Good morning, everyone, and thanks for joining the Atlas Energy Solutions conference call and webcast covering the fourth quarter of 2025. Joining us on the line today are John Turner, our President and CEO; Blake McCarthy, our CFO; Tim Ondrak, President of Power; and Bud Brigham, Executive Chairman. Remarks on how the company performed operationally and financially during the fourth quarter of 2025 will be delivered by John, Blake, and Bud, and after those comments we'll take your questions in a Q&A session. Prior to kicking off our prepared remarks, please be aware that forward-looking statements, as defined under the U.S. securities laws, will be part of this call. Those statements rest on information currently available and on management's expectations as of this statement, and they should not be viewed as guarantees regarding future performance. A number of risks, uncertainties, and assumptions that are hard to predict are inherent in forward-looking statements. Consequently, our actual outcomes and results may differ materially. Additional detail on these risks appears in the annual report on Form 10-K that we will file with the SEC on February 24, 2026, along with our quarterly reports on Form 10-Q, our current reports on Form 8-K, and our other SEC filings. Forward-looking statements should not be relied upon unduly; no obligation is undertaken by us to update these forward-looking statements. References to certain non-GAAP financial measures, including Adjusted EBITDA, Adjusted Free Cash Flow, and other operating metrics and statistics, will also be made. The GAAP reconciliation comments and calculations can be found in yesterday's press release; having said that, I'll hand the call over to John Turner.
Thanks, Kyle. In Q4, Atlas brought in $249 million in revenue and produced $36.7 million of Adjusted EBITDA, which works out to a 15% Adjusted EBITDA margin. Across all of 2025, we generated $1.1 billion in revenue and $221.7 million of Adjusted EBITDA, for a 20% Adjusted EBITDA margin. We came in ahead of where we originally thought Q4 would land. Tonnage totaled 5.3 million tons, matching the third quarter sequentially. What stood out was how muted the usual year-end seasonality proved to be, since customers kept holiday downtime to a minimum. That felt especially encouraging after the sharp drop in West Texas completion activity we went through during the summer. It looks now like the majority of operators have rightsized their activity to a $50-$60 WTI strip and are at ease running at those levels. The quarter also set a record for utilization on the Dune Express — the highest we've achieved so far — as Delaware Basin customers more and more appreciate how efficient and reliable this system is for their logistics supply chains. To us, that signals strong performance from the system as we head into 2026. Back in November, we announced an order for 240 MW of power generation equipment, which speeds up our strategic shift toward becoming a leading provider of behind-the-meter long-term power solutions spanning a wide range of domestic industries. We regard the power market's evolution over the coming decade as a genuinely generational opportunity, and we're pursuing it aggressively. After years in which U.S. electricity consumption stayed fairly flat, the grid now faces surging demand, which reached record levels in 2025 and is expected to climb by as much as 25% by 2030, fueled by explosive data center growth and a resurgence in domestic manufacturing. Utilities are finding it hard to keep up given infrastructure constraints and reliability challenges. Meanwhile, residential electricity prices keep climbing — up 7.4% in 2025 by itself — creating political and economic pressure to deliver more affordable, dependable alternatives. That dynamic is driving developers to lock in dedicated behind-the-meter power assets so they can de-risk projects and hit their timelines. For a lot of these companies, grid constraints amount to a new and urgent problem, dramatically compressing the windows in which they can make decisions. Since the summer of 2024, Atlas has been establishing itself as the go-to solution in this space. The Moser acquisition, which closed this time last year, gave us a cash flow platform along with critical engineering expertise that complements our strength in large-scale project execution. Over the past 9 months, we've been actively shifting the business away from a traditional short-term generator rental model toward a Power-as-a-Service approach, selling electrons under longer-term arrangements. That shift has meant upgrading communication systems, refining how we sell, and directing our commercial efforts toward customers who want dense, long-term deployments. The progress has us encouraged. We've hit a tipping point in this transformation. Earlier this year, we successfully deployed our first microgrid with a Permian E&P customer, which has since been upsized. In the first quarter of 2026 alone, we expect to deploy at least 30 MW under long-term microgrid multi-basin contracts with E&P and midstream customers. Looking at the pipeline we have today, our goal is for over 50% of the fleet we currently operate to be covered by long-term contracts by the time the year ends. We also hit an important milestone in January, when our patented hybrid battery solution was deployed for the first time — it works alongside generators as a grid-forming system and brings substantial gains in both cost and maintenance efficiency. This technology's commercial upside reaches well past the oil field. These steps forward in our existing power business are encouraging, but the bigger behind-the-meter projects are what represent a genuine step change opportunity for Atlas. Commercial negotiations are actively in progress, and we expect to offer better visibility soon on where equipment gets placed and what the resulting economic impact to Atlas will be. Across our pipeline there is a wide variety of behind-the-meter power projects spanning numerous industries — energy, data centers, manufacturing, and others — and contract terms generally run from 5 to 15 years, which generates durable long-term cash flows; our particular strength, and where we see especially compelling risk-adjusted returns, lies in projects in the 50 to 500 MW range, since our modular platform allows for efficient execution and high density deployments. At the same time, our differentiated track record with large CapEx infrastructure projects — our high-capacity plants and the Dune Express conveyor system among them — paired with our scalable design and expanding expertise, gives us an edge for executing even larger scale opportunities as customer demand grows stronger. This opportunity set keeps expanding quickly, with a number of prospects moving from initial discussions into formal proposals and active negotiations. In 2027, we are aiming for over 500 MW deployed across our fleet, and there is potential for considerable additional growth past that as we lock in larger scale projects and build on our initial orders. Delivery of the ordered equipment is scheduled to start in the second half of 2026, with energization targeted to begin in Q1, 2027. Any one of these projects could meaningfully improve Atlas's cash flow profile, and I am very excited to share more details with you as we close transactions. Stay tuned for the updates. I will now turn the call over to our CFO, Blake McCarthy, for our financials in more detail.
