Home / Transcripts / New Fortress Energy Inc. (NFE) · November 7, 2024

New Fortress Energy Inc. (NFE) Earnings Call Transcript

November 7, 2024

NASDAQ US Energy Oil, Gas and Consumable Fuels earnings 54 min

Earnings Call Speaker Segments

Executive executive
#1

Thanks, and welcome, everybody, to this morning's session. We're glad you could be here for the call in which we'll go over what we delivered in the third quarter of 2024. A recording is being made of this call, and a replay will be accessible in the Investors portion of our site, listed beneath Events and Presentations. In that same spot, there's a slide deck we intend to go through during today's discussion. Kindly take a look at it, since it contains significant details regarding forward-looking statements as well as non-GAAP measures; having said that, I'll now turn things over to Wes Edens, our Chairman and CEO. Wes?

Wesley Edens executive
#2

Okay, thank you, Matt, and I appreciate everybody joining the call. As we normally do, we're going to walk through the deck together as we go along, though let's begin right at the start — Page 3, beginning with the quarterly financial results. Adjusted EBITDA for Q3 came in at $176 million, which is essentially exactly in line with the forecast we gave last summer. Operationally speaking, it was a fairly sluggish quarter. We're continuing to bring FLNG operations fully into service, and I'll get into that shortly. We completed the sale of our first full cargo, which was sold and shipped to Europe. We received the non-FTA permits around Labor Day, and that let us pivot toward non-FTA countries. Naturally, it appears that ban will probably be removed following the presidential election, but for us that was still a meaningful milestone; we're lowering Q4 guidance slightly because of some maintenance work we've undertaken, so FLNG volumes will come in lower. The unit has been brought back online and is performing nicely; we've been focused on optimizing output, and we're extremely pleased with how it's producing — I'll cover that in a moment — but that's a positive; we're also going to place Barcarena into service, and that carries certain accounting implications; still, from an operational and business perspective there's nothing but upside there, though Andrew will address that shortly. The FEMA claim is a topic I'm constantly asked about. We remain in discussions with Weston, our contractor, along with the core and FEMA, and as anticipated, we believe a resolution is forthcoming and favorable; there's nothing concrete we can share on it yet. Clearly, how a FEMA settlement lands in Q4 or Q1 would substantially shape our forecast; and beyond that, if these new strategic alternatives we're exploring — which I'll discuss at some length — actually materialize, they could shift things around as well. So in truth, forecasting outside of operations becomes somewhat more complicated, simply because these are such large, individual transactions; the notable events carry over to the next page. Let me begin with Fast FLNG. Before the maintenance event occurred, we operated for 14 days, measured hourly, at roughly 105% of nameplate capacity. So it's working extremely well; this is the stage in the liquefier process where you sit down alongside the vendors and exchange ideas regarding debottlenecking and operational adjustments you could make to boost production. We held a major meeting in Houston on Monday devoted precisely to this, and it went very well. Our team feels strongly that there are several near-term additions we can implement, adding 3% to 5% to 10% of nameplate capacity. That aligns with what others in the industry are seeing. This is simply a normal thing to work through. Step one, reach full operation — hit nameplate capacity. Step two, fine-tune things so you can improve on what you're already doing. So that's very, very encouraging news. As of this morning, I believe we're wrapping up cargo number four. One point on that, since people have raised some questions: the Penguin holds roughly 170,000 cubic meters of storage. The typical vessel we load on the round trip to Puerto Rico comes in at around 135,000 cubic meters. That cushion gives us an enormous degree of operational flexibility. So whenever weather hits, whenever a storm has rolled through and there are swells, and you wind up pushing things back by a day here or there, those 35,000 cubic meters of buffer essentially mean we anticipate zero downtime operationally while loading — and that's what we've seen so far. So everything is on track and proceeding as planned, though FLNG has clearly exited the construction stage and entered commissioning's final phases; and operationally at this point, we're doing quite excellently. On Brazil, I'll hand that over to Andrew, but the major build work carries on. From where we sit, the key takeaway is: on schedule, within budget. The EPC contractor is executing very well, and there's an absolute hive of bustling activity on site. But I'll let Andrew address those specifics. Finally, on our end, a massive, massive priority for this company has been the corporate refinancing and capital formation we carried out during the quarter, wrapping up with this morning's signing of our agreement to bring it to completion. Put more plainly, here's what we achieved: we refinanced and pushed out the entire 100% of 2025 corporate debt, folded 2/3 of the 2026 into one single class, and then pushed the bulk of the revolvers out to 2027. And — last item — we also closed a $400 million equity raise, in which I personally put in a significant amount of investment back in October as well. The effect of all this is that it has essentially brought substantial liquidity into the company, and it has also stretched out debt maturities, which now positions us to genuinely go after the next set of things I'm about to discuss, all in a very ordinary course of events. So that's excellent; it came together very collaboratively with our bondholders and our banks. We're fortunate to have an extremely professional and broad-based lender group that worked through this smoothly; and now it sets the stage for us to concentrate on the strategic goals we laid out the other day. But before I get into that, let me pass the remaining updates over to Andrew. Andrew?

