Home / Transcripts / Ero Copper Corp. (ERO) · November 5, 2025

Ero Copper Corp. (ERO) Earnings Call Transcript

November 5, 2025

Toronto Stock Exchange CA Materials Metals and Mining earnings 48 min

Earnings Call Speaker Segments

Operator operator
#1

Appreciate everyone joining us. I'm the conference operator, and I'd like to welcome you to Ero Copper's Third Quarter 2025 Operating and Financial Results Conference Call. <<operator_script>> Please note that this call is being recorded. <<operator_script>> At this point, I'll hand things over to Farooq Hamed, VP, Investor Relations. Farooq, please go ahead.

Farooq Hamed executive
#2

Thanks, operator. Good morning, everyone, and welcome to the Ero Copper Third Quarter Earnings Call. We released our operating and financial results yesterday afternoon, and they're posted on our website together with our financial statements and MD&A covering the 3 and 9 months ended September 30, 2025. You can download the matching earnings presentation straight from the webcast, and it's in the Presentations section of our website as well. On the call with me today are Makko DeFilippo, President and Chief Executive Officer; Wayne Drier, Executive Vice President and Chief Financial Officer; Gelson Batista, Executive Vice President and Chief Operating Officer; and Courtney Lynn, Executive Vice President, External Affairs and Strategy. Before we get started, a reminder that today's discussion will contain forward-looking statements, which carry risks and uncertainties that could cause actual results to differ materially. For a detailed discussion of those risks and their potential impact on our business, please see our most recent annual information form, which is available on our website as well as on SEDAR and EDGAR. Unless otherwise noted, all figures discussed today are in U.S. dollars. With that, I'll hand the call over to Makko DeFilippo.

Makko DeFilippo executive
#3

Thank you, Farooq, and I appreciate everyone making time to be with us this morning. On behalf of the whole team on this side of today's conference call, these are exciting days here at Ero. In our previous quarterly update, and through conversations held with numerous stakeholders since, we have discussed the fundamental transformation taking place at Ero during this year. That work has kept producing sequential gains in how each quarter performs and has opened up new value drivers throughout our portfolio. You can see these efforts plainly in our Q3 results and in the Xavantina release we put out yesterday. I will address both during today's call, and we will make sure there is ample time for questions. Yesterday, ahead of the market opening, we announced the outcome of a dedicated behind-the-scenes push we began late last year aimed at creating value from inside our portfolio, particularly at the Xavantina operations. That push involved sampling, metallurgical testing, characterization and commercialization of stockpiled gold concentrates, which have been generated in small but high-grade quantities ever since processing operations started more than a decade ago. Those efforts have now resulted in the announcement of a maiden inferred resource of 24,000 tonnes at approximately 37 grams per tonne, containing 29,000 ounces of gold.

Makko DeFilippo executive
#4

That figure came from thorough sampling covering roughly 20% of the concentrate stockpile's volume. Late last month — just under 1 year after we set out the initial work plan for this initiative alongside our teams — we began shipping gold concentrate, and that gave us our first invoice this week, which Wayne will cover in greater detail. Going forward, we anticipate selling 10,000 to 15,000 tonnes of concentrate in Q4 2025, with an operating cost of about $300 to $500 per ounce of gold. With payability of roughly 90% to 95% after deductions and treatment charges, in practical terms this means we expect to meaningfully speed up deleveraging across our business — one of our core objectives for 2025. Sampling campaigns continue so we can better quantify the gold concentrate remaining in the stockpile, and we expect to sell the entire volume over the coming 12 to 18 months, which we anticipate will deliver a significant lift to gold sales and financial performance. Before I return to the quarter itself, let me address what is probably the first question many of you have. How did October go? And how does that stack up against underlying operational guidance ranges? A single month doesn't make a quarter, and there's a considerable stretch of time between now and December 31, but I'm pleased to report that every single operation in our portfolio posted not only 2025 calendar year monthly records for productivity and production, but all-time historic monthly records in October, surpassing some that were set many years ago.

