Good morning, and thank you for joining the Atlas Energy Solutions conference call and webcast covering our second quarter of 2026. Joining us on the line are John Turner, our President and CEO; Blake McCarthy, our CFO; Tim Ondrak, President of Power; and Bud Brigham, Executive Chair. Remarks about how the company performed operationally and financially during the second quarter of 2026 will be delivered by John, Blake, and Bud, and after those comments we will take your questions in a Q&A session. Prior to starting our prepared remarks, please be aware that forward-looking statements, as defined under U.S. Security laws, will be part of this call. These statements rest on information currently available and on management's expectations as of this statement, and they should not be viewed as guarantees regarding future performance. Difficult-to-predict risks, uncertainties, and assumptions are associated with forward-looking statements. Material differences between our actual outcomes and results are possible. Additional detail on these risks appears in the annual report on Form 10-K filed with the SEC on February 24, 2026, along with our quarterly report on Form 10-Q for the first quarter, current reports on Form 8-K, and other SEC filings. Undue reliance should not be placed on forward-looking statements. No obligation is undertaken by us to update these forward-looking statements. References to certain non-GAAP financial measures, including adjusted EBITDA, adjusted free cash flow, and other operating metrics and statistics, will also be made. GAAP reconciliation comments and calculations can be found in yesterday's press release. Having said that, John Turner will now take over the call.
Appreciate that, Kyle. Turning to Q2, Atlas brought in $293.2 million of revenue along with adjusted EBITDA of $49.5 million — an EBITDA margin of roughly 17%. Blake is going to walk through the financial specifics afterward in the call. Before diving into the quarter, I want to explain the structure of our power business, since this draws a lot of questions; it's split into two divisions. The first, oilfield power, provides generation to oil and gas operators throughout numerous basins, and we anticipate that fleet wrapping up this year with 180 MW-200 MW deployed, most of it tied to long-term agreements. The second, long-term behind-the-meter power, delivers primary, permanent power to large-scale users, mainly data centers. Within that segment, we closed our first-ever agreement this quarter, and growth there is supported by the Global Framework Agreement we hold with Caterpillar. The highlight of Q2 came when we completed our initial behind the meter deal — a power purchase agreement for 120 megawatts with a subsidiary of a technology infrastructure provider that carries an investment-grade rating. Let me walk through the economics. The project's capital comes to approximately $190 million. After the permanent facility becomes operational, we expect this contract to generate roughly $55 million in adjusted free cash flow on an annualized basis. That equates to a cash-on-cash payback of less than three and a half years. These economics apply only to this particular contract, this specific counterparty, and this individual site — they should not be applied to future projects. Just as important, the money we need to build this site fits inside the capital guidance we gave you three months ago. To fund this expansion, we are not raising the capital budget we announced earlier. Socorro, Texas is where it's going, and here's the order of events: a 26-megawatt facility has already been completed and is right now supplying power to the site through the customer's construction and testing phase. Atlas equipment installation for the permanent plant begins during Q3. In Q4, commissioning gets underway. At the end of Q1 2027, the 120-megawatt facility energizes, and revenue recognition for this new system begins in Q2 2027. That timeline sums up the whole thing. This project demonstrates how Atlas applies its complete solution strategy in the behind the meter market, so customers can resolve their power procurement needs with a single call at any stage of a project's life cycle — whether that means delivering power during the critical early-stage ramp-up or supplying it throughout the facility's operational life. The commercial opportunity set for permanent behind the meter power keeps expanding quickly. With demand for compute capacity exploding alongside the evolution of AI, the urgency in our commercial negotiations has risen. As frontier models grow more complex and capable, accelerating access to token generation becomes more pressing. The priority on access to power is best illustrated by hyperscalers continuing to build out their internal procurement teams, adding seasoned power professionals who have sped up and sharpened contract negotiations. Over the last several months, the character of the power deals we're going after has changed, both in terms of size and duration. When we signed our framework agreement with Caterpillar, our assumption was that fully contracting the capacity we'd placed on order would take 8 to 10 projects; we had a lot of confidence we could accomplish that; we anticipated it would demand considerable commercial effort. Prospective buyers now see much more clearly what we can deliver commercially, and because of that we've found the size of the undertakings we're engaged in has gone up considerably. What this means is that the odds keep rising that just two to four projects would tie up whatever uncommitted capacity remains to us, whereas previously we figured it would take 8 to 10 projects to do so. Beyond that, we've noticed that the people we're negotiating with increasingly want — and in some cases truly need — agreements that run for a longer period of time. Given that it's becoming more difficult to obtain grid access within any timeframe you can count on, those prospective customers are looking at island power as the way to serve their sites over the long haul. When we first started looking at this, we considered 10-year contracts to be the ideal length. Increasingly, people considering becoming our clients are asking for contracts lasting fifteen to twenty years, since they want to reduce the risk tied to powering their sites over an extended horizon. Because these possible buyers are keen to move fast on the opportunity to secure island power for the long haul, we're discovering that our approach — providing a complete service package