Ramaco Resources, Inc. (METC) Earnings Call Transcript
October 28, 2025
Earnings Call Speaker Segments
Thanks, everyone. I'm speaking for Ramaco Resources in welcoming each of you to the conference call covering our earnings for the third quarter of 2025. Joining me today are Randy Atkins, who serves as Chairman and CEO, Chris Blanchard, our EVP for Mine Planning and Development, and Mike Woloschuk, our EVP for Critical Mineral Operations. Ahead of getting underway, allow me to deliver the customary cautionary note. A number of the matters we'll address during this call qualify as forward-looking statements under the Private Securities Litigation Reform Act of 1995. Such forward-looking statements reflect what Ramaco anticipates regarding events yet to come. They carry risks, uncertainties, and additional factors, a great many of which lie beyond Ramaco's ability to control, and these could lead actual outcomes to diverge substantially from what those forward-looking statements describe. Every forward-looking statement is valid only as of the moment it is given, and unless the law demands otherwise, Ramaco assumes no duty to refresh or amend any forward-looking statement, whether prompted by fresh information, later events, or any other reason. I also want to note that a reconciliation of the non-GAAP financial measures we intend to cover today appears in our press release, available for viewing at our website, www.ramacoresources.com. Finally, I'd urge each person on this call to visit our website and grab today's investor presentation. Having said that, allow me to bring in our Chairman and CEO, Randy Atkins.
Appreciate it, Jeremy. To kick things off, I'd like to express my gratitude to all of you for joining us today. Once again, there's plenty for us to dig into. The rare earth side of things saw yet another incredibly active quarter, while met coal essentially carried forward what we saw in the prior quarter. Given that our rare earth pivot has drawn the bulk of the focus, that's where we'll begin. I'll walk through several updates on developments that have occurred since our previous call, and Mike Woloschuk, who leads Critical Minerals for us, will do the same later on. Following the July groundbreaking we held with Secretary of Energy Wright, we've been working quickly to turn that momentum into action, reducing risk around future execution as this distinctive corporate transformation proceeds. Here's a quick rundown of where things stand as we construct this vertically integrated, mine-mouthed critical minerals platform. Naturally, we begin with the sizable deposit we hold. Honestly, that asset is the source of all our flexibility; our belief is that we'll operate the biggest upstream production platform in the U.S. for heavy magnetic rare earths, plus the three critical minerals we have — gallium, germanium, and scandium. Turning to the midstream side, after an optimization was completed at our pilot plant — which is presently being built — our plan is to construct a sizable commercial facility for oxide separation and processing. Its scale will allow refining capacity sufficient not just for feedstock derived from our own coal, but ideally for third-party feedstock too, provided the economics prove attractive and accretive. That's the idea behind creating what amounts to a regional, or possibly even national, processing hub. We aim to preserve flexibility regarding the plant's size, subject of course to how markets evolve as we progress. Finally, regarding downstream, we've just shared our intention to set up a national strategic stockpile and terminal for rare earths and critical minerals located at our Brook Mine. The name we're giving it is the Strategic Critical Minerals Terminal. Our plan is to develop it alongside a top-tier commodity structuring and financial advisor, whose identity we'll reveal soon. Our view is that holding a major, perhaps even leading, position across every link of the rare earth supply chain will make Ramaco the most complete vertically integrated upstream, midstream, and downstream critical minerals producer anywhere in the United States. As for pushing this platform forward, in August, as you're aware, we brought in $200 million through a common stock placement; our liquidity now sits at a record level, and naturally we'll need still more going forward. Come September, we unveiled intentions to expand the Brook Mine's base size by 2.5x, reaching roughly 5 million tons. That would supply more feedstock to support a higher yearly oxide output exceeding 3,400 tons per year. I want to make the point as well that, if final market demand supports it, our operations and technical teams could handle — assuming we get the usual approvals — scaling this output up once more to a minimum of 8 million tons of coal mined each year; from that, by our calculations, we'd get about 5,000 tons of oxide output. In my September shareholder letter, I laid out that we presently figure that at the 5 million ton coal-based output mark, during the initial year of commercial oxide manufacturing, which we now expect in 2028, our rare earth business might deliver over $500 million in EBITDA. A projected NPV above $5 billion is also possible. Of course these are projections, but they demonstrate how large this project is. I should mention, though, that these figures came from applying the identical price deck relied upon in the July summary of Fluor's preliminary economic analysis report. Honestly, the same individual prepared and reviewed them — Mike Woloschuk — who has of course since come aboard with us, together with another senior person from Fluor. Naturally, as we proceed with design, engineering, and optimization, we'll sharpen these figures, together with prevailing market prices and other data. Starting in July, because of market conditions, we've observed Western offtake agreements at considerably better pricing than the Fluor report assumed. Western price realizations, previously