Kodiak Gas Services, Inc. reported strong Q1 2026 results with total revenue of $346 million, up 5% year-over-year, driven by new horsepower and price increases. Adjusted EBITDA reached a record $190 million, up 7% YoY. The company highlighted significant momentum in both its Compression and newly acquired Power Infrastructure segments. Management raised the low end of its 2026 guidance for compression infrastructure revenue and increased its adjusted gross margin estimate. The Power Infrastructure segment is expected to generate $95 million to $125 million in revenue for 2026. The company is investing heavily in power generation capacity, aiming for 300 to 500 megawatts of growth per year through 2030.

What topics did Kodiak Gas Services, Inc. cover?

What were Kodiak Gas Services, Inc.'s May 11, 2026 results?

Kodiak Gas Services is well-positioned for growth with strong momentum in both its Compression and Power Infrastructure segments. The company's ability to secure long-term contracts and manage supply chain challenges will be critical to sustaining its growth trajectory. Investors should watch for updates on contract wins in the power segment and any changes in the competitive landscape that could impact pricing power or supply chain dynamics.

Earnings Call Speaker Segments

Graham Sones executive
#1

Hello everyone, and thank you for being here on this Kodiak Gas Services call and webcast, where we'll go over what we delivered in the first quarter of 2026. With me today from the company are Mickey McKee, our President and Chief Executive Officer, and John Griggs, our Executive Vice President and Chief Financial Officer. Once I finish my opening comments, Mickey and John will discuss what's been happening in the market lately, give you an update on the direction of our Power strategy, and take you through our results along with the revised outlook for 2026, which now includes our new Power segment. Then we'll take your questions. A replay of this call can be accessed via webcast and by phone until May 25th, 2026. You can find replay information under the Investors tab on our site, kodiakgas.com. Please keep in mind that everything we discuss today is accurate only as of May 11th, 2026, and might not still be accurate when you listen to a replay or read a transcript. Statements made by management on this call could include forward-looking statements as defined under U.S. federal securities laws. Such statements represent management's present views, beliefs, and assumptions, drawing on information available at this time. While we think the expectations described in these forward-looking statements are reasonable, a range of risks, uncertainties, and contingencies might lead the company's actual results, performance, or achievements to differ materially from what management has expressed, and management cannot guarantee that these statements or expectations will turn out to be accurate. We will also reference certain non-GAAP financial measures. You can find the details and reconciliations to the closest comparable GAAP measures in our earnings release, available on our website. At this point, I'll hand things over to Kodiak's President and CEO, Mr. Mickey McKee. Mickey?

