opportunities that we're examining. Cash will never be enough, and this will definitely help us. As I've said, this transaction won't affect us because, in spite of diluting 51%, we indirectly continue to hold 34%. The 17% that dropped is compensated by the surplus, INR 7.00 billion, whatever is going to come into our hands. Even if we earn very low returns on that, it is going to more than make up the change in the holding of Hindustan Aegis.

Murad Moledina executive
#63

This is going to be quite favorable for the EPS of our sub. It's a really solid consolidation strategy, and we're eager to see it carried out very quickly.

Amit Vora analyst
#64

All right, thanks a lot, sir. Sir, one more thing regarding the KGPL update that was already provided — but can you confirm it will be able to start by the last quarter of this financial year?

Murad Moledina executive
#65

If it had been up to me to execute it, I would have said so for certain. Yes, we remain hopeful, and we're seeing enough progress on the ground that we expect KGPL to be commissioned in Q4. We're very glad to report that the PNGRB hurdle has been cleared. We've received PNGRB's approval for Kandla Port. With Pipavav, we already had it. Pipavav poses no issue, but for Kandla we secured PNGRB's approval to hook into KGPL as well, which sits only a very short distance from our hookup point. Yes, we look forward to getting started on KGPL in Q4 of this year.

Amit Vora analyst
#66

So back in December 2022, you set a guidance of 25% annual growth CAGR, and that's been kept up across these last three years. Looking ahead another four or five years, could we still see that same 25% CAGR, or might you expect something even higher than that?

Murad Moledina executive
#67

We've already stated that for the period from 2022 to 2027, so that part is certain. At this point, I'd say I feel fairly confident—or rather, we feel fairly confident—that we should definitely do better than that. We would go beyond the 25% CAGR that we gave as guidance to our investors a long way back for 2022 through 2027. Look, I think we're putting in a lot of effort to deliver more than this particular commitment.

Amit Vora analyst
#68

Thanks a lot, sir. That’s everything from my side. Thank you.

Murad Moledina executive
#69

Thanks.

Operator operator
#70

Thanks. Attendees, if you'd like to pose a question, just hit star and one on your touchtone phone. Our next question comes from Niloth Pal Sahu at GM Financial. Go ahead. Can you hear me? Yes.

Murad Moledina executive
#71

Yes, Niloth, that's right. Congrats on a solid set of numbers. Sorry if I'm asking something you've already covered — my line dropped partway through. Do you have any outlook for distribution volumes? They came in pretty strong this quarter. Could you give us a sense of how the price differential is trending this quarter, and how you see the volume ramp-up shaping up for this year and, if you can, for next year? Yes. On distribution volumes, we did 1.9 lakh. I think we're on track to do well this year where volumes and margins are concerned. Higher volumes always mean better margins, and that's because of the procurement efficiencies we get. Yes, I think for next year as well — I've said before that we're working toward 30% CAGR growth where distribution volumes are concerned. I think this year we'll more than achieve that. In the years ahead, we also expect to keep delivering at least that 30% growth. Thank you. One expectation from KGPL: we are to achieve this action this quarter.

Operator operator
#72

Apologies for cutting in. Ma'am, your voice is breaking up. Would you mind repeating your question? Sure. Is this clearer now? Yes, go ahead. Yeah. So on the KGPL pipelines, has connectivity been achieved? Are we facing any capacity constraint? From what I understand, the overall port has been given a 6.5 million ton capacity. Is there a specified allocation for us? How do you see volume ramping up from the pipeline?

Murad Moledina executive
#73

On that 6.5 million figure — are you referring to Kandla? Yes. No. At Kandla, we have sufficient capability to handle it. As you're aware, a turnaround is achievable, and from our end we can manage 4 million. IOC is connected through KGPL as well, and Adani Port is connected too. All three of us combined possess adequate capacity to deliver 6.5 million, which has served as the year mark for Kandla Port. I don't believe there will be much of a constraint. In fact, my personal view is that within a couple of years, as you suggested, we might need to add capacities at Kandla for more distribution beyond KGPL and JLPL. Possibly, but not in the near term, not over the next two years at minimum. No capacity addition. Beyond two years, yes, I think we would be in a position to do that. Okay, sir. Understood. Thank you. Those are my questions.

