Home / Transcripts / i-80 Gold Corp. (IAU) · February 20, 2026

i-80 Gold Corp. (IAU) Earnings Call Transcript

February 20, 2026

Toronto Stock Exchange CA Materials Metals and Mining earnings 37 min

Earnings Call Speaker Segments

Operator operator
#1

Good day, everyone, and welcome to the conference call and webcast where i-80 Gold will discuss its 2025 fourth quarter and full year results. The presenters from the company today are Richard Young, who serves as President and Chief Executive Officer of i-80 Gold; Paul Chawrun, the COO; and Ryan Snow, the CFO. Before we move on, please be aware that remarks made today could include forward-looking statements, and those carry risks and uncertainties. As a result, actual outcomes might differ materially. Everyone is asked to turn to slide 2 in the presentation, which can be found on i-80 Gold's website, so you can review the cautionary notes about the forward-looking statements provided on this call along with the risk factors tied to those statements. Once today's formal presentation concludes, we will take your questions. At this point I'll turn things over to Richard. Please go ahead.

Richard Young executive
#2

Thank you, Joanna, and hello, and thanks for being with us today. Beginning on slide 3. During 2025, we made considerable strides in moving our development plan forward and in recapitalizing the company's balance sheet as we work toward becoming a mid-tier gold producer. On the operations side, we hit our 2025 production guidance, with consolidated gold output of just under 32,000 ounces, which would have landed at the higher end of the range if not for the inventory buildup at the end of the quarter, and Ryan and Paul will address that shortly. Our output keeps climbing as Granite Creek continues to ramp up. At the same time, we moved drilling, technical studies, and permitting forward across our project portfolio over the year, which keeps us on track to deliver key project milestones in our development plan. Drill results, especially at Granite Creek, were very encouraging and back our decision to broaden the infill and resource expansion programs in 2026. On the development front, we started construction at Archimedes, the company's second underground mine. We also finished the year by completing the engineering study for refurbishing the Lone Tree process plant, which remains the cornerstone asset in our hub-and-spoke strategy for processing material from our three underground mines.

Richard Young executive
#3

The board gave the green light for Hatch engineering to proceed with the entire Lone Tree refurbishment, which is a $400 million project. We also completed several recapitalization steps, and after year-end we obtained a financing package worth as much as $500 million. This recapitalization changes things fundamentally for us, since it lets us move our development plan forward without the balance sheet holding us back. Importantly, the money we raised came from first-rate financial partners — Franco-Nevada, National Bank of Canada, and Macquarie — all of whom buy into our long-term vision for the company and carried out thorough due diligence. Having them on board speaks to how good our projects are, along with our team and our plan for execution. At this point I'd like to hand the call to Paul, who will give a detailed update on that development work. Paul?

Paul Chawrun executive
#4

Thanks, and hi everyone. Moving to slide 4. During the quarter, operations and development work moved along nicely, and both mining at Granite Creek and advancement rates at Archimedes beat what we had planned. We're still building up our bench strength, bringing on skilled people in the crucial areas needed to deliver our growth plan — geology, mining, and metallurgical engineering among them, plus supply chain, community relations, and the Lone Tree project owners team. I'm glad to share as well that we met our safety performance targets, closing out the year with a better TRIFR of 0.62, and that includes a fourth quarter with no incidents. At Granite Creek Underground, mining keeps ramping up thanks to fewer water-related effects on mine operations, changes to mine sequencing, and the delineation of extra high-grade zones via short-term drilling that weren't part of the original resource model. Because of that, we mined more mineralized material in the fourth quarter and for the full-year period year-over-year. During the fourth quarter, we mined a bit more than 41,000 tons of high-grade mineralized material, which includes roughly 15,000 tons of high-grade oxide material grading 11.19 grams per ton gold, about 26,000 tons of high-grade sulfide material at a grade just above 9 grams per ton gold, and on top of that another 19,000 tons of incremental low-grade oxide material at just over 3 grams per ton gold.

