Good morning, everyone, and thanks for joining the Ivanhoe Mines first-quarter earnings conference call. Right now, every line has been placed in listen-only mode. After the presentation, there will be a question-and-answer session. <<operator_script>> Today is Thursday, May 1st, 2025, and this call is being recorded. I'll now hand the conference over to Matthew Keevil, Director, Investor Relations and Corporate Communications. Matthew, please go ahead.
Thanks, operator. Good morning, everyone, and thank you for being with us. I'm delighted to welcome all of you to the Ivanhoe Mines conference call covering our first quarter financial results. It is definitely a sunny day here in Vancouver. As the operator said, I'm Matthew Keevil, Director of Investor Relations and Corporate Communications at Ivanhoe Mines. Joining us on today's call from Ivanhoe Mines are Founder and Executive Co-Chairman Robert Friedland; President and Chief Executive Officer Marna Cloete; Chief Financial Officer David Van Heerden; Chief Operating Officer Mark Farren; and Executive Vice President, Corporate Development and Investor Relations, Alex Pickard. Today's event will wrap up with a question-and-answer session. <<operator_script>>. If your question doesn't get addressed during the call, please reach out to our Investor Relations team directly. Before we start, I want to remind everyone that today's event will include forward-looking statements involving risks and uncertainties that could cause actual results to differ materially from those in the forward-looking statements. You can find details of the forward-looking statements in our April 30th news release, as well as on SEDAR+ and at www.ivanhoemines.com. It's now my pleasure to introduce Ivanhoe Mines' Founder and Executive Co-Chairman, Robert Friedland. Robert, please go ahead.
I want to thank everyone who has joined this call. I'm speaking to you from Positano, Italy. It's a real pleasure, naturally, to present our team and this quarter, which set records in just about every way. Our Kamoa-Kakula copper complex now ranks among the Top 3 copper producing complexes anywhere in the world. April brought record-breaking output. For copper production, we're basically level with Grasberg for second position, but our momentum is substantial. And as you will see, we intend to make this complex even greater still. So it has been an amazing quarter, notwithstanding the macroeconomic climate and our share price. May we move to the next slide, please? I'd like to share this good news with you: through the good offices of the United States Department of State and the Government of Qatar, a peace agreement has been signed under a declaration of principles that settles the tribal difficulties in Northeastern Congo. That area has absolutely no impact on our operations, which sit well over a thousand kilometers to the south, with no road connections. Even so, we're very happy to see that The Congo is stable, holds the support and interest of the United States government as well as the Qatari Government, and that the principles have been put together for a peace agreement that will last in that area.
We believe this is really beneficial for the nation, since we are its biggest mining company. So with that, I’d like to bring in Marna—or would you handle that for us, Mark?
Thanks. Thanks, Robert. This is Marna, and welcome everyone to our quarterly call. It's been a pretty exciting quarter for us. I think we've really gotten past some of the problems we were dealing with toward the end of last year and still at the start of this year, especially when it comes to power. We're really excited that in April we hit a record of 50,000 tons of copper produced per month. So that's a new record for us. And if you annualize that, it would put us well above 600,000 tons of copper. So really exciting times for us. I think the other thing that really surprised us this quarter — sorry, you can flip to the next slide — that really surprised us this quarter was the milling capacity at Phase 3. The milling rate was 6.1 million tons. That was more than 20% above designed capacity. So you can see our teams are really pushing the envelope when it comes to letting all our infrastructure work for us. Just going back to power, we went from 50 megawatts of imported power to about 100 megawatts of imported power during the quarter. And we expect that to increase further for the rest of the year, and that will really help with the exciting start-up of our smelter during the second quarter that we're about to begin.
Looking at the numbers side, I don't want to take away from what David is going to share. He will walk you through the quarterly results. On both EBITDA and revenue, this was a record quarter. And from a cost standpoint, I believe it was also a very strong quarter for us, since we were heading toward the lower end of our cash cost guidance, and David will provide more detail on that. Moving to the next slide, on health and safety: we do aim for excellence in this area, and complacency is never acceptable. Our performance was solid relative to the industry average, and we just held our board meetings where we established our safety targets for the year ahead, and there we are aiming for a further decrease in our title recordable engine injury frequency rates. So that is something we are working on and something we are very proud of, particularly given that we have come through a stretch of intense construction, and we are also entering a stretch of intense construction at Platreef. Then, turning to the next slide, we are very excited to publish our 8th annual sustainability report, and I really encourage you to take a look at it.
Seeing what our teams are accomplishing across every project is genuinely remarkable. The figure that truly jumps out, I think, is the first one on this page: Kamoa-Kakula and Kipushi together account for roughly 8% of the DRC's GDP, and we have paid $1.1 billion in taxes and royalties to the government. That alone demonstrates what a green-field discovery can achieve for a nation, and we are convinced there are many more discoveries still waiting to be made in the DRC. So when companies commit to exploration, it genuinely transforms the fate of a country rich in minerals. You can review the statistics shown here, but our workforce has expanded 38% year-on-year. And I think it matters to recognize that the majority of our employees are local, drawn from the communities where we operate. That is something we take real pride in. We have constructed new educational facilities. We have backed local enterprises. And every one of these initiatives we undertake genuinely guarantees that we hold a social license to operate in the areas where we work. So with that brief introduction, please take a look at this report. There are several excellent videos to watch, so you can see that this is not merely a talk show — what we are doing is real and it is changing people's lives.
