Capital Power Corporation (CPX) Earnings Call Transcript
November 2, 2026
Earnings Call Speaker Segments
Hello, and thanks for holding. You're joined on the Capital Power Q3 2026 Analyst Conference Call, and we're glad to have you. <<operator_script>> I want to let everyone know that this call is being recorded as we speak. At this point I'll hand things over to Roy Arthur. Please go ahead.
Good morning, everyone. I’m Roy Arthur, Vice President, Investor Relations and Investment Partnerships. Thanks for being here as we go over Capital Power’s third quarter 2026 results, which came out earlier today. Both the quarterly report and the presentation for this call can be found on our website. Before we get started, let me lay out how we’ll use our time today. To begin, our President and Chief Executive Officer, Avik Dey, will take you through our key messages and a business update, covering the strength of our contractual foundation, the upside embedded in our business and our growth potential that we see beyond that. After that, our Senior Vice President, Finance and Chief Financial Officer, Kevin MacIntosh, will go through our third quarter highlights and financial results. Avik will then wrap up with a few remarks before we open the floor to questions. One quick housekeeping note. I’d like to remind everyone that today’s discussion includes forward-looking information and references to non-GAAP financial measures and ratios. Please see Slide 19 of the presentation for the applicable disclosures. With that, I’ll hand things over to Avik.
Thanks, Roy, and good morning to all of you. Before I get started today, I want to take a moment to recognize the outcome of the Alberta referendum held on October 19. First off, what an incredible day for Canadians, and a wonderful show of democracy from Albertans. We saw historic turnout at the borders and firmly approved and endorsed a strong Alberta inside a united Canada. I believe it's a great day for Alberta, a great day for Canada, and importantly, a great day for Capital Power as a strong and proud Alberta company. There are three key messages we'd like you to take away today. First, we have a solid foundation of high-quality contracted cash flows. Our earnings base is stable and includes long-term contracts with a diverse set of investment-grade counterparties. Second, we have significant embedded upside with a derisked path to execution. That upside sits within the assets we already own, with contracting in merchant value driving our AFFO per share growth. We have already made significant progress crystallizing this upside. As you'll hear Kevin talk about, our foundation of contracted cash flows together with our merchant upside delivered a record adjusted EBITDA this quarter. This reflects the strength of our diversified business and its underlying fundamentals.
And third, healthy fundamentals across our main markets are opening up fresh chances for development and contracting. Beyond what M&A might bring, we see additional value through contracted development possibilities at our sites with utilities and large load customers, on top of the embedded upside. With that in mind, I'll give some context on each of these. Let me begin with contracted cash flow. It supports a big share of our growth. It services our debt and funds our growing dividend. Roughly 75% of our EBITDA sits under long-term contracts. That's intentional. Long-term contracting has always been central to how we operate the business, and historically our contracts have averaged a weighted average contract life of 9 to 11 years. These contracts are high quality as well: between 80% and 90% of contracted EBITDA comes from investment-grade counterparties, and over 70% is with utilities or system operators. This contracted base provides stability. On top of that, we have upside from merchant power prices, and our supply and trading team actively manages that risk. Combined, these give a balanced and compelling total return proposition. Our contracted portfolio also provides a clear route to growth, and our track record keeps demonstrating that we can deliver on it.
During 2025 and so far in '26, we've signed contracts for close to 2 gigawatts, and that figure includes projects that have already come online. Over the near to midterm, roughly 3 gigawatts within our portfolio can still be contracted, as legacy agreements begin rolling off in 2029, while upgrades at sites we already own add even more optionality on top of that. Beyond that built-in upside, we also see a substantial chance to build out and sign contracts for new generation located at our existing sites. Those opportunities I just described, together with the rigor we apply in pursuing them, strengthen our confidence that we will hit our 2030 targets, which include AFFO per share growth of 8% to 10% and total shareholder returns of 13% to 15%. As we noted before, since '25 we've contracted and placed into service about 2 gigawatts spanning several jurisdictions, at prices that are materially higher, with a weighted average contract life of roughly 15 years. That amounts to roughly 14% of our fleet, which is about double what peers averaged during the same stretch. Our recent success in contracting isn't a fluke. It's a strategy we've demonstrated and one we keep carrying out. This contracting opportunity fits into a bigger picture. Throughout our portfolio, we identify as much as $1.25 billion in additional yearly adjusted EBITDA upside beyond our 2026 base.