Makko DeFilippo executive
#5

Beginning with Caraíba, we carried forward the strong momentum from Q3, and in October we hit all-time record ore volumes at each of the Pilar, Vermelhos and Surubim mines. Record highs at every one of our Caraíba operations underpinned an all-time monthly record for mill throughput of slightly more than 400,000 tonnes, which works out to an annualized run rate significantly above what we have installed. That outcome came thanks to a successful debottlenecking effort launched earlier this year and finished in Q3 at essentially 0 cost. Q4 at Caraíba has begun well, with more than 3,500 tonnes of copper generated in October, matching our strongest month of the year to date. Over at Tucumã, throughput volumes and grades improved sequentially after yet another quarter of close to 20% sequential growth in copper output, delivering a fresh monthly record in October of roughly 3,300 tonnes of copper produced. Finally, at Xavantina, we turned out a bit under 7,000 ounces of gold in October, with no contribution counted from our new concentrate sales operation. That result deserves particular attention given that our average quarterly output across the first half of the year was 7,000 ounces as well.

Makko DeFilippo executive
#6

The outcome you see is a product of the significant work we've done to get Xavantina mechanized successfully, which has made it safer and lifted productivity. Rodrigo Fidelis, his team, and everyone across the wider Xavantina operation have my genuine admiration for what they've done to deliver these results. Taking a broader view, we've devoted substantial time this year to altering how we operate, pushing back on the status quo, creating incentives for improvement and optimization throughout the organization, and keeping our attention on health and safety as the route to productivity and operational excellence. The improvement we saw across the group following a difficult first half of the year, the green shoots in July and August, the momentum carrying from August into September, and all-time records falling in September and October have been energizing, and we anticipate many additional production records being broken in the months and years ahead. I take deep pride in the work we're doing to deliver these results, in our global leadership team for their dedication, and I'm thankful to our operational leadership for achieving them while steadily bettering our consolidated safety performance. That was a lengthy detour away from our third quarter results, but I hope it has cleared up the question queue. Returning to the quarter itself, Q3 marked another record for Ero in consolidated copper production, driven by greater contributions from Tucumã, rising nearly 20% for a second quarter in a row.

Makko DeFilippo executive
#7

Turning to Q4, and as my October remarks showed, we keep strengthening our position and anticipate that the fourth quarter will deliver the highest output of any quarter this year across each of our three operations. At Caraíba, throughput at the plant set a quarterly record, helped by mining rates that rose sequentially at all three mines in the complex — momentum that has continued into Q4 so far. Grades fell in the quarter as anticipated, since we moved our center of mass to the upper levels of the Pilar mine and took in additional ore from the Surubim pit, a strategic change we discussed in detail last quarter. Looking ahead, we anticipate continuing to gain from elevated throughput, which stems from a debottlenecking push spanning multiple quarters aimed at lifting copper output. We anticipate that robust Q4 production will let us land at the low end of annual production guidance, and we anticipate cash costs easing from Q3 levels in Q4, which supports full year C1 cash costs in the lower half of our range. At Tucumã, third quarter output rose 19%, propelled by ongoing mill throughput ramp-up, which was up roughly 37% versus the prior quarter, partly offset by planned grade reductions.

Makko DeFilippo executive
#8

Turning to Q4, we anticipate further gains in throughput levels, and with better grades coming from the mine, that should deliver the year's strongest production. October has started off well, and we expect robust Q4 output to let us hit the low end of our annual production guidance. At Tucumã, we've revised our full year C1 cash cost guidance to account for maintenance and freight costs in Q3 that came in above expectations, and those will be partly offset by the underlying cost improvements we anticipate in Q4. At Xavantina, production rose roughly 17% quarter-on-quarter as the mine started to see the benefit of the mechanization investments we made in the first half of the year. We mined more than 50,000 tonnes of ore in Q3, a level not reached since 2022. Looking to Q4, as I mentioned in my October commentary, we expect higher mine tonnage, more tonnes processed and higher grade stopes to drive a substantial increase in gold production in Q4, which should let us reach the lower end of gold production guidance and meet the full year cost guidance ranges at Xavantina. At Furnas, a central piece of our growth strategy, physical work streams on site made good progress through the end of October.