Andrew Dete executive
#3

Good to be speaking with everyone once more. I'm looking at Page 5, where I'll give the Brazil construction update. It's a positive one for this quarter: Salva 2, our 630-megawatt combined cycle plant, now stands at 80% complete, which is a genuinely strong milestone for us. The photos in the lower left show it — we've got an actual power plant out there, with close to 2,000 people working on site last month. There's a huge amount of activity happening as we move through the last phases of electromechanical assembly; all the equipment has arrived, and from here it's simply a question of finishing the work. Our projection is that cash flow begins in the second half of 2025. That falls under the firm Datang rate EPC agreement, along with Mitsubishi and <<inaudible>>. So at the moment everything at Salva 2 remains on track, and the past quarter brought genuinely strong progress. As for our Port of Zen project — you'll recall we signed and acquired it in December, with the announcement, I believe, coming in January of this year — we relocated it to the Barcarena site, and construction is underway right now; we've advanced considerably there. In fact, we're running ahead of schedule. We had targeted 15% completion at this stage, but we're actually hitting 25%, so activity has been excellent. Take a look at the photos in the lower right. On top, you can see the four separate pads for the large gas turbines. Below that, the large cleared <<inaudible>> is where the substation goes. Mitsubishi is also making strong headway on the turbines. That project is therefore pulling together more quickly than we anticipated, and we're ahead of schedule as things stand. So it's a very encouraging update on our Brazilian construction work this quarter. Over to you, Wes.

Wesley Edens executive
#4

All right, let's turn to Nicaragua. That's the last terminal we expect to come online, and we're still looking at Q1 for that. Construction of the 200-megawatt power plant has wrapped up entirely. As for the Jetty and the FSU, they're at 95% completion, and we figure they'll be done in the coming month or two. The pipeline, as you can see, has been dredged and crews are now putting it in. So what's left is basically finishing the jetty and connecting the pipeline that runs between the terminals and the power plant. Then we plan to bring in our FSRU — we'll position the freeze — once it leaves the dry dock at the end of this year. So from that angle, it's a very, very encouraging update. Alright, let's move on to section two, the strategic update. If you look at that page, what you're seeing are excerpts taken from the 8-K we filed a few days back. So, on October 2, 2024, New Fortress Energy put out word about a set of financing transactions. Once those deals close, the goal is to boost the company's liquidity and give it more financial flexibility — that ties back to what we touched on earlier, and we're going to get into it in a bit more depth. To push those objectives forward, the company has started the process of finding strategic partners for one or more of our core businesses, and that covers projects in Brazil, Puerto Rico, Jamaica, Mexico, Nicaragua, along with FLNG 1 in Klondike. We plan to look into options with possible strategic partners, funding arrangements, business collaborations, or selling off assets — all aimed at strengthening the company's cash position and financial maneuverability. That refers to the 8-K filing we put out two days back, and I believe it plainly spells out where our attention lies. Speaking in plain terms, the way I see it, our simple focus is this: we think the combined value of our various businesses and units is considerably greater than what the company's debt and equity currently reflect. So what we're really trying to do is bridge that difference by zeroing in on specific assets we can capitalize, by bringing partners into the mix, and by doing things along those lines, so that the value gets unlocked. When you look at what defines our businesses, for the most part, the first thing is that construction is already finished. Or in Brazil's case, it will be finished before long. That means there's essentially no construction risk, or very little. These are assets in operation, and they serve a large base of long-term community customers. Second, they call for minimal CapEx, or none at all; as a result, the cash flows coming out of them — and those are substantial — flow from operations basically right down to the bottom line. Third, the LNG supply they have lines up with the customers. Basically, by balancing supply with demand, you eliminate commodity risk, and what remains is a straightforward matched operation involving product coming in, gas and power going out to customers, plus a long-term agreement linking the supply side and the demand side; at that point it's really just a pure infrastructure play. And finally, they offer clear, visible growth potential, since only a portion of the asset's capacity is actually being used; taken together, these traits amount to what you might call the ultimate prize in infrastructure investing. Little to no construction risk, minimal significant cash flow concerns given extremely long-term commitments, and no CapEx. No extra capital needed, flows directly to the bottom line, lengthy operating track records without incidents, and zero commodity exposure; so that, in general terms, describes our assets. Now turn to Page #9. We think there's considerable value across all of the businesses. We picked these three to spotlight because they're the furthest along and largest in scale, but we hold a very favorable and upbeat view on the worth of every one of them and believe that when combined, this sum of the parts considerably exceeds the present valuation of our debt and equity; these three assets — Brazil, Jamaica, and the pairing of Puerto Rico with FLNG1 — possess the traits I just described; they have long-term supply, specifically aligned with longer-term customer offtake, which reduces climate-related exposure. The projects, once again, apart from the remaining construction in Brazil. Now, as for the remaining pair, construction is complete and operations have begun; they require almost no further capital investment, and they offer considerable added worth via significant avenues for expansion. Each of these stands out as a unique holding, though there's a great deal they have in common. We've invested billions of dollars and devoted many years to bringing them to life — roughly a decade in Jamaica, seven years in Puerto Rico, and five years in Brazil. So the capital we've deployed has yielded these remarkable properties, and we believe we're now well positioned to engage investors regarding a range of possibilities for them. With that, let's turn to Page #10, going from left to right. The Puerto Rico and FLNG assets serve as the ideal downstream complement — and upstream complement — for one another. Since FLNG 1 is operational now, and potentially FLNG 2 as well, each holds significant standalone value because, clearly, we live in a world where a notable gap still exists between what it costs to produce LNG and what the market is willing to pay. But in our view they're worth far more when paired with San Juan's downstream requirements. We hold a Jones Act exemption permitting us to transport the gas directly from one location to the other. So in Puerto Rico at the moment, there's this high and wide gas contract of 80 TBtu that we have, and it's only being used in part — though we're really optimistic that things are going to change and grow quite a bit. Even the way it is now, that market exceeds 70 TBtu. You've got nine customers, the LNG supply lasts 20 years, the contract runs 4 years, and we think there's a strong chance this will develop further somewhere down the line. Looking at the entire complex, owned-to-managed power capacity adds up to 9,000 megawatts. That's a huge market where we obviously have a very significant footprint, and we've now got the supply to go with it. Moving over to Jamaica, which is our oldest and most mature asset: 30 TBtus in volumes, 25 customers. The supply side has a 20-year matching arrangement, with contracts lasting 17 years on average, plus 330 megawatts split between owned generation and managed capacity — is that right? That gives us something very durable over the long haul and very predictable, and on top of that, there's meaningful upside available. Last of all comes the Brazil Complex, and Andrew is going to walk through that. In the northern part of the country, there's a massive combination of a terminal plus a baseload buyer in Norsk Hydro, totaling 2.2 gigawatts of power — a pocket of industrial activity located within one of the planet's most ecologically fragile areas, backed by very large long-dated offtake agreements. So how do we intend to proceed? Our aim is straightforward: reduce the company's debt, and by doing that, make the value of the assets we own far easier for investors to appreciate. Through this refinancing, we're able to get there in a deliberate, well-considered manner. One crucial element of the refinancing is that, to the extent we pursue asset sales, we can pay down debt without incurring a penalty. In effect, this gives us a very flexible capital structure as long as we go down the asset-sale path, and that is precisely our intention. There's also the option of reducing leverage naturally, just by bringing in more than we spend on expenses — obviously, that's the baseline scenario. Asset sales, however, can accelerate that considerably, which is why they're our main emphasis. As for what the strategic transactions look like, they could come in a few different shapes. Equity sales or JVs are possibilities. These might take the form of partnerships, or they could involve selling these businesses entirely or in part. For a number of them, we've engaged advisers, and we expect the coming months to be extremely busy as we move ahead. Luckily, electricity and the ability to obtain it is arguably the most talked-about subject in the world right now, both abroad and here at home. And as I mentioned before, time is the one commodity that isn't available for purchase. We've invested time—decades' worth—into these assets, and we anticipate there will be many interesting matters to cover as we go forward; so I'll pass it to Andrew to discuss the composition.

