Hecla Mining Company (HL) Earnings Call Transcript
November 4, 2026
Earnings Call Speaker Segments
Thanks, Hillary. Morning, everyone, and I appreciate you being here for Hecla's conference call on our third quarter 2026 results. I'm Mike Parkin, and I serve as Vice President of Strategy and Investor Relations. You can find the earnings release we put out yesterday, as well as today's presentation, on our website. Joining us on this call are Rob Krcmarov, our President and Chief Executive Officer; Russell Lawlar, Senior Vice President and Chief Financial Officer; Carlos Aguiar, Senior Vice President and Chief Operating Officer; Brian Erickson, Vice President of Operations; Kurt Allen, Vice President of Exploration; and additional members of our management team. Once our prepared remarks wrap up, we'll take your questions. Moving now to slide two, cautionary statements. Anything forward-looking that the management team says today falls under the Private Securities Litigation Reform Act of 1995 and carries risks, which are laid out on this slide, in our earnings release, and in our 10-Q filing with the SEC; those risks, along with others, might make actual results differ from what the forward-looking statements project. Non-GAAP measures referenced on this call and the related slides are reconciled either in these slides or at the back of the news release. Please keep in mind, when we talk about financial figures and projections throughout this presentation and in the earnings release, we mean our continuing operations. I'll hand the call to Rob now.
Thank you, Mike, and good morning to all of you. If we move to slide three. Hecla is coming into the third quarter of 2026 from a position of genuine strength. What I mean is financial strength — a standing today that represents the most robust balance sheet in the company's extremely long history. The characteristics laid out on this slide that establish us as North America's premier silver producer, those have not changed. What is different now is the confidence we have to invest in what lies ahead. I'm keen for our team to talk through some truly remarkable developments emerging from our substantial project pipeline that further cement our market positioning. More on that shortly. Moving to slide four, Hecla delivered another really solid quarter, even if a few of the top-line figures moved in a different direction than they did last quarter. Let me spend a moment explaining why, since I think the underlying story is genuinely a good one. Revenue from continuing operations was $334 million, compared with the record $411 million we reported in the first quarter. Two factors account for that change, and both deserve to be spelled out clearly because neither one reflects a production issue. The first is that metal prices pulled back from the highs reached earlier in the year, although my confidence in the outlook for silver and gold prices remains very strong. Next, timing accounted for a portion of that shortfall. We had generated a considerable volume of silver concentrate—chiefly from Greens Creek—that remained unsold when the quarter closed. If those shipments had gone out during the period, revenue would have come in clearly above what was already a robust quarter. That material went out in early August, so it will be reflected in our third-quarter numbers. Anyone who has tracked us for a while is familiar with the uneven sales cadence at Greens Creek. Adjusted EBITDA from continuing operations reached $199 million, over twice the $94 million posted a year earlier. Operating cash flow was—my apologies. Okay, sorry, let me continue. Let me stress one more time — I mixed up a few figures from the prior quarter, and I want to apologize to everybody for that. Continuing operations brought in $150 million in income, equal to $0.22 per share, compared with $118 million, or $0.18 per share, during the second quarter. Adjusted EBITDA from continuing operations came to $211 million. That represents a 6% gain quarter over quarter and a rise of more than 40% versus a year earlier. Operating cash flow from continuing operations reached a record $203 million. Free cash flow also set a record, at $151 million — almost three times what we produced in the third quarter of last year. Greens Creek topped the list, posting a site record of $147 million. Our balance sheet has never been in better shape. We closed the quarter holding nearly $700 million in cash, with no long-term debt other than finance leases, and we've secured a fresh $500 million revolving credit facility. Aside from a small amount of letters of credit, that facility remains undrawn, and it includes a $100 million accordion provision. All told, we have about $1.2 billion of liquidity available, and that gives us real choices — the freedom to keep funding the projects and assets that make the most sense on our own timeline, rather than having the silver price call the shots as it did in the past. Looking at what we achieved operationally, silver production reached 4.2 million ounces, which came in within 1% of what we delivered in the second quarter. From Greens Creek we got over 1.9 million ounces. Lucky Friday produced close to 1.3 million ounces, in line with our expectations now that it has moved past the high-grade pocket responsible for its second-quarter result — that record set in Q2 — while Keno Hill contributed just under a million ounces, showing the potential this asset holds and explaining why we keep putting capital into it and reducing its future risk. One brief point regarding Keno Hill: that record came about because the mill was run close to its permitted limit. Our existing permits can't sustain that for long, so we've decided to hold throughput down in order to remain inside permit limits. Carlos will walk you through the numbers and the timing on that shortly. Silver output ought to decline by less than throughput, since we'll be more selective at both the mine and the mill. Let me be clear, Keno Hill has a high fixed cost base, so during the permitting period at current prices, expect lower revenue and a higher cost per ton; that said, I continue to see real value in that ground, and that's why four drills are turning there. We also made some favorable adjustments to our 2026 guidance. We raised the lower bound of our consolidated silver production range, we upgraded our guidance for silver cash cost and all-in sustaining cost, and we lowered our capital investment guidance. Turning to slide five, this slide shows where we plan to take the company. Our medium-term goal is to become a silver producer above 20 million ounces per year. A possible restart at Midas is part of that, and so is Keno Hill achieving its permitted mill rate once the permitting and infrastructure work is complete. It all depends on exploration success, development, and permitting. In the nearer term, we have two organic opportunities at Greens Creek. The first is the pyrite concentrate circuit that came up in our prior quarter's discussion, while the second is dry stack tailings, for which we now see multiple possible routes. Low capital intensity is the common thread across the three projects shown on the following slide. For every one of these investments, our hurdle is a return that comfortably exceeds our investment thresholds, and early signals from the pyrite circuit look promising on that front. My view on silver and gold is constructive. Even so, my preference is to accumulate cash at this point so that we can continue moving these projects forward no matter where prices go. That is why our balance sheet has received so much of our attention. I'll hand things over to Brian, who will take you through the most recent progress on each one. Brian, the floor is yours.