Thanks, John. During Q4, the fundamental results from our sand and logistics operation got better, even as pricing stayed difficult. Sequentially, plant operating expense per ton came down to $12.28, even with elevated costs in October tied to the operational challenges in Q3 and more maintenance spending in December. Our cost of production has improved, but it is still elevated at our flagship Kermit complex because of current constraints on our dredge feed. We expect that to be alleviated when our 2 new Twinkle dredges are deployed, with commissioning scheduled in the second quarter. For West Texas sand and logistics, the market backdrop is still challenging, with pricing currently at the industry's marginal cost of production. We anticipate that completion work in the Permian will decline compared with last year, although at present it appears to have leveled off around what we saw in Q4. Despite these difficult market conditions, the Atlas commercial team has positioned us well to achieve volume growth in 2026. By relying on our low-cost mines and our logistics capabilities, we captured a larger portion of the sand purchasing budgets of existing customers and brought in several important new accounts — ties that we anticipate expanding and scaling throughout 2026 and afterward. The present macroeconomic picture for oil remains highly unclear, and our ability to see our customers' plans for the entire year is quite limited. We've got a really packed Q1 agenda. Sequentially, we're looking at sales volume rising roughly 10%, and then Q2 should bring even more growth. When that winter storm hit at the end of January, it disrupted operations for everybody in the Permian, and we ended up losing about 4 days of production and deliveries. That temporary shutdown should take roughly $6 million off our Q1 EBITDA. I take real pride in the fact that Atlas kept delivering sand in the Delaware longer than anyone else before the ice forced us to stop. Credit goes to the Dune Express for that — it takes so many miles of road out of the equation, along with the risks that come with them. And on the subject of the Dune Express, it's still performing exceptionally well. On January 12th, we celebrated one year since our inaugural commercial delivery. With support from our partners, I'm delighted to share that we've removed over 21 million miles of truck journeys from the Delaware Basin. It's a point of real pride for us that the Dune Express is delivering meaningful gains in safety and quality of life for families and the wider community across the region. During the fourth quarter, the Dune Express set a shipment record of roughly 2.1 million tons, which included a single-month high in November of 760,000 tons. Looking ahead to Q1, we anticipate that fresh client contracts plus ongoing spot shipments will lift Dune Express throughput, and we think we're on track to move more than 10 million tons through the Dune Express during this year. We appreciate our customers working alongside us to help make the Permian Basin a safer spot to live and work. That said, the natural follow-up is: given how well the Dune Express is performing, what explains the soft service margins in Q4? Holiday-period load bonuses aimed at keeping drivers on hand weighed on Q4's numbers, but the real explanation comes down to pricing. In the Permian, logistics pricing has dropped to levels that cannot be sustained at all—far beneath what was seen in the COVID period. As we try to keep pace with the Dune Express, certain logistics rivals have behaved in ways that look more and more irrational, and in our view this leaves both those competitors and their customers exposed to future trouble and disruption. It appears that a number of companies right now are charging standard rates while essentially providing subsidies to their customers. The margin advantage that comes from the Dune Express does exist. It merely shields us in part from pricing that is historically terrible. On a positive note, there are indications this market is starting to turn in the opposite direction. Rates from third-party trucking are starting to gain upward traction, mirroring trends in the wider over-the-road sector; usually that is the earliest signal that trucking firms have grown weary of subsidizing their customers, meaning margins must rise. In November, Atlas brought its first last mile storage pile system to market. Whereas competing pile systems generally rely on mining equipment repurposed for oil field use, ours was designed specifically for the job. Right now, we've got six systems up and running for our wet sand work, and we're in the middle of testing how the system performs with dry sand. These systems matter a lot because they let us keep backing our customers' round-the-clock pumping programs, which are hitting record sand volumes for every completion crew. Even though the sand and logistics business in 2026 looks like it'll remain tough, we plan to take advantage of the softer market to strengthen Atlas's position as the go-to provider. In our sector, pricing has swung too far in one direction for too long, and there's no question the pricing rubber band is pulled taut. We continue to hear more accounts of competitors who can't deliver on what they've promised their customers. I’ll repeat what was said on the large cap oil field services calls: even a very slight uptick in completions activity will be enough to get pricing moving. During this RFP season, market share moved toward the better-quality suppliers, and less volume was distributed among the lower-quality mines. In the Permian, sand supply and demand are far tighter than the market appreciates, particularly for dry sand; on our previous conference call, we established a cost savings goal of $20 million in annualized savings. As things stand now, we have achieved that goal by combining the removal of third-party last mile equipment, decreases in rental equipment, headcount optimization, and procurement savings. Even though those efforts are paying off already, we're not going to stop looking for more ways to cut costs. Our goal is to shrink the fixed cost base across the entire company. Moving on to the numbers. John already noted that Atlas brought in $1.1 billion in revenue for the full year 2025. Company-wide Adjusted EBITDA was $2,221.7 million, a figure that works out to 20% of revenue. If we break down the full year's revenues: proppant sales reached $478 million on volumes of 21.6 million tons, while logistics contributed $558.8 million and power contributed $58.5 million. In Q4 2025, revenue totaled $249.4 million, divided up like this: proppant sales made up $105.2 million, logistics generated $126.1 million, and power rentals added $18.1 million. On a sequential basis, total proppant volume sold increased a little, hitting 5.3 million tons, while roughly 4.9 million tons were moved by our logistics business. During Q4, the average price at which we sold was approximately $19.85 per ton; when we look at Q1, we expect volumes to rise about 10% quarter over quarter, and the average sand price should be roughly $18 per ton. Excluding DD&A, cost of sales in the fourth quarter came to $187.3 million, which consisted of $60.6 million for plant operating costs, $115.2 million for service costs, $7 million for rental costs, and $4.5 million for royalties. For Q4, our cost to run the plants came to roughly $12.28 per ton, with royalties factored in. That's a sequential decline from Q3, though it remains higher than what we'd consider typical. The drop stemmed from greater volumes as well as fewer unnecessary expenses at the facilities compared with the third quarter.