linked to Chinese published prices, are now clearly decoupled. A premium will exist for dependable Western supply chains. This grows more evident daily, and Chinese export restrictions are the cause. As you've seen, it now looks like Trump and President Xi may have delayed enforcement of China's new REE restrictions by a year. Chinese control hanging over the market isn't disappearing. Whether we like it or not, we're engaged in a full long-term mineral war with China. That's particularly the case for scandium, since the Department of War's Defense Logistics Agency just signed an offtake to buy scandium at over $6.2 million per ton. That price is 2/3 above the $3.7 million figure applied in both the Fluor report and my shareholder letter. Comparable upward revisions exist across the board for a number of the other oxides we'll make. Let me concentrate on scandium briefly — Mike will cover it in greater depth later as well — because it's especially interesting given how much we'll eventually produce. People call it the forgotten rare earth. America depends 100% on imports for scandium. We hold no stockpile, possess no recycling capability, and have no production capacity at present. It goes into lightweighting autos and planes, solid oxide fuel cells, semiconductors, 6G wireless for drones, satellite communications, and other defense capabilities. Worldwide output is extremely limited, with a modest global market of, frankly, under 50 million tons per annum. Our output is going to reach nearly 180 million tons each year. According to estimates, just the automotive industry's need for scandium alloys would call for more than 1,000 tons annually — and honestly, that supply doesn't exist right now. Along those same lines, based on what we've heard lately from parties potentially buying scandium oxide, we anticipate demand that is nearly indifferent to price will run past what the Brook Mine is projected to produce each year. As I mentioned, this mineral matters greatly for making cars and planes lighter, plus for technologies behind numerous military uses. Quite simply, there's no availability for such applications, which makes long-range planning impossible for a mineral that China now controls entirely. Growth in demand for it is extraordinarily robust, and as I noted, nobody outside China has been able to build any substantial, dependable Western source. We're going to be in a strong spot to deliver that substantial scandium supply. Going ahead, to help grow our rare earth business, we intend to work closely with federal and state authorities to broaden the Brook Mine permit we already hold. At present it spans approximately 4,500 acres, and we anticipate extending it so it eventually takes in the bulk of the close to 6,000 acres we control. Starting from our July groundbreaking, we've extracted roughly 125,000 tons of coal and material so far, which honestly gives us sufficient ore feedstock to keep the pilot plant running for quite a while.
Once the pilot is up and running, we anticipate mining extra coal from time to time, and we may also mine coal that could be sold to local third-party utility customers. Chris Blanchard is going to cover our mining activities in greater depth shortly. Turning to midstream, our commercial oxide processing facility is going to be engineered and designed with the flexibility to expand its capacity so it can handle output of greater volumes of oxide. As I mentioned, the reason we're doing this is twofold: to handle our own added capacity, and because there's a chance we may pursue some type of third-party merchant processing arrangement. Naturally, before we move ahead to a full-scale commercial plant, we'll aim to de-risk this intricate execution through designing, testing, and optimizing the different separation and refining processes at our pilot plant, which, as I noted, is presently being built outside Sheridan. What we're aiming for is to size, design, and carry out the plant development appropriately, with attention to keeping both capital cost and the plant's future operational expenses under control; we broke ground on the pilot last week and anticipate starting initial operations in 2026. Mike is going to go into this much further and in considerable detail; meanwhile, to speed up the pilot process, the plant components are right now being designed, engineered, and tested on a shakedown basis at a facility in Canada owned by a company called Zeton. Zeton ranks as the world's largest pilot plant design and fabrication company. The bulk of this testing will likewise be coordinated with Hatch Limited, another Canadian firm, which is preparing our feasibility analysis. Refining a number of rare earth elements and critical minerals will be the focus of our commercial processing plant, among them, naturally, our heavy magnetic rare earth elements such as terbium and dysprosium, along with critical minerals such as gallium, scandium, and germanium. China has banned the export of all of these to the U.S. In certain instances, we will be the only U.S. producer of these oxides, and in many, we will likewise be the country's largest or dominant producer. Steps are being taken right now to speed up the engineering and planning for the full commercial oxide facility. We're hoping to kick off the engineering and procurement work on this plant next spring. Our aim is to start site work and initial construction on the facility in late 2026 or early 2027. This would, naturally, depend on the usual questions of equipment availability and timing and related purchasing. Our record liquidity levels, though, ought to put us in a position to pre-purchase some of this equipment, which should help speed things along and fast-track the process as much as we can. We recognize the execution risk that comes with any new development. In fact, the D&A of our entire operation since this company was founded is to build projects from scratch on budget and on time. I'd note that