that begins with early engineering and continues through maintenance and operations across the entire life cycle — is building momentum. Those data center prospects are turning to us to address every aspect of the power challenge. They're not interested in detailing engineering or equipment specs. What matters to them is a load quantum featuring productive load swings, along with a reliability metric. Their ask is that we hand over a system capable of hitting their targets in as little time as possible, backed by a partner they trust to stick around for the long haul. And one more thing—we haven't observed any prospective deals slipping to the right. People feel a real urgency to push projects ahead, so we anticipate the industry will log more contract activity across the weeks and months ahead. In our view, Atlas sits in a strong position to pursue those opportunities. Beyond the 120 MW tied to the project we just announced, we'll bring in another 120 MW by the close of this year, with a further 350 MW set to arrive throughout 2027. Having that 470 MW ready to deploy in 2027, along with visibility into a consistent ramp phase, matches what prospective customers are asking us for, which puts Atlas in a solid position to compete; our contracted backlog, we think, could shift significantly during the back half of this year. Once new contracts are signed, we'll make announcements about them. People frequently ask us: what power-related competitive edges does Atlas hold? What makes Atlas the ideal collaborator for long-term private power solutions? Atlas has constructed infrastructure projects valued at more than $1 billion, among them numerous mining facilities in West Texas that rank among the lowest cost, plus a groundbreaking 42-mile conveyor called the Dune Express; we handled the design, engineering, construction, power, and now the operation of all these projects. Building large, complicated projects is part of who we are. That considerable know-how is in demand in today's markets, since our power customers confront fresh obstacles requiring exact execution. When buyers such as data center operators increasingly turn to private power, they want assurance that whoever supplies their power possesses the depth and experience to deliver on schedule and within budget. As our power business expands, you will observe how our engineering and execution know-how reshapes the way firms secure the critical power they require. The equipment you select and the construction partners you choose will be important. Innovation sits at the heart of the Atlas culture. No other company dredge mines in the Permian, we were first to deliver frac sand autonomously there, and we alone offer multi-trailer sand deliveries. To change the way sand gets to the Northern Delaware Basin, we built the longest sand conveyor network in North America. That same unconventional approach is what we plan to bring into the private power sector. Contracting momentum keeps building across our oilfield power assets. In this quarter, we executed additional contracts and agreements covering megawatt placements both now and in the future, and our current expectation is that total oilfield megawatts deployed will land between 180 MW and 200 MW by year-end, with long-term agreements covering the majority of that figure. We are proceeding very intentionally about where we put our existing oilfield fleet, prioritizing agreements with longer tenure over near-term deployments. We think customers will continue to seek out contracts that secure their electricity supply, since conventional utility schedules continue to fall behind. There's growing curiosity about microgrid setups that rely on Atlas' battery tech as well; with that tech, we're able to hybridize customer sites to improve dependability. Our hybrid solution combines portable generators, a strong battery setup, and control software managing on-site loads plus available power, delivering better reliability for our clients and efficiency gains for Atlas. Private power demand is strong. In our view, we're still near the beginning of a significant infrastructure expansion cycle. We've got the proper equipment, the proper approach, and above all, the proper team. I'll now pass things over to Blake McCarthy, our CFO, so he can go into more detail about the trends showing up in our sand and logistics segments.
Thanks, John. If I had to choose one word for what's happening right now in West Texas across sand and logistics, I'd say nuanced. Over the first half of this year, macro conditions have gotten much better. Geopolitical events keep fueling volatility, sure, but in our view the balance of supply and demand for crude has shifted dramatically, and the fundamental floor under oil prices has moved higher. Clearly we aren't alone in thinking this, since the Permian rig count is up 17% from when the Iran conflict began. Private operators have driven that increase — they're the quickest to react when the commodity price backdrop shifts. If our view proves right, it wouldn't shock us to see public E&Ps step up activity next year, once their capital budgets have been refreshed. Even with more rigs running, completion activity has only held flat, and that's the piece that generates demand for our business. Several things explain this. First, operator DUC inventories were already lean going into 2026, and well placement activity lined up very closely with completion schedules. As pad sizes have increased, even with today's efficient drilling operations, building new pads and placing well bores so that frac operations can run simultaneously takes extended time and planning. On top of that, gas takeaway capacity in the Permian is still a problem. More than 4.5 bcf of incremental pipeline capacity arriving in the back half of this year will ease this somewhat, but year to date it has definitely capped activity for a handful of operators, especially in the Delaware Basin. As we said on our last call, beyond the marginal few frac fleet additions we saw in April, we don't expect more until later this year, while operators try to get comfortable with the strip amid the volatility. That said, recent conversations with customers lead us to expect activity levels to start ramping moderately in Q4, in a counterseasonal way, as customers aim to hit 2027 running. Pressure pumpers are showing discipline, refusing to bring incremental equipment to market until pricing on their current utilized fleets improves. With little equipment and few crews readily available on the