Good morning, everyone, and thank you for being with us on the Kodiak Gas Services conference call and webcast, where we'll go over what we delivered in the third quarter of 2026. With me today from the company are Mickey McKee, our President and Chief Executive Officer, and John Griggs, our Executive Vice President and Chief Financial Officer. Once I finish my opening remarks, Mickey and John will offer their perspective on how the industry looks right now, take you through the results for the quarter as well as our revised outlook for 2026, and after that we'll take questions from callers. If you'd like to hear today's call again, a replay will be accessible via webcast and by phone until November 23rd, 2026. You can find the replay information under the Investors tab on our website, kodiakgas.com. Please keep in mind that what we discuss today is current only as of November 9th, 2026, and it might not be accurate anymore by the time you listen to a replay or read a transcript. Statements made by management on this call could include forward-looking statements as defined under United States federal securities laws. Such statements represent management's present views, beliefs, and assumptions, which are based on information available at this time. While we believe the expectations described in these forward-looking statements are reasonable, a range of risks, uncertainties, and contingencies could

Graham Sones executive
#2

Good morning, everyone, and thank you for being with us on the Kodiak Gas Services conference call and webcast, where we'll go over what we delivered in the third quarter of 2026. With me today from the company are Mickey McKee, our President and Chief Executive Officer, and John Griggs, our Executive Vice President and Chief Financial Officer. Once I finish my remarks, Mickey and John will offer their perspective on where the industry stands right now, take you through the quarter's results and our revised outlook for 2026, and after that we'll take your questions in the Q&A session. You'll be able to access a replay of this call via webcast and by phone until November 23rd, 2026. You can find the replay details under the Investors tab on our site, kodiakgas.com. Please keep in mind that what we discuss today is accurate only as of November 9th, 2026, and it might not still hold true when you listen to a replay or read a transcript later. Statements made by management on this call could include forward-looking statements as defined under United States federal securities laws. Such statements represent management's present views, beliefs, and assumptions, drawing on information available at this time. While we consider the expectations described in these forward-looking statements to be reasonable, a range of risks, uncertainties, and contingencies might lead the company's actual results, performance, or achievements to differ materially from what management's statements express, and management cannot guarantee that these statements or expectations will turn out to be accurate. Our comments will also reference certain non-GAAP financial measures. You'll find the details and reconciliations to the most directly comparable GAAP measures in our earnings release, which is posted on our website. At this point I'd like to hand the call over to Kodiak's President and CEO, Mr. Mickey McKee. Mickey?

Mickey McKee executive
#3

Thank you, Graham, and thank you all for being with us today. Before we begin the call, I want to talk about a few changes. At Kodiak, we take a lot of pride in growing our people, and we're glad to offer chances for career advancement. Graham, who has done an outstanding job heading up our investor relations for the past 4 years, is stepping into a new position as Senior Vice President of Corporate Finance and Treasurer. Congratulations, Graham — I have every confidence that he will do well in this new role. Kevin Smith will now lead our investor relations efforts. Kevin is a former research analyst and brings more than 10 years of investor relations experience. Many of you are already familiar with Kevin, and we expect this change to go smoothly. Please join me in offering congratulations to Kevin and to Graham. As is our practice at the start of every meeting here at Kodiak, I'd like to open with safety. Before any job at Kodiak, our technicians must complete a job safety analysis—what we call a JSA. In a JSA, technicians review each step of the work, identify possible hazards, determine how to reduce them, and confirm they possess the right tools, protective gear, and training needed to perform the task. This process asks our people to look closely at what a job involves and to think through how they'll complete it both well and safely. I'd urge each of you to adopt your own JSA approach whenever you're about to start a task. Even if it's something routine, or something you haven't tackled in some time, stop briefly and confirm you grasp every possible hazard and that you possess the proper equipment and preparation to get it done. During the last six months, attention has increasingly turned to the way elevated crude prices, diesel, and lube oil too have weighed on the economy, fueling inflation and compressing margins. Kodiak isn't shielded from this, though John will address it afterward—we've implemented measures that partly counterbalance higher fuel and lube oil costs so our margins and cash flow stay protected. What's not getting enough focus, though, is that domestic natural gas prices have fallen compared with a year ago, which reduces inflationary pressure and provides the US with an enormous energy cost edge over the rest of the globe. With the increase in natural gas demand coming from Gulf Coast LNG facilities and gas-fired power demand, today's pricing conditions couldn't have happened without investment in and development of infrastructure assets in the Permian Basin, which made the tremendous gas production growth possible. During the first three quarters, Kodiak brought on line over 120,000 additional horsepower, and most of that capacity was directed to the Permian so we could keep up with robust production. According to independent third-party estimates, Permian gas output has grown by about 2 Bcf per day since this spring, and we take encouragement from the outlooks several E&P industry leaders have offered for further growth in natural gas production. Just as important, our company and the natural gas sector as a whole have delivered that expansion in a safe and dependable manner, working closely with regulators and with the communities in which we operate. Turning to power — the last several days have certainly been turbulent, so I'd like to step back for a moment and walk through a few of the benefits that come with the US leading the way in developing artificial intelligence. First off, advances in this rapidly evolving field are driving economic growth throughout the country, contributing to job creation in construction, power, and manufacturing. At Kodiak, we've been directing funds toward training and have stayed busy onboarding additional technicians as we grow our workforce. This past week, the US Bureau of Labor Statistics released figures showing labor productivity climbed 3.6% at an annualized rate during the third quarter — the fastest annualized pace in a year. That pickup in labor productivity came largely from spending on technology like AI; those gains are showing up at Kodiak, where our technicians rely on AI to make our operations more efficient and safer. Last, data centers are demonstrating a rising dedication to serving as good community stewards by generating their own electricity and delivering benefits to nearby areas, among them contributions to construct local community centers, money for school districts, and money for trade schools. Here at Kodiak, we remain dedicated to creating a positive impact in the communities where we live and work. Beyond that, we favor power assets that use little or no water, and combined with cutting-edge emissions and noise reduction technology, this keeps our environmental impact limited. What we're trying to do in power mirrors what the industry has already achieved in natural gas compression: increasing supply to meet demand as safely and responsibly as possible. As a number of the hyperscalers mentioned this earnings season, demand for compute capacity remains strong. We continue to see that demand reflected in our commercial conversations. I'm very enthusiastic about how our power commercial team is progressing as we concentrate more sharply on projects in advanced commercial discussions spread across several states. The opportunities we're chasing could soon have our new units up and running while generating strong returns. And to help us prepare for the growth and technical demands we're facing now and will face down the road, I'm happy to report that we recently cut the ribbon on our new Bears Academy training facility in Midland, Texas. At this world-class site, participants get hands-on instruction with equipment for both compression and power assets. With 34,000 square feet of space, the facility equips our technicians with the training and know-how they need to fully run and service electrical equipment and to diagnose and maintain mechanical equipment. During the first 9 months of this year, Kodiak employees have accumulated over 67,000 hours of training. This is much more than just a training facility — it's an investment in the skilled workforce that America's growing energy infrastructure needs, and that's something we're very proud of. In fact, we're planning an event for next year: an investor and analyst day in Midland, so that many of you can come visit and see Kodiak's industry-leading training and operational support facility and meet some of the people who run it. The timing of our new facility's opening couldn't be better, as we ramp up our technician workforce to prepare for significant growth in our power infrastructure business. We recently began site work and started setting equipment at the previously announced data center in West Texas. All told, 40 reciprocating generators running on natural gas will be deployed, and we expect them to start up in the first quarter. Because we're gathering reciprocating units from 7 existing sites that are on short-term contracts and adding some new equipment to help satisfy the demand, the West Texas data center offers some distinctive opportunities. As I mentioned earlier, our power commercial efforts are advancing considerably. During the past several months, we have worked with hyperscalers as well as data center developers, carrying out detailed engineering across several projects.

