Good day, everyone, and welcome to the Q2 and H1 FY '27 earnings conference call for Ceigall India Limited. <<operator_script>> Kindly be aware that this call is being recorded. At this point, I'll turn the conference over to Mr. Mohit Upadhyay of Adfactors PR. Thank you, and the floor is yours, Mohit.
Thanks, and good evening, everyone. Welcome to the Q2 and H1 FY '27 Earnings Conference Call of Ceigall India Limited. Joining us today are Mr. Ramneek Sehgal, our Chairperson and Managing Director; Mr. Kapil Aggarwal, the CFO; and Mr. Saravanan, Whole-Time Director. Before I hand things over for the opening comments, I should note a cautionary statement: this conference may contain forward-looking statements regarding the company, and those rest on the beliefs, opinions and expectations of the company as of today's call date. Such statements do not guarantee future performance, and they carry risks and uncertainties that are hard to predict. We'll start the call with opening remarks from management, and after that, the forum will be open for a question-and-answer session. I'll now hand the conference to Mr. Ramneek Sehgal for his opening comments. Thank you, and over to you, sir.
Good evening, everyone, and thank you for joining the Q2 H1 Financial Year '27 Earnings Conference Call for Ceigall India. I hope all of you are doing well. Before we begin, on behalf of the entire Ceigall India team and family, I would like to extend my warm wishes to all our investors, analysts, and stakeholders on the occasion of Diwali. I wish you and your family a very happy Diwali and a prosperous new year. Joining me on today's call is Mr. Kapil Aggarwal, our CFO, along with the Investor Relations team. Our financial results, investor presentation, and press release have been shared with the stock exchanges and are now also available on our website. I hope all of you had an opportunity to review them. The second quarter and the first half of the financial year '27 have been a strong period for Ceigall India as we continue to deliver healthy growth in revenue and profitability while making significant progress across our diversified infrastructure portfolio. Our performance reflects sustained execution across our ongoing projects, improving operational efficiencies, and a continued focus on expanding into high potential infrastructure segments. During the quarter, we further strengthened our order book, which stood at approximately INR 22,681 crores as of September 30, 2026, providing strong revenue visibility over the coming years.
What's key here is that our order book is getting more and more diversified beyond roads and highways into other sectors. We're active in metros, renewable energy, transmission, distribution, and industrial infrastructure, and that positions us well to seize emerging opportunities throughout India's infrastructure landscape. A major development in the quarter was our move into the power transmission segment. REC Power Development and Consultancy Limited issued us a letter of intent for the Lakadia-Jam Khambhaliya-Jamnagar Transmission project in Gujarat, a project worth roughly INR 5,700 crores, GST included. The scope covers building a 765/400 kV substation and about 300 kilometers of transmission lines, with a construction period of 36 months, followed by an operational period of 35 years. This marks an important milestone in our diversification strategy and strengthens our presence in long-term infrastructure assets. Our core roads and highway business also saw healthy order inflow during the quarter: through our joint venture, we secured 5 packages for NH-913 Frontier Highway in Arunachal Pradesh, aggregating approximately INR 3,128 crores and spanning around 278 kilometers. These projects further strengthen our presence in Northeast India and reinforce our capability in executing large-scale infrastructure projects across challenging geographies. On the execution front, we received 3 HAMs, namely Varanasi-Ranchi-Kolkata Highway Packages 11 and 12 and the Indore-Ujjain Greenfield highway project, worth INR 4,050 crores.
