Home / Transcripts / Hecla Mining Company (HL) · May 6, 2026

Hecla Mining Company (HL) Earnings Call Transcript & Summary

May 6, 2026

New York Stock Exchange US Materials Metals and Mining earnings 50 min

What were the key takeaways from Hecla Mining Company's May 6, 2026 earnings call?

In Q1 2026, Hecla Mining Company (HL:US) reported robust financial results, with revenue exceeding $410 million, representing a 13% increase quarter-over-quarter and doubling year-over-year. The company achieved record adjusted EBITDA of $265 million and consolidated free cash flow of $144 million, highlighting strong operational performance. Management reiterated production guidance of 15.1 to 16.5 million ounces of silver for 2026, signaling confidence in ongoing projects and a debt-free balance sheet, which positions Hecla favorably for future growth and potential shareholder returns.

What topics did Hecla Mining Company cover?

What were Hecla Mining Company's May 6, 2026 results?

Hecla Mining's strong Q1 2026 results and debt-free status enhance its investment thesis, positioning the company for growth in a favorable silver market. Key catalysts include ongoing exploration projects and operational efficiencies, while risks remain around permitting timelines and market volatility.

Earnings Call Speaker Segments

Mike Parkin executive
#1

Thanks, Hillary. Good morning, everyone, and I appreciate you being on the line for Hecla's conference call covering our results for the first quarter of 2026. My name is Mike Parkin, and I serve as Vice President of Strategy and Investor Relations. You can find both the earnings release we put out yesterday and the presentation for today on our website. Joining me on this call are Rob Krcmarov, our President and Chief Executive Officer; Russell Lawlar, Senior Vice President and Chief Financial Officer; Carlos Aguiar, Senior Vice President and Chief Operations Officer; Brian Erickson, Vice President of Operations; Kurt Allen, Vice President, Exploration; Matt Blattman, Vice President, Technical Services; plus additional members of our management team. Once our prepared remarks wrap up, we'll take your questions as well. Moving to Slide 2, cautionary statements. Any forward-looking statements the management team makes today fall under the Private Securities Litigation Reform Act and carry risks, which are laid out on Slide 2, in our earnings release, and in our 10-Q filing with the SEC. Those risks, along with others, might cause actual results to diverge from what the forward-looking statements anticipate. You'll find reconciliations for non-GAAP measures mentioned on this call and in the related slides in both the slides and the news release. We also released our 2025 sustainability report earlier this week, and it's up on our website. One thing to keep in mind: whenever we talk about financial figures and projections during this presentation and in the earnings release, we mean our continuing operations, unless we say otherwise. That's because of the Casa Berardi operation sale, which closed at the end of March. I'll hand the call to Rob now.

Rob Krcmarov executive
#2

Thanks, Mike, and hello everybody. Prior to discussing the quarter, I'd like to briefly recognize the position our company is in at this moment, since I believe that background is important. When I came to Hecla 18 months back, the business had roughly $550 million in net debt. As of now, we have zero long-term debt — not any. That turnaround, and what it makes possible for shareholders, is truly the subject of this call; so let's move to Slide 3. Hecla heads into Q2 of 2026 occupying the strongest financial and strategic footing in the company's recent past. As the premium silver producer in North America, we possess 6 core characteristics that genuinely set us apart from our peers: a silver legacy dating back to 1891, operations solely within the United States and Canada, peer-leading silver exposure across both revenue and reserves, a reserve life approximately twice that of our peer group, plus a deep and advancing project pipeline, and additionally a cost structure that places us as the lowest cost producer among our peers. All of these reinforce our premium valuation and establish us as a premier destination for silver investors. Now to Slide 4. The Casa Berardi sale in March was an intentional, well-timed choice. We captured the cash flows up to that point, locked in substantial value, including a 9.9% equity stake in Orezone plus the deferred cash consideration. And we demonstrated our ability to do what we ought to be doing, steering our capital and management's focus toward our silver growth platform. Then on April 9, roughly 4 weeks back, we redeemed our final $263 million of senior notes; so Hecla is now free of long-term debt for the first time in many, many years. We hold a fully undrawn $225 million revolving credit facility along with a cash balance that's growing on strong operating performance in the silver market. What thrills me is what lies ahead throughout the portfolio, from the Greens Creek Highrite concentrate circuit and tailings reprocessing project to the Midas Restart opportunity in Nevada. We have a collection of organic value creation opportunities that are compelling due to what they share in common. Each is screened to have lower capital intensity than conventional mine development, although that assessment remains subject to ongoing evaluation, particularly for the early-stage project. That means the potential for robust returns on invested capital and real per share value creation. We believe in this value, and we're working hard to unlock it. Past these near- to medium-term opportunities, I am very excited about our 2026 exploration program, representing a near doubling of exploration investment from 2025, which could be the thing that reshapes the long-term picture of this company. Now to Slide 5. The numbers of this quarter, they speak for themselves, and I'm proud of what this team has delivered. Revenue from continuing operations exceeded $410 million; that's up 13% from the prior quarter and double what we generated in Q1 2025. Everyone, we posted adjusted EBITDA of $265 million, which is a record, along with record consolidated free cash flow of $144 million, and every single mine had positive free cash flow. Silver production came in at 3.9 million ounces, up roughly 3% from the quarter before. Cash costs sit at almost negative $3 per ounce, while all-in sustaining costs are under $10 per ounce. Given where silver prices are today, those margins are outstanding, and the caliber of those margins shows how the transformation of this business is appearing in the numbers. Moving to Slide 6; Slide 6 frames our production outlook. For 2026, we're guiding to 15.1 million to 16.5 million ounces of silver, which is a solid operational baseline, but the trajectory past that is what I want you to see. A potential pathway to 20-plus million ounces annually is supported by our project pipeline, and the drivers are Keno's gradual ramp to 440 tonnes per day plus the possible restart of Midas in Nevada. Past that, there's a potential Keno Hill expansion and possibly additional growth from the Aurora and Hollister mines in Nevada, as well as the Liby project in Montana. But before we reach Midas, there are 2 near-term opportunities tied to our flagship Greens Creek mine in Alaska that I'm especially excited about. I want to be sure they get the proper airtime today; so Brian Erickson, our VP of Operations, will give an overview on those and then provide an update on the Midas restart project. So Brian, over to you.