Mickey McKee executive
#2

Thank you, Graham, and I appreciate all of you taking the time to be with us today. I'd like to open the way we begin every meeting here at Kodiak — with safety. With the summer driving season upon us, it's worth remembering that getting behind the wheel ranks among the most dangerous activities most of us undertake daily. That's the reason every Kodiak employee goes through a safe driving course, and last year we introduced telematics to cut down on distractions while driving. I'm grateful to our safety and training teams for providing our workforce with these important resources, and to the entire Kodiak team for embodying our safety first culture each and every day. Lately, geopolitical developments have made it painfully clear that energy security and dependable energy infrastructure matter greatly to our everyday lives. The energy picture continues to shift, with natural gas demand climbing because of LNG exports and power generation, data centers included, as the AI competition speeds up. This dramatic jump in demand is putting pressure on supply chains, driving equipment lead times to unprecedented levels, and heightening the demand for well-trained technicians who can keep high horsepower machinery operating. Kodiak is positioned strongly to rise to this occasion. Our supply chain group has taken a proactive approach to procuring new equipment across both Compression and Power, and our exceptionally capable team stands ready to continue providing the service our customers count on. The natural gas Compression market finds itself in territory never seen before. Wait times for new large horsepower equipment continue to grow and currently exceed 180 weeks for 3,600 inline gas Compression engines — more than three years. Thanks to our solid vendor partnerships, we have locked in new large horsepower Compression packages for 2027 and 2028, and we are pursuing further units for delivery in 2029. We stay confident in our capacity to hit our goal of 150,000 horsepower of annual growth, which would give us a Compression fleet of no less than 5.2 million horsepower by the close of the decade. Even as supply remains constrained, Compression demand keeps growing among both our E&P and midstream customers, who now enjoy greater visibility into the coming surge of natural gas volumes. Permian operators are beginning to ramp activity back up amid stronger oil prices and record U.S. oil export volumes. With over five Bcf per day of Permian gas takeaway capacity anticipated to come online by year-end, multiple customers have inquired about moving their 2027 equipment orders forward. This has shown up in our pricing, as we've proven sustained pricing strength that we anticipate carrying into 2027 and past that point, reflecting how tight the market is. Something to remember is that over the past two years, Kodiak has regularly upgraded the quality of its fleet, making strategic moves to sell off certain smaller-horsepower Compression assets outside our core business. Those units bring in a higher revenue rate measured in dollars per horsepower, yet they come with thinner margins. We've raised the average horsepower per unit across our fleet, going from 943 horsepower per unit when Q1 ended last year to 977 horsepower per unit as of now. At the same time, we've pushed up the average revenue rate in dollars per horsepower, which means we've effectively offset the industry trends affecting revenue per horsepower, even though our competitors' horsepower per unit figures have all declined during that same stretch. A further trend we're noticing involves customers committing to longer-term Compression agreements so they can secure equipment availability. In the quarter, we signed a 10-year Compression services contract extension with one of our top customers, and another 10-year extension with a different top customer is now being finalized. This further highlights how the large horsepower Compression business functions as infrastructure. In addition, during the first quarter we acquired a package of large horsepower Compression units from a Permian producer, along with a seven year contract to supply Compression services. Several factors made this significant. It's an accretive method of expanding market share and producing immediate cash flow, given the lengthy lead times currently facing large horsepower engines. It also confirms what our customers tell us: Kodiak runs units efficiently and cost effectively. Now I want to discuss our Distributed Power business, which goes to market under the name Kodiak Power Solutions; the DPS acquisition closed on April first, and integration has moved fast. We're already on the same ERP platform, and we've restructured our commercial and operations teams to back the business. DPS came with a solid commercial team possessing extensive Distributed Power expertise, including one of the earliest islanded primary power data center contracts, which is presently in its third year of operation and has reliably met its 99.9% reliability guarantee for its customer. Let me mention a few reasons we're enthusiastic about the long-term growth prospects for Distributed Power. The power market is changing rapidly. Texas ranks first in the country for data centers under development, with more than 150 in development right now, as hyperscalers put priority on low-cost energy, available land, and a constructive regulatory environment when choosing sites. A recent estimate puts planned data centers in Texas at over 30 GW across the next two years. Speed to power is another key factor. The AI world moves quickly, and delays can leave projects at a disadvantage. Behind-the-meter solutions aren't merely short-term fixes; they're increasingly cost-competitive with grid power, frequently offering similar or better reliability; we're presently in talks with several data center customers regarding long-term contracts at high-quality returns to supply primary power. The opportunity set is substantial, and we anticipate it will continue expanding as hyperscalers grow their CapEx plans. Recent estimates suggest hyperscalers' AI-related CapEx spending between now and 2030 could surpass $5 trillion. With the substantial need for digital infrastructure and microgrids that we're seeing right now, and given how focused we are on acting fast to seize that opportunity, we've been quite busy securing more power generation capacity. As we mentioned in this morning's press release, we've lined up additional power generation capacity on top of what we picked up through DPS. At present, orders are placed for over 260 MW, with roughly 61 MW arriving in 2026 and the rest spread across 2027 through 2029. We're also deep into talks with several counterparties regarding another 1.3 GW, which would come online on a fairly steady delivery cadence through the end of the decade. The equipment we're purchasing consists of a blend of recip engines and industrial gas turbines, built specifically for data center and microgrid use; that aligns with our power growth strategy, which aims for 300 MW-500 MW of growth annually through the end of the decade, translating to a Distributed Power fleet of roughly 2 GW by year-end 2030. From the conversations underway today, we anticipate that our power equipment investment will produce unlevered returns above 15% and EBITDA build multiples near 5x, on par with our Compression business once you account for the extra advantage of lengthening the average duration of contracted cash flow from high-quality customers. While we invest to expand both our Contract Compression and Distributed Power assets, we remain dedicated to preserving financial flexibility and keeping our balance sheet strong. Our Contract Compression business produces highly resilient free cash flow, which will assist in funding our power growth. On top of that, we have substantial liquidity under our ABL and numerous financing alternatives open to us as we move through this stretch of robust infrastructure growth. The investments we're making now will contribute to a stronger, more profitable company going forward. This morning, we published our first quarter 2026 financial results. I'll touch on a few highlights, then let John dive into more detail. We closed the first quarter with 4.4 million revenue-generating horsepower. Average horsepower per revenue-generating unit came to 977, the highest of any of our Contract Compression peers and a number we anticipate will keep climbing given our emphasis on large horsepower. Our fleet growth investments, combined with divestitures of non-core units, pushed fleet utilization to 98%, yet another industry-leading figure. During Q1, we posted strong year-over-year growth in Contract Services revenue and adjusted gross margin. Contract Services adjusted gross margin reached 70.6%, marking a seventh straight quarterly rise and a new high for Kodiak. Margin improvements remain fueled by solid operational execution and returns from our technology investments. Real-time equipment monitoring allows us to identify problems sooner, cut down on failures, boost operational efficiency, and reduce parts spending. In our other services segment, first quarter results showed a sequential uptick in station construction activity, plus improved margins on AMS services. Robust performance across both segments lifted Adjusted EBITDA to $190 million for the quarter, a 7% year-over-year increase and a fresh company record. As we look toward the remainder of 2026, momentum in Compression remains solid. For our 2026 new unit Compression deliveries, we are fully contracted, and on our 2027 deliveries we are advancing well, with more than 40% already under contract. In our updated guidance, we account for both the additional contribution anticipated from power and the investment being made to scale that business and fuel growth in the years ahead. To go deeper on our financial results and our revised outlook for 2026, I'll hand the call over to John Griggs. John?

