Farooq Hamed executive
#1

Thanks, operator. Good morning, everyone, and welcome to the Ero Copper Fourth Quarter and Full Year 2025 Earnings Call. We released our operating and financial results yesterday afternoon, and they're available on our website together with our financial statements and MD&A for the 3 and 12 months ended December 31, 2025. You can download the earnings presentation that goes with this call directly from the webcast, and it's also in the Presentations section of our website. On the call with me today are Makko DeFilippo, President and Chief Executive Officer; Wayne Drier, Executive Vice President and Chief Financial Officer; Gelson Batista, Executive Vice President and Chief Operating Officer; and Courtney Lynn, Executive Vice President, External Affairs and Strategy. Before we start, I want to remind everyone that forward-looking statements will be part of today's discussion, and those involve risks and uncertainties that could cause actual results to differ materially. For a detailed discussion of these risks and the potential impact on our business, please refer to our most recent annual information form, which is available on our website as well as on SEDAR and EDGAR. Unless otherwise noted, all figures discussed today are in U.S. dollars. With that, I'll now hand the call over to Makko DeFilippo.

Makko Defilippo executive
#2

Much appreciated, Farooq, and good morning to everyone joining us. Because we already shared our 2025 output figures and 2026 outlook in early February, I'd like to take a step back and explain why we believe Ero sits in a strong position given current market conditions. As many of you probably noticed, last week we released our first preliminary economic analysis for the Furnas project. That represented an important achievement for the company and stood among our main objectives for this year. Across the past 18 months, our exploration and engineering efforts, together with extensive historical technical programs that Vale completed on this project from the early 2000s onward, have allowed us to design an integrated open pit and underground mine that we expect to yield a total of more than 1.2 million tonnes of copper, 2 million ounces of gold and 9 million ounces of silver across an initial 24-year mine life. That underscores the quality of Furnas and reinforces why it is a cornerstone asset in our long-term growth strategy. During the first 15 years of operation, Furnas should produce roughly 70,000 tonnes of copper, 111,000 ounces of gold and over 500,000 ounces of silver annually, at first quartile C1 cash costs of about $0.24 per pound of copper produced. Using long-term consensus metal prices, the PEA delivers an after-tax NPV of roughly $2 billion and an IRR of more than 27% on $1.3 billion of initial capital. Taken together, these metrics set Furnas apart from comparable projects on capital intensity while delivering strong economic outcomes across a wide range of commodity prices. Put another way, we see an exceptional project that is both financeable and buildable. Impressive though it is, the PEA represents merely our starting point, and our focus this year is on sustaining that momentum. During 2026, we plan to finish another 50,000 meters of exploration drilling, aimed at extensions of high-grade mineralization surrounding planned underground infrastructure. We'll likewise continue chasing the opportunities we've identified to make the economics even stronger — among them installing a magnetite recovery circuit for producing a high-grade magnetite concentrate, plus a gravity pre-concentration stage designed to boost gold recoveries. Each of these initiatives could lift byproduct revenue further, and the early results we're seeing look encouraging. Turning to what makes Ero distinctive: we've laid out a strong long-term growth plan at Furnas quite clearly, and we're excited to keep moving it toward a construction decision in the years ahead. Maybe the key point is that the money required to bring Furnas to that stage should remain fairly limited while we keep pushing forward technical studies, drilling and permitting work. Meanwhile, spending on capital across the operations we already have is expected to come down, since we are moving past a stretch of several years of heavy investment that covered building Tucuma and significant commitments at Caraiba. Those investments are either finished or, as with our new shaft project at Caraiba, have moved beyond the point of peak capital spending. So Ero is now coming out of a heavy investment phase with an outstanding long-term growth asset, a growing capacity to generate cash, consolidated capital needs that are falling, and three operating mines whose metal mix is right on target given where commodity prices sit in the cycle. Looking across the wider sector, plenty of companies, most of our peers among them, are about to launch big project builds over the coming year. We see that dynamic as a positive. Changing tack a little. I'd like to discuss what we achieved in 2025 and how we're looking at '26, and I want to start by recognizing how our teams