Andrew Dete executive
#5

Sure, thank you. To build on that, we want to take you through a case study focused on the margin makeup business. If you turn to Page 12 — and this is just a reminder — NFE's work in Jamaica got its start with the Montego Bay terminal back in 2015, which reached completion in 2016. Following that, we built our CHP plant in 2017, and then, in 2018, we signed the contract for the Old Harbour terminal, which sits just to the west of Kingston. Old Harbour wrapped up in 2019. After that came COD on the power plant in 2020. The map on the left gives you a real sense of what our operations in Jamaica involve. The Montego Bay terminal matters a great deal since it feeds the Bogue Power Plant and also serves our 21 different small-scale customers, who represent most of the large industrial customers on the island. The Old Harbour terminal has a direct pipeline connection to the Clarendon and CHP plant, of which we own roughly 150 megawatts, and that provides electricity to Jamaica Public Service. It also provides steam to the JamalCo alumina refinery. In addition, a pipeline links it to the Old Harbour power plant, which Jamaica Public Service owns. So essentially, we own and supply three of the island's major power plants. Our Montego Bay terminal serves essentially the island's 21 biggest industrial buyers of LNG, and the important figures appear at the lower right. In the past, we were moving roughly 30 TBtus annually; our customer count stands at more than 23. When we began, every one of our long-term contracts ran for 20 years; these days, around 17 years typically remain on them. Each contract contains two pieces: a capacity charge that is fixed, plus a payment based on volume for the gas, and that volume piece includes an approximately 85% take-or-pay requirement annually. I noted earlier that the average contract life left is 17 years. At Clarendon, we are the owners of the 150-megawatt heat and power plant. On the whole, roughly 65% of Jamaica's electricity supply is covered by us. If you look at Page 13, that will give you a clearer picture of what our operations look like. At present, our operations are based mainly out of the Old Harbour terminal, situated just to the west of Kingston. From that location, we send a shuttle vessel up to the Montego Bay terminal roughly once per week so that storage there stays stocked. Larger international LNG deliveries come in to the Old Harbour terminal; from there, gas moves by pipeline to the 3 power plants I referred to earlier — one belongs to us, while JBS owns the other two, and under our long-term agreement we provide gas to them. From our Montego Bay terminals, we operate the trucking operation serving those 21 industrial clients I referenced earlier. Turning to Page 14, we've laid out a handful of investment highlights to help you frame how we view our Jamaican operations. Our offtake agreements are genuinely long-term, with an average of 17 years left to run. Working with Jamaica Public Service has been excellent — they're a terrific partner. Even through difficult economic periods, COVID included, the relationship has proven very productive. Ties between the two businesses remain solid, and we've continued to grow and take on additional joint work. As you may know, Marubeni and Korea East-West Power hold ownership of Jamaica Public Service alongside the Government of Jamaica. The LNG we source comes from investment-grade suppliers. Usually, our deliveries into Jamaica happen under a long-term arrangement with Shell. Like Wes mentioned, this is exactly the kind of enterprise we envisioned building alongside NFE — a spread business spanning many years, covering gas and power sales in Jamaica backed by 17-year offtake agreements, while we secure international LNG cargoes from Shell through our DES contract, with those cargoes arriving at the Old Harbor terminal. We have a truly outstanding operations team. Starting in 2015, it's clear we've had a capable group in Jamaica overseeing the terminals as well as the checking operations. The workforce there has remained dependable and has grown steadily. NFE set up a program at the University of West Indies focused on cryogenic engineering training. A large number of those graduates have joined us. They've turned out to be fantastic staff for us, and overall, it's a spot where we've got a highly skilled and upbeat team. The next phase is clearly to keep growing. We've got excellent chances for added growth, with bunkering being a major focus — aiming at the shift for container ships to LNG supply. Plus, there are numerous fresh possibilities to build new power in Jamaica, boost electricity access in the nation, and keep serving other small-scale clients. Moreover, as the market evolves, we believe our Jamaican hub could serve as a central point for the whole Caribbean. We're clearly positioned well to reach other Caribbean Islands. Of course, our Puerto Rican operation initially began and was supplied from Jamaica, which serves as a strong example for expanding into other nations using this Jamaican terminal as a hub, and all that added growth needs minimal CapEx. Page 15 takes a closer look at our Montego Bay terminal. It's roughly a 24 TBtu facility in capacity terms. We constructed these on-storage — storage tanks here, offering around 57 TBtus of yearly storage; this is what we provide weekly from our primary terminal in Old Harbour. At this location, we regas and pipe gas to the Bogue power plant, which links via pipeline to this terminal. Additionally, we handle our trucking activities from the truck-loading manifold, visible on the left side of the storage tanks. Page 16 covers the offshore terminal in Old Harbour. This sits only to the west of Kingston, and there you have the hogue galant, an FSRU costing $170,000; it's an LNG terminal built at world scale, capable of taking every one of those big cargo shipments that would naturally arrive at such a facility, and it lies merely a handful of miles off