Looking at the first quarter, we anticipate that our OpEx per ton will come in at roughly the same level as what we saw in Q4, which captures the effect of January's harsh weather conditions. As we move through 2026, we anticipate seeing better realized variable costs once the new dredges are brought into service at the facility we currently operate. Cash SG&A came in at $22.6 million for the quarter. When you strip out litigation expenses, SG&A should come down in Q1 thanks to the cost-reduction programs we announced earlier. Adjusted Free Cash Flow — which we calculate as Adjusted EBITDA minus maintenance CapEx — totaled $22.9 million, representing 9% of revenue. Growth CapEx came to $5.1 million, most of which related to our power segment, while maintenance CapEx for the quarter reached $14.4 million. The higher maintenance CapEx figure was mainly associated with preparation work for dredging and wet plant operations at Kermit, done ahead of the Twinkle dredge deliveries. For 2026, we anticipate cash capital spending of roughly $55 million, a substantial decrease compared to the prior year and concentrated mostly in the first half. We have planned maintenance CapEx of about $45 million, with around $10 million going toward growth, divided equally between sand and logistics on one side and power on the other. In addition, we anticipate making progress payments on the 240 MW of power assets we've ordered as deliveries start taking place during the second half of the year. Those payments will be funded through the lease facility we recently announced with Eldridge and should add up to roughly $190 million across the back half of the year. Net interest expense should run at about $16.5 million per quarter during Q1 and Q2, then increase to roughly $20.5 million in Q3 and $22 million in Q4. As John mentioned in his comments, our plants have kicked off the year with a high level of activity. With WTI sitting near 60, whether we sustain this pace will depend on where oil prices go. We have strong visibility into solid volumes for the first six months of this year, though a number of our customers are adopting a wait-and-see stance regarding their completion schedules for the second half. The market share we've recently picked up demonstrates Atlas's work to establish itself as the dependable partner of choice for the top operators in the Permian Basin. Turning to the first quarter, although volumes should rise on a sequential basis, the anticipated drop in sales price per ton, together with revenue lost from the winter storm's impact on operating days, will create a margin headwind. Our logistics business took a hit from load bonuses paid to guarantee driver availability around the calendar transition, which will hold back logistics margin improvement until later in the quarter. We're observing a shift back toward a more typical cost structure as the quarter moves along, and that, paired with an expanding delivery schedule, should produce a better margin structure over the course of the quarter. For the power segment, we're looking at a bigger contribution from one quarter to the next; EBITDA should come in roughly level with what we saw in Q4, and when the quarter wraps up in March, the company ought to be running at a higher rate than it was in January. At this point I'll pass things along to Bud Brigham, our Executive Chairman, who has a few closing comments for us, and after that we'll open the call up for Q&A.
Appreciate that, Blake. Even as we work through yet another down cycle in crude pricing, Atlas's prospects have honestly never looked better. Much like we found ourselves perfectly placed when the Permian bounced back after COVID — a recovery that drove a major lift in our cash generation — we're now set up to benefit from the rebound in oil and gas activity that's bound to come. On top of that, as I mentioned during our previous call, we are going hybrid. Right now, Atlas is building the foundation for game-changing, long-term expansion via behind-the-meter power contracts. Those deals, running 5 to 15 years, should provide strong revenue visibility along with costs we can count on — things like fixed, stable expenses for SG&A, maintenance, and interest — which balances out our oil and gas revenue streams that are powerful but carry more volatility. Our track record in big infrastructure projects, made even stronger by buying Moser, means we're uniquely suited to serve the boom in AI, robotics, and manufacturing. We view these first permanent power projects as a strategic launching pad, pulling in additional customers and assembling a portfolio of assets that throw off steady, recurring cash flow. As John Turner talked about, appetite for behind-the-meter power is climbing quickly, driven by higher costs and possible grid shortages that are nudging commercial, industrial, and data center users toward making fast commitments on bridge and permanent solutions; we're seeing a dramatic transformation in how power gets sourced. To use a phrase from our friends at Bloom Energy, on-site power has gone from being a last resort to a business necessity. U.S. power demand is expanding at the quickest pace it has in decades. Let me stress this: the Atlas investment story is more compelling than it has ever been. Persistent underinvestment in exploration spending, combined with shale's maturity and steep decline rates, creates the conditions for what I expect to be an extended upcycle. Whereas most U.S. shale basins are dealing with inventory depletion, the Permian — where Atlas holds the lead in proppant production and logistics — will be essential for satisfying growing oil demand. Even with sand and logistics pricing at cyclical lows like we see now, our low-cost approach stands out, thanks to Dune Express and our efficient mining operations. Once activity comes back — and that's a matter of when, not if — we expect better utilization, pricing, and margins, setting off a steep jump in profitability. By putting capital to work ahead of this oil upcycle while simultaneously rolling out our high-potential power business, Atlas gives investors two catalysts for meaningful growth. I'm extremely thankful for our outstanding team, the real innovators driving our progress. Their commitment leaves me more hopeful than ever about what lies ahead for Atlas. Thanks for being with us on our fourth quarter and year-end conference call. I'll turn it over now to the operator for Q&A.