I'll now pass things over to David so you can move to the following slide, and he'll walk you through the results for the quarter. Thanks.
Thanks, Marna, and good morning and good day to everyone on the call today. Perhaps I'll begin by drawing attention to the nice image of the smelter furnace on this slide. Commissioning is almost finished, and the smelter will be one of the few initiatives that truly transform our financial results over the coming few quarters. Moving to the next slide, Kamoa-Kakula posted its highest quarterly revenue ever, $973 million, in the first quarter of 2025. That came at a realized copper price of $4.19 per pound of payable copper. Revenue rose 15% quarter-on-quarter, from the $843 million recorded in the last quarter of 2024. We began stockpiling concentrate ahead of the smelter start-up expected in May, with 48,000 tons of copper held in concentrated inventory at the end of the quarter. As a result, payable copper sold was lower than copper produced. As the 22,000 tons of copper and inventory at the Lualaba copper smelter are realized over the upcoming quarters, and with us almost holding enough inventory for our own smelter, copper sales should come in close to, or above, copper produced in the remaining quarters of the year. We therefore expect to comfortably beat this latest revenue record in the coming quarters, provided the copper price stays near current levels or rises further.
Turning to the following slide. At Kamoa-Kakula we achieved record EBITDA of $585 million, and it came in at a very healthy 60% margin, while cash cost fell quarter-on-quarter to $1.69 per pound of payable copper, which sits toward the lower end of the cash cost guidance range we provided. Mine side cash cost came in near the same levels as the fourth quarter of last year, though we did gain from reduced treatment and refining charges tied to updated benchmarks, and that produced a $0.08 quarter-on-quarter saving in cash costs. Given that power cost is $0.10 higher than it was in the first quarter of 2024, the team has really done well to contain the costs. We have Kamoa-Kakula's EBITDA waterfall. The EBITDA waterfall highlights that the 35% quarter-on-quarter EBITDA growth was driven principally by the high copper price throughout the quarter. On our Q4 call, I mentioned that the quarterly EBITDA for the fourth quarter was artificially low due to the re-measurement of contract receivables, and that corrected as predicted in Q1, with the mark-to-market of provisionally-priced sales being a $51 million gain in Q1 compared to a $52 million loss in the fourth quarter of last year.
We moved 3,000 tons less than in Q4, though EBITDA gained from reduced treatment and refining charges. Excluding the volume effect, the modest quarter-on-quarter rise in cost of sales stemmed from elevated power costs in Q1. Mark Farren, our COO, will walk you through the recent growth in imported hydropower, which since mid March 2025 has been cutting reliance on pricier backup generated power. One point worth flagging: absent the inventory build, EBITDA for the quarter would have come in considerably higher. If we had sold the 18,000 tons that inventory rose by, net revenue would have been an estimated $110 million greater, with EBITDA roughly $65 million greater. And had all 48,000 tons of contained copper in inventory been sold during the quarter, EBITDA would have been about $170 million greater. So there's a fair amount of dry powder that should serve us well going forward. Moving to Kipushi on the following slide. Kipushi is beginning to add positively to our EBITDA, despite not yet running at optimal levels.
As you'd expect, logistics is overwhelmingly the largest driver of Kipushi's cash cost, and that's been managed quite well, with total cash cost sitting near the low end of our guidance range. We anticipate mining support services and processing costs will decline as output rises. Turning to Ivanhoe's consolidated results on the following slide. Net profit climbed by nearly 40% versus the prior quarter, driven by a 45% rise in our share of Kamoa-Kakula's profit. Exploration expenditure in Q1 came in somewhat below what we'll see in the quarters ahead, since exploration progress was held back by the rainy season. Moving to the next slide, given record EBITDA contributions from both Kamoa and Kipushi, it's no surprise that Ivanhoe Mines posted record EBITDA, but with many near-term initiatives set to drive additional growth in the quarters to come, they say that now is a really good time to earn our stock. It wouldn't surprise me if each quarter ahead over the coming 12 months turns out to be a record. We've watched production at Kamoa-Kakula rise over the past month, and we expect sales to be more closely aligned with production. And, results will keep looking better as the smelter ramps up, as Kipushi moves to steady state, as Platreef's Phase 1 starts production, and as we realize the benefits of Kamoa-Kakula's Project 95, beginning next year.
Now let's move on to the following slide. Throughout Q1, our spending on growth initiatives has stayed on schedule, and our guidance remains as it was. We've had a great deal of success obtaining project-level facilities where needed, and those have proven advantageous. That said, the need for them has diminished, given that the CapEx profile is tapering off along with the rise in our operating cash flows. As we proceed with the Phase 2 development at Platreef, we are considering a larger project finance facility to fund Phase 2 CapEx. Let's go to the next slide. The leverage ratio is still pleasantly low, even after the well-timed completion in January of the $750 million notes at 7⅞%. We have set a targeted net leverage ratio of 1x through the cycle. And while it's somewhat above that on a backward looking basis, it stands at as low as 1.2x based on an annualized q one EBITDA and will decline quite rapidly as we deliver the expected EBITDA growth. Our pro rata cash position was very healthy at March, at $763 million, with $717 million of that held at an iron mines level. With that, I'll pass things to Alex Pickard, Corporate Development and Investor Relations, to cover the exciting operations and project updates along with Mark Farren.