sidelines, there's a significant lag — roughly two months — between a customer contracting a fleet and completion operations actually starting. Turning to the supply-demand balance in the sand market itself, we think it's much tighter than current pricing and market sentiment imply. Sand is the ultimate commodity: a little bit of oversupply quickly pushes price down to the marginal cost of production for the industry. Conversely, just a little undersupply can send prices spiking rapidly. Nameplate capacity might suggest there's still quite a way to go before the industry comes into balance, but we believe those figures dramatically overstate the true productive capacity of the industry. For the last 3 years, upkeep capital expenditures were something most of the market barely considered. From what we've seen in recent spot deals with clients who lost productive time waiting on sand, it looks like additional output out of the Permian remains constrained; that pattern should grow clearer as the wider sector gets nearer to running at full capacity. We keep hearing stories about rival plants running into operational trouble while trying to increase output, and that has us rethinking our prior calculation that 4 to 6 net additional completion crews would be needed before the market tightens. In our view, the market is speeding toward a genuine test of how much capacity truly exists; we figure now is the moment to push the matter. Before that moment arrives, non-productive time, or NPT, will probably turn into a major point of contention for the sector — not because of sand availability, but because of whether trucks can be had. Hauling rates have settled at far higher levels, and as the national over-the-road freight market keeps raising prices, the shortage of drivers in the Permian has grown sharper. On top of steeper hauling rates, the surge in diesel prices has sharply pushed up the total expense of moving sand. Atlas is partly shielded from a portion of this inflation thanks to what the Dune Express gives us and because we run autonomous trucks, yet we're starting to observe rivals who were slow to lift logistics pricing getting hurt operationally by these shifts. In June by itself, we stepped in on 2 well site jobs partway through completion because competitors just couldn't line up drivers at the pay rates they were quoting; we anticipate this pattern will show up more often in the back half of the year; given where oil prices sit, any delay in turning resources in the ground into revenue becomes far more costly for operators. Plainly put, we think operators will have to pay steeper rates to steer clear of NPT tied to both sand and trucking starting in Q3 and picking up speed in Q4, which we believe works in Atlas's favor. The aim of this commercial approach is to underscore how much execution reliability is worth. Atlas delivers a higher standard of execution reliability to our customers, made possible by what we've invested in our plants, our logistics infrastructure and, above all, our people. Sometimes we end up hurt by our own achievements. When we perform well enough, clients may start treating that standard of service as a given. For over a year, we've been prepared to set our pricing at levels that let our customer base reap the operational efficiencies of the Atlas network and capture price savings, an approach that has won us market share. We think we've accomplished what was necessary to bring rationality to the market. Our view is that the operational thinking of many rivals has been badly compromised, and the market requires a stretch of genuine capacity discovery. Right now, we've decided to stay firm on prices for specific tenders out there in the market. A number of customers might put the cheapest-looking choice first on paper, and from our perspective, that will make clear who among the service providers can actually perform versus those that just can't; our expectation is that this will put to the test both the industry's genuine productive capacity and how much non-productive time operators are willing to tolerate. Sand volumes for the second quarter came in at roughly 5.6 million tons, which fell short of what we had anticipated, since rig moves and changes to completion schedules hurt volumes in late June. In July, volumes bounced back well, reaching about 2 million tons. Our expectations for the full third quarter are still somewhat uncertain because of the commercial strategy we mentioned earlier, along with certain planned breaks in customer completion schedules. The range we currently expect is about 5.3 million tons-6 million tons, which, we'll admit, is quite wide. In our view, this near-term uncertainty is needed so that the stage is properly set for the more significant contracting season at year-end. It should be noted that our Q4 completion schedule is already set up for a strong finish to the year, standing as the highest volume quarter of the year on a tons basis that is already allocated, since some key customers are getting themselves in position to end the year with building momentum.
For the quarter, our last mile operation hit a record for tons shipped, coming in at 6 million tons. In Q2, we completed over 4,600 driverless deliveries, which represents a 70% increase versus the first quarter. Thanks to our collaboration with Kodiak, we're starting to see meaningful gains in productivity, and we anticipate those will speed up as fresh operational milestones get hit that broaden the geographic range our trucks can serve; our goal is to be running on public roads by the midpoint of next year, assuming regulatory and operational targets are met. We also achieved record quarterly volumes on the Dune Express. Now on to the numbers. Revenue for the second quarter of 2026 came in at roughly $293.2 million. Total proppant volume sold was unchanged from the prior quarter at 5.6 million tons. The average price we realized per ton of proppant in Q2 was about $17.70. Cost of sales for the second quarter, not counting DD&A, totaled $221.3 million, broken down as $66.1 million for proppant plant and logistics equipment operating costs, $1.4 million for power equipment costs, $140.7 million in service costs, $8.8 million for rental costs, and $4.3 million in royalties. On a per ton basis, our proppant plant operating costs in Q2, royalties included, were around $12.39, a decline from Q1. For Q3, we expect OpEx per ton to be flat or lower, contingent on total volumes, as our initiatives to improve plant operational efficiency keep paying