Brian Erickson executive
#3

Appreciate that, Rob. Moving on to Slide 7. To start, I want to talk about the pyrite concentrate circuit at Greens Creek — this is a brand-new project we're bringing to the market. We are assessing how feasible it is and what the economic upside looks like for building a pyrite concentrate circuit at the Greens Creek mill. Should it pan out, this initiative would create an extra marketable concentrate stream, lifting total silver and gold recoveries at the mill and possibly cutting the mine's reclamation liability by a meaningful amount. On top of that, there's further upside from possible reserve growth, since adding lower grade silver along with our sulfur blocks might expand the underground mineral reserve. Right now the project looks like it would need only a small amount of capital, and it could start producing cash flow in roughly 2 years. We plan to give the market another update on this project in late '26, early '27. Next, the tailings reprocessing project at Greens Creek. We brought this project to the market at our Investor Day back in January in New York. I want to be upfront about where things stand today. Evaluation is still ongoing, and a development decision will come after the test work wraps up. What makes this project so attractive is what's already sitting in the dry stack facility at the site — an estimated 10.4 million tonnes, holding an estimated 50 million ounces of silver and close to 600,000 ounces of gold, plus a number of other critical minerals. Using year-end 2025 prices, the gross metal value contained in that facility came to roughly $6.8 billion. I emphasize gross value, because that figure comes before recovery rates, processing costs, and the capital needed to actually get the metal out. A third-party partner of ours is carrying out Phase II metallurgical test work, which we anticipate finishing around mid-2026. That test work, together with locking in a suitable processing facility, is what will decide whether we proceed and in what manner. So far the results have been encouraging, and the signs suggest this won't demand the scale of capital that building a new mine from scratch would require. We'll share more on that — share more on that — once the test work is in hand. Beyond the potential cash flow, reprocessing the tailings carries the extra benefit of possibly shrinking the mine's long-term reclamation liability, converting what today is a liability into something that generates value. Last, the Midas restart project in Nevada. As you're aware, Nevada ranks among the best mining jurisdictions anywhere in the world, and within the state we have 3 highly compelling projects that we intend to push forward this year via exploration and other work. Midas, the furthest along of the 3, is a historically high-grade silver operation, gold too, which we picked up through the Klondex transaction; it comes with fully permitted infrastructure, which meaningfully lowers the capital needed to get the asset into a cash flowing state. We are looking at a hub-and-spoke approach — an operating model in which material from several regional deposits, among them the close-by Hollister project, gets hauled to and run through the mill that already holds a permit for 1,200 tonnes each day. At the site there is also a permitted tailings storage area next door, capable of holding roughly 15 years of material; we have put $16 million toward Nevada exploration during 2026, which is over 3x what was invested the year before, and Kurt will update everyone shortly on the newest drilling results. What we aim for is a resource large enough to justify spending on a restart. Still, I want to be clear that the grades being encountered — the target sits far under 1 million ounces of gold equivalent for us to begin. This resource we are targeting should serve as the foundation for a restart PEA. I will hand the call to Carlos now for the operations review.