Much appreciated, David. As David said, this is Alex Pickard joining from London, which is also quite sunny today. Our COO, Mark Farren, and I will be handling this part together. On the next slide, though, I'll begin with an operational review of Kamoa-Kakula for the first quarter. To give some context, we've noted a number of times that Q1 was heavily constrained by the power difficulties we faced, at least through mid-March. We're delighted to report that we have now mostly put those difficulties behind us, and Mark will go into that in far greater detail. Even so, despite every one of those difficulties, I believe it's fair to say Kamoa-Kakula still turned in a very strong operational performance across the quarter. Throughput came to 3.7 million tons milled — comfortably a record, and close to 15 million tons on an annualized basis. We continue to see ample room to lift that to 17,000,000 tons with fully stable power. Since it was commissioned last year, Phase 3 has truly stood out. We've been milling well over 20% above its 6 million tons per annum design capacity, and with some optimization there's potential to drive that throughput even higher.
When you look at the grades, the blended grade shown on the left side comes in at 4.1%, with approximately two thirds of that supplied by the Kakula mine and approximately one third by the Kamoa mine. Kakula's grades were once again quite strong, therefore above 5%, while Kamoa's grades sat around 2.75%. Those figures should climb toward 3% during the year ahead, as that mine transitions out of development and into more of its steady-state stoping operations. And then also quite encouraging on the recoveries at Kakula in particular, we recorded all-time-best recoveries, comfortably above 88%, which is great to see ahead of our Project 95 initiatives arriving early next year. And then at Kamoa, recoveries came in near 85%, which likewise leave considerable headroom for improvement, even prior to the optimization work being introduced. So with all that, we have kept our guidance for this year at 520,000 to 580,000 tons of copper. I will move to the recent results on the following slide, which greatly exceed that sort of production rate. But over the medium term, we are definitely aiming for 600,000 tons of copper, and possibly more on an annualized basis starting next year. So returning to the recent operating performance.
Back in April, we said publicly that everyone at Kamoa-Kakula has done a remarkable job lining up extra imported hydro power from several sources, though much of it arrives from Mozambique. We have essentially doubled the imported power we bring in, going from 50 megawatts up to 100 megawatts, and that sits on top of the 50 megawatts supplied by generation on the DRC grid. What the right-hand side shows is truly a step change in performance since that power started flowing. Kamoa-Kakula has been posting some pretty incredible numbers, and we are genuinely excited about what that means for the remainder of the year. So on that chart you can see weekly copper and concentrate production in the bars, and above them we have also placed the annualized rate, which has been comfortably above 600,000 tons. And actually, one small correction: the bar for April 28th was a provisional figure. We now have the month-end numbers in, and it comes to roughly 12,000 tons for the month, which works out to 624,000 tons annualized. So it really is delivering enormous production. And then there is the record in April as well — surpassing 50,000 tons is a major milestone.
I believe we should recognize what the team at Kamoa-Kakula has accomplished. And I want to share for the first time that the final figure came in at 50,246 tons. That means we exceeded the 50,000 ton threshold with room to spare, even though the month was a shorter thirty day one. I'll now hand things over to Marc on the next slide, who will go into more detail about the power.
Thanks, Alex. So if we look back over the quarter, we were really leaning on that capacity. We relied heavily on our diesel gen-sets. As everyone knows, we brought in 220 megawatts of diesel, and we ran roughly 150 megawatts of it continuously. We came into this quarter in January with imported power and snow power at just under a hundred megawatts. And by March, just to give some perspective, we're at 150. And we're heading into the month of May. We expect to have 220 megawatts, split between snow — essentially in-country hydropower — and imported power. And until we bring the smelter up, that means we won't be using any gen-set or diesel power. Total demand when we do run the smelter flat out comes to about 250-odd, 270 megawatts, basically. That's the target for the end of this year. And we have plans in place to cover that with imported power and locally generated hydro power. So I think, all in all, we did speak about it. I won't go through all the initiatives in detail, but we're making progress inside the country with various initiatives. We'll turn the turbine in the quarter — I think late quarter two, early quarter three — the big 188 megawatt turbine will be turning, for Inga 2.
That's going to add more generating capacity. And beyond that, we have efforts underway within the grid aimed at stabilizing it — the same efforts I've mentioned before and bring up each time — to steady the grid and ensure we have consistent, stable power flowing through that network. Every one of those projects is moving forward, and I believe we're receiving backing, and thank goodness for that. We're receiving backing to pursue longer-term import projects along with in-country projects so we can boost our capacity within the country. That lets us expand the business, and absent this power, we won't be in a position to do what we want to do. Above all, we needed to get it stable. We've added more facilities, both import and local, and I believe things are heading in the right direction. Ultimately, the ideal outcome would be having 220 megawatts of redundant diesel power and perhaps taking criticism for over capitalizing on that. I'll be quite pleased when that day comes. So that's the status on power and the initiatives within that grid. Next slide. Now, these projects we're about to discuss are genuinely very quick to implement.