Mickey McKee executive
#4

Speed to power still matters, but in our view the industry's emphasis is moving toward whether a power provider can run the equipment and deliver high reliability. That's a major selling point for Kodiak. Supplying equipment is something anyone can do; what sets us apart is our experience, our people, and the capability to operate dependably day in and day out. Finally, John and I want to stress as strongly as we can that our balance sheet strength is itself a meaningful strategic edge. Turning now to compression: demand for contract compression is still robust, with Permian gas production continuing to beat expectations. Availability in the compression sector is still constrained. Wait times for the newer Caterpillar 3600 engine models have stopped climbing, yet they remain close to 190 weeks. Through the use of AI technology, we continue to discover methods of boosting operational efficiency — this enables remote monitoring of units, early detection of issues before they disrupt operations, and confirmation that our technicians possess the right tools and training for each task. We are making strong headway in committing the remaining equipment we have open for 2027, and we have started signing contracts for equipment in 2028. Contract compression continues to be a business with very high margins that generates a substantial volume of free cash flow. Earlier today, we released our financial results for the third quarter of 2026. I'll go over a handful of key points, and then I'll turn it over to John, who can fill in the details. Within compression infrastructure, we closed out the third quarter with 4.5 million revenue-generating horsepower. Fleet utilization improved once again, hitting 98.3%, and average horsepower per revenue-generating unit has climbed back above 1,000 horsepower for the first time since we completed the CSI acquisition in April 2024. For us, utilization and average horsepower continue to be industry-leading metrics. During Q3, we delivered strong year-over-year growth in both compression infrastructure revenue and adjusted gross margin. Compression infrastructure revenue for the quarter was up 7% compared with a year earlier. That solid pricing result shows the gains we've achieved by recontracting the fleet we already have, along with the demand underpinning contract compression in a market this tight, where gas growth is highly visible. Adjusted gross margin for compression infrastructure reached 70%, marking the third quarter in a row at or above that level. This outcome would not have been possible without our relentless emphasis on large horsepower compression assets, paired with what we put into training and technology; the margin numbers this quarter were particularly impressive considering the adverse headwind from elevated lube oil prices that we dealt with during the period. Our supply chain group continues to do a tremendous job planning ahead and negotiating favorable contracts, which helps us source cost-efficient supplies and reduce price risk. We actually just signed an agreement that secures most of the lube oil we buy at a favorable locked-in rate through the entirety of 2027, which essentially removes that cost swing from our concerns. On the power infrastructure side, revenue rose 28% quarter over quarter, driven by broader commissioning work at a data center and by short-term rental arrangements that got extended, with those units remaining onsite longer than we had anticipated. Our adjusted gross margin came in at 75% for the quarter, above what we had forecast, because we managed to stretch out contracts carrying high margins and lessen our reliance on outside parties. Bear in mind that during Q4 we will be withdrawing equipment for the West Texas data center project, and that will cause a temporary dip in certain margins. Broadly speaking, the team is performing very well when it comes to reducing expenses and running things more efficiently, and we anticipate that will show up clearly in what we deliver for 2027; we closed out the quarter with 413 megawatts in our fleet. Roughly 16 additional megawatts of reciprocating power should come online during Q4, since certain shipment dates for new power equipment have slipped into 2027. Conditions in the market are still very tight. When we hold our next earnings call, we intend to share more on the schedule and the outlook for power deliveries in 2027 as part of rolling out both our 2027 capital plan and our full-year guidance. Every segment delivered solid performance, pushing adjusted EBITDA to $224.5 million for the quarter — a 29% year-over-year gain and a fresh company record. To sum up, demand for our large horsepower compression stays strong while the industry scrambles to match the fast pace of natural gas output growth in the Permian. Our operations team keeps doing a great job of driving operating efficiencies higher, which lets us counter rising lube oil costs and hold margins at high levels. Looking ahead several years, things remain very promising. Our commercial group has been excellent at securing contracts for additional horsepower. Regarding power, more than twelve months ago we gathered and put together something akin to a JSA of our own, spelled out the hazards, and set down both the equipment and the approach required for us to succeed. We have placed orders for the necessary tools and equipment, we have a training site where the coming generation of technicians can learn to deliver, safely and reliably, the dependability our customers now count on, and we have a commercial team achieving significant progress. Over the past few months, interest from AI frontier labs, hyperscalers, and data center developers has only climbed, and our pipeline of high-quality commercial opportunities keeps expanding daily. Kodiak is in a very exciting period, and our outlook has never felt more energized. Thanks to the strong results we posted in Q3 — John will cover those — we're raising the midpoint on three full-year guidance measures: adjusted EBITDA, compression infrastructure gross margin, and discretionary cash flow. That reflects the improved visibility we now have for the remainder of the year. We remain enthusiastic about the investments we're making right now, which will drive growth and enhance Kodiak's margins in the years ahead. At this point I'll hand things over to John so he can go deeper on our financial results and walk through our updated outlook for 2026. John?

