Hecla Mining Company (HL) Earnings Call Transcript
August 5, 2026
Earnings Call Speaker Segments
Appreciate that, Hilary. Morning, everyone, and thanks for being here on Hecla's Second Quarter 2026 Results Conference Call. This is Mike Parkin speaking, Vice President of Strategy and Investor Relations. You can find our earnings release, put out yesterday, plus today's presentation, on our website. Joining us are Rob Krcmarov, President and Chief Executive Officer; Russell Lawler, Senior Vice President and Chief Financial Officer; Carlos Aguiar, Senior Vice President and Chief Operations Officer; Brian Erickson, Vice President of Operations; Kurt Allen, Vice President of Exploration; plus other members of the management team. Once our prepared remarks wrap up, we will be — we will be available for — to take whatever questions you may have. Moving to Slide 2. Any forward-looking statements the management team makes today fall under the Private Securities Litigation Reform Act and carry risks, which are laid out on this slide, in our earnings release, and in our 10-Q filing with the SEC. Those risks, and others, might cause actual results to diverge from what the forward-looking statements project. Non-GAAP measures referenced on this call and in the related slides are reconciled either in the slides or the news release. One note: when we talk about financial figures and projections during this presentation and in the earnings release, we mean our continuing operations. Now I'll hand things over to Rob.
Thanks, Mike, and hello everyone. If you'll move with me to Slide 3. Hecla closed out Q3 of 2026 in a really strong position — and by that I mean financial strength, a standing that today represents the healthiest balance sheet in the entire lengthy history of this company, and the characteristics laid out on this slide, the ones that establish us as North America's premier civil producers, those remain the same. What's different now, however, is the level of confidence we have to put money into what lies ahead. So I'm excited for our teams to talk through some impressive things emerging from the deep pipeline of projects we have, which tightens our grip on where we sit in the market. I'll say more about that shortly. Now to Slide 4. This was yet another very strong quarter for Hecla, even if a few headline figures went a different way than they did in the prior quarter. And I'd like to take a moment to explain why, because the story underneath, in my view, is a positive one. Continuing operations revenue came in at $334 million, against the record $411 million we posted in Q1. There are two reasons behind that shift, and both deserve clarity, since neither one reflects a production issue. Number one, metal prices retreated from the peaks seen earlier in the year — though my confidence in where silver and gold prices are headed hasn't wavered. Number two, a chunk of the difference was purely about timing. A significant quantity of silver concentrate, largely from Greens Creek, had been produced yet remained unsold when the quarter closed. If that concentrate had gone out during the quarter, revenue would have come in noticeably higher on top of what was already a strong quarter. That inventory went out in early August, and you'll see the effect reflected in our Q3 results; those of you who've tracked us for a while are familiar with how uneven the sales pattern runs at Greens Creek. Adjusted EBITDA from continuing operations reached $199 million, which is over twice the $94 million we brought in a year earlier. Operating cash flow came to $175 million, while free cash flow was $136 million. That's our second-best quarter ever, and it lands very near the record $144 million from last quarter. Each of our mines produced free cash flow once again this quarter, with Greens Creek and Lucky Friday both establishing fresh site-level quarterly free cash flow records, at $130 million and $88 million, respectively. Our balance sheet is, quite simply, the finest it has ever been across our long history. We finished the quarter holding $483 million in cash, carrying no long-term debt beyond capital leases, and with a $225 million revolving credit facility that is essentially fully undrawn, plus a $75 million accordion. A balance sheet this strong hands us genuine optionality — the flexibility to continue putting capital into the projects and assets that make the most sense for this business on our own schedule, instead of having our balance sheet call the shots. When it comes to operations, we turned out 4.2 million ounces of silver, which is an 8% increase over the previous quarter. Lucky Friday also set a fresh quarterly record, producing 1.5 million ounces of silver. I'm particularly happy about how we did on safety. Our consolidated total recordable injury frequency rate, or TRIFR, came in at 1.57 — a significant gain compared with the 2.07 we reported in the first quarter. That sort of progress shows genuine, intentional dedication from our teams, and honestly, it means more to me than any financial figure on this slide. In early June we held our annual Safety Day as well, with senior leaders going to each site to drive home safe work practices. Now let's look at Slide 5. Our medium-term path toward becoming a 20-plus million ounce silver producer keeps moving forward, built on the Keno Hill ramp-up and a possible Midas restart, with added upside ahead from Keno Hill expansion plus Aurora and Hollister in later years. In the nearer term, there are 2 organic opportunities at Greens Creek that I'm eager to tell you more about today. Each one fits the profile of a high return, low capital intensity project that we target. For any of these organic investments, our hurdle is a return on invested capital that beats our cost of capital by a solid margin, and early work on both indicates they can clear it. I'll hand things to Brian now so he can take you through them. Brian, the floor is yours.