Morning, everybody. John, you spent some time on the power segment. A quarter back, you placed that order for 240 MW. If I recall, you said at the time that you had line of sight into customer opportunities there. Since then you've locked in financing, and I'd assume that doesn't come together without a similar line of sight. Maybe an update on what has made contracting this take a bit of time, and do you now have solid line of sight into where this equipment will ultimately go, given that deployment is under one year away?
Yeah, Jim, that's a great question, and thanks for raising it. Yes, we have strong visibility into the customers expected to take the substantial majority of this equipment package, which remains on track for delivery. Deliveries, I believe, start in late 2026. These are high quality, creditworthy counterparties spread across diversified markets, and they've signaled meaningful follow-on requirements past their initial commitment, which gives us clear pathways for additional equipment orders and sustained growth going forward. Our strategies are still, or remain, solely focused on behind-the-meter power solutions, and we aren't pursuing grid, interconnected, or utility scale opportunities. Rather, we deliver reliable on-site power directly to customers dealing with grid constraints. In many cases, these engagements start with bridge power to meet immediate needs, which throws off significant near-term cash flow and speeds our path to full development. These bridge arrangements soon shift into long-term behind-the-meter agreements that we're primarily working on, as customers come to recognize the prolonged grid timelines and the value of our integrated approach. ...yes, the answer to that is yes, we do have clear line of sight on who those customers are and expect to be reporting on that here shortly.
Thanks for that. As a related follow-up, I've been observing how this market has developed and how various companies take different approaches. It appears there are 2 strategies I've noticed: one involves firms simply supplying power equipment, essentially as a rental offering, while the other involves firms delivering a complete solution, including all the balance of plant and so on. I'm wondering if you might expand on which approach aligns with yours and how you view the return potential in that area?
Sure, go ahead. I'll let Blake take that one.
And then we also have Tim Ondrak, who heads up our Power Business, and he's certainly able to speak to this with more insight. It's a great question, Jim. Obviously, there's the equipment side, and that's the piece I think most folks in the market can see pretty clearly — alright, it costs X, so you rent it out for Y, and you get a return. But once you move into these behind-the-meter solutions, right? Based on what the function is — say, what the facility actually does — the balance of plant needs differ, and the auxiliary equipment required differs too, so that shifts the dollars per MW you're providing, on both the upfront side and, as a result, what you end up having to charge. Our approach has been to engage very early with certain customers we know are putting significant money into their facilities and who are running into the reality that — the grid has basically told them, "Hey, what you need isn't something we can give you." We really work to grasp what they're aiming to achieve in their operations. We do a great deal of front-end engineering so we genuinely match what they need. That can lead to quite a wide spread when it comes to, first, what our facility costs, and second, what we then have to bill them. Since we will always aim for, you know, a solid unlevered return on the capital we deploy. And when it comes to return on equity, given the leverage applied in these situations, it becomes quite appealing. So with these initial ones, expect a fairly wide range, which is exactly why we're eager to share the economics and will be fully transparent about it once we close deals.
I'd say that's also the reason the signing has stretched out somewhat. Another point on why these contracts have been slow to finalize is that, well, they aren't merely deals for renting generators. In reality, these are... you know, you've got to come in and handle planning and engineering. You know, you need to do — you need to get all of the, you know, the equipment arranged. There are plenty of various tasks you've got to handle on that side. I believe that's the cause of it dragging on more than putting pen to paper on a generator would.
It also makes those facilities much stickier...
Exactly.
because it's fit for purpose.
Okay, so I guess to wrap things up, our approach is essentially bridging toward something permanent. The core idea behind it is that we see electricity as a fundamental requirement. Based on which utility territory you're in and where folks happen to be putting up their sites, those hold-ups might run to 2028, or even as far out as — I believe we've been told by some 2034. Whenever a customer considers the amount of power they require as they're getting their facilities going, it could be a good deal lower than what they intend to grow into. What we have to do to carry that out involves delivering temporary power generation that transitions into a lasting installation, one that serves that long-term demand and brings the customer to a point where a utility's schedule is no longer a concern, letting them focus instead on running their operations.
That clears it up completely, fellas. Thanks for the detail. Catch you in 7 days.
Thank you, Jim.
Hey there, good morning, everyone. I'd like to stay on the economics topic, if that's alright. Clearly, certain figures are circulating out there. There's talk of roughly $300,000, give or take, for each MW annually in EBITDA. Perhaps line that up against what you're paying for financing right now. Could you shed some light on — when you bring up the recips, putting up the facility, and the balance of plant that's part of it — what's the right way for us to view the economics and the earnings from these prospective projects you're developing? A bit of clarity there regarding the figures we keep hearing in the market would help.