John Griggs executive
#5

Thanks, Mickey. We delivered another exceptional quarter, with segment margins that stood out, especially in compression and power infrastructure. A number of factors came together well to drive these results, and a great deal of credit belongs to our operations, HR, training, and IT teams, who collaborated closely to keep executing at a very high level and to keep delivering additional operational efficiencies. Let's walk through the quarter. Revenue came in at $402 million, a 25% increase year over year. The bulk of that growth stems from adding our power infrastructure segment, although our compression infrastructure segment also grew nicely, fueled by ongoing additions of new horsepower at leading-edge rates as well as price increases on legacy equipment. We added about 102,000 horsepower of revenue-generating capacity during the quarter compared with the prior quarter. That figure includes the 43,000 horsepower we acquired by buying out operating leases, which we covered on the last call. We ended the quarter at $23.51 per ending horsepower — a 3% increase year over year, though down sequentially. That dip is an anomaly caused by those operating lease buyouts and by a high-revenue, low-margin compression contract that ended early in the quarter. Absent those two items, and with pricing for new horsepower sets and contract renewals remaining favorable, we anticipate the dollars-per-horsepower metric will resume its steady climb as we close out the year and move beyond it. A notable highlight this quarter was our ongoing progress on compression segment margins. For the quarter, compression infrastructure's adjusted gross margin came in at 70%. That's a 170 basis point gain versus a year ago and unchanged from the prior quarter, despite a sizable sequential jump in lube oil expenses. Delivering steady, robust margins in that segment while taking in a cost bump of about 30% since Q1 across such a large share of our variable cost base would not have been possible without top-notch execution by the people operating those units. As Mickey mentioned, a new kind of supplier deal has largely eliminated the month-to-month swings in lube oil prices from here on out. Moving on to power infrastructure, revenue for the quarter came in at $42 million, with adjusted gross margin at 75%, which is comfortably above the top end of the annual margin guidance we provided. Segment revenue climbed 28% quarter over quarter, helped by more commissioning activity at one of our data center projects as well as extensions on a number of our high-rate short-term contracts. Our power assets continue to see robust demand, and short-term contracts keep getting renewed. When the quarter closed, the power fleet stood at 413 megawatts, with 382 megawatts producing revenue, which works out to 92.5% utilization. For the quarter, adjusted EBITDA reached $224.5 million — yet another record for the company — while net income came in at $71.5 million, equal to $0.70 per diluted share. Moving on to capital expenditures: maintenance CapEx in Q3 was roughly $21 million, which was in line with what we expected. Other CapEx likewise met expectations, at $11 million. CapEx tied to growth in compression infrastructure totaled $111 million, with $34 million of that amount connected to winding down the operating leases. New fleet additions came to approximately 64,000 horsepower, making this our strongest quarter of the year by that metric. Growth CapEx for power infrastructure declined sequentially to $68 million, driven mainly by the timing of our turbine payment milestones and partly by some of our 2026 deliveries moving into 2027. For the quarter, discretionary cash flow came in at $158 million, up 36% compared with a year earlier. Turning to the balance sheet, total debt was approximately $2.8 billion when the quarter closed. In May, our primary equity offering generated roughly $836 million net of expenses, and that gives us the ability to pre-fund the equity piece of our growth capital spending plans. Leverage at the end of the quarter was 3.1 times, and unused revolver capacity totaled around $1.6 billion. Going forward, we think the strength of our balance sheet, combined with our ability to tap multiple sources of relatively low-cost debt capital, provides a meaningful competitive advantage as we continue building out the power leg of our energy infrastructure platform. To wrap up, the board has approved a $0.51 per share dividend, which is a 4% rise compared with a year ago and will be distributed later this month. Coverage based on discretionary cash flow from our third quarter is above 3 times. I'll finish with a few remarks about our revised 2026 guidance. We made a number of changes, but I'll focus only on the more significant ones. First, we lifted the bottom end of adjusted gross margin for compression infrastructure, resulting in a new range of 69.5% to 70.5%. Because our compression business is largely contracted on a take-or-pay basis and we have solid visibility into our biggest cost items, we feel quite confident about guidance at this stage. For the power segment, we chose to raise the low end of our adjusted gross margin range. We expect Q3 outperformance to more than offset the effect of shifting part of our working fleet as we prepare for the West Texas data center project in Q1. Given these updates, we lifted the midpoint of our total adjusted EBITDA guidance to $850 million. On growth CapEx, we raised the midpoint for our compression infrastructure growth CapEx by $10 million. We've been coordinating with packagers to speed up deliveries of new units wherever possible, which helps us line up better with customers' development plans and overall demand. We expect to bring on roughly 170,000 horsepower this year, and that figure includes about 21,000 horsepower from the Permian purchase leaseback deal we closed in the first quarter. On power infrastructure, we're lowering our growth CapEx guidance to a range of $350 million to $400 million. That change reflects certain new power unit deliveries shifting out of 2026 into 2027, along with a payment schedule for balance of plant items that has become more finalized. Our current projection is that roughly 16 megawatts of new recip generators will arrive during Q4, bringing the full-year figure to 29 megawatts; that said, I'll return the call to Mickey.