Makko DeFilippo executive
#9

At this point, we've drilled roughly 50,000 meters, which fulfills the drilling commitments laid out in the agreement for the Phase 1 and Phase 2 programs. Phase 1 wrapped up earlier this year, and that drilling was done to back an updated mineral resource estimate along with a preliminary economic analysis. The technical work streams supporting the preliminary economic analysis are still underway, and we remain on schedule to finish that study in the first half of next year. Drilling carried out under Phase 2 of the agreement will be put to use in time to support work on a pre-feasibility study. As things stand, we don't expect to slow the drill program at Furnas, given how well these programs have gone and the early insights we have into potential project economics. Our goals for this year were to turn around and stabilize the operations, reach commercial production at Tucuma, delever the balance sheet, push long-term growth initiatives at Furnas forward aggressively, and in due course begin returning capital to shareholders. Transformative work doesn't move in a straight line, but watching the momentum we've built and the results coming through in an incredible September and October gives me confidence that we're on the right path. Every part of our business is contributing to these goals and to creating additional value for all of our stakeholders from what we believe is a truly remarkable asset portfolio.

Makko DeFilippo executive
#10

I remain just as grateful for the ongoing backing and confidence in what we're building at Ero. So that we have enough time for Q&A, I'll stop here and hand things over to Wayne, who'll walk you through our financial results in more detail.

Wayne Drier executive
#11

Thank you, Makko. The third-quarter numbers we posted showed copper concentrate sales at Tucuma up 24%, and that — along with stronger prices for both copper and gold in the period — pushed revenue to $177 million, which is $14 million more than what we saw in the second quarter. At the same time, operating costs came in higher, as we had anticipated, because of lower mined and processed grades at Caraíba and because of a shift in how we account for Tucuma after we declared commercial production there on July 1, 2025. Just to remind everyone, ramp-up costs are no longer being capitalized, and we started recognizing depletion, depreciation and amortization at that operation. So adjusted EBITDA came to $77.1 million for the third quarter, and adjusted net income attributable to owners of the company was $27.9 million, or $0.27 per share. At the close of the quarter, our liquidity position was $111 million, made up of $66.3 million in cash and cash equivalents plus $45 million of undrawn availability on our revolving credit facility. We're still deleveraging the balance sheet, and during the quarter we paid down $9 million on our copper prepayment facility. That, together with higher trailing 12-month EBITDA, brought our net debt leverage ratio down further — to 1.9x at the end of Q3, versus 2.1x in Q2 and 2.5x at the end of 2024.

Wayne Drier executive
#12

Looking ahead, we anticipate our strongest performance will come from all 3 of our operations during the fourth quarter, and with extra cash flow generated by gold concentrate sales at Xavantina, we expect deleveraging to speed up materially over the months ahead. Since Q4 began, we have already shipped 3,000 tonnes of gold concentrate with an invoiced value of roughly $10 million, which gives us early momentum toward that objective. Turning to our foreign exchange hedge program, the total notional position at quarter end stood at $290 million, made up of 0 cost collars carrying a weighted average floor of BRL 5.59 and a weighted average ceiling of BRL 6.59 per dollar. These run through December 2026. The real strengthened over the quarter and moved below our collar range, which produced a realized gain of $2 million on these hedges. I will now hand the call back to Makko for some closing remarks.

Makko DeFilippo executive
#13

Thanks, Wayne. Before we get to the Q&A, I'd like to briefly restate our dedication to carrying out the strategy at Ero that we laid out back in January of this year. We appreciate your ongoing backing of our company. We're eager to talk with you again in the new year. With that said, I'll hand the call back to the operator now so the lines can be opened for questions.

Operator operator
#14

<<operator_script>> Our initial question is from Fahad Tariq at Jefferies.

Fahad Tariq analyst
#15

Regarding Xavantina and the gold concentrate, it may be a bit soon to say for certain, but how should we think about the remaining 80% that hasn't been sampled yet? Is it fair to assume the concentrates are homogeneous and that this could come to roughly 144,000 ounces of contained gold?

Makko DeFilippo executive
#16

Absolutely. Thanks for asking. Anyone on this call can do the math — 29,000 ounces divided by 0.2. The opportunity has us genuinely excited and we see what it could mean for the company, though pinning down precisely how much volume will remain is premature at this point. The real answer is that we simply have to get out there and do the work. As we laid out in our prepared remarks and in yesterday's news release, we do expect that full volume to be sold across the coming 12 to 18 months, and that ought to deliver a very meaningful lift to our financial results. That said, when it comes to specifying densities and grades for the volumes not yet sampled, that is very hard to do.