That upside breaks into 2 pieces. The first piece is roughly $400 million to $550 million, coming from recontracting and upgrades on about 3 gigawatts of capacity. Another $375 million to $700 million is merchant upside tied to power prices in Alberta and PJM, spanning approximately 5 gigawatts of capacity. In both markets, supply and demand fundamentals are tightening, which supports this opportunity, and our existing assets leave us well placed to capture it. What makes this upside compelling is the way we capture it. It calls for no new shares, no new project debt, and only limited growth capital, so it is highly accretive to AFFO per share. This upside isn't theoretical. We're already delivering meaningful progress on this opportunity. In PJM and Alberta, we have hedged more than 40 terawatt hours of power from 2027 and beyond, and on top of that we recently contracted nearly 2 gigawatts of capacity. Taken together, this not only derisks our long-term growth profile but also lowers how much M&A we need in order to hit our 2030 growth targets. Where we do pursue M&A, our focus is on expanding this embedded opportunity set. I've spoken about the value in our existing fleet, and it is significant, but it raises the question: what comes next?
Solid appetite in the markets we serve is opening up growth possibilities on top of the $1.25 billion in adjusted EBITDA upside I mentioned a moment ago. On top of that, we're seeing multi-gigawatt potential in the markets that matter most to us. As that demand rises, what customers care about isn't just getting power quickly — they also want reliability, help managing commodity risk, and commercial and regulatory know-how. We've discussed this in the past. It's that blend of factors that sets us apart — Capital Power. We're an investment-grade counterparty, we've demonstrated a solid operating record, and we hold deep customer relationships in the regions where we do business. Thanks to our commercial and trading capabilities, we can put these agreements together and handle the risk that sits behind them. Beyond that embedded upside, our sites give us a brownfield edge. Rather than pursue an alternative greenfield project, we may be able to leverage our existing land, generation, and interconnect to bring new generation online more quickly and more cheaply. Through years of proactive engagement, we've established a trusted presence in the communities that host us. Genesee, right here in Alberta, is the best illustration of that of any location. Getting power fast also hinges on equipment, and turbine supply has ranked among the industry's tightest constraints. That picture is beginning to change. Lately we've been seeing more credible listings for complete or unused turbine packages, even if asking prices are still steep.
This pattern has shown up in earlier cycles, so we recognize it. Calling a turn would be premature, yet these first indications make us confident about securing the equipment required to deliver development growth at or above our stated return targets. Kevin will now walk you through the third quarter results.
Thank you, Avik, and good morning to all of you. This morning I found myself thinking about what an important point we're at in the year. People right across Capital Power are finalizing their 2027 plans, and at the same time they're keeping a sharp focus on closing out 2026 on a strong note. That requires remarkable dedication, and I feel real pride in the way colleagues throughout the organization keep delivering. I'll begin with the highlights from our third quarter, then take you through our financial results, which feature a record quarterly adjusted EBITDA contribution, and I'll finish with an update on guidance for 2026. In the quarter, we announced a 250-megawatt long-term energy supply agreement with Meta. We're also continuing to move forward with upgrades at Arlington Valley and Hummel, with those expected to be complete in 2027. On the development side, roughly 180 megawatts of solar capacity is progressing toward commercial operation in 2026 and 2027. From an operational standpoint, we produced approximately 14.5 terawatt hours across the portfolio, an increase of 8% year-over-year, and 60% of that came from our U.S. fleet. We've also now finished 68% of the total outage days we had planned for 2026. Now to our financial results. Adjusted EBITDA for the third quarter came in at $553 million, which is $76 million higher than the third quarter of 2025. That record quarterly adjusted EBITDA contribution shows just how strong our diversified portfolio is.