since Ramaco was formed, we have deployed in excess of $500 million in capital on greenfield development projects. We’ve already brought on board a highly skilled and seasoned team of professionals, some from inside the company and some from outside, to help steer how we carry out work in this area. As we move ahead, we’ll be adding many more people. As I mentioned, we’ll keep fine-tuning the scope and engineering of the project so we can deliver it with the strongest cost discipline we’re able to achieve, covering both the CapEx outlay and the operating expenses down the road. Frankly, because this project matters so much to our nation, we’ll receive plenty of support. We’ll keep collaborating with our longstanding allies at the Department of Energy’s National Labs to put to use some highly innovative science and technology, aiming, we hope, for significant technical breakthroughs. Naturally, as we’ve consistently stated, we won’t begin actual building of the complete commercial plant until we’ve secured enough long-term offtake agreements; regarding that, the procurement talks we’re still having leave us quite optimistic. I’d note that ever since the Chinese embargo and export controls were put in place, the market has been decoupling from China. Based on what counterparties tell us, there likely won’t be any future moment when a Western customer feels at ease treating China as a dependable long-term source. That carries direct consequences for us, affecting both the demand from customers and pricing over the long haul. Moving forward, prices historically quoted from China will be vastly different from what a trustworthy Western supplier charges, and that’s the role we aim to fill. Additionally, as I said last week, we disclosed that our board gave approval to establish the U.S.’s first and presently sole Strategic Critical Minerals Terminal and Stockpile at the Brook Mine; for Ramaco, this operation will create a fee-based terminal services business. This will capitalize not just on our own output but on the logistical and infrastructure benefits we already enjoy from sitting on our own vertically integrated Brook Mine site; we expect no commodity price exposure at the terminal and will get steady, predictable revenue streams; for our customers, the terminal will offer secure, auditable storage of strategic rare earths with no capital outlay or operational burden. The terminal will be capable of rapid deployment and will deliver domestic supply chain resilience. Our strategic advisor will help with the development and execution of offtake agreements involving both private and public customers, along with the development of the financial contracting and operational implementation of the terminal. We’ll share more on this as our plans move forward. Now I’d like to turn to our metallurgical coal business. The overall met markets are still under pressure. The cause is identical to what we’ve pointed to essentially throughout the year. China keeps dumping cheap steel into global markets, which pushes down both prices and production everywhere. Jeremy will go into markets in greater detail shortly. Like we've mentioned during earlier calls, we reached what appears to be a highly sensible conclusion: not to move tons at a loss into a market drowning in supply. Luckily, our liquidity standing is now the best it has ever been, giving us room to hold this line. Consequently, we're once more slightly lowering our production outlook, even though our mines keep performing very strongly and with healthy reduced mine costs; put simply, we plan to align what we produce with what's demanded. To be clear, this cut to guidance stems entirely from soft pricing in export spot markets. It isn't due to elevated mine costs. In fact, among U.S. met coal producers, we're one of the few whose cash costs have fallen under $100 per ton, and our third quarter cash costs landed at roughly $97 a ton. I should note that beginning in Q4, our costs right now sit even lower than that number. Naturally, we are also presently negotiating with North American steel mills regarding the annual 2026 domestic contracts. We'll cover that shortly, but talks remain ongoing, with honest reality checks happening on both sides.
It shouldn't be necessary for any producer to sell into the steel sector at prices that lose money; that's definitely not something we're going to do. Once those negotiations wrap up, we'll speak about them more openly. In line with what we've previously stated, we're going to hold future growth CapEx at our met mines down at bare minimum levels until markets start turning better; our plan instead is to concentrate on getting our rare earth elements and critical minerals business commercialized quickly. That said, whenever chances for bargain-priced asset purchases in the met space come along, we'll always be watching for them. Our thinking is to try to set Ramaco's met business up for growth over a longer horizon from a financial standpoint that gives us an advantage, whenever that kind of situation arises. Let me finish on a strongly upbeat note. The key takeaway is that our liquidity position right now is the strongest it has ever been in this company's history. We're now proceeding quickly down a path spanning multiple years to transform Ramaco into the sole U.S. dual critical mineral platform covering both rare earths and met coal. The work in front of us is substantial, but we plan to meet that challenge. We're going to tackle this transition with the very same capital, financial, and operational discipline we've demonstrated so far. Looking ahead, I have a strong belief that we'll benefit both our shareholders and our country well in the years ahead. So with that, I'd like to hand things back to the rest of our team to go over finances, operations, and markets. To start, I'd like Mike Woloschuk, who heads up our critical mineral business, to offer a few additional thoughts regarding our rare earth business. Mike?