Mickey McKee executive
#6

Thanks, John. To wrap up, I want to return to the idea of the job safety analysis I brought up near the start of this call. Good results are never something that happens by chance. They call for preparation, proper equipment, capable people, and a disciplined way of executing. At Kodiak, we think those elements are in place. Our compression business keeps gaining from solid market fundamentals and rising demand for large horsepower equipment. Meanwhile, we're putting money into the assets, training, technology, and talent needed to build a leading power infrastructure platform that can serve our customers' growing needs. The opportunities before us keep growing, and our confidence in Kodiak's long-term outlook is stronger than ever. Above all, we stay focused on executing safely, operating reliably, and creating long-term value for our customers and shareholders. Thank you for joining today's call and for your continued interest in Kodiak. With that, we're glad to open the line for questions. Operator?

Eli Jossen analyst
#7

Hey there, good morning. Appreciate you fitting us in for questions. I'd like to begin with the power infrastructure outlook. In your remarks you mentioned positive conversations with counterparties, but I just want to get a feel for whether we've seen a shift after the political developments of this past week. Could you speak to the tone of those conversations and whether they've changed post-election, and maybe more specifically whether there's a shift in timeline or in willingness to keep developing in Texas overall? Thanks.

Mickey McKee executive
#8

Hey, good morning, Eli; Mickey here; we've got a lot of those conversations happening right now; it's early days after the election, but the overall tone of the discussions we've been having is that there's not much change in the development plans. I think there's a little bit of uncertainty in Texas, but Texas isn't the only place where we're looking at these opportunities. I think that, as we move forward, as I said in my prepared remarks, demand for compute capacity is still extraordinary right now, and I think development of these will keep happening and the build-out will continue, and whether it's in Texas or somewhere else is, we're pretty agnostic to it, we can take this power wherever we need to.

Eli Jossen analyst
#9

Great. Thanks for the detail. So perhaps pushing that one step further — you've got a very solid equipment backlog. That looks more and more valuable given the compute-constrained environment you describe. Just regarding timing and deployment, has anything shifted? Are we still basically expecting the earlier targets you set out, or how could that change?

Mickey McKee executive
#10

We believe our deployment capability remains quite solid. Most of the turbines we've ordered from Baker Hughes won't begin arriving until Q4 of 2027, and I suspect many of those questions will get resolved long before then, and we'll be in a position to ensure we can deploy them at favorable prices and terms.

Eli Jossen analyst
#11

Thanks, guys.

Mickey McKee executive
#12

Yep, thanks, Eli.

John Mackay analyst
#13

Hey, team. Thanks for making the time. I'd like to begin on the core compression side. A year ago, you folks gave us at least some soft guidance pointing to 8% EBITDA growth for compression through 2030. I think over the past year we've watched Permian gas expectations rise, we've watched compression lead times stretch out, and you've done a really strong job on costs. Looking at that 8% a year later, any puts and takes? Thanks.

John Griggs executive
#14

Hey, John. This is John. I'll handle that one. Look, a while back we provided our 8%, or our growth algorithm of 8% compounded across many years on an EBITDA basis in the compression business. Then, as everyone knows, we went further when we laid out roughly 150,000 horsepower per year for the next 5 years, landing at 5.2 million. Once you factor in some of these purchase leasebacks and operating lease buybacks, that 5.2 is now, mathematically, about 5.3. Here's our answer: we couldn't be more excited about the compression business going forward. Whether it's the E&P earnings releases and what they say about gas production in the Permian, or the FIDs that got greenlit over the last quarter, the Permian is going to produce a massive amount of gas going forward, and it's going to need a massive amount of compression. I guess, if pressed, I'd take the over on the 5.3 million; it feels like it's going to be there at great returns going forward, and we just hope we can take care of our customers.

Mickey McKee executive
#15

Let me push that point a bit further, John, and simply note that we now have greater certainty regarding lube oil pricing as we move ahead, we know what our growth will be going forward, most of our fleet is secured under long-term contracts, we understand the escalators contained in those contracts along with our capacity to redeploy equipment. We feel quite positive about the outlook there.

John Mackay analyst
#16

Thanks, I appreciate that. Could you unpack it a bit more for us — maybe strip out some of the noise and show what growth could have been — and then, without getting too far ahead of the '27 guidance, just broadly speaking, how should we think about pricing as we head into, say, the coming year? Thank you.

John Griggs executive
#17

Sure, I'll handle the first part and then pass it back to Mickey. We came in at $23.51 per horsepower, which was a slight step-down from the previous quarter; we had previewed with everyone listening beforehand that a step-down was expected, and I highlighted two items in the prepared remarks. First was when we bought out operating leases, which essentially raised the denominator and brought the dollar per horsepower down. Second, early in the quarter, we had the termination of really one of our lowest-margin compression projects out there, as well. Had you removed those two, we would have been just a touch above $24 per horsepower. I guess the message I'd leave with you and any investors is that anyone who kind of reads through this and claims there's pressure will, I guess, be disappointed when we report next quarter and return to that upward trajectory. Then, Mickey, the second question concerned the outlook on pricing going forward.

Mickey McKee executive
#18

I don't believe we've observed any shift—any shift at all—in how we view pricing moving forward. When you look at the contracts we actually signed during Q3, you saw us—we saw a sequential step-up in pricing on those deals. We don't disclose that publicly, but you did see a lot of horsepower get set in Q3, much of which only contributed revenue for a partial quarter, and you'll see the full run rate from those in Q4 as well. We still feel really good about the kind of numbers we've always discussed here in compression pricing, and there's no change there.

John Mackay analyst
#19

Awesome. Thank you, guys.