This rise came primarily from bigger contributions at Hummel Station and Rolling Hills, helped by stronger PJM power prices along with summer demand. Higher results were also posted by our Canada Flexible Generation segment. Beneficial portfolio optimization, increased generation and pricing at Goreway, plus contributions from our Ontario battery storage projects, more than offset weaker spot power prices and reduced generation in Alberta. Those gains were partly offset by a smaller contribution from La Paloma, where financial hedges arranged following the acquisition settled worse than they did last year. AFFO came in at $306 million, a decline of $63 million versus a year earlier. Even with higher adjusted EBITDA, AFFO reflects increased sustaining capital spending, largely due to a heavy maintenance schedule across our Alberta fleet, rotor replacements at Rolling Hills and Harquahala, and planned maintenance at Hummel Station and Rolling Hills. We also recorded higher net finance expense and current income tax expense compared with the prior year. For the year to date, adjusted EBITDA reached $1.308 billion, an increase of $142 million. That gain was driven by a full 9 months of operations at Hummel Station and Rolling Hills, together with the same factors seen in the quarter. AFFO was $788 million, a decrease of $34 million relative to the prior year. This mirrors the same pressures from sustaining capital, finance expense and taxes.
Part of that was offset by $174 million of Clean Technology Investment Tax Credits that we recognized during the second quarter for Canadian renewables projects that qualify. So the bottom line is that adjusted EBITDA hit a record this quarter; some parts of the portfolio came in softer, but stronger results elsewhere more than compensated, and that demonstrates what a diversified portfolio is worth. Given how we've performed so far this year and what we expect for the remainder of it, we are reaffirming our 2026 guidance: adjusted EBITDA of $1.565 billion to $1.765 billion, and AFFO of $890 million to $1.010 billion. Those metrics should stay in range thanks to this strong performance. For 2026 sustaining capital expenditures, the guidance range is now $350 million to $370 million. That's up from $290 million to $330 million previously, and it reflects unplanned outage work, mainly at the U.S. flexible generation fleet, plus a planned outage moved up from 2027 into the fourth quarter of 2026 so we can ensure high reliability through 2027. This increase is driven by events, and a significant portion of it is tied to insurable events. We expect insurance recoveries in 2026 and 2027, along with concessions from original equipment manufacturers, to meaningfully offset the cash impact of the higher sustaining capital. All in all, we remain confident in how resilient our portfolio is and in the durability of our cash flows.
The contracted base we have gives us stability, and the contracted and merchant upside embedded in it gives us a clear route to raising cash flow per share. Before we go further, I want to highlight something that distinguishes Capital Power: our lengthy track record of dividend growth. From 2016 onward, our dividend has risen from $1.51 per share to $2.79 now, on the basis of our 2026 estimate — a gain of roughly 85%. We sustained that growth across commodity cycles, shifts in the market and major changes in our portfolio. In the quarter, we announced a 2% dividend increase for 2026, which makes our 13th consecutive year of dividend increases. We've set it at the low end of the 2% to 4% yearly dividend growth through 2030 that we previously communicated. That mirrors our confidence in the cash flow from our contracted fleet while preserving room to fund the growth opportunities ahead of us. Our message hasn't changed. We invest with discipline, grow our cash flow and return a meaningful share of it to shareholders. With that, I'll hand it back to Avik for closing remarks.
Thank you, Kevin. Before we take questions, let me return to the point we began with. All of what we covered today is built on a stable foundation. Long-term agreements with investment-grade counterparties provide cash flow we can predict, and that reliability is exactly what allows us to invest confidently and continue raising the dividend annually. Beyond that foundation, we have growth requiring no new purchases. It is already present in the assets we hold. As we contract and capture merchant value throughout the fleet, that potential is the most obvious engine behind our AFFO per share growth through 2030, and we have a clearly defined route to realize it. Further out, demand from utilities and large load customers is generating genuine contracting and development possibilities at sites we already own. Add M&A to the mix, and we gain additional levers for value creation plus a runway stretching far past the near term. The message is straightforward. A stable foundation, growth already inside our assets, and new opportunities now forming. Our confidence in Capital Power's direction is strong, and we are proceeding with discipline to seize it. Taken together, that gives us a business combining utility-like stability with IPP-style growth.