Thanks, Rob. Now moving to slide six. All three organic projects that Rob mentioned—and that you can see on this slide—continue to move forward, and they all share one key characteristic: each one is expected to require only modest capital spending. These efforts leverage infrastructure already in place, they rely on permitting routes that are established and well-understood, and the operating know-how already exists within the company. That positions us to generate potentially high-margin production along with cash flow growth, while cutting back on many of the exploration and development risks that come with greenfield projects. Beginning with the Greens Creek pyrite concentrate circuit: engineering work is progressing on a new circuit at the mill designed to recover additional silver and gold that today goes to the dry stack tailings facility, yielding a marketable pyrite concentrate for which demand appears strong. This effort sits at a scoping level, with some advanced design incorporated, and preliminary cost estimates are being prepared. At average reserve grades, our estimate remains that once fully ramped up, the circuit could contribute potentially 1 million-1.2 million ounces of silver and 10,000 to 15,000 ounces of gold in annual production, on top of what Greens Creek already produces. Early signs still indicate a robust return on capital that clears our investment thresholds, while also slowing the pace at which tailings are added to the storage facility, which we would expect to reduce future investment tied to tailings storage capacity. Given a favorable benefit-to-cost ratio and what we consider low technical risk, this project lends itself well to an accelerated engineering and execution path, subject to permits and final investment approval. Under that approach—excuse me—we expect to start intermittent pyrite concentrate production as early as late 2027 using temporary equipment, with the potential to hit full capacity once the new circuit is completed, which is expected in late 2028. These estimates are still preliminary and subject to change as engineering advances, but we're very excited about this project. Second is the Greens Creek tails reprocessing project, which is the middle image on the slide. I want to spend a bit of extra time here because the scope of what we're evaluating has widened. As of September 30th, the dry stack tailings facility held an estimated 10.7 million tons of material containing roughly 51 million ounces of silver, nearly 600,000 ounces of gold, and additional critical minerals. At quarter-end metals prices, that amounts to an in-situ gross metal value of approximately $6.4 billion; that's a gross figure before transportation, processing, and sales costs, which we expect to be significant, and it is not a mineral resource or reserve; so think of it as a measured scale. We're assessing the potential of three pathways forward with this. The first pathway is the one we've been working on for a few years, a multi-phase metallurgical program with a third party. Phase three testing was completed in August, and the metallurgical results are pending and expected any week now. That marks an important milestone, and it ought to help guide what we do next — among other things, the possibility of moving to a pilot plant test in phase four. Whether we take that route hinges on a suitable processing facility being secured by our potential partner, and they are working on that. Early signals suggest a path to initial cash flows for Hecla that could be fairly low in capital intensity, with those first cash flows possibly arriving in roughly three years, as we understand things today. That timing, however, rests on several factors that are mostly beyond our control and may shift. What's new this quarter is that we are now assessing two further pathways. One of these new potential routes involves selling the dry stack material directly. After interest came in from third-party smelters and concentrate dealers, we are assessing whether this material might qualify as low-grade feedstock suitable for direct sale; that idea is moving from concept into action. During the fourth quarter, we plan to load a test parcel at Greens Creek of about 5,500 dry metric tons of this low-grade feedstock, to be shipped and sold to a third-party smelter. It is still at an early stage, and there is no guarantee it will result in commercial shipments next year and beyond, but it represents an important first step, and we intend to update the market as we learn more. The third pathway is self-processing. That would potentially entail an on-site processing facility, which might call for new permits or amendments to existing ones. We expect metallurgical evaluation of the self-processing concept to get underway in the first quarter of 2027, with initial results potentially in hand by spring of 2027 to help us decide the next steps. These pathways for the Greens Creek tailings are not mutually exclusive. More than one of them could be part of how we move forward, and we are assessing combinations of two or more. That flexibility is a genuine strength, since it gives us multiple routes to capture value and generate cash flows from material already on site. As with pyrite concentrate, reprocessing all or part of the tailings could shrink the space required for tailings storage and help reduce Greens Creek's long-term reclamation liability. We expect to share further details over the coming quarters as the evaluation work progresses. Lastly, the Midas restart project in Nevada is also continuing to move ahead, and it carries that same low capital intensity characteristic. Midas has permitted infrastructure, including a mill with roughly 1,200 tons per day of milling capacity, a tailings facility with about 15 years of storage capacity, and other surface infrastructure — all of which could help cut the time and capital a restart would need. We are working to grow the existing high-grade gold and silver resource to the scale required to support a restart, and we continue to assess a hub-and-spoke model that would feed ore from Midas and potentially other regional sources, such as Hollister, which sits well within trucking distance, through the existing mill. At Hollister, drilling got going again this quarter following a pause that lasted several years, and Kurt will go over the newest Nevada exploration results shortly. To sum up, three capital projects, each at a different stage, sharing one thing in common: low capital intensity and the potential for high margins. We'll keep you posted as the work moves forward. At this point I'll hand the call to Carlos for the operations review.
