Good afternoon, all. I appreciate everyone being here on today's conference call, during which we'll go over what we achieved in the first quarter of 2025. A recording of this call is being made, and a replay will be accessible in the Investors portion of our site beneath the heading Events and Presentations. In that same spot, there's a presentation we intend to go through during this call. Kindly take a look at it, since it contains key details regarding forward-looking statements as well as non-GAAP measures; having said that, I'll now turn things over to our Chairman and CEO, Wes Edens. Wes?
Okay, thank you, Matt. Hello, everyone. There's a lot to cover this afternoon, so I'll do my best to keep my remarks short. Let me begin by saying that core earnings for the quarter came in right where we expected. On the paper you have, if you check those yellow boxes, you'll notice that after Q1 of '24 — the most recent quarter we reported — when the FEMA plants were operational in Puerto Rico, we've essentially seen highly steady core earnings: $110 million, $177 million, followed by $109 million and $116 million. So that's pretty consistent with expectations. For the rest of the year, our core earnings projection aligns closely with what we've seen in the first half, with acceleration coming in the back half as we bring assets online, especially those in Brazil. That said, the EBITDA we had projected for the quarter fell short of that, purely because there were no one-off results to include. If you review our historical figures, we've typically combined core results with one-off results, and this quarter we had none of those one-offs. Even so, we anticipate EBITDA plus gains to land between $1.25 billion and $1.5 billion for the year, which exceeds our earlier guidance. We're off to a strong start on that front, especially given what happened just today. We already recorded substantial gains from our Jamaica sale, which we'll get into shortly, and there are several other items that will be meaningful events adding to our core events. But our focus is on quality over quantity when it comes to earnings — specifically, what we aim to deliver for shareholders and our constituents is repeatable, straightforward, and very long duration cash flows. I'll walk you through what the portfolio looks like, since we have plenty of those to offer. So let's turn to Page #4. Key events ahead of us. The most important one is the Jamaica sale — $1.055 billion, closed today just a few hours ago. That works out to roughly $800 million in net proceeds and a $430 million gain. So that's a solid beginning in tackling the one-off gains we plan to produce throughout the year. The FEMA claim stands at $659 million, exactly as we originally filed it. There's a very high level of engagement with the Army Corps, which is our — with our prime contractor, Weston, and significant progress is being made. We expect this claim to be resolved at some point in the near term. As with any government proceeding, it's impossible to forecast the exact timing or amount with real accuracy, but we stay optimistic about our position, since we know what we are owed. That $659 million is what that line captures. As for the FSRU sub-charters, we had several vessels sitting in our portfolio that we didn't need, so we pulled them back and leased them out again to third parties at better rates — the Eskimo, the Freeze, plus a couple of others in that group. The total nominal dollars appear on the line underneath: $143 million in profit, $59 million, $110 million at $312 million, with terms running from 3 up to 10 years. Applying a 10% discount rate, the present value comes to $236 million, just for context. These assets can either be collected month-by-month across the coming 3, 5, or 10 years, or we could pursue a sale and create a onetime gain — that's something under evaluation. Finally, the excess cargo sale we did at the end of last year, with results reported in the fourth quarter — again, looking at the prior page, that excess cargo came to $296 million. We held excess cargoes and worried the market value might drop, which proved prophetic since that's precisely what occurred; we sold them. The gain from those was really the onetime gain from last year. Another $125 million is still to be collected, mainly across '26, '27, and '28. Those are the major events for us. There are additional ones too, but ideally this provides helpful context as you assess the $1.25 billion to $1.5 billion EBITDA or gain estimates we're giving for the year. Page #5; our near-term focus has centered on asset sales, debt reduction, and deleveraging. The case study here is the sale we just closed in Jamaica. Looking at the time line underneath, you'll see we listed the property for sale in the fourth quarter of 2024; we ran our second-round bid and narrowed it down to 5 bidders in the first quarter. We opted to work exclusively with Excelerate in March, and we've now closed the sale — both the timing and the amount beat what we had forecast; we did it faster and at a higher price than originally projected. So we feel great about that. A bit on Jamaica above. This was the first market where we began conducting business, and it's a great market. We ended up generating $125 million in EBITDA, a stable, mature market with long-term contracts lasting 20 years. A significant portion of them were supplying Jamaica's gas and power needs. We supply roughly 60% of the island's gas or power. We still believe there are significant remaining growth opportunities in Jamaica for bunkering and expansion. So we feel great about the asset we sold to Excelerate, but from our standpoint, this is a meaningful deleveraging event for us. Alright, so the sale price comes to $1.055 billion, with $227 million going toward debt repayment tied to the direct Jamalco asset and the power plant, plus an estimated $50 million in fees, which leaves net proceeds of $778 million. Chris is going to get into that a bit later. Now, page #6. After the Jamaica sale, what we're aiming for is really, really straightforward. First and foremost, we want to simplify the balance sheet, and we do that by lengthening the duration so it lines up with the underlying assets while also bringing our debt costs down. To get there, our focus is on shifting away from a corporate debt structure toward something closer to asset level financing, and I'll go into that in more detail. This is an area where we've built up a lot of experience on the floor. And I'd say in many instances, once a capital structure gets too complex or too hard for people to parse, the value of the underlying assets can end up hidden behind it, and you wind up with the worst of all worlds. So what we're really zeroing in on is separating out those assets that carry the long duration, the credit quality, the repeatability that we know to be the most mixed and most valuable, putting those forward in a financing context, and delivering the right outcome from that.