There are plenty of opportunities in front of us that we're enthusiastic about. Having said that, I'll hand things back over to Roy.
Thanks, Avik. Operator, we're ready to start taking questions now.
<<operator_script>> Robert Hope from Scotiabank will be asking our first question.
Could you perhaps update us on how the M&A landscape looks, both on the contracted side and on what we'll call the merchant side of the PJM market? What headwinds and tailwinds are you seeing as you evaluate things, given that assets keep transacting?
Thank you for that question, Rob. In my view, we've really had two distinct narratives play out this year. We entered the year with a fair amount of activity, especially on the larger transaction front. On the single plant side, though, we saw fewer opportunities reaching the market. Then, given the regulatory landscape, the moratoriums, and certain announcements made during the year, I'd characterize the second half as largely frozen. As a result, very few assets have come up for sale. So when I think about the broader strategy, '26 strikes me as something of a pause in the M&A market when it comes to single asset opportunities. As for the larger transactions, we're familiar with the ones that have already changed hands, but my expectation is that '27 will see single plant transactions pick up again. Hopefully that addresses your question. And while I have the mic on M&A, I'd add that overall, our partnership with Apollo remains strong as we've continued evaluating opportunities. There's solid alignment between us on how we see the U.S. generation landscape. The merchant opportunity set continues to excite us. If anything, going forward our emphasis will be on really seeking out those single plant opportunities, with probably a greater tilt toward the bilateral side when it comes to sourcing and originating deals, maintaining our focus on PJM and on opportunities that arise or that we originate in MISO and potentially WECC, while placing somewhat less continued emphasis on ERCOT from an M&A perspective.
I hope that addresses what you were asking.
Yes. That's great. And then could we return to what was said about turbine availability in the prepared remarks? So what exactly is behind your belief that a turn in the market could be coming? Are we seeing some rival projects drop away, or supply increasing? Is the supply chain catching up? Are there other factors? And I guess, secondly there, does this potentially speed up or bring forward your operate thinking?
Yes. So I think my overall comment would be — and I think we've been consistent on this. Our business plan has been focused on stability and predictability. And as you've heard me say time and time again, we're focused on high-quality counterparties and focused on hyperscalers and large-scale data centers. What we've observed in the market as moratoriums have come to fruition in the U.S. and many of these slots were taken by other counterparties is in the chase for speed to power, in certain instances, we're seeing the ability to swap slots and take deliveries in '28, '29, '30. So I wouldn't call it enough to pick the trend, which is what my comments were. But I think if we needed turbines on a specific project, we're seeing a better ability to capture them, and it's really about trading slots near term in exchange for longer term and working with counterparties or even the parties that actually own those turbines directly. So I think we feel better about it. Again, not ready to call a trend. I don't think there's anything structural in the market happening that's saying supply chain is catching up or competing projects are falling away.
Like I mentioned several times during the past year, what we keep observing is the market high-grading those data centers — the data centers, mind you, not one data center, not a single data center. So for the near-term ones, the ones with high-quality counterparties that are taking chip deliveries within the next 2 to 4 years, my view is that every one of those projects will move ahead. And I believe our access to equipment and the supply chain is going to improve across the coming 2 to 3 years. Again, that's not sufficient to declare a trend, but I do think an opportunity is emerging there for companies such as ours that have stayed the course and remained focused on contracted opportunities.
The next question comes from Benjamin Pham at BMO.
Perhaps I could begin with the organic growth pipeline. There are several projects you're moving forward at present. Windsor is now entering service, the U.S. storage pipeline is tracking your expectations, and you appear fairly bullish on that outlook as we go forward. Maybe you could just update us on how we ought to be thinking about replenishment of the organic growth pipeline and perhaps any timing around it?
