Capital Power Corporation (CPX) Earnings Call Transcript
April 29, 2026
Earnings Call Speaker Segments
Hello, everyone, and welcome. My name is Roy Arthur, and I serve as Vice President of Investor Relations and Investment Partnerships. We appreciate your joining us to review Capital Power's results for the first quarter of 2026, which were released earlier today. Our first quarter report, along with the presentation for this conference call, is available on our website. On today's call, Avik Dey, our President and CEO, will provide a business update. Following that, Kevin MacIntosh, our Senior Vice President, Finance and CFO, will take you through a review of the company's quarter-end financials. Avik will then conclude with a look at our 2030 strategic priorities, and afterward we'll open the floor to analysts' questions during our interactive Q&A session. To start, a reminder that any comments today about upcoming events are forward-looking, based on assumptions and analyses the company has made. Because of risks and uncertainties tied to our business, actual outcomes may differ materially from what the company expects. For details, please see the cautionary note regarding forward-looking information on Slide 4 or our documents filed on SEDAR+. During today's discussion, we'll also cite several non-GAAP financial measures and ratios, which are likewise identified on Slide 4. Keep in mind that these metrics aren't GAAP-defined financial measures, and GAAP doesn't prescribe standardized meanings for them, so they probably won't line up with comparable metrics other companies use; we offer them to supplement the GAAP figures when management reviews the company's results. You can find reconciliations from these non-GAAP financial measures to the closest GAAP measures in the MD&A dated April 28 covering the first quarter of 2026. We also recognize that Capital Power's head office in Edmonton sits on the traditional and contemporary homeland of many Indigenous peoples of Treaty 6 and the Métis homeland. We recognize the many Indigenous communities located in these regions, whose ongoing presence keeps enriching the community and our own lives as we gain further knowledge about the Indigenous history of the lands where we reside and work. Having said that, I'll now turn things over to Avik.
Appreciate that, Roy. Our Q1 2026 numbers demonstrate just how disciplined our approach has been and how sturdy the portfolio is, even against a choppy macro environment. Execution without letup is fundamental to this company. It's what sets the Capital Power team apart once uncertainty arrives, and it fuels lasting growth. We'd like to leave you with three main points today. To begin with, our business continues to be steady. Despite elevated macro and geopolitical turbulence across the globe, our strategy and operations remain the same in North America, and we continue to see many routes to value creation. Next, diversification is delivering returns for us. By diversifying across regions, power markets, technologies, and market segments, we keep lowering the risk profile of our portfolio and widen the set of opportunities we can go after. Later in this presentation we'll get into it, but we still observe robust supply and demand basics in every one of the main markets we serve. On top of that, and this matters, we see attractive growth prospects in all 3 of our main generation technologies — natural gas, renewables, and storage. And lastly, when it comes to risk and return, nothing about our method has shifted. Our capital allocation stays disciplined and consistent, with a sharp emphasis on risk-adjusted returns that are compelling. The business is still resilient, and we keep delivering compelling long-term value creation, backed by steady cash flows and growth that is disciplined. We're still moving forward at a steady pace on the priorities we set for 2026, and we stay disciplined about how we create value. The dedication our team shows day in and day out across North America, along with their strong execution, is what drives our success. This quarter we're also glad to call attention to a number of key leadership changes that make our organization even stronger. Kevin MacIntosh, who is here with me on this call, has moved into the position of Senior Vice President, Finance and Chief Financial Officer. Along with that, Andrew Pearson, a key member of our organization since 2008, has come onto the executive team as Senior Vice President, U.S. Commercial, and he works out of our Washington, D.C. office, which just opened. As we look forward, starting July 1, 2026, Steve Wollin has made the choice to retire following 25 years of exceptional leadership and service; and Mike Toshima is set to come aboard the executive team in the role of Senior Vice President and Chief Commercial Officer, working out of our Edmonton headquarters. We feel profound appreciation for Steve's guidance and the enduring mark he has left on Capital Power. Taken together, these changes highlight how deep our leadership bench runs and our ongoing commitment to developing and maintaining a high-performing team. Looking at Q1 2026, the highlights start with pushing the Arlington Valley contract out to 2038 — that supports our commercial optimization approach of locking in durable long-term agreements with investment-grade counterparties — along with moving the Arlington Valley and Humle upgrades forward and advancing construction on four fully contracted projects totaling about 280 megawatts across Canada and the U.S., all with investment-grade counterparties. On the operational side, the team put up another strong quarter, producing roughly 11.5 terawatt hours across the fleet. Importantly, over half of that generation came from the U.S. portfolio, which keeps underscoring how well our diversification strategy is working. To wrap up, the planned outages we have underway are progressing on schedule, which improves both the reliability and the efficiency of our fleet. Macro disruptions caused the market to begin the year poorly once again—the second consecutive year of that pattern—yet our approach and operations haven't changed. Crude prices have climbed a great deal, and so has volatility across