I'll kick things off, Blake — and Blake, you can chime in afterward. As we mentioned before, the economics clearly hinge on multiple factors. When you mention balance of plant, developing the facility — those things are standard in the turnkey behind-the-meter offerings we provide. Naturally, weigh that against the contract's initial duration. What we've zeroed in on is a longer-term contract framework, for the sake of stability. Our aim is appealing IRRs, comfortably exceeding our cost of capital across that initial term, plus additional upside coming from extensions and expansions. Anything you'd like to tack on?
Yes. Derek, I appreciate that. I'm genuinely happy you brought that up. I believe it's an excellent question, since I realize folks are looking for some sort of metric they can put into their models. The remark John made regarding IRR is likely the finest route to reach that indirectly; with these projects, we aim for an unlevered IRR up in the high teens, which we consider quite appealing given how contracted these cash flows are. Once you add any form of leverage on top of those cash flows, the equity returns, as I noted, become quite appealing. From a long-term standpoint, I think that when people mention something like $300 per MW, that's likely a solid proxy for equipment by itself, though it's a bit too simplistic when you're actually building these custom power facilities. I believe that relying on that IRR and, well, we do disclose, clearly, the size of our facility has been made public. I think that's a solid method to reach it indirectly. You ought to be able to apply that to equipment costs to arrive at a reasonable proxy for the cash flows we anticipate from these projects.
Understood. All right, excellent. That's really useful. So for my follow-up, on the topic of lead times for the extra equipment you mentioned — you brought up moving toward 400 to 500 MW of deployed capacity. Will that build on the 240 MW, meaning those bigger 4 MW recips you ordered not long ago? And if that's the case, how should we think about the timing for those deliveries and what the lead times look like? And then past that possible 500 MW, maybe some visibility into future orders beyond the 500.
Yeah, well, Thanks, Eric. I'll handle that one, unless anyone else — but Tim, jump in if you'd like. I mean, our ties with the main OEMs, plus our distinctive record of getting large-scale infrastructure projects done, those remain big advantages, and they're what let us lock in the initial 240 MW of those 4 MW reciprocating units in the first place. Delivery is set for later in 2026, and they also let us keep solid visibility into further equipment for high-quality opportunities, along with the more than 2-gigawatt pipeline we've been discussing. These connections rest on trust, scale, and getting positioned early, and they've given us access to capacity redirected from projects that slipped elsewhere in the industry. Lead times on further 4 MW recips now stretch into late 2027, which shows how strong demand is across the industry for behind-the-meter generation equipment. That being said, our recent $375 million lease facility offers flexible, non-dilutive support shaped to what we need, permitting milestone payments through the packaging conversion into term finance at delivery. It's played a key role in funding our initial 240 MW commitment and puts us in a good spot for near-term deployments as we head toward our 500 MW target by 2027, with most of that under long-term contract. Looking past 2027, especially as we chase bigger, denser, behind-the-meter opportunities across diversified end markets, we expect we'll need more financing support for other equipment orders. We're actively weighing options consistent with our disciplined capital approach, drawing on our demonstrated history with financing and strong cash flow generation from bridge to permanent transitions. Regarding additional equipment packages, at this moment the package we've obtained is those 4 MW recips. Other possible opportunities may exist out there, and I'll let Tim say more about that.
Right. Derek, I'd say equipment is out there. If you examine capacity worldwide, much of it has piled up in backlogs. There have been plenty of public announcements, you know, that let you sort of work backward toward whatever might remain. In our view, two separate pools of equipment become obtainable. With the first pool, you know, you've got to be present in the market, you've got to be engaging with people, and, you know, orders get cancelled or parts of orders get cancelled or pushed out, so, you know, equipment shows up on the market. There's a second one, I think, where, you know, OEMs are doing exactly what we are doing, where they're, you know, out there forging ties with the groups that are installing these things. As John hinted, I think we're well positioned to capitalize on those ties. You know, you look at the people on this team and the connections they carry, and then you look at how Atlas is regarded and, you know, our ability to run and build out these sizable projects. I think that reassures OEMs that when they hand assets over to Atlas, you know, it will be a solid long-term partnership, and it's going to reflect well on all of us. That's what we're focused on, I think. We have visibility into the equipment we would, we'd deploy to get us to that 500 MW.
Great. Well, I appreciate all the detail. I'll hand it back over.
Thank you. Morning, everyone.
Tim Ondrak, good morning.
Stephen Gengaro here, and I suppose, continuing with the electricity subject, something we more or less picked up across the past 2 years is that a particular capability is needed in order to put these assets in place at the location, plus run them in a way that is effective and efficient. Could you describe, in a sense, the know-how you have in-house for carrying out these behind-the-meter projects?
Okay, I'll start us off on that, and then I'll hand things over to Tim, who honestly articulates this topic far better than I do. If you look back at Atlas's track record, we've accumulated substantial know-how when it comes to putting up large, complex plants, correct? We built the Kermit facility and the Monahans facility, starting from nothing more than a spot out in West Texas, and carried that through to some of the most advanced sand production sites our sector has. Keep in mind, we're the crowd that decided a 42-mile conveyor belt belonged in the middle of the desert, and I'd guess plenty of folks shook their heads when they heard that idea. Yet here we are, 12 months afterward, and it's running. I believe that during those first conversations, the reaction was: Wow, these folks know how to construct massive, intricate infrastructure from scratch. Now pair that with the electrical know-how we pulled in-house through buying Moser; we certainly haven't been idle since completing that transaction. We've recruited a considerable amount of talent, genuinely impressive individuals, to strengthen that team. When those two pieces come together, the result is quite potent; after that, as people find out about Atlas, the key point is that this customer base looks nothing like any we've served before, correct? It isn't merely the 25 E&Ps everybody is familiar with and appreciates; instead, it spans the wider economy, so we have to invest heavily in explaining just who Atlas is to them. As soon as they begin to grasp our identity and our accomplishments, they take considerable reassurance from it. After that, we send in a few of our electrical specialists, and they proceed to impress them with what they know. Those commercial talks move ahead fairly swiftly. Still, I'll pass it to Tim now for the concrete details.