off. Our logistics segment showed robust sequential gains in Q2, driven by record volumes, a rate environment that's getting better, and high utilization of the Dune Express. Logistics margins in Q2 reached 14%; looking at Q3, we anticipate margins will remain solidly in the double digits. Our power division likewise delivered strong sequential growth, helped by better utilization of our oilfield power fleet and the commencement of operations at our new Socorro, Texas facility. We expect the Q3 contribution from this segment to show further improvement as we place greater portions of that fleet under long-term contracts. Adjusted cash SG&A for Q2, excluding unusual litigation expenses and other non-recurring items, came to $24.3 million. For Q3, SG&A should average around $22 million-$24 million, not including legal fees related to litigation and contracting activities. Growth CapEx during the quarter was about $131.5 million, most of which was associated with our initial order for Cat power generation equipment. Maintenance CapEx came in at $14.6 million. We've budgeted roughly $200 million in CapEx for the second half, which keeps our total capital spending for the year within our full-year 2026 guidance range of $350 million-$375 million. The bulk of that, roughly $175 million-$190 million, is tied to building out our private grid power business; notably, about $110 million of second-half growth CapEx relates to the build-out of our already contracted Socorro facility, which will start producing meaningful cash flow in Q2 of 2027. As a reminder, we expect this to generate roughly $55 million in adjusted free cash flow annually. What's left pertains to purchase commitments tied to the Caterpillar Global Framework Agreement that was made public back in March. No fresh outlay is involved here. What we're doing is honoring an order that's already recorded. For our legacy operations, maintenance expenditures should decline, since most of the bigger projects at the plants are now finished. When it comes to maintenance capital outlays for our standard logistics segment, we anticipate an average of roughly $5 million-$7.5 million each quarter during this year's second half, which underpins that segment's capacity to generate free cash flow. Following the convertible offering we completed successfully in April, Atlas' available liquidity combined with positive free cash flow from our standard logistics segment is well in excess of what's needed to cover our forthcoming capital requirements. Turning to the third quarter, total sand and logistics sales volume continues to be the largest unknown. Although we anticipate ongoing gains in our production costs at power plants, planned customer breaks together with stricter handling of outstanding tenders should produce a short-term decline in total volumes, all with the aim of achieving better pricing over the longer term. For Q3, our present projection is EBITDA between $30 million-$45 million. As noted previously, we anticipate that the fourth quarter will deliver significant sequential gains, driven by volumes already allocated and customer completion schedules that have been shared with us, with our current outlook equal to or better than Q2 results. At this point I'll turn the call back over to John.
Thanks, Blake. I'd like to echo what Blake said regarding the change in our commercial strategy; this is a deliberate strategic choice. On certain sand tenders, we're keeping price steady instead of pursuing volume, and we're prepared to give up near-term volumes in order to do so; our belief is that this will push the market to recognize the rationalization in productive capacity and logistics capability that has occurred throughout the West Texas sand industry, and act as a catalyst for a pricing recovery. At this point I'll pass the call to our Executive Chairman, Bud Brigham, for a few closing remarks before we open the call up to Q&A.
Thanks, John. During late July and early August, in the majority of the nation, people everywhere are looking forward to the football season that's about to start. At this moment in the calendar, no football team has lost a game yet. That's what I refer to as the talking season. When it comes to power, it appears the market hasn't given credit to the reality that Atlas has left the talking season behind; we've already started scoring on the board. It brings to mind some of the doubt that surrounded our first company, Brigham Exploration, back when we were breaking new ground with horizontal drilling and multi-stage fracking in the Bakken close to 20 years ago. The majority of folks didn't think fracking horizontally would be effective in oil. Across the following five years, not only did we demonstrate they were mistaken, we also set the pace, producing better output and stronger economic results. Roughly five years after that, we repeated the feat with Brigham Resources in the Permian. When we launched Atlas eight years ago, the same doubts came up regarding whether local sand could work. We then went on to construct the biggest state-of-the-art frac sand facilities anywhere in the country and significantly boosted the economics for operators in the Permian. Only three years in the past, plenty of people claimed we were unable to construct North America's biggest conveyor system for moving proppant 42 mi right into the middle of the Delaware Basin. Naturally, we pulled it off; these kinds of challenges are something we enjoy; we happen to be extremely, extremely skilled at handling them. No one else constructs large-scale energy infrastructure as effectively as Atlas does. Once again, here we are, and this time there's a remarkable chance in private power. Even before anything else, with our very first contract, the doubters have come out strongly once more; that's okay. This isn't new territory for us. My confidence in our team, our strategy, and the partners we've selected is absolute; we're eager and looking forward to shifting the story. Thanks for being with us today. I'll hand the call over now to the operator for Q&A.
Morning, everyone. John, what you said regarding how quickly data center deals are progressing caught my attention, and it seems to differ somewhat from what we've been hearing elsewhere during this quarter. Could you elaborate on the project sizes, the scope, the timing — all of that? I found it notable that distributing that capacity across two, three, or four customers marks a change; I'd appreciate a bit more detail on what to expect in the second half.