the coast, tied in through a pipeline to Jamaica's power grid. Our CHP facility appears on Page 17 — combined heat and power, that is. At this site, two Siemens SGT 800 turbines, visible in the image, generate the electricity we then sell to JBS. The high-pressure steam produced as a byproduct gets sold and consumed within the alumina refining operations at the Jamalco refinery, which isn't visible in this shot but sits roughly off to the picture's right-hand side, linked via pipeline. Consequently, one avenue for incremental growth is definitely increasing the volume of gas we move to the Jamalco alumina refinery, something we intend to pursue gradually. Page 18 simply illustrates how significant this has proven for Jamaica. As I noted earlier, when you add together the electricity we provide, the gas we provide, and the small scale fuel we provide, we account for roughly 65% of Jamaica's total energy output, making us genuinely essential infrastructure for that nation.

Andrew Dete executive
#6

Through the partnerships we formed between 2015 and 2019, and by structuring them so that we could secure pricing for 20 years, we've managed to make a genuinely strong impact on what Jamaica pays for energy overall, and we believe that shows up quite favorably in the broader macro story of the country. Debt relative to GDP stood at roughly 135% when we began, and it has fallen to somewhere around 75%. A great deal of credit belongs to the leadership team in Jamaica and all their efforts to push that figure lower. On unemployment, the starting point when we arrived was roughly 14%, and today it sits near 4.5%. They've also been upgraded several times, moving from a B rating to BB minus. For economic development and macro progress, Jamaica has proven to be a remarkable case study. We believe that choosing wisely to pursue long-term gas and power at prices that are highly stable and competitive gives them a strong foundation for many of these kinds of favorable macro advances; on the right-hand side you can observe that when we entered the country in 2015, natural gas accounted for 0, while oil-based generation made up 97% of the mix. That has reversed. Natural gas now represents 64%, and oil has dropped to 16%, something we think will keep evolving over time; and clearly, this sort of foundation of dispatchable natural gas generation has opened up the ability to then add other intermittent generation sources in Jamaica. We've also witnessed considerable renewable power growth since that period. So we estimated roughly $2 billion in total fuel cost savings, a 33% cut in carbon emissions, and 36.5 million trees planted as an equivalent, all from what NFE has accomplished by shifting Jamaica's oil-based power to natural gas. Page 19 simply lists a handful of the growth vectors we foresee ahead in Jamaica. Bunkering is truly the major one. The Old Harbor terminal, situated right at the top of Kingston, sits beside an extremely busy shipping lane. We've already completed a number of spot bunkering transactions. And as additional cargo vessels, on both the container and bulk carrier sides, keep getting constructed with LNG-based engines or become capable of conversion, we believe this will be an enormous opportunity for our terminal to serve essentially all the commercial ship traffic passing Jamaica. On the new power front, a new plant is needed on Kingston's East side, something the Government of Jamaica has publicly discussed, and we think that's a project we'd like to take part in. And clearly, within the next couple of years, it's something we believe both should and could take place. Continuing on, another key priority for us involves switching additional peaking generation located on the island — the kind still powered by oil — over to gas. I brought up the added gas supply earlier. A pipeline already links us to the Jamalco Illumina refinery, and that presents an opening. Beyond that, we see further chances as we keep expanding LNG fuel for the nation's industrial sector; and as I noted on the right side, we aim to remain a hub serving the Caribbean. We clearly accomplished that when we launched our Puerto Rico business, initially moving volumes out of Jamaica. Yet we keep expanding into additional locations across the Caribbean that are seeking cleaner fuels and greater electricity access. With that said, I'll shift to the refinancing update on Page 21. Per Wes's comments, we've just closed a refinancing deal that essentially refinances our 2025 notes, which had been $875 million, and also exchanges roughly 2/3 of the 2026 and 2029 notes. Every one of those moves into a fresh bond tranche for us — a November 2029 maturity carrying 12%. So on this page you can observe the bonds listed up top, the 3 Series we had before, the '25, the '26s and the '29s, and it illustrates those essentially moving into this new series of notes shown at the bottom, which we refer to as the senior note to 2029 new; and that effectively extends the maturities by refinancing the entirety of the '25 plus 2/3 of the '26s and '29s. We're also modestly growing our total debt through raising some new money. Thus we've strengthened our overall corporate liquidity by bringing in an incremental $327 million through this transaction, and combined with the $400 million of equity we raised, that comes to about $727 million of incremental corporate liquidity. Turning to Page 22. This simply shows how we extended the maturities via this transaction. So we haven't only refinanced the '25 notes along with 2/3 of the '26s and the '29s; we've additionally extended our revolver — the bulk of our revolver maturity. We hold a $1 billion revolver. We've extended $900 million of that revolver maturity out to 2027. That's 18 months beyond where it sat in 2026. A remaining $100 million isn't being extended and remains at the 2026 maturity date. So here's our updated maturity profile, which generally pushes our bond maturities toward the back end into 2029. Chris, over to you.