showed resilience and dedication, pushing through a number of challenges to produce meaningful gains throughout the business as the year progressed. Those efforts gave us back-to-back quarters of improved operational performance and opened up a significant new value driver at Xavantina. Starting with Caraiba, the fourth quarter was the strongest operating quarter we had all year. Mill throughput reached nearly 1.2 million tonnes, which was 18% higher than Q3 and set an all-time record for that operation; that drove copper production up 15% quarter-over-quarter and helped us achieve C1 cash costs of $2.27 per pound. At Tucuma, copper output rose by more than 22% quarter-on-quarter, another record for the operation. Better process grades helped offset a lengthy stretch of unplanned downtime in December, caused by bringing Q1 maintenance forward for an early mill liner replacement. That early work was prompted by a wear part quality issue from an OEM that affected several operations in the region, ours included. C1 cash costs in Q4 came to $1.75 per pound, and I would point out that roughly $0.10 of that reflected expensing the unamortized portion of the liners. Moving to Xavantina. Output was 53% higher versus the prior quarter, thanks to improved grades and stronger throughput as gains from our effort to shift the mine toward mechanized operations began to materialize. In addition, our gold concentrate initiative contributed an extra 15,000 ounces of gold during Q4. As a result, combined gold from Xavantina — mine output plus concentrate shipments — reached almost 20,000 ounces in the quarter and surpassed 50,000 ounces across the full year. Beyond those numbers, what in my view makes 2025 among our strongest years ever is that our operational teams delivered these results while simultaneously recording one of our finest years for consolidated safety performance. When it comes to 2025, no other metric is more important to me, whatever else people might say about the year. As we look toward 2026, the guidance we've issued presumes that the operational improvements achieved in the fourth quarter will be largely carried through the entire year. We continue to pursue chances to lift performance even more throughout the business—most notably at Tucuma in the back half of this year—but none of that is baked into our guidance. At Tucuma, we've made considerable progress this year on adding more tailings filtration equipment, which will open up additional throughput capacity at the site. That equipment is under construction right now, and if all goes according to plan, we'd expect the benefit to show up at the operation in the fourth quarter. As I said, neither the potential upside here nor the related capital spend has been included in our 2026 guidance. That was intentional, for three reasons. First, setting guidance at steady state mattered to us this year. Second, plenty of time separates us from the fourth quarter. And maybe most importantly, given where metal prices sit today, we anticipate payback on this investment within 1 to 2 quarters. So although it's a highly important objective and we expect to finish it this year, it won't alter our strategy or our capital allocation choices for 2026. At Xavantina, we're putting money into our ventilation circuit, mine development and equipment so as to lift mine capacity and output. That's an easy long-term value driver built into our business when we consider the milling capacity available there. Last but not least, at Caraiba, we're moving ahead with the new shaft project for the Pilar mine and pursuing a number of operational improvement initiatives that we hope to talk about later this year. Briefly on cadence for 2026, our consolidated copper production guidance sits at between 67,500 to 77,500 tonnes. That mirrors year-over-year growth driven mainly by higher sustained plant throughput at Caraiba and Tucuma, partly offset by lower planned grades. Copper production should be weighted toward the second half of the year owing to mine sequencing and a modest rise in throughput across the year. Looking at Xavantina for 2026, our guidance is for mine production between 40,000 and 50,000 ounces, and we anticipate Q1 will be the weakest quarter of the year for output. That pattern reflects our mine sequencing and also ties in with a significant ventilation upgrade scheduled during the quarter, which includes finishing the new <<inaudible>> surface. Consequently, output ought to lean toward the back half of the year. Sales of gold concentrate should continue through the year, although we anticipate they'll be fairly modest in Q1 because of the rainy season. To add a bit of context there, you'd be hard pressed to find a simpler operation within our portfolio. The process involves only three stages: first, material is removed from the stockpile; next, it's laid out under the sun to dry; and finally, it gets moved for shipment. As you might expect, that middle stage becomes far less efficient when the rainy season arrives. I'll now turn the call over to Wayne, who'll walk you through the details of our financial results.

