Home / Transcripts / Neogen Chemicals Limited (NEOGEN) · February 12, 2026

Neogen Chemicals Limited (NEOGEN) Earnings Call Transcript

February 12, 2026

National Stock Exchange of India IN Materials Chemicals earnings 66 min

Earnings Call Speaker Segments

operator operator
#1

Good day, ladies and gentlemen, and welcome to the Neogen Chemicals Ltd QT FY26 earnings conference call. Please be aware that every participant line is currently in listen-only mode, and once the presentation wraps up, you will have a chance to pose questions. If you require help at any point during this call, simply signal an operator by pressing zero on your touchtone phone. I'll now turn the conference over to Mr. Nishit Solanki of CDR India. Thank you, and the floor is yours, sir.

Analyst analyst
#2

Thank you. Good afternoon everyone, and welcome to the Neogen Chemicals Q3FY26 earnings conference call for analysts and investors. Senior members of the management team are with us today, including Mr. Anurag Surana, Non Executive Chairman, Dr. Harin Kanani, Managing Director, and Mr. Gropi Krishnan Sarathi, Chief Financial Officer. We'll begin with opening thoughts from the management team, and after that we'll open the floor for your questions. Before we begin, a standard disclaimer. Certain statements made or discussed on today's conference call may be forward looking. Actual results could vary from these forward looking statements, and a detailed disclaimer is available in the Q3FY26 earnings presentation, which has been uploaded on stock exchange websites. With that, I would like to invite Dr. Harun Kanani to share his perspectives. Thank you. And over to you, sir.

Harin Kanani executive
#3

Thank you. Nishit. Good afternoon, everyone. Thanks for joining us today to go over the financial results for our third quarter of fiscal 2026. I hope you've had a chance to look through our investor presentation. What I'll do is give you a summary of how we performed operationally, plus an update on the key strategic growth initiatives we're pursuing. Q3 was a period of steady recovery and a decisive pivot toward a future ready portfolio for Neogen. Even with volatility in global markets, our core business remains robust, supported by resilient demand in pharma, flavors and fragrance and other specialty applications. With our product optimization initiatives at the initiative and the Dahij replacement plant nearing completion, we are firmly on track to achieve our growth ambitions before our CFO provides a detailed financial overview. Here is a quick summary. On a consolidated basis, we delivered 9% revenue growth in Q3 with a gross profit up 13% with around 150 basis points margin expansion. While top line growth was strong, EBITDA and PART were pressured by transient costs related to Neogen Ionics ramp up, elevated operational expenses due to fire incidents and interim toll manufacturing setup and higher finance cost from Dahesh plant reconstruction and other investments. These are short term impacts as we pivot to a future ready portfolio.

Harin Kanani executive
#4

Also, the eligible costs are going to be recovered. A portion of those eligible costs, at minimum, will come back to us via loss on profit insurance claims over the upcoming quarters — primarily in the next financial year. On the fire incident, we have received INR 83.48 crores in insurance claims through 9 months of FY26. As a result, the net claim receivable is INR 251.12 crores. We remain in close contact with the insurer to speed up the final settlement of the outstanding balance. At the same time, construction and the replacement plant at DAHED are moving ahead quickly, with commissioning still on schedule for Q1FY27. We have confidence that this new facility will be fully compliant and optimized for greater operational efficiency. Turning to an update on strategic expansion initiatives in battery materials — the Strategic Indo Japan alliance for Electrolyte Salt Production: we have successfully closed a joint venture with Japan’s Morita Investment Ltd. to produce and sell LIPF6 salt across the globe. Neogen will hold an 80% majority stake in the new entity, Neogen Morita New Materials Ltd., backed by a 20 million investment from our partner. For the remaining stake, the JV brings together 30 years of proven Japanese technology to accelerate international customer approvals and production efficiency. Notably, this facility is India’s only non FEOC compliant electrolyte salt plant with proven, established technology — offering a strategic alternative to the Chinese supply chain while advancing Atmanirbhar Bharat through significant import substitution.

Harin Kanani executive
#5

Let me bring you up to speed on the Pakhajan Greenfield project. Commercial production of electrolyte at Pakhajan Greenfield remains on track, with H1FY27 as the target, while electrolyte salts are targeted for H2FY27. That schedule lines up deliberately with India's ACC battery rollout and with rising worldwide demand at the facility for supply chains that are non FEOC compliant. Equipment for the plant has been delivered, assembly work is in progress right now, and trial production should begin before long. We have already hit an important milestone, obtaining long-term commercial supply approval from a prominent giga scale Indian manufacturer after successful PPAP completion. Internationally, provisional approval of our lithium electrolyte source has come in from multiple global clients. Final site audits are expected to wrap up in Q1 FY27 once commissioning takes place, and Neogen will then stand out as a highly cost competitive global source for lithium salts and electrolytes, supported by proven Japanese technology. At present we see meaningful tailwinds from the US 45x tax credit's non FEOC requirements and from recent price volatility in China, and both raise our attractiveness as a strategic global partner. We anticipate that several large scale international customers will complete their approval process shortly, opening the door to bulk consignments and regular commercial productions in H1FY27.

Harin Kanani executive
#6

As we look forward, we're at a key inflection point, moving from executing projects to beginning regular long-term supply agreements. We have confidence that Neogen Ionics is going to be the cornerstone of our growth going forward, diversifying our revenue streams and improving our margin profile. By combining world-class Japanese technology with our own indigenous manufacturing experience, we are cementing Neogen's position as a technology-led leader in the global battery chemicals value chain. As the electric vehicle and energy storage ecosystems develop, our ability to supply material at scale puts us in position to capture substantial market share and deliver long-term sustainable value to our stakeholders. That wraps up my opening remarks. I'll now hand the call over to our CFO, Mr. Gopikrishnan Sati, who will review our financial performance for the period. Over to you.

