At this point, I'd like to hand the conference call over to Siren Fisekci, our VP of Investor Relations. Ms. Fisekci, the floor is yours.

Siren Fisekci executive
#2

We appreciate everyone being with us today for Pan American Silver's conference call and webcast, where we'll go over the results for our second quarter of 2026. On this call we'll be sharing forward-looking statements and information, and we'll also reference non-GAAP measures. For details, please refer to the cautionary statements found in our MD&A, our Q2 news release, and the presentation slides covering the period that ended June 30th, 2026 — all of these can be accessed on our website. At this point I'll hand the call over to Pan American's President and CEO, Michael Steinmann.

Michael Steinmann executive
#3

Good morning, everyone, and thanks for being with us today on our Q2 2026 conference call. The second quarter brought strong financial results, solid silver output, and significant advances on our growth projects. We produced $344 million in attributable free cash flow, returned a record $300 million to shareholders, and hit a key milestone at La Colorada in early August with the first cut of the 588 decline, which opens access to the skarn deposit. Attributable silver production came in at 6.5 million ounces for Q2, landing at the top of our quarterly guidance range, thanks to continued strong performance at La Colorada and Juanicipio. We're still on track to meet our full-year silver production guidance of 25 to 27 million ounces. Q2 silver segment all-in sustaining costs were $17.80 per ounce, mainly reflecting higher-cost ounces from the inventory drawdown that built up at La Colorada during the first quarter of 2026, higher royalties at La Colorada because we mined more tonnes than originally planned from the adjacent third-party concession, unfavorable currency exchange rates, and higher labor-related costs. Attributable gold production was roughly 166,000 ounces, below the quarterly outlook we issued in February. We expect Q2 to be the weakest gold production quarter of the year, with output weighted more heavily toward the fourth quarter, as we said in Q1.

Michael Steinmann executive
#4

In Q2, all-in sustaining costs for the gold segment came in at $1,984 per ounce, a bit higher than our quarterly outlook because production was lower than forecast, along with inflation in labor and materials. Importantly, across the first half of the year, all-in sustaining costs stayed under the bottom of our guidance range for silver and matched our guidance range for gold. Given how we've performed so far, we are reaffirming our full-year 2026 operating outlook ranges for silver and gold production, for silver segment and gold segment all-in sustaining costs, and for sustaining capital. Under that outlook, we now anticipate full-year gold production landing at the low end of the guidance range of 700 to 750,000 ounces. We've also adjusted our third quarter gold outlook to roughly 3 to 6,000 ounces under the bottom of the quarterly guidance range of 178,500 to 192,000 ounces of gold. This shift in our near-term gold outlook mainly mirrors production that came in below expectations at Jacobina and El Peñón. At Jacobina, we now expect gold production to be about 10,000 ounces under the bottom of the original annual guidance range of 181,000 to 191,000 ounces, which mirrors adjustments to mining sequencing. The mining method used at Jacobina for the last 40 years has been open stoping, with very few of the stopes backfilled.

Michael Steinmann executive
#5

In recent years, Jacobina has had seismic events. Although no injuries or damage to infrastructure occurred from these, we reassessed the risks tied to seismicity and put measures in place during Q2. These include leaving bigger pillars, lowering output rates at certain higher-grade zones, and raising development rates so that more mining areas are opened. As a result of these steps, overall mining grades will land nearer to the average mineral reserve grade. Over the longer term, we are looking at alternative Avoca-type mining approaches in some areas, using waste rock backfill and cemented backfill, as part of optimizing the Jacobina operation. Jacobina remains an outstanding generator of cash flow, with a lengthy reserve life and considerable room for optimization. We are progressing multiple upgrades at the process plant, among them the installation of new carbon-in-pulp tanks and an electrical control system, with both anticipated to be commissioned during this year. We are also moving ahead with conceptual engineering work aimed at streamlining and simplifying the process plant flowsheet; this will inform a trade-off study assessing whether the best option for this long-life asset is to upgrade the existing process plant circuitry and take out obsolete equipment, or instead to construct a new state-of-the-art processing facility. At El Peñón, silver output should stay inside the original annual guidance range of 3.65 to 3.95 million ounces.