Yeah, so, Blake, you covered a few points there. I'd say, you know, the main thing is that when Moser came on board, the team we brought in had 50 years of running operations behind it, so from a talent standpoint, that gave us a really strong foundation. We then built on that group by bringing in talent from outside, and those folks have given us a big lift with CNI and the bigger MW deployments. Over the long haul, what we've put together is an operating group carrying 20+ years of know-how running large engine systems. You know, if you pull all of that together, our view is we can produce the same quality of execution we've shown in the sand and logistics space, and we've carried that across into the power space.
All right. No, that helps. That gives us good detail. Thanks. My next question is this: you brought up, I believe, while answering an earlier question, the matter of grid interconnection hold-ups, and I think you also said something along the lines of treating that as a bridge toward permanent power. From where we sit, that bridge toward permanent power looks quite lengthy, so I was wondering what you are picking up regarding utility interconnection and the lines for bigger loads waiting to be served, plus how that shapes your planning and thinking.
Yeah, I mean, look, that's a huge question. It's a huge question, since if you examine the utility network across the United States, it's unbelievably complex, correct? The regulations shift, you know, occasionally even when you go across the street. Whenever we speak with people about their projects, each one has its own distinct story, yet with overlapping themes. That overlapping theme is that utilities won't reach their targets, so they have to consider what's referred to as a bridge solution. Once you genuinely grasp the difficulties utilities are dealing with, and, you know, you observe projects from utilities being pushed forward in various districts, you realize that's going to impact, you know, essentially the whole industry. What utilities are telling us, and I believe I brought this up before, is somewhere between 2028 and 2034 for a load to interconnect, and that's roughly throughout the U.S. In certain locations, you can find data points indicating it takes longer, or it's shorter. From that viewpoint, what we're actually discussing is infrastructure. That can be bridged, and I believe we have a solid solution for bridging it. We have, you know, more than 200 MW of bridge equipment within what we purchased from Moser. Once again, our thesis is that this is a long-term infrastructure play, and that bridge system comes with certain drawbacks. How you address a few of those drawbacks, you know, whether fuel efficiency, footprint, or whatever else, is by putting in a long-term system built to remain in place and run. You know, we discuss, you know, 5 to 10-year contracts, 15-year contracts, but honestly, these are 30-year facilities if that's what's needed. We believe that structural shift in this market will reward those who take ownership of it and install their own systems now. You know, we think the wider grid truly gains from private capital deploying extensive infrastructure, really throughout the whole United States.
Sure, Stephen — and honestly, this whole area shifts so quickly. It seems like each morning brings four or five stories that tie together, each one extending the timeline further out and moving it later. I'd say all of us strongly share the view that utilities will face growing pressure to, well, likely push back on a number of these interconnection requests, simply because we expect affordability to turn into an ever-larger catchphrase in politics. It's likely best for everyone if the private sector takes on solving this, rather than, you know, depending on the public utilities to handle it. Yeah, even when they're able to draw power off the grid, drawing all of their power off the grid isn't possible. I mean, as Tim mentioned, we're not just in conversations with end users — we're also talking with the providers. That's what the providers keep telling us: they might supply part of the power, yet supplying the entire amount isn't something they can do. Those customers are likewise being informed that before power can be given to them, they must demonstrate the ability to supply themselves, you know, generate a certain quantity of power on their own in order to receive that extra power from the grid. Clearly, plenty is happening and plenty is shifting right now, but that's roughly the situation as it stands today.
There's one final thing I'd add on that: we're out in the market, having conversations daily, and folks are evaluating sizable projects. What comes up most reliably is this — first, the utility keeps pushing back the date when it will actually arrive. Second, they won't satisfy the entire power ask.
Great. No, thanks for all the color. That's helpful.
Thanks, John. So far, I believe the questions have appropriately focused on power. I did want to ask about the sand and logistics business. First-half volumes appear really strong. I realize there's limited visibility for the second half of the year. Could you provide some sort of range for production growth over the entire year, just to give us some benchmarks to think about?