Gopikrishnan Sarathy executive
#7

Thank you. Thank you, Dr. Kannani. Good afternoon everyone. Welcome to the Neogen Chemicals Q3FY26 earnings call. I'll walk you through the financial highlights. Please note that all figures are on a consolidated basis. Revenue for Q3 came in at 220crores, which works out to 9% year on year growth. This was driven by higher volume across both the organic and inorganic chemical segments, reflecting steady market demand. Notably, we kept operating volumes resilient despite a temporary capacity bottleneck at our DAHED facility. Those were effectively mitigated through strategic toll manufacturing arrangements. In addition, neogen ionics contributed rupees 12 crore to the quarter's revenue. As we continue to scale our battery chemicals vertical, breaking down our performance by segment, Organic chemical revenue reached 187 crores, a steady 6% increase in year on year. Our inorganic chemical segment showed even stronger momentum, delivering rupees 33 crore in revenue, a 35% growth compared to the same period last year. EBITDA for this quarter stood at 32 crores, demonstrating sequential resilience despite several transitionary headwinds. On a year on year basis, our performance was impacted by temporary cost factors. Specifically the operational overheads as we scale up at Neogen Ionics and following the hedge fire incident. In the additional interim toll manufacturing expenses.

Gopikrishnan Sarathy executive
#8

The primary reason for this was to maintain customer supply while the plant was being rebuilt. We see these near-term expenses as vital for safeguarding our market share and getting ready for future growth. As Dr. Kanani pointed out. Insurance claim recoveries will offset the near-term pressure stemming from these transitional costs. Under the loss of profit policy, we reported a profit after tax of rupees four crore for the quarter. The year-on-year variance is mainly due to higher interest expenses tied to our capital expenditure at Dahij, together with the front-loaded expenditure at Neogen Ionics as it gets ready for large-scale commercial production. Moving to the corporate update, reflecting their strong confidence in the long-term growth trajectory, the Board has granted in-principle approval to raise up to 150 crore through a preferential issue of equity shares to the promoter. This infusion highlights that steadfast commitment to Neogen's expansion and gives us financial flexibility to speed up our growth initiatives. This preferential issue is subject to the required regulatory approval. That brings my remarks to a close. I will now ask the moderator to open the floor for Q and A. Thank you.

operator operator
#9

Thanks a lot. We’ll now start the question-and-answer portion. If you’d like to ask something, you can press star and one on your Touchstone phone. To take yourself out of the question queue, press star and 2. We ask participants to use answers while posing a question. Ladies and gentlemen, we’ll pause briefly while the queue is put together. Our first question comes from Abhijit Akela at Kie. Please go ahead.

Abhijit Akella analyst
#10

Good afternoon, and thanks very much for taking my questions. Could we begin by getting the latest figures on the gross and net debt balance as of December, and perhaps some detail as well on how working capital has been trending? Based on the numbers provided in the tables at the back, it does appear that inventory DSOs and receivable DSOs both rose over the quarter. So what exactly drove those increases, and what is our outlook for improvement on that front?

Harin Kanani executive
#11

Hi Abhijit, thanks for that question. Yeah, inventory has gone up a bit, and the same goes for receivables. I'd say receivables are essentially consistent with business growth and broadly what we anticipated. As we mentioned, you know, this year the debtors and creditors you brought up will roughly offset one another, and on inventory there'll be a modest rise this year, because first, like you know, at present we're dealing with several external vendors, and we also want to accumulate a bit of stock since we intend to halt the external vendors by year-end and begin internal production in Dahedj during the first quarter. So when internal production starts, at the outset the plant is only ramping up. That's the period when we want to make sure that even if production is slightly delayed or the ramp-up takes time, we're accumulating a little inventory by the end of this year so we can handle the following quarters. I think, as you know, our Dahej plant kicks off and streamlines in the second half of the year.

Harin Kanani executive
#12

On the inventory side, things should come online. We’re holding to our target once we reach full utilization in the next financial year. By the end of next financial year, we’re aiming for inventories of around 140 to 160 days. And as you mentioned, debtor days usually depend on whether sales are more international or more domestic — debtors typically fall in a range of 60 to 90 days by year-end, and that’s what we’d like to target. Generally, we’ll try to keep debtor and creditor levels at a similar kind of level.

Analyst analyst
#13

Thanks, Arimbhai. On the gross and net debt figures, could we get those as of the end of December?

Harin Kanani executive
#14

Perhaps. Gopi, do you happen to have those figures right there with you? All right.

Gopikrishnan Sarathy executive
#15

Hi there. Which figures are you referring to, sir?

Analyst analyst
#16

Just.

Harin Kanani executive
#17

Yes, I have a figure for that. Regarding total debt — gross debt, I should say — the current number is roughly 680 crores on a standalone basis, and approximately 1150 crore, about 1175 crores, on a consolidated basis.

Abhijit Akella analyst
#18

Thanks for that. Now, regarding the payment from Morita for their 20% stake in the JV — when do we expect to receive it? And the fresh allotment of 150 crore to the promoters — when would that money be expected to come in?

Harin Kanani executive
#19

We have four non-business flows — essentially non-operational flows — that are sizable and on the way. Let me walk you through that. On the insurance side, we're very near to receiving another 60 crores as a second interim payment toward the rebuilding, against the CapEx loss. That should come in this week. It was actually meant to happen, but some procedural matters at the last minute between the insurance companies caused a slight delay. So roughly 60 crore is expected within this week, and the main stock claim, between 150 and 170 crore, should arrive before the end of March. That comes to around 210 crore expected here, in reference to the 20 million we are expecting. So basically we have to ask our bankers, since the whole project was part of one, and now we're seeking the bank's permission to separate it into two different entities. That is underway. Once it comes through, we can finish the remaining formalities, transfer the asset to the subsidiary Neogen Morita, and then receive the equity from our partner.

Harin Kanani executive
#20

That should land near the close of the current quarter, and based on exactly when the timing falls, it could be either this year before March or a bit into April. Essentially, though, by Q1 we ought to have the money from that source, and lastly the 150 crore from the promoter. Our plan, then, is basically to have the funds in place before the end of March. That said, as you're aware, certain regulatory approvals are required, since some transfers took place, such as when the trust was formed, from my father and mother to the respective trust. So we're simply seeking a clarification. Accordingly, subject to the regulatory approval, it will either take place before March or it will take place in Q1. In the worst case, though, as you know, by Q1 next year we would have 150 crore from the promoter, roughly 200 crores from the partner, and at least 200 odd crore from insurance. So we expect approximately 550 crore to come in either this year or Q1 next year.