John Griggs executive
#3

Thanks, Mickey. That was a good recap. There's plenty of positive momentum here at Kodiak. Within our Compression segment, we keep hitting new highs on both revenues and margins, and the opportunity for growth and returns in our new Power business is very compelling. Now, on to what we delivered this quarter. Total revenue came in at $346 million, which is 5% higher than the same period last year. The main drivers were new horsepower, higher pricing and solid operational execution. Over in Contract Services, revenues were up 6% versus a year ago and 2% quarter-over-quarter. Revenue-generating horsepower grew by roughly 35,000 on a sequential basis. We achieved a price increase of 3.7% compared to last year, reaching $23.31 per ending revenue-generating horsepower. That gain was notable given that about 20,000 of the horsepower added this quarter arrived right at the end of the period through the purchase leaseback deal Mickey referenced, so it didn't really contribute to revenues. The standout was Contract Services adjusted gross margin at 70.6%, which is 138 basis points better than last quarter and 286 basis points better than a year ago. Hitting that high-water mark reinforces our belief that the substantial investments in training and operational technology we've made over the past couple of years are paying off in a real way. This quarter, we saw Compression parts expense come down, because our spending on telemetry technology and data analysis lets us keep a closer eye on equipment, which means fewer failures and less spending. We're also picking up efficiencies from connected technology platforms, which gets information to our skilled technicians faster. All of that supports better real-time decisions in the field, which generally means improved runtime and even stronger customer service. Turning to other services, revenues climbed 25% sequentially thanks to more station construction activity during the quarter; margins rose sequentially to roughly 16%, driven by a larger share of that activity this quarter and higher margin revenue streams. Adjusted EBITDA for the quarter rose 7% compared to the same quarter last year, hitting a new company record of $190 million; adjusted net income was $52 million, or $0.59 per diluted share. Now let's look at capital expenditures. Maintenance CapEx came to about $18 million in Q1, right where we expected it. Other CapEx was $7.5 million, also on plan. Growth CapEx of $86 million consisted of $24 million for the Compression purchase leaseback transaction plus $18 million tied to new power generation equipment; going forward, we'll report power growth CapEx separately. The power gen equipment orders we're placing run about $1.1 million — $1.2 million per megawatt. We'd anticipate spending roughly another 30% on balance of plant equipment. That BOP number may shift based on what setup a customer needs. Once you exclude the purchase leaseback and the power-related amounts, Compression growth CapEx was approximately $44 million, covering delivery of 18,000 new unit horsepower during the quarter along with various other items such as fleet revamps and deposits on long lead time engines. Discretionary cash flow came in at $126.5 million, which is a 9% increase compared to the same period last year. That gain came from higher Adjusted EBITDA along with reduced cash taxes. Now turning to the balance sheet: net debt stood at $2.7 billion when the quarter closed. During February, we issued $1 billion in senior notes maturing in 2031, carrying an attractive 5.875% rate. Those proceeds went toward redeeming our 2029 senior notes and reducing our ABL. As of March 31st, our credit agreement leverage ratio was 3.6 times. And lastly, our board approved a dividend of $0.49 per share, which gets paid later this month. Given our first quarter discretionary cash flow, that dividend stays well covered at 2.9 times. Now let's move to our updated 2026 guidance, which we've divided into the three segments we plan to report going forward. Contract Services is being renamed Compression Infrastructure and will keep containing the same items as before. We're establishing a new segment named Power Infrastructure, which will hold the vast majority of our new Power business. A small portion of DPS' historical and future revenues — primarily items such as fleet mobilization and logistics — will show up in our Other Services segment. For Compression and Power, we'll guide and report growth CapEx separately so visibility improves. As a reminder, our 2026 guidance only reflects three quarters of contribution from the DPS acquisition. On the changes: we raised the low end of Compression Infrastructure revenue guidance to capture the progress we've made recontracting units and the greater visibility on new unit growth; we lifted our adjusted gross margin estimate to 68.5%-70%, up from our original guidance, factoring in the recent climb in oil prices and how that affects our lube oil and fuel expenses during the second half of the year. For Power Infrastructure, we're guiding to full year revenues of $95 million-$125 million and an adjusted gross margin range of 60%-70%; we're keeping those ranges wide because the acquisition is so new, and also to preserve commercial flexibility for meeting the timing needs of longer strategic deployments. Although we expect to take delivery of 61 MW of additional power equipment in 2026, we don't expect to realize any material revenue increase from those units until early 2027. We raised the top end of our other services revenue guidance range to account for the non-recurring revenues from the Power business I mentioned earlier. Bringing it all together, our 2026 Adjusted EBITDA guidance now sits at $820 million-$860 million, and our discretionary cash flow guide is $520 million-$570 million. We increased both maintenance and other CapEx by $5 million each, reflecting the addition of the power fleet. Compression growth CapEx of $245 million-$275 million aligns with the March press release announcing the purchase leaseback transaction. We remain on track to add roughly 170,000 horsepower throughout the year. On the power growth CapEx side, like Mickey pointed out, given the robust demand indicators coming our way, we're starting an investment cycle in power meant to substantially boost our earnings power down the road. That works out to adding about 300 to 500 megawatts each year starting in 2027 and running through 2030. To reach those goals, power growth CapEx for this year should come in between $400 million and $500 million, and roughly $90 million of that ties to gensets and balance of plant set for delivery in 2026. What's left covers equipment planned for delivery in 2027 and beyond. I'll second what Mickey said about leveraging the strength of our incredibly resilient and highly creditworthy Compression business to help fund our initial growth and power. While doing that, you should expect us to protect the balance sheet. With that, I'll turn it back over to Mickey.