If you turn to Page #7, that illustrates my point well. What we've essentially done is align the long-term supply within our portfolio alongside our FLNG unit, which is doing extremely well, and then pair two long-term agreements with Venture Global and place them next to those long-term demand contracts. I've identified the five most significant ones — there are smaller ones too, but these carry the most weight. On the supply side, you'll note we hold 215 TBtus for a 20-year term; on the demand side, this group of major contracts averages 20 years too, with ratings spanning BBB, BB+, BBB-, and B+ in one instance, yet overall these are high credit quality assets with very long duration, and these reflect their stated contract terms. Simply deduct the supply cost from the demand value, and you'll see these assets by themselves produce $500 million in yearly margin. These aren't assets we hope to build someday or ones we're merely discussing pursuing — this genuinely forms the portfolio's core. My way of viewing it: we're drawing on roughly 50% of our entire supply portfolio. Out of the 215, that means 109 TBtus is committed. Should we manage to duplicate our efforts across the remaining half under terms comparable to the first half, we could create $500 million expanding to $1 billion in yearly margin with exceptionally long duration — and that opens up enormous financing possibilities. It likewise delivers substantial shareholder value. That's where our attention lies. Page #8 shows that to complete the cycle and fund this effectively, you must command every link in the logistics chain — supply-demand, terminals, vessels, and logistics overall. Luckily, we command all of it. The four terminals pertinent here are La Paz in Mexico, Puerto Sandino in Nicaragua, Barcarena in Brazil, and San Juan in Puerto Rico. These terminals we possess, operate, and have largely built out. Beyond that, we maintain a committed fleet of terminal and transport vessels to serve both the locations and then onward to shore — linking every piece together. Therefore, combining these long-term cash flows, credit quality, and duration — especially that 20-year span — is precisely what fuels our confidence that significant opportunities exist here. There's a rationale behind Charlie Munger carrying compounding tables in his back pocket: 20 years of repeatable cash flows makes for an unbelievably potent mix. This is something we've already got, and in our view the opportunity to build on it is outstanding. So when it comes to growth, there are two areas we're concentrating on: Brazil and Puerto Rico. Here with me in New York are Leandro and Jeremy, part of our Brazil team, who lead that business for us, and they can share some background on what we've achieved as well as what we're working toward.
Thank you so much, Wes. Hello, everyone, and good afternoon. It's a pleasure to talk about how things are going and what lies ahead for us in Brazil. During the last several years, we've directed substantial strategic capital into that country, creating the basis for a business that delivers high value and withstands challenges. Following many years of committed effort and investments totaling billions, the point when our main assets begin full commercial operation is nearly here. For one of these projects — a combined-cycle power facility with 624 megawatts of capacity — we anticipate achieving COD during the latter half of this year, and the other facility, an open-cycle plant rated at 1.6 gigawatts, remains on schedule to hit COD by the middle of next year. This represents a pivotal juncture for our company. Through these investments, the business is being transformed into one holding long-term contracted assets, and everyone here is thrilled to participate in this evolution at NFE Brazil. On Slide #10 here, I'd like to draw attention to the Barcarena complex together with the long-term contracts tied to it; every one of those contracts carries inflation linkage, offers shielding against swings in gas prices, and enjoys support from solid credit ratings, which gives us steady, foreseeable cash flows for the business. Beginning with the Norsk Hydro arrangement, deliveries kicked off in March 2024 as part of a gas supply agreement running 15 years, priced off Henry Hub with an adder of $6.04 per MMBTU, and a portion of that adder gets modified annually according to U.S. CPI, exactly as this slide illustrates. Roughly 30 TBtu per year falls under this contract, with a 90% take-or-pay provision. Turning to CELBA 2, the 624-megawatt facility, we hold a 25-year PPA featuring 100% take-or-pay throughout the second semester annually, commencing at COD, which we expect to happen in the year's second semester. About 18 TBtu per year represents the gas volume involved, counting just the take-or-pay, with pricing set at 91% of JKM plus a $4.36 per MMBtu adder that likewise gets adjusted each year by U.S. CPI. Lastly, regarding PortoCem, the 1.6-gigawatt facility, we locked in a 15-year capacity agreement with the national grid, compensating us roughly $280 million for keeping the plant available, along with a dispatch component any time the plant generates electricity. If we assume a 10% dispatch rate, that works out to roughly 12 TBtus per year in extra gas demand priced at premium levels. Strong contractual pricing underpins these projects, as Wes pointed out, showing just how solid our commercial base is. I'll now turn things over to Jeremy, who will take you through the construction update.