Abhijit Akella analyst
#21

Got it. No, that's really useful context, thanks. Just a couple more if I can. If that's alright, one concerns the salt order receipts. So clearly, I believe in the presentation and your comments you said things are progressing well and we're somewhat near getting the order. So if you could please just give a bit more detail on it. Precisely where things stand. And by when we expect to see. Some meaningful shipments taking place there.

Harin Kanani executive
#22

As we mentioned during opening comments, a lot of people have demonstrated quite strong interest, correct. That includes both the regulated, larger customers and the non-regulated ones — you know, those who might purchase only once or twice, something along those lines. So those sales have gone up already, and that's why you're able to see what's smaller but, value-wise, a meaningful rise when it comes to our quarter-over-quarter sales growth in the salt business. Still, for me, the most important point is this: we have one customer with whom, at this stage, we've now finished the majority of the requirements. So they've begun work on the final timelines for approval. As we stated, we'd expect that to happen by Q1, but at the same time three to four additional customers — who, as discussed earlier, were mentioned before — have already begun taking samples, or some of them have started approving the samples we provide. And given what's happening in lithium, even our intermediate, meaning the simple lithium salt as well, we've gotten very strong inquiries.

Harin Kanani executive
#23

We feel, unfortunately, that the approval cycle is simply such that some of these folks have already approved our samples. They're planning audits, say during March, April, and May, and then perhaps, if needed, we'll have to carry out some corrective actions on that basis. So we expect that by June our Dahej site ought to be audited and approved. And by that point, as you can see, the majority of our capacity will also be coming online. So once those capacities come online across Q2, Q3, and Q4, we can see solid SALT-related revenues coming from Dahej. And in the case of Pakhajan as well, we're trying to accelerate the salt so that, you know, by Q2 of the financial year — by September is when we said, as we've said, the second half. But we want at least trial production to begin in the first half so that we can kick off the validation process, and by December at the latest we try to get the Pakhajan site approved as well, so that we can capture the maximum benefit of the 2027 requirement. So I'd say the Dahej site should be fully qualified through several customers by June, that is Q1, by the end of Q1, and sales should begin in Q2.

Harin Kanani executive
#24

Regarding Pakhajan, our aim is to wrap it up by Q3 in the second half, so that from Q4 of the next financial year it begins adding to sales.

Analyst analyst
#25

Turning to the capacity addition slide — the 1,100 tons set to be commissioned at the hedge now shows a timeline of March 26th, whereas I believe last quarter it was December 25th. So is there any specific reason for that slip of three months?

Harin Kanani executive
#26

So essentially, our team participated in a training session alongside the Morita team. Our folks actually visited Morita's plant team and took part in a hands-on training session, and while doing that, they identified certain improvements we could make going forward. So we're essentially putting those into place. Most of it is nearly finished. But we wanted — and also, at one of the other plants, we made a slight design change that we implemented in the additive production portion of it. So I think it's just those design modifications for additional improvements that we were rolling out. It went through in March regardless. As yet, approval has not come through. So we thought it best to get them finished at this point instead of starting and then halting again. That's why we chose to wrap them up now and finish the expansion at this time.

Analyst analyst
#27

Thanks. One final item from me: there were a few news stories lately about one of your biggest prospective customers — someone who could build battery capacity in India — more or less shelving those plans due to an inability to obtain Chinese expertise or technology. Any comments on that? And, quickly adding a second point, bromine prices have been quite firm lately. Has that affected our business on the realizations side, and could you break out volume versus price for this quarter for organic and inorganic? Thank you very much.

Harin Kanani executive
#28

Okay. So first, regarding the specific customer you brought up — we haven’t gotten any communication of that kind from them, and we’re basically still talking with that customer about how their requirements can be met. Those conversations are ongoing. Then on the second point, about bromine being strong: most of this has been — and again, it isn’t a very large difference — but I know, for instance, with lithium, with organolithium, we saw a slight increase in volume, while for organic derivatives it’s very hard to give you a volume figure, because the product mix shifts quite a bit. So overall, yes, there is volume growth, but it’s really because of the product mix that this volume growth doesn’t tell you too much. Specifically on bromine prices holding up, it hasn’t changed much for our business, since most of our bromine is usually contracted over a longer period, and we also have contracts with our customers. So basically, from one contract to the next, it kind of gets material. So unless bromine goes up by 2 times or 3 times, we really don’t see a big impact from that.

Analyst analyst
#29

Thanks, and thank you very much. Best of luck.

operator operator
#30

Thanks. Our next question comes from Arun Prashad at Avendus Park. You're up.

Arun Prasath analyst
#31

Good afternoon, Dr. Harin, and thank you for the chance to ask. My first question is this: I'm looking back at what we discussed on the prior call, when we noted that some of the earlier-stage approvals for result would involve your customers visiting your facility in February — this January — or online, followed by the final approval. Now here we are again discussing timelines that are three to four months further out. So I'd just like to understand why these approvals keep getting pushed back. I realize they have a bit more time to comply with the regulatory requirements, but what is actually driving this ongoing postponement of the approval timeline? That's my first question.

Harin Kanani executive
#32

So, as you’re already aware, we had said that by January–February we would have all the modifications those folks require completed, and after that they’ll either do it online or visit. That’s where things stand today. We’re currently in the middle of fab and finishing up right now, and what. And we’ve essentially let them know that yes, we have carried out more of all the changes. So we keep talking with them, you know, every other week. They said, okay, we’ll let you know what our action plan will be going forward. So whether they’ll come within one or two weeks, or whether they’ll come in three weeks, I don’t know. But we were supposed to be ready by January and February, which is what we are ready. And now, you know, they can come anytime. And what I said about June is that not only the existing customer, but even the other customers who are like now approved, even they are likely to complete their. So some of them started late, right? And even these guys now are saying, okay, I will come for an audit in April or March or something.

Harin Kanani executive
#33

So by June, our expectation is that everyone — including even the new customers — should also have it done.

Arun Prasath analyst
#34

And then when it comes to these new customers as well — is this the last stage of the audit, or are we really just at the start?

