Home / Transcripts / Pan American Silver Corp. (PAAS) · May 6, 2026

Pan American Silver Corp. (PAAS) Earnings Call Transcript

May 6, 2026

Toronto Stock Exchange CA Materials Metals and Mining earnings 33 min

Earnings Call Speaker Segments

Operator operator
#1

We appreciate everyone joining us today. I'm the conference operator, and this is the Pan American Silver call covering first quarter 2026 results. Please note that everyone is connected in listen-only mode and that we are recording this conference. Following the presentation, you'll have a chance to pose questions. If you'd like to enter the question queue, press star followed by one on your phone's keypad, and a tone will confirm your request. If you require help at any point during this call, signal an operator by pressing star, then zero. At this time, I'll hand the conference over to Siren Fisekci, Vice President Investor Relations. Ms. Fisekci, please go ahead.

Siren Fisekci executive
#2

We appreciate you being with us on today's Pan American Silver conference call and webcast, where we'll go over the results for the first quarter of 2026. On this call we'll be making forward-looking statements and sharing information, and we'll also reference non-GAAP measures. For the cautionary statements, please refer to our MD&A, the Q1 news release, the shareholder return framework news release, and the presentation slides covering the period that ended March 31st, 2026 — every one of those documents can be found on our website. At this point I'll hand things over to Pan American's President and CEO, Michael Steinmann.

Michael Steinmann executive
#3

Good morning, everyone, and thanks for being with us today. I'm happy to share that we've had another solid quarter of operating performance, with strong operating earnings. Attributable silver production came in at 6.4 million ounces and attributable gold production at 169,000 ounces, both in line with our outlook. All-in sustaining costs for the silver segment were $6.63 per ounce, well below guidance, while all-in sustaining costs for the gold segment were $1,851 per ounce, consistent with expectations. The silver segment cost performance was driven by low-cost ounces contributed by Juanicipio and by the impact of higher gold prices. Revenue of $1.2 billion was affected by the buildup of approximately 644,000 ounces of silver in inventory, primarily at La Colorada, due to the timing of concentrate shipments. Net earnings were $456 million, or $1.08 per share, and adjusted earnings were $1.09 per share. We continue to generate strong levels of free cash flow, reflecting both our operating performance and favorable metal prices. In the first quarter, we generated $488 million of attributable free cash flow. This has further strengthened our balance sheet, and we ended Q1 with a record cash and short-term investment balance of over $1.8 billion, including cash attributable to our interest in Juanicipio.

Michael Steinmann executive
#4

Our strong free cash flow generation and balance sheet have made it possible for us to roll out an improved framework for returning capital to shareholders. Under this new framework, we target returning 35% to 40% of annual attributable free cash flow to shareholders, combining dividends and common share repurchases through our normal course issuer bid of up to $1 billion. For 2026, we expect to pay aggregate dividends of approximately $305 million, which works out to a quarterly dividend of 18 cents per common share based on the current share count, and to use approximately $700 million for share repurchases. By stepping up share repurchases, we aim to enhance long-term per share value by giving each shareholder greater exposure to our high-quality portfolio and supporting sustainable growth in dividends over time. This enhanced shareholder return framework reinforces our disciplined approach to capital allocation while maintaining sufficient cash for growth and M&A activities, while providing resilient shareholder returns across commodity cycles. Turning to growth, the release of the revised PEA of the La Colorada expansion in March provides greater clarity on the capital requirements and long-term potential of this important organic growth project. The expansion is expected to produce an average of 19.1 million ounces of silver annually during the peak 5 years following construction and ramp-up.