Absolutely, Jim. I appreciate you asking. Clearly, we don't have visibility into every deal out there, but from our vantage point, potential customers feel a strong sense of urgency about getting contracts executed, and momentum is building. I suppose momentum is building so those projects can be de-risked, along with their timelines. The parties sitting across the table from us want to proceed as fast as possible, and clearly that means months rather than years. Of course, deals like these don't come together overnight. They involve billions of dollars and very lengthy terms, so negotiating them takes considerable time. Beyond that, they're pursuing these arrangements — or for the power deals, they're pursuing those concurrently with the data center lease talks, which are quite complex too, perhaps even more so. Once you bring all these contracts together, and after we finish negotiating ours, several steps must occur before anything can be signed; so many pieces are in motion. That said, what we've observed is real urgency to get deals executed. We've observed the magnitude of these deals growing. We've observed the tenor of these deals growing compared with what I described seeing, let's say, six months back. So from our perspective, clearly very encouraging. We won't announce any deals until a contract is signed, but we're actively working on them.
Understood. Thanks for that. To follow up, this one might be for Blake — could you say a bit more, Blake, about the volume guidance? It's clearly a pretty wide range for Q3, and I'm just trying to figure out how much of that comes from customers taking breaks versus you choosing to hold volumes steady so you can get better pricing heading into next year, and related to that, how confident are you in the implied ramp for Q4?
Yeah. Great question. I figured that was coming. I'd say it's entirely fair to describe it as having quite a bit of variability. Yeah, like you said, there are several moving parts in Q3. To start, we have some key customers taking short crew breaks during the quarter as they get ready to ramp up in Q4; that's probably about 50% of the variance. That covers some customers who are switching pumping providers as they lock in new equipment and shift to bigger frac designs. With activity ramping for some of these key customers, we're on track for a very strong Q4, and that's without any incremental volume wins. But the other effect is going to come from the change in our commercial strategy, and that's the piece where there's some uncertainty, and that's why the range is so wide. For over a year, we've been running the playbook that says, if you're the low-cost provider of a commodity and a service, when the market has too much supply, you have to price at the industry's marginal cost of production or a little under it so you can take market share and push the market to rationalize. We've done that, and we've inflicted a lot of pain on the market. A lot of our competition has laid off crews, they've taken maintenance spending down to zero, and some of them even have padlocks on their front gates. But just because a mine is sort of limping along doesn't mean it's theoretical sand. It isn't being bid into projects. All of this theoretical nameplate capacity, what I call zombie mines, is being bid into customer tenders for sand. It creates this perception that there's still plenty of oversupply of sand in the market. We just don't believe that's true. We think it doesn't really matter until our customer base believes it too. As long as Atlas is willing to match the competing bids in the market, customers can keep hammering on price while still getting access to our service and our execution reliability. It's only when we draw a line in the sand and let them go test the waters elsewhere that you sort of shine a light on the market and what's reality. We need to spark a shift so people can see what these mines are truly capable of producing, what rival haulers actually need to charge in order to bring the sand out, and who is genuinely able to coordinate all those separate moving parts to get sand delivered to location. We treat it like something minor, and we’ve made it simple; it’s somewhat a casualty of doing too well. When your performance is strong, occasionally it gets overlooked. Our expectation is that NPT — something we’ve attempted to eliminate in West Texas — is on the verge of turning into a fairly significant problem for certain operators. Ultimately, this will let us capture greater value from our products and services; we believe it positions us very favorably for RFP season for 2027. Carrying out this strategy is going to hand us a hammer during negotiations.
Thank you. Good morning, everybody.
Morning, Stephen.
Hello, Stephen.
Could I begin with the capital expenditure topic, more or less? This quarter, we're hearing quite a bit from businesses regarding the kind of CapEx per megawatt that gets deployed in the power segment. I believe we come across figures such as roughly $1 million for the generating equipment per megawatt, and perhaps something like $1.6 million-$1.7 million for the whole balance of plant, so to speak. What are you folks observing, and do you notice any sort of inflation in those figures?
Appreciate it, Stephen. I'll have Tim step in with every detail, since he's the person right there on the front line. As a quick opener, we've spoken quite openly about this for a while now — it truly hinges on the customer and the project. Go ahead and answer these for me. What load profile does the customer need to meet their goals? Which kinds of system resiliency and reliability metrics are non-negotiable for them? Each of those carries follow-on consequences for the total system cost, and as a result the price, which explains why we've stated from the outset that unlevered project IRR is the finest way to examine these projects. The reason is that front-end variables tend to shift, so the cash flow stream must shift as well. Tim, care to dive into the specifics?
Right. I believe Blake offered some useful context there, and to address what was asked, the capital expenditure figures we're observing for projects can run anywhere between $1.5 million per MW and $2.5 million per MW. Once again, what really drives those numbers is the purpose the system is meant to serve, as opposed to cost inflation. It's actually scope inflation. I think we're noticing hyperscaler teams digging a bit deeper into what engineering is requesting versus what procurement is prepared to commit to. There's a significant gap between a system built for five nines and one built for three nines. We're seeing somewhat more consideration given to what genuinely functions, what can be delivered, and what remains cost efficient in that scenario. As they expand those teams, the responses we get from them improve regarding what reliability and availability they're willing to accept, and what they require on load steps.
Yeah.
Okay.
Stephen, the main point here, I believe, is that what we're encountering isn't really rising costs so much as a broader set of work being included. As Tim mentioned, the hyperscalers have become more advanced; they've brought in considerable expertise on deals and procurement, meaning they're getting wiser regarding the money they commit, and they're very much asking, "What's actually necessary for us as opposed to what would we like?"