Project 95 has been approved, and it's 30% done. We'll wrap up Project 95 during quarter one of next year, and from quarter one onward it should deliver roughly 30,000 tons of copper production — perhaps slightly above 30,000 tons. The great thing about this copper output is that no mining cost or huge capital cost comes attached to it. So you'll see — it's going to have a major effect on our c one cash cost, since it's purely recovery based. That means we'll be raising the recoveries from the mining, production, and processing that we've already built and completed. So the bottom line — the impact lands directly on the bottom line, which I believe is going to be very good. Phase 3, Alex talked about phase three operating at approximately 6,000,000 tons. There will be a bit of tweaking on Phase three, some debottleneck work like what we did on Phase 1 and 2, so a fairly similar approach. Not a costly project, but we want to stabilize that throughput from the 5 to roughly a 6.5 figure, which will bring our total production to around 17 million tons a year with what we've currently installed. So Phase 1, Phase 2, Phase 3, a little additional capital, probably a 50 figure, and then we should be able to process 17 million tons, consistently.
We've already pinpointed that project, and within this year we'll settle exactly what has to be done and then move on it as quickly as possible, since it isn't costly and will deliver roughly 20% additional production for us. After that, the major effort on our side has really been examining what Kamoa-Kakula will look like over the long term. What number of further phases do we add? Does another phase exist? And what will it resemble, and how should we schedule it? That effort is now nearing completion, and I'm glad to report that a Phase 4 will certainly be part of it. Most likely it will be implemented in stages. Last time I mentioned some early works, probably on the plant side, and then we intend to target a huge quantity of tailings that we've placed in our first cell, grading around 0.7%, 0.8% copper, and we'll begin at the back end of that concentrator and produce roughly 40,000 to 50,000 tons of copper through that facility. Once again, with no mining cost and a reasonably efficient capital structure accompanying it, as we build up all the reserves for a complete Phase 4.
If you're familiar with what Phase 3 involves—and you are, since we've shared that with you—then Phase 4 will likely turn out to be a copy of Phase 3. All reserves will be built up using the existing infrastructure we've already put in place, meaning essentially the mines developed for Phase 3. In terms of capital, I believe the overall process will be quite efficient. And then, regarding the figure we're aiming for—since this always comes up—at steady state, over the long term, I'd say above 700,000 tons of copper, with certain years exceeding 800,000 tons of copper. So this is a substantial mine we're building. There's another significant step remaining ahead. Obviously, we need to lock in additional power for these projects, but you're welcome to review our track record. All three of these phases have been completed. They've stayed on schedule. They've stayed on track. We've succeeded in securing sufficient power to serve them, and we're going to start up the smelter during this coming month. So the smelter will be heated up over the next month, and we should begin feeding in July. Hopefully, we can have sufficient stable power to guarantee that it operates flawlessly.
From what we can see, our expectation is that power will become stable and then grow gradually, and that pattern should extend right into Phase 4. Let's move to the next slide, Alex. This is the point we're addressing.
Thanks, Mark. I'll start by giving some context on the smelter. You can see in the image what a fantastic facility it is. That's another incredible capital project the team has delivered, at a cost of about $1.1 billion. But it is the largest copper smelter in Africa at 500,000 tons of capacity, producing a 99.7% anode product. And in fact, it's the largest smelter of its kind, anywhere in the world. We have had some questions from people about the economics of the smelter in the context of the copper treatment charges. So for those who don't know, copper treatment charges are trading at all time lows, which really reflects the incredible tightness that we currently see and the level of demand for copper concentrates. But I think, focusing on the treatment charges basically misses the point entirely in terms of why we have built this smelter facility. There are many more benefits to the smelter than simply the saving on the treatment charge. And the biggest is that, the smelter will save, more than 50% on the logistics costs, which are currently, around a third of our cash cost, going from shipping concentrate to shipping anodes.
That saving by itself runs to hundreds of millions of dollars annually. Another advantage we highlighted on this page involves making sulfuric acid. We'll produce as much as 700,000 tons of acid. It typically sells for more than $200 per ton in the DRC copper belt, where most of the other operations extracting copper from oxides consume it, and talks about offtake for that asset are at a very advanced stage. Beyond the purely financial gain, there's also a tax advantage I failed to mention, plus, when it comes to our emissions and our CO2 credentials, this smelter will rank among the most efficient anywhere in the world, powered by hydropower. It will additionally deliver a substantial cut in our Scope 3 emissions, which mostly stem from the logistics of hauling copper concentrates by truck. That's exactly why we're tremendously eager to commission this smelter during the course of this year. And I'll hand things to Mark on the following slide, I believe, to comment on what we anticipate regarding operations and the ramp-up.
Okay, thanks Alex. As we talked about, we were essentially waiting until there was sufficient stable power available in the country. Heat-up begins in May. That is the current status, and the first feed appears to be in July. After that comes a ramp-up, and I believe it takes eight or nine months to reach 80% capacity, then we move it up to 100%. We have trained a very large workforce at that site. It is a mix of expats and local people, expatriates drawn from all over the world. This is a unique smelter incorporating very advanced technology, and I would invite you all to visit and take a look whenever you like. A fantastic installation. So we are very excited to finally get this smelter operating. But as Alex mentioned, the primary purpose here is to offset the enormous transport cost we carry and to lift that 60% margin David was talking about. This smelter will deliver huge financial benefits for the company. We are very excited to get it going. It will produce 500,000 tons of blister anode. That is its design capacity, making it the biggest facility of its kind anywhere in the world.