Thanks, Brian. Now on slide eight. During the third quarter, Greens Creek turned out 1.9 million ounces of silver along with almost 12,000 ounces of gold — below what we saw in the second quarter, mostly because maintenance during the quarter ran above plan. Costs applicable to sales came to $76 million, which reflects the larger sales volume resulting from the shipment timing Rob noted earlier, while cash costs were $10.11 per ounce and AISC was $3.25 per ounce, each figured after byproduct credits. Operations generated $155 million in cash flow, and free cash flow hit $147 million — a new quarterly record at the site level. As Rob said, the concentrate inventory we were holding when the second quarter ended went out in early August and shows up in these results. Going forward, we have more scheduled maintenance lined up for the fourth quarter. At our flagship operation we're still confident about hitting production guidance, which stays at 8 million-8.3 million ounces of silver and 51,000 to 55,000 ounces of gold. For costs applicable to sales, we're lifting guidance by $10 million- $250 million, which captures the actual results across the first nine months plus on-site power generation costs in the fourth quarter that came in higher than expected. That increase is expressed in total dollars. Measured per ounce, guidance has gotten better, thanks to our strong first nine months and larger byproduct credits. Cash costs are now expected at $13 to $12.50 per ounce and AISC at $5.50 to $5 per ounce, both after byproduct credits. Now to slide nine. Lucky Friday delivered almost 1.3 million ounces of silver, in line with plan. With the mine exiting the high-grade ore pocket, it generated record second-quarter output of 1.5 million ounces. Costs applicable to sales totaled $34 million. Cash costs came in at $7.31 per ounce and AISC at $27.68 per ounce, both after byproduct credits. Each rose versus the second quarter, a result of reduced production volume and greater sustaining capital spending. Cash flow from operations reached $88 million, with free cash flow of $67 million. Commissioning of the surface cooling project is anticipated in the fourth quarter of 2026; we expect underground working conditions to start improving soon after commissioning, which supports the mine's 15-year reserve mine life. Across the full year, we've narrowed our silver production guidance by lifting the bottom of the range to 5 million-5.2 million ounces, with costs applicable to sales unchanged at $140 million; cost guidance has improved as well. Cash costs are now projected at $8.50-$9 per ounce, down from $9-$9.75, and we've brought the top of our AISC range down to $25.50 per ounce from $26, giving a new range of $24.50-$25.50 per ounce, both after byproduct credits. Now on slide 10. Keno Hill turned out a record 963,000 ounces of silver in the third quarter. We got a boost from a new silver grade that came in over 35% better as we moved through the lower-grade zone we talked about earlier this year, along with a new quarterly record for milling rate. Operating cash flow came to $5 million, while free cash flow was negative $2 million, which reflects ongoing capital investment and working capital outflows. That said, don't count on that milling rate repeating; in September the mill ran near its permitted limit, but the capacity allowed under our existing waste rock, tailings, and Water Licence permits can't sustain that rate over time. Starting in the fourth quarter, we're deliberately holding back throughput so we can preserve that capacity and remain within permitting limits. We anticipate throughput dropping to roughly 300 tons per day in Q4, with additional suppression starting in January 2027 down to levels well below Q4 2026. As Rob mentioned, we expect silver production to fall proportionally less than throughput because we'll be mining and processing more selectively. Practically speaking, at today's metal prices, you should anticipate lower revenue and a higher cost per ton at Keno Hill this period, given how fixed-cost-heavy this asset is. We've been discussing this strategy for several quarters now, and we believe it's the best way forward. While we wait on permits, the team is concentrating on what's within our control; we're implementing tighter grade control to cut dilution, and that effort is already in progress. We're also planning to be choosier about what gets sent to the mill, and we're getting ready to stockpile lower-grade material so it can be processed later once we have permitted capacity. As these measures come together, we expect better grade and improved margin on each ton we process, while keeping the lower-grade tons available for later. The permitting and infrastructure work underway now is what should let the mine achieve its potential. I'll now hand the call to Russell for the finance update.