Understood. Alright, that tracks. You touched briefly on your balance sheet liquidity and roughly how you're financing the growth. Could you just walk us through again the power deployments you have planned over the coming 2 years and how you intend to cover the cost? Naturally, with the dynamics you just described, it will shift somewhat depending on which projects get signed, but how should we frame that?
Sure. In Q2, we made some sizable payments tied to the first order of CAT generators that we're taking delivery of this year. As I mentioned during the prepared remarks, there's still an additional $200 million of CapEx budgeted for the second half of the year, with 90%+ of it going toward the remaining CAT deliveries, plus down payments on our 2027 orders and ancillary equipment for the deployment we currently have under construction in Socorro, along with some other longer lead time items for additional projects. On the liquidity side, after the convertible raise in April and the Q2 CAT payments, we now hold roughly $168 million of cash on the balance sheet and about $125 million of undrawn capacity on our ABL. Beyond that, I think it's worth stressing again that CapEx for standard logistics will now genuinely mirror the low capital intensity nature of that business. We've essentially wrapped up the major CapEx projects we had planned for that business this year. For that business, CapEx drops to the $5 million-$7.5 million range going forward. On top of that, the CapEx cycle for our oil field power business has matured as well. Both of those businesses are about to start generating cash. We're more than covered for our near-term obligations; that said, it doesn't mean we won't require incremental capital for the projects we're currently negotiating. In fact, we've already made meaningful equity investments into those prospective projects. Most likely, funding for those projects will take the form of debt financing, which we won't put on the balance sheet until we're holding hard contracts with great counterparties.
Great. Okay. Thanks for the details.
Thank you. Sounds like you're doing pretty well on the oil field power side of things. I'm just wondering whether you might think about putting more capacity there. Presumably, that brings higher returns over a shorter horizon. The power contracts, the longer-term data center related contracts can take long-term, take a while to finalize. I just wanted to hear your thoughts on how you balance data center against possibly some shorter-term oil field work.
Yeah, go ahead, Tim.
Yes. I believe we're going to keep putting assets to work in the oil field power sector. During the past six months, we've grown considerably more choosy about that. We prefer to place those where there's some duration. We prefer to place them in locations where density exists for us. That's the way we capture efficiencies and keep running that operation. It's an excellent operation. The means to expand that operation are far quicker than the means to expand an operation backing industrial power data centers. To respond to what you asked, it remains very much driven by opportunity. When we've established solid ties with solid clients who anticipate requiring those assets for a timeframe we find suitable, we'll keep putting them to work in that sector.
That sounds good. Perhaps we pivot over to logistics. In March, margins were around the mid-teens, and they ended up under 13% when you look at the entire second quarter. It really seems like everything is set up to benefit the Dune Express. I'm somewhat curious why margins aren't perhaps improving beyond just a stable move into double digits as we move through this year.
Yeah. Regarding the Q2 moving pieces, there's a delay, as I mentioned, with third party carrier rates continuing to climb. The over-the-road national freight market keeps getting stronger, and that begins drawing truck drivers away from West Texas. Your costs rise with a delay on those third party carrier rates, and then you begin adjusting your own hauling rates. That is actually a pricing tailwind. When you look toward the second half, it's more of a knock-on effect from that, and once again, there's some flexibility within that guidance, and it relates more to — it's connected to the volume guidance on the sand side, where clearly there's a fixed cost absorption component. Once again, it's flexible guidance centered more on, "Hey, we're putting this stake in the ground; we're beginning to shift rates." We believe there could be that sequence of a, "Hey, like this sort of nudging the market along with an initial response and then wrapping up with a robust Q4."
We are seeing tightening in the trucking market.
Yeah, absolutely.
Understood. Thanks.
Hello, good morning. I do value the pricing discipline being shown as demand gets better. I'm attempting to understand what that might imply for your typical pricing. There's roughly $4 /t of a gap between certain contracts you entered the year with and sales done more recently. Just reasoning through it, if the market moves to your level, would your typical pricing as you go into 2027 basically remain level near the $18.50 you reported in Q2? Or is it moving up? Just attempting to gauge where the realized price might land given the current dynamics in your book.
You're asking about 2027 pricing? Clearly, we won't guide on that at this point; what we're aiming to do, as you mentioned, is put ourselves in a stronger position when RFP season arrives, when, as I said, the market's true productive capacity gets highlighted; a meaningful share of the book is rolling over for 2027. If we can secure the pricing shift, the increases we're seeking, that would mean pricing that is accretive to the average sand price.
Understood. To phrase it plainly, I'm not attempting to force you into giving precise figures regarding your approach, yet your approach works out if the market moves toward where you are. That would mean your realized pricing goes up as we head into the coming year? Would that be accurate?
Absolutely. 100%.
All right. I simply wanted to get that cleared up. Thanks for that. It's encouraging to watch the strides being made with Kodiak and self-driving trucking. Perhaps you could give us a bit more detail. You brought up 100 trucks operating on the road within roughly 12 months. At what point does that begin to show up in the financials? With 100 trucks running, what should we expect regarding your cost base, and then, as you grow that number, what might it ultimately translate into for your financials?