Harin Kanani executive
#35

No, no—final, final. Naturally, they could come to us and say, “Hey, I’d like a plan comparable to your Pakajan plant.” That’s a decision they’ll make once they actually show up and go through it. I can’t forecast that. Right. But yeah, I mean, that would be the audit. If they arrive and are satisfied, then no—we can begin. And then some of them say, oh, you know, Pakhajan is going to be a much better, much bigger plant because it’s designed from scratch. Maybe we’ll just wait six months and take it from Pakhajan, so that can happen. But many of them right now are showing urgency to buy now. So we hope that they will start buying from Dahil and then move over to Pakhajan afterwards. So after three or four, maybe one or two will go this way. The other may say, okay, I’ll wait for Pakhajan and then start. Because anyway, the capacity that we have in the hedge also is relatively limited.

Arun Prasath analyst
#36

Right, right. And we also—

operator operator
#37

Apologies, Mr. Arun — perhaps. We did ask whether you could mute your line while management is responding, since there's some disturbance coming through that we can hear from Elaine, sir.

Arun Prasath analyst
#38

Yes, of course, we’ll take care of that.

operator operator
#39

Please continue.

Arun Prasath analyst
#40

Yeah. Doctor, we also heard that a few of your US customers are going through some restructuring where the OEMs earlier had entered into the JV and the electron, they are backing out. Does it concern you that at this stage this kind of restructuring is happening which may potentially again delay approvals or, or something like that?

Harin Kanani executive
#41

My guess is you might be referring to GM and Ford making some JV changes and so on. None of that touches us. Yeah.

Arun Prasath analyst
#42

Alright. So does that mean, with the OEM going forward, you'll have two layers of approval? One from—hello.

Harin Kanani executive
#43

Yes, please proceed. Yeah, my apologies.

Arun Prasath analyst
#44

So does that also shrink your possible customer base? Earlier, you might have had a blend of clients — both OEMs and battery makers — and now perhaps OEMs are stepping back from holding a direct stake in manufacturing. So is it fair to say we'll end up with a smaller pool of those customers?

Harin Kanani executive
#45

No. So Arun, essentially, you need to keep in mind that most of the OEMs, or these JVs, are basically self-producers among the OEMs. So what basically happens is, when you look at the electrolyte intermediate, which is Lips 6, the two key vendors are the cell producer and the electrolyte maker. So those are the two parties who must approve you. Okay. And the cell. And of course, in some cases, the cell producer will also be an OEM. And as I explained, compared with before, when we had, okay, maybe one company, right, that had contracted with Neogen in. In the future now with, I mean not in the future, with the Morita JV that we have done, there are several more who are interested. So in a way, our market has expanded with the JV, and more customers are available to us than earlier.

Arun Prasath analyst
#46

Alright, got it. Thank you, sir. Next, you mentioned several fundraisers that are set to take place over the coming six months — approximately 6 and 5 to 600 crores. Most of that money will mainly go toward working capital needs as we expand the business, since in any case you've already secured the bulk of your capexes. So, is that the situation, or will you be taking out a separate working capital loan as well? How should we think about this?

Harin Kanani executive
#47

So whatever amount we're raising, right. Part of it will—some of it would, of course, be, say, the JV money that's going to come in, and that will partly go toward finishing the capital projects, right? Because contributions are also needed there. Like, as you can see, our total debt, as I explained earlier, is not—we haven't fully drawn down all the term loans. So some contribution is required from us. So partly it will be for that contribution, and partly it will, of course, be for working capital deduction, and it's all not fundraise. That's the money that's going to come in, whether it's from insurance. The second is from the JV, and the third is from what we currently propose, promoter infusion.

Arun Prasath analyst
#48

And regarding our initial interest payment — that moratorium is still a few quarters off for us. Right. And as for paying back principal.

Harin Kanani executive
#49

Right, right. So, yeah. So with any loans we hold in the hedge, say we're completing in Q1 — in that case, the first principal repayment would fall in Q1 of FY28. And, you know, in Pakajan's case, right, it'll be — as things stand, we've said H1. So, for instance, if we're looking at H1, FY27 as the point when we begin, then H1 of FY28 would be the matching first repayment after that. So essentially, one year out from the plant's start, from the SEOD.

Arun Prasath analyst
#50

Alright, sir. Thanks so much, and best of luck to you.

Harin Kanani executive
#51

I appreciate that.

operator operator
#52

Thanks. Our following question comes from Rohit Nagraj at 361 Capital. Your line is open.

Rohit Nagraj analyst
#53

I appreciate the chance to ask this. My first question concerns the guidance we’ve given for FY27 and past that. We had said we’d be getting roughly 400 to 500 crores out of the battery chemicals side of the business. But there’s been a bit of a delay when it comes to commissioning that project, specifically around approvals. So are we still holding to that same guidance, or would you want to revise it for FY27 — and perhaps it then slips even into FY28? Thank you.

Harin Kanani executive
#54

No, our guidance stays as it is. The expectation behind that guidance was that our Tahit site would be completely ready by June. And we expect to begin recording sales from this basically in Q1, with the bulk coming from Q2 onward. So that is unchanged. Therefore our guidance doesn’t change. At this point we have not factored in Q4 sales from Pakhajan, so we have kept that essentially as a backup — if, you know, there is some further delay, that would serve as additional sales, just our dahed sales, and whatever electrolyte demand we expect should let us hit the original target. And whatever we do in Q4, if there is any slip-up from the hedge, those Q4 salt sales will contribute to that, or else it will be an additional amount on top of what we have already done.

Rohit Nagraj analyst
#55

That's useful. Now, regarding Neogen Ionics and the Morita joint venture — how is this whole deal put together so that the JV ends up valued at $100 million? What is Neogen currently putting in, both in equity and in debt? And there will be a further $20 million coming from Morita. Since we have a total investment plan of 1500 crores for this, what will the equity participation and the debt look like, and when will the full investment have been made?