Wayne Drier executive
#3

Thanks, Makko. Record copper concentrate sales powered our fourth quarter financial results, along with a 59% jump in gold dore sales, the start of gold concentrate sales, and stronger copper and gold prices during the period. Together these factors pushed quarterly revenue to a record $320 million, which is $143 million above the third quarter. Consolidated C1 copper cash cost per pound came in roughly 1.5% higher quarter-on-quarter, with most of that increase stemming from Tucuma, where we saw higher transportation, demurrage and port costs during the quarter tied to the COP30 activities in Para State. That added about $0.10 per pound to our Tucuma C1 costs, which were also affected by the accelerated amortization of the mill liner that Makko mentioned earlier. Gold C1 cash cost per ounce fell by approximately 29% versus the third quarter. As a result, the company posted stronger operating margins, with adjusted EBITDA rising to $186.7 million in the fourth quarter and $409.7 million for the full year. Adjusted net income attributable to owners of the company came to $108.4 million for the quarter and $220.4 million for the year, or $1.04 and $2.12 per share, respectively. Our liquidity position at quarter end was $150.4 million, including $105.4 million in cash and cash equivalents and $45 million of undrawn availability under our revolving credit facility. We keep deleveraging our balance sheet, with net debt falling to approximately $502 million at year-end from $545 million at the close of the third quarter. Combined with significantly higher 12-month trailing EBITDA, this produced a material improvement in our net debt leverage ratio, which dropped to 1.2x at the end of Q4 from 1.9x in Q3 and 2.6x at the end of 2024. With copper and gold production expected to grow in 2026, plus the additional cash flow from Xavantina's gold concentrate sales, we intend debt reduction and return to shareholders to be key elements of our midterm capital allocation strategy. At December 31, we had $155 million drawn on our revolver, which we intend to pay down fully in 2026; we would like to keep a strong cash position on the balance sheet and target a net debt-to-EBITDA ratio below 1x ahead of commencing a return of capital program. I'll now pass the call back to Makko for some closing remarks.

Makko Defilippo executive
#4

Thanks, Wayne. Before we begin the Q&A, I'd like to restate the 3 core elements of Ero's value proposition. First, throughout the last decade, Ero has repeatedly unlocked value that had not been fully appreciated, frequently via work backed by solid partners. Clear illustrations are our gold concentrate program and our wider partnership with Royal Gold at Xavantina, plus, more recently, progress on the Furnas project alongside our partner, Valley Base Metals. Second, we have followed a disciplined, countercyclical method for allocating capital, putting money into building projects at times when development activity throughout the sector was constrained; that approach has placed Ero in a favorable position compared with our peer group, which is now getting ready to enter major capital investment phases. Third, Furnas is a high-quality, long-life asset being advanced with a top-tier partner, and we see it as a compelling cornerstone for Ero's long-term growth. With that, I'll hand the call back to the operator to open the line for questions.

Orest Wowkodaw analyst
#5

I have a question about the gold concentrate stockpiles at Xavantina. No guidance has been issued by you on what those volumes might be this year. But given the 15,000 ounces you sold in the fourth quarter, would that serve as a decent guide for shipments in periods or quarters when there's no rainy season?

Makko Defilippo executive
#6

Yes. Thanks for the question, Orest. Clearly, this is a somewhat tricky situation. Clearly, we released an initial resource based on the 20% of the volume that we could sample. So as you can imagine, giving exact guidance is difficult for us; but strong volumes and shipments are certainly what we expect. What we achieved in Q4 is what I would point to; that happened at the tail end of the rainy season. So if you — just for context, the rainy season in Mato Grosso typically begins in November and runs through March, April, depending on the year. And so some of those sales did take place once the rainy season had started. Clearly, several initiatives on site are being advanced by us to increase volumes from there. And as I said at the outset of the call, Q1 is the heart of the rainy season. This year has been exceptionally rainy in Brazil, as you probably know, from some of the news flow and the flooding that's occurred throughout the country. And therefore, very, very modest sales are expected by us in Q1 and then a pretty aggressive ramp up in Q2, Q3.