I suppose the very first thing we have to accomplish, for us to begin realizing the gain from this — thank you, Scott, for raising that — is that we truly need to widen the geographic reach those autonomous trucks cover; at present they operate within a couple of heat zones. Work shifts into and out of those heat zones. To get the most out of autonomous delivery, we will have to serve as many well sites as possible using it. First and foremost, what we had to achieve was gaining the ability to send those trucks into additional heat zones.
Let's widen things out.
Yes, expand that footprint. Then, clearly, the other item on our list was getting more trucks onto the road. We're looking at sometime around the midpoint of the coming year. That target is fairly ambitious, though Atlas intends to be running over the road. Regarding what effect this will have on our margins.
Yes. To add to what was said regarding Doug's question earlier. That delay where driver expenses increased and then eventually got baked into the rates you charge for hauling. That fluctuation is essentially removed. When the trucking sector gets tighter, your expense stays steady, and it turns into genuine incremental gain; it also lowers the risk for our logistics side of things because as crew counts grow, one of the larger dangers is, well, are you able to secure sufficient third-party drivers? Are you able to secure sufficient trucks? That turns into an increasingly smaller concern once you have a greater number of autonomous trucks operating on the roads.
Yeah; considering every one of these programs arriving tied to commercial driver's licenses plus CDLs from abroad, that is going to create a sizable effect upon the trucking sector moving ahead.
Good morning. Blake, you mentioned you would not add debt onto the balance sheet absent contracts backing the new power needs. I suppose I am curious about how you view absolute debt levels, or net debt, or leverage, whichever way you prefer to examine it. Which sorts of targets do you aim to remain under while you expand the power business?
Yeah. My sense is that early on in a buildout like this, leverage ratios tend to stretch quite a bit before those initial major projects begin generating cash. That pattern, I think, is pretty common across the industry. But once those projects are up and running, they tend to de-lever themselves quite rapidly. These projects typically show cash-on-cash payback periods of about five to six years. And you're generally looking at conventional project financing structures, with equity-to-debt ratios somewhere in the neighborhood of 30%-40% equity and 60%-70% debt. If you look at those cash-on-cash returns, you arrive at three times pretty fast. The OFS part of my brain reacts by saying, "That's more debt than I'd like." But given agreements with durations of 15 or 20 years—genuinely solid, concrete terms—you're actually in quite a powerful position to use leverage.
Yeah, got it. That's a significant trade-off. I also wanted to look at the EBITDA guidance you gave for the third quarter. There's clearly a range in there, and my assumption is that most of that range stems from the range you mentioned regarding sand production, which is pretty wide. Could you break down the EBITDA and tell us how much you expect from sand, from logistics, and from power?
When you look at it, all of that variance comes entirely from the sand and logistics side. On the power side, EBITDA should rise a bit, since we'll have a full quarter of deployment for that small facility we installed for the construction phase of the Socorro project, plus ongoing improvements on the oil field power side. Sand and logistics are truly very tightly linked. Once again, regarding that variance, roughly 40% of it comes from customers telling us things like, "Hey, we're going to take a shorter sailing."
Okay, I’ll wrap up my answer to that. Sorry, our system went mute. Roughly 40% of that comes from those customer breaks. There are 30, 45-day breaks during the quarter, ahead of their ramps into Q4 and into 2027. The remaining part of that difference comes from the sort of uncertain response we’re preparing for when it comes to the change in commercial strategy. That pretty much covers it. Sorry for the interruption.
Sure, please go ahead.
I'm fine, thank you.
Alright, I appreciate it. I know it's unusual for us to spend time on politics and public policy, but I noticed that Greg Abbott, the governor of Texas, announced — I think it was just yesterday — a halt on data center construction, or at least for those connected to the grid. There's a lot of frustration in rural Texas at the moment. We have a midterm election coming up. And this week brought another item: the lieutenant governor, along with a leading senate committee chairman, pushed ERCOT and the PUCT to delay construction of the 765 kV lines heading into the Permian. Chuck, if those lines don't end up being constructed, then it appears you'd need additional thermal generation out in the Permian. Could developments of that sort — might these two public policy changes drive up the need for your power offerings in the Permian?
Yeah, thank you, Chuck. Clearly, when it comes to policy, these things are pretty recent. Clearly, we don't see eye to eye with them. Yes, this represents a possible tailwind for Atlas and honestly for any organization, any business holding extra power or owning power assets that are able to be put to work right away across the coming two years. My view is this will be an enormous tailwind. A number of businesses—many of the hyperscalers—have already wrapped their heads around this, and they're now starting to either supply or seek out their own power solutions located behind the meter. My expectation is that this trend will simply keep going. On top of that, I believe it will drive quite a few companies to move out into West Texas, where they'll begin putting data centers and their projects. Indeed, this represents a substantial tailwind, and it's something we've been observing.
Yeah.
I believe what we're beginning to witness is that a lot of customers, a lot of users—people hunting for power—are showing just how pressing this has become, and those are the ones we're converting into businesses that can actually get at that power.