Michael Steinmann executive
#5

The updated PEA marks a very substantial step up from the study we originally released — better grades, less capital intensity, stronger returns across the board, and lower technical risk now that we've settled on a conventional long-hole open stope mining approach. Continued exploration success drove this improvement, having outlined new high-grade veins to the east of where we currently mine. Drilling is still hitting mineralization outside today's resources, which points to room for further growth in the resource base and a chance to push peak production out further. The board signed off on $265 million of project capital across the next 5 years to fund a ramp that will give us access to the skarn mineralization. For 2026, we now anticipate spending $92 to $95 million on the La Colorada skarn project, which lifts our consolidated 2026 project capital guidance to $240 to $255 million. At Jacobina, our optimization project is moving forward as well. In Q1 we finished building two new carbon-in-pulp tanks and made improvements to the tailings pump system. A major opportunity we see at Jacobina involves simplifying and optimizing the process plant flowsheet. Conceptual engineering is almost done, and next month we'll move into basic engineering. We also anticipate detailed engineering within the coming month for a filtration plant, a filtered tailings stack, and a temporary mine paste backfill plant.

Michael Steinmann executive
#6

Regarding Escobal, Guatemala's government is carrying on with the ILO 169 consultation, and there has been continuous engagement, which includes recent visits to the site to examine care and maintenance work and to verify adherence to the suspension ordered by the court. Right now, no timeline exists for wrapping up the Escobal ILO 169 consultation, nor for operations at the mine to restart. Because our operating performance in the first quarter was strong, we are keeping our full-year outlook unchanged for production, all-in sustaining costs, and sustaining capital. Some gold production is expected to move into the fourth quarter of 2026. We are watching for possible cost pressures, especially those tied to fuel prices. Since most of our mines are underground, our direct exposure to fuel is fairly limited — roughly 5% of total operating costs. Rising fuel prices can create wider inflationary effects, including on labor and consumables. We stay focused on handling these pressures proactively. To sum up, 2026 has begun very well. We posted another strong quarter. We are producing robust free cash flow. Production and costs are consistent with our guidance, and we have rolled out an enhanced shareholder return framework that mirrors this strong cash generation. With that, I'll hand the call over for questions.

Operator operator
#7

Thanks. We’ll start the question-and-answer portion now. To get into the queue for questions, press star followed by one on your phone’s keypad. A tone will confirm that your request has been received. If you’re on a speakerphone, lift your handset before you press any keys. To take your question back out, press star, then two. Our first question comes from Fahad Tariq at Jefferies. Go ahead, please.

Fahad Tariq analyst
#8

Hello, and thank you for taking my question. You just brought up how more expensive diesel could affect consumables and labor. Could you perhaps say whether you have begun to notice any consumable prices rising, or anything you are hearing from your suppliers? Thanks.

Michael Steinmann executive
#9

Scott, could you handle that question, please?

Scott Campbell executive
#10

Morning. No, not to any meaningful degree. There have been some upticks in geosynthetics expenses, along with quite small ones for getting staff to and from sites, where higher fuel prices have been handed through to us — yet nothing material across any part of our operations.

Fahad Tariq analyst
#11

Thanks. Perhaps just one more from me. Regarding the silver segment’s ASIC, which came in very low this quarter, partly due to byproduct credits at Cerro Moro, could you discuss how it would need to trend considerably higher to reach the full-year guidance? Maybe just explain how that will happen, and whether ASIC could potentially come in below the guidance range? Thanks.

Michael Steinmann executive
#12

Yes, thanks, and it was indeed a strong quarter on silver costs, as you noted. The main driver, I think, is quite evident: Juanicipio, with its robust output. If you remember, one of the appealing aspects of that mine was the combination of solid silver production at Juanicipio and extremely low costs. Then, as you pointed out, Cerro Moro's byproduct credits have been very robust this quarter. Well, this is just one quarter into the year. We will clearly revisit things at midyear to see whether cost guidance needs updating. After a single quarter, we opted simply to keep it unchanged. A very good beginning to the year on the cost front, no question.

Fahad Tariq analyst
#13

That's great, thanks a lot.

Michael Steinmann executive
#14

I appreciate that.

Operator operator
#15

Our next question comes from Ovais Habib at Scotiabank. Please proceed.