the wider market, even as gas prices have declined; this highlights the structural edge that gas-fired generation retains. Here in North America, natural gas delivers inexpensive fuel, flexible operations, and considerable protection from worldwide turmoil, and that makes us even more certain this fuel is vital both for satisfying power demand growth over the long run and for keeping costs affordable. The takeaway is simple. The basics underpinning power generation remain solid, and we're holding our course as we strive to supply customers with dependable, reasonably priced electricity while building long-term value for shareholders. Contracted cash flow plus merchant generation capacity together make up our return profile. From 2021 through 2025, contracted EBITDA grew at a compound annual rate of about 18%, powered by acquisitions, development, and recontracting of assets already in place. Our contracting wins across Ontario, MISO, and the Durzen Southwest demonstrate how we can unlock meaningful value by optimizing the asset base we already hold. We continue to make tangible headway toward delivering the $1 billion of embedded upside we outlined at our Investor Day in December. The contracting deals we recently completed at NCB and Arlington Valley have already generated roughly $170 million in contracted EBITDA upside, and there's additional upside still ahead. Our North American portfolio runs about 12 gigawatts, and approximately 7 gigawatts of that is earmarked for contracting or recontracting. So we have a long, visible runway to create incremental value from assets we already own. With power market fundamentals continuing to tighten, that optionality becomes more valuable, which confirms that contracting is still one of our strongest levers for long-term value creation. When we look at further acquisitions, we'll give priority to assets where our platform and expertise can unlock incremental value through commercial optimization. Even though we've diversified quite a bit lately, Alberta remains a significant portion of what we do. It's an appealing market, and for data center investment it presents a distinctive and persuasive value proposition. We're heartened by the regulatory strides made recently — the Alberta Canada MOU, the removal of the CER for Alberta, and ongoing advancement in the ASOS Phase 1 and 2 data center interconnection processes. Those measures boost confidence for investors and sustain data center expansion while preserving affordability, reliability, and substantial economic upside for Alberta and Canada; in our view, Alberta enjoys certain structural benefits relative to other jurisdictions courting large data centers. Existing underused infrastructure, for example, spans generation, transmission, and distribution. Phase 1, by its very design, is centered on generation, yet we shouldn't overlook the transmission and distribution side of things. Our analysis indicates that if 1.5 gigawatts of load were added, a typical residential customer in Alberta would save about $6 each month, because the costs of existing transmission and distribution would be shared among a larger load base. In addition to efficient and dependable generation, Alberta benefits from an abundant supply of inexpensive fuel, and its forward prices trade lower than at other major North American natural gas sales points. The province also has a strong track record when it comes to load colocation: roughly 3 gigawatts, or about 25% of provincial load, sits co-located with generation. This all makes us more confident that the industry can succeed in this market and deliver benefits to constituents. Beyond Alberta, diversification continues to benefit our portfolio, with growth coming from a number of regions. This combination of geography and markets reduces our reliance on any one regulatory or pricing environment and gives us multiple avenues for creating value over time. In PJM, forward energy prices continue to reflect strong long-term spark spreads, along with improved visibility into capacity prices through 2030. We're also encouraged that the recent reliability backstop procurement proposal favors the most cost-effective new capacity, which we expect to include brownfield expansions and upgrades at existing generation. As for MISO, it continues to demonstrate strong supply and demand fundamentals. Regarding bilateral pricing, we extended our contract with MCB — the biggest gas cogeneration facility in the United States — out to 2040 on favorable terms. In that area, capacity pricing continues to encounter considerable upward pressure stemming from rising demand. The first quarter of 2026 nicely demonstrates diversification delivering results in real life. Although PJM saw higher gas prices and greater volatility, we simultaneously benefited from robust performance in Ontario and MISO, highlighting what our varied and resilient portfolio brings us. Alongside spreading across regions, we keep our attention on three primary power generation technologies: natural gas, renewables, and storage. Relative to the forward outlook, power generation growth historically has been subdued across the last two decades, running at roughly 0.5% annually. Yet these 3 technologies have shown significant and consistent growth well beyond that rate. Over the past 20 years, natural gas-fired generation has grown steadily as aging coal units retire and rising renewable penetration has increased the need for reliable, dispatchable power; that same push for reliability has also driven rapid growth in utility-scale battery storage, supported by declining lithium costs and longer storage duration to better integrate intermittent renewables. Looking ahead, we continue to see opportunities across all 3 of our businesses. Natural gas, renewables, and storage each play an important role in meeting the grid's needs as power demand keeps rising. As we said at Investor Day, natural gas will play a starring role. Combined, these technologies leave us strongly placed to seize growing demand and stay adaptable, so we can meet customer requirements throughout the markets we serve. I'll now pass things to Kevin MacIntosh, our Chief Financial Officer, who will give the financial update.