And let's see how things progress from there — heating up in May, then first feed in July. A tremendous amount of effort has gone into this. The footprint is massive. Following our generator fires, we've carried out extensive risk assessment around fire, and it's also a vital focus area for us on any smelter. So it's a priority area, and it has had our complete attention. So we believe it will be a terrific component of our plan here, taking it forward and getting it running smoothly. Thank you. Next slide. Kipushi. Kipushi — we got it moving last year, roughly speaking. It was commissioned. It's still running, but optimization is needed. There's work we identified last year that is now being executed. And I think the de-bottlenecking work wraps up around October this year, and then we should go beyond the nameplate. We're sort of reaching nameplate achievements at the moment, but we will exceed that nameplate around October this year. And my target really is to get us north of 250,000 tons. So, between 250,000 and 300,000 tons of zinc, which will make it, I think, roughly the top three zinc producers in the world.
It's a very small footprint, honestly. It isn't a large mine, but the grade is extremely high. As you can see on the slide, the feed grade is 32.2% feed. And I believe across this coming quarter and the two after that, we'll have Kipushi running smoothly. Its operating cost wasn't bad. Our target is to keep it under $1 per pound, so it earns a margin and adds to our EBITDA. It will never be a massive mine, but from a mining standpoint it's a very well-run operation. And given the improvements we're making to the processing, I think it's going to be a really, really lovely business that we own and that we operate. Thank you. Next slide. I talked about de-bottlenecking. That's progressing nicely. There's also — we had some issues with power. We still have a few power issues at Kipushi. We take a similar approach to power in terms of de-risking it and making sure we get it stable. It's not a big ask that the total project or the total site runs on 18 megawatts, so it's not that difficult to manage. But still, we are focusing there. And, like I said, as soon as we get it to steady state, which to me will be quarter three, quarter four, we'll run north of 250,000 tons of zinc.
We're still discussing guidance. We ought to finish the year at slightly above 200,000. I believe, roughly in the vicinity of 200,000 tons of zinc. We're depending pretty substantially on our performance in the second — pardon me — the third and fourth quarter. Still, things look promising. Thanks. Onto the next slide. Alex, would you like to kick this off?
Absolutely. Thanks, Mark. We're turning now to Platreef in South Africa and revisiting the study results we released for Platreef back in mid-February. I'd just point out that the technical report for that study is now up on our website, so I'd suggest reading it for the full details. These studies really lay out the path to take Platreef from the world's largest precious metals deposit to one of the world's largest and lowest cost producers of this suite of metals — platinum, palladium, rhodium, and gold on the pressure side, but also a very significant contribution from nickel and copper production. The study is split into two parts. There's a feasibility study, which looks at Phase 1 production, coming later on this year, together with the Phase 2 expansion, which we're busy with and is on track for 2027. That's around 400,000 ounces of production. And then there's a much larger expansion study, which basically triples the hoisting and the milling capacity by 2030. And that's where we take Platreef to over 1 million ounces of the full precious metal production, PGM, and that's reflected in the PEA or the scoping study.
Moving to the next slide, please. What this slide does is present that same point visually, so you can see our position in 2025. We expect to commission the Phase 1 concentrator near the end of this year, and it carries a milling capacity of 800,000 tons per annum. That means we will generate some cash flow across 2026 and 2027. That said, our primary focus is bringing this mine to scale, which is what the Phase 2 expansion represents. The essential element there is the shaft infrastructure along with the hoisting infrastructure. So the key date we are watching — and Mark will walk through it on the next slide — is when we have Shaft #3 hoisting, which lifts our overall hoisting rate to 4 million tons, and that essentially lets you fully open up the underground footprints of Platreef. As for the scale of this ore body, the sky really is the limit regarding how big you can go. We are carrying on with work on Shaft #2, which essentially is a shaft capable of hoisting 8 million tons of ore waste per annum, making it one of the very largest shafts in the world. And that will truly be the item that unlocks the long-term potential and the long-term footprints of Platreef toward the back end of this decade.
Now, though, I'll hand things over to Mark, who can go into more detail on the operations and projects in that area.
Thanks, Alex. Today Platreef reached the reef on 850 — that’s thrilling for everyone. So at last we’ve cut into the reef. We’ll begin ramping up, the long-haul stopping sections, and we’re on reef and expanding the footprint. Really exciting for all involved. Looking back at the history here, and very briefly, since it’s a long history, the sleeping giant kind of history — the giant is waking up. I can assure you of that. Believe it or not, but Platreef is going to start moving now. Shaft #2 is the shaft we must unlock for Platreef’s capacity in terms of wasting. That shaft — we’ve worked flat out basically to hold it, from underground, and now we’re working flat out to equip it. And we will have it running in Q1 2026. Once it runs in Q1 2026, it not only de-risks that first phase of production, that 800,000 tons, but it creates the opportunity for us to ramp up very quickly into what we call Phase 2, the 450-odd thousand ounces, profile. And while we’re doing all of that — I know I’m talking a lot — but while we’re doing that, we are also working flat out on Phase 3.