Mickey McKee executive
#20

Thanks, John.

Praneeth Satish analyst
#21

Thank you, and good morning. To begin with, congratulations to Kevin and Graham on their new roles. Perhaps focusing on the power side, considering the projects in the funnel that you have out there, could you share your thoughts on the contract duration you're observing? What is the shortest tenor among the projects you're seeing out there, and what does the range look like? And then, Mickey, I believe you said there are projects outside of Texas as well. Is there a way to sort of break down, for the funnel, what the geographic mix is and what percentage might be in Texas versus outside of Texas?

Mickey McKee executive
#22

Certainly. Thanks for joining us, Praneeth. To start with the second part of your question, I'd say probably most of the projects we're looking at are in Texas, but we are looking at several states across the Lower 48 here. We feel fairly good about the Texas ones continuing to move forward here. I think you've seen some softening in some language, and as we discussed in the prepared remarks, right, water usage and noise abatement and emissions controls are going to be really key to those being built out in Texas, and we feel like we've got a good handle on those things. As for contract term, we're not really ready to announce one publicly yet, but we're seeing a minimum of 10-year terms, most of them at 15-year terms, and no change to the contract tenors there that we're seeing in some of those commercial discussions.

Praneeth Satish analyst
#23

Understood. That's useful. So, I realize you aren't giving 2027 guidance at this point, but just thinking conceptually, when it comes to power — the power business in Q1, I suppose the big swing factor here is the timing of the West Texas data center commissioning? Are there any other puts and takes we should be considering? And after that facility is fully commissioned, would power revenue resemble the Q3 revenue run rate? Is that the correct way to look at it?

Mickey McKee executive
#24

Pretty close, I'd say. That's probably right. As I mentioned, we're pulling back equipment at the moment so we can deploy it to that West Texas data center, so you'll see a slight dip in Q4, but I think once we get that stuff up and running, we'll be right in that ballpark of that kind of Q3 run rate.

Praneeth Satish analyst
#25

Gotcha. Thank you.

Mickey McKee executive
#26

Yep, thank you.

Doug Irwin analyst
#27

Hi everyone, and thanks for raising that. I'd like to build slightly on the question about contracts and the power margin. You've clearly had some success already in lifting the margin on the business that was already there. So could you perhaps walk us through how market rates currently compare with some of those legacy contracts that came over to you, and where you'd expect margin to go once additional contracts are added on top? And also, does more equipment out in the field still need to be termed out, or should we assume that from here on most contracts will be attached to new equipment?

Mickey McKee executive
#28

Thank you, Doug. We're glad to have you with us today. Honestly, the legacy contracts we inherited are pretty inconsistent. A few of them are priced too low; others are short-term deals that are actually priced too high, frankly, simply because they were structured as 3- and 6-month contracts, and DPS was clearly aiming to maximize near-term cash flows. On that margin, you'll see another dip in the fourth quarter, as I just mentioned — we might pull back equipment and earn less revenue from it, but we definitely won't release the people tied to it, and we'll keep some of that cost. Once we redeploy that capacity during Q1, you should see some improvement there. And moving forward, I'd say there's a meaningful chunk — maybe not huge, but likely around 200 megawatts — that needs to come out of legacy contracts and be put back into service, and we're currently scouting the right locations across the country for that.

Doug Irwin analyst
#29

Understood; that helps. Perhaps as a follow-up, just regarding the range of opportunities for power outside of data centers. Given what's happened over the last few weeks, might those opportunities be turning somewhat more appealing, and if so, how should we view the possible size of such opportunities compared with some of the data center deals you may be handling?

Mickey McKee executive
#30

We keep coming across further opportunities within the microgrid space, particularly in and around the Permian Basin for oil and gas, and we find those quite attractive, and our focus on them hasn't changed or shifted at all; we're working on a few of them, and so long as they offer the term and returns we seek and feel comfortable with, we'll keep working on them too. There are multiple such projects in the pipeline and at attractive sorts of returns, and we're going to keep working hard on them and bring some of them to fruition.

Doug Irwin analyst
#31

Great. Thanks for the time.

Mickey McKee executive
#32

Yep, thanks, Doug.

Neal Dingmann analyst
#33

Good morning, everyone, and apologies for the delay. I'll start with a question about the power contract area—John or Mickey, the 76 megawatts of power you announced, I believe back in September, has that actually been deployed yet? And please remind me how it works, since it appears you've kept getting quite favorable pricing on this; perhaps you could explain the structures involved. Thanks.

Mickey McKee executive
#34

That 76 megawatts is the West Texas data center we've been talking about here, Neal. We're starting site construction and site prep on that equipment at this very moment, and it'll be deployed beginning around the end of December and continuing into January and February, with the aim of having it energized before the first quarter wraps up. As for the remaining contracts, everything we're currently pushing hard to move forward is shaping up right in line with what we anticipated.

Neal Dingmann analyst
#35

Great. Thank you, Mickey. For my second question, perhaps an easy one regarding compression: do you still see possibilities out there for purchase leasebacks, maybe from some of your customers?

Mickey McKee executive
#36

We're definitely observing meaningful interest in that area, along with opportunities we are actively pursuing. Those tend to be somewhat inconsistent; much of it depends on the corporate philosophy and cash flows of our customers. So we're examining a handful of them and hope to keep making headway in those discussions, but that opportunity certainly remains available out there.

John Griggs executive
#37

Hey Neal, John here. I also wanted to put some numbers around pricing, just so it's clearly on the record. At the project level in the power business, every one of our projects is underwriting at high teens or better, with a payback of roughly 5 to 6 years on a cash-on-cash return basis; that's held steady ever since we began these discussions, and it appears to be what we're seeing in our key negotiations.

Neal Dingmann analyst
#38

Thanks to the two of you. I appreciate the extra information, John.

Mickey McKee executive
#39

Thank you, Neal.