Thank you, Avik, and good morning to all of you. My name is Kevin MacIntosh, and it's a pleasure to be with you today in my new role as CFO of Capital Power; there are meaningful opportunities in front of us. And although our ambitions are substantial, we begin from a place of remarkable strength, with a high-quality asset base and solid strategic positioning. Before we go through the quarter, I want to briefly return to a handful of the main themes we laid out at Investor Day, since those themes keep shaping our thinking on risk, return, and capital allocation throughout the business. If you look at the last decade, what we've delivered shows a steady capacity to produce durable growth along with strong returns for shareholders. First, when it comes to returns to shareholders, we've raised our dividend for 12 years in a row, compounding at about 7% each year, from $1.51 per share in 2016 up to $2.69 per share in 2025. Second, that dividend growth has been backed by genuine business growth. Adjusted EBITDA has compounded at roughly 13% annually, rising from $509 million in 2016 to $1.6 billion in 2025. That expansion has occurred while staying inside obvious financial boundaries. Those include maintaining a targeted dividend payout ratio between 30% and 50%, net debt to EBITDA of roughly 4x, and a cash flow base that is mostly contracted. This record of excellence was achieved through commitment and self-discipline. I'm delighted to join this team and to carry that legacy forward, providing genuine value to you, our shareholders. Our balance sheet remains a central strength and acts as the bedrock enabling fleet growth, capital deployment, and value creation over the long term. In 2026, about 75% of our cash flow is locked in via long-term contracts or hedges, giving us substantial visibility and resilience. This dependable cash flow foundation gives us room to go after M&A in merchant markets, raise the dividend, and in the end produce solid total shareholder returns. How good that contracted base is matters just as much. Roughly 90% of our PPAs involve counterparties with ratings of A or better, and that bolsters revenue certainty as well as credit quality across the portfolio. Our weighted average contract life has held steady in the 9 to 11 year band, showing just how well positioned our asset base is to serve customer needs. We're still confident in our ability to carry out commercial optimization, including long-term contracting throughout our portfolio. Two recent illustrations of that are the Arlington Valley and MCV deals. In each case we lengthened the terms on assets we already own, working with investment-grade utility counterparties, which brings in cash flows that run longer and carry more value—clear evidence of the substantial embedded value across our portfolio. On top of that, our investment-grade ratings from S&P, Fitch, and DBRS speak to the quality of our assets and the strength of our finances, and they open efficient channels to public debt and hybrid markets in both Canada and the U.S.; that cheap access to capital boosts our capacity to commercialize megawatts and to fund acquisitions, which in turn supports growth in AFFO per share over time. With that, let's turn to our results for the first quarter of 2026. We had a strong quarter on both the operational and financial fronts, with solid execution throughout the portfolio and meaningful progress on the ongoing investment in our assets through sustaining capital. Turning to the key metrics, adjusted EBITDA came in at $404 million for the quarter, an increase of $37 million year-over-year, driven by contributions from the Hummel Station and Rolling Hills facilities acquired in 2025 and partly offset by higher corporate expenses. Those higher expenses stem from increased staffing costs tied to growth in the U.S. as well as higher equity-based compensation reflecting the company's share price performance. AFFO for the quarter was $154 million, a decrease of $64 million year-over-year, mainly because of higher sustaining capital expenditures reflecting greater activity across the U.S. flexible generation portfolio, along with higher financing expense and increased current income tax expense, largely due to less tax depreciation, partly offset by the higher adjusted EBITDA I mentioned earlier. All in all, this quarter reinforces our ability to execute our strategy and maintain strong financial performance even while we proactively invest in the reliability and long-term performance of the fleet. Given our performance year-to-date and our outlook for the rest of the year, we are reaffirming our 2026 guidance ranges for adjusted EBITDA, AFFO, and sustaining capital. As we said before, maintenance-related capital spending for 2026 is expected to land between $290 million and $330 million. That number mirrors a scheduled upkeep cycle spanning the whole fleet, with 493 outage days and 39 planned outages included. We are making this investment deliberately, and it puts the company in position to take advantage of solid market fundamentals over the long run. Last, this outlook backs a 2% boost to the dividend in 2026, pending Board approval, in line with the framework we laid out at Investor Day. Taken together, these guidance ranges show our confidence in the portfolio's resilience, the durability of our cash flows, and our capacity to deliver strong financial results while we keep investing for future growth. Having said that, I'll now pass things along to Avik, who will offer some final comments.