Appreciate that, Rob. Morning, everybody. If you'll go with me to Slide 6. First up is the pyrite concentrate circuit at Greens Creek — the one we plan to unpack in far greater depth during this call. In short, we are pushing forward on engineering plus metallurgical studies for a brand-new processing circuit at the Greens Creek mill; should those studies prove out, we would generate a sellable pyrite concentrate stream from mill tailings that today are sent to the dry stack tailings facility. This is still fairly early-stage work, yet I want to leave no doubt about how strongly we believe in it. The relative simplicity involved, paired with the returns we are currently seeing at this point in the study, gives us confidence this is headed toward execution rather than being an evaluation done merely for its own sake. After it reaches full ramp-up, we anticipate the new circuit might contribute roughly 1 million to 1.2 million ounces of silver plus 10,000 to 15,000 ounces of gold in added yearly production. That comes on top of what Greens Creek already produces, while simultaneously lowering the volume we place into the tailings facility. Early engineering and medical — pardon me, metallurgical work indicates the possibility of a robust return on capital that would clear our investment thresholds. It should be a project with low capital intensity, with CapEx presently estimated at somewhere around $40 million to $60 million. That's anticipated mostly for mill components, a storage building, sizing upgrades and a bit of shiploader work to accommodate the extra tonnage. Added operating costs across the new circuit should also be comparatively modest when measured against the overall increase to our yearly spend, and are presently put at an incremental $10 million to $15 million per annum. Putting all of that together, you can see the possibility for impressive NPV upside at today's metals prices. Right now, we are aiming for first quarter or first production somewhere between the fourth quarter of 2027 and the first half of 2028, followed by a ramp-up period of about a year. We will keep tightening the economics as engineering moves ahead, and we will keep you posted. Let me stress that these figures may change as we work through additional engineering studies, but we are quite enthusiastic about what this project could mean for production and, even more importantly, for potential future cash flows. Next, I'll cover the Greens Creek tailings reprocessing project. It stays among the more compelling opportunities within the portfolio, the dry stack tailings facility <<inaudible>> over 600,000 ounces of gold <<inaudible>>. Using metals prices as of June 30, 2026, that amounts to <<inaudible>> value of approximately $6.1 billion, and I must emphasize as reporting recovery processing capital cost; we are working alongside a vendor specializing in new technology and set to begin Phase 3 metallurgical test work this month, which we expect to wrap up during the quarter. That work, together with confirming a suitable processing facility, should establish how we proceed. And as with pyrite concentrate potential to produce Green Creek reclamation liability potentially meaningful added benefit potential cash flows could generate. Should this project turn out to be workable, we'd anticipate it becoming another low-cost intensity project that pairs nicely with the pyrite concentrate project. And then, the Midas restart project in Nevada keeps moving forward as well. We're still assessing the hub and spoke model, which would feed ore for Midas and possibly Hollister or other sources in the region through the mill that's already permitted. In addition, we're looking at the mineralization that remains in the old mine beneath the existing mill as a possible extra resource. Kurt will cover the most recent Midas exploration results in a few minutes. At this point I'll hand the call over to Carlos for a review of operations.
Thanks, Brian. Moving on to Slide 8. During Q2, Greens Creek turned out 2.1 million ounces of silver along with more than 14,000 ounces of gold, which matched what we had anticipated. Cost applicable and sales came to $50 million, and cash costs stood at negative $17.11 per ounce, with a basic figure of negative $10.71 per ounce, both calculated after byproduct trends. This quarter delivered exceptional results, powered by very strong byproduct revenue. Cash flow from operation reached $139 million, while free cash flow hit a new site level record of $130 million. Rob mentioned that some of the concentrate we produced during this quarter hadn't been sold by the end of the prior quarter, which explains why our production was strong but recognized revenue didn't match. That material went out in early August and will be reflected in the third quarter's financials. Looking at the entire year, our updated expectation for Greens Creek is silver output between 8 million and 8.3 million ounces, which is better than what we previously told you, along with gold production of 51,000 to 55,000 ounces. Costs applicable to sales should come in at $240 million, while cash costs will range from negative $12.15 to negative $12 per ounce, and ASIC will be between negative $4.25 and negative $3.75 per ounce — each of those figures calculated after byproduct credits, and both representing an upgrade from earlier guidance. Turning now to Slide 9. Lucky Friday had a fantastic quarter, setting a record with 1.5 million ounces of silver, or a higher mill rate. Costs applicable to sales reached $35 million, cash costs came to $3.95 per ounce, and ASIC was $17.8 per ounce, again both measured after by-product credits. We generated $104 million in operating cash flow, while free cash flow reached a record high of $88 million. Completion of the Surface Cooling project is still expected by September. Looking at the entire year, our silver production guidance has been narrowed to a range of 4.9 million to 5.2 million ounces, with $140 million in cost applicable to sales. We now anticipate cash costs will be lower, between $9 and $9.75 per ounce, while ASIC should come in somewhat above $20.50 to $26 per ounce, which reflects greater planned spending on sustaining capital. Moving now to Slide 10, at Keno Hill we turned out 625,000 ounces of silver during the second quarter, an increase over the 0.5 million ounces recorded in the first quarter. We generated $18 million in operating cash flow, while free cash flow came in at just under $15 million — marking Keno's fifth straight quarter with positive free cash flow. At Keno Hill, our strategy is intentional. Instead of chasing higher tonnage before the necessary site development and permitting work is completed, we're operating the mine at a steady, reduced rate, concentrating our resources on those efforts while still producing patio free cash flow — work that we believe will enable a significantly larger tonnage rate down the road. For the full year, our revised guidance now stands at 2.2 million to 2.6 million ounces of silver, which mirrors our near-term emphasis on permitting and site we love. There's something positive I'd like to point out regarding permits; this quarter, the authorization came through for us to enlarge the tailings storage facility at Keno Hill. That green light speaks to the solid relationships we've established with the Yukon government as well as our First Nation partners <<inaudible>>. It also represents a key element of the groundwork underpinning our plans over a longer horizon for this time. At this point I'll hand things over to Russell for the finance update.