Paul Chawrun executive
#5

During the year, we mined roughly 142,000 tons of high-grade mineralized material. That included a bit more than 70,000 tons of oxide mineralized material grading above 11 grams per ton gold, nearly 72,000 tons of sulfide material at 9.08 grams per ton gold, and on top of that 73,500 additional tons of incremental low-grade oxide material running just under 3 grams per ton gold. Gold production came to 3,600 ounces for the quarter and 23,000 ounces for the full year. That figure reflects the gold available for sale at the third-party processing facility, which feeds into total gold sold of about 5,200 ounces in the quarter and 21,600 ounces for the full-year period. Because of timing delays at the third-party processor, the sulfide stockpile ended up higher than we anticipated, at an estimated 6,500 ounces of recovered gold. We expect to process that material in the first quarter of 2026. Water inflows were stable through the quarter. The upgraded pumping system commissioned in the third quarter supported effective water mitigation in the active mining areas, and as a result, we expect to exceed waste development this year as the main decline rate increases. Construction of a second, larger water treatment plant began in December and is on track to start operating by the end of the second quarter of 2026.

Paul Chawrun executive
#6

The purpose of this plant is to allow water to ultimately be discharged away from the underground workings, since at present the water being removed is recirculating back into the system. On the whole, I'm happy with the operational gains at Granite Creek, and the site operating team deserves the credit for that. Turning to exploration on slide 5. In the South Pacific Zone we finished the infill drilling program, together with seven target tests in December, comprising roughly 16,000 meters of core drilling across 46 holes, plus another six infill holes drilled to test and confirm continuity of mineralization. Assay results set out in the January 20th press release showed strong, high-grade mineralization across the South Pacific Zone, pointing to possible expansion toward the north and at depth. Encouraged by these results, drilling pushed past the existing structural boundaries, opening a new area that had not been tested and could potentially enlarge the mineralized envelope. As drilling continues, our focus is on an initial spacing of about 140 feet for the deposit as a whole, then progressively tightening that spacing to build our understanding as we get nearer to planned mining areas. We have now put together a preliminary resource estimate to support the Granite Creek Underground feasibility study.

Paul Chawrun executive
#7

Because of the extra work the mine plan now needs — optimizing sequencing with the new resource model, folding in the productivity gains we're seeing from current performance, and adding the geotechnical engineering work — the feasibility study for Granite Creek Underground is now expected to wrap up in the second quarter. Data from the 2025 drill program will be merged with infill drilling results from 2023 and 2024, giving us an updated mineral resource estimate that draws on three additional years of data. We've got a $10 million exploration drill program on tap for 2026 to probe high-potential targets and further delineate resources. All told, we continue to feel good about the longer-term upside at Granite Creek Underground. Moving to the Ruby Hill property on slide 6: construction at Archimedes got underway in early September. Underground development is running ahead of what we expected, hitting roughly 680 meters by year-end. Alongside permitting and development, one of our main priorities in the months ahead is pushing toward the exploration drift to back up ongoing feasibility-level technical work, and we expect the first mineralization to be intercepted by the third quarter. Infill drilling in the upper 426 zone at Archimedes began during the fourth quarter. A sizable $25 to $30 million drilling program is slated for Archimedes in 2026, with more than 175 holes and over 60,000 meters.

Paul Chawrun executive
#8

The results of this effort are going to serve as the foundation for a feasibility study that we expect to finish in Q1 of 2027 — roughly a year ahead of what the PEA had indicated. If you turn to slide 7, the Mineral Point open-pit project, which is also located on the Ruby Hill property: engineering and technical work is ongoing there to underpin permitting and to pin down when a pre-feasibility or feasibility-level study would occur. During 2025, we drilled about 8,600 meters of surface core, which supports the geotechnical, metallurgical, and hydrogeology studies and gives us baseline data to move permitting and engineering forward. A sizable drilling program — between $40 and $45 million — is scheduled at Mineral Point for 2026, aimed at roughly 131,000 meters, along with another $5 million earmarked for permitting and technical work. Mineral Point today holds the largest gold and silver mineral resources in the company's portfolio, and it has the potential to become our biggest gold-producing asset. At present it falls within phase 3 of the development plan. That said, the financing package we recently secured gives us the financial flexibility to speed up both the feasibility study and permitting. Now on to slide 8. Cove is an advanced-stage exploration project and would be the company's third planned underground mine. Across the GAP and Helen zones, infill drilling over the past two years — approximately 41,000 meters at 30-meter spacing — has been finished.