Thanks, Kevin, and welcome aboard once more. Our confidence hasn't changed: we can keep delivering performance that leads the industry and produce better returns for shareholders over the long run. At our Investor Day we shared the targets for 2030, and they are annual AFFO per share growth of 8% to 10%, roughly 50% growth in our U.S. total U.S. owned capacity, and total shareholder return of 13% to 15%. We're also aiming for annual dividend growth of 2% to 4%; pairing that attractive risk-adjusted growth with yield puts Capital Power in position to create compelling shareholder value. With that, I'll turn it back to Roy to wrap up the call.
Thanks, Avik. That brings the formal presentation portion of the call to an end. Operator, we're ready to take questions now.
I'd like to begin with the PJM market and the reforms taking place there, and I appreciate the commentary you gave on the call. So as we consider the potential reforms underway in that market, we do notice your remarks about how it supports your asset base there. At what stage do you believe there will be sufficient certainty to truly get conversations going about upgrades and further expansions of your assets in that region? And then, I suppose, secondly, thinking about concentration, would you be open to continuing to add a merchant in that market?
Thanks for the question, Rob. So I believe it's important to acknowledge that when we consider the potential reforms and the announcement of the backstop option, what was announced at the same time was also an extension of the floor and cap on the BRA option. And that was in fact reaffirmed this morning in support of the FERC announcement approving the extension of the BRA cap through 29/30. So when you step back and consider PJM and the interplay between balancing the capacity market and the energy market, the energy market remains attractive, and that's reaffirmed by the DRA options being extended through 29/30. And so from an energy standpoint, we view PJM favorably. We would be willing to take on additional exposure there, given the specification of our portfolio and the depth of the market into which we can hedge and contract. Regarding upgraates and upgrades and potential expansions, those conversations have not stalled because of uncertainty around the PJM auction process; in fact, they've accelerated; so, as you'll know, with PJM's recommendation on the proposed backstop auction, they proposed a bilateral process through which they can match load to supply ahead of that backstop auction. And that process is one in which all generators are actively involved, as are we; so to really cut to the fine point on it, we think the market is active. We remain bullish on it. We believe there are opportunities, particularly around the existing generation, to add to the portfolio. And I think given that we've got a strong balance sheet, we're investment grade, we're well diversified; we're well-positioned to capitalize on it.
And then perhaps turning to the recontracting efforts. Over the past 12 to 18 months, you've had quite a few successes. When you look at the remaining portion of the asset base — which does have contracts coming due within the next 5 to 7 years — how are you thinking about the timing there? Is it possible to lock in some upside at this point? Or, since you've already notched some wins recently, might you hold off so as to be better positioned to capture upside over a longer horizon? I'm just trying to understand how you weigh capturing the upside now against waiting and perhaps getting somewhat more.
That's precisely the trade-off we work through for every single plant and every expiry; it comes down to a commercial judgment about what we see in the supply-demand outlook, where current pricing sits, and what we view as current C in each individual market. So what we've done — and what we'll keep doing — is optimize against our present view of the market, aiming to maximize NPV per kW at every one of our plants. What we're not trying to do is plan and stagger this out so that we can reliably deliver an announcement each quarter or every 2 quarters regarding future contracting. Each plant will be handled as a standalone decision centered on maximizing NPV per kW; that said, we've been in active discussions today to a greater degree than we were last year regarding recontracting opportunities, and we're continuing to push those forward. But whenever we announce something, you can be confident that the announcement is the one we believe best maximizes NPV.
The next question or comment is from Nick Amicucci at Evercore ISI.