Michael Steinmann executive
#6

We now anticipate gold production coming in roughly 10,000 ounces under the bottom of our initial full-year guidance range of 104 to 111,000 ounces, which reflects weaker-than-expected continuity in some secondary structures. Looking across the portfolio, we anticipate gold output strengthening through the rest of the year, weighted toward the fourth quarter as we said before. We expect second-half production to gain from better gold grades and increased throughput at Timmins and Shahuindo. In addition, we are handling the impacts of El Niño at our sites in Chile and Argentina. Severe rainstorms disrupted site access for essential personnel during July and into August. Our teams are managing these situations actively, with safety still the number one priority. Moving to our financial results, revenue came in at $1.1 billion, and attributable revenue, which includes our 44% interest in Juanicipio, reached $1.3 billion. Net earnings totaled $305 million, or 72 cents per share, including a tax expense of $179 million. Adjusted earnings came to 73 cents per share. Cash flow from operations amounted to $320 million, after $205 million of income tax paid and $17 million used for working capital. Attributable cash flow from operations was $418 million, and attributable free cash flow reached $344 million, including our share from Juanicipio.

Michael Steinmann executive
#7

For 2026, Q2 should be the biggest quarter for taxes paid, since that's when the final settlement of 2025 taxes comes due. Profitability and tax payments have both gone up thanks to stronger metal prices. Because of that, we've raised our 2026 guidance for income taxes paid to a range of $585 million to $635 million. Our financial position is still very strong. We closed the quarter with $1.8 billion in cash and short-term investments, which includes cash attributable to Juanicipio. In July, we renewed and amended our 5-year senior unsecured revolving credit facility, doubling its size to $1.5 billion and adding a $750 million accordion feature. The facility is still undrawn, and total available liquidity stands at roughly $3.2 billion. That financial strength gives us considerable flexibility to invest in our operations, move organic growth projects forward, and return capital to shareholders. At La Colorada, work is underway on the 588 decline to access the skarn deposit. That's a key step in advancing the planned expansion laid out in the revised PEA released in March. Engineering for the material handling system and ventilation shaft is also moving ahead, with the design, cost, schedule, and recommendation expected before year-end. At Timmins, we're advancing phase one of the Timmins Camp project, which includes the Bell Creek shaft extension and two exploration drifts to access the Vogel and Samson deposits.

Michael Steinmann executive
#8

Our plan is to put out revised mineral resource and mineral reserve estimates during the third quarter, along with a preliminary economic assessment for the Timmins Camp project in the first half of 2027. Over at Escobal, the ILO 169 consultation process is still underway. Representatives from the government came to the mine in May. In June, we held meetings with representatives of the Ministry of Energy and Mines and the Vice Minister of Sustainable Development, and in July a bilateral meeting took place between the government and the Xinka representatives. No timeline exists yet for wrapping up the consultation process, and there is still no date for restarting Escobal. The strong free cash flow we generate is turning into meaningful returns for shareholders. During Q2, we returned a record $300 million through share repurchases and dividends. So far in 2026, we have bought back more than 7 million shares under our normal course issuer bid. We have also declared a Q2 dividend of 18.4 cents per common share. The enhanced shareholder return framework we announced in May is working as intended. Repurchases shrink the share count, which raises dividends per share and increases each shareholder's exposure to our asset base and the free cash flow we will generate in the future. That free cash flow generation remains robust, and we will keep balancing shareholder returns against investments in our growth portfolio.

Michael Steinmann executive
#9

Having said that, I'll now open things up for questions.

Operator operator
#10

We're going to start the Q&A portion now. If you'd like to get into the queue for questions, just hit star followed by one on your phone's keypad. A tone will sound to confirm your request. Should you be on a speakerphone, lift the handset first before you press any keys. If you want to take your question back, press star and then two. Our first question is from Lawson Winder at Bank of America Merrill Lynch. Go right ahead.

Lawson Winder analyst
#11

Thank you, operator. Morning, Michael, and everyone on the team. I appreciate the update you gave us today. I want to begin, I suppose, with the obvious issue everyone's thinking about — Jacobina and the operational problems at that site — and what it has meant for 2026 guidance, with your expectation now sitting at the lower end of the gold production range. When you consider everything that has occurred and what you've shared with the market today, what are the implications for sustaining gold output at that mine into '27 and beyond, at that level of just under 200,000 ounces per year? Does 2027 get affected in any way?