Fahad Tariq analyst
#17

Alright. Maybe we can shift topics now and just talk about Brazil costs more broadly. One of your peers — perhaps more on the mining side, though leaning toward gold — has mentioned notable inflation in labor and contractor costs, specifically in Brazil. I'm just wondering whether you've noticed anything like that starting to show up.

Makko DeFilippo executive
#18

Yes. And that's a really good question too. Let's step back for a moment and review the past 8 years, since I believe the context matters here. What we observed, in effect from 2017 through last year, is that Brazil's inflation rate was exceeded by the currency's depreciation. So I'm not sure which commentary or which company that originated from. Still, it's reasonable to say that measured in U.S. dollars, inflation in Brazil remains elevated. We notice this in our labor agreements. We notice it in our contractor pricing. And during the last 2 years, we haven't gained as much from a weakening BRL as we did in earlier years, right, from 2017 to 2022. As Wayne described, one way we work to offset that is by placing cost of collars on the foreign exchange, which we've implemented for a portion of our spend next year with a floor that is higher than this year or at a weaker level than this year, to help counter some of the inflation we're experiencing. But once more, I think any time we discuss inflation cost in Brazil, it's important to layer in what's happening with the currency and our efforts to help offset that.

Makko DeFilippo executive
#19

There are several programs we’ve mentioned before—what we refer to as our full potential exercise. That effort brings together operations and procurement so that, as the business has expanded over the last 2 years through integrating Tucuma and, now, mechanizing Xavantina, we can keep pursuing longer-dated contracts throughout the group. And we have realized cost reductions at a—at a—I don’t want to describe it as a significant level, but at least sufficient to offset the inflation we are encountering in our business. So we will keep up that work. Again, it is essential to protecting our operating margins over the long term, and we’ll carry on with that effort going forward.

Operator operator
#20

Guilherme Rosito from Bank of America has our next question.

Guilherme Rosito analyst
#21

My first question concerns the value creation strategy at Xavantina. I'd just like to grasp the timing side of it — why was this announced at the present moment rather than earlier? Considering the cash OpEx tied to those concentrates, they appear highly accretive even with weaker gold prices. And naturally, that's even more the case now that prices sit near $4,000. So perhaps you could elaborate on the reasoning for acting now instead of sooner — was it simply a question of time plus having the ability to examine it? Also, do you see scope to apply the same approach at your remaining operations, particularly Caraíba, which has operated for a while and may hold something in the way of concentrate stockpile or perhaps waste on the dams? And lastly, a quick one on Tucumã. How do you view operating rates across the quarters of 2026? At what point do you now expect to hit nameplate capacity in throughput?

Makko DeFilippo executive
#22

Perfect. Thank you. We'll take those in order. Thanks very much. Now, regarding the opportunity to create value at Xavantina, it's important to emphasize that this effort did not really get underway only once gold reached $4,000 an ounce. We have been aware of it for several years. In a previous role of mine, I took part in an engineering study aimed at extracting value from this material. We carried out a fair amount of engineering work several years back, and results were mixed at that time. As you can likely imagine, we were rather occupied in recent years with the construction of Tucumã. So those efforts were left aside. With the leadership changes we made this year, at the site and across our technical team, a handful of important initiatives that we laid out late last year were pursued in earnest. This was among them. To be clear, the effort needed to unlock that value was not just a question of selling concentrate. It required considerable work in sampling, material characterization, and metallurgical testing, plus a major push from our commercial group to reach the point we got to only a few weeks ago.

Makko DeFilippo executive
#23

So what I’d say is this: as a value-creation initiative, it looked excellent at the outset, when gold was priced at $3,000 per ounce. At $4,000 per ounce it clearly looks fantastic, but the timing of that gold-price climb was circumstantial. As I mentioned, we launched this in earnest late last year. So I hope that addresses your first question. Regarding other opportunities to create value throughout our portfolio, I’d say we have quite a few chances to generate value from our operations. We’re examining a few things—one of them I’ll discuss shortly, which is at Tucuma. At Caraíba, well, we have to do the work. It’s difficult for me to tell you what further opportunities exist there. We have to do the work to establish whether residual value remains at that operation. Clearly, we devoted the first half of this year to health and safety, operational excellence, detailed planning, health and safety across that—across every one of our assets—and among the value initiatives we’re pursuing, we’re quite enthusiastic about some activities at Caraíba, though it’s too early to say whether that will be something comparable.