Carlos Aguiar executive
#4

Thanks, Brian. Before I take you through the mines, I want to note that our production and cost guidance for the year has been reaffirmed. That summary is available on Slide 22. Moving to Slide 9, let's begin with Greens Creek. During Q1, this mine turned out 2.2 million ounces of silver along with 13,000 ounces of gold. Total cost of sales reached $82 million, while cash costs were negative nearly $12 per ounce and AISC came to negative $8.39 per ounce, both figured after byproduct credits. These are best-in-class figures, and they show the robust byproduct revenue we're capturing from gold, zinc and lead. Cash flow from operations totaled $131 million, and free cash flow reached $126 million — an exceptionally strong quarter. One operational item deserves attention: Greens Creek achieved a record this quarter for underground backfill placement, putting in nearly 164,000 tonnes, which is 16% higher than the 2025 quarterly average. That matters a great deal, since it provides us with added operational flexibility and improved ground stability as we progress through the remainder of the year. Now to Slide 10. Lucky Friday turned out 1.2 million ounces of silver during Q1. Total cost of sales reached $49 million, cash costs were $12.07 per ounce, and AISC came to $23.78 per ounce after by-product credits. Free cash flow reached $49 million. On the operational front, throughput rose 10% versus the prior quarter, though that gain was partly offset by an 11% drop in mill grade. This is a fairly normal result given the grade variability that naturally occurs at Lucky Friday, and we do anticipate average silver grade will strengthen in the second quarter; regarding the surface cooling project, construction stands at 81% complete, and we remain on track to wrap up by midyear; this represents a significant long-term investment. It's built to expand cooling capacity across the mine's roughly 15-year reserve life, allowing us to keep mining safely and productively at depth. Now to Slide 11. At Keno Hill, we turned out nearly 0.5 million ounces of silver during Q1, and free cash flow reached $15.3 million. I'd like to note that this represents 4 straight quarters of positive free cash flow at Keno Hill, which demonstrates profitability at current throughput rates and silver prices. Q1 production took a hit from 2 factors: diminished power supply from Yukon Energy Corporation because of the extreme cold weather that spilled over from Q4, and lower silver grades as we mined through a lower grade zone of the Birmingham deposit. The encouraging news is that both of those headwinds are now behind us. We expect mill rates will strengthen in Q2 as we transition into higher grade areas, and the power constraints have been settled. With that, I'll pass it to Russell for the finance update.

Russell Lawlar executive
#5

Thanks, Carlos. Moving on to Slide 13, I'll walk everyone through the financials. Just like Mike said during the cautionary statements, everything I'm going over reflects continuing operations, which means results tied to the asset we sold, Casa Berardi, aren't included in these numbers. Q1 set records across several financial measures. Continuing operations brought in revenue above $410 million, a 13% increase versus the previous quarter and twice what we saw in Q1 of last year, driven by steady operational performance and much stronger realized prices for silver and gold. On Slide 13 you can see that silver accounted for 73% of revenues, and every dollar of that came from the United States or Canada; that really distinguishes Hecla from our peers on both counts and delivers meaningful value for shareholders. Even more critical is what we earn on those revenues. The graphs at the bottom of the slide show we captured a margin equal to 90% of the realized silver price in the quarter, which is genuinely outstanding. That margin converted into considerable free cash flow across every mine, led, as we anticipated, by Greens Creek at close to $126 million for the quarter; Lucky Friday also stood out at nearly $50 million, and Keno Hill contributed $15 million despite still being in ramp-up. I'll cover how we plan to deploy that capital in a few slides. Now to the balance sheet: we closed the quarter holding $588 million in cash against $266 million of total debt, putting us at a net cash position of $321 million. That marks a major strategic inflection point and a major milestone. The chart in the top right of this slide shows just how sharply things have changed in a relatively brief stretch. Like Rob said, this has materially derisked the company and created considerable shareholder value. Following the end of the quarter, we redeemed the last $263 million of senior notes, so for the first time in many years Hecla carries no long-term debt. We now have a $225 million revolving credit facility that's completely undrawn, plus a $75 million accordion, giving us the strongest balance sheet in the company's recent history. On to Slide 14. I want to focus on what the full portfolio of assets can deliver over time under various price decks. For the first quarter, we've updated this chart, which illustrates our anticipated consolidated free cash flow for 2026 at various silver and gold price levels. If we assume silver at $100 per ounce and gold at $5,500 per ounce, our projection for the full year is over $900 million in consolidated free cash flow. Under assumptions nearer to current market prices—$75 for silver and $4,500 for gold—we project upwards of $700 million. This impressive cash-generating capability provides us with significant flexibility and a range of strategic choices, which we'll discuss on the following slide. Our approach to capital allocation, as outlined on Slide 15, adheres to a rigorous set of priorities. First and foremost, we prioritize safety and environmental performance — that's what underpins our right to operate, and there's no room for compromise when it comes to funding those areas. When we shift toward putting money into sustaining and growth capital, where we're aiming for returns between 10% and 15%, those projects are essential to keeping this company going and they set up future value that allows us to invest even more. Kurt will walk us through exploration shortly, but the opportunity we have to create shareholder value through the drill bit is truly outstanding; we've boosted what we're spending this year now that our balance sheet risk is reduced and cash flows have opened up, and if things go well, we'd anticipate being able to keep raising that level of investment going forward. On the last slide, I went over how strong our balance sheet is, how we've been paying down debt, and what that means for our investors. That said, we're going to keep building up cash while still putting high-quality money into the business. When we look at strategic investments, we judge them by return on invested capital and accretion per share, but those chances don't come up very often. So we need a solid balance sheet so we can act when those opportunities show up. On top of that, given that our mines are best-in-class, with long lives, low costs, and located in the best jurisdictions, we don't feel any pressure to make a strategic investment right now, but we'll be ready to move when the moment is right. Last but not least, returning money to shareholders completes the picture. Our balance sheet carries no debt, and free cash flow hit a record, so our aim is to build a cash position big enough to pay for the projects in our pipeline while also creating value for those who own our stock. While doing that, we'll start looking at ways to give capital back to shareholders; a share repurchase plan is already in place, and the Board has approved it for 20 million shares. Let me give that some context, since I believe it highlights something that sets Hecla apart from the companies we're compared against. Over the past 5 years, those peers went after growth hard via M&A, and in certain instances those transactions watered down their shareholders by over 50%. When you look at how much Hecla's outstanding shares have increased, it's only a small portion of that figure. And what that gives us is this: across all the per-share measures that count — silver output, reserves, revenue — we come in at number one relative to our peers. No other silver producer in our peer set has managed to increase silver production per share across that stretch of time. That's the kind of discipline we plan to keep applying going forward. So as our cash builds up, and should we notice a gap between how the market values us and what the fundamentals actually support, we'll be ready to put capital to work via buybacks, provided it satisfies the return on capital standards we've set. At this point I'll hand things over to Kurt, who will give the exploration update.