Harin Kanani executive
#56

Okay, so at the moment we're still in discussions with the banks. One thing that's very clear, though, is that 80% will be Neogen's share, and 20% will be Morita's share. We're still talking with the banks about, you know, exactly what debt-to-equity ratio we'll have once the separation happens — we're hoping they'll keep it at the same 70/30 level. So depending on that, whatever balance isn't covered by the bank will basically come in the form of equity. Some of this has already been contributed as equity. So I think it's better that, you know, I'll be able to give you better clarity on this once we get the final clarification from the banks — once the loans are separated and we're able to take them separately.

Rohit Nagraj analyst
#57

Okay, okay. Just to clarify one thing. So basically, next year, once Bahead begins bringing in revenue, there will be a 20% minority interest tied to Marita's equity stake. Is that correct? Do I have that right?

Harin Kanani executive
#58

No, that's not in Dahej. There's no Dahej — Dahej is 100% Neogen. Just the Pakhajan site is going to be through. The Pakhajan site is going to be through Monitor.

Rohit Nagraj analyst
#59

And could you break that out by Pakajan site — what the potential revenues might be in FY27, and perhaps over the longer term in FY29.

Harin Kanani executive
#60

So, once again, on Pakhajan — the salt business, if that's the angle the question is coming from. So the Pakhajan side is going to be for Morita. Only the salt portion will be Morita, and the H and the electrolyte will stay with nil. So in FY27, as I explained earlier, at present we haven't factored in meaningful sales, since it will be in Q4, which we've kept as a bonus. So the bulk of what we've given will largely be nil sales. Maybe, you know, some of that would be routed through NML because, you know, at the end of the day — for example, the salt in the international business is going to be sold by the JV. But, like, you know, from a revenue standpoint, I think most of this would be annual for FY20. If you talk about FY29 — see, FY29 is a bit tricky, because it depends on how much of the salt we're consuming internally and how much of the salt we're selling in the international market. Now that depends on how the international market develops beyond the initial years and the desire to have a China-free supply chain, etc.

Harin Kanani executive
#61

The second factor is how Indian customers decide between sourcing LIPF 6 locally versus opting for a lower-cost option, you know. So that's what it hinges on. Actually, if you look at it, should we need to serve our current international customer demand plus Neogen's own internal consumption, then essentially we'd require additional capacity for the salt, since the present capacity of the salt won't be sufficient. We'll have to add capacity. But I think that clarity, and that decision will be made somewhere near the end of FY27 or FY28 to address the FY29 demand. So since India electrolyte demand is still developing in FY27 and 28, the existing salt, the capacity will be enough to serve both. But by FY29, should we need to serve both international as well as local consumption, then we need to add more capacity. So I think it's a bit difficult for me to tell you in FY29 how the breakup will be.

Rohit Nagraj analyst
#62

Glad that was useful. I appreciate you taking the time to respond to every question, and best of luck. Thanks.

operator operator
#63

Thanks. Our next question comes from Meet Katsodia of Navisha — the lion. Go ahead.

Meet Katrodiya analyst
#64

Good afternoon, team, and thanks a lot for the chance to speak. Sir, I have one question about the US side: if salts of Chinese origin are restricted starting, say, in 2027, is it Signal that US customers would consider buying again and holding stock during 2026, then beginning to use it in 2027?

Harin Kanani executive
#65

To meet that. There are two points here, correct? I mean, look at the batteries manufactured in 27 — they cannot use Chinese material. So it's not a question of purchasing; it's a question of producing batteries that don't contain that material, you know. So storing and using it doesn't do them any good. It's not like a customs duty that's going to be imposed, right? So that's a different matter. So it comes down to usage. Therefore that won't happen. The second thing is, the way matters stand as of today, you know, with Chinese prices, at times China is actually more costly. Third point is, even if you wanted to store and use it, normally shelf life doesn't exceed six months, even at the electrolyte salt stage. So I don't think they're able to stockpile too much of it.

Meet Katrodiya analyst
#66

And also, when customers bring up lowering their reliance on a single channel, what does that look like when it actually happens? For instance, do they usually begin with a phased approach, dual sourcing, and ramp up earlier than expected? Say they'll kick off from Q3, Q2, Q3 of 27 and beyond, or at what point can you see the significant ramp-up coming from our customers? Just trying to get a sense of it.

Harin Kanani executive
#67

So you've got two kinds of customers, right? Some are cautious—they began engaging with us two years back and prefer getting ready in advance. Then there are a few who are essentially telling us yes, they'd want a ramp-up. So they'll take some quantity from Neogen in Q2, then Q3, then Q4, and then perhaps additional volume next year, you know. So some customers are like that, and some are extremely price sensitive. So of course in the last two months, you know, things shifted. But up until then they said they'd audit us through Q4, validate us, have everything ready. And Q4 is when we make the switch, right? Because that's what's regulatory driven. So it's entirely. So one customer was more regulatory driven. Some customers preferred caution, preferred to scale up gradually. Another customer says the approval is very complicated. So first do Dahesh, then do Pakhajan again. So I'll start only directly from Pakajal. So it's kind of a mix of those, and some of these keep shifting too, because they had a different response when Chinese prices were very low three months ago.

Harin Kanani executive
#68

And now there's a different reply from them: they said fine, earlier I told you I'd purchase solely from Pakajit, but at this point, alright, perhaps I could also take the hedge into account. So I'll begin authorizing the hedgehog. So all of that varies, you know, from one customer to another, and once more it hinges on what the market situation is.

Meet Katrodiya analyst
#69

That's quite useful. And the final one is based on the most recent online negotiation with customers and ecosystem players in India — a rough indication of what the actual salary capacity could realistically be operational by, say, the end of 2026. And how does that number look to you for 2027?

Harin Kanani executive
#70

You, in calendar year 26 and 27.

Rohit Nagraj analyst
#71

Yeah, right.

Harin Kanani executive
#72

My apologies — could you repeat the question? I thought I heard you mention something about India. The audio wasn't very clear.

Meet Katrodiya analyst
#73

Right, right, right. I posed that question because of your potential talks with customers and ecosystem participants in India regarding battery cell production. So roughly, how much actual cell capacity could come online by, say, the end of calendar 2026? And how does that figure look for 2027?

Harin Kanani executive
#74

You mean capacity for manufacturing cells, is that right?