Makko DeFilippo executive
#24

I wouldn't anticipate the same degree of opportunity. Still, we are certainly pursuing several other high-value opportunities throughout the group. Regarding Tucuma 2026 and that last question you raised: we're observing a steady ramp-up in production rates and throughput levels at Tucuma. The progress from September and October has been genuinely encouraging. As I outlined, there's still plenty of work ahead of us before December 31 at midnight. It's fair to say the improvements we've achieved from January, February, March through to now are significant. However, we view those gains as hitting terminal velocity on throughput volume due to our filtration system. So at present we're looking at adding extra filtration capacity to help ease that bottleneck, or at minimum to accelerate the pace of improvement. That work is underway right now. At this stage, I wouldn't expect us to reach design capacity until the second half of next year, but we'll discuss it further in January when we release our guidance for the year. We have numerous initiatives in progress. In fact, a mobile filter press arrived on site last week.

Makko DeFilippo executive
#25

We're quite eager to bring that operating capability in to help us get past some of the remaining hurdles. One thing worth noting is that we aren't discussing big-dollar spending here, first of all. Second, I think the bright spot is that, across the rest of the asset, our crushing circuit, our grinding circuit, and our flotation circuit are all doing exceptionally well. So with Gelson here and the entire team, we're looking well past 4 million tonnes a year and at how we can get the most out of the installed asset we have as part of a debottlenecking exercise. That matters a great deal when you consider the longer-term production profile at Tucumã coming off later in the mine life. If we're able to raise throughput levels with a comparatively modest investment, that will clearly go a long way toward stabilizing production volumes over the long term. So stay tuned, more information on that to come. Hopefully, that answers your question on Tucumã.

Operator operator
#26

Emerson Vieira of Goldman Sachs has the next question.

Emerson Vieira analyst
#27

I've got two batches of questions. First, on gold concentrate sales: could you tell us the expected timeline for sampling the remaining 80% of the total stockpile volume? Second, on the gold side, I just want to check whether these concentrate sales fall under the same terms the company has with Royal Gold. What I mean by that is, should we assume 25% of those 24,000 ounces gets delivered at 40% of spot prices? Then moving to Tucumã: can you share what's been done so far, and what the next steps are for the ongoing improvement of the tailings filtration circuit? Also on Tucumã, looking at guidance and using 3Q recoveries and grades as a reference, the company's throughput — I mean, Tucumã's throughput should actually nearly double in 4Q so you can hit the 30,000 tonnes guidance. But I understand grade should improve and throughput has been ramping through the quarter. So could you share the throughput figure for September, or any latest update on throughput numbers, please?

Emerson Vieira analyst
#28

That is all.

Makko DeFilippo executive
#29

Hold on one moment — I'm jotting down your final question so I capture all of them. I believe we're — yes, thank you for asking, Emerson. So, to begin working through your first question about gold concentrate sales, and the timing for the remaining volumes on sampling: the practical reality is that we performed a substantial amount of work on the volume that was available for sampling. Before we resume sampling, that volume needs to be sold, and that is clearly what we are doing, as Wayne alluded to. Doing so as quickly as we can is our objective. The reality is that we have a planned resource and reserve schedule. At this point, we believe our concentrate volume sales will outpace the timing of our resource update. From a practical standpoint, what that means is that we will give clarity each quarter, in arrears, on the concentrate volumes sold next year. We'll discuss that further next year in our guidance regarding providing some additional directional levels on the quarterly cadence of concentrate sales. As Wayne said, and as I mentioned, the first sale took place this week. So before we discuss the cadence for next year, we'd like to have a few more weeks and months of sales under our belt.

Makko DeFilippo executive
#30

Keep watching for more on that front. That said, the way it works in practice is that we will ship and sell whatever volume we can, as fast as we safely can. As a result, going forward we'll give updates each quarter, reported after the fact. That said, we'll also share some extra forward-looking detail about guidance for next year in January. On the second question: are concentrate sales covered by the stream? Yes, they are. That term is fairly standard in every streaming agreement, so there's nothing out of the ordinary. However, the stream gold from concentrate sales, or the gold generated by concentrate sales, will fall under the streaming agreement. Our relationship with Royal Gold is excellent. Over the years they've been an amazing partner in Xavantina's growth and vision, starting from their very first investment. So we're very happy that these deliveries will help speed up the effective pay down to Stage 3, which is an effective 6% stream tail. For further detail on that, you can review the streaming agreements we've filed on SEDAR. But in effect, it will help accelerate the move to the next phase, which is a step down from the 25% gold deliveries.