Thank you, Carlos. Turning to Slide 12, let me...
Apologies — Russell, may I simply — Russell, may I cut in here. I realize Brian's connection dropped while he was calling in from Yukon. Therefore I'd like to go over one portion again that could matter and didn't come through. Brian was, at that moment, discussing the 51 million ounces of silver along with the 600,000 ounces of gold, plus the numerous other metals that remain locked in. I simply wish to note that a vendor specializing in this technology is the party we're collaborating with. And this month they're scheduled to begin Phase III metallurgical test work, which we anticipate finishing within the quarter; so that effort, combined with locking down an appropriate processing facility, is expected to establish how we proceed. Thus I only wanted to set the record straight on that matter, since I realize it got lost in transmission; so the floor is yours, Russell Lawlar. Thank you.
Thanks, Rob. I'll begin on Slide 12. As Mike mentioned, whatever I discuss here is based on what our continuing operations delivered. During the quarter, mine revenue came to $323 million, and within that total silver made up 68%, gold contributed 14%, and the rest came from our base metal byproducts. Net income from continuing operations reached $118 million, or $0.18 per share, while adjusted EBITDA stood at $199 million. Our margins are still outstanding; through the quarter we captured 90% of the realized silver prices margin. Consolidated free cash flow totaled $136 million, almost equal to last quarter's record of $144 million, with contributions from all 3 mines. Now to the balance sheet. We closed the quarter holding $483 million in cash, with no long-term debt outstanding beyond capital leases and what amounts to a credit facility that remains fully undrawn. A year ago we sat in a net debt position of nearly $270 million, and today we've shifted to a net cash position of roughly $472 million, which is the strongest balance sheet Hecla has ever had. Moving to Slide 13. All of us have seen oil prices and fuel prices rise because of what's happening in the world right now, and I'd like to take a moment to explain why this affects Hecla much less than it does a large portion of our peer group. It starts with what our ore bodies look like. Our mines are underground and high-grade. Given that high grade, we have to process significantly fewer tonnes for every ounce we produce; we aren't operating big fleets of diesel haul trucks, which is what low-grade open pit operations rely on, so our diesel use per ounce is low by its very structure. That's mainly why fuel represents just about 3% of our consolidated cost structure this quarter; it comes down to how these operations work. The second element is the source of our electricity. Power represents our biggest energy input, and we buy it from local utilities, mostly generated by renewable hydro power. Hydro power isn't priced based on crude oil or natural gas, so when fuel markets spike due to geopolitical shocks, the cost of the energy that actually runs our mines and mills stays put. Combine those 2 factors — high-grade ore that holds our fuel intensity down, plus a power base rooted in hydro that isn't tied to volatile fuel markets — and the result is a cost structure that's much more predictable and much more shielded from energy price swings than what most of our peers can say; when fuel prices are rising and uncertain, that feeds straight into more resilient margins, and it also brings the added advantage of a lower carbon footprint for the metals we produce. As we move to Slide 14, you'll notice this slide has been updated for our Q2 results and outlook changes, and it projects our 2026 after-tax free cash flow across a range of metal prices. With silver at $50 and gold at $3,500, we estimate roughly $500 million in preconsolidated free cash flow for the entire year. Should prices come in under current spot levels, at elevated levels of $75 silver and $4,500 gold, which sit above where we are now, we anticipate the possibility of producing close to $700 million in free cash flow. At the highest point in that range, we're presenting today $100 per ounce silver and $5,500 gold. We foresee the capability of generating close to $800 million in annual free cash flow. Clearly, that represents a bullish case, yet it demonstrates the degree of operating leverage our platform possesses across a broad spectrum of prices. This illustrates how our business can deliver considerable cash flow throughout a wide variety of price environments. I'll now hand the call over to Kurt to walk through exploration.