Good afternoon, everyone. I'm happy to report a highly encouraging construction update for this quarter. Regarding the CELBA power plant we discussed previously, as Leandro mentioned earlier, that 624-megawatt combined-cycle facility — since our prior update, general progress has risen by more than 7%. At PortoCem, progress has gone up by over 15%. This puts our two plants at 95% completion for CELBA and beyond 54% for PortoCem. These significant milestones were reached even though the quarter just passed brought an extremely heavy rainy season; during a couple of those months, precipitation hit levels close to 30-year historical records. For PortoCem, largely in its civil construction stage, it was a notable accomplishment for the project team to not only hold the float and the schedule gains we have, but even push them up slightly. Returning to CELBA 2, the combined-cycle plant, at 95% we are approaching a highly significant milestone: mechanical completion. Right now we're in a very critical phase — high-pressure hydro testing. We've brought the steam system up to 96 bar on the path toward 300 bar ultimately. Another key aspect of that 95% is that it signals a shift in where effort is concentrated at the site. Reaching 95% mechanical completion essentially lets us move the primary effort away from our construction contractor and hand it to our power core provider, Mitsubishi, enabling them — following first fire, which we anticipate for the gas turbine at the end of August — to assume the main workload on site and begin producing commissioning power. On PortoCem, even though we're in a civil construction phase, we made substantial headway over the last quarter. One interesting point: if you remember the prior update, we shared images of gas turbines being transported to the site. Now, as shown in our update on Slide 11, we have photos of gas turbines installed there. In fact, two of the three turbines are already built, and we have them set up on site. The third gas turbine is due to arrive at the end of this month, and we're also currently installing two of the three electric generators. The main advantage we've drawn on to keep our schedule more than 10% ahead of the planned completion percentage at this stage is that our key equipment showed up well before the scheduled delivery dates. This removes risk from our schedule entirely and helps us preserve a 10% float in our completion plan right now. Importantly, over the past quarter since we last spoke, we've also kicked off work on our 500-KV transmission line and the substation, where our GIS is set to arrive later this year for installation. Right before I give the floor back to Leandro for the power auctions, there's one interesting point about PortoCem I want to mention. As you remember, this is a project we acquired from a different site and moved over to our Barcarena facility, and it came with certain milestones that the original project developer had fallen behind on. We've actually moved ahead on the schedule to the point where we are now completing some of the milestones the original developers had promised to regulators in Brazil, even though they had been developing it for over a year when we acquired the project. So we're looking forward to another strong quarter and will update you then.
Thanks, Jeremy. Moving on to Slide #12. I'd like to talk about how the market looks and what opportunities are coming up. Our attention will be on the capacity auction that's anticipated later in this year. To start, many of you have likely already heard that the auction initially planned for June got scrapped. In our view, that's just a short-term postponement, really. The Ministry of Mines and Energy has said openly that it anticipates the option will occur in 2025. We also anticipate that rules will bring greater clarity and fairness to the competition. Let me be clear — the fundamentals remain the same. By our estimate, Brazil continues to require contracts for 10 to 15 gigawatts of capacity. The PPAs should come with CODs ranging from 2026 to 2030, covering both brownfields and greenfield assets. Capacity payments will be offered along the lines of PortoCem, featuring 15-year terms for greenfield projects, with gas indexed to JKM and TTF. Although the auction's postponement generated some near-term noise across the country, our confidence in the structural necessity of the auction remains strong. There's no doubt Brazil requires the power. Should this action fail to occur, the system might encounter genuine operational difficulties. As NFE Brazil, we're completely ready. We're set up to register more than 2 gigawatts of projects in the auction ahead. On top of that, over 3 gigawatts of third-party projects have sought gas proposals from us, which demonstrates unmistakable market confidence and how competitive our platform is in Brazil. In summary, we foresee a route to significant expansion of our business in Brazil, backed by strong counterparties, dependable regulatory support, and growing demand for our integrated LNG to power model. Many thanks, and now I'll pass things to Wes.