Makko DeFilippo executive
#31

Now regarding Tucumã's filtration capacity—what the plan is, what work has already been completed, what remains in progress, and some clarity on the throughput level. As I said near the start, we are still observing this steady pace of gains. That pace is decelerating—as I noted, we're approaching terminal velocity in the rate of change—and that simply reflects the fact that, it appears, we'll need some extra filtration capacity. As I mentioned, several months back, we brought the mobile filter press onto the site. It's now being ramped up and is running, which ought to ease the need for a bit more capacity. Gelson and the team are carrying out further engineering work and examining other sources for incremental tailings capacity to help push past that rate of change and lift throughput volumes. As you noted, we're still looking forward following a solid October, and as I said, grades and recoveries are performing well. We anticipate that carrying into Q4, which helps us reach the low end of our guidance range at 30,000 tonnes of copper for the year. On the throughput level itself, as I said, we continue to see gains. We saw improvement in September and October.

Makko DeFilippo executive
#32

We anticipate November and December will be solid months too. During the previous conference call, I believe I referenced an exit rate of roughly 80% of our design throughput. We could fall slightly short of that figure, yet we've kept receiving high-grade feed from the mine, which should help sustain output levels in Q4. Gelson, I'm not sure whether you'd like to say anything regarding the particular work streams tied to filtration capacity.

Gelson Batista executive
#33

Alright, thank you, Makko, and thanks for asking. You brought up before that Tucuma keeps getting better step by step. I'd say this reflects what we've achieved across the whole year. A number of initiatives are underway around debottlenecking. We've brought in specialists, and they've been supporting us for a while now, along with optimization work at the plant — though it differs by area, mainly at the filtration plant, plus smaller items in the mill, the grinding system, and the thickener too. So that work continues, and we expect to see the results in 2026.

Operator operator
#34

Our following question is from Craig Hutchison at TD Cowen.

Craig Hutchison analyst
#35

Regarding Xavantina, it appears Q4 has gotten off to a solid start. Could you provide some guidance on what the mining rates look like, perhaps on a quarterly basis? And as you head into next year, what capacity do you now have with the mechanized equipment in place? Then, as a follow-up, how should we think about grades as you move into next year, given the updated reserves you have, which I believe sit at just under 7 grams a tonne.

Makko DeFilippo executive
#36

Yes. Thanks, Craig. Regarding Xavantina, several points deserve mention. Perhaps take a step back briefly before I get into specific rates. One goal of our strategy at Xavantina in this year, clearly, was to unlock value from gold concentrate sales. So that mark is checked, that item is off the list. The second involved genuinely pushing out the known boundaries of mineralization at the mine. And I believe our resource update reflected that quite well, particularly through the very substantial growth in measured indicated resources and inferred resources. The target we set was to uncover 1 million ounces. That was our aim. And looking at what we released yesterday, it seems fair to say we hit that goal of 1 million ounces. A few of the latest drill holes in the underground mine. We're reviewing a recent intercept this morning that came out a few weeks ago, 15 meters at 11 to 12 grams per tonne. So we are seeing a major boost in the potential for Xavantina, and that has us very excited. So once more, returning to the strategy for the year, mechanize the mine, make it safer, extend the limits of mineralization.

Makko DeFilippo executive
#37

Clearly, we've begun this effort now, and over the coming years we'll need to carry out further infill drilling so those resources can be confirmed—they aren't mineral reserves at this point. That said, the mechanization work has pleased us greatly, and so has what it delivers for Xavantina. We touched on mining rates during Q3. From an ore processing standpoint, you can plainly see a substantial rise, correct? Mining and processing reached 50,000 tonnes in Q3, which works out to a rate slightly above 15,000 tonnes. In October we managed to at least equal that, with considerably higher grades—simply a reflection of our position within the ore body—landing at roughly 17 grams per tonne for October. That's a very high grade. Variability in the deposit does still exist, but mechanization has let us lift the mining rate considerably, achieve it at reduced cost, and simultaneously boost productivity and safety.