Appreciate that, Russell. Turning now to Slide 16. Our exploration and predevelopment budget for 2026 stands at $55 million, which is the highest figure ever recorded in this company's history, and that represents approximately 4.5% of the revenue we expect. Three priority areas divide those funds. The first, our near mine programs, receives $24 million; these carry the lowest risk and deliver the strongest return within our targeting, contributing 1 to 2 years' worth of resources for conversion to reserves. Nevada gets $16 million, allocated across Midas, Aurora and Hollister, where our target is a resource of 0.5 million to 1.5 million ounces of gold equivalent, intended to serve as the foundation for a possible minus restart. Also, $10 million is allocated toward early-stage and generative exploration. I'd like to walk you through some promising findings from the exploration release we put out last week — that was July 29th — and you can find it on our website. Let's turn now to Slide 17. Over at Keno Hill, a high-grade silver trend has been stretched to 800 feet of strike length, and it remains open in both directions. With that extension, we've moved nearer to the historic Hector Calumet mine, where more than 96 million ounces of silver were produced over its operating life. The old workings are visible on the right-hand side of this image. On the exploration side, some recent highlights: 10.2 feet grading 62.7 ounces per ton silver — that's close to 2 kilograms per metric tonne — along with 10.1 feet at 44.6 ounces per ton silver and 8 feet at 22.4 ounces per ton silver. Results like these back up how we see Keno Hill over the long term: an asset capable of supporting mining for generations. We're doing follow-up work on those results, and another update is expected later in the year. Turning now to Slide 18. Down in Nevada, drilling around the Pogo Center gap at Midas has turned up 2 new high-grade gold-silver mains in the Midas style, and the system is still open — this builds on what Brian walked through earlier regarding the wider Midas Hub-and-spoke opportunity. The fresh veins we've found look a lot like the ones that were mined with great success in the past at Midas. In addition to those results, I'd like to point out that two more exploration programs are picking up steam during this quarter. We've had drilling going at Hollister for a number of weeks now. And over at Aurora, which happens to be my favorite project, we expect to kick off drilling in the middle of August. Aurora produced in the past, yielding exceptionally high-grade mineralization, and its historic results ran above 2 ounces per ton of gold — that's over 60 grams per tonne. Much like Midas, there's a permitted mill sitting on the site. Getting this to work as an operating site once more would require some investment. Depending on what the drill bit reveals before we reach that point, we'll concentrate on it; for the business, this might turn out to be a significant value-servicing chance, and I'm genuinely eager to see what the first holes show, which we might have by this autumn. So keep watching. At this point I'll hand the call back to Rob for his closing comments.
Thanks, Kurt. Now if you’ll turn with me to Slide 19, I’d like to offer a few closing remarks before we take questions. During this quarter, we once again delivered solid financial performance, extending a record that has allowed us to reduce debt and reach a position of genuine financial strength—one that enables ongoing investment in our strong project pipeline for many years ahead while also unlocking value for shareholders. Our underlying business has never been in better shape. We are making prudent, disciplined investments across our asset base so that it is positioned for lasting success. Safety results showed meaningful improvement during this quarter. As I noted at the beginning of the call, our balance sheet is unquestionably the strongest in the history of this company; we have confidence in a strong precious metals market, and we believe silver’s future is very promising. At current pricing, we are already producing significant free cash flow; and, as Russell mentioned earlier, at the upper end of the price scenarios presented to you today, this platform is capable of generating close to $800 million of free cash flow on an annual basis. That reflects the operating leverage we now possess, and we are working diligently to secure its benefits for our shareholders. I sincerely hope you feel the same enthusiasm we do about our project pipeline and the momentum its advances are creating, and we believe Hecla continues to be the most attractive route for gaining silver exposure within this sector. We look forward to continuing to execute and to keeping you informed throughout the year. At this point, I’ll ask the operator to open the line for questions.
Nice work on a solid quarter. Clearly, metal prices have slipped somewhat. I'd imagine there's a bonus arrangement tied to metal pricing for employees by asset. I'm just curious whether we can somehow translate that into a cost per ounce or cost per tonne for each dollar move in the silver price underneath? Or what's your approach to modeling it?
I'll let Russell take that question.
Absolutely, Heiko, no issue at all. The item most closely linked to the silver price, I'd say, is the profit share at Lucky Friday. If you look back to late last year, you'll notice that, as we guided, our prices sat lower, since the guidance obviously came in lower during the year; as prices climbed, you saw our prices rise. This year, we deliberately set higher prices when we entered January and February — we were at high prices, high silver prices. So we intentionally incorporated high prices into that profit share, and as the year has progressed downward, we've watched that cost diminish. In the guidance we've now released, we've applied strong prices, though not the $90 silver we utilized at the start of the year. I'm trying to work out how to communicate directly what that amounts to per ounce. Honestly, I'd need to follow up with you on that. Right now, I don't have a specific figure for you. Still, I believe it's largely confined to Lucky Friday, and you can observe it when you examine how Lucky Friday's costs have performed across roughly the last year or so.
Yeah. I think it would be quite useful if you folks could devise something like — I don't want to call it a formula, but yes, almost a formula aimed at the analyst community. Completely <<inaudible>> question. Turning to longer-term capital investment, do you have any color on what we ought to model for longer-term capital? And maybe that's a question you can't really answer, but I'll try differently. If you can, are there any large-scale investments at any of the other assets coming on in 2027 and 2028 that may not be obvious for us.
I can continue the...
Thanks for the question.
Go ahead, Rob.
Alright, Russell, over to you. Okay. Regarding — sorry, it feels strange since we’re each in different offices. I’ll go ahead and begin, Russell, and perhaps you could jump in to cover anything I miss, if that’s alright? When it comes to CapEx, there aren’t any significant expansions planned for the near term. What we do have is the restart in Nevada, and we figure that will require fairly low CapEx since the mill is already ours. As for the pyrite concentrate project’s CapEx, it’s actually quite modest, especially when you consider the incredible returns it should produce. The cooling project at Lucky Friday is nearly complete; so I’d say there’s nothing truly major on the horizon. Anything you’d like to add, Russell?
One more point on top of what Rob said — yeah, that's right. Yeah, just a small addition here. What I'd tack on is that at Greens Creek and Lucky Friday, we're constructing tailings facilities across the coming 2 years. And at Keno Hill, tailings are going to be built by us in the near term, and then somewhat more toward the intermediate term, though beyond that, Keno Hill is also going to keep putting money into infrastructure so that mine's output can be raised.
Great. Thanks to both of you, and I'll get back in line. Again, a strong quarter. I appreciate it.