Orest Wowkodaw analyst
#7

As far as the stockpile is concerned, is there anything you've come across that might indicate the grade across the remaining 80% of it would differ materially from what you've sampled?

Makko Defilippo executive
#8

Hard to answer that, Orest, but nothing so far — clearly we lack samples from there as we move forward, yet up to now, nothing points the other way.

Emerson Vieira analyst
#9

I'd like to get a bit more clarity on the Tucuma Q3 press issue. Could you give us an update on that? Have you already placed the order for the mobile filter that's meant to boost future availability? Any timing update would be really helpful. Also, how long should the maintenance take in the first quarter so you can move ahead with replacing the new aligners? And a third Tucuma question: could you walk us through the production guidance for 2026? What do you expect in terms of grades and the throughput ramp-up across the year? Those are my questions.

Makko Defilippo executive
#10

Thank you. There's quite a lot to unpack there. If I miss something, I apologize — just ask it again — but thanks for the questions. First, on the filter press capacity, yes, that equipment has been ordered and it's being manufactured. As I mentioned in the prepared remarks, that's a very important objective for us. But given what we've outlined, it isn't included in our guidance, and first and foremost, we expect the payback on that investment to be very fast in this environment. We expect it to be operational in Q4, since both the size of the investment and the current prevailing copper price mean that this investment and the completion of that project have very little influence on how we think about our business for 2026. As I said, it wasn't included in our guidance, so that's first and foremost on that point. The second part of your question related to the maintenance that happened on the mill lining. To be clear, we expected that maintenance to occur in Q1. We had to pull it into Q4, so it's effectively already been completed for the year. That was roughly a 10-day period of downtime that occurred in Q4 and affected our Q4 results.

Emerson Vieira analyst
#11

Okay, then no further maintenance downtown... regarding...

Makko Defilippo executive
#12

Each month we do have planned downtime. That remains something our team handles, but during Q1 of this year we aren't scheduling any prolonged downtime window.

Emerson Vieira analyst
#13

Okay. And then one final item about the reconciliation on grade and throughput versus the guidance, if you would?

Makko Defilippo executive
#14

Yeah. Good question. Thanks. So obviously when we came out — we had a strong result last year where grade is concerned, and we do expect grades to decline. Right now we're looking at — across our guidance, just under 3 million tonnes of processed throughput; and I'd say roughly 1.3% to 1.4% copper for the full year.

Guilherme Rosito analyst
#15

Two points from me. First, regarding Tucuma, I'd like to go a bit deeper on the C1 cash cost guidance. I'm simply trying to grasp how we'd account for the cost rise as the year unfolds compared with where we stood in 4Q. I realize grade is lower and feed isn't in there. So including feed, guidance could shift; but I'm just attempting to understand, because you get more fixed cost dilution as processing goes up, and the CRCs are also higher than what you're presently running at Caraiba. So I'm just trying to grasp all these moving pieces and what's driving costs higher this year? And then, regarding Xavantina, I was hoping you might discuss what advantages came from the mechanization investments made last year. What's the expected way that appears in this year's results? And what are your expectations around grades across the year? How ought that to vary, and what level of volatility should we anticipate throughout the year? That's all.