Thank you, Ben. If I had to describe our growth thinking, I'd point first to the $1.25 billion of adjusted EBITDA headed our way from a mix of upgrades, recontracting and merchant exposure. Turning to your question about replenishing inventory, we have close to 3 gigawatts of available capacity — roughly 25% of our fleet — that's open to opportunities, uprates and expansions included. On the greenfield front, I'd tell you we don't currently hold an active portfolio of new sites. As we keep working with partners, and as I said earlier when Rob asked about fleet availability, we're always assessing site potential, though it's consistently been within a framework where a counterparty is prepared to sign a contract with us, possibly alongside capacity we already have. So whether it's buying new plants that carry that expansion capacity, as we did at Rolling Hills, or examining new sites, I expect the inventory will be filled in and around those 3 gigawatts on the current fleet. That said, I'd set our boundary at the markets where we already operate, and say Capital Power will do what it does in locations that need natural gas for baseload or critical capacity, in markets where we can wholesale power and contract.
And should chances arise to grow or perhaps take on work through contracted arrangements, we will assess those. Ben, does that address what you asked?
Yes. No, it does. And maybe just turning to a different question about how you're allocating capital. You said M&A has been pretty slow this year but might pick up next year. You've got recontracting opportunities. I see your stock has fallen considerably from quarter to quarter, and from what I can tell it's reflecting the corporate expense. How do you feel about stock buybacks versus the growth side of those things?
Ben, this is Kevin, and I appreciate the question. Clearly, that is a possibility, though I don't believe we will pursue it unless significantly more weakness emerges. We find ourselves in a fortunate position, since we have very few major capital commitments tied to organic growth. As a result, we have plenty of alternatives available. Naturally, we keep an eye on the matter of share buybacks. That said, I would characterize it as there being no near-term intention to launch an NCIB.
The next question comes from Mark Jarvi with CIBC.
Go ahead with your thoughts on M&A, Avik. Clearly, there's encouraging commentary about upside in the assets we already hold and about reaching the targets. How should we read what you said? Does it mean less dependence on M&A to reach that 8% to 10%? Or do you still see M&A as part of the picture, with the potential to land at the top end of the 10% AFFO per share target, or even exceed it?
Well, I won't tie myself to what you said, but I'd argue the second outcome is more probable than not. So I wouldn't characterize it as a reduced emphasis on M&A. Actually, I believe '27 will be busier rather than quieter, since '26 amounted to basically a pause. But I'd really emphasize that my remarks centered on the fact that we don't require it. There's so much built-in growth across the current portfolio and fleet. Over the last 2 years alone, we've recontracted 2 gigawatt of capacity. So I think when you look ahead and consider the opportunities, we're going to be even more sharply focused on locating acquisitions that fit our criteria — ones with embedded upside that, thanks to our emphasis on operational excellence and commercial execution, let us earn excess returns. So I think if anything, it's simply going to mean a more disciplined approach to M&A instead of examining everything on the market; we'll return to basics, working to find and pinpoint those plants where we believe we can genuinely create added value for ourselves and for our customers.
All right. So with the revised RBP in PJM and IRAS not moving forward, where does that leave you at this point? Could you contract Hummel as things stand today? With some of that uncertainty, how is it shaping what you're either actively pursuing or considering at Rolling Hills right now?
Well, I won't single out Rolling Hills or Hummel by name. But what I'd say about PJM is that we're still seeing activity on the bilateral front. We expect that to keep happening. I think the recent announcement involving Google and Constellation really speaks to that, in terms of operators backing bilaterals in response to linear own generation. So we keep seeing that trend. But to answer your question directly, we are looking at multiple opportunities there. And I think the market overall is moving ahead even with IRAS on delivering capacity against the rate payer pledge as well as the bilateral as a result.
To follow up on that point, is it your view, then, that the contracts are linked to a certain number of added megawatts at the site? Or is it possible to do the contracting without any need to alter the units' capacity?
For us specifically, I'd say that across a 3 to 4-year horizon, our hedge position exceeds 80%. That gives us room to sign contracts. I'd note that everyone participating in PJM is paying close attention to new capacity for contracting, yet that contracting capability remains available. Our attention, I believe, is really centered on requiring additional power to back the bilaterals within the wider PJM process.
Shar Pourreza from Wells Fargo is on the line with our next question.