Michael Steinmann executive
#12

Morning, Lawson. So, regarding Jacobina and, naturally, this seismic activity—I just want to be clear that no damage has been caused to our infrastructure or anything of that sort by this activity. But it is something that has been occurring for many years at Jacobina, since the mining method there is open stoping with pillars. Naturally, when you continue mining over a long period, you observe activity. If you remember, our plan always included placing a backfill plant as part of our optimization study. For several reasons: obviously, we want to transition from this tailings dam—the conventional tailings dam—to a dry stack tailings dam over time, and then use a portion of those tailings as backfill in the mine. That was the plan all along. After consulting with many of our specialists and the systems we have in place, we decided to proceed with this more quickly, relieve the main zones somewhat, and develop more rapidly into other zones we have in the mine. Obviously, that demands a bit more development at present, and as you saw, it impacted that gold production—I believe we guided down to about 10,000 ounces less production.

Michael Steinmann executive
#13

It won’t have a huge effect this year. We have plenty of mitigation available. As we explained, right now we’re leaving bigger pillars as a near-term mitigation measure. Keep in mind that once paste backfill is installed, we’ll be able to recover a substantial portion of those pillars. Those reserves aren’t gone. We simply move into other zones. A few of them contain gold of somewhat lower grade than what we’re currently mining, which explains the difference. This is essentially a deferral of output into the future and future investment in a stronger, larger Jacobina. It’s genuinely part of the program, arriving somewhat sooner because we want to be truly on the safe side, yet I really don’t foresee any effect across the long-term program. Jacobina’s reserve life currently extends well into the 2050s. Exploration has kept delivering strong success. Looking at the overall picture at Jacobina, I really don’t see a major effect from this, though in the short term, certainly, that’s what we just reported with roughly 10,000 ounces less production this year.

Lawson Winder analyst
#14

Thanks for giving us that view on how short-term these matters are. You also mentioned in the MD&A that El Niño effects could keep causing disruptions for the rest of 2026. Have those possible effects been taken into account in the revised wording on the gold production guidance?

Michael Steinmann executive
#15

So far, the El Niño effect has mainly shown up in Chile. I'm confident that many of the folks on this call have heard about the significant hit to certain copper output in Chile. We experienced extremely heavy rainfall, particularly in the south in Florida, and it actually extended across to Cerro Moro, where we're getting a lot of rain. Naturally, when conditions become extremely wet, you face some everyday difficulties in getting your ore moved to the plant and running it through the plant when it's really wet. There's no major impact there. I'd say the largest effect we've encountered wasn't actually rain-related for our operation, since the biggest effect was at El Peñón. Of course, we're way up in the north. It's an extremely dry region, but many of the roads and major highways in Chile have been disrupted, which made it rather difficult to complete our shift changes at 100% and bring all the personnel in. We're offsetting that through alternative transport routes, by flying people in and out to Antofagasta, et cetera. All of that is part of our plan. It remains to be seen how the Niño effect progresses this year. It appears it's going to be a fairly strong phenomenon this year.

Michael Steinmann executive
#16

Temperatures are pretty elevated in the water, and obviously that's going to shift further north, and typically it will have an impact closer to around Christmas or thereabouts in Peru — which is where the name El Niño comes from, actually; that's the origin of it, since it usually happens nearer to Christmas. In this area, we'd anticipate more rainfall, and then afterward the Niño effect obviously spreads across the entire globe. You're going to observe consequences in Australia and Europe, et cetera. At our operation we are ready and doing further preparation, ensuring that all of our diversion channels along with holding ponds are set for larger rain events right now. We'll watch how that develops. Obviously, should it have a larger impact, then we will update the market. Right now, as I mentioned, it has been more of a secondary impact so far at El Peñón, simply because of considerable infrastructure damage in the road system of Central and South Chile.

Lawson Winder analyst
#17

Excellent. That seems to be properly taken into account. So just as a last point, there hasn't been much direct talk about the plan to give back as much as $1 billion in cash to shareholders during this year via buybacks as well as dividends. Can you simply verify that this is still the goal, even though it wasn't really emphasized clearly this quarter in the same way it was the previous quarter?

Michael Steinmann executive
#18

We issued the press release last quarter containing the plan, and I believe it's quite evident that we are proceeding according to that plan. In fact, you likely noticed that we returned $300 million during this quarter. Naturally, that places us somewhat ahead of the plan, but as you remember, we actually established the plan following Q1. We needed to make up some ground from Q1, when we paid the usual dividend, obviously, but I think we spent only roughly $25 million on share buybacks in Q1. That's why the catch-up. We're clearly right on track at present. The concept we published involved approximately 35 to 40% of cash being distributed to our shareholders. That remains completely in effect. I think we carried on. Ignacio, perhaps how many shares have we repurchased so far this year?