Okay, thank you, Leandro. I’ll take a moment to discuss Puerto Rico, since that’s another major market for us where we’re seeing a great deal of activity. I’ll give a quick snapshot of how the energy system there is structured. It’s a highly under-invested and very outdated system that badly requires repair and substantial new investment, especially when it comes to new generation. Nothing material in terms of power plants has been constructed there over the past 30 years. As a result, the typical plant is very old, and rotating equipment simply isn’t meant to run efficiently for 40, 50, or 60 years. So the existing fleet faces numerous challenges. More than 50% of it operates on some mix of oil and diesel. If you compare that with the mainland United States, under 1% of our electricity comes from diesel. That shows you just how enormous the gap is between the utilities on the mainland and what exists there. What this tells us is that the strategy and the requirements for the energy business in Puerto Rico are, in our view, incredibly obvious. First, there isn’t enough reserve capacity, which means they require temporary power — and that’s precisely what they’ve pursued by issuing a solicitation for temporary power. Particularly given the approaching summer and the strain on the system when temperatures rise there, plus hurricane season right around the corner, there’s worry that they don’t have sufficient reserve because some plants are offline, and they’re trying to compensate by running an RFP for temporary power. Second, roughly 925 megawatts of power currently runs on diesel and could easily be switched to natural gas; that amounts to approximately a $300 million gap in fuel cost between burning diesel and burning natural gas, with zero benefit gained; so in our opinion, the RFP that’s been discussed for gas supply ought to contain a requirement to convert those to other assets as well — we list the four here. There’s the Mayaguez 200-megawatt plant, Cambalache at 240 megawatts, the 3 Pratt & Whitney mega gens located in Palo Seco, and the Aguirre 1 and 2, which is the combined-cycle facility in the south. Each of those could be converted without difficulty, and doing so costs the system relatively little while producing extremely significant reductions in their fuel cost, exceeding $300 million annually. Finally, no new power generation has been built over the last 30 years. A plant was approved by the government in early January. That marked the first new PPA signed in quite a while. We serve as the gas provider for it over the long term. So our view is that, for the most part, what will really fix the problems this system faces is essentially constructing a fresh generation. That's because the unreliability and the inefficiency we see are, to a large degree, a result of those aging power plants. And at this moment, PREPA has efforts in motion to tackle these matters — issuing RFPs for temporary power, putting out an RFP for gas supply, and issuing an RFP for new generation. All of those, in our view, represent appealing possibilities and circumstances, and we will definitely be taking a close look at them. Our infrastructure in San Juan just posted a very strong quarter. This marks the first occasion we received a large ship. Essentially, thanks to the channel widening the Army Corps has been working on, we could swap out the flotilla of somewhat smaller logistical vessels for a bigger ship, and that in fact lets us bring in more supply more efficiently — so it lowers our costs, and it also substantially boosts that terminal's capacity, which comes at a good moment. So, with that said, I'll hand things over to Chris.