Chris Guinta executive
#7

Okay, thank you, Andrew. Morning, everyone. Turning to Slide 24, we'll go over CapEx along with the financials. This opening slide — Page 26 to 24, pardon me — is designed to address the questions we've gotten regarding gross and net CapEx, and aims to give a bit more clarity. I realize there's a large volume of figures on it, but I'll walk through the ideas first, then we'll dig into 2025. So we begin with CapEx from the cash flow statement and subtract capitalized interest, which brings us to gross CapEx. For those of you who aren't accountants, here's the way capitalized interest functions. While constructing major capital projects, we must incorporate a share of the company's interest expense incurred while building. To accomplish this, we estimate the company's total interest expense and assign a portion of that total to our construction projects, putting those costs on our balance sheet. You'll see we don't provide a forecast for capitalized interest expense looking ahead to '25 and 26, since it depends heavily on the timing of when assets enter service. As our assets shift from construction in progress over to PPE, capitalized interest will drop to 0. Continuing down the page, we present the notional gross dollars of CapEx for every asset class: power plants, terminals, maintenance, vessels and FLNG. Last, we show the asset-level financings tied to the power plant and FLNG projects, arriving at the blue, bolded line labeled net CapEx, which we've presented previously. So looking at 2025, as you can see, forecasted gross CapEx comes to $815 million, consisting of $415 million of power plant CapEx, matching the $415 million of power plant financing, plus $330 million of CapEx tied to FLNG2, once again matching the FLNG Term Loan A facility. So the takeaway is that out of the $815 million in gross CapEx, $745 million gets funded through committed debt facilities, which leaves roughly $70 million of net CapEx to be funded by cash flows from operations. Now on to the financial results for the third quarter, and we're on Slide #25. Total segment operating margin for Q3 came in at $220 million. That splits into $185 million from sales to customers via our downstream terminals and cargoes sold into the market. As Wes has said previously, whenever the market price is above the price we can sell through the terminals, we're able to optimize the portfolio, which we've done at times. We had another $35 million of operating margin from the Ships segment. Core SG&A for the third quarter was $26 million, down for the third consecutive quarter this year, and it better approximates what we'll be running on a go forward basis in 2025. The deferred earnings line reflects a payment received in Q3 that shows up in segment revenue, but won't be earned in EBITDA or earnings until 2025. This is pretty much in line with what we did back in Q2. We gathered roughly $60 million as a prepayment tied to cargo sales scheduled for delivery during 2025. Also, because of our planned delivery schedule, we found ourselves somewhat long on LNG, which let us capitalize on favorable market conditions and secure earnings set to be recognized in '25. That $60 million brought in during Q3 is offset against the 42 million earned in Q3, which leaves 18 as deferred and left out of the adjusted EBITDA figure. Taking all of that into account, adjusted EBITDA came to $176 million for the third quarter, which takes us up to $636 million across the 9 months that ended September 30. Now, turning to Slide #26. GAAP net income came in at $9 million, or $0.03 per share. After you factor in a $2 million impairment charge related to the Miami liquefier, that gives you adjusted net income of roughly $11 million for Q3, equating to approximately $0.05 per share. Regarding the Miami liquefier, regulatory approvals are now in hand, and we anticipate completing that sale prior to month's end. Last, funds from operations for the first quarter totaled $46 million, or roughly $0.22 per share. A few brief points about the balance sheet. Naturally, Andrew has spent the past several weeks at the Vanguard alongside the bond holder group, but I want to point out that we've managed to collaborate with our revolving letter of credit and Term Loan A lenders to secure a handful of key amendments, which is another demonstration of their backing for the company and our strategic efforts. To be specific about the revolving credit facility, we pushed $900 million into new tranches set to mature on October 27, which trims 2026 maturities and takes more risk off the balance sheet. The pricing on this facility compares favorably to the new bond issuance, and we appreciate the ongoing support from our relationship lending syndicate. One more item I'd like to mention is that the third quarter 10-Q filing with the SEC is scheduled for Tuesday, November 12. As we talked about this morning, we've finalized a binding agreement with the bondholder group along with the various bank facilities, which will settle within the next 2 weeks. That said, when the filing happens, the 2025 bonds and various bank facilities will appear as current liabilities on the balance sheet. After the transactions close and fund, those maturities will be extended and properly reflect the long-term classification of the debt. We'll issue a press release once the transactions fund, showing the pro forma balance sheet for 9/30 with the correct classification. With that, I'll hand the call back to the operator for Q&A.