Mickey McKee executive
#4

Appreciate that, John. To close things out, I want to emphasize again that we've gotten 2026 underway very strongly. Our first-quarter Adjusted EBITDA came in above what we had projected, and the fundamentals in the Contract Compression market continue to be compelling, with demand that's highly visible. We're very enthusiastic about what our Distributed Power business offerings can do and about the chances to expand that business. Thank you all for joining us today, and at this point we're glad to take your questions. Operator?

Eli Jossen analyst
#5

Hi there, good morning to all of you. I'd like to begin by discussing the contracting structure for the backlog. I'm aware that you folks have given us a bit of extra detail regarding long-term agreements you've signed, but within that roughly 2 GW backlog objective you've laid out, what's the right way for us to think about contracting? Also, how ought we to consider periodic updates as things progress regarding the 300 MW-500 MW of yearly capacity you intend to bring online? Thank you.

Mickey McKee executive
#6

Yes. Hello, Eli. Appreciate you asking, man. Morning to you. Well, I'd say this: at this point we've held this business for just five weeks, and our attention is quite intensely fixed on ensuring the supply is there so we can get those contracts signed. Our main concern is making certain the equipment is arriving to us as we speak. Beyond that, we're seeing an enormous volume of inquiries and discussions taking place at this moment, on the data center front and also involving microgrids. Further news about those agreements will come as we proceed, and once they arrive and we can assemble those frameworks for you, we should be in a position to provide updates likely each quarter, moving forward from now.

Eli Jossen analyst
#7

Great. You know, I believe the sort of competitive advantage you folks have shown when it comes to executing on equipment procurement is, you know, certainly distinctive. Could you tell us about how you manage to secure this type of lengthy, you know, more and more difficult supply chain and, yeah, obtain this equipment when others can't? Yeah, any details on that would be wonderful. Thanks.

Mickey McKee executive
#8

Yeah, certainly. Right now it's a challenge. There's a shortage of this equipment; it's hard to get; we're using every relationship we have, both inside the industry, in the Compression industry, and with the suppliers we currently work with, plus a few new ones. We have some efforts underway to build some long-term frameworks concerning some supply agreements, and we're putting in a lot of effort on those, and we'll share more about them once we get them finalized too.

Eli Jossen analyst
#9

All right, great. Thanks, guys.

Mickey McKee executive
#10

Thanks, Eli.

John Mackay analyst
#11

Hey, everyone. Appreciate you making room for me. I'll follow up on what's already been discussed. You mentioned some of this already. Let me put it more bluntly. When it comes to CapEx per megawatt, John, I realize you spoke to this briefly. Could you shed a bit more light on how you view that balance of plant spending? Perhaps organize it by the various kinds of customers. Do you have any thoughts on what you're aiming for regarding that blend of customer types? Thanks.

John Griggs executive
#12

Yeah, absolutely. John Griggs here. I'll take the first portion and then hand things over to Mickey. Appreciate the question. As we've mentioned, and I believe this lines up with what others have stated too, the base power, given that we're already buying some and since we're in serious talks with OEMs about buying additional, let's say $1.1 million-$1.2 million per megawatt. There can be some variation between recips and turbines, but that's roughly what we're putting into our model. Then on the balance of plant side, we're applying, let's just say $1.5 million per megawatt. It can shift, and those familiar with this business understand that well. If a data center wanted every possible extra on their project, you could quite easily reach at least 2x, roughly what you paid for your original equipment. If you had a less sophisticated application and maybe you already had some of that kit internally too, it could be, you know, significantly less, 1.2 times or thereabouts; we believe $1.5 million is the correct figure to use on an all-in basis.

Mickey McKee executive
#13

Just to expand a bit further on the customer mix you brought up there, John. Right now we have a huge number of discussions taking place in the data center space, and those are a blend of ordinary digital infrastructure plus AI compute type loads. You're going to see a combination of those various sorts of data center customers, and as far as customer mix goes, that makes up the majority of what we're currently looking at.

John Mackay analyst
#14

Thanks for that detail, guys. Here's my second question, and it's likely a fast one. When you consider the various customer categories — the various kinds of what we refer to as plant build out, based on how the plants are balanced — do you have confidence in that return framework you laid out earlier during this call and at the time you initially announced the DPS acquisition?

Mickey McKee executive
#15

Without a doubt. As we complete the engineering upfront on these projects, our plan is to factor those costs into the model, ensuring the returns satisfy both the expectations and the thresholds we've already established.

John Mackay analyst
#16

Okay, that's reasonable, everyone. Thanks for the time. Thank you.

Mickey McKee executive
#17

Thank you, John.

Jim Rollyson analyst
#18

Morning, everybody. Mickey, let's shift over to the competitive side of things, perhaps. Looking back at your track record in Compression, you essentially launched this operation attempting to craft a superior solution when it came to uptime and also customer service, and that approach has paid off quite well. Now that you're moving into the power arena, it's clear the field of players pursuing this business looks a bit different. I'm simply wondering how talks with customers, or prospective customers, tend to unfold, and in what way you manage to capture that business against the five or six other competitors going after it as you move ahead.