Switching to PJM for a moment—given the deals we’ve observed and, clearly, in the RTO, and Google obviously didn’t take the clean energy attributes for Constellation. When we consider capacity obligations, are you thinking along the lines of CT storage? And should we assume that new capacity being brought online covers roughly 25% to 30% of hyperscalers’ needs? That appears to be something of a rule of thumb for new capacity.
I believe I can offer our viewpoint here, and speaking more generally about the market, that estimate of yours is exactly right. If you look at our fleet specifically, and how we combine new capacity—and today, I'd say our main focus is on CT—but that blending of CT, CCGT storage is, I think, the direction we're headed. And on the storage side especially, what it accomplishes is helping to relieve some of the strain on grid reliability. So by folding that into overall energy solutions, it serves several purposes. And we're observing the same pattern in Canada. In Ontario, we've already seen it with utility scale batteries and the way they bolster resiliency. We have 2 of those projects co-located at thermal sites. But I think that's a solid rule of thumb. For us specifically, I think, when you look at Rolling Hills, obviously that is the answer. But I think a wider opportunity exists there as well further down the road. It isn't one we're specifically focused on at present regarding the CCGT potential at that site. Still, I think that opportunity is present over the medium to longer term.
Understood. That's clear. Now, when you point to that incremental opportunity of $400 million to $550 million in contracting and upgrades, do the margin economics shift depending on whether it's a portfolio deal rather than co-located or asset-specific? And is there any sense of direction in the negotiations or the inbounds you're receiving at this stage?
I wouldn't frame it as there being a difference — actually, let me put it this way. Being able to price that marginal electron depends on duration, counterparty, and speed to market. Each of those pillars carries competing value. And I think over 17 years we've shown we're fairly adept at figuring out how to maximize NPV per KW, based on how we assess the commercial opportunity, the opportunity cost, and the CapEx. When you look at where we're headed with the RBP in PJM — and I think your question is most relevant to PJM — the market is focused on the upgrade opportunity, because during the 15-year contract period, it's the upgrades that are going to be very competitive relative to CONE. So there is a pricing difference when we're looking at contracting existing assets on existing capacity versus new capacity around and operate in service of bringing your own generation. So that's really more tied to what's on the denominator of total CapEx versus here's what the pricing sensitivity is to the customer, if that makes sense.
The next person to ask something is John Mould from TD Cowen, who's on the line.
I suppose I'd like to begin with Genesee, and the work you've done there to bring additional capacity to the market or toward some kind of contracting opportunity. I'm just curious how that effort is progressing, how you're viewing the work you've carried out with AESO at that site, and what the potential time lines might be for unlocking some of that incremental capacity. And then, maybe without casting it too broadly, more generally: how are you thinking about the Genesee site in terms of longer-term contracting opportunities, and how has your thinking evolved over the course of the year as you've had various discussions about that potential?
Thanks, John. First off, I want to say that Genesee remains the standout asset in our portfolio as a company. Let me give you some context on that. John, I'm aware you've visited the site, and many of you have as well—Manhattan spans 15,000 acres in aerial extent. The Genesee site covers 26,000 acres. That makes it 1.7x the size of Manhattan. And it just so happens to sit in a spot that's 50 kilometers from a major center and within reach of 3 points of contact on fiber, critical access to water, critical access to pipeline, critical access to high-voltage transmission. So you've heard me make that point repeatedly. What's different today compared with a year ago, and this stems from a great deal of hard work by not only us but our industry peers, AESO, Minister Glubish and his team in the province overall. I'd say Alberta today is ahead of many jurisdictions throughout North America, because in effect, Alberta took their moratorium 2 years ago in how they set up Phase 1 and Phase 2. So today, when we look across the U.S. and see hundreds of moratoriums in place, we're now well along in the process of bringing new capacity through Phase 2.
When I step back and take a look at Genesee, what I see is a site with considerable potential, thanks to the infrastructure already in place, the existing footprint, and the ties we have with communities in and around the site, built on our long 40-year operating history. And I think that because we've been out front — working alongside government to put together and support the Phase 1 and Phase 2 initiatives — the market as a whole is now at a point where projects are coming forward, whether ours or somebody else's. So today we're looking very proactively and having conversations about potential opportunities through Phase 2 at Genesee. I think you should expect us to push those efforts forward. On Phase 2, when it comes to setting the rules of the road for bringing your own generation, we're getting closer to resolution there. And I can say we're in active discussions about building a power solution for potential customers at that site. I can't give you a sense of timing. I can't give a status update on where we stand. But I would say things are moving along, and it's really a testament. We've always known we had one of the most attractive sites in North America, because we've got excess capacity that, technically speaking, is able to be in service today.