This is a significant step forward, since those projects are now entering the execution stage and will feed into our construction pipeline across the next several quarters. We also kept making substantial headway in our renewable energy business. In the quarter, our fully owned subsidiary commissioned 10 megawatts of the solar subsidy -- solar capacity at the 147-megawatt solar power plant in Maharashtra ahead of schedule. That represents a promising start to our operating journey in renewable energy. Our focus stays on ramping up execution across our solar and battery energy storage projects. Another key priority continues to be our HAM asset monetization strategy. After the successful monetization of the first HAM asset, we are moving ahead with monetizing the remaining mature assets, among them the Bathinda-Dabwali and Jalbehra-Shahbad projects. In the contract quarter, we also secured provisional COD for the Jalbehra-Shahbad project. Our aim remains to recycle capital from completed assets into new projects, enhance capital efficiency, and support our future growth needs while keeping our financial discipline. And as we sell these projects, our debt is coming down as well. After the quarter ended, we also obtained the completion certificate for the Delhi-Saharanpur Highway project, which marks yet another important contractual milestone and reinforces our execution track record in complex road infrastructure.
As we look forward, we stay confident about the opportunities opening up throughout India's infrastructure sector, given a strong and diversified order book, a healthy execution pipeline and a growing presence in renewable energy and transmission — power transmission. Our focus will continue to be on speeding up project execution, keeping operational efficiency in place and chasing opportunities that generate sustainable long-term value for our stakeholders. Before I wrap up, I want to thank our clients, business partners, lenders, shareholders and, most importantly, our employees for their continued trust and support. With that, I'd like to hand the call over now to our Chief Financial Officer, Mr. Kapil Aggarwal, who will walk you through the financial performance for Q2 and H1 financial year '27 in greater detail. Thank you, guys. Thank you.
Thanks, Ramneek, and a warm welcome to everyone joining us today. It's a pleasure to walk you through how we performed financially and operationally in the second quarter and first half of the FY '27. I'll start with our stand-alone financial performance. Stand-alone revenue from operations for Q2 FY '25 came in at INR 974.5 crores, versus INR 787 crores in Q2 FY '26, which works out to a year-on-year growth of 23.8%. For half year '27, stand-alone revenue from operations was INR 1,876 crores, against INR 1,605.3 crores in H1 FY '26, a growth of 16.9%. Stand-alone EBITDA for Q2 FY '27 came to INR 130.5 crores, compared with INR 91.8 crores in Q2 FY '26, a growth of 42.3%. Stand-alone EBITDA margins improved to 13.4%, up from 11.7% in the corresponding quarter last year. For half year FY '27, stand-alone EBITDA was INR 251.6 crores, registering a year-on-year growth of 35.8%, with stand-alone EBITDA margin improving to 13.4% from 11.5% in half year FY '26. Our stand-alone profit after tax for Q2 FY '27 was INR 82 crores, compared to INR 55.9 crores in Q2 FY '26, a growth of 46.7%.
On a stand-alone basis, PAT margins rose to 8.4% from 7.1% in the same quarter a year earlier. Stand-alone PAT for half year FY '27 came in at INR 157.2 crores, a year-on-year increase of 40.6%, while the stand-alone PAT margin improved to 8.4% from 7% in half year FY '26. Now turning to consolidated financial performance. Let me move on to how we performed on a consolidated basis. Consolidated revenue from operations in Q2 FY '27 was INR 1,022.5 crores, versus INR 806.6 crores in Q2 FY '26, which works out to a year-on-year growth of 26.8%. In half year FY '27, consolidated revenue from operations reached INR 1,992.1 crores, against INR 1,644.7 crores in half year FY '26, a growth of 21.1%. Consolidated EBITDA in Q2 FY '27 came to INR 174 crores, compared with INR 113.6 crores in Q2 FY '26, a growth of 53.2%. Consolidated EBITDA margins rose to 17% from 14.1% in Q2 FY '26. In half year FY '27, consolidated EBITDA was INR 317.4 crores, a year-on-year growth of 42.5%, with consolidated EBITDA margins improving to 15.9% from 13.5% in half year FY '26. Consolidated profit after tax in Q2 FY '27 was INR 92.2 crores, against INR 56.2 crores in Q2 FY '26, a growth of 64.1%.