Yeah, that's a reasonable question, and, apologies for being opaque, but, you know, right now, what I also hear from some of our customers is that the outlook is somewhat opaque. Think back a quarter ago — seemed like each macro piece you picked up had oil pegged around $45 to $50 by now, and yet here we sit with WTI at $66. Sure, a hefty geopolitical risk premium is baked into that number, but none of us really believes we're headed into a world where that kind of risk just disappears. Our sales organization performed really well in the field. We had instructed them to secure the volume, and that's precisely what they accomplished, which positions us well for a robust opening six months. Having said that, many of our buyers came to us essentially saying they had locked in their plans for the initial half of the year, but preferred to preserve some flexibility regarding what their arrangements would look like during the latter portion. A significant portion of that, I'd say, hinges on where commodity prices are trading. At this moment, based on our current view, we anticipate that total volumes will increase compared with last year; that would suggest... That provides us with... I recognize that represents quite a wide range when it comes to second-half volumes, since we do anticipate fairly substantial volumes during the first half of the year. Even so, the pricing landscape is still quite difficult, so that clearly works against us, but it has us concentrating on what is within our control, namely reducing the variable cost of production at our facilities. We have a lot of enthusiasm regarding those dredge commissionings on the horizon, which will occur later in this quarter and carry into Q2. Those will produce meaningful enhancements at the facility we operate now. So when it comes to sand logistics, I would describe our objective as essentially cementing our standing as the Permian's number one sand logistics provider, and reaching a point where, when the cycle eventually turns, we are the quality supplier whose stickiness is such that no one would want us to quit delivering sand to their well site, given that we have made it so their operations never need to think about it.
No, that's reasonable. Regarding logistics, you mentioned the trucking difficulties and noted some upward movement in trucking rates. Any insight you can provide about the margin outlook for logistics this year, following a fairly sluggish beginning on the margin side with the Dune Express?
Yeah, good question. I attempted to offer some clarity on that since I believe it's something we're asked about often. We're in a position to advance and enhance from the low base at which we closed 2025 and opened 2026. During the latter part of Q4 and the beginning of Q1, our logistics operation was weighed down by substantial load bonuses provided to third-party carriers so we'd have drivers ready to satisfy customer requirements throughout the holiday period. This was to guarantee delivery when, honestly, the weather is quite terrible, which it definitely was in January. Also, as stated in the prepared remarks, our sales team was feeling quite confident throughout the contracting season, and they've excelled at obtaining fairly appealing work in what remains a very challenging market. That encompasses a significant volume of work set to generate additional Dune Express volumes, which is the primary factor behind creating greater margin differential amid weak pricing conditions. From a numerical standpoint, Doug, I'd say logistics margins in Q1 will likely appear fairly comparable to Q4, with December of last year and January of this year being the lowest points. Q2 right now is just rough estimates, but I've factored in a solid increase reaching the double digits, perhaps not exactly mid-teens, yet a solid increase and an enormous relative gap compared to where the remainder of the market stands.
Understood, thanks.
Thanks for inviting me, everyone. To start, could you address how many power inquiries are actually coming in, or what volume, from E&P operators regarding microgrids? Have you attempted, or do you plan to attempt, linking sand volumes to agreements for that electricity?
Hello, John. Yes, regarding the growth in microgrid demand originating from E&P, what we are observing seems somewhat unrelated to any particular base; in, you know, likely two among our three busiest basins, roughly 50% of incoming inquiries for well site generators involve some form of microgrid configuration; this generally means linking, you know, output from two up to perhaps four pads together.
All right.
Our expectation is that, you know, as we move further into the year, an increasing share of units will go toward those kinds of systems.
When it comes to connecting the sand volumes with the power side, sure, that's clearly a smart concept; our aim is to serve as a wide-ranging solutions provider for our customers. Right now, many of the groups handling those areas operate independently. You have completion crews doing their work versus production crews, and in plenty of these companies, they're largely distinct. On the sales side, we continually strive to offer better solutions to our customers. I won't rule that out.
Okay. All right; that's all I had. Thanks, guys.
JD.
Morning. I'd like to return to the subject of volumes. You brought up the talks about bringing on additional customers during this year, plus the fact that you're capturing a bigger portion of spend from the customers you already have, and it appears those efforts have paid off. Let me make sure I have this right — are those gains already baked into the volume guidance for the first quarter, or is it really later in the year when those volumes begin to take effect?
What I'd say is that those gains aren't really captured in our first quarter volumes. What I mean is, first quarter volume will be somewhat lower due to the weather, though I'd anticipate seeing a portion of those effects start to come through as we go along. You'll get a bit of it during the first quarter, and after that it will take hold in the second and third.
Sure, so, as usual, there's a build in customer activity. January typically gets off to a slower start, and we see a consistent increase as the quarter goes on; that storm in January, of course, took out roughly 4.5 days of operations for everyone in that region. Those volumes don't completely show that impact. What we're looking for is Q2 volumes to rise compared with Q1.
Understood, understood. To follow up on that point, you brought up solid volumes during the first half, yet buyers adopting a wait-and-see stance in the back half. I suppose, simply from what you've been hearing, it appears E&Ps may not truly be accepting this $65 WTI crude price at present. Do you figure they're still behaving as though we're in something like a mid-50s setting? So I'm just wondering, how low do you believe oil would need to fall before they'd think about cutting volumes during the latter six months of the year?
Yeah, I'd say their spending plans for this year were put together using roughly $50-$55 oil as the basis. I believe what's happening right now in West Texas mirrors that commodity strip. You know, they've only just locked in those CapEx budgets, and they won't shift away from them merely because of, you know, swings in the commodity price. The more time the commodity price, you know, remains elevated, the more at ease folks become with it. I'm certain they aren't grumbling about the extra cash flows They're pocketing at this moment.
So the wall — that investment cycle — the amount of time to make a call is actually quite brief. So with these shale wells, they have the ability to hold off longer before deciding. And as Blake mentioned, they feel fine about their current position. Should that hold, you'd likely see consistent activity, consistent through the close of the year, though that hinges on where prices head.
Thanks a lot. I'll hand it back over.