Meet Katrodiya analyst
#75

Okay, okay, okay. Okay. Battery cell. Yes.

Harin Kanani executive
#76

Alright, battery cell, man — so, battery cell. You know, if you look at what we've got to work with right now, whatever it is. So Ola has said they'll go from 1.5 to 5 giga. Then there's a 3 giga that's starting off with Excite, and a 4 giga that's starting from — a 4 giga that's starting from Body Energy. So if you look at that, between all of them, technically you should have roughly 12 gigawatt hours of production coming online this year, right? And by the end of this year you should have 12 giga. Let's say we call it 12 giga, and if the ramp-up happens — okay, every month, for instance, about one giga of consumption should be reached by, let's say, the end of December 26th. Right? So actual consumption may land somewhere between — actual production, maybe around 3 giga or 5 giga or 6 giga, depending on how it ramps up. But when you get into 2027, you get in with 12 giga of already installed — installed capacity. And sorry, and on top of this you may have to add, you know, whatever Reliance has announced and Amaraja has announced and Tata has announced.

Harin Kanani executive
#77

If you take into account what their initial capacities were and what they set out to achieve — Reliance's aim was to get to as much as 40 giga within a year of starting. For Amaraja, I believe the starting capacity was roughly 2.5 or 5 giga. And Tata's — Tata hasn't disclosed its starting capacity. So when you total all of that up, you'd expect, say, at minimum somewhere around 25 to 30 giga by the close of 2027 as we head into 2028. And naturally, by that point, you might — and, sorry, sorry — you also have to factor in that by then, if Ola adds more capacity, or Worry's plan to lift capacity from 4 to 20, or Amaraj, or Excite's intention to grow from 3 giga and beyond. So, sorry, I think by the end of 27 we should be, if all goes well, by the end of 27 we should be at 4050 giga plus going into 2028, based on what customers have told us.

Meet Katrodiya analyst
#78

Understood? First question. Suppose I were dealing with numerous players. All of them hold the opinion that everybody would rather have 2 suppliers, correct? One main and another perhaps backup. And suppose that in India, say Bari wishes to have a 2 supplier. So then what would you say is the mode or perhaps the USP of Neogen that lets it serve as a primary supplier versus our competitor. So I just want to grasp what those things are that Neogen pitches to Vari or perhaps to other folks as well, such that they would rather have Neogen as a primary supplier.

Harin Kanani executive
#79

So I think, first, we're already prepared. We've got 3, 4 years of experience making it in the lab and supplying successfully, and for the last one or two years even from a commercial plant in Dahij. Second is our Mitsubishi collaboration. As you know, Mitsubishi is recognized as the best electrolyte producer when it comes to quality. So you can be 100% sure about the quality of the supply. And the third is, you know, we have backward integration. And the fourth, I think, is that we actually have capacity, because one thing is you need capacity — right now we'll have 30 gigawatt hours worth of capacity that will be ready, let's say, so nobody has to worry about whether Neogen can supply enough quantity or not. So I think these three, four things put Neogen in a positive light. And just for your reference, not everybody in Electrolyte has always two suppliers. I know historically many companies where, with one single supplier, if they feel the risk, they will ask that same supplier to keep multiple plants.

Harin Kanani executive
#80

However, there are occasions when a sole vendor can be exclusive. That means having two suppliers isn't always required when it comes to electrolyte.

operator operator
#81

Pardon the interruption. Could we ask Mr. Meer to kindly get back in the queue? There are participants who are waiting for their turn. Thank you. Ladies and gentlemen, we ask that each participant keep questions to two. Should you have a follow-up question, you're welcome to rejoin the queue. Our next question comes from the line of Nilesh Koge with HDFC Securities. Please go ahead.

Analyst analyst
#82

Hi there, good afternoon, Hareem. I'd like to ask about the CDMO and Advanced Intermediate business. In nine month FY26, what did those two business verticals contribute? Also, how are things progressing, and what are the inquiries looking like in the CDMO and advanced intermediate business? Is there any guidance on that for FY27?

Harin Kanani executive
#83

Nilesh, thanks a lot for putting that question to me as well, and not just about the battery. I appreciate it. No, so I think in three DMO and Advanced Intermediate we're doing a bit better than we did last year. And as you know, for the first six months, nine months we were actually ahead of last year. But whatever POS we had with our customers, we completed those, and now, you know, some of the new revised repeat POS — people are waiting, especially on the CDMO side, for the new site to come online. So we've already shared our progress with the customers, and maybe by the end of this month or from March onwards customers will start visiting, and we expect — so we expect again some, you know, repeat orders, or new projects that are kind of on hold — we can start achieving orders against that. But overall, I think, you know, we expect that as we go. Let's say this year, if you look at the run rate, you know, we're at around 800 plus kind of revenue, and as we move from 800 plus to 950 or so, we feel CDMO will be one of the significant areas — contract manufacturing CDMO — and Advanced Intermediate will be a significant, significant area where we'll have growth.

Harin Kanani executive
#84

Looking at the nine-month figures, they're essentially unchanged from the prior nine months, when you compare that against CDMO and contract manufacturer Advanced Intermediate and CDMO.

Analyst analyst
#85

Even though our Daesh facility isn't located there, correct?

Harin Kanani executive
#86

Right, even though — so with one semiconductor customer, they needed specialized equipment, and since they had sufficient inventory on hand, we ended up skipping it. We weren’t able to do it this year. So even without Dahij in the picture, you know, we managed to hold things at the same levels, but the majority of these products we could handle out of Mahape and Karkadi — a few we couldn’t — so we weren’t able to book the growth there, though we did keep things steady.

Analyst analyst
#87

And then, second, regarding this tool manufacturing arrangement we set up due to the lack of a darage facility: what percentage of revenue is coming from that at present, and once our Dahesh facility is ready, do you expect some margin expansion since you're moving from the tooling model to in-house production?

Harin Kanani executive
#88

Right. So at present, a portion of those elevated costs you're noticing will come down. As we go forward, your other expenses will shift somewhat — whatever tolling-related costs exist will essentially disappear. Naturally, part of that will show up as extra power and fuel expense at our DAIS plant. But on a net basis, what we believe is that you ought to see an improvement in our cost structure.