Thank you, Randy. Activity levels picked up during the third quarter, and I'd like to walk through several of those items. To start, Martin van Wyk came aboard as Senior Vice President of Critical Minerals Processing. Martin arrived to us from Fluor, Australia, where his role was global subject matter expert for rare earths. His background spans more than 20 years across mineral processing, hydrometallurgy, and rare earth element flow sheet development. His credentials include a Master of Chemical Engineering and a postgraduate certificate in corrosion engineering from Curtin University in Perth, Australia, plus a Bachelor of Metallurgical Engineering from the University of Pretoria in South Africa. We expect him to relocate to the U.S. with his family in early 2026. On September 4th, the Brook Mine pre-feasibility study was awarded to Hatch. As Randy noted, Hatch brings world-class expertise in rare earths and critical minerals hydrometallurgical flow sheet development. Within Hatch's scope sits the development and management of the metallurgical test work programs supporting the pre-feasibility study, along with process flow sheet optimization and pilot plant design. Completion of the final PFS report is scheduled for April. The metallurgical test work programs also went to two commercial laboratories, Element USA and SGS Lakefield. Ramaco knows both of these labs well, and each brings extensive experience developing rare earths and critical minerals hydrometallurgical flow sheets. Our test work is being executed in parallel so that flow sheet optimization is accelerated. We further finalized umbrella agreements and task statements with the U.S. Department of Energy National Labs so that test work scope could be executed there once they returned from the government shutdown. In addition, late in September we published an updated S-K 1300 compliant Technical Report, incorporating an inferred resource estimate for the area currently permitted. Findings in this report point to potential opportunity to raise the cutoff grade and boost throughput, thereby achieving higher critical mineral production relative to the previous phase; a drilling program got underway at the Brook Mine and is presently in progress, designed to complete infill drilling within the permitted zone with the aim of increasing geological confidence required to support selective mining. Step-out drill holes are likewise being completed to assess how high-grade trends extend southward and to expand the total resource size past the currently permitted area. As Randy noted, the detailed engineering, procurement, and construction package for the pilot plant was awarded to Zeton, a recognized global specialist and leader in the design, fabrication, and construction of pilot and demonstration plants. Built on skids, the pilot plant will then be shipped to our pilot facility in Wyoming. Architectural and engineering designs are now complete for the Brook Mine pilot plant and laboratory facility, which Chris will describe in a bit more detail shortly. This complex will rise on Ramaco's property directly across the interstate from Ramaco's existing iCAM facility. The high-voltage electrical power, the geotechnical work at the site, and the foundations are done. Orders have been placed for analytical equipment destined for the laboratory facility that will serve as our own on-site analytical lab. Regarding the grade of the deposit, Ramaco has received questions from investors and from the media, and I want to spend a little time on that subject. Other commodities, gold and copper among them, report equivalent grades so that byproduct credits are accounted for, but the rare earth sector does not do this when it reports parts per million total rare earth oxide; there is no concept of a neodymium or praseodymium equivalent grade. Because of that, deposits holding high-grade critical minerals, the Brook Mine included, have to be compared on an equivalent basis, which the industry calls a basket price. When the Brook Mine basket price is compared on an NdPr equivalent grade, our figure stands more than 10x above the industry trend for our parts per million TREO; this reflects the high-value components present in our deposit. On top of that, deposits with higher parts per million TREO tend to be dominated by low-value lanthanum and cerium. For many of the highest-grade deposits, roughly 70% to more than 80% is lanthanum plus cerium, and removing those from the flow sheets is costly. Having said that, I would now like to hand the call over to our Chief Financial Officer, Jeremy Sussman.
Thanks, Mike. Turning to the balance sheet, I'm happy to report that liquidity hit a record $272 million when Q3 closed. That's the highest we've ever seen. Compared with the same stretch of 2024, liquidity rose more than 237%. We finished the quarter with net cash of $77 million. In Q3, we sold $200 million of common stock through an offering underwritten by Morgan Stanley and Goldman Sachs; on top of that, we said we would redeem the $34.5 million of 2026 senior notes carrying a 9% rate and issue $65 million of 2030 senior notes at 8.25%. As mentioned, with our attention on the core metallurgical coal operation, Q3 2025 operating results came in solid once again, with cash cost per ton at $97; that keeps Ramaco in the first quartile of the U.S. cash cost curve. Cash cost per ton sold dropped $6 versus Q2 thanks to better productivity overall. Looking ahead to Q4, mine costs have kept falling all through October. Keep in mind that November and December include holidays, which will affect costs somewhat. Q3 production declined slightly from Q2, coming in at 945,000 tons. That reflected the usual July 4th miner vacation plus our ongoing preference for value over volume. As Randy said, we'd rather leave production in the ground than sell it at a loss into the spot market. Fortunately, our strong balance sheet, record liquidity included, gives us that flexibility. Total tons sold dropped to about 900,000 in Q3 from about 1.1 million tons in Q2. The main reasons were that certain shipments slated for July wound up going out late in June, along with our disciplined stance on spot sales. Sadly, metallurgical