Frank Galanti analyst
#8

Frank Galanti here, filling in for Ben. I'd like to kick things off by asking about where FLNG 2 stands. What's your current thinking on the CapEx for it? Also, has it gotten every regulatory sign-off plus the financial arrangement with Mexico? And beyond that, can you shift the development schedule around in order to control cash flows?

Chris Guinta executive
#9

The order you asked about is actually flipped. So yes, we definitely can adjust timing so cash flows stay manageable. That's exactly why the CapEx you'd expect in Q3 and Q4 tied to FLNG 2 has come down. Within the contract, we have a number of distinct mechanisms covering module construction as well as civil construction, and those let us set the pace of CapEx however we choose, which matters a great deal. Turning to the second of the 3 parts, our ties with Mexico are still very robust. There was recently a change in administration there. The CFE's new leadership has restated to us their backing for this facility and for the partnership as a whole. We've expanded the gas supply we provide them in other areas of the country, in Baja. So I'd say we stay a trusted and valued partner to the CFE. As for our execution of existing — pardon me, future permits, that's still awaiting action; and as they get themselves organized over the course of — we anticipate that within roughly the next 90 days, they'll return to the normal pattern of issuing the various construction permits that would be required. Once again, nothing different from what we handled for FLNG number 1, and these ought to come through in the ordinary course. On the project's first part, look, we have — the CapEx we expect, as we set out, I believe it was Slide 24, indicates that you sort of return to full spend rates in January. So once more, that's going to be something the management team discusses, specifically regarding how quickly we wish to proceed. But these are agreements with the construction company for the modules, and you've got a contract signed — fixed-price contracts for the civil construction onshore at the Altamira facility.

Wesley Edens executive
#10

Yeah. I mean, looking at it from a commercial perspective, having FLNG 2, or potentially even 3 and so on, alongside the FLNG 1 facility that's already running — that's clearly a huge, huge piece of what we're working through as we evaluate these separate business units. I mean, if you've got additional demand downstream, which we certainly do, then being able to provide more supply in a more efficient manner over a fairly brief window could be extremely, extremely appealing to a third party. So we're aware of that since we've received plenty of inquiries on the subject, but that's definitely one of the factors that will be taken into account. Bundling those two together isn't mandatory, though there are clearly synergies from doing it — much like you see with the separate trains, Train 1, 2, 3, 4, the various liquefiers. The underlying process is the same here.

Frank Galanti analyst
#11

Okay, that's really useful. Now let's shift topics somewhat to Puerto Rico. The earlier steer was something like over 100 TBtus, together with that 80 TBtu contract across the island. Yet the latest in-depth financial report only pointed to 53 TBTUs for 2025. My understanding is that the gap came down to switching either the quarry or the Macas power plant. Is that how we should be looking at it? And could you also update us on where those power plant conversions stand, from the regulatory angle?

Wesley Edens executive
#12

Right. So — our sense was that things had paused somewhat while awaiting the elections. The elections took place. Jennyfer won the governorship. Two days ago, in her first speech, she mentions gas conversions as well as new gas-fired power being required, which matches what we've believed right from the start, the opening minute of the first day — a transcript of her remarks is available — and honestly it couldn't have aligned more closely, or been more favorable, with our own thinking. Our sense is that several extremely clear and simple gas conversions exist, and the earliest among them will be these megaGens, which we expect to come online within the next couple of days. After that come Marcellus, Kavalachi, Gary — every one of them a major diesel consumer. And essentially they wind up costing Puerto Ricans a lot of money by burning diesel rather than natural gas. With the new administration in place, my sense is that attention will return to this. As for converting those facilities, we believe it's really fairly uncomplicated. Looking at Puerto Rico in general terms, I'd say it ranks among the biggest opportunities anywhere for switching diesel over to gas. In any market we know of, it could genuinely save them billions of dollars year after year. So the business case couldn't be any stronger; and my sense is that within the next 60, 90, 120 days, you'll probably witness a great deal of activity coming out of there, and these figures will then more or less capture that. That 53 TBtus represents merely the base case for what exists right now and in no way captures what we believe the market opportunity will probably amount to over the months ahead.