Derek Podhaizer analyst
#40

Hey, good morning, everyone. So, perhaps building on a few of those previous remarks, I'd like to dig into what you're hearing lately from your hyperscaler and data center developer customers regarding whether project scope might be growing or even bringing in extra services that we keep hearing about from some of your competitors, and whether that ends up pushing the capital cost per megawatt higher. I believe you folks referenced roughly the 1.5, though I'm certain pricing would move alongside that and those economics you just walked through, John. Any color on whether these projects are becoming larger, whether the scope is widening, and what that might mean for some of the upfront capital you'd need to deploy?

Mickey McKee executive
#41

Hey, good morning, Derek. What I'd say is that from the very beginning we anticipated being fully responsible for balance of plant and potentially battery backup on some of these things. I wouldn't describe the scope as shifting much from where we sit, but it's something we were anticipating as we entered this, and it will be something that contributes to the overall capital of these projects. You are seeing a bit of variation in the market, and a number of these data center developers we're speaking with actually would prefer to own the batteries themselves while outsourcing the power and balance of plant. It varies somewhat depending on whom you speak with, but we absolutely intend to do precisely what you'd expect and what the others out there are describing and deliver a full turnkey solution here spanning construction through startup through operations.

Derek Podhaizer analyst
#42

Great. No, that all makes sense. So turning to compression — there's plenty of discussion about pricing and where it's headed, but could you speak to the term you're observing? Any shifts in some of the leading-edge term? Are you seeing it stretch out given how tight the market is? I think you mentioned Cat is still around 190 weeks for deliveries, and I think there's a possible air pocket coming at us in the back half of next year. Would your customers be willing to commit to a longer term? Any thoughts on that?

Mickey McKee executive
#43

Right now, what we're clearly noticing is that customers are willing to talk about extended terms — spanning 5, 7, and even 10 years. It's not especially consistent, but those conversations are definitely running longer in tenor than they were just 2 or 3 years back.

Derek Podhaizer analyst
#44

Understood. Excellent. Thank you, Mickey. I appreciate that. Handing it back to you.

Mickey McKee executive
#45

Yes, thanks, Derek.

Theresa Chen analyst
#46

Morning — and I'd like to add my congratulations to Graham and Kevin on the new roles. John, I'd like to revisit what you said regarding margins in the compression segment. At this stage, what portion of the compression cost structure is still open to swings driven by commodities? As you work to reduce that exposure through longer-term procurement, how are you weighing the trade-off between locking in more cost visibility and keeping flexibility should market conditions shift?

John Griggs executive
#47

Hi, Theresa. As of today, none. It's extremely, extremely minimal, given what Mickey also referenced in his earlier call — we've signed an agreement with our supplier that locks in our lube oil prices for essentially all of '27, beginning with December. We already had a contract that provided visibility through the bulk of this quarter in any case. The compression business is quite stable since it's production-oriented, so our volumes are very well understood. Price is the sole variable we truly have to guard against, and so we've now essentially removed it from consideration; we're delighted about that. We have plenty of matters to handle in the business day to day rather than contending with that commodity price fluctuation, and we believe it will let us at minimum set a budget and keep working on capturing these training and technological efficiencies — and that is what will drive our margin going forward.

Theresa Chen analyst
#48

Understood, thank you. Going back to the Baker arrangement — should the commercialization schedule extend, what flexibility do you really have regarding when and how fast you make the power capital outlays connected to it? More precisely, could you take us through the amount of capital you've pledged under this arrangement? How ought we to think about the possible balance sheet exposure down the road? And does the Anthropic One Power deal announced not long ago influence your view of the economics of the remaining alternatives for this power supply?

John Griggs executive
#49

I suspect Mickey will chime in on this alongside me. Our fundamental approach is to deploy this capability for customers through long-term agreements that deliver strong returns, and we remain dedicated to it — no matter what occurred last week, we truly are not deviating from that approach and we don't see any reason to. That being said, regarding the flexibility matter, the amount of money we have committed, the strength of the balance sheet and all of that, we basically detailed it in that press release — I believe we have made it clear to everyone that we have committed to purchase approximately 1.1 gigawatts from Baker Hughes through 2031, I think that is accurate. That amounts to more than roughly $1.4 billion in capital with Baker Hughes. There is flexibility on our side — should the worst-case scenario materialize, we could exit that arrangement. Frankly, it would leave a scar, but if circumstances demanded it, we could do so. Regarding your One Power question, in case anyone isn't familiar, Anthropic acquired an independent power company's — essentially just raw power, a collection of Cat engines when you get down to it — at an attractive premium compared with the price they had paid. As we sit here right now, we continue to view power as a scarce resource; we wholeheartedly agree that compute is enormously in demand, and no matter what took place last week, that demand will only increase. The key issue is site selection for those data centers. In my view, demand for power will remain very strong. As Mickey noted, and as I mentioned during our call, our balance sheet is in excellent shape. Having raised our equity capital in advance last quarter, at a time when conditions were extremely favorable, puts us in a great position. We’re quite optimistic about getting through the coming two years of this investment cycle and staying inside the leverage range we established earlier—three to four times—and we rest easy regarding our balance sheet, the liquidity we have on hand, and our capacity to raise additional debt capital on favorable terms via the many alternatives available to us.

Theresa Chen analyst
#50

Thanks for that thorough response.

Elvira Scotto analyst
#51

Hello, and good morning to everybody. You touched on this when answering a question earlier, but you've credited a meaningful chunk of margin improvement to AI, machine learning, and the technology investments you've made, I suppose. Could you sharpen the picture on the ROI from those technology investments, and how much have they added to margin over the past year, and what further gains do you believe are still out there as you deploy large language model tools to field technicians?