coal spot price indices kept sliding. U.S. indices dropped another 6% from Q2 to Q3 and nearly 20% versus a year earlier. That produced a year-over-year earnings decline even with strong operational performance. Even as index pricing kept dropping, we still delivered Q3 financial results roughly in line with Q2. Some details: Q3 adjusted EBITDA came to $8.4 million versus $9 million in Q2. Q3's net loss was $13 million versus Q2's net loss of $14 million. Class A EPS posted a $0.25 loss in Q3 against a $0.29 loss in Q2. None of our primary peers have reported Q3 yet, but we believe our $23 per ton cash margins in Q3 will rank among the highest in our peer group. Remember, our Q1 cash margins of $24 per ton topped our peer group. Since then, cash margins have come down only $1 per ton. That's even with U.S. coal indices falling almost $20 per ton between Q1 and Q3. Once again, that speaks strongly to execution by both our operations and sales teams. Turning to what's ahead, we're implementing some minor tweaks to how we've guided 2025 operations, reflecting where the market stands right now. To be specific, we're fine-tuning total output and volumes sold. We're cutting back on certain higher-cost output so we can avoid having to sell tons into spot markets at possibly weaker prices, particularly shipments into Asia. At today's pricing, that ought to deliver a net gain for free cash flow. Because of the idling of the Laurel Fork mine at the Berwind complex, our expected production for the full year 2025 now sits at 3.7 million tons- 3.9 million tons, compared with the prior figure of 3.9 million tons. Expected sales for the full year 2025 now sit at 3.8 million tons- 4.1 million tons, compared with the prior figure of 4.1 million tons. For everything else in our guidance, we're broadly keeping the midpoint unchanged, except that we're bringing DD&A down from $71 million- $76 million to $70 million- $72 million, cutting the estimated tax rate by 5% to 20% to 25%, and nudging idle expenses up slightly from $1 million- $2 million to $2 million- $2.5 million. Keep in mind that our SG&A guidance now factors in stock comp, so it lines up apples to apples with the income statement figures. Moving on now to our rare earth elements and critical minerals segment, I'd urge everyone to go through Randy's September shareholder letter, available on our website, which walks through the recently announced upsize of the Brook Mine. To be specific, the economics indicate a pre-tax NPV at an 8% discount rate of $5.1 billion, alongside an IRR above 150%, with total initial capital cost of $1.1 billion. At full year, nearly steady state production by 2028, we project reaching more than $500 million of EBITDA from the Brook Mine. Considering the multiples attached to rare earth names, it goes without saying that we're tremendously enthusiastic about what this new business line could deliver; since Jason is traveling, I'll touch briefly on the markets for metallurgical coal and REEs. Starting with the metallurgical coal side, the market remains troubled by a persistent glut of Chinese steel exports. That situation has weighed on steel output in essentially every market where we traditionally operate. Although China's anti-involution rhetoric around supply-side reform has been a hopeful sign, we still haven't observed any significant drop in Chinese steel exports. One encouraging factor we've noticed in the market is that supply across each of the primary markets — Chinese domestic met coal, seaboard, and U.S. met coal production — has come under pressure; that's because price indices are presently trading into the third quartile of the global cost curve, and a large share of that supply is underwater at these price levels. We've even started seeing Tier 1 Australian producers idle portions of supply because of tough market conditions. Then, as the calendar flips to 2026, we expect additional supply rationalization. Right now, we don't foresee any significant upward movement in pricing. On the subject of 2026, negotiations are underway at present for metallurgical coal sales in 2026 to North American steel groups, and those talks are continuing. Like Randy mentioned, once that process wraps up, we'll come back with an update on those sales. Recent political headlines from the United States and China have clearly been the driving force in the rare earth and critical minerals markets. As you're aware, earlier this month, China imposed yet more limits on its rare earth element exports; those added restrictions highlight even more strongly why a dependable domestic REE industry is needed, particularly for the heavy REEs found in critical minerals including gallium, germanium, and scandium. Taken together, these elements account for over 90% of the revenue the Brook Mine is expected to generate; China has also prohibited exporting these elements to the U.S., and at present there is essentially no output anywhere in the United States of any of these REEs in critical minerals. With that in mind, what the past quarter has shown us is a genuinely bifurcated market, with Chinese pricing on one side and Western pricing on the other. As Randy mentioned, scandium is arguably the clearest illustration. At the moment, no dependable Western index exists for scandium. Even so, the U.S. Department of War recently struck an agreement with Rio Tinto to buy their scandium byproduct at $6.25 million a ton. That figure is 67% above the $3.75 million price used both in the summary of the Fluor PEA and in Randy's shareholder letter, and it is over 5x larger than the index prices manipulated by the Chinese. On the whole, we expect political tensions will only cause this split between Chinese and Western REE markets to widen. Since our Q2 call, we've held meetings with quite a few prospective customers. While we'll definitely inform the market once we have definitive offtake agreements signed, the broad array of inbound calls we've gotten from industry-leading companies across sectors such as aerospace and defense and automotive, to name just a couple, is encouraging to me. At this point I'd like to hand the call back to Chris Blanchard, our EVP for Mine Planning and Development.