Ignacio Couturier executive
#19

More than 7 million.

Michael Steinmann executive
#20

What's the current total again at this point? As you'd expect, we're still repurchasing shares here in July.

Ignacio Couturier executive
#21

Back in July, I believe the figure exceeded 2 million — 2 million shares.

Michael Steinmann executive
#22

Clearly, we’re still carrying that program forward with a lot of strength. Lawson, whether the total comes to exactly a billion dollars or falls below that naturally hinges on what price our buyback pays per share. My attention is really on how many shares we repurchase—the count itself. Without question, that initiative is more robust now than it has ever been. As you can see, we’re running noticeably ahead of where we planned to be.

Lawson Winder analyst
#23

I appreciate it.

Operator operator
#24

Wayne Lam from TD Securities has the next question. You can go ahead.

Wayne Lam analyst
#25

Thanks. Morning, guys. Maybe just morning. Just to follow up on Jacobina — a couple months back at the Investor Day, the talk was still focused on the chance to raise output and the efficiencies at Jacobina. I was just wondering, did a seismic event happen over the past couple months that sort of prompted this reevaluation of the underground mining method? Given the changes here and the potential move toward more selective mining, is there still potential to scale that production at Jacobina going forward, in line with some of the optimization work you're doing?

Michael Steinmann executive
#26

Yes. Absolutely. Like I mentioned earlier, from what I can see, this is more of a short-term effect. There's still activity happening on the seismic side. As I said, it really comes down to the precaution we chose to take, and we examined this using our microseismic system to confirm that everything is safe for our people and for our infrastructure, as we noted. No damage has occurred to it. Over the medium and long term, the potential for expanding Jacobina remains exactly the same, absolutely. We're moving at full speed on the optimization. You likely heard during the call that we made a considerable investment in the plant and are in fact reviewing alternatives there too. Let me hand it over to Martin, who will provide us with a bit more detail on that plan.

Martin Wafforn executive
#27

Hi Wayne. For sure. As we look ahead at this optimization project, we're really viewing a complete overhaul of the plant as a single undertaking, and as Michael said, with the tailings facility we have to use filtered tailings there. We've also been examining paste backfill underground for a while now, and much of the test work required on that front is done—specifically regarding the strength and rheology of the paste backfill. All of these items are moving along. The plant will require some time. The existing facility is at capacity, but yes, we'll be considering expansions to that plant's size going forward, and we haven't truly settled on what the mine can do to supply the plant in the future, though that's among the things we're addressing as this study progresses. Because of this, we do expect that we'll move back somewhat toward the mine reserve average grade as we open new areas in the mine.

Wayne Lam analyst
#28

So it sounds as though efforts are underway to boost the mill's capacity, yet you haven't fully completed the analysis needed to determine if the mine is able to support that larger mill capacity?

Michael Steinmann executive
#29

That program remains exactly as we presented it, obviously, at the Investor Day. The work continues and isn't finished. Yes, we're clearly still evaluating what the optimum mill size is, and as the press release showed, we're considering either boosting productivity at our existing mill — right now we're focused on improving recoveries — or potentially a completely new mill down the road. As I've said, we're planning the mine out well into the 2050s, with likely strong reserve replacement for many, many years ahead. At some point, a bigger, state-of-the-art plant at Jacobina would probably make a lot of sense, but Martin and his team continue working through the technical aspects. Everything on that front is proceeding as planned and moving forward at full speed.

Wayne Lam analyst
#30

Thanks, understood. Turning to Peñón — we've talked before about how that mine has consistently had a fairly brief reserve life, which keeps getting pushed further out. Now that the stockpiles are depleted, I was wondering what share of output that historically represented. And do you view this period of lower continuity mineralization as temporary, or is that something we should be modeling going forward, and will it be reflected in the reserve update that's coming? I just want to understand better how we ought to think about it from here.