Hello, Kevin. I'm looking forward to collaborating with you. This is a quick one from me as well. Avik, you referenced in your earlier remark how discussions have picked up, especially in PJM. I just want to understand whether you're sensing a greater urgency among large load customers to negotiate bilaterally on their own terms instead of leaving it to the "power tender we're going to be exposed to?
Nick, I love that analogy; what we're definitely seeing is more activity in conversations. If you asked any generator active in PJM, I think they'd tell you all of us are having more conversations. PJM, I think, has put forward a plan that encourages those bilaterals to happen ahead of that backstop auction. Still, I think we need more visibility on the process. So more activity is what we're seeing, not less. And if more of these bilaterals get entered into ahead of the backstop option, I think that's good news for everyone. The best-case scenario is that we're working down what's required for the auction because we're figuring it out ourselves.
And so, when we think about that as well, I mean, you folks are, I'd say, a bit more strategically placed, given that — I suppose the administration's original aim seemed to be aimed at new-build gas generation, whereas now we can actually do uprates and, in a way, get more out of efficiencies at assets we already have. Would that be a fair way to put it?
Well, I believe in the talks we've had, the administration has made its goal plain, and that goal is to tackle the need for new capacity to serve a big load without putting the ratepayer at a disadvantage. So the drive coming from the Energy Dominance Council lines up precisely with that. So I think at this moment we're in a spot where all of us are being urged to look for ways to add megawatts to every one of the grids in the markets where we operate, which makes the grid more reliable and more affordable for the ratepayer, while also tackling the need for large loads. That, I believe, is the reason PJM has backed this bilateral process, since it's attempting to help load and generation come together within it.
My first question concerns Slide 10 in the presentation, the Wild Alberta slide, where you highlight a figure of 2 gigawatts under realized infrastructure. So are you assuming that this amount — 1.2 gig for Phase 1 and 0.8 gigawatt — will not fall under your own generation?
Thank you, Ben. I'd frame it in a different way. What I'd call it is our Zoom outlook for Alberta. Once you add Phase 1 together with MSSP and the generation that's available, we believe capacity comes closer to 2. When Phase 1 was announced, our messaging was consistent with that as well. From where we sit, that figure is nearer to 2. So there is that wiggle room between the 1.2 that was announced and 2, and we expect some accommodation to come through the Phase 2 dialogue as well; so I'd treat that as a general comment on the market and on our confidence that capacity will be available in Alberta without compromising affordability for the rate payer.
And you brought up the CER and the MOU as well, saying they could potentially help the data center build or back it up. Could you explain what you were getting at with that?
Yes. Look, I believe the MOU matters a great deal when it comes to encouraging new gas generation. Our capacity to take on some or any merchant risk on new builds in Alberta, I think, will hinge on whether we can run a gas plant across the whole life of that asset; so for Alberta, getting CER repealed is essential to that; that doesn't mean we're unable to build gas specifically to serve behind-the-fence data centers, but I think repealing it opens up the market for wider commercial opportunities. And I think our position in Alberta, as one of the biggest generators and with the most efficient fleet that's effectively supplying baseload into the market, means we're best placed to price that marginal megawatt, contract that marginal megawatt, and deliver energy services to large customers through long-term offtakes.
And perhaps one final thing, Alberta. You've got your updated hedge in place for 2028, but I noticed the forward curves have fallen sharply since the last presentation you gave for the quarter. Could you just walk us directionally through your thinking on hedging a given percentage versus leaving it open, and how you see Alberta power prices potentially moving?
Yes. First and foremost, I'd say our dedication to balance sheet strength and to our IG credit rating is paramount, along with keeping cash flows stable for the company. So our overall hedging philosophy hasn't shifted when it comes to 80, 65, 50, year 1, year 2, year 3; that philosophy remains the same, and we'll stay consistent with it. Strategically, as we see it, we do have flexibility at the enterprise level, especially now that the company is more diversified; so we'll stick with that to keep cash flows stable and preserve our approach to balance sheet strength. But given that we now have more exposure across more markets, and we've almost doubled in size by capacity over the last 3 years, we do have additional levers available to capitalize on that contracted merchant exposure and to optimize it. So I realize that isn't a direct answer to your question about what and how much, but I'd stress that point as we think about moving out along that curve, particularly year 2, year 3 and beyond, we will remain consistent with the 80, 65 to 50, though the makeup of what we're hedging, where we have flexibility to optimize given our merchant exposure effectively in PJM, Alberta and CIO, will vary.