Mickey McKee executive
#19

Yeah. Morning, Jim. I mean, look, these two businesses share plenty of parallels. There are certain subtleties involved, plus some variation regarding the equipment itself and so on, but our approach will remain identical, and it begins with a service-first mindset — we intend to serve as a complete solutions provider, and we'll support that through runtimes and similar offerings. What drew us to DPS at the time of the acquisition, clearly, is the reality that they hold a data center contract that is already fully islanded, one that now carries more than 2 years of operational history with reliability above 99.9%. That service-oriented philosophy truly matches what Kodiak has continually delivered within the Compression segment. We feel quite sure we can become a supplier of a distinctive offering here, one that genuinely centers on our customers and whatever requirements they present to us.

Jim Rollyson analyst
#20

Understood. Thanks for that. Perhaps pivoting to the main part of your operation right now. Given how far out the lead times have become, you folks typically stay on top of this, but I'm wondering how you're getting ready in advance regarding engines. Are you, say, checking beyond Cat as well to guarantee every need your customers have is satisfied, and maybe how are you preparing for that whole situation?

Mickey McKee executive
#21

For sure. We're definitely gazing ahead and ensuring we've secured engines along with shop space, since those two are truly the largest commodities in this situation, and making certain we can reach all of that moving forward; 2027 and 2028 are entirely secured for us, and at present we're tackling 2029; that genuinely aligns with what our clients anticipate given the extremely clear natural gas need that exists with LNG alongside power demand emerging; we believe we're remaining in front of it, doing what we've consistently done, and monitoring the supply chain closely while ensuring there are no holes in those deliveries.

John Griggs executive
#22

Jim, just to jump in really fast here — regarding that 750,000 incremental horsepower Mickey mentioned during last quarter's call, I'd say it's completely achievable, considering the way we handle both the supply chain and the demand signals.

Jim Rollyson analyst
#23

That's good to hear, and it doesn't come as a surprise. Thanks for the thorough detail, everyone.

Mickey McKee executive
#24

Appreciate it, Jim.

Doug Irwin analyst
#25

Hi, everyone. I appreciate the question. I'd like to begin by focusing on that 260 MW that you've already secured. I'm wondering whether you could share additional specifics regarding what that first combination of equipment will consist of — specifically, how many turbines compared with recips — and also any further information about the schedule past 2026 for accepting delivery, plus where things currently stand regarding contract negotiations up to this point. I realize it's still quite early on.

Mickey McKee executive
#26

Yes. Good morning, Doug. Yes, it remains quite early on. We're still sorting through many of those specifics. What I can say is that the equipment we've secured so far combines recips and turbines; that will remain our approach moving ahead; we believe there's a market and demand for each, and we believe maintaining a solid blend of recips alongside turbines is the direction we want to take. Of the 260 MW we've secured to date, the split is roughly 50/50 between recips and turbines. Looking ahead, my expectation is that the weighting will shift somewhat more toward turbines. When we consider 2027 and afterward, and think about delivering somewhere between 300 MW and 500 MW annually, my expectation would be roughly 25% recips with about 75% turbines. When we consider those turbines, from a real estate perspective they require far less space, deliver much greater power density, and suit the data center contracts we're pursuing — and already discussing — extremely well, since those deals typically run around 200 MW to 300 MW apiece. That's our plan moving forward and how we intend to grow the business.

Doug Irwin analyst
#27

Thanks, that's useful. As a second question, can you talk about how the money required for some of this power equipment might compare with what we normally see in Compression? I'm wondering how evenly that $400 million-$500 million of CapEx this year would be spread, in case some of the power capacity requires larger upfront payments or deposits for the bigger turbines. I'm just considering the effect on cash flow if the spending is more front-end loaded.

John Griggs executive
#28

Yeah, sure. That's a fair question. I'll take that one. To begin with, regarding that 300 MW to 500 MW figure we mentioned for the 2027 to 2030 period, it's not a perfectly straight path, though it stays pretty contained within that band based on what we've already acquired or the ongoing talks about buying equipment. You're right that in the turbine space in particular, there tend to be more initial or milestone-based payments than what we see in our Compression segment. When it comes to recips, it's still uncertain how things will ultimately shake out. Those are important factors we're also navigating as we engage with our channel partners or OEMs on this. When we consider how to fund this and how we'll handle it moving forward, I suppose there are a few points worth making that I see as significant. To start, I'd note that safeguarding our balance sheet — and by extension the entire franchise — matters enormously to us; our leverage goal sits at four times. At present, we're roughly at that level. Thinking back to our IPO, leverage stood at 4.2 times, and we pledged to bring it down to 3.5 by the close of 2025 — which we accomplished right on schedule. So here, as we kick off this investment cycle and get construction underway, we've made it very clear to everyone — investors, analysts, creditors, rating agencies, and so on — that you should anticipate our leverage moving above the 4x long-term target we've set, though that will only happen from time to time. That happens while we're putting the foundation in place, and afterward, once contracts start landing and you factor in both the Compression and Power businesses together, deleveraging will pick up speed, bringing us back to that target and beyond. Before we wrap up, I want to point out something important: our Compression segment is remarkably sturdy. It has very little vulnerability to short-term swings in commodity pricing, and it has come through major stress scenarios — COVID, and even what followed Liberation Day — with excellent results. We're backed by a fantastic ABL facility and strong banking partners. Over the past two years, we've completed three bond deals very successfully, and that includes the first 10-year bond ever issued within the Compression business. When you put all of that together, this is a solid operation, our leadership group is experienced, and we retain plenty of options for funding the company going forward.