Makko Defilippo executive
#16

Thanks for the questions. So yes, beginning with Tucuma, a really, really good question there. The main drivers for guidance, as you mentioned, is grade. Coming off a year with much higher grades, that clearly affects our Q1 — our C1 costs — and we're also doing extra maintenance work to keep operations stable. I'd describe those added costs as nonstructural. On TC/RC and shipment, we've received some questions about the differences between Caraiba and Tucuma. Two main factors drive that. First, the concentrate grade is lower, so costs per pound of copper are higher. Second, we have to move that material a considerably longer distance. Putting those two together, we do see higher TC/RCs. Right now, the TC/RC market across our business looks better than what we had budgeted for. That said, most of those are longer-term contracts already in place, so we aren't capturing the full advantage of benchmark pricing. And then, more fundamentally, as you probably understand better than most, we're facing a very strong BRL headwind throughout our business. That applies to all of our operations, and it's reflected in our guidance. So I'd say the big moving factors on Tucuma cost drivers would be the grade we're mining and the extra maintenance costs we're incurring. To repeat, we do anticipate a Q4 gain from those expenses — the TC/RCs and shipment-related costs, partly since the concentrate grade is below Caraiba's. On your second question about mechanization's advantages, that really comes down to two items. As I've said on a number of calls this year, a major plus of that investment is reducing the share of our workforce put at risk, and that ranked among the primary motivations for undertaking it — namely, getting our people as distant from the work phase as possible. That's point one. Moving on to the second point, and I’m hoping we’ll have an opportunity before this year is out to demonstrate what our people have accomplished at Xavantina—that facility operates for just 15 to 20 days per month, a situation that arises because the asset is constrained on the mining side. So looking forward, and despite the production cadence we just discussed for this year, with the ventilation circuit improvements being tied in, we anticipate being able over time to align mine output more closely with mill capacity—again, that isn't reflected in our long-term guidance, but it's among the key easy value drivers we see in our business; and Gelson and the team are working hard on it, and we hope to be able to discuss what that could look like later in the year.

Fahad Tariq analyst
#17

Someone earlier on this call brought up the idea of potential capital return once net debt to EBITDA reaches the targeted levels below 1x. Could you give a bit more detail on that — what form it might take, the timing, and so on?

Makko Defilippo executive
#18

Sure, I'll take that, and Wayne can chime in if I've missed anything or if he has something to add. I'd say there are really 3 steps that we view as critically important in driving that decision and its timing. First and foremost, as Wayne said, we want our net debt leverage ratio under 1x. As you can see from our Q4 results, given where we moved from Q3 to Q4, we're approaching that metric quickly. Obviously, the world is a volatile place, so we'll see what happens over the next few quarters, but right now at 1.2x we're pretty close to that metric. Secondly, as we mentioned, we want to pay down our revolver; at year-end we had $155 million drawn, and that's simply a logical place to pay down our debt. And again, we're cognizant that paying down debt, including our revolver, is a de facto return to shareholders. So that's an important component of the strategy. And number three, we're having a lot of discussions with our top shareholders about what that might look like and the timing. I'd say stay tuned. Let's get through steps 1 and 2 before we get too excited about step 3.

Fahad Tariq analyst
#19

That seems fine. So perhaps regarding Furnas — the notion that you're heading into a stretch where a number of your peers are entering a build cycle, and Furnas, I suppose, has a considerably longer timeline. Is there any chance — or any desire — to attempt speeding that up? Or is that even feasible considering where things stand at present, the conditions of the earning agreement, and what still has to get done?

Makko Defilippo executive
#20

Yeah. Furnas has us quite enthusiastic, as you likely gathered from our prepared remarks and noticed in our webcast materials. The fact is it remains a few years away; that positioning suits us. There's work required to push through a prefeasibility study, to deliver on certain value drivers we view as easy wins for boosting the project's value and lifting byproduct revenue. Beyond that, we still have to move forward on several permitting work streams. In truth, I believe we do have the appetite to push that project forward as quickly as we can. I'd say we're already doing exactly that. And because of that acceleration, we continue to anticipate modest capital spend across the next few years.

Stefan Ioannou analyst
#21

I'm just a bit curious, going back to the gold concentrate sales. I believe at first it was hinted that you might — we were expecting to sell off the whole stockpile across, let's say, 12 to 18 months. Now that we understand the rainy season and all of that better, should we think of that number as likely to be stretched out over a somewhat longer period?