Thank you, Carlos. If we move to slide 12, I'll walk you through the financial results. As Mike mentioned, all the figures I'm about to discuss are from our continuing operations. Hecla offers an investment opportunity unlike any other. Our mines are located in the best jurisdictions, we have a very low-cost profile and long mine lives, and on top of that we provide best-in-class exposure to silver — 69% of third-quarter revenues came from silver, gold accounted for 15%, and base metals made up the remainder. Quarterly revenues, including environmental services, totaled $395 million, of which $372 million came from mining operations, a 17% increase over last quarter. That rise is mainly attributable to shipment timing at Greens Creek, as we've already covered. With these revenues, we continue to be the purest silver mid-cap multi-asset producer, and as discussed, our project pipeline points toward expanding silver exposure for shareholders. Moving to slide 13, I'll provide more detail on the quarter's financial performance. Income from continuing operations came in at $150 million, or $0.22 per share, versus $118 million, or $0.18 per share, in the prior quarter. Beyond the higher revenue, income gained from a $36 million increase in fair value adjustments, largely tied to realized and unrealized gains on marketable securities. Partly offsetting that were $41 million of higher costs applicable to sales on greater volumes sold, $22 million of additional tax expense on improved profitability, and a $6 million rise in exploration and pre-development expenses as programs ramped up, including new initiatives at Hollister and Aurora. Our margins remain strong. We realized $63.62 per ounce of silver sold, and with an AISC of $14.34 per ounce, that produced a margin of $49.28 per ounce, or 77% of the realized silver price. AISC rose versus the second quarter, mainly due to lower output at Greens Creek and Lucky Friday, reduced byproduct credits tied primarily to less gold production, and higher sustaining capital, mostly at Lucky Friday. These Non-GAAP measures of AISC and cash costs exclude Keno Hill, which is still in pre-commercial production. As we showed last quarter, our oil exposure is substantially lower than many industry peers. It starts with the nature of our ore bodies — high-grade, high-value underground mines where we mine fewer tons to extract the value, so we burn less diesel. The second factor is that every one of our operations draws power from local utilities, where diesel prices don't affect the rate. Occasionally, Greens Creek will generate power. However, that typically isn't for extended periods and doesn't materially shift the cost structure when it happens. Operating activities delivered a record $203 million in cash, which was 16% higher than the prior quarter, supported by favorable working capital changes and more payable ounces sold. Consolidated free cash flow also hit a record $151 million, exceeding the earlier record of $144 million from the first quarter. Looking at the site level, before exploration and corporate costs, Greens Creek posted a record $147 million and Lucky Friday contributed $67 million, while Keno Hill came in slightly negative because working capital movements weighed on its cash flow; that is mainly tied to collecting payment from two concentrate shipments that slipped into October. On the balance sheet, we finished the quarter with $692 million in cash, up from $483 million at the close of the second quarter. That rise reflects our strong cash flow generation as well as $64 million in proceeds from selling investments. We carry no long-term debt beyond finance leases, and we put in place a new $500 million revolving credit facility, undrawn apart from $3.4 million of letters of credit, along with a $100 million accordion option. Combined with our cash, total liquidity comes to roughly $1.2 billion. A year ago we had a net debt position of approximately $144 million, and today we hold a net cash position of approximately $680 million, giving us the strongest balance sheet in Hecla's history. I will now hand the call to Kurt to walk through exploration.
Thank you. Thanks, Russell. During this quarter, our exploration and corporate development spending came to $16.6 million. Our 2026 guidance is still $55 million; given the success achieved this year, we intend to increase that budget next year. Moving to slide 15. I'll begin with Keno Hill, where drilling activity increased over the course of the quarter. Four drills are now operating, and we anticipate all four will keep running until the year ends. That is already delivering results at the Flame & Moth, where drilling within the favorable Basal Quartzite, along strike from the Lightning vein, has outlined a new mineralized extension with more than 350 feet of dip length, situated 900 feet to the southwest of the current resource. Significant mineralization was hit in three of four holes. Hole K26944 gave 26.1 ounce per ton silver and 14% zinc across 8.5 feet. Hole K26951 gave 6.5 ounce per ton silver and 3.5% zinc across 16.1 feet. This new extension remains open to the northeast in the direction of the current resource and to the southwest along strike, and follow-up drilling will continue in the fourth quarter. Moving to slide 16, at Bermingham Deep, we are still extending the high-grade trend that points toward the historic Hector-Calumet mine, which historically produced roughly 96 million ounces of silver. Southwest step-out hole K26940 gave 25.7 ounce per ton silver and 4.2% lead across 10 feet on the footwall vein, and hole K26942 stepped out another 165 feet into strongly mineralized rock, with assays pending. Along with hole K26945 to the northeast, the known strike length of this trend now stands at 1,300 feet, which is a 500-foot increase over the second quarter. On the Bermingham Deep Main Vein 2, hole K26940 also cut 61.1 ounce per ton silver and 3.8% lead across 5.3 feet, extending that vein roughly 260 feet to the southwest. Moving to slide 17 and on to Greens Creek, at the West Ore Offset target, approximately 500 feet from the northwest resource, significant sulfide mineralization was intersected in three of five holes. Holes PS-511, PS-512, and PS-513 encountered six, 11, and 8.3 feet respectively, defining sulfide mineralization across 300 feet of strike with assays pending. These results support the idea that this area could hold a meaningful extension to the mineralized zone that exists at Greens Creek. At Zinc Creek, the target horizon was intersected in all four holes this year, with strong alteration and abundant pyrite, including nine feet of semi-massive pyrite in hole PS-509. Underground, three rigs carried on defining and stepping out from existing resources with good results, including 63.6 ounce per ton silver across 14.1 feet in the 200 South Zone. Moving to slide 18, in Nevada at Midas, hole DMC-494 gave 0.73 ounce per ton gold and 2.9 ounce per ton silver across 1.4 feet, confirming a second narrow high-grade vein that follows our second quarter discovery in hole DMC-481. Step-out holes on both veins all intersected the structure, with assays pending on all but one. What these results do is affirm that the Southwest Pediment area is prospective, and that area is a key component of how we are assessing a possible restart at Midas. We also started drilling at Aurora, where Brawley Peak displayed intense alteration, and at Polaris, where banded quartz veins showing evidence of boiling came up, which tells us deeper drill testing is needed on those targets. At Hollister, drilling got underway at the South and Excalibur targets, with assays still pending. Work at Aurora and Hollister will both carry on through the fourth quarter. With that, I'll hand the call over to Rob for his closing remarks.