Mickey McKee executive
#29

Doug, you're right to point out that certain of these larger turbines carry some advance progress payments. That's something we're watching very closely, and we're working to use the ties we already have with our current OEMs and vendors so that the effect of any such progress payments stays as small as possible.

Doug Irwin analyst
#30

Got it. Thanks for the time.

John Griggs executive
#31

Thanks, Doug.

Neal Dingmann analyst
#32

Good morning, everyone. Appreciate the update. Another strong quarter. My first question is for Mickey, or perhaps John — specifically regarding Compression M&A. Could you discuss the potential for future purchase leasebacks of Compression horsepower? From what I hear in my E&P conversations, it really seems like a number of E&Ps would be open to, and interested in, handing over ownership to you folks, based on your track record of service. I'm just curious — how active are those talks right now? What kind of potential do you see in that area?

Mickey McKee executive
#33

Hey, good morning, Neal. There's a great deal of opportunity in that space, in my view. As John mentioned, we're clearly in the midst of this power investment cycle, and our focus is going to be squarely on that, but we'll also seize opportunistic situations that arise on the Compression side as well, particularly when it comes to purchase leasebacks. Last quarter we closed one — a package of just over 20,000 horsepower — and that was a really solid deal for us. It was a nice, bite-sized transaction that we could digest without difficulty. Things have gone very smoothly, with us assuming operations on that equipment on April first. We're big fans of those transactions and want to pursue additional ones moving forward, and when those opportunities present themselves, we'll capitalize on them.

Neal Dingmann analyst
#34

No, I believe there's a significant chance in that area. Then, regarding my question about services, perhaps referring to slide 14 or another one you presented today. I'm curious, Mickey, whether for you or John, would the current staff simply want to ensure they can handle service for both Compression and Power, and do you currently have sufficient personnel to service everything you have, or are you steadily bringing in more people?

Mickey McKee executive
#35

Yes, what I mean is, we're constantly bringing in people and having them complete our training course. It's a top-tier course. We're launching our new building in Midland. We'll relocate there in June, I believe, around that time. It will be an excellent tool for us to keep training our staff and also our clients' staff so they can be near our machinery safely and similar matters. It's something we're highly dedicated to. I believe we emphasize the training side of our team as much or more than anyone else in our field; we're thrilled about how much of a differentiator that is. Regarding the technicians at present, we're quite well-staffed; we're still bringing in more to manage our expansion. We're introducing new training courses into our Bears Academy for power and electrical related items right now. Collaborating with several of our OEMs and equipment suppliers to come and offer training courses at our building for our staff. We're intensely focused on it and will train as many individuals as possible to be as efficient as possible moving forward; also equipping them with our technology that we possess. We're deploying large language models and similar items that will assist technicians with AI agentic type items that will let them help with parts locations, with troubleshooting and all those sorts of matters. We anticipate that to be completely deployed here in the second half of the year. That will be an enormous benefit to our employees.

Neal Dingmann analyst
#36

Thanks, Mickey.

Mickey McKee executive
#37

Thanks, Neal.

Jimmy Larkin analyst
#38

Hello, and good morning. I appreciate you taking my question. I wanted to know, first, whether we might revisit the contracts, and whether you could walk through how you're locking in contracts for the incremental megawatts you're buying. Would you say it's largely pre-contracted, or does some of it involve ordering on spec for future megawatts? Thank you.

Mickey McKee executive
#39

Yes. Good morning, James. Mickey here. So, on the Power side, we have to seek out this equipment and make commitments for it. Honestly, I wouldn't describe it so much as speculation; committing that CapEx spend is more of an educated approach, I suppose, as we proceed. We're reviewing our backlog of opportunities already in place that DPS contributed, plus further inbounds that have arrived since we closed the deal; on many of those, we're in fairly advanced talks regarding contracts to be established across the coming months. Depending on how well-informed we are about the pipeline, we do need to place orders for certain equipment; hopefully, we'll be discussing contracts coming in quite soon.

Jimmy Larkin analyst
#40

All right, that's clear. Moving on, my second question had to do with profitability in the Compression infrastructure business. My understanding is that we're already past 70% as of the first quarter. I realize the updated guidance is out and it's been raised somewhat. Could you walk us through how that looks for the remaining quarters and what we ought to anticipate? Given how 1Q came in, might that 70% figure drift upward?

John Griggs executive
#41

Yes, I appreciate you raising that point. That figure is something we're quite pleased about. Hitting 71% during the first quarter was simply outstanding as far as we're concerned. When it comes to that unit—the Compression division—performance right now is outstanding across the board. In our view, three key factors explain this. First, as Mickey mentioned a moment ago, we've been putting money into both our workforce and our technology throughout the past two years. Those outlays are now generating returns, plain and simple. Equipment failures have become less frequent, our spending decisions are sharper, output per employee has risen, and all of that shows up in the margin figure. Second, keep pushing toward greater horsepower. And third, pricing. Regarding the guidance, it sits slightly under what we delivered in Q1, so there could be some conservatism baked in. What we're dealing with is that elevated oil prices push up lube oil and fuel costs, and both of those feed into our cost of goods. Because it's hard to predict how that will play out ahead, we concluded that the guidance we put forward is where we ought to be.