Ovais Habib analyst
#16

Thanks, operator. Hello, Michael, and hello to everyone on the Pan American team. Congratulations once more on a strong quarter, particularly regarding the costs in the silver segment. The shareholders' return program was also a pleasant positive surprise, so it was great to see that. I have a couple of questions, and perhaps I'll begin with Juanicipio. Over the last couple of quarters, Juanicipio has consistently demonstrated some positive grade reconciliation. How do you see that grade taking shape as the year goes on, and then how should we view things as we move further into the future?

Michael Steinmann executive
#17

Yeah. I'll begin, and then the technical team will provide a bit more detail on that. Absolutely. Look, we've observed this strong outperformance at Juanicipio across many quarters, even prior to our acquisition of the asset. It's a great mine, as you know. I think one of the primary reasons is that we find additional tonnes higher up with better grades. Just to remind you, these systems are very similar to what we see at La Colorada. Very high-grade silver, some gold, high-grade gold closer to surface. The deeper you go in the mine, the deeper and higher grade you get into base metals. That's why, like at La Colorada, and the same will hold true for Juanicipio when you conduct exploration, you discover additional veins, you blend those in and you start mining higher up again, you bring in higher silver grades. That's kind of the system. That's the geology of all these systems in that silver belt of Mexico. Same for Juanicipio. As I said, the main structure, the grade will go into more base metals, more zinc and lead rates when you go deeper down. As you see, very strong outperformance on the silver side up to now.

Michael Steinmann executive
#18

At some point, obviously, I think we'll see that decline show up — a decline just on silver. As I said, base metals are up very strongly. Right now we're benefiting from these high grades. That's why, I think, the decrease will be quite a bit slower than we probably anticipated.

Ovais Habib analyst
#19

Appreciate that, Michael. Perhaps we can shift over to La Colorada for a moment. About the PEA you announced — clearly, quite a bit of drilling wasn't included in it, and you had outlined some very high-grade results along with good structures. Do you anticipate putting out some form of updated study that brings in those results, and/or any optimization work you've had going on behind the scenes, over the coming couple of quarters?

Michael Steinmann executive
#20

Absolutely. We’ll provide those exploration updates, and then obviously we’ll incorporate this data into our midyear reserve and resource update, which we typically publish sometime in August. At that point you’ll get a fresh sense of how things stand. As you said, left out — we didn’t truly leave them out. It’s simply that producing an updated PEA along with the entire mine plan and all of that is a great deal of work, while our geologists are highly enthusiastic about that project and continue drilling extensively and generating lots of data. There’s always a fairly lengthy — I wouldn’t call it a lag, but a backlog of data that arrives somewhat later. That will keep happening, since we have many drill rigs operating at La Colorada, and new data will be coming in constantly. Once again, we’ll release updated exploration results and then fold that into our revised reserve and resource estimate.

Ovais Habib analyst
#21

All right, wonderful. I appreciate that.

Michael Steinmann executive
#22

Ovais, Steve would like to add a few further remarks on that.

Steven Busby executive
#23

Yeah, sorry about that, Ovais. This is Steve Busby. I just want to add that we’re going to push back the next report on a PFS update, since our schedule for this initial development of the ramp and eventually the shaft is so long. Those are sort of taking priority over the development schedule. We want to get those early works projects underway and moving forward, and after that we’ll go back and begin doing additional engineering and such for the plant and surface infrastructure. As Michael says, we’ll update resources along the way, but we won’t be coming out with a new mine plan right now for a couple more years, at least.

Michael Steinmann executive
#24

Adding to that — Ovais, you likely noticed in the press release that the board has approved the first tranche of capital for the La Colorada skarn. For us, that's a terrific milestone on a project that's truly, truly significant and large. La Colorada is going to rank among the biggest and lowest-cost silver mines anywhere in the world. We've given the green light to an initial $265 million so we can push a ramp down from the existing mine toward the skarn. Constructing that ramp is roughly a 5-year undertaking. As you'd expect, the ground and conditions are ones we know extremely well. We drive plenty of ramps, yet this one will be quite special for us, since it will reach the shaft and represents the first major piece of capital spending on the La Colorada skarn project. Getting it underway mattered because, so to speak, this is really one of the slowest parts of the puzzle when it comes to putting everything together. As Steve mentioned, there's ample time afterward for building the new plant and the surface infrastructure.