Thanks, Wes. I'm glad to have this opportunity to talk with all of you today. First off, I want to share some additional specifics regarding the pair of SEC filings we turned in earlier this week. On Monday, we submitted an 8-K outlining an update on how the money from the Jamaica sale will be allocated, and I'll walk through that in a moment. Then yesterday, we handed in a notification of late filing under Rule 12b-25, which gives the company permission to submit our full form 10-Q by no later than Monday, the 19th. Two factors led to this delayed filing. First, we wanted to announce the closing of the Jamaica business sale, including explaining the use of proceeds to investors. Next, with the money from selling the Jamaica asset now received, we're able to share an improved outlook on liquidity along with a lower going concern risk—the one that showed up in the 10-K. With that, let's turn to Slide 15. We've already explained how the Jamaica deal gets handled for both cash and accounting purposes. The proceeds waterfall appears on the left-hand portion of the page, while the gain we'll book in Q2 sits on the right-hand portion. Prior to the latest change to the credit agreement, there was a rule requiring that 75% of money brought in from significant asset disposals go toward reducing super priority debt. That category covered the revolver, term loans A and B, plus the new 2029 notes. Even so, we were able to work out a deal with the lenders under the revolving credit facility: they agreed to set aside the waterfall on asset sale proceeds, and in return we paid the September amortization installment of $270 million ahead of schedule. On top of that, we reached an amendment to term loan A calling for a $55 million pay down — a fairly small amount — which is the same sum those lenders would have collected through the waterfall regardless. We also removed the debt-to-capitalization covenant from that facility, and brought its financial covenants into line with the ones in the revolving credit facility. None of these covenants get tested before September 30 of this year. Thanks to those changes, we kept close to $400 million in after-tax proceeds. That money can help address some of our nearer-term maturities, such as the 2026 notes and the non-extended revolver tranche. As a result, we have no debt maturities coming due until the second half of 2027. Over on the right side of the page, you can see the accounting gain we expect from this deal. We start with gross proceeds of $1.055 billion, subtract asset-level debt along with fees and expenses, and that brings us to net proceeds of $778 million. From there, we reduce by our basis of $177 million and by a goodwill allocation of $172 million, which produces a book gain of $430 million. I want to start by expressing a lot of gratitude to the entire team that put in relentless effort to bring the Jamaica deal to completion. That covers the people we employ directly, the advisers we bring in from outside, and our partners over at Excelerate — and we're wishing them the very best as they move forward with what is truly a remarkable asset. Now let's turn to Slide #16. I'd like to take one more moment to talk about the two FSRU contracts that we signed over the last couple of months. We told you back in December about the Eskimo being chartered to EGAS. And then earlier this week, word came out that the Freeze had been chartered to Energia 2000. Taken together, those two projects add up to approximately $200 million in earnings down the road. On top of that, we're in advanced negotiations with counterparties regarding 2 more FSRU opportunities, and those add another $100 million to the portfolio's overall value; looked at yearly, such relets could lift our cash flow by as much as about $50 million in extra EBITDA each year. Beyond that, given how strong demand is for these contracts, there's a chance to novate them or sell them off to other companies, and that would give us upfront payments we estimate at somewhere near $200 million. Once that happens, it would flow into EBITDA and naturally into earnings as well. Please turn to Slide 17, where we have our financial results. On a total segment basis, operating margin for the first quarter was $106 million, compared with $240 million in Q4 of 2024. Core SG&A for Q1 landed at $34 million, which is the same figure we reported for the fourth quarter of '24. Looking ahead to the remaining quarters of 2025, we're projecting $30 million per quarter. Adjusted EBITDA for Q1, as Wes said earlier, came to $82 million. Turning to Slide 18: under GAAP, we recorded a net loss of $200 million in Q1, equal to a loss of $0.73 per share. No significant onetime items were present, meaning adjusted EPS matched GAAP exactly. Our earnings quality this quarter was strong, as Wes already pointed out, but the quantity did not reach our initial expectations. There were a couple of things we thought would land in Q1 that look different from the numbers we're giving you now. The first is the PR incentive payment, about $110 million. Our expectation is still that we bring that in sometime during 2025, but we hadn't reached an agreement on it by the time the first quarter came to a close. The second is the charter sale involving the Eskimo vessel. Same story here — we still see it getting done in 2025, but our thinking is that putting it in the same bundle as the other charters we've already signed, along with the ones still working their way through, gives us a stronger set of contracts to offer than if we sold it by itself. And even though earnings landed under what we'd projected, our liquidity is still in good shape. We closed Q1 with $448 million in cash on hand and $275 million available through our revolving credit facility. On top of that, add the $393 million in cash proceeds following debt pay down, and that leaves you with more than $1.1 billion in pro forma liquidity as of the end of Q1. With that, I appreciate everyone's time. I'll hand the call back to the operator for Q&A.
Chris, thanks for detailing the liquidity, the cash, and the injection following the Jamaica sale. What I was hoping is that you might take us through — obviously, there's a substantial amount of restricted cash sitting on the balance sheet. Could you perhaps indicate — is that restricted specifically against particular projects? And which kinds of obstacles exist that might unlock that cash so it becomes unrestricted?
Greg, the brief response is that nearly all of it ties to the CapEx in Brazil. So that's restricted cash, which means it can only be used on the two projects still being built, the CELBA power plant and the PortoCem power plant. The rest, likely somewhere in the range of $40 million to $50 million, is restricted in connection with other credit instruments we hold within the business, and some of that will be released because of this Jamaica transaction, roughly $30 million of it. The remaining portion would remain restricted simply because, again, it serves as collateral for other sorts of credit support enhancement — credit enhancement on additional instruments throughout the business.
Okay, that's really useful. And when we take a look — when we take a look at the capital structure and a few of those debt instruments, they're trading below par. You hinted that you might try to refinance that once the Jamaica deal closes. But considering the cash sitting on the balance sheet and running the math, is the company considering possibly doing open market buybacks of some of that debt, just to be a bit more opportunistic?