Makko Defilippo executive
#22

Yes. Well, let's look at it — that 12 to 18 months is what we discussed later on in November. If you consider what we laid out in the guidance that came out this year, we said through mid-2027, and those time lines are roughly a month either way, pretty well in line as far as we're concerned.

Stefan Ioannou analyst
#23

Alright. Alright. So we're still looking at roughly mid-20 27. Alright. And perhaps shifting topics a bit, just regarding the — you brought up exploration spending between $30 million and $40 million. Is that mostly concentrated at Furnas, or are there other noteworthy projects we ought to keep in mind from an exploration standpoint during this year?

Makko Defilippo executive
#24

That's a really good question. Yes, the bulk of that amount sits at Furnas. I'd say we're continuing to move several opportunities forward across the portfolio, at Tucuma and at Tucuma, Xavantina, and Caraiba, each at differing stages of development. Once more, I believe the best guidance I can offer right now is that we're enthusiastic about what we're doing there. We anticipate providing an update at our Investor Day later in the year.

Craig Hutchison analyst
#25

I just wanted to ask whether those heavy rains could affect concentrate shipments from Tucuma, or the timing of those shipments as well? Or does it only impact Xavantina?

Makko Defilippo executive
#26

Yes, that's a great question. Across our operations, we plan for a normal level of operational disruption in our cadence. What we've observed so far at our other operations, I would say, matches what we expected and what we built into both our budget and our guidance for the year. So in terms of operational disruption, nothing out of the ordinary has shown up. All of our operations face operational disruption because of the rating season. Our guidance and the way we think about cadence for the full year already reflect that.

Craig Hutchison analyst
#27

All right, that's great. Then regarding TC/RCs and your C1 cash costs, could you share what you're assuming for TCRs this year?

Makko Defilippo executive
#28

Those rest on long-term contracts that are commercially sensitive, though I'd note that what we've seen in the market sits well below zero; we aren't factoring that in at either one of our operations. And like I said, these are long-term agreements that are commercially sensitive. They remain quite low compared with history. As I mentioned, when I consider the major headwinds and tailwinds facing our business, at Caraiba we enjoy a significant tailwind from byproduct gold prices. That was likely fairly evident. And if you examine how that byproduct line item has performed across the last several years, we are encountering headwinds on seaborne shipping freight because of what's going on in the world today. And then there's also the BRL, which has been a major — I believe last year, the BRL ranked among the top — it was one of the best performing currencies versus the U.S. dollar. So that represents something of a headwind. So there are definitely some gives and takes. We feel quite pleased with where our guidance stands at this point in time, considering some of the gives and takes we're seeing there. But of course, we'll keep everyone updated should we see things shift significantly in either direction.

Anita Soni analyst
#29

I'd like to dig a bit deeper into Furnas, if I could. What I'm curious about is how the exploration drilling you've completed ties into the PEA. Could you walk us through how much of that drilling ended up in this PEA? And is there still some drilling that was outlined but didn't make it in?

Makko Defilippo executive
#30

Yes. Great. Thanks for raising that question. You're exactly right. On the PEA, we began drilling late in 2024. Of the 50,000 meters we drilled last year, 28,000 meters of drilling is captured in the PEA, and we anticipate finishing another 50,000 meters during this year. So if you're after — there are multiple stages under the earn-in agreement, and we'll have effectively — by the end of 2026, we expect to have completed every phase of drilling, all the drilling requirements. And as I said, just 28,000 meters of drilling is covered by that PEA. With the drill program we finished in the second half of last year and the first part of this year, our objectives are twofold. First, as we move toward pre-feasibility study, we need to convert the inferred mineralization contained in the PEA into measured and indicated resources so it can go into the mine plan. And second, we — as the production profile shows, years 16 through '24 really see a drop-off, and that relates to — really to how much drilling we've been able to complete. So as part of our drill program we've targeted some key step-outs around some of the planned underground infrastructure that, if successful, should improve the production profile later in the mine life. Obviously, we still need to do the drilling and the mine planning to support what I just said there; so — but we're looking forward to advancing that work stream and getting it included into the pre-feasibility study.