Operator operator
#74

Thanks. Our next question comes from Mr. Romit Nagpal, calling in from Terrapolis International Private Limited. The line is yours — go ahead.

Romit Nagpal analyst
#75

Good afternoon, and congratulations on those strong results. I have a few questions about the capacity capital you plan to spend, roughly $5 billion. The bulk of that will likely go toward building capacity for AVTL. How does that actually work in practice? Do you lay out the money first and then recover it from AVTL through a fixed cost plus margin arrangement?

Murad Moledina executive
#76

Yes. This will sit within what we refer to as AVTL, naturally, pending all the necessary approvals. Our infrastructure work is carried out on an arm's-length basis. Typically, those margins come in at 25%. When consolidated, that gets eliminated. Naturally, since these are independent companies, Aegis Logistics on a standalone basis receives cash for the margin it earns from the infrastructure development. On a consolidated basis, it will also show up in ALL, given that we consolidate line by line. It will sit, naturally, inside the AVTL vehicle. We've walked through that several times previously.

Romit Nagpal analyst
#77

The second question concerns what you mentioned earlier regarding the sizable cash position, and you're reviewing opportunities, of which there are plenty. Whenever you're able to settle on such an opportunity, whatever you ultimately use the money for, does that in the end also in some way lead to it being housed in AVTL?

Murad Moledina executive
#78

That's possible. It might not happen. It depends. Yeah.

Romit Nagpal analyst
#79

All right. That's all.

Murad Moledina executive
#80

So with AVTL, the cash that gets used actually comes back to us. It doesn't really leave. The cash is only effectively spent when it stays in ALL. For AVTL, if we do the development, then of course AVTL covers the whole amount, our margin included. We get back everything we've put in, and the extra — the margin — stays as cash. That's just how it works. If AVTL takes it up, the cash doesn't disappear.

Romit Nagpal analyst
#81

No, no, that's fair. But since I hold Aegis Logistics, obviously my focus right now is just on Aegis Logistics. Thanks anyway.

Murad Moledina executive
#82

Okay, so whether it stays with us or, of course, goes down. Should it go down, we get 25% upfront, and on top of that we hold a 40%-44% stake in AVTL. That means we also earn from the operations. If it stays with us, of course, that's a typical 20%-25% EBITDA margin business. We earn the same way, even if it stays inside ALL — depending on the type of asset and the type of infrastructure, that will decide whether it's housed in AVTL. If it's a terminal, yeah, there's every chance it gets housed in AVTL.

Romit Nagpal analyst
#83

Alright. Thanks. That's all.

Operator operator
#84

Thank you. Our next question comes from Priyankar Biswas at JM Financial Limited. Please go ahead.

Priyankar Biswas analyst
#85

Yeah. Can you hear me okay?

Murad Moledina executive
#86

Yes, sir.

Priyankar Biswas analyst
#87

Congrats, gentlemen, first of all. My quick question is this: you were emphasizing that once the Kandla-Gorakhpur pipeline is connected, volumes ought to ramp up more during the second half. What I take it to mean is that Mangalore should be ramping up too. On that basis, could we get a general sense of where we might finish FY 2026 from an LPG volumes standpoint?

Murad Moledina executive
#88

That isn't the guidance we've provided. It really hinges on numerous factors. Still, certainly Mangalore is going to continue rising, and Kandla as well, since we definitely will only be connected into Jamnagar in Q3. You'll observe JLPL's benefit in Q4. As for KGPL, given that it gets connected in Q4, you might not see any benefit at all, though it will show up in the following year. There will also be an advantage for VLGCs berthing at Kandla carrying LPG cargo starting in Q4. Pipavav, KGPL, and Kandla — KGPL, yes, partly in Q4, but the bulk of it next year. JLPL, Kandla, and the VLGC Jetty enabling, yes, in Q4. Mangalore, Q3 and Q4, you will see it. It's all a variety of scenarios. Yeah.