Right. Chuck, to build on John's point there. It's basically been about 12 months that we've watched this develop. We've brought it up during several earlier calls — these sorts of political headwinds affecting the grid. I'd say our prospective customer base completely understands it, and they've stopped considering those projects. That's probably why you're seeing the tenor of contracts go up, because if you went back 18, 24 months, folks were discussing, hey, five, seven-year contracts. Today it's 15 to 20, simply because they're saying, "Hey, Bud, we aren't even going to bother thinking about the grid." You look at the backlog, you look at the requirements, the capital requirements they need to put up on the front end of that, with still question marks surrounding it. For them it's just simpler to say, "You know what? We'll handle this ourselves." And ultimately, on top of that, they get higher reliability. There's much better resiliency, a system built around their usage. When you consider that, the combination of that, you aren't getting four or three nines from the grid, right? You're fortunate if you're getting 98%. When you're thinking about the applications that they're going for, it was never the ideal solution for them. Now with these political headwinds, I think it's gotten even more significant. We see them thinking about these more as the permanent solution.
Right, and that is exactly what led us to enter into the Global Framework Agreement alongside CAT. It became clear to us that this need — the need for power — was shifting to behind the meter, and those who will come out ahead are the ones with the ability to deploy.
Hi everyone, and thanks for letting us ask. We were curious — when you look at the commercial pipeline of opportunities on the power side, could you break down how that might split between oil and gas and then some of the bigger projects?
Sure. Larger projects make up most of what's in our pipeline. On the oil and gas side, that's a universe we understand well. We have about 40 MW we could put to work there. Those megawatts are either already on the ground or working their way through the process. When it comes to the bigger power segment, our opportunity set sits at approximately 8 GW -10 GW, which is the same figure we gave on our most recent quarterly call. Some projects have drifted in and out. Bear in mind this is essentially before Governor Abbott's announcement yesterday; those projects have increased in size compared with the conversations we were having six months ago, nine months ago. The nodes customers approach us to solve tend to fall in that 500 MW and above range. That's an initial piece. It's roughly what they require to get going, and some of those campuses are designed for 1 GW, 2 GW, or even 3 GW of behind-the-meter power, for every reason John and Blake just mentioned in the previous question.
All right, that's quite useful. Perhaps one more question. Could you expand a bit on that pricing element you mentioned regarding logistics? Which margins are you aiming for in that area? You mentioned a commercial approach, and that's partly why the Q3 guidance may come in somewhat below what we had expected. How should we frame your targets, and what might Q4 look like if those figures materialize?
Sure. I'd say the point is larger than simply, "We're aiming at this particular margin level." The bigger picture is this: if you take the nameplate capacity and simply total up every mine that exists, using the basis of "this is what it was designed to achieve as nameplate capacity," the conclusion would be that an awful lot of sand is on hand. We're aware that even at our own sites, where we've been directing considerable maintenance CapEx, a gap exists between nameplate capacity and what we can effectively produce. We're certain that our mines are maintained better than any others in the Permian Basin, without exception. Consider all those other operations that have merely been running somewhere between 0% and 20% utilization across the last two years, held together by duct tape and bailing wire. That nameplate capacity represents theoretical sand. It keeps getting submitted into these tenders and wielded by operators as leverage over pricing. We describe it this way: "You only require a handful of grains of sand worth of undersupply for pricing to shift dramatically." Regarding the incremental portion of that, everyone recognizes the incremental margin on pricing is 100%; it begins shifting extremely fast and delivers an enormous effect on our income statement. Really, the situation is, "All right, we've got to" — until we finally declare, "You know what? Just have those guys put it to the test. Let's determine whether it's genuine." Until you cast that light on the reality that suddenly you're beginning to see well site NPT problems and similar issues, theoretical sand will always remain available. At that point, it shifts from being a theory — theoretical sand — into simply non-existent sand, and you wind up with concrete data regarding the productive capacity of the whole industry. My view is that tightening happens fairly rapidly, and it substantially alters your positioning in those negotiations. On the logistics side, it's quite comparable. Everything is interconnected. As for traditional trucking, the market is extremely tight. Our advantages have kept us shielded from that. The Dune Express, which cuts our dependence on third-party trucks considerably, is key. Shift to someone else, and they're handling everything via trucks. The quantity of trucks required to maintain your wells is going to triple. That gives rise to a significant issue, which in my view is going to lead to additional inflation in what truckers charge. Should folks prove unwilling to raise the prices they bill the operators, they simply won't possess the trucks; so this is somewhat of a grand experiment, yet I believe it's going to produce some rather strong findings.
Alright. I appreciate all of you joining us on this call, whether you're here live or listening in. Let me wrap up by saying that we're pleased with our current position and where we stand right now with Atlas; we've got two solid businesses, genuine strengths in each one, and a team that understands how to get things done. There's still work ahead of us, and we see that clearly, and we'll stay focused, put in the effort, and allow the outcomes to tell the story on their own. We're eager to share our third quarter results with you. Thanks.
Appreciate it. That brings us to the end of today's call. At this point you're free to drop off, and thanks so much for joining us.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Atlas Energy Solutions Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Atlas Energy Solutions Inc. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.