Anita Soni analyst
#31

Yeah, that was the second question. I just want to dig a bit more into the inferred category. How — what sort of drill density do you currently have? And what do you need to reach for the M&I?

Makko Defilippo executive
#32

Well, I don't have that right at the top of my head. We can come back to that one. What I can say is that roughly 60% of the material we have, including the PEA, is inferred. I'll follow up with you right after this call regarding drill spacing. Obviously, that will be laid out in the technical report that will be filed shortly. I just don't have that information right at my fingertips.

Anita Soni analyst
#33

That's okay. Should you proceed with filing the technical report—that was actually my third question, when will you file it—since I'd like to dig into the details on that. And after that I'd also want to look into some of the dilution matters too, because I saw that your M&I and inferred contains no dilution whatsoever <<inaudible>>. But that's all from me on my question.

Makko Defilippo executive
#34

Yes. Just to make that clear, it's a key point regarding dilution. You're right. Dilution isn't included in the resource statement. The mine plan has been fully diluted, and you'll see that reflected in the assumptions laid out in the technical report.

Dalton Baretto analyst
#35

I'd like to pick up on the Furnas drilling, though from another angle. Makko, you mentioned all the drilling completed last year that wasn't part of much of this year's program. As I understood it, the high-grade cores of the deposit reach further down, perhaps deeper than Vale had expected. So I'm trying to get a sense of how much of your drilling is pursuing that higher-grade material, and whether we might see some kind of grade bump in the next resource update.

Makko Defilippo executive
#36

Those are good questions. Look, the way I'd frame it is that the project as it stands today stands on its own 2 feet, right? We're pursuing some additional value drivers to smooth out the production profile and further enhance the economics. But as the numbers show, it absolutely stands on its own 2 feet; we — if you look at the final hole we drilled as part of the PEA, I'll quote a few figures here, so take this with a bit of grain salt, but it came in at roughly 150 meters at 0.8% copper and 0.5 gram gold, more or less; and that was the last hole drilled that made it into the PEA from that 28,000-meter program. That intercept was located 600 meters beneath the surface, and we can plainly see a chance to expand the deposit—at depth as well as laterally along strike—and we anticipate incorporating those into upcoming studies. As I mentioned, we will be moving those drill programs forward. Regarding the grade improvement, look, we still have to finish the infill drilling that will feed the pre-feasibility study. So multiple phases of technical work remain ahead. The effort that not only our team put in but also the very, very robust technical work Vale has carried out over the years to establish an incredible foundation that we could build upon, I believe, truly reflects the quality of the project. Our technical group is in constant contact with us. The relationship is strong, and together we're pushing this ahead to deliver the greatest possible value; and considering everything we've achieved as a team to move not just output significantly below ground, but the mine also requires roughly 30% of the tailings it expects to produce to return underground as paste backfill, we've truly collaborated to shrink the environmental footprint and, we hope, positioned ourselves for a superb fast-tracked project.

Dalton Baretto analyst
#37

Makko. And could you also remind me whether there's some kind of mechanism in the agreement you have with Vale that provides you the option to purchase the portion you presently won't earn into?

Makko Defilippo executive
#38

No; we're quite pleased to be pursuing this project together with Vale Base Metals.

Makko Defilippo executive
#39

Yes. Thanks to all of you for being with us today. Of course, we're always around to answer any follow-up questions. I appreciate the robust discussion on the Q&A side as usual. I think one last bit of housekeeping here shortly on our website, for those of you who are interested, we will be hosting a Capital Markets Day in mid-September; that will be physically in person in Sao Paulo and obviously, virtually; and as I said, that information will be on our website shortly. Thank you all very much. Have a great weekend. Thank you. Bye-bye.

Operator operator
#40

That wraps up today's conference call. You can disconnect your lines now. Thanks for joining us, and have a pleasant day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ero Copper Corp. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Ero Copper Corp. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.