Picking up where the last question left off, even with all the regulatory strides and Alberta's structural edge, the forward curve from 2028 onward is clearly only slightly above where we are this year, around the high 50s to low 60s. So if we set hedges aside and look purely at the power price, how would you describe those forwards? And from a directional standpoint, what do you figure the market is failing to see?
Thank you, Maurice; this is something we went back and examined closely. If you go back in history, to 2018 or 2020, and look ahead to 2023, the Alberta forecast or forward strip showed much the same pattern, and the reason is that with so little liquidity at the back end of the curve and the way this market is structurally set up, when the curve has that steep a slope, there's simply no motivation or incentive to lock in at the back end when contango is steeper there. So it isn't a case of the market failing to grasp it. Because liquidity is lacking, nobody has an incentive to transact. That's why we keep leaning on fundamentals for our pricing outlook. And I'd argue that with the contango steepness we have today, what's being missed is an appreciation of how supply is tightening, how the supply-demand gap here narrows across the coming 3 years, and the market is underestimating where future spot prices will land. So I can't tell you, Maurice, whether Q1 2028 brings $80 or $90. What I can say with a high degree of confidence is that we see a tightening market here and pricing returning to higher levels across that 3-year stretch. And going back to Ben's earlier question, that's exactly what informs our thinking on medium to long-term hedging and contracting in Alberta; we really like the exposure we hold. We believe the upside is asymmetric to the upside; especially as we consider possible new builds in the market, data center load arriving, and continued economic growth in Alberta, which is running well ahead of the rest of the country.
Just to add a quick follow-up on that. Thinking about the supply and demand dynamics behind the timing of this possible spike, perhaps supply won't arrive any sooner, but do you have any thoughts on where demand shows up a bit later?
Sorry, I don't follow the question. Could you say that again, Maurice?
So clearly, Phase 1 expects demand to show up, say in '27 and '28, and then possibly the supply that backs that additional supply arrives nearer to the beginning of the following decade. If demand turns up somewhat later, then maybe you don't get that price spike until later in the decade than '28.
Yeah, that's a fascinating point. And when you examine the current market structure and the way the marginal electron gets priced. And incidentally, a comparable dynamic exists in PJM, where you had a 2-year BRA auction. In the past, that was sufficient to give generators an incentive to pursue new build, since the sequence of consecutive DRA auctions gives you enough visibility to FID build over 2 to 3 years and then participate in that market dynamic; in Alberta, the situation is comparable, yet there's no capacity payment to encourage new builds. So in the past, the merchant market reacted to higher pricing, but we had 2- to 3-year cycle times between FID and COD; and so now, when that cycle time is 4 to 5 years, and the cost of new build is 2 to 3x what it was 5 years ago, I don't believe the response time or the elasticity of supply matching demand is what it once was; so I think what that means for your question is that the matching of new load to new supply, you and I will all see far more clearly in the marketplace. So if prices run in Alberta within this merchant market, the likelihood of new merchant capacity arriving and coming online and dampening the back end of the curve at the back end, I mean, year 2, year 3, year 4, we don't view as viable as it once was simply because lead time, supply chain, construction times are far longer for new build; so the resilience of this market from a pricing standpoint looks actually quite favorable for us.
Let me wrap up with a wider question about Canada. Yesterday the federal government laid out several pillars for the national AI strategy it has coming. I'm curious what your initial impressions of that framework are. And specifically, could any divergence from how the Alberta government is approaching this create better opportunities for Capital Power beyond Alberta?
Well, speaking for my own book here, Maurice, Genesee remains, in our view, among the most attractive locations in North America for hosting a data center. That said, our business is selling power. So doing it on that site isn't something we're obliged to pursue, but the opportunity is there. I genuinely think there's strong alignment between the province of Alberta and the Feds when it comes to enabling AI investment and building a sovereign data strategy for Canada; I believe we can contribute to that; and the federal government's effort to enable capital investment and speed up approvals all supports it. The good news in Alberta, I'd say, is that the train has already left the station regarding Alberta's backing of data center capacity, Phase 1 moving into Phase 2. Still, I think any further alignment between federal backing for sovereign data centers and Alberta continuing to welcome that industry without hurting reliability for consumers is heading in that direction; so I'd call yesterday a positive on that front. The next step, though, I think, is how we take that to we need 250 megawatts or 500 megawatts, and we need a COD by date; and I think those are conversations all of us are part of.