We definitely examine the capital structure. We believe there are some meaningful opportunities that come out of it. I think the — I mentioned the asset level debt, and perhaps I should expand on that briefly, because it will be useful for this. The capital structure utilized for liquefaction typically, when people construct a liquefier, they sign a series of SPAs. It's largely a wholesaling approach of selling gas to others. The margin in that business is fairly thin, yet the credit quality and the duration are extremely long and extremely strong, so they can create substantial financing capacity in doing so. In our situation, we also hold a portfolio of gas, both from our own liquefier and from some other sources. Our blended cost for that gas is approximately Henry Hub plus 2 50. Our margin across the assets I listed is around $4.50. So that's $500 million of financeable cash flow that is currently embedded in our capital structure, yet when we bring that into a 20-year duration transaction and simply run the math, it can refinance a large portion of the balance sheet, possibly all of it. And so from where we stand today, we believe now is the right moment to truly concentrate on this. Clearly, a great deal of the company's attention went to the Jamaica sale, but that is finished. And this will be the following step. And within that context, the aim would be to refinance the entire corporate balance sheet over roughly the coming 12 months. And in doing so, if we succeed, we'll clearly repay all the debt. And as we begin repaying it, we'll examine opportunities perhaps to retire at a discount if there are still bonds available at a discount. So that's how the process works. We believe that reducing our debt load via the divestiture we recently completed, which brought in significant liquidity and resolved our liquidity challenges—now we're sitting at more than $1 billion in liquidity—makes us feel excellent about what that deal has achieved for us. The power plant in Brazil is almost finished, since we hold assets that are highly financeable, with exceptionally strong quality and extremely long-term cash flows. The moment has arrived to refinance at a dramatically cheaper cost. Lengthen the maturities so they align with the lifespan of the cash flows underneath; after that, we believe that, given the enhancement of our capital structure, the loan will genuinely deliver a considerable advantage to us; plus we still possess plenty of untapped capacity. Thus, we have drawn on merely around 50% of the volumes within our portfolio that we control. Consequently, if we manage to recapitalize the balance sheet successfully, reduce expenses, and extend maturities, and afterward expand as we anticipate doing in Brazil and Puerto Rico and elsewhere, every bit of that expansion would ultimately flow to the shareholders' gain; therefore, those are the upcoming two phases we truly foresee. So the initial phase was a divestiture, and at present it's a recapitalization refinance, and following that will come growth. These constitute the main elements of what we believe is necessary to achieve genuine success. So pardon me for providing a lengthy response to a brief question, but that's the background that I hope will be somewhat clearer.
Wes, I wanted to ask whether you might spend a moment discussing the near-term power chance in Puerto Rico. Whenever companies submit bids in that process, does that cover equipment, or equipment along with fuel? And what approach is NFE pursuing here regarding whether you're putting in bids to supply equipment or merely fuel? Or what does that process look like?
All I can do is speak to whatever I've seen via the portal, since a government body runs this process, and thus they're pretty strict about the way they answer requests and hand over details. The guidelines were pretty explicit that what they wanted was a single all-in cost for power over a given period. So you can't really just put in a bid for turbines alone. We in fact posed that exact question inside the RFP questionnaire on the portal. The 2 questions we raised were whether you were permitted to submit a bid for equipment as opposed to one combined power price, that's number 1. And number 2, whether there was a guaranteed minimum dispatch we might count on so we'd know how much power would be produced, which would let us crunch the figures more easily. And the reply was that no, nothing was guaranteed as a minimum; therefore the RFP's demands were pretty tough. As far as we're concerned, we're fortunate to run a large operation on the island, which means we can leverage the infrastructure already sitting there, and that's essentially the situation. And I'd say among the 3 opportunities I laid out — the emergency power, the gas contract, and the long-term generation — each might prove appealing given the right conditions. Still, I'd note the emergency power is likely the least appealing purely on economics, because of its fairly brief duration and the absence of any sort of commitment regarding its utility.
Okay, got it. Moving on to my follow-up, and I think this one's directed at Leandro. About CELBA — that figure of 18 TBtu each year, would it be reasonable to think of it as leaning more heavily toward the later part of the year on a seasonal basis? Or is it more the case that it's distributed uniformly across each of the 4 quarters? Also, I just want to confirm one thing from Slide 10: there's no fixed payment for capacity attached to it, right — it's purely the 100% take-or-pay arrangement on the volumes?