Clearly, we still need to keep moving along the regulatory route so those megawatts can be unlocked. But in my view, what matters even more is the overall tone around how Alberta is seen as a market for hyperscalers, and how at the same time it tackles reliability and affordability worries for the consumer while also adding new capacity into the market. I'd say Alberta stands in an enviable spot today compared with other markets, and being right at the leading edge of that is something we're excited about.
All right, that helps. Then perhaps just one about La Paloma. I realize I raised this during the previous quarter. Still, I'm curious what you're observing in the resource adequacy market, since it's considerably more opaque than several other markets we look at. How are you approaching contracting that capacity through resource adequacy agreements rather than through other routes? And I understand you aren't providing '27 guidance today, but how should we view the step down next year in that resource adequacy contracting relative to the broader gradual step down heading into 2029?
Yes. So I'd say, when you take a step back and look at the California market, you're pointing out the weakness in the RA market. We keep examining contracting opportunities, and we're not in a position to comment on that. Obviously, batteries are having an impact on the market there. I think over the medium to longer term, we're more constructive and see a market that gets back into the double digits, well into the double digits. So I think overall, over the medium to long term, we're more bullish than bearish. And I would say slightly bullish. But we continue to think of La Paloma as a site that's critical to reliability in California and an important part of delivering grid reliability there. And we've got multiple options to either expand or contract around that site. So I know it's a bit of an open-ended response, but I think generally, recognizing the short-term pressures there, we feel like we've got some options to commercialize there.
Maurice Choy of RBC Capital Markets is on the line now with our next question.
Let me return once more to Alberta. I was hoping you could share what you're picking up on regarding the reasons the AESO Phase 2 announcement appears to be needing more time before it finally crosses the finish line.
Maurice, we still anticipate a resolution on that front over the next few weeks, and we expect it to be measurable within a low single-digit number of months. I think the — I wouldn't characterize it as a delay; it's really just a matter of working through the logistics and the details as the province gets ready to introduce legislation on it. So I think there's really nothing beyond that.
Possibly just one brief follow-up question. When do you expect that initial intake to occur?
I'd simply point you back to what I said earlier — we're looking at a timeframe measured in weeks up to a low single-digit number of months, though I can't give you any greater certainty than that. Still, I'd call it imminent.
Thanks for that detail. My follow-up question is about the $1.25 billion in incremental EBITDA upside you've identified from recontracting and merchant power. Obviously, that's higher than the $1 billion figure from last year's Investor Day, and it seems you've been talking about it more since September. Could you remind us what portion of that $1.25 billion will actually be captured before this decade ends — and therefore feed into your 8% to 10% CAGR — and how much you expect might come after the decade?
Yes. I'll take an initial stab at that, Kevin — please jump in if you want to add anything. The sole reason we aren't using 2030 as the anchor is that a handful of those recontractings carry upside beyond the 2030 calendar year. You can look at some of the recontractings we've already announced. So, without being able to get very specific, I'd say most of that value is in fact captured before 2030 and including 2030. The only reason we frame it as an approximation is that, technically, a portion of it — some of the higher contracting rates — begins on a timeline after 2030, not dramatically later than that, but we couldn't pin it down to Q4 of '29, which is why we've issued the guidance we have. Still, I believe the economic value of it has now been captured, and that's how we've chosen to present it to you from a portfolio standpoint. Kevin, anything you'd like to add there?
No. The sole point I would add is that this depends on commercial negotiations. We therefore recognize how important it is to grasp when the cash flows occur. And when we finalize deals, we will ensure the disclosure is transparent, so you can see the effect on both EBITDA and AFFO.