Michael Steinmann executive
#31

Naturally, we'll be releasing our mid-year reserve update at the start of September. And naturally, everything that shifts along with the discoveries made on the exploration side, and so forth, is going to be folded into that update. If you look at those smaller structures, you've got smaller parallel structures alongside the main ones that show less continuity and call for additional drilling. For the moment, we've taken those out of the reserves. A number of them have follow-up programs running with Chris and his team on exploration to bring in extra drilling. We've substituted them with material from other structures that, in this instance, carry higher silver grade and lower gold grade — which is why we're exactly on track with silver production, though we're running somewhat below on gold production. There are still plenty of places to go, obviously. We continue drilling and exploring extensively at Peñón. It has been, and remains, a very, very large cash flower for us and has been a remarkable deposit through the years. There's still plenty left to discover there, but right now, as I mentioned, that shift toward higher-grade silver will likely carry on for the foreseeable future this year. That's why we trimmed the gold a little bit and locked in the silver production for the year.

Wayne Lam analyst
#32

Thanks. And maybe just one final item, specifically about Timmins — could you provide some background or additional detail regarding the production increase you've guided to for the second half? Along with the mining rate increases that are planned, could you update us on the ground condition problems that came up last year?

Michael Steinmann executive
#33

Absolutely. Timmins is doing fairly well at the moment. We've seen some fluctuation in our production rates as of late. As far as geotechnical seismicity goes, we haven't been experiencing any major events lately. The paste backfill we brought in at Bell Creek is genuinely assisting on that front, both for overall recovery and for keeping things under control. Naturally, the plan remains the same, Wayne, as it stands here. Likely sooner, or at the latest by the middle of next year, we'll be presenting a fresh PEA on Timmins featuring what we refer to as the new Timmins, including all the extra satellites we're currently advancing toward two and exploration. You'll get the updated plan for Timmins — something we hinted at during Investor Day — but clearly, the PEA will contain all the specifics at that point, with refreshed resources, refreshed mine plans, cost, capital requirements, and so forth, to add what is probably a considerable mine life to our Timmins deposits.

Wayne Lam analyst
#34

Perfect, I appreciate you fielding my questions.

Michael Steinmann executive
#35

I appreciate that.

Operator operator
#36

Our following question is from Cosmos Chiu at CIBC. You have the floor.

Cosmos Chiu analyst
#37

Thanks, Michael and the team, for fielding my questions. I'd like to start on the financial side. This quarter you came in below consensus on earnings, partly because taxes were higher. Could we spend a moment on that? I saw the tax rate came in at roughly 37% for Q2, which is above the 32% you had in the first half. Given where commodity prices sit right now, should we treat 37% as the new normal? Also, in the MD&A you mentioned that higher commodity prices are driving more taxes. Yet for the second half, for tax purposes, you're assuming $60 an ounce and $4,000 an ounce, a bit below today's spot. So if commodity prices do remain at more elevated levels than you're assuming, is there a chance taxes land even above your updated guidance?

Ignacio Couturier executive
#38

Cosmos, good morning — this is Ignacio speaking.

Cosmos Chiu analyst
#39

Hello,

Ignacio Couturier executive
#40

Cosmos. On taxes, yes, the effective tax rate definitely varies from quarter to quarter. As you said, in Q2 we saw a rate in the high 30s. In Q1, though, we saw high 20s. Looking at the year overall so far, we're in the low 30s, which is roughly where we anticipated. Yes, unfortunately there is some variability. In Q2, we saw some true-ups related to the prior quarter, some adjustments. For the full year, we're tracking in that low 30s area, and that's roughly where we expect to land. Do keep in mind that unfortunately, on the tax expense side, there is some variability. You'll see that in prior years too — there was a fair amount of variability in what that effective tax rate is. When you look at the year overall, it's roughly where we expect. On actual taxes paid, yes, we've always guided that typically the first half of the year has higher payments than the second half, and that's due to the true-ups that we have to pay typically at the end of Q1 or early Q2.

Ignacio Couturier executive
#41

A big part of this comes down to how profitable the prior year was. In 2025 in particular, we had a jump in profitability during Q4. That is the main thing behind the bigger true-ups we recorded at the close of Q1 and on into Q2, and it is what is pushing up the tax payments we have reported for the first half of the year. As for the remainder of the year, yes, we have reguided to a range of $585 million to $635 million. That is roughly where we expect things to land given where metal prices sit today. Stronger profitability is what is driving it. Another factor as well is that, thanks to robust cash flows at the operations level, we are producing a substantial amount of cash at the sites, and that cash needs to be repatriated, and much of the cash we repatriate carries withholding tax with it. That is simply a frictional cost of moving money around the company. That is one more element influencing the overall range of $585 to $635 million.