Craig Hutchison analyst
#38

All right, 17 grams per tonne in October — fine. And then, of course, those grades likely aren't sustainable, but as we move into next year, I suppose we'll be watching for updates regarding those grades too.

Makko DeFilippo executive
#39

Yes. Well, Craig, I think that if you look back through history at what we've managed to accomplish, again, we do experience month-on-month volatility, which generally evens out when viewed on a quarterly basis. So we still anticipate high grades in Q4, particularly given the outstanding performance in October across some of the areas we have available to mine. Once again, we're accomplishing this at a lower cost today. We're doing it more safely. And I'm extremely proud of the Xavantina team for everything they've achieved this year.

Operator operator
#40

Our following question is from Anita Soni at CIBC World Markets.

Anita Soni analyst
#41

I just have a couple of additional questions following up on what Craig asked about Xavantina. So regarding the — I suppose what I wanted to see is a breakdown within the new reserve estimate: what portion comes from sublevel stoping, and what portion comes from your usual room and pillar, expressed as a percentage?

Makko DeFilippo executive
#42

Yes, thanks. Only a tiny amount of room and pillar mining is left. Relative to our total reserves, it will be immaterial. Our entire focus is on sublevel stoping. Some residual room and pillar does remain, yet sublevel stoping will make up the overall majority.

Anita Soni analyst
#43

All right. So turning to the cutoff — I mean, in that cutoff analysis on resources, which tends to be somewhat less conservative than what you'd apply on reserves — I believe you used a consolidated mining and processing figure of USD 107. Is that a — I mean, how should we think about mining costs and processing — well, processing costs, I suppose, will stay the same, but on the mining side, what sort of savings would we see relative to the mining costs you're delivering at present?

Makko DeFilippo executive
#44

Yes. Thanks. That's a good question. We've examined this closely. I would say we are at an early stage with mechanization. <<inaudible>> going back to it, the initial plan had been to finish mechanizing the mine by June of next year. It proved such a resounding success that we moved that timeline forward. Our final Jack Lake mining crew departed the site in September, so we are now 100% mechanized. I think giving a specific cost reduction figure is probably a bit premature since we are still optimizing. But what we have observed thus far — again, I wouldn't commit to this over the long term — is something in the order of a 30% to 35% reduction in mining costs in terms of BRL per tonne. Obviously, FX and a few other variables there are going to have an impact, but so far, roughly a 30% reduction in mining unit cost.

Anita Soni analyst
#45

All right, could you give me an idea of where processing costs stand at the moment?

Makko DeFilippo executive
#46

That figure isn’t available to me at the moment. We can definitely follow up once this call has ended—yes, after the call.

Anita Soni analyst
#47

Alright, and then just one final question here. It has to do with the Matinha vein. When I look at how the resource converted into reserve, the dilution is greater than the 23% figure that I believe you were applying in the estimate. Could somebody give us some detail on what took place with that particular vein? The other vein, the San Antonio vein, appears to be roughly consistent with the 23% dilution you mentioned. But this one declined from 11 grams per tonne in resources to 6.65. That works out to nearly half, or a 40% drop. So is there something specific there that I ought to be considering?

Makko DeFilippo executive
#48

Yes. Of course, that 23% figure is an average across the board. I think once you dig into the specifics — and we can take that up offline as well — that's probably the better approach. But if you consider the planned stopes we have with sublevel stoping, those are clearly bigger than room and pillar. As a result, that tends to raise planned dilution whenever you factor in any kind of variability in the ore body — its orientation, dip, any contours — you tend to bring in more planned dilution when larger stopes are being used. So again, that 23% represents the average across the ore body. So we can discuss the Matinha vein and some of the impacts there more specifically in the update offline. But hopefully that gives you a rough sense of what we're looking at.

Anita Soni analyst
#49

Yes. And then just one final question. Do you plan to file a 43-101 for this one? Or have you already done that? My apologies — I'm traveling at the moment.

Makko DeFilippo executive
#50

Sure, that's not a problem. Within 45 days of the news release that went out yesterday, we will — so you can expect it before year-end.

Operator operator
#51

Our following question is from Roald Ross at Clarksons Securities.