Kurt Allen executive
#6

Thanks, Russell. Moving on to Slide 17. For Hecla's exploration program, 2026 is going to be a year of major transformation; we are putting $55 million into exploration and predevelopment, and that's the highest amount ever. The programs have been organized around 3 priority areas, and as we get into the warmer months, I anticipate seeing more and more activity at an increasing number of sites. At the assets we have in production, our goal is to do better than simply offset reserve depletion, and I'm really enthusiastic about the growth projects we have in Nevada, with drilling underway at Midas, Hollister starting up in June, and Aurora beginning in July. What has me most enthusiastic is the Aurora Gold and Silver project located in Western Nevada. It's at an earlier stage than Midas, but you could argue it holds the biggest potential for a long-term discovery. Given historic grades that averaged more than 2 ounces per tonne gold equivalent, plus 7 drill-ready targets that have now been identified across the extensive land package, Aurora shows all the signs of a district that was underexplored rather than played out. And importantly, Aurora already has a permitted mill of its own on site at 600 tonne per day, which means that should exploration yield a compelling resource, the capital hurdle to reach production is substantially less than what a development starting from scratch would require. I've been out to Aurora several times myself, and Rob recently paid a visit to the project, and the two of us are quite eager to see our initial drill targets put to the test. Now on to Slide 18. At Midas, our follow-up drilling on the center offset vein keeps adding to what we know about this high-grade gold and silver system. Drill hole DMC 476 came back with 0.21 ounce per tonne gold and 1.6 ounce per tonne silver across 2.3 feet, which stretches the known vertical extent of narrow high-grade mineralization along the center offset structure to beyond 500 feet. We have now established the strike length of this structure at over 1,350 feet, and drilling is going to keep stepping out toward the southeast, where the structure is still open, and also toward the Northwest. Two more holes also hit parallel high-grade structures, which strengthens the prospectivity here; we'll be giving regular Nevada updates, exploration updates, all through 2026. At this point I'll hand the call back to Rob for closing remarks.

Rob Krcmarov executive
#7

Thank you, Kurt. I'd like to begin by talking about the market, since that truly lays the groundwork for all the rest. We — not long ago, the World Silver survey came out, and it verified 2025 as the fifth year in a row of supply deficit, with cumulative stock drawdowns now surpassing 700 million ounces since 2021. That sort of structural tightness isn't something that gets fixed overnight, and we aren't seeing meaningful amounts of new mine supply arriving over the medium term. Prices have swung around so far this year. That's just how this market behaves, but the gold-to-silver ratio currently stands at roughly 65:1, far above the low point we witnessed during the last silver bull market; and according to history, that ratio narrows when silver outpaces gold; nobody can say precisely when that will occur. But one thing I'm certain of is that Hecla, carrying no debt, generating record free cash flow, and offering the sector's best silver exposure, is an extremely attractive way to be positioned for the moment it does. The 6 attributes shown on this slide, legacy jurisdiction, silver focus, reserve life, project pipeline, cost structure, they aren't merely a list, they're what resulted from deliberate decisions this team has made across the last 18 months. And in my view they amount to a differentiated investment case that the market will come to recognize more and more: debt-free, record free cash flow, a clear organic growth pathway requiring little capital intensity. We've only just begun, and I'm eager to keep you informed all through the year. At this point I'll ask the operator to open the line for questions.