Cosmos Chiu analyst
#42

Alright, so on the operational side, perhaps a question regarding El Peñón. As you noted in both the prepared remarks and the MD&A, continuity came in somewhat below expectations — something involving certain secondary structures — yet you managed to hold your silver guidance while having to reduce the gold guidance. I'm just curious: do those secondary structures affect gold grades to a greater degree, or gold production, compared with silver? My understanding was that at El Peñón, gold and silver grades tend to move together fairly consistently.

Michael Steinmann executive
#43

It's correct that when you combine it all, it was fairly consistent, but at Peñón those veins are actually very, very silver-rich, and then there are also very gold-rich veins. Obviously, we blend them in production. What happened with these secondary structures is that some of them, as I mentioned, we removed from the mine plan because continuity wasn't there. For many of them, additional drilling is simply still required, and exploration is actually back in. While that drilling happens, we move those structures into resources. If the drilling is positive, they'll go back from resources into the reserves. To replace that production, we went into areas that are more silver-rich and less gold-rich. As I said, they really are both. They don't always come together. The end result is that we have no problem delivering on the silver, but there's a bit less gold right now in those structures that are developed. It's really a constant play on the blending at El Peñón between the gold-rich and the silver-rich, and at the moment, that's just what we have developed. Hence more silver production right now and a bit less gold production at Peñón.

Cosmos Chiu analyst
#44

Okay, so perhaps a final question about project capital. In the first half you came in a bit under what you’d expected — roughly $84 million, when the expectation had been 103 to 110. You’ve kept the full-year guidance at 240 to 255 million. Is that purely a timing issue? If you could briefly explain where the second-half spending picks up, that would be helpful.

Michael Steinmann executive
#45

Okay, let me begin with the broader view, and after that I’ll turn things over to Scott — though yes, timing certainly is a factor in all this. The weather has a major influence. Clearly, beyond the Niño events we’ve seen this year, there are also dry and wet seasons, and those differ quite a bit from one location to another. As you might expect, our operations span from deep winter at present in Southern Argentina all the way to summer in Mexico. So the timing differs there, and the point in the year when it’s ideal for us to deploy that capital differs as well. I’ll hand it to Scott now, but my view is that this really comes down to the timing of spending.

Scott Campbell executive
#46

Right, that's it. Hi, Cosmos — Scott here. Good morning, Cosmos. A nationwide strike in Bolivia held up the mobilization of the main contractor for our tailings expansion. So there was a bit of a lag. The market for big contractors in Peru and Mexico is highly competitive, and we saw some mobilization-related delays there as well. No, nothing has been postponed. It's simply a small lag, and we'll make that up later in the year.

Michael Steinmann executive
#47

I want to be clear for everyone listening: that situation obviously has no connection whatsoever to the mine. What it involves is road strikes within the country, and of course that had an impact on us through mobilizations — there's no problem on our end.

Cosmos Chiu analyst
#48

That's nice to hear. Thanks once more, Michael, Ignacio, and Scott, for taking care of all my questions. I have nothing further. Thank you.

Michael Steinmann executive
#49

Much appreciated, Cosmos.

Operator operator
#50

We'll take our next question now — if you'd like to ask one, just press star followed by one again. Carey MacRury from Canaccord Genuity has the next question. Go ahead, please.

Carey MacRury analyst
#51

Hello, and good morning, everyone. I have a question about the royalties at La Colorada. Since you're running operations on that neighboring ground, I was hoping you could offer some guidance regarding what we ought to anticipate for those royalties during the latter half of this year and on into 2027.

Michael Steinmann executive
#52

During the second quarter, it ran somewhat above that level. Over the course of the year, things will balance out. Later in the year, there will be somewhat lower tonnage originating from that source. Essentially, it’s simply part of our mine plan to move past those claims and return to structures entirely within our own claim area where we operate. It’s really only short-term variability in those royalties, which came in a bit higher this quarter than they will going forward. Broadly speaking, this year, I believe we set them at, what, 30

Scott Campbell executive
#53

Was that thirty-five percent?