Theresa Chen analyst
#42

Morning, and thanks for letting me ask. Turning to the base business, Mickey — you're now looking at lead times beyond 3 years, and since the IPO, and likely even earlier, that figure has gone in just one direction. Given that, how do you view pricing power right now? And following what you said earlier about that pricing power carrying on through 2027 and past it, what are you observing on price hikes throughout the industry, and what do you expect across the coming 2 years because of the tight supply? Stepping back, Mickey, would you call this situation sustainable? If it is, how does the industry resolve this supply crunch, and how do you expect the landscape to change because of it?

Mickey McKee executive
#43

Hey, morning, Theresa. Those are good questions. Look, I believe pricing for our equipment will keep trending higher, and it will keep climbing. By how much and for how long — plenty of outside factors will influence that, correct? Things like oil prices, the competitive landscape, and all those various elements. I do believe we have the chance to sustain the robust pricing we've witnessed across the past several years. New units keep leaving the door and getting priced at spot rates that are quite favorable for us. We keep managing to reprice the base fleet upward somewhat as those contracts expire. As you can see from what I mentioned in my prepared remarks, producers and midstreamers are now ready to commit equipment for extended periods, which we consider terrific for our base business; we'll keep watching that rise, and we'll keep seeing those dynamics play out in the business. Regarding the supply crunch, boy, I believe demand will keep exceeding supply here. Lead times keep stretching out. You've got a growing share of Compression shifting away from electric nowadays due to grid power access. I believe a supply shortage will persist across the industry for the foreseeable future, particularly given rising GORs in the Permian Basin, growing supply emerging from the Permian, plus greater takeaway capacity that's enabling more growth there. We're enthusiastic about the Permian and other basins going forward, and we believe there will be ongoing, incredible demand for our services and our equipment.

Theresa Chen analyst
#44

Thanks, that's useful. Regarding Power Infrastructure, when we consider the trajectory you've described for the scale of expansion, out through the finish of the decade — distinct from and on top of the prior inquiry regarding contract length, structure, terms and so forth with the data center counterparties, which I gather we'll receive additional detail and visibility on as you proceed through this expansion — how are you approaching counterparty credit risk in those agreements? What portion of terminal value sits inside your 15% unlevered return objectives?

Mickey McKee executive
#45

Excellent question. I suppose I'll take the second one first. It somewhat hinges on the project itself and its duration. I'll tell you, if we're building the numbers around a 15-year contract, we'll assume a zero terminal value. You're familiar with the math, given that you work in finance. Even if you assign a substantial terminal value there, it won't amount to much across that span. If it were a seven year contract, the response would be different. Every situation somewhat hinges on the project. I'd say we must feel genuinely at ease that we're going to land in that upper teens dynamic whenever we sign any contracts. What was the initial question?

John Griggs executive
#46

Parties on the other side of the trade.

Theresa Chen analyst
#47

Risk tied to a counterparty's credit.

Mickey McKee executive
#48

That's absolutely essential to the mission, isn't it? I mean, that's how it's always been for every kind of business. When it comes to our Compression business, we've been quite lucky that many of the firms we trade with have been swallowed up by a few of the biggest names in the global energy sector. Our preference is for more customers with investment-grade ratings. In our view, the chance is also present on what I'd describe as the digital infrastructure front. The marketplace is simply far broader, I suppose, when you look at how many players take part, whether they own, construct, and build out the data centers or are the customers underneath. Every single contract will differ somewhat. We will certainly factor that into how we weigh things when choosing which contracts to go after and which ones we'll allow someone else to take.

Theresa Chen analyst
#49

Thank you.

Mickey McKee executive
#50

Thanks, Theresa.

Sebastian Erskine analyst
#51

Morning, everyone, and congratulations on what you've announced today. That's really thrilling. My first question concerns the discussions you're having with your customers. What I wonder is this — one benefit tied to Compression has been that the equipment usually remains at the site for a great many years, stretching past even the original contract period, roughly speaking. So are a growing number of your buyers viewing this as something temporary that gets them through until the grid is ready, or could it serve as a lasting, fully integrated utility-style package for those hyperscalers?

Mickey McKee executive
#52

Morning, Sebastian. So the standard contract period we discuss with these data centers runs 10 or 15 years, and plenty of them are seeking the choice to prolong things once those periods end. My sense is that this business has shifted quite a bit in a brief span, moving away from the belief that it was a bridge toward grid interconnection. More and more, what we keep being told is that it will likely serve as a lasting power supply for them, subject to regulatory shifts and that sort of thing. I believe many of the folks involved in this business right now genuinely view it as a lasting answer and want to confirm it's the correct answer over the long haul. More and more, we hear folks saying six to eight years for grid interconnection, and now, beyond a decade or perhaps never. I think we're regarding it as lasting digital infrastructure and Power Infrastructure that will remain in place across a very, very extended stretch of time.

Sebastian Erskine analyst
#53

Thanks for those details. Regarding margins — the 60%-70% adjusted gross margin figure for Power Infrastructure. John, you did cite a wide band initially; could you walk us through what's driving that, plus how much room there is for margin improvement over the medium term? Is the main emphasis simply growing revenue?