Thank you, Jeremy. And good morning, everyone joining us today. Picking up on a few things Mike said earlier, I want to begin with an update on the work happening on the ground at the Brook complex since we last spoke. Over at the pilot plant site, the geotechnical drilling got underway and wrapped up in September, and the engineering report that followed, which we need for the foundation design, was finished only in recent weeks. Alongside that, we've secured every local zoning permit required to start construction and position the pilot plant. Ground was broken at the facility last week, just as Randy noted, and we anticipate the foundation work itself kicking off in November. Our expectation is that the building will be under roof early in 2026, in time to take delivery of the first pilot plant modules from Zeton. As Mike pointed out, this facility will also be home to our own analytical testing lab. Two ICP-MS machines will be the key pieces of that equipment; they're already on order and will speed up testing of our ore for rare earth elements and critical minerals. Over at the Brook Mine, as Randy said, we moved a substantial volume of coal, rock, and ore through the first months of operation. To give you a bit more detail, we mined and set aside roughly 300 tons of high-grade REE critical mineral ore for additional bench testing and pilot testing, both at the site and elsewhere. That material all came from a single band of strata sitting between our Deeps seam and our Monarch seam. Bulk samples of about 500 kg apiece have already gone out to the national labs, plus third-party commercial labs, to keep refining the flow sheet and testing it. For some perspective on how much high-grade ore we've stockpiled, once our pilot plant is on-site and running, we expect it to handle roughly 3 tons of ore per day. Given what we've built up so far, that gives us about 20 weeks of uninterrupted processing at the pilot plant's full capacity. Even so, we're working the mine this month and anticipate shipping and selling our first thermal coal from the Brook Mine within the next few weeks, destined for a test burn at a utility in the area. If that testing goes well, we think we could sign a term agreement to sell thermal coal commercially, kept separate from our rare earth ore. While we're in the pit gathering coal for the test burn, we'll also be separating new critical mineral ore from the next stratigraphically lower horizon, taken from the partings in the Monarch seam floor; based on all our initial drilling and testing, we expect it to carry a similarly high concentration. This Monarch ore zone should let us collect enough extra ore to keep our pilot plant supplied through its first full year of operation. The mine stays in active status so we can pull additional samples for testing whenever needed and keep pushing the larger project forward. Over a longer horizon, we've already been in talks with Sheridan's regional power provider to kick off the upgrade work on the area's high-voltage transmission lines, so that we can handle the high-voltage power requirements of the complete commercial processing plant at Brook. Turning now toward the east and to the metallurgical side of things, the third quarter came through well from an operational standpoint; monthly cash costs kept getting better and lower after the July holiday month, and by September they reached $86 per ton across the whole company. As was noted earlier, we made the tough call in early September to halt production at our low-vol Laurel Fork mine, which sits at the Berwind complex. Sadly, with where the market stands now and looks to be headed soon, it simply didn't make financial sense to keep running the mine, since our holding costs matched up with our net operating costs. Taking out the comparatively higher-cost Laurel Fork output did add a couple of dollars to bringing down the company's overall cash cost for September, and naturally, we'd look for that to keep going; the mine stays on hot idle status, and we're keeping up the mine and its infrastructure until market fundamentals recover enough to bring those incremental tons back. Even though we're now running three fewer underground sections than we had originally budgeted to run in 2025, September's productivity came in above budget by enough to nearly equal the entire original budget for tons produced. Let me remind everybody that the fourth quarter includes two months with the customary shutdown vacation weeks. Though we anticipate productivity and production carrying on at present levels, the effect of those two vacation months will soften the cash cost results we saw in September, which we expect to hold or improve upon in October. On the operational front, as we finish up our budgets for 2026 and later years, we're getting every one of our complexes ready to pivot fast once the market turns up. That said, only a small amount of meaningful capital for met coal growth is slated to be spent in 2026. Along those lines, we're also collaborating with all of our vendors and suppliers to trim costs wherever possible. In the same way, we're negotiating with our lessors for relief on royalty rates, or else strategically relocating our sections where we're able from higher third-party royalty areas onto coal we own. To put it plainly, as we wrap up 2025 and move into 2026, on the metallurgical side of the business, we'll put ourselves in the strongest position we can and manage what's within our control. That means volume and operating costs. We'll keep up our standing as one of the lowest-cost domestic producers and stand ready to restart our growth targets the moment it's responsible to do so. Having said all that, at this point I'd like to hand things back to the operator so anyone on the line can ask questions. Operator?
Morning, everyone. Thanks for laying all that out. On the bigger picture, there's been a lot of discussion regarding agreements involving the US and its partners. Could you share your perspective on that, and then explain how it affects whatever backing you receive from the American government for your development? I've got one more question after that.