Yes. Chris, the power plants do receive a capacity payment. The amount is roughly $25 million annually. However, our largest inflow arrives during the latter half of the year, tied to output and connected to the 18 TBtu of gas referenced on the slide. So while we received certain payments across the year, the bulk of what the plants owe us comes due in that second half, when power generation must occur.
Following up on that — I believe this ties back to what Greg asked, and I want to confirm I understood everyone properly. Regarding divestitures, my recollection is that you initially set a target around $2 billion, though my memory often lets me down; still, it's obvious Jamaica removes a great deal of risk — a substantial chunk of that figure. Is there anything remaining that you could walk us through?
You raised the topic of additional divestitures. What I'd say is that, looking at the business — we have a fantastic operation in Brazil, as the team has mentioned, and that opens up plenty of possibilities for us. Then there's Pacific Theater, which functions as a distinct business of its own across Nicaragua and Mexico. That said, I think that even without divestitures, the idea Wes raised — being able to carry out sizable securitization-style deals — would let us refinance what we owe at a much lower cost. Honestly, Wade, that's what we're really after.
Got it. Thanks for that. Let me shift topics slightly. I noticed that FLNG 2 wasn't mentioned — wasn't shown in the presentation. Could you provide an update on where things stand?
Absolutely. Right. Not much has changed during roughly the past 60 days regarding FLNG #2. What I mean is, it's still being built at the Kiewit yard. Our attention has clearly been on completing the Jamaica transaction and on the business refinancing, so that we're certain of having plenty of liquidity and headroom, if you will, for everyday operations; we're very fond of this project. We remain involved with it alongside the folks in Corpus and in Mexico, and further updates will come as construction reaches more significant milestones.
Regarding Nicaragua, I was just hoping for an update.
Sure. On Nicaragua, we're at the last phase of reworking the PPA we hold with the government. We generated plenty of useful ideas around it. Essentially, our goal is to build a framework that most closely mirrors the CELBA arrangement and Puerto Rico's long-term gas contracts. So you've got a capacity payment structured to cover our costs. Then there's the marginal gas cost, which we believe captures the credit's value, more or less. Take Norsk Hydro, an investment-grade credit — that's Henry Hub plus 6. CFE, a BBB- credit, sits at Henry Hub plus 7 45. Our aim is to land at a modest premium over that, which would reflect Nicaragua's lower credit quality. So once the contract's final agreement is reached, we'll wrap up whatever work is left. As for the power plant, it's essentially 100% complete. The terminal requires somewhat more time and effort, though we are extremely close to finishing. So all that remains is to lock in our agreement so we can proceed.
Regarding Slide 7 — clearly, Plaquemines and particularly CP2 volumes won't be arriving for quite a while. How do you see covering LNG supply requirements from today until the Venture Global SPAs begin?
At this moment we're in a really strong position, since we hold the FLNG volumes. As things stand, that facility is running essentially at the cold box's nameplate capacity; a couple of weeks from now we have an outage scheduled, and we expect it to deliver a meaningful improvement over that level; so performance is already quite steady, dependable, and at a solid level. We also believe there's considerable upside tied to that planned outage along with debottlenecking work. Our projection is that this lands at 90 TBtus. Looking at the volumes we currently hold, the only ones required in Brazil this year are really the Norsk Hydro ones. When we get to the back half of next year, the CELBA plant takes over. For Puerto Rico, the big gas contracts we executed earlier in the year are scheduled to start up in 2028. So when we survey the whole portfolio, the requirements are in fact pretty well balanced, moving forward one step at a time; and should we add those lines thanks to success in Brazil, Puerto Rico, or some other place, we can at any point bring in volumes to handle that; but our net position stands at 215 against the long-term figure of 109. Naturally, certain near-term volumes within that could get displaced should we succeed on some of these longer-dated items; even so, we're sitting in a very favorable spot regarding our gas requirements and the gas we're using at that point. So in fact — it aligns nicely with the timing of these upcoming developments.
Understood. For several months or quarters now, you've discussed the major opportunities tied to both the Puerto Rico RFP and the Brazil capacity auction coming in June and the second half of this year. Clearly, you hold some competitive infrastructure advantages. Do you think that some of the chatter regarding liquidity and the balance sheet might influence how regulators make any of those decisions? Or, given your entrenched position and the clear virtuous cycle of favorable awards across the entire business, do you figure that makes it essentially a moot point?