Paul Chawrun executive
#9

That work produced meaningful advances for the Cove project, substantially strengthening our geological understanding and raising our confidence in continuity and grade. It also gave us a better grasp of the metallurgical response so we can optimize feed and gold recovery in the autoclave. The Cove feasibility study is almost finished. That said, more work is needed: we have to revise the mine plan and cut-off grades to reflect the new gold price estimates, and we need to further evaluate opportunities for capital cost reduction and design optimization through the dewatering program, which has pushed completion into early Q2. In parallel, permit applications are underway as part of an ongoing EIS process. Turning to slide 9. At Granite Creek Open Pit, efforts to advance the project are continuing. Technical work has been progressing to move the project toward either a pre-feasibility or feasibility-level study, and trade-off analyses are being carried out to optimize the project economics. Geotechnical drilling in support of baseline site investigation engineering was deferred in 2025 because of ongoing operating permit updates for Granite Creek Underground, which sits on the same property, pushing the start of drilling into 2026 and leaving the timeline under review. Early-stage permitting activities will continue in 2026, followed by commencement of baseline field studies in 2027 in preparation of an EIS.

Paul Chawrun executive
#10

Now if you go to slide 10, we can take a look at the Lone Tree plant. In Q4, as Richard noted, we finished a class 3 engineering study covering the refurbishment of Lone Tree. The board has just given us a positive construction decision. Lone Tree is a cornerstone asset and sits at the heart of i-80 Gold's hub-and-spoke mining and processing strategy — it's built to process high-grade refractory feed coming from our three underground gold projects: Granite Creek, Archimedes, and Cove. The autoclave has a design capacity of up to 2,268 metric tons per day, which gives total annual throughput of roughly 820,000 metric tons, assuming 85% plant availability. The processing circuit will feature an integrated pressure oxidation and carbon-in-leach circuit that can handle both refractory and non-refractory mineralized material. Work with Hatch engineering is moving ahead as planned — things like advancing long-lead engineering packages, further optimizing the execution plan, engineering tied to operating permits, and pushing detailed engineering forward to support a first gold pour in December of 2027. Submitting the necessary applications for the primary environmental permits remains on track, with completion planned for the first quarter of 2026. The plant is permitted for the operational components currently in use.

Paul Chawrun executive
#11

That said, the sign-off on fresh and updated permit filings for the new plant design—covering air quality, water pollution, mercury emissions, and reclamation management—still needs to be brought current. Getting the autoclave running again will represent a significant milestone in moving the company's development plan forward, since it delivers greater processing capacity, materially better margins on each ounce of gold, and should translate into stronger free cash flow generation. On slide 11 you'll see the company's 2026 guidance. Broadly speaking, that 2026 guidance lines up closely with the preliminary economic assessments released in the first quarter of 2025, apart from the following items. At Granite Creek, the groundwater effect was not captured in the PEA, as we've previously disclosed. The main features of the 2026 mine plan, once the water ingress impacts from 2025 are taken into account, are a faster development rate than the PEA in order to make up for lost development time, greater growth capital stemming from the extra dewatering infrastructure, and higher recovery rates plus increased processing costs tied to the toll milling agreement signed after the PEA was finished. Consequently, for 2026, relative to the latest Granite Creek PEA, roughly 20% more material is expected to be mined. Mining, G&A, development, and sustaining costs are consistent, and the infill and step-out drill programs have grown thanks to the successful outcome of the 2025 program.

Paul Chawrun executive
#12

When it comes to Archimedes, the tons and grade mined along with development costs are mostly consistent with the latest Archimedes PEA. What differs is the production and processing costs tied to the new toll milling agreement that was signed after the PEA was completed, and the costs associated with the feasibility study have been moved up to 2026 from 2028. Bringing the Archimedes infill drill program forward runs roughly $10 million more, which allows an exploration drift to be built and covers the added expense of drilling longer holes sooner than originally planned from the upper levels. At Mineral Point, technical and permitting work moved ahead to 2026 from 2028, where overall infill and step-out drilling, technical work, and early permitting activities are expected to come to about $50 million, and those costs are covered under the new Franco-Nevada royalty. Other permitting, technical work, and holding costs are mostly in line with the PEAs. With that, I'll now hand the call over to Ryan for the financial review.