Ovais Habib analyst
#25

Great. Appreciate the detail from both Michael and Steve on that. I have nothing further, and I’m eager to be there for the site visit in early June. Thank you.

Michael Steinmann executive
#26

Thanks, Ovais.

Operator operator
#27

Cosmos Chiu from CIBC has the next question. You can go ahead.

Cosmos Chiu analyst
#28

Thanks, Michael and team, and congratulations on a strong start to 2026. Perhaps on skarn once more — good to see that you've committed $265 million for the initial internal ramp. Could you remind us about the dimensions of that internal ramp? Will it be sufficient for production? Will it eventually be used for production, or will most of the hoisting come from the east hoisting shaft? Could you perhaps help us picture how this will eventually work?

Martin Wafforn executive
#29

Okay, Cosmos — Martin Wafforn here. The decline we're driving measures 5.5 meters by 6 meters. It's a large decline, and the aim is to accommodate big trucks, roughly 50-tonne capacity trucks. Those will be used to haul up to the 588 level. After that, other trucks will handle the waste we generate. In fact, it's 12.4 kilometers of development that we'll carry out over the next 5 years. All of that will travel up to surface through the other decline. Over the long term, all our production will go up the east production shaft. That's the plan. We'll also have this ramp available.

Michael Steinmann executive
#30

As I mentioned, our long-term plan involves using that shaft to hoist the ore up to surface.

Cosmos Chiu analyst
#31

Thanks. And then on the other piece of capital that's being returned, Michael, as you said, it's good to see this new, enhanced framework for shareholder returns is now in place. So my question is: when we're trying to work out how many shares you might repurchase each quarter, is it that simple? For instance, in Q1 you produced $488 million of free cash flow. As a rough estimate, could I take that figure, multiply it by 35 or 40%, and then subtract what you'd typically distribute each quarter, to get to how many shares you might buy? Obviously it will depend on where Pan American Silver's share price is, but is that roughly how we should think about execution under that framework?

Michael Steinmann executive
#32

Okay, so what we’ve announced is a return of as much as a billion dollars. Part of that comes through the dividend. The dividend is essentially set at a fixed total of $305 million for the year. As we repurchase shares, the dividend return per share will rise gradually and modestly because more buybacks are in place. That’s another interesting element added to our capital return framework. We reviewed our past returns. Naturally, we raised the dividend three times during the last quarter, but our cash flow generation is so strong at present, and with the major projects we’re constructing, there is sufficient capital for all of our growth as well. You likely noticed we already hold roughly $1.8 billion across cash and short-term investments. The board thinks we can return as much as a billion dollars. Obviously, I believe that too. We are squarely on track for it. That’s essentially the plan. How many shares are we able to buy? As you mentioned, that will hinge on the share price. We will genuinely strive to reach that billion-dollar return this year.

Cosmos Chiu analyst
#33

Thanks, Michael — good to hear from you. So, following up on that, I noticed that during Q1 you didn't use very much of it. You repurchased roughly 460,000 common shares in Q1, and that isn't much, considering that to reach some of those figures you just referenced, you'd probably need to repurchase something like 10 million shares over the remainder of 2026. So my question is: why weren't more shares repurchased in Q1? Was it because of a level related to where you were trading, as you noted in the press release, with share buybacks at $54.04 a share in Q1, or was it simply because, in Q1, this enhanced shareholder return framework wasn't in place just yet?

Michael Steinmann executive
#34

It really came down to two things: the framework hadn't been established yet, and — this part matters — remember that we released the updated PEA, and for a good stretch we were in a blackout period, so we genuinely couldn't buy back shares during that time, until all of that information was public. The moment that occurred, we began repurchasing shares. That explains the delay you saw. As you'd expect, we're going to ramp up those buybacks quite aggressively from here in order to reach that billion-dollar total return for this year.