John Griggs executive
#52

Thanks, Elvira. It feels like I'm addressing my board at this moment too, since this question comes up all the time; the response we give our board is identical as well, which is that no one factor is responsible — it's all of them, correct? If you take into account — I won't cite specific figures — the real capital we're directing toward machine learning and artificial intelligence is actually quite modest relative to, I'll put it this way, the total scale of the business and the additional dollars we're bringing in. That by itself represents merely one piece of the equation. The second piece involves everything we've invested, which I'd describe as training but which is truly about growing people: bringing in, nurturing, educating, and keeping these essential individuals, then instructing them on how to put these excellent technologies to work. It isn't as simple as claiming that spending one dollar here yields three dollars there, before the returns or margins become what you might call the proof in the pudding. As I've said previously, we do believe that—prior to CSI in 2024, and really near the point when we truly accelerated on machine learning, AI, and all the training efforts we're undertaking—our compression business carried a 66% gross margin, while CSI stood at 55%. We combined the two operations and realized some synergies, yet at present we're hitting 70%, and that figure comes after roughly 1 to 1.5 percentage points of drag caused by elevated lube oil prices — so you could say around 71%. When I look back at a business with about $1.2 billion in revenue and consider the margin improvement we're achieving, the payback is extremely substantial compared with the overall dollars we've invested. Regarding how far this can go, a couple of years ago we never imagined we'd be running a 70% gross margin business given our profile. We're not going to forecast where that figure ends up. Still, it seems there's room for further gains as we move ahead—though each successive quarter will certainly get harder, since we're already performing at strong levels.

Elvira Scotto analyst
#53

Great. So I understand that a lot of the growth in compression is coming from the Permian, particularly since gas output there appears to be exceeding forecasts, but are other basins showing growth too?

Mickey McKee executive
#54

Elvira, it's Mickey here. We certainly are; we've just signed some good contracts for '27 and '28 covering growth in the Northeast, and we're definitely seeing opportunities in the Rockies, plus in the Eagle Ford and down in South Texas too.

Elvira Scotto analyst
#55

Great. Thank you very much.

Mickey McKee executive
#56

Yep, thanks, Elvira.

Connor Jensen analyst
#57

Hi everyone, thanks for taking my call. A lot of what I wanted to ask has been covered already, though I do have a quick one remaining regarding the other services segment. I'd like to know how we ought to view that segment given how strong revenue has been this year in 2026 — is there a sizable number of power-related projects that might move it, or how should we be thinking about that segment moving forward? Thanks.

John Griggs executive
#58

That's a great question. That segment doesn't get a lot of airtime from us because of how small it is relative to everything else, but I'd describe it as being driven mainly by two businesses. One is our projects business — essentially we function as a project manager, practically a general contractor, working on oilfield equipment, or historically on stations or oilfield production equipment, and those carry fairly thin margins. The other is our aftermarket services business, where we perform mechanical work on equipment our customers already own, or we supply them with parts. Those two are roughly equal in size. I'll take the second one first. Regarding AMS, we had likely been overly concentrated on CSI integration, compression, and power—to the point that the unit got too little investment. These days we've shifted more attention toward it, installed fresh leadership, and we're starting to witness what I'd describe as promising early indicators about its future direction. It will never be enormous by any measure, yet it certainly has room to expand beyond its current level. Over the coming couple of years that looks favorable to us, and given the amount of compression equipment in the field, we believe customers will more and more look to Kodiak for help maintaining their equipment. Switching over to project management: during 2026 we handled a fairly sizable job with slim margins for one of our key strategic customers, and that job is now in its final phase. Looking ahead at what I'd term the non-power side, the timing of when fresh projects get underway is really the main variable. Let me turn to power. As we begin expanding that side of the business, we anticipate a genuine acceleration in our station construction, meaning our project management work tied to power. Expect uneven timing, since this tracks the construction of what amount to standalone power generation facilities, though the scale will still be significant. I wouldn't put too much weight on the Q4 portion, because it will recover and carry on through '27 as the power comes online, and project management will ramp up considerably.

Connor Jensen analyst
#59

Great. Appreciate it, folks. I'll hand it back over.

Patrick analyst
#60

Morning. Patrick here, sitting in for Julien. Thanks for fielding my question, and congrats once more to Graham and Kevin. I had just one remaining. I was curious — I believe you've discussed previously the in-depth kind of engineering studies you've been carrying out for the power contracts coming up, and you also noted that most of the ones under negotiation were going to be located in Texas. I'm wondering whether, if you shift toward other states, or even absent any such shift, anything changes regarding your anticipated timeline for turning those into revenue-generating work should you have to begin the engineering anew at fresh sites.

Mickey McKee executive
#61

I wouldn't expect that to be the case. My sense is that the engineering work we've been doing applies fairly well to other states too — it's really just electrical design, so I don't believe the engineering side would set us back much. As I mentioned, we're currently evaluating projects across several states, and I feel we're in a solid position.

Patrick analyst
#62

Alright. To follow up, I think, just to clear up a few things said earlier: are you still quite confident that Texas will host most of those projects, do you expect the majority of them to wind up in Texas, or was that your initial majority and it could shift?

Mickey McKee executive
#63

I think it's still early days after this election and the midterms here, so plenty of water will pass under the bridge, and we'll see what happens. We still feel fairly confident about it, a lot of the potential customers we're speaking with still feel as though they're proceeding with their projected plans, and we still feel pretty good.

Patrick analyst
#64

All right. Thanks a lot.

Mickey McKee executive
#65

Thank you, Patrick. I have two quick questions. First, I realize you may not say much about this, but regarding power timing and growth: apart from that 76-megawatt deal that becomes operational early next year, ought we to expect the following sizable step up in the power business to come in early '28, when the bigger assets from Baker begin coming online?

John Griggs executive
#66

I’ll take that one. Yes. Given the timing of when Baker Hughes delivers the turbines and when we’re able to energize them, the meaningful ramp really does not arrive until early ’28; we do get some incremental power during ’27, and we’d expect to put that to work as well, but the big ramp will come in ’28. Great. Thank you for that. Then just a quick second question on the compression horsepower side: with supply chain tightness, are you seeing a meaningful uptick in the price you pay for assets, and I assume that is reflected in the economics of deals, but could you comment on that?