I'd like to add my congratulations to Kevin, Andrew, and Mike on their new appointments, and I wish Steve all the best as he approaches retirement.
Regarding the East-West transmission expansion debate that's been circulating recently in connection with national security, I'm curious — from the standpoint of an incumbent IPP in Alberta, what would you identify as the chief advantages or disadvantages of growing Intertide capacity, and how could the company be positioned to either seize those market opportunities or reduce exposure to risks associated with additional interties later on, whether east-west or North-South?
Thanks for that question, Pat. On the intertie matter, if it's a national security concern and provinces are behind it, we're already engaged and will stay engaged in those discussions. The thing is, an islanded power market works because baseload gets backing from ratepayers for transmission and distribution, and generators also support it via private investment. So in a market with interties, where the stakeholders differ, figuring out how that functions is a key consideration—you don't want to weaken the market structures already in place that underpin building and owning that infrastructure. When one province’s system is financed via a crown corporation, entirely by ratepayers, while another market gets support for transmission and distribution from private industry plus ratepayers, you have to find a fair approach to handle this for both markets, since you can’t undermine the market structure in one relative to the other; so I don’t see the Intersight discussion as a threat. Additional infrastructure linking the nation, delivering improved reliability and affordability for customers, and promoting fresh infrastructure construction along with new industrial production capacity — those are precisely the discussions we ought to be having as enterprises throughout the country. Still, we need to work through the specifics to grasp how it affects every separate jurisdiction and how it ultimately serves the whole. So this is something we are actively engaged in discussions about. We are contributing our views to those discussions. Yet in itself, I don't regard it as a threat, because ultimately, if it does go through — and I believe its economics are extremely, extremely difficult. I want to point out that our nations together have more than 40 million residents and generate slightly above $2 trillion in yearly GDP — which amounts to half of California's economy. Given that, putting money into infrastructure on this scale is challenging when your markets are fairly small, spread province by province, and striving to link up with the coastlines where much of the economic activity happens. For the ratepayer, the interconnection on its own might not represent strong value. We simply need to figure out how all of that is going to function.
And then perhaps just one housekeeping item regarding your outlook on recontracting. I realize that's a fairly minor piece of the portfolio, but since the contract expires in 6 months or so, I believe, is there any news on renewing the island generation facility with BC Hydro, or I suppose, how might you be considering monetizing or maximizing the value of that asset should recontracting not pan out?
We're examining several alternatives for island generation, though we don't have any update on that right now; and I'd acknowledge your point, it's fairly small relative to our overall portfolio and contribution.
Perhaps I could begin with Genesee and that 466-megawatt cap on grid exports set by the MSSC. Earlier this year, and also back in 2025, you ran some tests above 466 megawatts. Could you update us on where that effort stands and when you believe you might hit the milestone of exporting 100 or 200 megawatts beyond those 466 megawatts into the grid?
Yes. Thanks for asking, John. That testing process is still underway for us. As you mentioned, we've done preliminary tests, and this is an active program we're pursuing alongside the ISO to move the approval forward. We stay confident about bringing additional megawatts online, and we hope to give a further update as testing carries on through the year. But I can't give you anything specific on timing or volume, beyond hoping to have an update during this year; the initial testing is progressing and moving in a favorable direction, though there's still work ahead, and we're doing it together with the ISO.
All right. So a broader question about organic development, whether that's renewables or gas and storage: by the close of this year, most of your development pipeline will be finished. I believe you have just a single project coming online in early 2027. So what sorts of opportunities are you seeing to refill that organic pipeline? And how do the potential returns stack up against what you're seeing in M&A markets at the moment?
We remain, I'd say, bullish about the chance to develop. As we emerged from the repowering project, which stood as the biggest CapEx project in our company's history at Genesee, our attention moved toward renewable development. And as we've broadened and grown the company, we see, I think, a very compelling chance to develop around development. The clearest illustration of that is the backstop auction and what we're beginning to observe in the market. We're beginning to observe longer-term PPAs tied to data centers and/or load serving entities seeking to lock in long-term supply; so at our Investor Day, we said we have roughly 1 gigawatt of development pipeline for our company; and in earnest, I'd say, we're really concentrating on trying to expand that pipeline this year and beyond; so I'd expect that to become a growing focus for us. On relative returns versus acquiring, I think it's a trade-off of duration and tail and contractedness against realizing short-term pricing in the short term. And the reality is, we need a balance of both. But what we're seeing in greenfield development, I think, is commensurate with us delivering 13% to 15% shareholder returns over time; so we believe our cost of capital is competitive; we believe there are a number of opportunities, and all 3 actually renewable storage as well as gas, and we're trying to ramp up our origination efforts and build that pipeline. So that's a key focus for us now, given where we stand as a company.