Ryan Snow executive
#13

Thanks, Paul. Now moving to slide 12. Gold sales rose to roughly 28,200 ounces for the year, up from 21,500 ounces during the same period a year earlier, which reflects the progress achieved at Granite Creek, as Paul described previously, partly offset by a delay in the scheduling of third-party processing. That delay left more than 6,500 ounces of sulfide mineralized material sitting in inventory, and we anticipate processing it during the first quarter. In reconciling tons mined, gold produced, and gold sold, two factors deserve attention. First, a timing gap frequently exists between mining and production when a third-party processor is used, and under our agreement delivered material may take as long as 120 days to be processed. Second, a 59% payability factor applies to our high-grade oxide material, which affects gold sold relative to contained ounces produced. For each ounce sold, we effectively give up the 41% of contained ounces. Total revenue from gold sales grew to about $95 million for the year, versus $50 million in the prior year, driven by selling roughly 6,700 additional ounces at a higher realized price of approximately $1,000 an ounce, notwithstanding the inventory buildup mentioned earlier. Gross profit for the year came in at $11.5 million, an improvement from a gross loss of $15.7 million in 2024, largely because gross profit from Granite Creek turned positive in the second half of 2025.

Ryan Snow executive
#14

We posted a net loss of slightly less than $200 million, or 10 cents a share, and our adjusted loss came in at $123 million versus $111 million a year earlier. That gap of about $75 million between the net and adjusted figures stemmed from non-cash fair value revaluation losses, driven mostly by higher metals prices and by our share price over the course of 2025, plus a non-cash write-down at Lone Tree on assets considered obsolete under the revised refurbishment estimate we issued in December. The adjusted net loss primarily reflected higher pre-development evaluation and exploration expenses, since development work ramped up across several projects as part of the company's development plan. And as a reminder, under US GAAP, which we adopted in 2024, pre-development evaluation and exploration costs get expensed until mineral reserves are declared. We ended the quarter with roughly $63 million in cash, lower than the prior quarter because of an unusually large year-end build in finished goods and stockpile inventories, continued spending on drilling programs supporting the planned technical studies and the development plan, investments in Archimedes and Granite Creek development, and early-stage work under the limited notice to proceed at Lone Tree.

Ryan Snow executive
#15

At year-end, the balance matches what we anticipated under the recapitalization plan. If you turn to slide 13, it's a real pleasure to walk through where our recapitalization plan stands. We announced not long ago the finish of a highly competitive process, and it produced a financing package worth as much as $500 million. Within that package there is a commitment letter with Franco-Nevada covering a $250 million royalty, plus a gold prepayment facility of up to $250 million involving National Bank of Canada and Macquarie Bank. The Franco royalty of $250 million comes in return for a 1.5% life-of-mine net smelter return royalty, which increases to a 3% life-of-mine net smelter return royalty as of January 1st, 2031. That royalty covers output from every mineral property in the portfolio. At closing, $225 million becomes available to the company, and $25 million of that must go toward advancing Mineral Point in 2026. Another $25 million from the royalty financing is likewise anticipated to become available in 2026 to push Mineral Point further ahead once the first disbursement has been spent on the project. That lets us direct $50 million toward resource expansion, infill drilling, technical work, and early-stage permitting activities at Mineral Point during the year.