So these phases are basically interconnected. What Alex mentioned—8 million tons per year of hoisting—is what Shaft #2 unlocks. That shaft isn't being delayed. We've actually completed the reaming on it, the raised bore. And next year, we'll begin slapping and equipping it. So as we move along, it'll be ready for Phase 3 hoisting. So in terms of where we stand with Platreef, I think we're finally starting to get there. We have Shaft #1, which we've used to access the ore body and to give us the ability to get into Shaft #2 and Shaft #3 to install the ventilation shaft, which we've done. And I'm very excited about Platreef. We are officially in the ore body now. We'll start opening up the footprint. We'll hoist out of Shaft #3 from quarter one 2026. And from that moment on, we'll see a very fast ramp up into a Phase 2 and a Phase 3 with a very good operating margin. And we're confident about the work we've published in this latest FS and PA study. I think the footprint we have is a very solid one. It's a massive ore body.
There's a massive competitive edge in ore versus our peers, thanks to the distinct ore body we have relative to anything else across that bush field complex. And what we're doing there has me very excited. Thank you. Next slide. Yes. We discussed this already. We're on reef at 850. We're also developing toward it at 750. Opening up the footprint, developing some of the ore, creating the long-haul stopes, and getting ready for the hoisting shaft will handle the rest of the issue — that shaft arrives in quarter one next year, and then we can open up the mining and feed, the first concentrator and the next one, at the end of, within 2027. So from now it will start moving quickly. Next one. Next slide. Alex?
Thanks, Mark. So, as usual, we're saving the best for last — Western Portland and what we're doing on the exploration side. It's shaping up to be another massive year for exploration and drilling out at Western Portland. Our budget sits at $50 million, which represents a 35% increase over 2024, along with an ambitious drill program totaling 102,000 meters — that's 20% higher than 2024. At the moment we've got five rigs turning. We're just about at the tail end of the wet season, so very shortly that number will more than double, reaching 11 rigs once the dry season arrives. A significant share of that drilling will target the 300 square kilometers of new licenses we picked up in late 2024. That's an area we're genuinely excited about. And as we've said before, we're planning an interim mineral resource update to be published in the coming weeks. I think it will really catch people off guard, given what we've essentially been able to accomplish across 2024, with the first quarter of 2025 serving as the cutoff. But for roughly $30 million to $35 million spent on exploration over that period, we've very, very substantially drilled out and grown our resource base at Makoko, Makoko Western, and Kitoko.
The rationale for calling it an interim resource is that we fully anticipate being able to update that resource once more, at this same point next year, and that will really serve as the sort of platform to shift much further into studies and engineering. Then the final slide just addresses our exploration in a broader sense. We did put out some very exciting news in early April — namely that Ivanhoe Mines is entering Zambia in a big way. So we have recently put together a license package of around 7,750 square kilometers. That is well north of 3x larger than the whole Western Portland license package we hold today. And as you can see on the map, we are essentially pursuing a fairly similar geological thesis — the continuation of Western Portland style sedimentary geology through that northwestern corner of Zambia and ultimately into Angola, where our license holding comes to about 22,000 square kilometers. So that is roughly 3x bigger again than what we have in Zambia. In Angola specifically, we have now sort of laid the foundations when it comes to building out an exploration camp. We are planning over 6,000 meters of drilling during this year's dry season.
And regarding Zambia, we’ll return with further updates on what our plans are. What we can say is that the Zambian government has done excellent work in completing high-resolution airborne geophysics across the whole license area. That gives us a really strong head start, and hopefully we can begin drilling—and targeted drilling—much more quickly. And then the last item—last but not least, and not shown on this slide—we do expect further news later this year regarding our initial exploration program in Kazakhstan. We intend to be drilling some of those projects around mid-year. So with that, I think we’ll wrap up the presentation and hand things back to Matt for Q&A.
Thanks, Alex. As usual, I'll hand things back to the operator first so any analyst questions coming in over the phone line can be cleared, and with the time we have left pending, we'll take questions as they arrive. So, operator, please go ahead with the questions coming over the phone line. Thank you.
Thanks. Our first question is from Orest Wowkodaw at Scotiabank. Go ahead, please.
Hello, good morning, and thank you for the update. I'm just curious: those near-term growth initiatives at Kamoa-Kakula related to Project 95, along with the throughput optimization work on Phase 3 — are those captured within your estimate, or forecast, of the complex producing roughly 600,000 tons of copper beginning next year, or do they come in addition to that 600,000 ton figure, say, during the '26, '27, '28 timeframe?
Mark here. That's a fair question. So Project 95 is essentially a set of releases, some pressure around holding the 600, or let's say staying above that 600 figure. Anything beyond that — for instance, if we take on project four with early works treating the tailings — that adds another 50. So at that point you're moving toward the 650 to 700 range. And then any other project, which is the Phase 4 project, takes us north of somewhere between 700 and 850. Project 95 on its own is meant to get us stable at 600 and a bit above that number, and everything else is incremental. It goes beyond that. So we're aiming to go — I've provided some guidance here, north of 700 over a long stretch toward where we're heading.