So within the political sphere, whenever America begins striking agreements with other nations, that clearly carries broader political consequences. Regarding what this means for supply, I believe we still need to see exactly which kinds of supply those nations would provide to America. The verdict isn't in yet, in my view. Perhaps I'll turn it over to Mike for his thoughts, since he likely knows far more about certain operational details in some of those countries. When it comes to America and whatever it may or may not do in an effort to back its own home industry here, my sense is the administration is pressing ahead on multiple fronts to offer as much backing as possible, which is what we've witnessed across the past several months. Mike, go ahead please and share your thoughts on this.
Yeah, look, the way I see it, these deals are only for the near term. Until domestic production of those critical minerals scales up in the U.S., we may need to bridge that gap over the short run. Given what these critical minerals actually go into, I believe there's going to be U.S. domestic supply, and this is really just a near-term fix.
Thanks. My next question concerns pulling rare earth elements out of coal. Could you describe your efforts so far and what remains to be completed before that process is considered de-risked, and whether it has been accomplished in other places, or simply share some perspective on that? Thanks so much, everyone.
Absolutely. I believe a portion of the industry assumes we're pulling coal or rare earth elements out of fly ash. That's not what we do. We devoted a significant chunk of a calendar year to evaluating multiple processes and metallurgical flow sheets, all aimed at a single key goal: making every one of the high-value critical minerals soluble. What our process plant essentially does is take the clays and shales mixed in with coal, and from those we recover the rare earths. After solubility is achieved, the flow sheet carries lower risk when it comes to purification and separation, since technologies, examples, and commercial applications for those steps already exist. In my opinion, the riskiest portion of this flow sheet involved demonstrating that the minerals can be extracted, and that we have accomplished. Right now, within the pre-feasibility study, we're allocating more effort to that downstream purification, examining alternatives such as: should we go with precipitation, or ion exchange? We're upgrading the concentration of our rare earths and critical minerals so they're ready for additional downstream processing and optimization. As with any project, while we move forward through the engineering studies, we're seeking greater engineering design definition and optimization.
Alright, let me add one more point — something we've mentioned previously, though it's likely worth repeating. Coal, in essence, serves as a nonconventional rare earth source. It's nonconventional in several ways. For one thing, the majority of rare earths appear in hard mineral form. Mining coal is far simpler. It's also a softer substance when it comes to processing. Naturally, from the perspective of processing and mining, it isn't radioactive. Nearly all other hard rock minerals produce radioactive tailings, and those must be managed during mining, on the waste side once the mine is finished, and clearly throughout processing too. Coal is a far more benign feedstock to handle.
Thanks, guys. I'll jump back in.
Appreciate it very much, everyone. Would you be able to discuss how modular the designs are for the processing facilities, and how should we think about portions of that capacity beginning operations? Could it be that you might begin bringing some of that capacity up somewhat sooner while you bring certain sections of the facility up to speed?
Yeah, look, we are — and I believe the acceleration has been announced. What I discussed today is that we're running test work programs simultaneously; there are two commercial labs plus the U.S. government labs all working on optimizing this flow sheet. Once they're back at it, our plan is to have testing under way at three facilities. Regarding ramp-up, we've addressed that before. We do have some optionality there, whether it means staging things to match demand. What we've got to accomplish first, I think, is getting the flow sheet confirmed, engaging early with technology providers — and some of those conversations are happening right now — to ensure they move the engineering forward alongside us, plus identifying long lead items, which is what Hatch is doing at present, so equipment orders can be placed early. I think being permitted gives us an edge, since we're able to get onto this site and do some early site works, unlike projects that are still waiting on permits. Every one of those factors is going to help us ramp up faster.
Thank you very much. In light of the considerable worth being generated by that facility — or produced at that site — via scandium, could you describe the stage those discussions have reached? Are there any kinds of pricing matters, whether on the upside or the downside, that in your view might end up affecting a few of these projections? With additional capacity beginning to come on stream, I believe certain people could grow somewhat uneasy that you'll begin pushing around the wider market's pricing, yet that might not happen. I'd simply like to understand how far along those talks really are, plus whatever effect there might be on a few of the estimates.
Alright. We won't dig too deeply into the specifics of negotiations that are happening right now in real time. What I can tell you is that conversations are underway with customers both here in the U.S. and abroad when it comes to scandium. We haven't reached any discussion of specific pricing yet, but as I said, the last truly significant price marker, frankly, came from the U.S. government through the deal they struck with Rio a couple of weeks back. As for negotiations, we clearly aren't going to negotiate out in the open, just like nobody else would. As soon as we reach a stage where there's actual agreement on any points, then of course that will be made public.
Perfect. Thanks so much, guys.