Mickey McKee executive
#67

That is completely embedded in the deal economics. We've observed a bit of an inflationary increase in that area, though I wouldn't characterize it as significant. It falls in that mid-single-digit range, roughly. Great. Thanks for all the details. Yep, thanks, Selman?.

Nate Pendleton analyst
#68

Morning, and nice work on the quarter. With the dividend having just gone up, I'd like to ask about capital allocation. How do you balance returning capital against the chance to put more money into the two businesses or pay down debt?

John Griggs executive
#69

That's a great question, and we figured it would come up as well. Let me be specific: a 2-cent bump works out to a 4% raise in the dividend, and when it comes to shareholder returns and capital allocation overall, the board and I look hard every quarter at whether that dividend level is appropriate, so that our strategy for allocating capital and returning money to shareholders serves our investors well and can also be sustained over the long run. As everyone is aware, we have a major investment cycle ahead of us in the power piece; we're an infrastructure company right in the middle of an investment cycle, and our compression business delivers durable, contracted cash flow that will be around for the long term. Once the power we've ordered is under contract, it will carry those same characteristics, just with longer-term contracts; we believe the investors who came into this were infrastructure investors who care about the dividend. We think many of those same investors remain with us. We may have drawn in some new ones, but as we emerge from this, we'll be an infrastructure company, so we believe it matters to keep paying a dividend that is sustainable, so to speak, while also growing it annually. On top of that, we firmly believe it is critical at all times — and even more so in periods like this — to safeguard our balance sheet. I'll return to the point I made earlier: we raised equity last quarter when the timing was right, effectively pre-funding our equity needs. We have $1.6 billion of liquidity available through an excellent revolver that we can upsize, and we've accessed the capital markets rather successfully as we move forward. With the compression business making up, call it whatever you like, 80% of our business today, that high-quality, durable, leverageable cash flow gives us a meaningful competitive edge over others whose core business isn't quite as strong, letting us keep funding our growth through debt capital with, in our view, a range of options.

Nate Pendleton analyst
#70

Understood. Thanks; perhaps I could ask something else about the balance sheet you brought up. You've previously mentioned the possibility of becoming a consolidator within distributed power. Given some of the market volatility discussed on this call and across the broader power sector, could you speak to how the opportunity set is changing when it comes to adding assets or capabilities in that business?

Mickey McKee executive
#71

Once more, in light of these midterms, things are somewhat unclear at the moment, so we'll keep watching the market to see whether opportunities for consolidation arise, and we're always keen to examine that, and we'll keep assessing any such opportunities.

Nate Pendleton analyst
#72

Understood. Thanks for taking my questions.

Mickey McKee executive
#73

Thanks, Nate.

Jimmy Larkin analyst
#74

Hello, and thanks for taking my question. Turning quickly back to power pricing during the quarter — revenue per megawatt rose 20%. I believe we touched on this somewhat, but in your prepared remarks you commented on new data center commissioning as well as longer time on site for certain existing units, and I was wondering whether you could offer a bit more detail on those, perhaps what you're seeing regarding pricing there and longer contract durations.

Mickey McKee executive
#75

So what you're seeing, right, is that many of these folks had power under short-term contracts, and since they figure the grid will arrive to supplement their power and so forth, it's taking longer to get there, and a lot of people aren't ready to let go of the power they currently have under contract or on site. Quite a few of them are looking to renew, and obviously we're evaluating renewals for short-term contracts along with pricing and nudging that up somewhat as we work through it — we're getting the most value we can out of that equipment while it sits on location. This is pretty much in line with expectations: those assets are remaining onsite beyond the timelines specified in the agreements, and we keep handling that fleet in a suitable way while determining when we can retrieve the equipment and place it into long-term contracts.

Jimmy Larkin analyst
#76

Great, thanks. Just a quick follow-up — I wanted to confirm something, and we touched briefly on the midterm elections and what comes after them, and I just want to make sure that the West Texas data center site remains on the same timeline and that nothing could potentially shift to the right there.

Mickey McKee executive
#77

No, that's the same time frame.

Jimmy Larkin analyst
#78

Great. Thank you.

Mickey McKee executive
#79

Yep, thanks, James.

Zack Van Everen analyst
#80

Hello, everyone. Thank you for letting me ask a couple of questions. Perhaps just regarding power — I realize you've addressed this topic previously — but now that discussions have moved along, do you have a clearer sense of the scale of each of these projects, or at least the typical magnitude you're seeing in terms of requests out there?

Mickey McKee executive
#81

Well, every one of these projects involves several phases; they begin at anywhere between a couple hundred megawatts and 500 megawatts, then expand beyond a gigawatt at some point down the road. Each one differs, but we are definitely discussing multiple hundred megawatts at any given moment for every project.

Zack Van Everen analyst
#82

Understood. That's clear; so perhaps one more thing about the compression schedules. You all brought up 190 weeks. I was wondering how much of that timeline being pushed further and further out relates to the power build-out and simply demand for the Cat facilities, as opposed to traditional compression and pipelines.

Mickey McKee executive
#83

Zack, it's both, correct? Compression is seeing heavy demand at the moment, and we're looking at considerable growth from gas volume growth across the country right now, particularly in the Permian, but the need for power is also putting strain on those upstream supply chain lines as well. The impact comes from the pull on both sides there.

Zack Van Everen analyst
#84

Understood. Great. Thanks for making the time.

Mickey McKee executive
#85

You're welcome. Thank you, Zack.

Mickey McKee executive
#86

Appreciate it, Operator, and thank you to all of you joining us on today's call. We're looking forward to talking with you once more after we report the results for the fourth quarter. Bye-bye.

Operator operator
#87

Thanks. That brings today’s conference to a close. You’re welcome to disconnect your lines now. We appreciate your participation.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Kodiak Gas Services, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Kodiak Gas Services, Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.