John Griggs executive
#54

Sure. At the end of the day, return on capital will always be the focus; we issued guidance that way for a couple of reasons. First, we've held this business for just five weeks. As Mickey noted during his prepared remarks, we've moved their operations onto our ERP system, but we simply wanted protection against any unexpected issues. Second, we've been quite upfront with every investor we've talked to that the DPS business we acquired had been somewhat starved of capital. They held this attractive long-term primary power contract with a data center, and were gaining, I suppose you'd say, momentum toward securing a second contract, yet they lacked access to power. The management team there deliberately kept many of their contracts on shorter terms, reasoning that if they could win that 100 MW, 200-plus megawatt opportunity under a quality long-term contract, they could then shift what was on short terms into it. That's essentially what we took on. There's a piece of this where, as we invest to build our foundation of power, plenty of that power will remain on short-term contracts, and we want to leave some of it there, so we can pull it off once we secure the contracts Mickey described. Were we to do otherwise, it would be extremely foolish to adjust our cost structure or workforce for what amounts to a temporary move, since we know a longer-term contract is coming. That's another reason we think, "Let's maintain a wide range." Once we reach scale, once we have more power, our view is that the range will narrow and look more like the Compression business.

Sebastian Erskine analyst
#55

That's genuinely great to hear, John, and congratulations on what you posted today. I'm excited about the expansion. Many thanks.

John Griggs executive
#56

Appreciate it.

Mickey McKee executive
#57

Thanks, Sebastian.

Elvira Scotto analyst
#58

Hi there, apologies, and good morning. Turning to the Power segment, could you give a bit of detail on the cash conversion cycle there? What sort of timelines are involved, you know, starting from the point a contract gets signed, assuming the equipment is on hand, through to the point revenue begins to be generated?

Mickey McKee executive
#59

Hey, good morning, Elvira. My sense is that will hinge heavily on the specific contract. I think you'll find certain cases involving installations that are somewhat less sophisticated landing in that roughly three to six month sort of window between procuring equipment and bringing in revenues; however, with certain of the more sophisticated, larger plants, the duration might run longer, perhaps somewhere in that six to 12, maybe 18-month span. A great deal of that is going to be determined by the contracts we end up executing here.

Elvira Scotto analyst
#60

All right, that's helpful, thanks. The bulk of the conversations you're having on the Power side — do they take place in Texas? And tied to that, is it possible for the Compression and Power businesses to, say, pool technicians or share operations so that efficiencies get driven?

Mickey McKee executive
#61

That's our view. To address your first point, we're getting a great deal of inbound interest and opportunities in Texas. Beyond that, we're also seeing plenty throughout the entire United States at this moment. It's a combination of the two, though many of them originate from Texas as development there continues to get built out. At present, we keep the operations groups apart so each can concentrate on Power or Compression alone. My sense is that as we grow and have projects located near our Compression operations, there will certainly be some overlap, allowing them to back each other up. Certainly on the operational support front, when it comes to supply chain, safety, and matters of that sort. We believe a bit of overlap will exist there, yet for now we're holding them separate so we can keep building out, grasp how these things will function, and identify where those efficiencies could emerge.

Elvira Scotto analyst
#62

Understood, that's excellent, many thanks.

Mickey McKee executive
#63

Appreciate it, Elvira.

Josh Jayne analyst
#64

Morning. Appreciate you fitting me in. My first question concerns that purchase leaseback deal. Could you expand on it a bit and share whether there's greater appetite for such transactions right now, from both your perspective and the operator's, given how tight the market is, and considering that for many folks this isn't really what I'd call a core operation for them, and also how they weigh service quality and similar matters? Perhaps you could go into a bit more detail?

Mickey McKee executive
#65

Hey, morning, Josh. That purchase leaseback we closed on was truly a strong deal on our end, and we believe it will be an excellent one for the customer as well. I think you nailed it there, correct? Owning and running their own Compression genuinely isn't a core competency for many of these customers. We've got back office support and infrastructure established inside the company to handle that daily and keep our focus on service daily. A customer stands to gain quite a bit by moving forward and executing on something along those lines. We do believe there are chances for further similar opportunities to materialize down the road.

Josh Jayne analyst
#66

All right, thanks for that. Beyond the lead times on engines, I think while you were responding to another question, you mentioned how crucial it is to have capacity at the locations where the units get packaged. Is there anything you can tell us about that? How limited is space right now, and what's your thinking?

Mickey McKee executive
#67

Yeah, that's another area we've really got to keep a very close eye on — shop capacity, and being able to assemble these things once the engine and the compressor for these Compression units arrive. We bring those two together while we're sourcing and locking in engines, and we make certain our packagers have plenty of shop space and capacity and so on. What you're seeing there is quite comparable to engine deliveries, since they reserve their shop space as engines come in and orders start arriving. Their lead times fall in roughly the same range as the engine lead times. They're more than 3 years out in terms of what's already booked, with shop space assigned to build these compressors. We're making sure that supply is secured along with the engines, so that we have everything required to ensure all those long lead items and critical path items get procured.

Josh Jayne analyst
#68

Josh, got it. Appreciate you fielding my questions.

Mickey McKee executive
#69

Mickey, thanks, Josh.

Mickey McKee executive
#70

Appreciate that, Melissa. And thanks to all of you for joining us on this call today. We're eager to talk with you once more when we share our second quarter results.

Operator operator
#71

Appreciate it. That brings us to the end of today's call. At this point you're free to hang up. Thanks for joining us.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Kodiak Gas Services, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Kodiak Gas Services, Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.