Priyankar Biswas analyst
#89

Basically, the run rate you're at right now—I mean the quarterly run rate—should go up meaningfully, at minimum in Q4, if not Q3. Would that be a fair way to put it?

Murad Moledina executive
#90

Yes. That's correct.

Priyankar Biswas analyst
#91

If I could just fit in one more question, sir — you're also putting money into ammonia terminals. Where do those projects stand at the moment? I believe there are 2 of them underway, correct — Kandla and Pipavav.

Murad Moledina executive
#92

Work has begun on the infrastructure side — specifically the Pipavav ammonia cryogenic terminal. That's currently in progress. Completion is expected in Q1 of the coming financial year. As for Kandla, we haven't begun yet, since a binding agreement still needs to be secured. We're simply awaiting the 2QC and some commitments. Once that happens, work will kick off right away. Not started as of now, but it is planned, yes. It could be very soon that we get going. That one too might land in the next year — in the latter half of next year — provided we can start within a couple of months.

Priyankar Biswas analyst
#93

All right, sir. I think that covers the main points from me.

Murad Moledina executive
#94

Thanks.

Operator operator
#95

Thanks. We’ll take the next question from Mr. Anil Sarin, who is calling in from K16 Advisors. Sir, please go ahead.

Anil Sarin analyst
#96

Yeah, thanks. I was just hoping to get some detail on JLPL. When is JLPL connectivity going to happen?

Murad Moledina executive
#97

Yeah, we're aiming to have that finished in Q3, so it should kick off starting in Q4.

Anil Sarin analyst
#98

Okay. Does that apply to Kandla as well, or is it for Pipavav too?

Murad Moledina executive
#99

Kandla alone.

Anil Sarin analyst
#100

Alright, great. And also, a few days back you disclosed something about the J2 project. How big is this J2 project, exactly? I mean, all the figures are there, but what's the CapEx tied to the J2 project?

Murad Moledina executive
#101

We're putting in place roughly 318,000 CBM of liquid storage terminal capacity, plus about 77,000 metric tons of cryogenic LPG terminal capacity. On top of that, a bottling plant with 35,000 metric tons per annum of capacity. Construction is already in progress. We anticipate that a portion of the liquid capacity will come online in Q1 of next year. The whole thing should be wrapped up by December 26th. You'll start to see some of the upside from the JNPA infrastructure work that's taking place in the coming financial year.

Anil Sarin analyst
#102

All right, that's useful. What's the CapEx tied to this specific project?

Murad Moledina executive
#103

Rupees 1,675 crore.

Anil Sarin analyst
#104

Right. So part of the disclosure also states that ALL — meaning the parent company — is set to get INR 500 crore from this project. Does that figure fall within it?

Murad Moledina executive
#105

Yeah. Nope. At the point we signed the framework agreement — basically the instruction to go build the infrastructure — we got 30%. The remaining 70% comes once that infrastructure is finished and up and running. That INR 500 crore represents 30% of the INR 1,675 crore infrastructure cost we're putting up at JNPA, the project we refer to as J2. So the INR 500 crore serves as an advance toward this infrastructure development that ALL is carrying out on behalf of AVTL.

Anil Sarin analyst
#106

Understood. After that's finished, you'd be looking at a margin of about 20%-25% on this INR 1,675 — is that correct?

Murad Moledina executive
#107

Yes.

Anil Sarin analyst
#108

All right, thanks so much.

Murad Moledina executive
#109

Thanks.

Operator operator
#110

Thanks. Since nobody else has anything to ask, I’ll now pass the conference to management for their closing remarks.

Raj Chandaria executive
#111

All right, thanks so much. I believe everyone has been impressed by how well ALL has done. As we said, it's our hope that we can keep up this kind of performance across the coming few quarters and the coming few years. With that said, I'd like to wrap up the conference call, and we look forward to talking with all of you at the end of January. Thank you.

Murad Moledina executive
#112

Thanks.

Operator operator
#113

Thank you. That brings this conference to a close on behalf of Aegis Logistics Ltd. We appreciate your participation, and you're welcome to disconnect your lines at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Aegis Logistics Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Aegis Logistics Limited earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.