Perhaps I could just add a brief follow-up on that point. Among the items you disclosed today was that a facility maintenance event has been shifted from 2027 into Q4 of this year. Was the decision to change the maintenance timing prompted by conditions you're seeing in the market? Or is this a case where the facility needs work done right away?
Maurice, this is Kevin. During the third quarter, we performed a bore scope inspection. There was some discussion about whether we could get all the way through to the spring. Looking at the calendar, we decided from an economic standpoint that it made sense to take the unit down now, so that next spring we're set to go with very high reliability on that asset as we head into the summer.
And then the next question that we have comes from Patrick Kenny over at NBCCM.
Turning back to data centers, aside from the regulatory holdups we're seeing on both sides of the border, I'd like to hear your view on how much local backing you have, or any opposition you may face on the ground across the portfolio, and how your team is planning to get in front of any NIMBY hurdles that could arise, whether at Genesee, Midland, Rolling Hills, or somewhere else?
Absolutely, and thanks for raising that, Pat. I value the question, since I see this as one of the things we do best and a real edge for us. And the key point, which you highlighted right at the start of your question, is the local piece. This comes down to engaging locally, and it can't simply be a reaction to wanting to plug in a big load at the moment you need it. What it really involves is that grassroots work with your facilities in the communities, plus candid dialogue and communication with stakeholders. And I believe we've shown exactly that across the 17 years we've been around, in the communities where we operate. Our heritage, having emerged from a municipally owned utility, established how much that local community involvement matters. So be it our community teams, our stakeholder engagement teams, our regulatory people, our government relations folks, it's a many-sided effort that calls for expertise, it calls for people, it calls for folks on the ground. And I think we've built up that track record and that conversation in every one of our main markets. Clearly, we're newcomers to Ohio and Pennsylvania. So those are 2 areas where we're working to build our presence in the same way that we're more firmly established in places such as Arizona and Alberta and Ontario and Michigan.
That said, this isn't really a data-center story. It's about serving as responsible stewards and partners in the markets where we operate as a generator. And within that — you've heard me make this point across 3.5 years. I made it in Q3 of 2023. We saw no path for these opportunities to materialize without partnering with stakeholders and providing affordability plus reliability gains and improvements for customers in the markets we serve. To my mind, this is the biggest infrastructure hurdle we've encountered over the past 75 years. And we're tying 40-year regulated infrastructure to 20-year data centers that are powering 5-year chips, and 80% of the CapEx sits in those 5-year chips. So the magnitude of what lies ahead is unlike anything we've seen, and the complexity is likewise greater than anything we've seen. And it comes down to constructing large infrastructure for customers with long-term needs. And that means it looks and feels like hard work. And I believe we've shown that we can deliver that as a power generation provider.
All right, that's really helpful context. So then, thinking just from an operational standpoint — with the milder temperatures we're seeing and these El Nino conditions that will probably stick around through the winter, which could mean both reduced generation and less price volatility — I'm just wondering how you're approaching mitigating or optimizing the fleet over the winter, including possibly speeding up any turnaround or upgrade opportunities?
Patrick, this is Kevin. Only to remind you, there was actually a single day yesterday — or rather, last week, when things sort of cleared, and it hit above $250 per megawatt hour during — that was one day last week, correct? So it really highlights how volatile this market is. Some participants, I'd say, are pricing their marginal megawatts rather aggressively. When we consider 2027 from a hedging standpoint, we're at 80% roughly across the portfolio. So the team is going to be watching quite opportunistically to secure additional hedges whenever that makes sense. What's interesting is that among these super El Nino case studies, some obviously feature very, very warm conditions, yet others include stretches of extremely deep cold. Having said that, there's no actual plan right now to bring turnarounds forward or shift their timing.
And it appears we have no additional questions coming in over the phone lines. At this point, I'll hand the conference back to Roy Arthur so he can offer any closing remarks.
Thanks, operator, and thanks to all of you for being with us on today's call. That wraps up this call. We appreciate your ongoing interest in Capital Power. Have a great day.
Appreciate it. That brings us to the end of today’s program. Thanks for joining us. You’re all free to disconnect now. Have a wonderful day, everyone.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Capital Power Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Capital Power Corporation earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.