Ryan Snow executive
#16

The gold prepayment facility with National Bank and Macquarie features an initial advance of $150 million at closing, along with a requirement to deliver roughly 40,000 ounces of gold across a 30-month period starting in January of 2028. There's also an accordion component giving access to another $100 million over a 24-month period once the facility closes, subject to customary conditions and lender approval. We expect to exercise that accordion in the first half of 2027, and at that time the additional gold ounces to be delivered will be set. For the entire $250 million gold prepayment facility, total ounces delivered are anticipated to account for under 15% of total gold output across the projected period from January 2028 to June 2030. The company set up this facility with National Bank and Macquarie aiming to transition the gold prepay into a corporate revolver that would fund development of Mineral Point once phase 1 of the development plan wraps up. Turning to slide 14. Proceeds from the financing package, together with the equity offerings the company previously disclosed and completed in the second quarter of 2025, add up to more than $800 million in funding supporting i-80 Gold's growth objectives.

Ryan Snow executive
#17

That presumes all warrants tied to the May 2025 equity financing get exercised across the coming 18 months. Management anticipates the last stages needed to finish the recapitalization plan—aiming at a total between $900 million and a billion—will wrap up before the first quarter ends. As part of that recapitalization plan, the company lately gave notice of redemption on its existing convertible debentures so as to supply the security required under the financing package. Those convertible debentures should be extinguished on March 16th. When finished, the recapitalization is expected to cover in full phase 1 and phase 2 of our development plan, which should lift yearly production to roughly 300 to 400,000 ounces of gold, up from under 50,000 ounces at present. Lastly, I would be failing in my duty if I let this moment pass without thanking every internal and external party who took part in this process and brought about such a great outcome. With that, I'll hand the call back to Richard.

Richard Young executive
#18

Thank you, Ryan. And last, if you turn to slide 15, looking forward, we're coming into a pivotal stretch that sets the company up to unlock real shareholder value. Fifteen months back, we set out a new development plan. Twelve months back, we filed 5 PEAs showing the value inside that plan, and since then we've spent the past 12 months pushing that plan ahead, moving the technical work forward, and finishing the recap. Looking ahead over the coming 12 to 18 months, we'll publish feasibility studies on our 3 high-grade underground projects, and in all likelihood a pre-feas for our flagship Mineral Point project, plus possibly our Granite Creek open-pit project. We'll kick off refurbishment of the Lone Tree autoclave and be well along in it, and we'll be ramping up production at Archimedes, our second underground mine. The board's and the management team's objective over the next 12 to 18 months is to shift our current valuation — which trades at a very significant discount to NAV — to something nearer to NAV, as we keep executing the development plan we laid out 15 months ago. We appreciate your continued support, and we look forward to keeping you updated as we keep executing on this development plan.

Richard Young executive
#19

So with that, Joanna, we'll now take questions. Thanks.

Operator operator
#20

Thank you. Ladies and gentlemen, the question-and-answer session is starting now. If you have a question, press the star key and then the one key on your touchtone phone. A prompt will sound to confirm that your hand has been raised. Should you want to decline from the polling process, press star and then the two. If you are on a speakerphone, please lift the handset before you press any keys. Our first question comes from John Tumazos at John Tumazos Very Independent Research. Please go ahead.

John Tumazos analyst
#21

Thanks a lot for taking my question. Perhaps the press release was somewhat brief when it came to the Lone Tree $400 million-plus capex for restarting the autoclaves. At a really basic level, autoclaves are thick steel vessels, and if they just sit idle for 10 years, they won't rust through. What are the ancillary items that need to be swapped out, or that have gone obsolete, or the design changes? I don't imagine you'd run oxide material through the autoclave vessels — maybe there are separate circuits. Could you walk through all the various changes that explain why the autoclave project is costing so much money?

Ryan Snow executive
#22

John, the autoclave vessel has to get new brickwork. That’s also referred to as refractory, so there’s some expense there. Another item is the CIL circuit as such. Its tanks must be swapped out. We have to put in a few vessels for part of the off-gas. Another major expense is the filtration setup — we’re opting for filtered tailings and a stacked facility; it won’t use the standard slurry approach. Then there’s also the upgrading plus certain instrumentation. Once you total all those pieces together, it amounts to $430 million under current capital conditions.

John Tumazos analyst
#23

Beyond Hatch, did you approach additional engineering companies and obtain competing proposals?

Ryan Snow executive
#24

We've been working on this project for roughly 4 years now — no. You can find a complete explanation on our website. I'd urge you to check out those details.