Thanks, Kurt. If we go to slide 19. In summary, safety got better once more, though we keep working so it improves even more. The total reportable injury frequency rate, TRIFR, again showed improvement, moving from 1.51 to 1.57 during the quarter, and that is the correct direction. I believe there is still room to do better, since, as I have said consistently, a productive mine is a safe mine. Q3 delivered record cash flow and another set of strong financial results. That adds to a record which has allowed us to reduce debt and reach a position of genuine financial strength — the sort that enables continued investment in our solid organic project pipeline for years ahead, while delivering value for shareholders. We hold almost $700 million in cash, carry no long-term debt, and have roughly $1.2 billion in liquidity. That is unquestionably the strongest balance sheet in this company's history. Our pipeline keeps moving forward: the pyrite concentrate circuit is advancing at Greens Creek, there are new possible paths for the dry stack tailings, and Midas may be heading toward a restart. Low capital intensity is the common thread across all of these. At Keno Hill, we are working through permits and the infrastructure needed to support the mine in reaching its potential. We do believe in a robust precious metals market, we think silver has a very bright future, and we are working to grow shareholders' exposure to the metal. I really hope you can sense the enthusiasm within our company for the project pipeline; we think Hecla is the most compelling way to gain silver exposure in this sector. Maybe a final word on guidance: we have narrowed our production range, improved our silver cash costs and all-in sustaining costs, and reduced our capital investment, all while generating record-free cash flow. With another solid quarter behind us, we are well-positioned to hit our 2026 guidance, and we look forward to keeping you updated. I will now ask the operator to open the line for questions.
Hello, and good morning to all of you. Congratulations on a solid quarter for Hecla. When I look at the balance sheet — $700 million in cash now, plus a credit facility of up to $600 million — what's the current thinking on the wisest deployment of capital from this point, and that includes how you view the valuation at which the shares are trading, weighing organic investment, returning capital to shareholders, and possibly M&A going forward? Regarding M&A, what criteria would you apply across jurisdiction, commodity focus, stage, and size? Thank you.
Russell, perhaps you could begin with the balance sheet?
Alright, that sounds fine. Good morning, Harrison. Regarding the balance sheet, honestly, as we've said before, we're aiming to build up a cash balance that can cover our future liquidity requirements. Brian discussed at some length those growth projects that are going to need capital. They aren't especially capital intensive, but we still want to be sure we can fund them. Kurt mentioned the exploration work he's doing. We anticipate positive results from that, so we want to be sure we're in a position to fund it. On top of that, we want to have adequate liquidity right there on our balance sheet so we can withstand low prices and similar circumstances. But as we go about strengthening that balance sheet, and as we see clarity emerge regarding these growth projects Brian mentioned, the exploration programs, that sort of thing, we'll keep assessing capital returns, and once we determine the timing is right, we would move forward on it. I'll ask Rob perhaps to address the M&A side of that.
Alright, thank you. Appreciate the question, Harrison. Regarding M&A, something I'd highlight is that our mine lives are exceptionally long — not quite, but nearly twice what peers average — which gives us visibility well out on the horizon. Another point worth noting, I think, is that within our sector we're somewhat unique because our silver exposure exceeds that of most of our peers, and we intend to keep it that way. You asked about criteria, so our aim is to remain a silver company, and we also want to remain in jurisdictions that are relatively safe. Right now we're in Canada and the U.S. I mean, you have to go where the scarce quality assets are, and does that mean we'll be there forever? No, probably not. We'll likely consider other jurisdictions, but we perform a proper detailed analysis of what a relatively safe jurisdiction looks like. As a rule of thumb, I've said that anything in the top third of the Fraser Institute Investment Attractiveness Index — we'd take a look at that country, but we wouldn't simply use it as a tick box. We would do a thorough risk assessment and understand whether we're comfortable with those risks, whether some of them can be mitigated, or whether it's simply not for us. Our M&A appetite at present, as I said, we already have a future that we've plotted out to + 20 million ounces, and investing in our organic projects that we already own, that we already control, and that we understand deeply. That's the path forward we prefer. If something comes along, we have time. We can be thoughtful and diligent and thorough. We have time. If something compelling comes along that meets our investment criteria, we will act. Again, I'd just point you to our preferences for organic growth. Obviously, M&A is a tool that's available to us. We'd just be very disciplined about how we do that.
That's really helpful detail—thanks. On a separate note, I wanted to ask about Keno Hill: could you lay out the outlook for processed grades there in a bit more depth? Obviously it's a very high-grade deposit, and I'm wondering—under the plan with lower throughput and greater selectivity—what are the targets for processed grades going into Q4 and across the next couple of years, until the permit amendments arrive?
Well, I'll begin. A few factors dragged the grade down in the first half. Output from the Bear Zone—clearly a high-grade zone—was lower. Dilution also occurred since we were mining certain remnant areas. That carries a higher cost and a lower grade. We transitioned into the Arctic Zone, and then there was also sequencing at Bermingham and Flame & Moth; those problems have since been addressed, so mill grade rose from roughly 19 ounces per ton in Q2 to roughly 26 in Q3. My expectation is that the grade will hold at approximately reserve grade. Any thoughts on that, Brian or Carlos?