Heiko Ihle analyst
#8

With where commodity prices stand right now, are there any capital projects further out that you'd be more inclined to take on at any of the sites you currently operate, perhaps in 2027 and later? You touched a little on the pyrite concentrate circuit tied to the tailings reprocessing project. But what I'm asking is, are there items that maybe aren't in analyst models yet under a 3-year plan?

Rob Krcmarov executive
#9

Appreciate that, Heiko. Not particularly. What I'd say is we've essentially called out the projects that hold our attention over the coming several years. A number of them are clearly nearer term, such as the pyrite concentrate project, which Carla discussed. That one is a very near-term opportunity, possibly arriving within the next couple of years. Past that, there's nothing truly longer term unless we achieve spectacular success at Aurora.

Wayne Lam analyst
#10

I'm kind of curious about Keno Hill — could you run through which permits are still pending there that are holding you back from increasing throughput? And from what I remember, was it only related to the back-end capacity involving the dry stack tailings? Also, with the Victoria Gold sales process potentially being resolved, as was announced not long ago, do you see that possibly giving some clarity around permitting that would let you raise the mining rates at that site?

Rob Krcmarov executive
#11

Appreciate that question, Wayne. Regarding Victoria Gold, it honestly doesn't have much of an impact on us, except that at some stage, once they're set, they'll be vying for a certain amount of permitting bandwidth. Still, I don't think anything will move quickly there. Among the issues that remain unresolved, there's the leakage that continues and has to be dealt with, plus a strong relationship — like the one we enjoy with the First Nation — that still needs to be built, along with all of that credibility. So with B Gold, I really can't picture it having an effect on us near term. As for the permits, I'll bring in Patrick Malone. He serves as our VP of Sustainability. I'll hand it over to him, since he's been deeply involved, together with his team, and he's assembled a group there to support our permitting efforts. Patrick?

Patrick Malone executive
#12

Appreciate that, Rob. So when it comes to Keno Hill, the permitting route has two stages. The first stage requires us to file a project proposal with YES — that's the Yukon Environmental Socioeconomic Assessment Board. Our target for getting that done is by the end of the year. YES then needs roughly 12 months to finish its review, and once that's done we'll file 2 permit applications: the QML, which backs the mining license, plus a water license amendment. What those amendments are really aimed at is lifting certain long-term restrictions — restrictions related to waste rock, to tailings, and to water treatment, plus a handful of other items such as power and camp space. Our present estimate is that we could get the amended permits at some point around mid-2029 — though naturally, permitting timelines do carry variability. Over the shorter term, from now until those permits come through, a handful of restrictions keep holding Keno Hill back. In the near term, we need the regulators to approve our Phase 2 West tailings, which would let us expand the Phase 2 tailings. Following that, waste rock could turn into a limiting factor under both the QML and the water license. So securing these long-term permits in mid-2029 matters greatly to our success over the long haul. Right now we're bumping up against limits on waste production and on storage capacity in the near term, but we're working closely with the regulators to obtain some short-term relief until those permit amendments arrive.

Wayne Lam analyst
#13

All right. So I believe you folks had earlier described a pretty step-by-step increase in output at that site. So I suppose there isn't any chance to, you know, speed up the build-out ahead of schedule at, for example, Birmingham or Flame & Moth, or for a few of those infrastructure pieces, so that once the permits come through, you'd be ready to move quickly up to that 440 permitted level or possibly even 600 before long?

Rob Krcmarov executive
#14

That 440 level — what I'd say is, it will be a step-by-step increase. Once more, it comes down to a series of permits; meanwhile, we have to handle the water. That means the more you build out, the more water gets exposed and the more water requires treatment. So every one of these elements is interconnected. I really don't see any meaningful way to speed this project up. I'd acknowledge there are certain risks around permitting, but I'd view whatever potential — let's term it — curtailment as essentially a bridge issue, not something wrong with the asset. The reserves stay the same. Still, clearly, should a delay occur, that carries a time value of money effect on IRR. Even so, our reserve life stands at 16 years. The economics remain extremely, extremely robust even with silver at $30; that fact doesn't disappear. Our attention, once again, stays on that permitting effort. That's what keeps us going. And once more, I'd point to what we mentioned earlier during this call — $15.3 million of free cash flow in Q1 — and that's the path we're safeguarding; so truly, it all comes down to permitting and being prepared to increase output to 40. As for the 600 tonnes per day — and past that — that genuinely belongs to the future. It would demand an entirely fresh round of capital investment plus further permitting. That isn't where our attention is. Our attention truly is on the present moment.

Wayne Lam analyst
#15

All right, got it. And so perhaps, now that those high-yield notes have been paid off, it's clear the balance sheet sits in quite strong condition. It's clear too that in a market that looks very different, your team in the past reduced the Silverlink dividend piece; yet given that competitors these days are boosting capital returns and tying those payouts to cash flows, might we expect something similar before long — a component tied the same way, considering the cash generation you project going forward?