Analyst analyst
#89

How much of the business we are currently doing through our tolling model is there that we can shift over to our in-house production?

Harin Kanani executive
#90

Honestly, it's really hard for me to give you a precise answer, because in certain instances I'm only running a single stage there. In other instances, well, it's. That's not the case. Alright, it's been fully completed. Right. But essentially, we're deploying it whenever the need arises, right? And you could essentially say that we're able to hold our revenues at the current level thanks to multiple sites. This particular site isn't the one we're relying on. There are multiple sites that we're utilizing in various ways. So, you know, much of whatever we intend to use should be finished from March and April onward. You know, our Dahesh plant will begin to become partially available, perhaps by the end of June, and we feel it will be fully available. So with the inventories that will accumulate and the first quarter, the way things go once production is on, I think we should be okay. And then, say, from Q2 onward you shouldn't see — we'll have steady production. So first, you know, as we aim to reach, say, 950 crore. So our quarterly run rate also rises to something like the 225 to 250 crore kind of range in the coming financial year.

Harin Kanani executive
#91

Along with that, some of the tooling-related costs will come down as well. And our insurance premium too — you know, the first year is the hardest. So that runs from July to July. So once that July has passed. So starting next year, maybe from Q2 or Q3 onward, you have Dahaj, which is fully stabilized. You have at least the worst of the insurance behind you, right? And the tolling arrangement cost is gone too. And hopefully by then, you know, the hedge will also be contributing from Q2 Q3 onward, significantly on the battery material side. So that's when, you know, you'll see good improvement in our performance.

Analyst analyst
#92

All right, thank you. Thank you. Many thanks, and best of luck.

operator operator
#93

Thanks. Our next question comes from Pratham Kankariya, who is on the line from Quantum Asset Management. Go ahead, please.

Pratham Kankariya analyst
#94

Yeah, hi sir — this is Audible. Hello.

Harin Kanani executive
#95

Yes.

Pratham Kankariya analyst
#96

Okay, so I just had a single question regarding the inorganic segment. If I leave out the neogen ionics revenue, then the trend for the inorganic chemical segment has been heading downward. So if you could just share your perspective — what's driving this? Is it entirely due to lithium prices falling? Though at this point that has also jumped up. So I just wanted to hear your view.

Harin Kanani executive
#97

Right, so that’s entirely down to the lithium decline and the effect of the spike. We might see a small amount in Q4, but more of it next year if the spike holds. Because up until Q — as you know, lithium prices began rising in November, December, I mean pretty much toward December. And then in January you saw most of the increase take place. So the material from that point will reach me by March or April, correct. So until then, you won’t see a big one.

Pratham Kankariya analyst
#98

All right, absolutely. Even so, sir, the revenue still landed on the softer side, and that's entirely down to price. Is that right?

Harin Kanani executive
#99

Yeah, yeah.

Pratham Kankariya analyst
#100

Alright, alright. Thanks. That's all.

operator operator
#101

Thanks. We'll take the next question from Jason Sones at IDBI Capital. Go ahead, please.

Analyst analyst
#102

Yes, sir, thank you for taking my question, sir. So it's probably a given that Pakhajan will only ramp up in H2FY27, as you mentioned. Now, just accounting for that, sir, would we be able to, you know, clock in 400, 500 crores from battery chemicals in 27, you know, accounting for that, and any approximate revenue estimations for 28 as well?

Harin Kanani executive
#103

So look, essentially, we've factored in only a very small amount from Pakajan salt sales, correct? Since we indicated it falls in H2, electrolyte will be steady during H1. And as I said before, that capacity expansion at Ola excite, getting it stable — then, you know, we mentioned even worry starting. So perhaps we can anticipate some electrolyte revenue, you know, coming through in the second half as these folks ramp up their operations. So that's something we've taken into account. And as I explained, you know, we said, okay, the salt at Pakhajan will arrive in H2. So technically we haven't counted any sales, even though we're on track that at minimum in Q4 we could secure some sales. But right now I've kept that as a backup in case — because this year, you know, from the moment we first got listed, whatever revenue projections we'd provided, we had to make a significant correction. So I'm a bit more cautious. So what we've done is that in Q4, whatever Pakhajan salt sales, we haven't considered them. So in case, you know, if Dahej slips slightly or electrolyte isn't delayed, the Q4 salt sales will let me essentially compensate for that, so that we don't go wrong on our guidance for the next financial year.

Harin Kanani executive
#104

So that's roughly where things stand on that. And for FY28, I think it's too early for me to put a number on it. But one thing that looks very strong to me is that our salt capacity should be utilized at 80% or more, because that is something that will be in very strong demand. And of course, if I sell it in electrolyte form, it will be higher. So if I look at today's market price, and if you think of 5,500 tons of total salt capacity and you think of 80% utilization even on that. Right. So that's around 4400 at a $20 plus kind of price. Right. Salt and added is even higher. So at an average price of about $20, it's very like, you know, if this assumption is valid, then you would have a thousand crore plus kind of revenue. And of course, whatever I sell in electrolyte form, that's further value addition. So therefore, it should ideally be beyond thousand crores. Like, you know, it should be something. But how much beyond is a little bit, a little bit difficult for me to tell you right now.

Analyst analyst
#105

Yeah, yeah. But at least for that first estimate, we mentioned 400, 500 crores. For 27, we're staying with that on battery chemicals.

Harin Kanani executive
#106

Yeah, yeah. Nothing has changed. Right, it's unchanged.

Jason Soans analyst
#107

Right, right — since you mentioned it, that's correct, because at a minimum the electrolyte will hold steady and at a minimum it'll be able to pick up some volumes on the electrolyte side.

Harin Kanani executive
#108

And yes, we are seeing electrolyte sales. Unfortunately, it hinges on when my customers get their plants started. There isn’t much beyond that which I can do. That’s the reason I’ve retained Pakhajan Q4 as a backup, so that any overperformance there can serve as a fallback if, you know, India electrolyte demand doesn’t develop as much, or if the initial approvals at the Hajj are delayed. So we can sort of compensate for that apps.