Regarding the 2 gigawatt figure you're projecting for Alberta, as opposed to the 1.2 in Phase 1, I'm wondering when you think we'll get clarity on that during Phase 2a. Some working documents from the ASO have come to light. And how do you see the 400 megawatts from Genesee being classified as potentially net new megawatts?
As for Phase 2, I'd describe our discussions as productive and cooperative. Beyond what the ISO has communicated about directional timing, we haven't formed a specific expectation on timing. Still, with respect to unlocking our megawatts beyond 466, we anticipate they would be treated as net new megawatts. We see the conversation as lining up with that view. In my opinion, that's a key reason we're so optimistic about Alberta and about data centers compared with other markets: right now, Alberta is among the only jurisdictions where that holds. Broadly speaking, we might not see eye to eye on every element of how we're carrying this out, but at a broad level, government, the regulator, and industry are aligned on the approach for building and introducing new load into this market structure.
All right. So clearly you've now got that MOU out there for Genesee. Are there other discussions underway with data center customers regarding something different at Genesee, be it straight offtake or colocation? Has anything shifted over the past couple of months?
We've got several conversations going on in Alberta right now, whether about offtake or colocation of data centers; honestly, that hasn't changed over the last 1.5 years, and those conversations remain active rather than casual. So yes, we're still just as bullish about the opportunity set as we were, and we're actively pursuing it.
So once we have some clarity around Phase 2 with the VB, along with CER and the Upper MOU being finalized, is it possible for those conversations to advance to the next phase?
Yeah. If you think in terms of stage gates, I'd call those two essential stage gates. We've been ready to move fast at Genesee for 1.5 years now. So as far as our capability goes, the work is done. A site is in hand. We understand what a site plan looks like. And I believe we remain in an enviable position to sign with anyone seeking to secure long-term energy in Alberta, on whatever project they're pursuing, whether that's at our site or somewhere else. So for us, it's comparable to the discussion we were having about recontracting; in a lot of ways, the arithmetic and the assessment of how to maximize net present value per KW at the Genesee site means we're weighing everything there, which is that we see a tightening market, we see a favorable energy market taking shape in '28 to '30. We have expansion capacity at the site. We have unlocked megawatts; and it's simply a matter of balancing whether we deploy those megawatts to support a 10-plus year offtake with someone else at someone else's site, or with someone looking for long-term supply, or whether we deploy some of those unused megawatts for someone who's co-locating. So I really like where we stand in Alberta right now. I think we're in a very good position at Genesee, where we have multiple levers to play, and we have the flexibility to play them.
So perhaps one final question: how would you rank or compare your level of confidence, or the probability, that the MOUs for the data centers at Genesee and at Midland today will become a definitive contract? Do those two feel as though they sit on comparable paths and probabilities? Or does one of them give you greater confidence that it will move forward to a final contract?
Well, my answer would take a different angle. What I'd point to is our probability of contracting and of maximizing the value of a megawatt at either plant, and I'd call that very, very high. So on MCV versus Genesee, with MCV we are making progress. I'd say confidence is high that we will contract those megawatts. We're moving the MOU forward on the data center, but we also have uncontracted capacity that will ultimately be optimized. So that is progressing, and we keep advancing Alberta. I would point out that we began the NCV process more than a year after we had started examining Genesee as a site. So MCV has gained enormously from everything we learned at Genesee and in Alberta, and at NCV our team has actually come from behind quite quickly when it comes to working with potential customers there. So for us, I think that is one of our advantages. We've been working at this since '23 across multiple sites throughout North America. And we've spoken with all of the customers about what their site requirements are, what their ramp schedules are, what reliability needs they have, and even what site configurations and power solutions they require. So we feel fairly good about how we can serve the ultimate customer here.
Thanks, operator. If nobody has any further questions, that brings our conference call to a close. Thanks again for being with us, and for the ongoing interest you show in Capital Power. A recording of today's presentation and webcast will be posted on our website. Have a great day.
Thanks very much, everyone, for joining us on today's call. That brings the program to a close. You're free to disconnect at this point. Have a great day, everybody.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Capital Power Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Capital Power Corporation earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.