Craig Shere analyst
#13

I get some of the harts points, yet looking back, the way this business has worked appears to be: put up power plants, make money from them, and hold onto import terminals further down the chain. Once we get through the rejiggering of the next few quarters, does that long-term orientation still stand? Also, do you think we might at last reach a steady, recurring, predictable mode of operations around 2026?

Wesley Edens executive
#14

I'm a bit unclear on what you're really getting at. To me, the core approach across all these markets doesn't change: you enter, you supply gas and electricity to those who require it. Clearly there are enormous shortfalls in gas access, enormous shortfalls in electricity access. That's why we've put up generation in various locations. We constructed the facility in Jamaica, for instance. We're putting up those plants in Brazil, and we also built a modest one in Mexico. Yet ultimately, what remains is remarkably straightforward in every single instance. Essentially you have a fixed quantity of gas flowing into a nation, a fixed set of customers downstream creating demand, zero exposure to commodity swings, and cash flows that are extremely steady and extend over a very long horizon — ones that can grow substantially with only a tiny bit of extra capital. Honestly, that's the ultimate prize when it comes to infrastructure investing. So these separate markets sit at differing stages of maturity, though each one is either essentially done or extremely near completion. Jamaica is done. Puerto Rico is done. Mexico is done. Nicaragua switches on in the upcoming quarter, while the Brazil projects will come online substantially across the following 9 to 18 months. All of them share quite comparable traits. There are distinctions among them, yet the striking thing they share is that each throws off very sizable cash flow. So even though we describe Jamaica as a fairly modest market compared with everything else we do, it generates more than $100 million in long-term income. Calling $100 million across 17 years small would be wrong. In our view, these holdings deserve a far, far higher valuation as infrastructure investments than the market currently assigns; we intend to go out and put that to the test, and we feel genuinely optimistic about it. Actually, by selling 1 or 2 assets, you might wind up in a position where every bit of your corporate debt is cleared and the company looks entirely different. Just offloading a single one would trigger a re-rating; so this isn't some pointless drill or a shot in the dark we're hoping works. We're pretty sure these assets will draw strong interest. There are all sorts of paths available to us, and we'll chase them down — so keep watching; that sums up the core strategy.

Craig Shere analyst
#15

Got it. And when it comes to the worth to other parties and your longer-horizon strategy for the assets you keep, do you think the Trump win could set off a fresh boom in U.S. liquefaction deals? Maybe driving market saturation, softer longer-run pricing, which would genuinely and sharply boost the worth of the downstream infrastructure you've constructed as the decade wraps up.

Wesley Edens executive
#16

Yeah. That's a quite, quite — it's a subtle point, and a genuinely strong one. I mean cheaper prices benefit buyers, and buyers are who we serve; so we can still deliver, I mean, prices are elevated, but at this moment they aren't absurdly elevated. So you can still essentially supply folks with gas and power and they're able to pay for it. But clearly, if you had a forward curve that was more normalized, like what you see today at the close of the decade, that's simply positive for buyers, and that's positive for these downstream assets. I mean our capacity utilization throughout the portfolio sits at roughly 20%. So the implication is we've spent billions of dollars putting this together, spending decades on them and so forth, and there remains plenty of capacity left; so a cheaper commodity price would surely spur greater consumption and it would work in our favor. So I do believe that — and look, politics isn't our area of expertise, but it definitely appears the LNG export ban is quite likely to be relaxed; and if freight rates normalize further, there's a thriving economy, there's likely additional LNG being produced, which on balance is a positive for the market and for us.

Chris Robertson analyst
#17

I'd like to pose something regarding today's FSRU marketplace and how your organization views certain subchartering possibilities, particularly when it comes to the Eskimo. So, in your view, which locations around the world currently offer the strongest test market chances? And in what way ought we to consider that regarding a possible increase to EBITDA down the road?

Wesley Edens executive
#18

Excellent question. We possess a fleet of FSRUs, a portion of which we operate ourselves, while a portion are in fact spare and rented out to other parties. A genuine premium still exists within the FSRU sector since demand for regas capacity is substantial, and constructing new units requires both time and capital. We have a single short-term charter expiring that we believe carries a significant discount relative to its market worth; that would represent a major victory for us. We believe additional scenarios exist too; however, the sort of concealed worth of our long-term Energos portfolio from our perspective is that we believe a considerable amount of uplift exists across a number of those assets, with FSRUs sitting at the top of that list; and we prefer to report on events that have occurred rather than project about events that might occur, yet we believe those differences are material; so the single large charter in TM shop, and I suppose a couple of years back, the Eskimos plus one more that appears on the list. Still, there ought to be solid developments to report, ideally within the very near future.

Martin Malloy analyst
#19

First off, I'd like to ask about free cash flow as we look ahead to next year. In that presentation from early September, if I recall, you put out an illustrative adjusted EBITDA of $1.3 billion for 2025; and then when you factor in your CapEx — $70 million net CapEx, as shown on Slide 24 here — should we expect free cash flow in '25 that's available for debt reduction to be north of $1 billion?

Chris Guinta executive
#20

Marty, this is Chris. I believe the way you're interpreting that earlier slide is exactly right. So next year we do have EBITDA minus maintenance CapEx and what you'd call unfunded CapEx of roughly $70 million. So we continue to talk about free cash flow. It's worth noting that because you have CapEx, free cash flow by definition will remain negative, but you do have financings that will cover the majority of that CapEx spending. So I'd agree that the way to think about it is the same as we laid out on the prior slide — EBITDA minus the unfunded CapEx, minus, clearly, debt service and taxes; and applying that methodology, my expectation is that it will be positive in 2025.