Analyst analyst
#109

Yeah, yeah, yeah, sir. And sir, if you could just let me know — I mean, at Pakhajan you're hitting 30,000, which will come on streaming. I'm only talking about electrolytes here. So by H1, how much will be online? Sir, out of the 30,000 empty

Harin Kanani executive
#110

That's the approach. Regarding the plant, we're running a joint trial together with Mitsubishi. Our plan, then, is for all three lines across the full 30,000 — every one of the three pipelines gets tested — and we'll be set for an annual capacity of the 30,000-ton type, which works out monthly to roughly 2,500 tons. Naturally, we'll handle the operational side — if we don't see, and we don't see business visibility in year one — so when it comes to staffing our people or certain other expenses, we'll do that gradually, but as of today the plant will be ready for the whole 30,000.

Analyst analyst
#111

Alright. Sure, sure, sure, sir. And sir, just regarding revenue growth from the base business, which gets discussed less these days, so just to understand — in 27 and 28, you know, 26 was subdued. I understand the fire thing and all of that is there, but with 27, you know, can we expect double digit revenue growth? Especially with the Dagg plant coming on track after the fire? So just wanted to know, for organic and inorganic, how do you expect the base business? Can we expect a double digit revenue growth there?

Harin Kanani executive
#112

Yes.

Jason Soans analyst
#113

Right, got it. Last thing, sir — I just want some clarity on this QIP, the 150 crores you mentioned. It's a bit unclear to me. So that 150 crores, is it basically that the promoter group will be raising its stake, or is this just a standard QIP that's being done? I just wanted to get that cleared up.

Harin Kanani executive
#114

No, this is a prep allotment. Basically, we felt that, you know, okay, Neogen could help with the equity. We know the insurance money is also coming. The equity is also coming. But as I said, you know, there's a good salt demand also. So we felt that, you know, in case, suppose if we have to do a little bit more on the salt or additive or as well as in the interim, you know, if we had that equity, then that would really help Neogen to seamlessly continue and like, you know, make sure that all our execution in 2026 happens seamlessly. And that was the whole idea. So we as a promoter group decided to invest 150 crore. But as I said, you know, there's this one clarification we need to take because my father and mother had formed a trust which was a family trust. And you know, Sebi already gives a permission that this is like, it's like a promoter and promoter group. But just because of that there has to be some cooling off period. So whether that is needed or not. So we are just taking some regulatory guidance on that.

Harin Kanani executive
#115

Beyond that, though, the plan was to bring 150 crore into the company ahead of March. That too will, you know, ease the interest burden and give us considerable flexibility regarding the things we want to do.

Analyst analyst
#116

But that's coming from the promoter group, correct? So our stake, which currently sits at 51.22%, essentially goes up in the company.

Harin Kanani executive
#117

Exactly. Yeah, that's correct.

Analyst analyst
#118

Exactly. All right, wonderful, wonderful. And only, only one final item. This money from the insurance claim — I hear you saying Morita is fine. It’ll require a while. 150 crores from the promoter. It sits in Q1FY27, this insurance claim mentioned this 200 crores for the stock claim by. At what point can we receive this?

Harin Kanani executive
#119

So look, look. That 60 crore, we expect it possibly today, possibly tomorrow, you know, within that window.

Analyst analyst
#120

Alright, alright.

Harin Kanani executive
#121

The insurance company had already collected all the documentation from us for the 60 crore release. We had the agreement — this is the second interim against rebuilding the plant. Right. So we have to stock and rebuild the plant. So again, rebuilding the plant. They're prepared to issue 60 crore at any given point of time. There are five insurance companies. So they all need to be pulled in to the lead insurer, and then the lead insurer transfers the money to us. So that process is ongoing. But that should happen anytime. Then, you know, the stock claim was also — in the case of the stock claim, the insurance company had appointed a third party, a big four kind of auditor. So that is about — so their process is almost complete. They should finalize the report based on that. The surveyor should finalize the report, and based on that, the money should ideally be released before March. But, like, maybe it can slip up. So that's why I said March or April. But we are working very strongly now with the insurance company — look, we have built the whole plant. In fact, if everything happens, we can even ask for the third interim again, because, you know, this should still be 140 crore.

Harin Kanani executive
#122

We could still request an additional interim release ahead of March. But those two are at least what I'm taking at the moment. And then, naturally, during the following year, as I explained before, the cost of rebuilding will exceed the loss. Right. So the remaining balance material against the rebuilding plant, along with the higher rebuilding costs — that needs to be evaluated and released, and the profit loss needs to be evaluated. So in my opinion, that's something — you know, the first part, the balance on the stock. Sorry, the balance on the capital rebuild ought to take place before September, and perhaps the loss on profit ought to take place somewhere from September to December. So in a sense, hopefully everything from the insurance should ultimately be achieved by December. September to December. Next.

Analyst analyst
#123

All right, thank you. I appreciate you taking my question. Thanks.

Harin Kanani executive
#124

Yeah,

operator operator
#125

Thanks. And everyone, that's going to be our final question for today, coming from Pratham Kankaria of Quantum Asset Management. Please go ahead.

Pratham Kankariya analyst
#126

Just a small thing — what would the ceiling be on capacity utilization for the salt electrolytes once we're fully ramped up?

Harin Kanani executive
#127

When you say utilization-wise, right, salt typically runs at 80%. It's similar to a chemical plant. For electrolyte, though, it's a formulation plant, so you can reach as high as 100%.

Pratham Kankariya analyst
#128

Alright, yes, of course. Thanks.

operator operator
#129

Thank you. Ladies and gentlemen. That was the final question for today, so at this point I'd like to turn the conference back over to management for some closing remarks.

Harin Kanani executive
#130

Thanks to everyone for spending time with us and joining today. We believe we've covered the questions you raised. If anything else comes up or you need more clarification, please get in touch with our Investor Relation team. We're grateful for your ongoing support and expect to bring you another progress update next quarter. Thanks again. Enjoy the rest of your day.

operator operator
#131

Appreciation is extended from Neogen Chemicals Ltd. With that, this conference has reached its end. We thank you for being with us. You are welcome to disconnect your lines at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Neogen Chemicals Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Neogen Chemicals Limited earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.