Russell Lawlar executive
#16

Appreciate it, Wayne; Russell here. I'll handle that one. For sure, during our prepared remarks, I noted that capital returns are under review. What we firmly hold, though, is that putting money into our business yields superior returns relative to what shareholder returns deliver. That said, our balance sheet is strong, as you pointed out, and we've directed a substantial amount of cash toward paying down debt, unlike — when you compare us with competitors, a lot of them have either refinanced or simply left that debt sitting on the balance sheet. Thus our approach differs somewhat, aiming to deliver long-term shareholder value in that manner; even so, we'll talk with our Board about how our return on investment strategy ought to look, how our return on capital strategy ought to look; so yes, I'd tell you to stay tuned on that front. We'll keep talking it over with the market as time passes. Still, we need to ensure we properly fund every one of the growth opportunities we hold internally, since that is genuinely where value gets created in this business.

Cosmos Chiu analyst
#17

Perhaps I'll start with something that builds on what was asked before. Rob, your MD&A refers to the 440 tonnes per day at Keno Hill as a medium-term target. What exactly does medium term mean here? From the sound of it, you may require the permit. So does medium term mean 2029 — in other words, you won't be capable of reaching 440 tonnes per day before those permits come through at some point in 2029? Is that how I should interpret it?

Rob Krcmarov executive
#18

Correct; that's — Patrick identified a few essential permits that we truly must obtain by 2029. And until those are in hand, that would...

Patrick Malone executive
#19

Between this point and the moment our permit amendments come through — the thing that truly unlocks the value — it's still going to be tough; and mid-2029 is when we expect that to happen.

Cosmos Chiu analyst
#20

Got it, that makes sense. Then, possibly at Greens Creek—and perhaps other locations too—I noticed some inventory had accumulated. We saw that buildup during the prior quarter. My impression is you're gradually clearing it. Take silver and zinc, for instance: right now sales roughly match output, but with precious metals you're still processing it, and that stockpile hasn't been fully cleared just yet. At Lucky Friday, Q1 sales came in below what was produced. So, taking a step back, my question is: what's driving this inventory accumulation? When do you figure you'll be able to sell through some of it over the coming quarters? And what kind of timeframe are we looking at?

Russell Lawlar executive
#21

Yes. Appreciate that, Cosmos. I'll handle that one. Regarding the inventory and receivables, remember that at Greens Creek we operate our own deepwater port, which gives us a significant strategic advantage. The catch is that our shipments typically leave once per month and arrive in very uneven batches, so depending on the timing of a vessel's departure, you might see product waiting at the port or money tied up in receivables. There are ways for us to speed up collection of those receivables. Yet if you examine the situation, particularly given the balance sheet we currently hold, simply being patient and collecting those funds through ordinary operations delivers real benefit to our shareholders. That likely explains why, over roughly the last twelve months, you've noticed us acting this way more often than before: with less debt and reduced leverage, among other factors, we now weigh choices using a farther-out horizon than we once did. So my take is that this amounts to nothing more than a matter of timing. Looking at it quarter by quarter, pinpointing the exact departure dates for those vessels and the timing of when that AR gets paid is going to be tough. That said, most of the receivables sitting on our balance sheet when the quarter closed came in over the following 30 days. There's another factor too: since we make concentrates, any rise in silver prices gets reflected when we settle pricing for shipments in a later month. That means the worth of our receivables climbs alongside it, which explains part of what shows up in accounts receivable. With Lucky Friday, our shipments typically go out every week—not once a month, I should say weekly. So the accounts receivable or inventory figures really hinge on which day of the week or month the timing lands on.

Cosmos Chiu analyst
#22

Okay, let me get my question in before the operator disconnects me. Regarding Greens Creek, it certainly sounds quite intriguing with the various projects you've got going there. And it's encouraging that the pyrite concentrate project has been announced too. My question, I suppose, concerns return on invested capital — what sort of hurdle rate are you considering for some of these initiatives, if you're able to tell us? Then, on the pyrite concentrate project, again, as much as you can disclose, is there any possible penalty component attached to that concentrate? And how is the market for that pyrite concentrate looking at present?

Rob Krcmarov executive
#23

When it comes to return on invested capital, we haven't calculated it separately for that specific project, but my expectation is that it would be quite compelling, simply because it's a relatively low CapEx project. I'm not certain what the circuit cost. My guess would be somewhere around net $40 million or so, $50 million.

Russell Lawlar executive
#24

Good starting point.

Carlos Aguiar executive
#25

Yes.

Rob Krcmarov executive
#26

So the payoff from that spending should end up being genuinely, genuinely attractive. Once more, what we aim for company-wide sits at 12% to 15%, and this one will slot comfortably inside that band. As for the concentrate sector, what I gather is extremely, extremely robust, which is exactly the reason we're examining it; on top of that, it opens up possibly additional reserves and adds to revenue too.