Thank you, Rob, and thanks to the team; and congratulations on hitting record free cash flows at the asset level for Greens Creek and Lucky Friday; but I guess my question is this — I'm looking at the asset level; and like Russell mentioned, $130 million from Greens Creek, $8 million from Lucky Friday and roughly another 14 from Keno Hill. Still, I can't seem to square that with your corporate level free cash flow of $136 million. If you line up the latest quarter against Q1, both Greens Creek and Lucky Friday came in below where they were, while the corporate line went the other direction and rose. So my hope is that you can walk me through the bridge to that corporate figure, because once I understand it, I'll be in a better position to figure out the smartest way to put those asset-level free cash flow figures to work.
Let me take that one, Rob. Yeah, I've been staring at the same thing myself. Good question, Cosmos. When we think about free cash flow at our mine sites, we turn to Page 3 of the earnings release, where we show how free cash flow ties back to cash from operations. For mine site figures, we add back exploration spending incurred at that location, since we allocate exploration expense at the corporate level, and in the current period it isn't truly tied to the operation's core. When you look at free cash flow for the company in the first quarter compared with the second, what you'll notice is that exploration expense rose from Q2 to Q1, and our consolidated corporate free cash flow figure does include that — that's the first point. The second point is simply corporate expenses that those Q1 corporate cash and cash outflows don't capture, meaning they weren't part of Q1. So basically, it comes down to timing — working capital timing.
All right. All right. Perhaps we can pivot somewhat regarding Keno Hill. You noted that Q2 output came in around 600,000 silver ounces, and per what the MD&A states, you're moving through a zone of lower grade. So my question is this: when I look at your updated full-year guidance, $2.2 million to $2.6 million, with the midpoint sitting near $2.4 million, that works out to roughly 600,000 ounces annualized, multiplied by 4. I'm simply attempting to work this out. During Q2 you're progressing through a lower grade section. If you're exiting that, I would have expected guidance — or at minimum the midpoint — to potentially exceed what Q2 annualizes to. That's my first point. And secondly, is that 600,000 ounces a level that can be sustained? Is that what we should expect? Once more, I'm just trying to get my mind around this.
Well, our projection for the third quarter is quite similar — yes. Rob, please continue.
No, please, Carlos, you go ahead.
All right. Our expectation is that Q3 will look pretty much like Q2. We're certainly working in the new zones — we're developing those new zones at Keno Hill. As for the guidance we're able to give today, the rest of the year should come in quite close to what we saw in the second quarter.
So, my question would be...
Right. Like Carlos mentioned, Q3 appears to be quite comparable to Q2. The main thing is that we anticipate hitting our updated guidance by the close of this year. As for what occurs in the interim, we simply haven't shared that degree of granularity at this point. Please continue and elaborate on what you were asking.
Yeah. No, I'm simply attempting to get my mind around what that sustainable rate looks like, though I believe you've already addressed what I was asking regarding the updated guidance, Rob. Then, I suppose my next inquiry about Keno Hill relates to whether that reduced outlook for this year has any bearing on when commercial production might potentially start, or whether that timing is unaffected.
We laid out 5 criteria that must be satisfied for commercial production; just one has been achieved so far, and that's the silver recoveries. At present, our attention is on securing the permits we require, putting money into the infrastructure, and progressing through all of that. If we're able to obtain those permits — the essential ones — by the middle of the period, and if we can carry out the main infrastructure projects across the coming 2 or 3 years, and if the tailings expansion can be pushed far enough ahead in 2029 for the mill to go back to normal production levels, then my expectation is that we'll start increasing toward greater output by around the close of 2029. So the ramp-up here has taken somewhat more time than originally anticipated. Even so, we know which permits are needed. We know what infrastructure requires investment, and we're striving to sort out the permits and finish those investments. What lifts our confidence is that the exploration findings Kurt mentioned — you saw the 96 million ounces next door at the Hector Calumet. You can see the expansion as we keep finding high-grade extensions at boom deep. As Kurt put it, this is a generational mine that will, we hope, be producing for an extremely long stretch, and all we have to do is carry it through this permitting and investment stage. It also generates positive free cash flow at present and has done so across the last several quarters.
Good to hear that. Perhaps just one final question. Rob, the various expansion initiatives you've got coming through the pipeline sound excellent. I'd like to zero in on the pyrite concentrate circuit, I suppose, since you referenced 1 million to 1.2 million ounces of silver annually and 10,000 to 15,000 ounces of gold annually. Does that figure come ahead of payability or after it? And should it be ahead, how does the market look for the specific pyrite concentrate you produce, and would it be considered fairly clean? If I attempt to model what this might translate to in value, since you've supplied the remaining parameters — $40 million to $50 million in CapEx, if I recall correctly, and you also provided certain operating figures — I'm simply attempting to work out the production figures.
The quality is really high. As a matter of fact, we've seen exceptionally strong interest from numerous inquiries, I suppose. I'll pass it to Russell, who might be — perhaps he can offer you a bit more detail on that.