On a consolidated basis, our PAT margins came in at 9%, up from 7% during the same quarter a year earlier. For the first half of FY '27, consolidated PAT was roughly INR 156 crores, which works out to year-on-year growth of about 45%, and our consolidated PAT margin rose to 7.8% from 6.5% in H1 '26. Now turning to the order book and how we performed operationally. As of 30th September 2026, the order book was at INR 22,681 crores, which gives us solid visibility on execution over the years ahead. Within that order book we have 18 EPC projects, 10 HAM projects, 1 DBFOT project and 10 tariff-based projects -- and if you look at it by sector, roads and highways still make up the biggest portion, at roughly 55%, then transmission and distribution at 21%, renewable energy at 16%, metro projects at 4% and Indian infrastructure projects at 3%. That speaks to our ongoing push to diversify the business while keeping a strong footing in our core infrastructure segments. On the balance sheet, stand-alone debt was about INR 436 crores as of 30th September 2026, and consolidated debt was about INR 1,730 crores. The stand-alone debt-to-equity ratio held at 0.2x, and the consolidated debt-to-equity ratio was 0.8% -- looking ahead, we stay focused on executing projects on time, lifting our operational efficiencies and keeping financial discipline in place.
Our order book is diversified and our execution pipeline is healthy, so we're still well positioned to back our growth ambitions throughout the infrastructure segments. That's all from me — with that, I'd ask the moderator to open the floor for the question-and-answer session. Thank you, everyone.
<<operator_script>> Our first question is from Vaibhav Shah at JM Financial.
Turning to guidance. We had originally guided to roughly 15% growth, but the first half has seen really strong growth. Margins have also come in very strong at 13.4%. So we'd like to revise our guidance for revenue growth and margins?
Hi, Vaibhav. As usual, I figured your question would come first. So thanks a lot for asking it. Following the IPO, our guidance was that we'd land in the 10% to 15% range. Naturally, we did better than that. And here as well, this year we've told investors to expect a minimum of 15%. And naturally, we've exceeded that too. We've always preferred to stay somewhat conservative on this. And it's always nicer for the investor to be surprised. So the growth drivers are the renewable business and T&D, and that really is giving us a push. And if you look, we've already delivered 10 megawatts of renewable, and it's moving ahead very quickly. And if you look, we're also receiving the incentive in that business. So once again, guidance would be a minimum of 15%, and we'll aim to overachieve it.
Regarding EBITDA margins?
The guidance stays as it is. We'll aim to beat it.
Alright. Sir, second question, regarding those solar and BESS projects. So for the MP project, when do we begin — when do you expect execution to start? The PPA has actually been signed, right?
No, no. So MP, we have 2 projects. One is solar, which has already started, which is a KUSUM. For Morena, there are 3 things required. One is PPA, we have already given the land. It's there. The third thing is the transmission lines. So transmission lines, when it is completed and the department indicates that it's about to complete or you can start, we'll start the project.
So should we expect this project to get underway this year, or the next one?
This year looks challenging, I think, because they're still in the stage of finalizing the contractor for the transmission line. Once that's finalized, the contractor would carry it out, and then they hand it over to us.
Alright. Second, regarding monetization — what proceeds should we expect from the monetization of Bathinda-Dabwali and Jalbehra–Shahbad? And when do you anticipate that cash coming in?
Thus, the inflow ought to be roughly INR 250 crores, and debt of about INR 540 crores is going to be reduced. And — but Bathinda–Dabwali, we're aiming for that in this quarter, and Jalbehra–Shahbad in the next quarter. Our goal is to wrap up all of it prior to 31st March.
All right. Finally, sir, what amount of total equity would the whole asset portfolio need? And how are we planning to spend it in order to fund it?
Yes. So the total requirement is INR 2,632 crores; INR 669 crores has been infused up to now, and the balance stands at INR 962 crores, while INR 161 crores has already gone in this year, leaving INR 1,801 crores remaining. And this year we're aiming for another INR 700 crores. Then over the following 2 years, again roughly the same INR 700 crores, after which it would be about INR 400 crores. So on equity, we had INR 400 crores of cash surplus sitting on our balance sheet last year, and close to INR 450 crores is coming from Neo. There's also cash accrual, which you would have noticed in both quarters — INR 75 plus INR 82. And going forward as well, there is cash accrual. So there's no challenge of that kind. But under the SEBI guidelines, we need to bring it down from 82.06% to 75%. So we expect money coming in there too, and that will also go toward the company's growth.