Well, I'd say we have a highly viable business. We've got a billion dollars sitting on our balance sheet. The assets we own are substantial — not only do they cost a lot to construct, they also take a huge amount of time to complete. So in those nations, we believe our competitive position was achieved through hard work. A number of years back, we made the decision to develop the core infrastructure needed to deliver it there. That being said, we don't operate as a monopoly in any situation, and having monopoly status isn't our objective. We aren't subject to monopoly-style regulation. That's simply not what we're aiming for. As for Puerto Rico, my understanding is that we provide less than half of the fuel consumed on the island right now. Ecoelectrica, located in the southern part, therefore possesses considerable gas capabilities. Our position in San Juan is extremely strong, and we built it that way intentionally. We invested hundreds of millions of dollars into developing our product in that market—something anyone else was equally free to do, or could have done—in order to secure that advantage. That said, there is nothing monopolistic about how we operate. We believe our positioning is solid. And what we anticipated would unfold across these countries appears, for the most part, to be happening. Obviously, we were not pleased when Brazil's auctions got pushed back, though the causes were beyond our control. And as Leandro pointed out, while the country's requirements may have diminished, they actually grew larger over that stretch. So our confidence in those auctions remains high. There's a really strong resource we have in the south, and we believe it will be key to those auctions once they happen. As for Puerto Rico, given the need for both short-term and long-term generation, we expect that having gas available in San Juan will turn out to be quite beneficial. Naturally, we'll have to determine whether we can accomplish that at rates that make economic sense, and then proceed from there. Still, our sense is that the competitive position is genuinely strong. The key thing is that once you break things down and examine what sits beneath those figures, and you consider the properties in our portfolio, those 20-year duration assets — which are mostly near investment grade — are producing $0.5 billion of cash flow. That's a strong position to be in. It's our view that our valuation doesn't come close to capturing that at all. So our plan is to fund this on a long-term basis, fix up the capital structure so its duration lines up with what we hold on the asset side, and then proceed from there. And should things go our way, through the hard work of our team and our folks out in the field, we can grow it further with additional long-term offtake and consume some of that spare capacity we're holding on the spot side. We believe there's enormous upside on both the debt and the equity side; so that's the strategy. The last thing I want to bring up is securitization. Over the course of our careers, we've completed securitizations or structured financings involving a wide range of products. As far as how hard this one is, looking only at the Brazilian assets, two of them involve direct obligations — one from the Brazilian government, and the other from Norsk Hydro. That gives you counterparties at BB+ and BBB, with clearly defined cash flows that have no variability and run out 15 and 25 years. That doesn't seem like the most difficult thing to accomplish; the contracts are all denominated in U.S. dollars. That's the thing we're going to pour all our attention into. If we can pull that off, it opens a real chance to turn to our capital structure and make some meaningful progress on that front. So that's what the summer holds for us, and we'll see where it lands.
Could you help us get a clearer view of the liquidity situation, especially how you're looking at gross CapEx requirements for the rest of this year? You clearly have a lot of restricted cash and liquidity laid out, but we'd really like to know how much still needs to be spent.
Sure. Let's begin with Brazil. The remaining CapEx for CELBA and PortoCem is completely covered by cash on the balance sheet under the restricted cash line. So that's already taken care of. It will be spread across this year and roughly the first 6, maybe 9 months overall, since some payment lag will extend past COD in 2026 for PortoCem. After PortoCem, there's very little CapEx left to spend. As you know, FLNG 1 is now in service. There's no further spending in Mexico or really in Puerto Rico until conversions happen, and whatever CapEx those conversions require, we expect PREPA to cover. That basically leaves Nicaragua, and as we've said before, the amount still to be spent there is roughly $50 million to $60 million. The remainder is FLNG 2. With FLNG 2, I'd say we control the pacing and how it rolls out. As I said earlier, we intend to be highly disciplined with cash right now so we can make sure we're addressing all near-term maturities; once those are handled or we complete refinancings, as Wes just mentioned, we would then proceed at a faster pace on developing the FLNG 2 CapEx.
Also, the part where you explained the changes to the revolver's covenants and term loan A's was really useful. But can we reasonably think that the asset sale provisions on the 12 and on term loan B probably won't come into play, considering how much capital you're putting to work?
I'm not certain I got what you're asking. Are you referring to the reinvestment rates?
Yeah. So when it comes to having to pay those down early, you're doing it without money from selling assets?
Right, asset sale proceeds aren't what we're using to pay those off. There's cash sitting on the balance sheet, plus cash flows generated by our operations, and those are available to us for refinancing, should we choose to, or for settling any of the other instruments.
Alright, that’s all from us. Thanks so much, everybody. We’re looking forward to speaking with you again in the next quarter. Thank you.
Thank you.
And this concludes today's call. Thank you for your participation. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete New Fortress Energy Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to New Fortress Energy Inc. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.