Appreciate that, Rob. When it comes to the pirate concentrate, there's one item I'd like to highlight — Brian, I believe, explained it clearly, though sadly his line got cut off while he was making that point. Rob then stepped in and sorted out part of the confusion. Even so, this project remains in progress. It's extremely — how should I put it — promising, in our view; our confidence in it is strong. We believe it will be a really solid project. That said, we're still doing some of the engineering work, and we're still finalizing certain cost figures; therefore, I don't want to publish a return on invested capital figure at this point, since we're still at those stages and still assembling those numbers. What I can tell you is that we have a return on capital criterion — we shared it at our Investor Day earlier this year — of 12% to 15% on invested capital; for this project, our expectation is that it would substantially surpass that. And if you look back — I believe it's in our earnings release, our Q, or possibly both — our expectation is roughly perhaps 1 million ounces of silver annually from this project. Indeed, that would boost our recoveries. We would also shrink what ends up in the tails, which delivers cost savings as well. The investment will be comparatively modest, again from a capital standpoint. And the reality is we already produce 3 concentrates at this mine. Consequently, on the operating cost side, we don't anticipate a substantial increase either. So when it comes to return on expected capital, we simply — we see it as being very, very robust. Does that <<inaudible>> for you?
Yeah. However, I suppose returning to what I asked initially, that figure of 1 million to 1.2 million ounces you described, that comes prior to payability factors, correct? So if I aim to approximate some sort of model by myself, I would need to, once more, I can make my own estimate to assign some kind of payability factor that gets applied to the 1 million to 1.2 million ounces?
Yes, I would say so. Go ahead and apply payability, since, as I mentioned again, at this early stage, we are still figuring that out among some of these specifics.
When I look at Lucky Friday and how well it did, I believe the company had said this was part of the plan. What I'd like to know is what drove those high grades. And I suppose the remark that it wasn't going to last, just going by the second-half outlook.
I'll pass it to Carlos shortly. But essentially, Josh, the high grade was scheduled. Timing is all it comes down to. This quarter, we moved through a high-grade zone. And once more, we don't anticipate keeping those high grades. It will likely go back to the main.
Yeah, yeah, part of that revenue came down to timing. We had actually anticipated getting a small piece of that high grade right at the close of Q2. So then — sorry — at the close of Q1, the biggest share of the high grade landed in Q2, and that explains it, correct, since it was scheduled that way. And naturally, we don't anticipate that sort of level over the rest of the year, yet it was certainly planned. It simply came down to timing.
Okay. Then, regarding the cooling project in September, is there anything we ought to keep in mind about what it implies for a tie-in, whether that would have an effect on productivity or throughput? And likewise, after the project is complete, how should we be considering the outlook for the mine?
Well, this project was truly intended to — please continue.
Continue, Rob.
All right. The main purpose behind this project was to prepare for the distant future as we move toward deeper levels and position ourselves; a lengthy reserve life already lies in front of us; measuring gains in productivity is quite hard, yet it simply follows that while operating in a mine that's rather hot, output will suffer when circumstances aren't ideal versus when employees feel at ease. Quantifying that isn't something I can do, although you simply understand on an instinctive level that better productivity ought to result, logically.
Understood. That's great. Then perhaps only one more item. Regarding what was said about Keno and trying to keep profitability steady, the picture seems comparable. Ought we to anticipate grades and throughput that hold more steady, matching what the first half delivered? Or does some level of further gains still lie ahead of the 2029 permitting milestone?
Well, only in connection with the growth — please continue, Carlos.
Okay, so for trout in Q3, we expect something comparable. There’s also a chance we’ll do some assay work in the final quarter. That said, on the whole, the back half of the year should come in a bit stronger than the front half.
All right. And the thing that would have caused that — which one of those factors was it?
Most likely, that would be a <<inaudible>>
Turning to the revised guidance, it was encouraging to see the ASIC figure come down. Could you walk us through what drove that? Was it more silver output at Greens Creek and Lucky Friday, a bigger byproduct credit, improved unit costs? And then perhaps some wider perspective on cost pressures you're noticing.
Russell, over to you.
Certainly. Thanks, Kevin. From an ASIC standpoint, I'd say Greens Creek really demonstrates how valuable that ore is, doesn't it? Let me touch on 2 or 3 points regarding Greenstreak in particular. To start, their first half was excellent when it comes to silver output — silver ounces came in extremely robust. The gold byproduct is enormous. I mentioned this during another question, I believe it was to call HEICO before, about the pricing assumptions behind our Lucky Friday cost guidance — similarly, we must estimate, regarding the byproduct prices we set at the start of the year, what will actually be realized compared with our projections, and we lean somewhat conservative there. Honestly, I'd need to revisit our year-end release to confirm precisely what those figures were. So on gold, we've clearly beaten expectations. Zinc has been quite strong — zinc prices have been quite strong. Something people occasionally overlook is that Greens Creek also generates a remarkable zinc byproduct. That covers Greens Creek. As produced costs are basically in line. They're performing well. Then looking at Lucky Brady's side, we've observed improved costs — I'd call it tighter cost discipline overall across the entire mine. That profit share I mentioned before has decreased somewhat, simply because silver prices have declined. That said, their first half was outstanding from a production standpoint; when you combine all those factors, that explains why the ASIC guidance looks better. I should note we anticipate capital spending during the latter half of the year exceeding what we spent in the first half. There are a couple of reasons for that. The third quarter generally offers a full quarter of improved weather for construction, with construction projects underway and so forth. Also, we simply tend to see additional equipment deliveries. We place equipment orders earlier in the year, and they tend to arrive later in the year. So I'd anticipate the third and fourth quarters carrying heavier capital spend; you can observe that by comparing our capital spend over the first 6 months against our guidance.