Roald Ross analyst
#52

Also, congratulations on the record output. I'd like to ask about this quarter's costs and, if you could, some commentary on whether the business is facing any cost pressures at the moment. So at Caraíba, there looks to be an 8% rise in mining costs along with a 28% rise in processing costs, while at Xavantina there appears to be a jump in sustaining CapEx — so is there a trend of rising costs, or any color you could add regarding that increase?

Makko DeFilippo executive
#53

No, there's nothing beyond what we laid out during the call. Of course, we significantly raised output at Caraíba, and that had an effect. Once you adjust for that volume, though, I believe it looks fairly similar quarter-over-quarter. Naturally, Q2 had a higher grade for us. So Q3 represented an increase. We anticipate that will decline in Q4, as I described on the call regarding Caraíba. At Xavantina, I think some capital timing differences exist. So I wouldn't interpret that as evidence of rising costs. I believe I addressed inflation in Brazil in one of the earlier questions. That affects every operation, I'd say not only in Brazil but worldwide, honestly, and we're putting in serious effort to ensure we counter those inflationary pressures through hedges on the BRL, allowing us to safeguard our operating margins as we head into next year.

Roald Ross analyst
#54

All right, great — second and final question as well. It looks like the company is at a stage right now where everything is basically focused on bringing Tucuma up to nameplate capacity. But once that's achieved later next year, how would you frame the company's vision and the next phase for the company? My expectation is that the furnace growth leg sits somewhat further out in the future. How would you characterize that next phase for Ero?

Makko DeFilippo executive
#55

No, that's precisely correct. I realize we aren't asked about it much these days. But looking across our portfolio, we still have quite a few value-generative projects underway or in process. Gelson and I were at Caraíba over the weekend, on site, reviewing how the shaft project is progressing — the one to reach a higher-grade zone in the Pilar mine, which we believe will transform productivity and, clearly, margins for that asset once it comes online in 2027. That's a major investment we've committed to. We've been working on it for several years. At present the shaft sits roughly 870 meters below surface. And today it takes around 5 minutes to descend to that level in the kibble, versus almost an hour driving down the ramp. So that will deliver a very significant improvement for our company later in 2027. Turning to Xavantina within that part of the portfolio: obviously a major value creation exercise, and we're incredibly proud of what we've managed there — not only in terms of unlocking value from gold concentrates, but also the mechanization of the mine. Looking at the planning, effort and execution of those investments and that project, it's been a big success this year.

Makko DeFilippo executive
#56

And once more, the work being done there makes me very proud. With that 1 million ounce target kept in view, we do see chances there to raise output down the road. Naturally, more studies are needed for that. Ventilation is part of it, along with drilling, development, and some infrastructure. So we are running studies that will support that in the future. But clearly, with 1 million-ounce potential and growing. Again, I mentioned a few of those deeper drill holes and the very strong mineralization we keep seeing at San Antonio. We definitely see a chance to grow that operation. That is something we are working on for the next year. And then you nailed it for us. It looks like a very compelling opportunity. Obviously, we are working hard right now on the preliminary economic analysis and the drilling, which we remain on track for the first half of next year. So if I take a big step back, I had the distinct privilege of being Ero Copper's first employee 9 years ago and of watching what has happened this year and seeing our teams firing on all cylinders here at the end of Q3 and early into Q4.

Makko DeFilippo executive
#57

This has been a remarkable year of change, and it’s been quite exciting to witness the outcomes we’ve managed to deliver. As I mentioned, there’s no certainty and no guaranteed plan. There is still a great deal of time remaining before December 31. Yet when I consider what lies past December 31 of this year, I feel tremendous enthusiasm about the groundwork we have completed and the direction we are moving in.

Operator operator
#58

<<operator_script>> With no further questions remaining, that brings the Q&A portion to an end. I'll now hand the conference back to Makko DeFilippo for closing comments, if any. Please go ahead.

Makko DeFilippo executive
#59

Yeah. Thanks, everyone. Appreciate you joining. Those of you heading back from the different site visits — safe travels. I'm looking forward to catching up in the days and weeks ahead and sharing where we see 2026 heading early in the new year. Thanks so much.

Operator operator
#60

That wraps up today's conference call. You're welcome to disconnect your lines now. Thanks for joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ero Copper Corp. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Ero Copper Corp. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.