Martin Malloy analyst
#21

Alright, and up to this point there hasn't been anything mentioned on the call regarding data centers. Perhaps you could provide us with an update on that front?

Wesley Edens executive
#22

Absolutely. There's a tremendous amount happening with the assets we hold in Wyalucing; we've held quite a few discussions with all sorts of different tenants about it. One of them, I believe, fits us really well, and we're actively pursuing it. The only reason I haven't given an update is that no definitive agreement has been signed yet. We feel good about getting one done in the very near future. One thing I'd mention is that overall market sentiment and appetite for island power — meaning essentially off-grid power that supplements people's access to the grid — has increased exponentially over the last 6 to 12 months, and it's an incredibly hot topic. Take, for instance, the recent FERC ruling concerning the Amazon situation at Talon. I believe that contributes to it; we think our company's capacity to deliver power within a relatively short timeframe, in a way that's highly reliable and cost-effective, represents an extraordinary advantage for us. And we're simply — we're intensely focused on this initial site since it's something within our control. We're currently in the process of filing for permits so we can build power, secure water, construct data centers, and so forth. And I believe the economic model behind it is a compelling one. And I believe once we have our first signed contract, we'll discuss it with everyone. But we believe it's not just a very attractive stand-alone investment but from a broader perspective, it could serve as a real model for a number of others to follow. So there's more on that coming. And ideally, by the time we provide another update here, we'll have something great to share.

Wade Suki analyst
#23

Let me start with something on the operational side, if that's alright — this one's for the folks who track vessel movements. As I recall, you said the BW Pavilion was on its way to Puerto Rico, but it looks like it paused in Jamaica along with the Virgin Isles. Could you walk us through the logistics a bit, if you're willing, and explain how we should interpret some of these movements we might spot on Bloomberg or whichever other platforms we're looking at?

Wesley Edens executive
#24

Honestly, for the FLNG assets in Puerto Rico, watching ships is likely to be a fairly dull pastime, since our expectation over time is that this becomes essentially a routine loop of LNG cargoes shipped from Puerto Rico — from Altamira over to Puerto Rico. So that's the situation. Naturally, adjustments get made when cargoes need repositioning to meet customer demand; sometimes a heel has to be discharged if it's U.S. Gas and can't be delivered to Puerto Rico. All sorts of minor things come up. Still, the core logistical pattern we anticipate going forward involves vessels loading at Altamira, sailing to Puerto Rico for discharge, then coming back; that covers most of it. Over in Jamaica, we hold a long-term arrangement with Shell, a DES contract that essentially just delivers there; in Barcarena, we have additional service contracts. So the number of terminals isn't large, and the complexity isn't great. My sense is that the priority with FLNG is ensuring, first, that it operates as anticipated, which it does, which is excellent. And beyond that, the logistics are straightforward enough that plenty of options exist for shifting things around. But we're simply meeting our demand in Puerto Rico, and as the unit grows ever more productive, reliable, and available, keeping track of those logistics gets simpler and simpler. So.

Wade Suki analyst
#25

Got it. I appreciate that. And looking ahead, is it fair to figure roughly one cargo every 2 to 3 weeks or so? Does that sound about right?

Wesley Edens executive
#26

Yeah. I'd say around 20 days-ish, correct? Full capacity is roughly 18 to 20 days. I suppose we had a genuinely strong production stretch — 14 days straight at 105% with zero bricks; then we hit a downturn, a maintenance cycle to swap out a valve that had to be replaced and repaired, and that has just come back online. So production has resumed now. And what we expect at this point, based on the performance we've observed so far and how reliable it has been, is that we have very high hopes that it only gets better from here, that we add a bit more output as time goes on, and it simply keeps running. And that would be the cycle; and this last — the nuance that I sort of — since I've received this question from quite a few different people, what happens when there's wave activity or swells and loading becomes difficult. The 170,000 versus 135,000 makes a difference, in the sense that the capacity hands you roughly a 4 or 5 day window on either side, which is an enormous amount of flexibility to shift around and sort of load and do one in place of the other. So that's why the logistics path here is so straightforward, and one that is extremely dependable, which we believe is precisely what we built it for, but it's performing very well.

Wade Suki analyst
#27

Great. Thanks — if I can fit in one last thing. On SG&A specifically, there's clearly been a slight increase. Could you break that down for us a bit? And then perhaps give us your thinking on where SG&A goes from here.

Chris Guinta executive
#28

Yeah. What I'd say is that our core SG&A emphasis has now declined for three straight quarters. On the whole, this quarter's SG&A contained quite a few non-cash items, plus certain costs tied to deals we're pursuing. That's the reason we've broken out the transaction or integration costs separately. Still, looking ahead to 2025, my expectation is roughly $25 million in core SG&A, along with a modest $5 million to $10 million of cash, while any noncash costs would flow through the T&I line.

Wesley Edens executive
#29

That's fantastic. Well, I appreciate everyone joining us and for the interest you've shown in both the company and this morning's call. We're eager to share more on this with you soon. Thanks so much. Take care.

Operator operator
#30

This concludes today's call. Thank you for your participation. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete New Fortress Energy Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to New Fortress Energy Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.