Great, that's useful. Russell, here's another one for you, maybe. Can you take us back through the tax losses you're carrying in the U.S. and Canada? And what's the right way for us to model the effective tax rate from here?
Sure, I can do that. When it comes to taxes, the thing I'd point to is where we operate — the U.S. and Canada. And that's simply because — let me single out the U.S. here — honestly, the way taxes work there is more favorable than what you'd find in nearly every other country globally. Consequently, compared to a lot of others in our industry, Hecla ought to be paying out lower cash taxes. Secondly, you'll notice — we made sure to draw attention to it in the earnings release — that over the quarter we handled some tax restructuring, merging our Nevada U.S. operations together with what you could call our primary U.S. operations, which encompass Lucky Friday and Greens Creek. Because of doing that, we're now able to offset the income coming in from Greens Creek and Lucky Friday using the expenses we have in Nevada. That's why you end up seeing a somewhat reduced tax rate, and clearly, we'll be paying out lower cash taxes as well. We anticipate being able to apply our NOLs this year at both the state level and the federal level. Because of that, we made a cash tax payment during Q1. I was actually attempting to find that figure, and honestly, I don't have it with me right now. Still, what you'd observe at this stage is that those would represent the taxes we anticipate paying.
All right, that sounds excellent. So perhaps we switch topics back to the pyrite circuit over at Greens Creek. Would there be any permitting approvals you'd need to obtain for it? And are there any surface space limitations at that plant you'd need to navigate around? Then maybe, as a follow-up, while you're carrying out the technical and costing efforts, when ought we to anticipate hearing some of those specifics? Also, ought we to anticipate adjustments to the resource or reserve given the greater recoveries from that circuit?
When it comes to — when it comes to permits, honestly I'm not sure what the answer is. This is really just an expansion of the circuit that already exists. So my guess is permitting would be quite limited, perhaps a load-out day item. I'm genuinely unsure — Carlos or Matt, might you provide any additional perspective on this?
Yeah, that's correct. As for the <<inaudible>>, a minimum of permitting is needed, and we don't anticipate any major hold-ups. So with that project, I don't foresee a problem, though a small amount is required.
Yeah. As far as reserves go, that's a pretty interesting thing to ask, since there is almost certainly material that had been sitting in resources; and given that we now possess the capability to process it at a profit, my expectation is that a portion of that could shift over into reserves, though quantifying that at this moment isn't something I can do.
Alright. Excellent; we will monitor that situation. Nothing further from me.
Robin Team. Rob, I'm certain you are aware that the Trail smelter located in BC is going through something like an $800 million improvement so it can handle germanium and gallium. I'm simply asking, has anyone ever assayed Greens Creek for germanium and gallium? Is this something under consideration, and do you have a urea plan to commercialize those metals should they be present?
It's quite possible that some germanium or gallium is in fact present in the tailings project. Honestly, I don't know. I'm going to — I will hand this over to Brian. Brian, in case you are still on the call, could you please respond to that?
Yes, I'm on. Can you guys hear me?
All right.
Right.
Indeed, something exists there, and we examined it within the scope of both production as well as tailings reprocessing and pyrite concentrate; it's fairly small, though that's definitely a discussion we must hold with smelters regarding what recoveries might be achievable on it and the payability.
Great. Then, I suppose, a somewhat comparable question regarding Lucky Friday. A few of its nearby operations in the Silver Valley are making a lot of noise about antimony and processing further downstream in that area. Are you folks also examining that possibility? If a centralized antimony plant were built, might you participate in it?
In contrast to our neighbors, Lucky Friday really contains no meaningful antimony. So we did take a look at it.
Great. And one last thing on that Silver Valley theme. There are a lot of these single-asset players around now that are either operating or getting close to first production. And you could probably make a case for consolidation there. Would Hecla be interested in that, or would they even take a look?
What mainly excites us is the built-in upside in our own assets; so especially at Lucky Friday. There's been no significant exploration there since roughly 2011. So that's something we're starting up right now. We keep watching all of our neighbors, I suppose, — and if a compelling value proposition comes along, we'll look at it, but we're more enthusiastic about the potential in what we already own and understand and where our own infrastructure already sits, which is in top shape.
Most of what I had has already been covered, though I do have one brief item about Aurora. I realize we're still in the early stages, but isn't there a mill located at that site? Would it be most logical, in your view, for you to handle the resource processing right there on location? Or might it instead fit into some sort of hub-and-spoke arrangement feeding into Midas here? And should you proceed there, what would it cost to get that mill back into working order?
Would you like to take that one?
Go ahead.
Thanks for that question, Eric. When it comes to Aurora, getting there overland isn't practical. We did handle a few loads of cotton in the past, but hauling ore from Aurora over to Midas is likely never going to work. There is a mill sitting on site with a capacity of roughly 600 tonnes per day; honestly, its shape isn't very good — definitely worse than what we have at Midas. That's the reason they'll either need to put more money into it or possibly build a new mill, and we haven't settled that question yet. The truth is, we should let the drilling results speak. Like Kurt mentioned, he's got a lot of enthusiasm for this. I visited the project in the late spring, and I can see exactly why he feels that way — there are open pits left from before, plus old underground workings and edits. On top of that, the strongest target Kurt is zeroing in on has never seen even one drill hole, and it's visible right from the hillside. So I'm eager to find out what it ends up producing.