Cosmos Chiu analyst
#35

Absolutely. Perhaps one final question. In that same press release, you mentioned additional projects, among them the Timmins project and the extension of the Bell Creek shaft. Those didn't receive much attention, but I believe they could matter. If possible, could you say a bit about that, and also about some of the exploration opportunities you referenced for that area?

Michael Steinmann executive
#36

Sure, that matters a lot. A press release only has a limited amount of space, after all. During our Investor Day, we'll naturally provide plenty of specifics on that. It's really exciting to sink the shaft and thereby add a great many years of future production at Timmins. Martin, perhaps you'd like to share some additional detail with us regarding the shaft extension?

Martin Wafforn executive
#37

Certainly. This is a fantastic project, and honestly, we're very pleased to see it made public. What we're doing is lengthening the shaft by an additional 625 meters, taking it from the present 1080 level down to 1705. Development will rely on Alimak raises — we'll come in and Alimak upward from two levels as we progress. The total investment comes to $131 million, and this lets us keep extending Bell Creek well into 2040 — in fact, based on how reserves play out, we currently believe it goes well past 2040. For the economics of the shaft extension, we used 2046. It's an exciting project. It should also assist with haulage costs, since at the moment we're mining a fair distance below the ramp. That will therefore help us on the cost side.

Cosmos Chiu analyst
#38

Good to hear that. I’m with you, Michael—the press release simply didn’t have sufficient space. That’s exactly why folks like me end up asking questions. Congratulations once more, Michael, Martin, and the whole team, and thank you for taking all of my questions. I’ll share the news.

Michael Steinmann executive
#39

Much appreciated, Cosmos.

Operator operator
#40

Geoffrey Hulme from Ingalls & Snyder has the next question. The floor is yours.

Geoffrey Hulme analyst
#41

Oh, my apologies. At this moment, I don’t have a question.

Operator operator
#42

If you'd like to ask something, just hit star followed by one again. Our following question comes from Don DeMarco at National Bank Financial. Go right ahead.

Don DeMarco analyst
#43

Thank you, operator. Good morning to you, Michael, and to the team. I appreciate your taking my question. Perhaps I could just pick up where the discussion about the skarn left off — naturally, we saw the board give its approval to the 12-kilometer decline across 5 years. Is that a formal go-ahead for the project, or would that instead be something we might look for following the PFS update that was mentioned, perhaps a couple of years from now?

Michael Steinmann executive
#44

See, this is a project that calls for a good number of years, but without question this marks the beginning of our skarn development. It isn't merely an exploration ramp going down to check what that skarn looks like. Clearly we hold a great deal of information. We have drilled on the skarn since 2018, when we made the discovery. You just heard Martin mention that we're driving a ramp of 5.5 by 6.5 meters, which will accommodate 50-tonne trucks. Without question this is the first spend on a great project and a great, big mine that we're going to build here for Pan American.

Don DeMarco analyst
#45

Alright. Naturally, the updated PEA was released a couple of months back, and it indicated capital expenditure of $1.9 billion. Could you just refresh our memory — I believe at this stage you were saying this would be financed entirely within Pan American. Is that correct?

Michael Steinmann executive
#46

You've got that right. Like I mentioned, we're currently sitting at $1.8 billion in cash and short-term investments. Naturally, a substantial amount of cash flow will be coming through in the quarters and years ahead as we build out this asset. We have ample resources on hand to finance this project while also continuing to return capital to our shareholders.

Don DeMarco analyst
#47

I suppose that leads nicely into what I wanted to ask next. The shareholder return program comes at a good moment. It's a genuine increase in share buybacks, and it lines up with a discounted valuation. I notice it's weighted toward buybacks. That's fairly typical for the sector. Could you share how you arrived at the split between shares and dividend amounts?