So we do anticipate a drop in silver output, though it should be proportionally smaller, since we plan to be more selective—not just in mining but in processing as well. Our emphasis will be on cutting dilution and putting higher-grade zones first in both mining and processing, while we halt extraction of lower-grade material that would be processed later. The actual output will hinge on getting the right grade through the mine and mill, and we'll give specific guidance on silver ounces in February.
Understood. I appreciate the specifics on those two items, and thank you for taking my questions.
Yes, thanks. Good morning, everyone, and congratulations on a solid quarter. Looking back to early last year, you had already highlighted certain permitting constraints at Keno Hill along with the possibility of scaling back or pausing operations. I have two questions, I suppose. First, now that silver is back around $50, could there be a chance to revisit a possible shift to care and maintenance, considering Keno Hill generated slightly negative free cash flow this quarter with silver at $63? Second, the Yukon appears to be a real hotbed for development these days, and the province seems eager to move projects ahead faster. I'm just curious whether something more specific to the project at Keno Hill is what's delaying the permits.
Let me take the care and maintenance question first. Essentially, our plan is to continue operating under the existing permits while that infrastructure gets built. As we note in our 10-Q, any step that gets delayed, limits on temporary waste stockpiling, or less power from Yukon Energy could result in additional curtailment or a stoppage. Should permits or infrastructure slip, or silver drop substantially, care and maintenance could become a consideration, but keeping the workforce intact is what we'd prefer; the finish line is visible at roughly three years out; our workforce has come to understand the ore body more and more and keeps getting better and more efficient at mining it. It isn't a major burden for us, and in my view the best path is to keep operating as long as possible and carry through to mid to late 2029, when we can see things really, some of those constraints being lifted and the full potential of Keno Hill emerging; on the Yukon, we are the only significant operating mine in the Yukon that is public and run by a public company. The government already supports us strongly; our relationship with the First Nation of Na-Cho Nyäk Dun is much improved. I believe every stakeholder wants to see us succeed. Stakeholders have come out to the site and visited us, and we're quite proud of what has been achieved there, particularly both in terms of the mining we do, the responsible mining, and also the rehabilitation work carried out through ERDC, our rehabilitation unit, which is in fact government-funded. The rehabilitation and reclamation they've been doing is highly visible to the community. Anyone driving by on the highway can watch it improve week by week and month by month. Patrick, you've been up in the Yukon lately. Anything to add?
No, I'd say your summary captures it well. Those relationships are in good shape. Permitting continues to advance. It's a process that takes deliberate effort. Our plan is to file the project proposal before the year is out, and that represents the initial stage of the YESAB review, the federal review. Nothing in particular is holding up anything that's presently underway. We're simply progressing through that process step by step.
All right, thanks. Maybe just turning to the tailings reprocessing project — the results from (Envirometals) with the Greens Creek material seem to have come out fairly well. I'm just curious why you're now looking at several different avenues beyond that one; specifically, if you chose to build your own facility, wouldn't that perhaps be viewed as beyond Hecla's area of expertise and add a fair amount of time before realization?
Brian, would you like to handle that question?
So, we brought up that third party we've been collaborating with — we've had a relationship with them for a long time — and their technology definitely appears to be performing well in the studies we've completed. The remaining two options really just provide us with flexibility. If you consider that site, being able to ship raw tails out as a low-grade concentrate certainly benefits the environmental side of closing that site, along with some of the long-term expansion costs tied to the tails facility. When it comes to reprocessing, that's basically what we're constructing at the mill. What we're building is a pyrite concentrate — that's a circuit — which is exactly what we'd be doing with the tails facility. So we're producing a pyrite concentrate as well, and that's within our wheelhouse since we're already going to be doing it. So those studies will get underway. Again, we should have some metallurgical results. We're somewhat concerned about oxidation of that material, so we need to figure out what the metallurgical results show and how well it will float. But I don't believe there are really any major technical concerns there. Another thing: it gives us the flexibility to examine all three, because there could potentially be a combination of three options for handling the tailings facility to monetize it. I think all of them remain viable paths. I think over the next year — six, eight months — we'll really begin to narrow down what we're going to do. From a capital perspective, I suppose, the cost of building a pyrite circuit at the mill will give us indications of the costs for building a reprocessing facility, should we go that route. So we'll have plenty of information coming in over the next several months that will guide our path forward.
Yeah, and I just want to return to the concern you raised at the beginning, Wayne Lam, about us moving outside our area of expertise. That isn't what we're doing. The pyrite concentrate circuit is established technology with quite low technical risk. That's what we're applying to material we currently produce. Basically, what we're doing is replicating that approach and considering installing a pyrite concentrate circuit to handle the existing tails. As Brian Erickson mentioned, we have to carry out some drilling and characterization to determine the extent of oxidation that has taken place. But we aren't actually venturing into new territory that is entirely unfamiliar to us.
All right, great, thanks. Perhaps just one final item. To follow up on capital returns: Rob, when you came aboard, clearly the balance sheet situation was quite different, and the silver-linked dividend had been scrapped. I'm just curious whether there might be an opportunity for you folks to establish some form of attributable linked returns program down the road; and picking up on Russell Lawlar's point, I think we grasp the future capital requirements, but given that the balance sheet is expanding the way it is, perhaps you'll soon even be in a spot to build Libby on a standalone basis at some stage. That's a joke, by the way.