So just to confirm that figure — INR 2,632 crores is what's needed in total. As of September, INR 639 crores has been infused. That leaves INR 1,962 crores pending — INR 1,962 crores — and are we expecting INR 700 crores of that to be spent during the second half of this year?
Right, right, right. At the beginning of the year it stood at INR 1,962 crores. Through the second quarter of this year, we've already put in INR 161 crores, and the remaining INR 707 crores for the current financial year will be invested across 2 quarters. Then for next year, the figure is INR 730 crores. And of course, for the third year, it comes to INR 397 crores.
So by FY '28, will all of that investment be complete?
Yes, yes, yes.
All right. And finally, sir, regarding the Lakadia project, what would its EPC value be? And when should we expect work on it to begin?
That INR 5,300 crores figure includes GST. And we're aiming to get it started ahead of 31st March. It's a bit aggressive, but that's what we're trying to do.
<<operator_script>> Our following question is from Madhav Das at Mehta Investments.—Since Mr. Das hasn’t responded, we’ll proceed to the next questioner. Our next question is from Yash Parkar at Patel Investments.
Sir, your order book has grown to roughly INR 22,680 crores, and that gives us a book-to-bill ratio of about 4.8x. How should we think about converting this order book into revenue over the coming 2 to 3 years? Also, could you go into more detail on the expected execution path across EPC, HAM and tariff-based projects?
That's a good question, Yash. To start, out of INR 22,681 crores, our order book from HAM comes to close to — roads make up 56%, T&D and solar account for 36%. Metro, industrial and other projects form the remaining mix. On the developer side, then, our order book stands at 73%. And the company is a minimum 15% growth. And of course, we've posted the better numbers — looking ahead, we have a solid order book for the next 4 years...
Alright. And sir, how do you see the infrastructure opportunity in India shaping up over the next 3 to 5 years, especially given the government's emphasis on highways, expressways, railways, renewables as well as power? So which segments do you think will experience the strongest tendering activity?
There's no turning back in this developing country. As you can see, we operate across 11 verticals and 16 states. What matters for Ceigall is that we must bid on projects at a 25% IRR. And if you look at the last 3 projects — Bathinda–Dabwali and Jalbehra–Shahbad — we guided our investors toward a 25% project IRR level, and we've delivered far more than we promised. So it makes no difference whether we win a highway project, a solar project, a hybrid project, a transmission project, or any other vertical. We have to make money — at minimum 25% IRR at the project level, or 30% to 40% EBITDA on EPC. So that is achievable. And given that we have so many verticals and so many states, securing an order book is not a challenge for Ceigall.
Yes. Sir, this is my final question. You recently got appointment dates for 3 HAM projects, and together those add up to more than INR 4,000 crores. Could you walk us through the first execution milestones on those projects — covering land availability, financial disclosure, equipment mobilization, and commencement?
The nice part with Ceigall is that ahead of those appointed dates, we get a reasonably solid window, so we mobilize early. Second, FCs — Ceigall has consistently demonstrated this historically. We've been supplying them ahead of schedule. And the encouraging news is that for every one of our highway projects, the financial closes have been completed and executed. Third, on VRK 11 and 12, each month we're receiving payments, running bill payments, and for Indore we expect it before Diwali as well. The projects have gained momentum, and we're genuinely looking forward to solid execution over the coming months, particularly March.
Sir, may I ask one more question? Sir, you've also moved into and grown within Arunachal Pradesh by way of several frontier highway packages, correct?
Yeah, yeah.
And what sorts of challenges exist? The Northeast has plenty of terrain difficulties and geographic conditions. So could you go into more detail on how execution is carried out, what logistics are required, and what the cost implications are versus projects in, for example, the northern plains?