All right, that's great, really useful. If you'll indulge me, one more question. Regarding Midas and what you're observing at the center offset — I assume that sits on the southern portion of the main fault, correct? Yet it appears to be some kind of offset. Does it closely resemble what you're encountering at the main minus mine? Or if you have anything else to add, that would be great.
Yes, it resembles the Midas mine. It's more fractured than what we observe at minus. At minus, there were very thin, extremely high-grade veins inside a zone 6, 7, 8 feet wide. So in that regard, it's comparable. The offset closely resembles the center discovery we made in 2021.
There have been plenty of solid questions raised, and I've taken on board most of them, though I do have a couple of follow-ups; so first, perhaps regarding Midas. I mean, clearly, there's plenty of promising exploration work going on there. You folks have discussed at length a good deal of the infrastructure already in place that could be brought back online quickly. Could you remind me again, maybe take me through what the process looks like and what we ought to expect across the coming 1 or 2 years? I'm simply attempting to get a clearer picture of when Midas might turn into a formal project that receives the green light, where you'd reach a production decision, and when we might see the first goal come out of it?
That one I'll pass to Matt.
Thanks, Rob. So, regarding what you asked, Alex — we are looking into this in earnest right now. Clearly, Kurt is doing the drilling work and figuring out what the resource actually is, and we will get that fully locked down. And honestly, the thing that worries me most is a scenario where Kurt nails down that resource, comes to me, and says let's start producing tomorrow — and I'm not prepared for it. That's why we've kicked off geotechnical work on the rock already. We've begun a hydrogeologic study covering inflows, plus geochemistry. We've also gotten started on certain design elements of mine and on what would be needed to get the mill back into shape; so all those figures are being worked on continuously. But clearly, we won't put money into any of that before we can confirm what's actually in the ground; so how things line up in terms of schedule will depend heavily on how exploration goes, though we're getting ready at this point so that the information is available if that happens — assuming the drilling confirms the resource that we're constantly after. Is that useful?
All right. Yeah, yeah. No, I suppose that was useful. What I'm saying is, despite the resource demonstrating that it can underpin the restart, my expectation — and this is still what you'd call a best case — is that we're 2 or 3 years out from a first order. Does that roughly make sense as the best case scenario?
That's likely around that ballpark. Then again, there are plenty of unknowns out there, though yes, that's probably a fair way to look at it.
All right. Are there any restrictions around permits, or any...
Restrictions around permits. All right; as far as restrictions tied to permitting go, we are currently working through it and taking stock of what we've got on hand. Broadly speaking, we already hold quite a few of those — those permits, though certain ones are going to need changes. Certain ones are going to need a few updates, yet on the whole, our position is significantly stronger than it would be were this simply a greenfield site.
All right. That's good. So, only one final item from me...
Alex, regarding project development — sorry, Alex — when you consider what it takes to advance a project, typically you start by establishing a resource, then you complete studies and so forth. Our circumstances are unusual, though, because a portion of the essential infrastructure is already ours. What we're aiming for, then, is to operate nimbly and pursue multiple workstreams simultaneously. Kurt, clearly, is focused on pinning down the vital resource details required to bring this into production. Matt, meanwhile, is handling the entire engineering study effort that has to be carried out behind the scenes. So nimbleness is really the heart of it. When it comes to 2 or 3 years, my guess is it'll likely take somewhat more time than that. As for the major permits — suppose, purely hypothetically, we decide to build a portal for reaching the fresh discoveries Kurt and his crew have identified. A new permit would, in all likelihood, almost certainly be needed for that. Yet the mill, the tailings facility — every one of the important permits — those are already secured by us.
Yeah, that’s very clear, Rob. I suppose what we’ll do is examine these projects and take in all the infrastructure; and my feeling is these can be brought online fairly quickly, yet I always overlook how much additional behind-the-scenes effort is required. And I have just one further question about Keno Hill. Clearly, this mine has been in operation for several years. You mention some permits, though ideally by mid-2029. I’d like perhaps a little more detail regarding the work underway there or what these permits require. Is it — is a portion of this more about gathering time series data that, honestly, regardless of what you do, will simply require a period of time to establish things for environmental or water reasons? Or I’m just attempting to determine whether anything could be done to speed up that process.
Not truly. I mean permitting follows its own path; our responsibility is to supply the engineering and design criteria that essentially shape the permit; and then the regulators take however long they take — they clearly must consult with the First Nations group too. But we do understand the order. And really, it is — as we’ve mentioned before, it centers on ensuring we have adequate water treatment capacity, adequate tailings capacity, and waste dump capacity too. We grasp the sequence we — but when it comes to timing, it’s extremely difficult to determine precisely. We’re moving as quickly as possible, but it isn’t fully within our control.
Alright, I appreciate everyone’s thoughtful questions today, and thanks for being with us this morning. Let me close with this. This company has never been in a stronger position than it is right now, and we are directing that strength toward the right areas on behalf of our shareholders and for the long-term worth of this business. We look forward to bringing you another update next quarter; so thank you, all, and enjoy the rest of your day.
This concludes today's call. Thank you for attending. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Hecla Mining Company transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Hecla Mining Company earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.