Great. And one more thing — regarding the capital expenditures tied to Project 95 along with the Phase 3 throughput optimization, has that already been included in the CapEx budget for '25 and '26?
Yes, I’ll handle that question. Project 95 is fully reflected in the CapEx guidance. The upfront expense for the throughput optimization is in there as well. So it could be increased a little.
All right, many thanks.
Daniel Major from UBS — you have the floor.
Hello, and thank you for those questions. The first one concerns the profile over the rest of this year at Kamoa-Kakula. During 2024 and the opening quarter of 2025, you accumulated roughly 50,000 tons of copper and concentrate inventory. What should we expect for Q2, and then for the release — yes, the possible release — of that inventory across the remaining months of the year?
I'm glad to address that question. So over the coming quarter, we'd expect our own figures to be fairly close to what we produce; there could still be some modest build in inventory held on our behalf at the smelter. Beyond that, though, we anticipate a reduction in inventory sitting at the Lualaba copper smelter. As a result, things should stay roughly level across the next quarter, perhaps with a slight uptick. After that, that inventory — both at the Lualaba copper smelter and at our own smelters — is then expected to be released over the third and fourth quarters. And as we mentioned, an estimated 17,000 tons of copper is expected to remain in the circuit snow.
All right, let me just make sure I've got that straight — 17,000 tons of copper sitting in the circuit. So by year-end, you'd expect to release the 48 minus 17. Is that correct?
Right. That's accurate. On top of that, having a little working capital inventory <<inaudible>> would help.
Alright. I think your audio cut out a bit there, but I believe I caught it. Okay. Yes, so my second question is a financial one, regarding the net debt balance over at the Kamoa-Kakula JV. I believe that comes to roughly $1.7 billion on a 100% basis. When we consider where the cash flow inflection point sits for the JV during the second half of this year and on into 2025 and 2026, how much net debt at Kamoa-Kakula would you aim to pay down across the coming few years? And clearly, that will have a bearing on how much cash gets upstreamed to the JV shareholders?
Yes. We've made an effort to kind of reflect the repayment schedules for the existing facilities within our MD&A, and you'll see that in advance they get paid down fairly fast. What I mean is, we have some optionality to add debt at the Kamoa-Kakula level, given its generating profile and the reality that leverage at the Kamoa-Kakula level is quite low too. So we'll be looking at simply optimizing that, along with how much cash we ultimately want to upstream. I think having a decent amount of debt at both levels is beneficial. So that's something we're considering.
All right. Still, let me press a bit further on that: would it be reasonable to think that you'd look to bring down the $1.7 billion in net debt, partly through a JV? Is that a fair way to put it?
Right. That's a reasonable point to some extent, though we'll always aim to retain some debt — certainly a few local facilities, and probably some offshore ones too, at that level.
Yeah. Dan, this is Alex. You might be glad to kick something off too. I mean, with $1.7 billion of net debt at the JV level, given that Kamoa is producing, or ought to be producing, well above a $3 billion kind of run rate going forward, that's very low leverage to carry. So to the extent that I think we can roll facilities and simply leave those outstanding, it wouldn't make sense in terms of capital cost of capital, to let us sort of unlock more cash flow.
That's very clear, thank you. If I can fit just one more question in — regarding Western Portland, I want to check whether there's different messaging from you around the resource update, specifically about issuing an official resource update versus the interim update you provided in January. Has the messaging changed, or did I simply misinterpret it?
The January interim update was really just showing you, you know, in terms of the strike and the deposits that we'll be including in the resource update, but we haven't put out any numbers to substantiate tons and grade. The last figures we released were roughly 18 months ago now. So these numbers expected in the next couple of weeks are basically putting out full resource estimates — tons and grades that will be signed up by an independent QP — which includes the Makoko West discovery. It includes the Kitoko discovery, some additional drilling at Makoko itself. And that's basically based on — it's a cut-off through the end of March of this year, but obviously, we're still drilling very, very heavily, which is why we refer to it as an interim resource. We're by no means finished, and most of those deposits do remain open to some extent in various directions, in particular to the South and to the West.
Excellent. I’m looking forward to that. Thank you.
Lawson Winder from Bank of America Securities — you have the floor.
Thanks. Appreciate it, operator. Thanks, Matt. And then Alex, David, and Mark as well. I just wanted to ask about power. You all discussed the different power initiatives quite a bit. What I'd like to zero in on is the solar power product that you've developed. Relative to your current grid cost, what cost do you expect with the solar project?
No, that's fine. Sorry I left that out. This is Mark. Two solar projects, 30 megawatts apiece, are already committed, and by mid '26 both should be up and running — so that's 60 megawatts. We're also in discussions with the providers for the next two projects. So solar will gradually be folded into the mix as time goes on. As I mentioned, the figure per kilowatt hour fluctuates, though it falls somewhere in a range of roughly $0.15 to $0.18-odd per kilowatt hour. That's fairly pricey, but my sense is that once these first projects are behind us, lower numbers will start showing up as time goes on.
Also, I should emphasize, building on Mark's point, that the $0.15 to $0.18 figure includes depreciation, since we aren't covering the capital expense. The IPPs will handle the CapEx; our role is simply that of off-taker.