Michael Steinmann executive
#48

Looking back at what we've done historically with buybacks and dividends, we returned roughly mid-30% of free cash flow to shareholders, and that was probably weighted more toward dividends. Now we've hit such a high level of cash flow, and as I mentioned, we've raised the dividend three times over the last three quarters. At this point, all of us believe that a robust share repurchase program is a better, stronger way to deploy our cash and return value to shareholders than simply raising the dividend again and again. I think it's a great mix. Yesterday, when we approved the billion-dollar return to shareholders, I think it was a great day.

Don DeMarco analyst
#49

Alright, that covers everything from my side. Thanks once more, Michael, and I wish you the best for the remainder of the quarter.

Michael Steinmann executive
#50

I appreciate it.

Operator operator
#51

Our next question comes from John Tumazos at John Tumazos Very Independent Research. Please proceed.

John Tumazos analyst
#52

Thanks a lot, and congratulations on all that cash and the positive developments. With the revised skarn PEA, capital expenditure dropped by roughly a billion dollars in upfront capital. Could you walk us through the subzones of the skarn where I'm assuming the updated PEA is tapping into a higher grade, perhaps a shallower portion of the skarn that requires less capital and generates more revenue, maybe it's lower temperature, maybe it needs somewhat less ventilation — my impression is that certain areas of the skarn are richer and easier than others?

Michael Steinmann executive
#53

Yes. Thanks for the question, John. Absolutely, you're right. The big reduction in capital between the two PEAs came down to the fact that, at first, this was a much, much larger sublevel caving project. Keep in mind, early on, we were looking at as much as 50,000 tonnes per day. Over the years that followed, we kept finding more and more high-grade material, not just in the skarn but also nearer to surface in some additional veins. I'd point everyone to several press releases we issued during the last 2 years about those wide, high-grade intersects we hit inside the skarn ore bodies, along with those really high-grade structures we found close to surface. Once you combine all of that high grade we've discovered over the past few years, we had an opportunity to construct a smaller, higher-grade starter, if that's the way to put it. I'm not certain starter mine is the correct term, since the project we released runs at least 37 years, but we will certainly mine those higher silver grades first, and that is the reason the tonnage came down from roughly 50,000 tonnes initially to around 15,000 tonnes per day, and simply relies on conventional long-hole open stoping.

Michael Steinmann executive
#54

So with that change, clearly the mine we'd construct is smaller, the plant is smaller as well, and there's less underground development—it's a much simpler, straightforward mining method, the kind we use at most of our underground operations. Together, those factors cut the capital requirement by $1 billion.

John Tumazos analyst
#55

I appreciate that.

Operator operator
#56

That wraps up the question-and-answer portion. Michael Steinmann, I'll hand the conference back to you for any closing remarks.

Michael Steinmann executive
#57

Thank you, operator, and I appreciate all of you joining today. It was another excellent quarter — robust output, contained costs, particularly at our silver operations — a terrific mix, clearly paired with metal prices that were extremely high, and that produced very strong cash flows. Given those powerful free cash flows, as the press releases showed, we put in place a fresh shareholder return framework aimed at giving back as much as a billion dollars through dividends plus share buybacks for 2026. We also gave the green light to some genuinely significant capital investment, as we discussed earlier with the folks on this call, for Jacobina, Timmins and, naturally, above all, for La Colorada — which truly represents the first capital spending ever approved to develop our outstanding skarn deposit at La Colorada, with an initial $265 million approved to sink or lower that large-access ramp down to the deposit. Our Investor Day will take place in Toronto on June 1st, giving us plenty of time there with numerous maps and cross-sections to walk through and explore in real depth all of these projects: La Colorada, Jacobina and Timmins, along with many other exciting projects Pan American has across development and exploration. I very much hope you can join us for that event.

Michael Steinmann executive
#58

Once more, that's set for June 1st in Toronto. You'll be able to attend in person if you happen to be in Toronto, or else through the webcast. I'm looking forward to speaking with all of you there. Enjoy yourselves between now and June 1st. Many thanks.

Operator operator
#59

That wraps up today's conference call. You're free to disconnect your lines now. Thanks for joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Pan American Silver Corp. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Pan American Silver Corp. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.