Richard Young executive
#25

John, just to jog your memory, Hatch was the outfit that constructed this plant during the 1990s, and no other group had a deeper familiarity with it. Autoclave technology is where they lead on a worldwide basis, so bringing in their top-tier team for this refurbishment makes us very happy.

John Tumazos analyst
#26

I appreciate it.

Richard Young executive
#27

Appreciate that, John.

Operator operator
#28

Thanks. Quick reminder, everyone: if you’d like to ask something, just press *1. Our next question is from Don DeMarco at National Bank. Go ahead.

Don DeMarco analyst
#29

Morning, Richard and team, and thanks for taking my question. First, at Mineral Point, I notice that a portion of the pre-development work has been pulled ahead from 2028. With that work sped up, could it open the possibility of developing this project or realizing value on it earlier than where it currently sits in phase 3?

Richard Young executive
#30

Don, yes, thanks. Yeah. From where we sit, and honestly from the moment I came on board, Mineral Point stood out as the portfolio's most valuable asset, and whatever we could do to speed up its development would pay off for shareholders. So with gold prices higher and the recap completed, we've now got the financial flexibility to push the drilling and technical work forward and move permitting ahead, and we're reviewing every option on the table to accelerate that permitting and the eventual development. In all likelihood, we're aiming to beat the original timeline in the development plan. As a quick reminder for everyone on the call, under the PEA, we'd anticipate average production of roughly 280,000 ounces of gold equivalent across a 17-year mine life, with ASIC costs near $1,400 an ounce. And with this infill and step-out program that Paul referenced, we do see opportunities to grow the resource and ultimately the reserve base of this project through the program designed for 2026.

Don DeMarco analyst
#31

Thanks. Definitely eager for that, and the growth possibilities there are intriguing. Moving to my next question: when we look at production guidance, output is coming in above last year, yet absent specifics on expenses or the toll milling contract conditions, how should we best model those ounces and reflect the margin improvement versus a year ago in a robust gold price environment?

Richard Young executive
#32

I suppose there are a couple of points. The sulfide toll milling costs roughly $275 to $280 per ton, and that's approximately triple what it will ultimately be once we run it through our own facility. Don, we're somewhat in a holding pattern until the tech report is finished. We'll have that tech report done in the second quarter, and once it's out, you'll get far more detail on Granite Creek and on the different pieces of the cost structure, but until that point, our hands are rather tied. That news will be released in Q2. Just as a reminder for everyone, we are a US registrant now, and we can't disclose feasibility study results until the tech report has been filed. That's the reason we'll see the Cove and Granite Creek tech reports in Q2 as we finish those tech reports and publish them, but we'll have much more detail on Granite Creek in Q2 as well as Cove, and then Archimedes to follow roughly about a year later.

Don DeMarco analyst
#33

Excellent. We’ll be looking forward to that. Meanwhile, we’re seeing higher production compared with a year earlier, and the gold price is also higher than a year earlier. In any case, I’ll get back in the queue. That’s everything from me. Thank you.

Richard Young executive
#34

Thanks, Don. Just to remind everyone, we did produce gross profit at Granite Creek during the second half of the year, exactly as we had guided at the start. And with metal prices at these higher levels, it will generate free cash flow—or at least we expect it to—even after accounting for development costs, growth capital, and the extra infill and step-out drill programs we have planned for 2026.

Operator operator
#35

Thanks. At this point, there are no more questions. I’ll hand the call back to Richard Young for closing remarks.

Richard Young executive
#36

Thank you all for being with us on this Friday morning. The progress achieved across the past 15 months has us excited, and we think that during the coming 15 to 18 months we will be considerably further along toward finishing phase 1 of our development plan — which will lift production to 150 to 200,000 ounces annually, with robust margins and free cash flow — and also toward advancing Mineral Point and our Granite Creek Open Pit as part of phases 2 and 3. There is plenty more news to come as we move through this year. We appreciate your time this morning.

Operator operator
#37

That brings today’s conference call to a close, everyone. We appreciate your participation, and please go ahead and disconnect your lines.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete i-80 Gold Corp. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to i-80 Gold Corp. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.