Yeah, you had me going for a second there, but thank you; regarding capital returns, clearly, at the pace we've been accumulating cash on the balance sheet, a point will arrive, likely at some stage during the first half of next year, when we need to take a serious look at returns. As for what form that takes, if there's a disconnect between how we value our assets and where the market values them, we'd consider share buybacks. I'm not sure about a silver-linked dividend. That has never really worked for anyone, neither in the gold space nor in our space. So it's probably unlikely, though dividends are something we would consider. I expect we'll have a far more thorough discussion at the board during the first half of next year.
That was great. Thanks for taking my questions, and congrats on a great quarter.
Thanks, Wayne.
Hey everyone, congratulations on the quarter. This is Tosin Jaiyeola, calling in for Fahad Tariq over at Jefferies. Perhaps I'll begin with Greens Creek. Over at Greens Creek, both throughput and silver grades came in lower versus a year ago, and Q3 AISC, I believe, landed roughly $5 per ounce above the year-to-date average. I just wanted to ask, what portion of that variance stemmed from temporary factors tied to maintenance and mining sequencing that would point toward the cost and grade profile as we head into 2027?
Sorry. It was very, very difficult for me to hear. Was anyone able to catch that and respond?
Hey, Tosin, you are a bit quiet. Could you repeat your question?
Yeah. What I was getting at is that at Greens Creek, both throughput and silver grades came in below the prior year, and Q3 AISC ran roughly $5 per ounce over the year-to-date average. How much of that variance stemmed from temporary factors tied to maintenance and mine sequencing, and was it indicative of the cost and grade profile as we head into 2027?
Tosin, I believe — if I caught at least the first part of your question — the point was that Greens Creek grades this year are below last year's. Brian Erickson is here with us; he served as our GM at that site for a long time. My view of Greens Creek is that the complexity there is precisely what generates a great deal of the value at Greens Creek. Grades at Greens Creek are going to fluctuate. At times they'll be higher, at times lower. Brian, I don't know whether you'd like to comment on that. Second, Tosin, you also brought up throughput, and from what I see, throughput in 2025 was higher than in 2026. Brian, perhaps you could say a few words on that, in connection with some of the projects we carried out earlier in the year.
Yeah, I believe Russell's right on that. Silver, it moves up and down quite a lot across the grades, and of course we sometimes get surprises that are very good, and other times we pass through zones of lower grade. So none of that is surprising. On throughput, yeah, it's somewhat lower; at that site, as I think we've said, there's been some fairly major mill work over the past two years, and that will carry on into next year; it's definitely having an impact on production, but longer term I'm not worried about it.
The infrastructure upkeep work we're carrying out nearby is meant to get us ready for the coming years in the lifespan of Greens Creek.
Right, thanks. Perhaps just one more question regarding Keno Hill. Being realistic, is it possible for Keno Hill to reach commercial production while running at a lower operating rate? And what impact does this slowdown have on the company's medium-term goal of 20 million ounces of silver produced annually?
Tosin, once more, I'll repeat at least the small portion that I managed to catch. I apologize again, since hearing you is proving difficult for me, but I believe you opened with commercial production at Keno Hill. The requirements for commercial production at Keno Hill are clearly set out in our 10-Q. What I'd say is that given the production suppression we've discussed, we would not anticipate that commercial production occurring until later this decade or early the next. What I'd add on that, though, is that none of the cost accounting is actually affected. That is simply a mining term we employ under U.S. GAAP.
Okay. So what's the implication of that slowdown for our medium-term goal of 20 million ounces?
How does that relate to how it affects reaching the ounce target? Is that what you're getting at?
Regarding the 20 million ounces, we've noted that we expect to hit that figure within the medium term. Once again, what's causing this slowdown is that production has been suppressed while we arrange our infrastructure investments and secure the critical permits we require, likely around mid-2029. After that, we should be fairly unconstrained and able to bring production back up to 440 tons per day. Over the longer term, past that point, the mill is in fact rated beyond 600 tons per day, though achieving that would call for a further investment phase and a further permitting phase, so that's a longer-term matter. As for the incremental reduction in output at Keno Hill, we expect it to persist for roughly three years, and after that you'll see it rise beyond what we have essentially produced across its entire history, in fact. So there's no real effect on our 20 million ounce per year target. Once again, noting that this falls in the medium term.
Hi there. Thank you, Rob and the team. My first question takes us back to Keno Hill. In yesterday's discussion, you went into considerable detail regarding the tailings capacity constraints. Is that a new development? It is definitely something that is newer to me. I realize you touched on it somewhat in your Q2 MD&A, but before that, the focus was more on the permitted capacity of 440 tons per day, the Quartz Mining Licence, and the Water Licence. Are all of these interrelated in some way? If the tailings capacity constraint isn't new to you, then is the mid-2029 timeline new? Is that the reason you've had to curtail throughput starting in Q4?
No, it isn't new, and yes, all of them are interrelated. To recap, I think one of the new elements is that we have quantified that 200,000 tons of tailings remain, so that is what we have to work with; we clearly need to obtain the permits to expand tailings capacity. As mining proceeds, we are also producing waste, so there is a limit on that front. In addition, as we carry out more development and more mining, we are generating more water, and therefore we need to treat that water to the same standards we committed to. Much of this is permitting related. There's really nothing new here. Patrick, could you provide some additional color?
Right. Like Rob mentioned, at present we have essentially 3 constraints. Those are tailings capacity, waste rock capacity, and the ability to handle water that comes through our water treatment plants. None of these are new constraints. What I believe we've done is give a bit more clarity regarding how we intend to manage those constraints until our permits arrive, which we expect in mid-2029.