That's a great question. We're already active in the Himalayan region. We completed Kiratpur-Nerchowk, which was leftover work from IL&FS. We finished it ahead of schedule. After that, we executed a tunnel on Ramban-Banihal — one of the hardest terrains out there. Many contractors attempted it and failed. Working alongside us was another well-known company in the country. They managed only 1,500, 1,600 meters. We completed 6.5 kilometers. In fact, the Amarnath Yatra took place this year via that route. We're building another pad adjacent to it, which is roughly 60% done. So our company has been operating in Himalayan terrain for over 10 years. Our USP is precisely this — working in Himalayan terrains. We've been executing projects ahead of time and finishing them ahead of time in Himalayan terrain as well. So expertise and the execution team — mobilization isn't a challenge. That's the USP of Ceigall.
Understood. Thank you. But even with profitability improving so strongly, consolidated operating cash flow was still negative in the first half. What are the main reasons behind that, and especially the working capital absorption? And when should we expect cash flow conversion to get better?
The main reason for this is essentially the HAM project. When you look at our consolidated cash flow, NHAI is paying us just 40% of what's due. Beyond that, this is only a half-year period. Once we report results for a full year, the picture will look different.
<<operator_script>> Our following question is from Madhav Das at Mehta Investments.
Sir, I have a few questions in the queue on that. First, our consolidated revenue grew 27% Y-o-Y. Could you help me understand which projects or segments were behind that growth? And how should we view the execution momentum for the second half of FY '27 on that front?
Could you say that question again, please?
Sure, so the question is about consolidated revenues being up 27% Y-o-Y. Could you help me understand which projects or segments drove that growth? And how should we think about execution momentum for the remainder of FY '27?
Right. Renewable is essentially the main driver this year. So in the renewable sector we've reached a turnover of nearly INR 143 crores, and last year that wasn't there at all. And moving ahead as well, we anticipate solid turnover from renewables and transmissions, which will contribute to the company's turnover.
And then on the second question — our EBITDA margins came in better this quarter. Could you walk me through the main drivers behind that improvement? And going forward, are those margins sustainable — the improved margins, can they hold up over the long run? If you could help me understand that.
As a result, our margins are healthy, and that has led to an improvement in EBITDA. In addition, we recently began our HAM projects VRK 11 and 12, which are profitable projects for us.
All right. And one more thing — could I ask the final question? Hello?
Madhav, we're picking up quite a bit of background noise on your line. Could you take a look at that, please?
With the strong order wins we had in the first half, what's the target for order inflow in FY '27? And how much more ordering activity do we expect during the half of FY '27?
We’ve given investors guidance of INR 6,000 crores. We’ve already gotten to roughly INR 5,400 crores. And we’ve already quoted tenders above INR 10,000 crores, and INR 6,000 crores is readily attainable — it will be attained. In the prior year we also guided INR 5,000 crores, and we received INR 11,500...
Everyone, that brings us to the final question for today. At this point I'll pass the conference to Mr. Ramneek Sehgal, who has some closing remarks. Thanks, and the floor is yours, sir.
Thanks to all of you for being with us today and for taking such an active part in the discussion. We truly value the ongoing interest you have shown and the confidence you have placed in Ceigall India. Looking ahead, our attention stays fixed on speeding up how we execute projects, deepening our footprint in emerging infrastructure segments, and keeping our financial discipline intact. With an order book that is both strong and diversified, we feel confident about our capacity to produce sustainable growth and build long-term value for our stakeholders. We trust we have managed to answer every question you raised. Should anything further come to mind, don't hesitate to contact our Investor Relations team at Adfactors PR. Many thanks again for your steady support. Wishing you a wonderful and joyful Diwali. Have a wonderful evening. Thank you very much. Have a good day.
Much appreciated. Everyone, that brings us to the end of today's call on behalf of Ceigall India Limited. We're grateful you could take part, and at this point you're welcome to hang up. Thanks again.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ceigall India Limited transcript - plus 131,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Ceigall India Limited earnings transcripts and 131,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.