Russell Lawlar executive
#27

Right. The one point I want to tack on there, Rob, regarding Cosmos — those tests have been done by us in-house, though we're at a really early stage. So I'd rather not put out a precise figure that we'd then need to walk back, since plenty of work remains ahead of us. That said, based on what we've completed, and looking at the treatment charges in our model, we've taken a cautious approach on the charge we'd pay, on the refining charge for gold as well as silver, and on the payabilities; and despite all of that — figures I'd expect to be conservative, though perhaps reflecting longer-term treatment and refining charges — the economics remain extremely compelling. So I'd say that's likely the full extent of the detail available to us at this point, until we can do a little more work and truly build a holistic study around it.

Rob Krcmarov executive
#28

Right. And one more point I should have brought up — this also brings down what we owe for reclamation. So there are several advantages in play; we're quite enthusiastic about this initiative, plus the reality that it doesn't demand much capital in the near term.

Cosmos Chiu analyst
#29

Yes. And suppose approval comes through at some point later on — these initiatives could all run in parallel, correct? For instance, regarding tailings recovery and the high concentrate, again, I'm not claiming the schedules would line up perfectly, but under those circumstances, they could take place simultaneously.

Rob Krcmarov executive
#30

Exactly right, Cosmos; both workstreams are underway on our end. Yes. That's completely correct. Both workstreams are underway on our end. They won't all arrive simultaneously. The pyrite con is clearly a nearer-term item; we still — just as a reminder, for the tailings reprocessing, Phase III testing is currently in progress. The samples have reached the lab. Should that prove successful, we'll provide an update to the market later in the year. The following step would essentially involve gradually moving up to another pilot plant and then expanding further beyond that. That one is at an earlier stage. It likely won't come through past when the pyrite might potentially be delivered, but both are being advanced by us simultaneously.

Alex Terentiew analyst
#31

Let me add my congratulations on yet another strong quarter. I've got a couple of things to ask. First, I'd like to go back to Keno Hill for a moment. Apologies — is my audio coming through for everyone?

Rob Krcmarov executive
#32

Yes, I can hear you now.

Alex Terentiew analyst
#33

All right. I'm not certain what just occurred there. All right. For my opening question, I just wanted to — I was hoping to get more detail regarding Keno Hill. So in order to reach that 40, you're referring to mid-2029 as the point when those permits come through. Earlier, you mentioned a gradual increase occurring across the coming years. Does that remain the approach given that timeline? Or ought we simply presume something closer to a flat level up to that point?

Patrick Malone executive
#34

Alex, it's Patrick Malone speaking. Yeah, my sense is that what we're contemplating is closer to a flat level. A portion of that is going to hinge on continuing talks with the regulators as we attempt to secure some near-term relief. That said, my expectation is that you'd see a flat level or, in certain instances, perhaps a slight deceleration to ensure we keep capacity intact.

Alex Terentiew analyst
#35

Alright, that sounds excellent. And for my final — apologies, for my following question, I realize you mentioned there will be certain talks with your Board regarding the capital return strategy at this point. Yet you also brought up that a share buyback is currently in effect. Have you made a decision on whether this is something you intend to establish as a program buy, or would it just be somewhat more opportunistic? Or what is your method for handling that situation?

Russell Lawlar executive
#36

My suggestion would be that this needs to be talked over with our Board, and we must make sure everyone is on the same page concerning a holistic strategy. However, I would add that whatever investments we undertake from the standpoint of returning value to shareholders must still satisfy the return on investment standards we have set out for the investments we make within our business too; therefore, we will be examining it through that lens.

Alex Terentiew analyst
#37

Okay, understood — that's clear. One final thing, if that's fine. Greens Creek turned in yet another strong quarter, surpassing — at least versus my own estimates — on grade, I believe. And when you check the yearly outlook, it was over 25% regardless. I'm not sure what the precise calculation looked like. What I'd like to ask is whether those stronger grades matched what you'd anticipated. Or is it possible that there are scheduled shutdowns or periods of weaker grade coming in the balance of the year? I'm simply curious — could the guidance potentially be nudged upward on that measure, given that grades are coming in higher than you'd planned?

Carlos Aguiar executive
#38

For Greens Creek, our grade and our cost are being reaffirmed, and for the rest of the year we anticipate grades along the same lines.

John Tumazos analyst
#39

In what way ought we to draw a comparison between the fresh Midas mine and the one that Dr. Ken Snyder along with the team previously got up and running? Is the right way to picture it 500 tonnes per day, half an ounce of gold, and 10:1 silver? Could the tonnage actually be higher?