Great. Patrick, or maybe Rob, as you said, there are three separate constraints: tailings capacity, waste rock, and water treatment. Which one is the biggest constraint? Are they all roughly the same?
I'd say tailings is a fixed constraint, since we know how much permitted capacity lies ahead of us. The other two are somewhat more variable; they hinge on factors that are, to some extent, a bit beyond our control. We aren't certain when we'll hit water. We have models. We believe we know what lies ahead, but there's some uncertainty around that. Tailings, though, is a hard constraint, and that's what our current plan is based on.
Mm-hmm. Great. And Rob, at Keno Hill, it was really good to hear you've got four drills on site, plus there's exploration success there. What I'd like to ask is whether you could walk me through the reasoning behind the near-term drilling at Keno Hill. Flame & Moth is great, 900 feet southwest of the existing resources, but you do have this near-term or intermediate-term constraint when it comes to milling capacity. Do you need to find more ounces, or what sort of return does this give you? Is the aim to find higher-grade ounces so you can actually feed the mill at a lower capacity?
High-grade ounces are always the goal, and that's where Kurt and his team have been enjoying a lot of success. Take a look at that Bermingham Deeps. As we head down plunge, the grades get even higher. Again, most of the exploration we do in the district is near mine. We're working in and around the ore bodies that already exist. We're not really going out to any of Kurt's 17 targets that could have more than 50 million ounce potential; we're really staying close to where we already have development, so we can basically monetize any wins there. Again, over the medium term, we're excited by that area along strike, continuing to step out from Bermingham Deep to the north, I guess it is, where you have the convergence of the historic Hector- Calumet. There are just a handful of holes there, and that's really where everything is pointing to us that there could be larger resources available. Kurt, sorry, I should have deferred to you.
No, I believe he addressed that thoroughly. One objective at Deep Bermingham heading toward Hector-Calumet is our belief that the fluid source feeding both deposits is likely identical, which means a substantial prize could exist between them. Every bit of our drilling has concentrated close to the mine, close to Bermingham, close to Flame & Moth, as we work to grow resources and reserves at the active operations.
You've touched on something important there, Cosmos — the high-grade aspect. It isn't merely about discovering high grade; the real key is extracting high grade through less dilution, and that will be one of our priorities. We're examining several alternatives that we've mentioned. Brian, could you speak to the mechanical cutting and that side of things?
Yes, we are of course providing guidance. We will be cutting tonnage at that site, but we are not stopping there; for several years now we have been working to shrink the mine widths and bring that dilution down. We have testing in progress at the mill to identify possible chances to lower dilution in the ore feed; so a great deal of effort is being put into this. We will bring you up to date once we have some highlights from some of this work we are doing.
Yeah. And I suppose, Rob, putting it more bluntly: with this near-term cap at 300 tons per day, is it necessary to locate additional ounces, even if they sit close to the mine?
I don't believe locating additional ounces is necessary. We already have a reserve life of roughly 15 years, if I recall correctly — something in that region; Bermingham Deep s, which carries a higher grade, is still to be developed. Additional ounces aren't needed. What's needed is achieving the throughput. As you're aware, it carries high fixed costs, so that denominator comes in somewhat low. So once we remove the constraint and can develop more quickly, mine more quickly, produce additional water, treat that water, and place the tailings and the waste, you'll observe it beginning to near its full potential within the 440 tons limit starting around about 2029 onward.
Great. Rob, perhaps one final question. It's encouraging to see that in a sector where everybody else is discussing inflation and higher input costs, and we've seen several companies raise their all-in sustaining cost guidance for 2026, you've actually moved the other way. You've brought it down, which is excellent. But maybe could you explain how much of that stems from byproduct credits, and could you perhaps address labor input costs? Are you noticing any pressure, particularly, say, in the Silver Valley? Because I've heard competition in the Silver Valley has been quite high when it comes to labor, when it comes to cost and so forth. Could you maybe cover all of that, Rob, or perhaps Russell?
Russell, that's a good
Cosmos, I can definitely address that. I share your view that it's a positive thing we've managed to bring our AISC down; that happened for a number of reasons, really. Byproduct credits were one, correct? At the start of the year, we had to make assumptions specifically regarding gold and zinc. With zinc, something people occasionally overlook is the substantial byproduct credit Greens Creek gets from zinc. Both of those have turned out better than the assumptions we'd made, and that's part of what we're seeing this year. Also, bear in mind that our sustaining capital came down a little bit as well, so that contributed to the AISC improvement too. Looking at it from the standpoint of just production costs, roughly 50% of our cost is labor, and that's something, as competition for miners shows up, whether in the Silver Valley or somewhere else, that we're going to have to keep pace with. I think in the current term, as you can see in our cost structure, we haven't been significantly affected, but it's something we'll need to keep in mind going forward.
Well, thank you. To follow up on that, I'd really encourage you—I realize we've gone past the time we set aside, but since your questions matter to us, please get in touch with Mike once this call ends. Thank you all for the thoughtful questions today, and thank you for being with us this morning. I'll leave you with this. This company has never been in a stronger financial position than it is now. We're well set up to hit our 2026 guidance, and we're putting that strength to work for our shareholders, and we look forward to giving you another update next quarter. Thanks, and have a great day.
This concludes today's call. Thank you for attending. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Hecla Mining Company transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Hecla Mining Company earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.