I'd be reluctant to leave that out. Folks, it comes in at under 50% of what diesel combustion costs, and there's zero capital expense. So when you consider the sequence of things you might want in place, having solar paired with battery storage for backup is genuinely great to have. That means solar power you can draw on around the clock, instantly — not solar that's only there for 5 hours per day. So this will be the biggest solar installation at any mine anywhere on Earth, on tap 24 hours a day, at below 50% of diesel's cost — in fact well under half of what burning diesel runs you. Thank you.
That's really thrilling. Thanks a lot, Robert. Good to hear from you. Then I also wanted to ask about Inga 2, which is likewise a very promising and exciting power source for the future. So the initial allocation that you mentioned in the release was 71 megawatts, and that would rise to 178, which is a very significant share of your power needs. Is that the baseline, and then is the increase secured through some kind of contract, or is there any risk that it could be withdrawn or given to other users?
Mark here once more. So yes, the figure is 178 megawatts for that turbine. It will be fed into the grid gradually, since we still need to reinforce certain other areas. We are adding capacity to the grid at both switching stations — one at Inga and one at Kolwezi — and we have also launched some stability projects. I believe I brought those up during the previous call. So the entire 178 is, roughly speaking, the — I think that lands in October or November of next year. It begins with an initial 50, then progresses to a 100 that will be allocated to us. And then, I think we have requested something around 150 out of the 180 that we asked for over the long term. So a portion of what I'd call our own work, our capacity that we bring in, will be going toward helping communities in the various areas as well, though not a large share of it.
Yes. Perhaps I should just add that the state-owned power utility has a contractual duty to give the largest allocation to those who put money into upgrading generation and grid stability, though curtailment does occur when there are overall capacity constraints. So I think it's still to be seen, as generation comes onstream for the mine, what those constraints will look like, and that's precisely why we also have the imports. We're also pursuing a few exciting infrastructure projects aimed at delivering extra power straight to the mine, as well as making sure we have enough power for growth projects too.
Yes, this is Robert. I believe you can stop fixating on this. I believe you can stop fretting about power over the long term. There are so many additional plans we have for bringing power in regionally and for bettering the regional grid. Our issue is simply growing pains, guys. We expanded this mine so quickly. Nobody ever — not a single person in the world figured we would expand this mine that fast. It has generated well over $6 billion of cash, since it began less than 4 years ago, which is somewhat astonishing. So, we have turned the corner on power. We have plenty of ideas, regionally, and it's extremely important to benefit the Congolese nation. We are now accountable for roughly 8% of the GDP of the country, and we are heading to at least 10% of GDP. But in the future, we envision a future where The Congo can produce millions of tons of copper per year that are not being produced now. The fundamental limiting, factor is hydroelectricity, and we are going to have it. So it is 100% true to state that The Congo is the world's fastest and greenest copper production on the planet. Congo has gone from about #8 to #2 in the world in copper production in no small part due to the efforts of our 30,000 people.
Congo is going to remain either #1 or #2 for the foreseeable future, with the highest grade and the greenest copper production anywhere on earth. So we won't really walk you through all the other power ideas we have, but we will say this: we have turned the corner on power. That comes from the enormous efforts Marna and Mark and her team have put in. Thank you.
Alright, thanks, guys. And there's no doubt about it — you've got an absolutely incredible, world-class asset, and it's great to see the power situation catching up thanks to all your hard work. Appreciate you taking my questions.
I appreciate that.
Thanks. This is Andrew Mikitchook from BMO Capital Markets. You have the floor.
I've got a quick question about the Western Forelands. Could you give us some idea of how the drilling done since the last resource has been split up? Should we be looking for a considerably bigger effect on Makoko and Makoko West compared with Kitoko, or just so we have a sense, when we look at the old figures, of where the greatest impact ought to be?
Thank you. Andrew, it's good to hear from you. Robert Friedland here. I've spent 40 years working in mineral exploration. My advice is to be patient. We're moving up to 11 drill rigs, and everything will be disclosed. As you're aware, we require an independent appraisal of the work completed. It always looks back to last March. So in a few weeks, we can hold another conference call to explain what the independent engineers are reporting. That said, it does indicate something that we've raised our drilling budget, and only god knows what might eventually be discovered in the Western Portland, and she may change her mind. So give us a few more weeks, and these independent numbers will be opening soon at a theater near you.
Alright. That's pretty much the response I figured on. Thanks, Robert. And thanks to the team for all the specifics and the strength and the wins you've achieved in that area. I'll close out here.
Thanks, Andrew.
Thanks. We have no more questions coming in. Matthew Keevil, I'll hand the call back to you.
Much appreciated, operator. We’re at the limit of our 60 minutes now, so we’ll bring today’s call to a close. Once more, I want to thank each of you for joining us for today’s event. We’re eager to talk with you again before long about the many additional exciting milestones ahead in 2025. As Robert noted, please keep an eye out for the upcoming resource update on Western Foreland and the call that will follow on it. With that, many thanks. Operator, you may now close out the call.
That brings today’s conference call to a close, everyone. We appreciate your taking part, and please go ahead and disconnect your line.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ivanhoe Mines Ltd. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Ivanhoe Mines Ltd. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.