Rob Krcmarov executive
#40

Appreciate that question, John. What I'd say is that it will in all likelihood end up looking unlike the former Midas mine. So there are 2 points here. The initial resource at Sinter, which I have pointed to before, comes in at approximately 180,000 to 200,000 ounces, with grades that are extremely high. This is a narrow ore body. The extensions that Kurt and his crew have identified are similarly narrow and of very high grade. The mill carries a rating of 1,200 tonnes per day; that's the capacity available to us; we are considering the possibility of several ore sources from the center. We are also taking another look at whether any remnant mining could happen at Midas itself. That study is currently in progress. And you will remember that Midas got shut down when the gold price was substantially below where it stands now. So there could be some gains in that; so I suppose what I'm telling you, John, is that several ore sources may be available to us, and it won't resemble the earlier Midas operation in an exact way. What stays unchanged is that the mill has a fixed cap of 1,200 tonnes per day.

John Tumazos analyst
#41

I don't know much about Aurora. Can you share if it's a heap leach open pit kind of target, what grade ranges we might expect, if there's a lot of silver in it, or anything else we've learned so far about Aurora.

Rob Krcmarov executive
#42

Appreciate that. In a moment, I'll have Kurt jump in. But let me say, like Kurt mentioned, roughly 4 weeks back I traveled to Aurora. I've heard Kurt speak with real enthusiasm about Aurora before. And I had to put effort into getting him to concentrate on Midas, which he's also enthusiastic about. And upon visiting, I totally understand — you stroll across the ground and there sit old open pits, old underground workings, — veins showing amazing intensity extending for kilometers. And the target Kurt likes best has never seen one single drill hole. So Kurt, is there anything you'd like to add?

Kurt Allen executive
#43

Right. I believe the targets we've laid out are underground minable ones; at this stage, open pit mineralization isn't our focus there. Open pit mining did occur previously at Aurora. However, our attention is squarely on high-grade targets suitable for underground mining. This project has us genuinely enthusiastic.

John Tumazos analyst
#44

Does that cover just gold? Or are both gold and silver included?

Kurt Allen executive
#45

Both gold and silver are in there, likely at a 1:1 ratio. Mostly what you've got is high-grade gold, though high-grade silver comes along with it too.

John Tumazos analyst
#46

Let me squeeze in one more. Core and Pan Am have both completed big silver deals down in Mexico. I realize our focus remains the United States and Canada; but given how strong your balance sheet is right now, could an acquisition be on the table? And if it were, would it stay inside the U.S. and Canada? The bulk of silver targets sit in Latin America or are scattered globally.

Rob Krcmarov executive
#47

Yeah. That's a fair question. One thing that sets us apart, and I mentioned this on the opening slide, is that we run our operations in safe jurisdictions; so it comes down to — you have to go where the silver actually is. Given how scarce primary silver deposits are, we'd be open to other jurisdictions. That said, they still need to be reasonably safe jurisdictions. As a rough guideline, anything sitting in the top 1/3 of the Fraser Institute Index, we'd run a proper analysis on it — we wouldn't take it at face value and we'd want to grasp those risks before making any move. So that's — it is — we would potentially go offshore anyway safe jurisdiction; regarding M&A, we've laid out our organic growth project. That's genuinely where our attention is. Naturally, we keep evaluating opportunities. Nobody ever stops looking in this business, but growing merely for the sake of growing doesn't appeal to us. Just getting bigger doesn't do anything for us on its own. Russell already went over how acquisitions can water down what shareholders hold. That's an easy slope to slip down, and we've chosen not to go that route. What we care about is building worth for shareholders over the long haul, measured per share, and that guides everything we do. So when it comes to buying other companies, we'll keep our discipline. What it really hinges on is where they're located — places with less risk — and whether they're centered on precious metals, with a very heavy tilt toward silver. When it comes to outstanding gold properties, we're open to looking at them—but only when they're strong enough cash producers to genuinely support our broader silver-focused plan, and silver comes first. Beyond that, we'd need to identify a distinct edge for ourselves in running that property, whether through consolidating a district, making use of infrastructure we already have, our technical expertise, or potential to expand exploration—whatever form it takes, we have to see an advantage plus solid financial returns. Naturally, as Russell mentioned, we'll hold ourselves answerable on that front. So at present, the M&A landscape is quite busy. Sure, rivals are pushing us to act, and we get why that pressure exists. Still, we've watched what occurs when a business buys out of a fear of missing out instead of real conviction, and that's simply not a path we'll take. Growth for us doesn't hinge on making purchases. What matters most is what we build ourselves, though naturally we'll seize a good chance if one appears.

Rob Krcmarov executive
#48

Appreciate that, Luke, and I want to thank everyone for spending part of your morning with us and for the questions you brought. Getting Hecla here has taken real effort from this team — no debt on the books, producing cash, and holding the strongest silver leverage anywhere in the industry. The underlying drivers favor us, and we are only at the beginning; so enjoy the rest of your day, all of you. Thanks so much.

Operator operator
#49

This concludes today's call. Thank you for attending. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Hecla Mining Company transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Hecla Mining Company earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.