Michael Steinmann executive
#54

We're looking at 30 to 40 — 30 to 40% of output coming from that area. And then, as the years go by, that contribution will decline, correct? The mine plan was laid out in the PEA, and every detail sits in there. To be completely clear, all of the skarn resources — 100% — are plainly within our claims, and every one of the new vein discoveries that we keep talking about and drilling is likewise within our claims. What we're really dealing with here is shorter-term variability in those tonnes originating from that spot.

Carey MacRury analyst
#55

Thanks. So perhaps a question about that credit facility. There's a huge amount of cash on the balance sheet, you're producing all of that cash, and you've doubled the credit facility while near-term capital spend isn't very large. I'm just curious what the thinking is behind the credit facility.

Ignacio Couturier executive
#56

Hey Carey, Ignacio here. Broadly speaking, this is simply about ensuring the company has the financial flexibility we require. Beyond that, market conditions have been quite favorable for investment-grade issuers such as Pan American Silver, so we figured now would be a good moment to take advantage of those favorable conditions. On top of that, we've learned from experience that having that kind of financial flexibility can be very positive for the company. When opportunities arise, we're able to react quickly to them.

Michael Steinmann executive
#57

Naturally, our balance sheet is quite robust. At present, you can see liquidity sitting at roughly $3.2 billion. We currently have numerous large projects underway. I just referenced the three principal ones — clearly the La Colorada skarn, the optimization study at Jacobina, and all the work we do in our Timmins Camp. This company is substantially larger than it used to be, and as Ignacio noted, it was an opportune moment and highly favorable conditions to essentially double our line of credit, which remains undrawn but is available to us within our liquidity so we can react to any opportunity that might come up. Right now, it is simply sitting there just as we had it previously, and it is great to have.

Carey MacRury analyst
#58

Perfect. That covers everything on my end. Appreciate it, everyone.

Michael Steinmann executive
#59

I appreciate that.

Operator operator
#60

Our following question is from Don DeMarco at National Bank Financial. You have the floor.

Don DeMarco analyst
#61

Thank you, operator, and good morning, Michael and team. I appreciate you taking my question. I'd like to begin with something about Escobal. I noticed that during the quarter you had government officials at the mine. Could you offer any additional detail about that meeting? For instance, was this the first occasion those specific officials had been to the mine, and did the visit have a particular purpose?

Michael Steinmann executive
#62

No, it isn't the first occasion. Authorities keep coming to the mine on an ongoing basis. Sometimes it's only the authorities, and sometimes they're joined by Xinka representatives. We've had a great many visits from nearby communities, and so on and so forth. This isn't the initial one. Typically, we receive plenty of visitors. The mine, of course, presents very nicely. It's in excellent condition, and you can walk through the plant, head underground, inspect the dry stack tailings facility, see all the environmental work we carry out, and observe everyday operations. It's simply wonderful to have them on site, and wonderful to hold reviews and discussions with them. There's no other reason behind it — it's just normal course.

Don DeMarco analyst
#63

Thanks. Moving over to Jacobina now — will any preemptive mining support or other work call for extra capex, or does whatever additional work is needed fit inside the sustaining capex budgets we already have? Or does the measurable effect of the seismicity come down simply to that 10k cut in production? Thanks.

Michael Steinmann executive
#64

That's really the situation. Obviously, we're working on that optimization study, and the extra capital that'll be needed for the paste backfill plant—all of that is in the engineering phase at the moment. Once we have every detail ready, we'll share it with everyone. Right now, yeah, the impact really comes down to that small reduction in production. Once all the numbers are together, the engineering is finished, and we make the final decision on size, location, et cetera, for the paste backfill plant, we'll of course share that with everyone.

Don DeMarco analyst
#65

All right, so just one last question. On silver costs for the year so far, you're running under the bottom of the guided range. Now, I notice you've kept guidance unchanged. Is that a conservative stance, or is there something in H2 that would point to silver costs bouncing back up and finishing the year nearer the middle of that range?

Michael Steinmann executive
#66

That's a great question. So, when you look at H1 — the first two quarters — production is tracking extremely well. Costs are also tracking very well for both metals, silver and gold. What we do see is these variations between quarters. You'll remember costs on the silver side were extremely low in Q1, then higher. The thing is, quarter by quarter there are impacts that aren't always present, correct? Certain quarters include special bonuses, special payments, tax true-ups, et cetera, et cetera. Looking at the cost increases we're seeing — and this applies to both silver and gold — there are plenty of different impacts. Byproduct credits, obviously, have an enormous effect on our costs. In Q1, with metal prices much higher, those byproduct credits helped bring that cost down. In Q2, obviously, metal prices dropped quite a bit, and therefore costs are rising. I really don't have a crystal ball to see where metal prices will head. The next-biggest impact comes from foreign exchange, which can be extremely large, since every jurisdiction we operate in uses foreign currency — even Canada — because our reporting is in US dollars.