Good morning, everyone. You brought up the last mile storage system. I just wanted to ask about it — it permits ongoing pumping of wet sand. You noted that a dry sand solution is being tested. What has to occur for that to work out, and if it does succeed, what kind of opportunity might that system present?
So, at the start of this year, or possibly at the end of last year, we rolled out a system built to boost how much sand gets sent out to the well site, and how reliably on schedule that happens — with really good site performance, you know. That drives up efficiencies, letting operators pump more sand downhole. We've been observing this. We began on the wet sand side. ... right now, every one of those systems is out in the field. Quite a few of our customers are running them and are asking for additional units. When it comes to dry sand, there's still work left for us to do there. On the question of when, that remains uncertain, but testing is underway that's showing progress, and we'll have more to say on that down the road. What we're observing from it looks encouraging. I think a few of the developments you'll notice ahead include continuous pumping. Many of our customers request it, or insist on it, because. You're beginning to see meaningful outcomes from how we get sand to the well site — that's what makes possible things like the Dune Express, and our wet sand offerings. This marks one more move along that path of assisting our customers with what they need and giving them workable solutions, ones that let them reach their objectives.
Continuous pumping is a really significant development in the sector we operate in. Those completion crews that we supply sand to are running continuous pumping operations. The volume of sand they're pumping each month is, you know, several times greater than what a traditional zipper crew would use. The major limiting factor, though, is the footprint at the well site. Things such as boxes and silos are designed around those limitations, correct? With the pile system, moving to piles clearly lets you place a greater quantity of sand in a single location; however, what our system accomplishes, in our view, is that it makes piles possible, while doing so extremely efficiently and with clean sand, and pairing that with PropFlow technology. This is a crucial enabler of highly, highly efficient continuous pumping operations. It's something that keeps driving that tailwind behind the sand intensity for every individual completion crew, which we believe over the long term — once people quit setting budgets based on $50 oil and perhaps become somewhat more at ease with something like $65 +, and we witness a bit more incremental activity — we think the market tightens up quite rapidly.
Thanks for laying that out. I also had a question regarding the hybrid power system you brought up. I suppose what sets it apart, and how would the potential for those assets shape up?
Right. So the hybrid power system basically brings together battery tech we created internally, we hold the patents for it, and it received funding via a DoD grant secured by the legacy Moser business back in 2018. Basically, what this setup does is pair up with the generators we already have, and it manages how those generators operate, so they're running at more or less peak load, and then the battery sends power through the system and turns the generator off. The effect is that it cuts the runtime on those generators, which stretches out our maintenance intervals from more or less a monthly service to one every 45 days, sometimes even one every 60 days. It brings down fuel expenses for our operators, and it reduces the chance of a shutdown event at the customer's site, and those, as you know, aren't good for downhole pumps, which is mainly what we handle in that business. We're quite enthusiastic about the possibility of rolling that out at scale within the legacy Moser business. We believe it's differentiated. We've demonstrated it across several well sites. I think if you take that and apply it to the wider industry beyond oil and gas, it has applications really in every industry where people are looking for clean, reliable power, and that battery system delivers clean, reliable power that can work alongside whatever systems they happen to use, whether those are prime power systems or backup systems.
Great. Thank you, guys.
Thank you.
Morning, John, and everyone else. I appreciate you letting me ask.
Yes.
Right.
Could you give us a sense of what kind of savings we should anticipate across the back half of the year, after that Twinkle dredge starts operating?
Pardon me, Jeff — what he's asking about is the expense reductions we anticipate during the latter six months of the year, once those dredges begin running.
Oh, yeah.
Yeah.
I think I can address that one.
Right. For more than 12 months at this point, we've lacked a consistent dredge feed at the main Kermit site. Clean, reliable dredge feed is exactly what that plant was built around. The result has simply been a series of process bottlenecks, and those have pushed up OpEx per ton from that site compared with... I mean, when that plant is performing at its best, no other facility we have across the whole Permian Basin costs less to run. As both of those dredges start up, and, you know, to make clear, these are Twinkle dredges that we've owned. A Twinkle dredge has been part of our fleet, one sits in the fleet today, and nothing else we run produces as consistently as it does. Our confidence in it is high. In our view, they are the F-150 among dredges. Once those units are online, the quality of our dredge feed should improve considerably, and that carries strongly favorable downstream effects throughout the process; watershed operations get better, the dryers face less strain, and the entire facility simply operates with greater efficiency. If you consider that, across the complex our total variable costs have likely been running roughly $1 higher as a result of those dredge feed problems. That applies over the course, you know, across the first half of the year, and it will carry forward. Still, it's quite a large circular reference when it comes to overall OpEx per ton, since such a big portion depends on volume throughput, which hinges on customer activity during the second half. Were you simply to take first half activity and project it onto the second half, you know, you'd observe a fairly substantial gain in OpEx per ton as we progress through the year.
Great. Thanks for that information. I'll give the call back to the operator now.
Thanks, operator, and thanks to everyone for being with us today, and for every excellent question; we really value the time you've spent with us, to our outstanding team, thank you for all your effort. To our customers, thank you for your partnership and trust, and to our investors, thank you for your steadfast and ongoing support and belief in Atlas; we look forward to and are excited about reporting our results for 2026, and our first quarter results in, 2 or 3 months. Thanks all for joining, and that concludes the call. Thank you.
Thanks, everyone, for taking part. That brings today's event to a close. At this point you're welcome to drop off the lines or sign out of the webcast, and we hope you have a great rest of your day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Atlas Energy Solutions Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Atlas Energy Solutions Inc. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.