Michael Steinmann executive
#67

The fact that those currencies are currently gaining strength clearly affects our costs significantly. Taking everything into account, a substantial portion of cost fluctuations lies beyond our control, since—as I mentioned—it comes down to foreign exchange, metal prices, and, to a smaller degree, energy and diesel expenses. For now, we simply prefer to keep the guidance unchanged and monitor how things develop through Q3. We'll certainly provide an update at that point, but we're quite pleased with how costs have tracked across the first 6 months for both gold and silver.

Don DeMarco analyst
#68

All right, that covers everything on my end. Thanks once more for fielding my question.

Operator operator
#69

Our next question comes from Lawson Winder at Bank of America. You have the floor.

Lawson Winder analyst
#70

Thanks, operator. Thanks, guys, for taking the follow-up. I wanted to ask about Escobal, and just to note that since the construction permits for the Cerro Blanco mine in Guatemala were approved, several indications have pointed to a much more forceful level of government support for mining generally in the country. I'd be curious to hear your thoughts on whether or not you agree with that. Then, further to that, Cerro Blanco was able to touch on a real hot-button issue at the mine, which was water purification from volcanic ash and issues from the past that had nothing to do with mining, but nevertheless they were able to generate a lot of community support through their efforts to help purify river water. I'm just curious if there's something like that at Escobal that might be one particular key issue. Ultimately, what I'm trying to get at is what are the key issues being discussed between the government and the Xinka at the current moment? Thank you.

Michael Steinmann executive
#71

Sure. Look, I don't believe you can just make comparisons between various projects and the limited number of operations in Guatemala. Each one sits in a different region, with different communities and quite distinct circumstances on the ground. Naturally, we must complete the ILO 169 consultation, a court-mandated process that stretches back several years now and has been extremely lengthy. I don't think conclusions from other projects can simply be applied to this one, since every project in Guatemala has its own quite distinct reality. The discussions, of course, still center on very similar subjects. As with any mining project, water comes up. In many locations, dust is an issue too. Clearly, that's not a major concern for an underground mine, apart from our tailings. Then there's vibration caused by blasting, along with other typical effects you'd expect from a mining operation. Those are really the key items under discussion. Don't simply draw parallels from one project to another. We truly need to look at each project in the country on a separate basis.

Lawson Winder analyst
#72

Michael, I appreciate those remarks. Now, regarding when you’ll update us on reserves and resources exploration, you brought up the third quarter. Can we perhaps sharpen that timing a little? Might it come out later in August, or would it be more of a mid-September event?

Michael Steinmann executive
#73

It's going to happen in September, early in the month, but yes, only a few weeks from now.

Lawson Winder analyst
#74

I appreciate that.

Michael Steinmann executive
#75

I appreciate that.

Operator operator
#76

That brings the Q&A portion to an end. I'd now like to hand the conference back to Michael Steinmann, who will offer some closing remarks. Please go ahead.

Michael Steinmann executive
#77

Thanks, operator, and thank you all for joining us today. Robust silver output and solid financial performance further strengthened a balance sheet that was already in very good shape, and that let us give back, as you observed, $300 million to shareholders through buybacks and dividends — a really strong outcome against that plan. Our priorities for allocating capital haven't changed, correct? We keep a solid balance sheet, $3.2 billion of liquidity at present plus our undrawn line of credit, put money into our high-return projects — which I noted, La Colorada skarn, naturally, the Jacobina optimization, and our Timmins project — and keep providing solid returns to shareholders via share buybacks and dividends. Metal prices are already recovering. Hopefully that continues, clearly, from their usual summer low. As I said a moment ago in the last question, we intend to publish our mineral resource and resource update in September. We look forward to sharing progress on all those efforts and the very very good results we achieved over the year across many many exploration projects within the company, with an update on that in early September. Until then, thanks, everyone, for calling in.

Operator operator
#78

That wraps up the conference call for today. You can go ahead and disconnect your lines now. Thanks for joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Pan American Silver Corp. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Pan American Silver Corp. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.