Morning, everyone, and thanks for letting me ask. Continuing on the rare earth theme, a few other coal producers have suggested they might develop rare earths in the PRB. Could you give us some perspective on what makes Brook stand apart from other PRB assets? What do you see as the key point of difference?
Absolutely. I'll essentially relay what NETL told us — they conducted a nationwide evaluation of rare earth locations, honestly, across the entire country and particularly within the Powder River Basin. Within the Powder River Basin, naturally, there are zones containing REE concentrations. What sets the Brook site apart is that we sit, honestly, at the very western margin, practically the boundary itself, of the Powder River Basin. To our west lies an area that experienced substantial volcanic activity, you know, millions of years back, and we gained from that volcanic ash falling onto our location. We likewise had, in a similar way, many rare earth deposits that, honestly, were mixed together with the alluvial seas, and those migrated upward through the crust to our location. What NETL said to us was that you could travel merely a few miles from our position — and our site likely spans roughly seven or eight miles — and potentially discover nothing at all. In fact, during our mining, you can locate high concentrations and then move perhaps 10 ft- 15 ft over, and you encounter none. We really can't speak to what another company's site may or may not contain, but we've been given reason to think our site is especially unique, with certain geological anomalies that possibly can't be replicated in other places.
Understood. That context is extremely useful, so thank you. Still on Brook, I wanted to ask about the Strategic Critical Minerals Terminal — do we expect it to contribute a significant chunk of CapEx to the whole project, or is it likely to be fairly minor?
It ought to be fairly minor. Naturally, in the broader picture, the major outlay will of course go toward our commercial oxide plant. My view is that it brings in a rather distinctive element, since it lets us hold sway over part of the downstream. We'll essentially become a one-of-a-kind location in that respect, able to serve — as I mentioned — either as a regional or a national hub for stockpiling rare earths, whether for public or private purposes. It provides a degree of price visibility into what we're doing, and it also lets us place our own feedstock and oxides into the stockpile, which opens up a form of controlled marketing along with certain finance opportunities.
Understood, that makes sense. Thanks for spending some time with us today, and I wish you the best going ahead.
Thanks.
Thanks, operator. Morning, everybody. For my first question, I simply wanted to ask a follow-up. I'd like to get a clearer picture of what makes the Strategic Critical Minerals Terminal worthwhile. What sort of economics is the third party going to get? I suppose what I'm asking is, why not just sell straight to customers using a smaller footprint, which might come with better economics?
Your second question, I'm not certain I grasped it, but on the first one, what do customers get? Essentially, we're going to have what amounts to a clearinghouse. Picture something closer to a regional petroleum hub, where you're able to market out of that location to third parties in a controlled fashion, and that gives some optionality to other producers and to us as well. As far as the economics overall go, my view is it'll be a net benefit. Clearly it won't demand heavy CapEx from us, yet it gives us visibility into the market that we otherwise might lack.
I appreciate that. For my follow-up, you recently made public the oxide pilot plant facility—or at minimum, its groundbreaking. The goal is for it to be up and running by the middle of 2026, and your expectation is to run it across a 6-month span. From what I understand, that's pretty quick compared with other pilot facilities in this area. So my question is: what is it, in the end, that makes you confident you can dial in and confirm the processing methods within that schedule?
I'll have Mike speak to a few of the technical details. Like I mentioned before, our aim is essentially to speed things up by, first off, while we're in the process of putting up a building to house the pilot plant, we'll complete that foundational engineering design and testing at an off-site location that already possesses all the equipment, infrastructure, and testing capabilities to carry that out in real time over a span of months—possibly up to 6 months—before we're even required to have our own site ready so that all that material can be relocated into it. From that angle, we'll move faster. That's the Zeton arrangement. Mike, please go ahead and address a few other points here.
Sure, I believe that deserves a mention. For the past 2 months or so, we’ve been working on the design for the pilot plant. Even though we only recently shared our current status, Hatch has been working alongside us to develop a basic engineering package. We have the mass balances and flow sheets in hand. Equipment sizing has been completed. A detailed engineering package has been delivered to Zeton. This effort is progressing well. We understand which equipment is needed, its sizing, and where we’ll obtain it. Chris noted that we arrived at 3 tons per day of ore feed to the pilot plant. Zeton was our choice since this falls squarely within their expertise. They handle the design and construction of such plants. They possess in-house technical capabilities, allowing them to fabricate vessels when custom designs are required, for example. We aren’t outsourcing fabrication to third parties. Another point worth noting is that I worked with Zeton over 20 years ago on a highly complex pilot plant as well. Regarding your question on ramp-up, honestly, we have Hatch, which employs several rare earths subject matter experts across the Americas. We added Martin, who came from Fluor, where there were comparable unit operations involving separation and purification. Internally, we hold some understanding of how the design will support our ramp-up efforts. The 6-month operating window exists primarily to produce material meeting the quality specifications required by our off-takers. That pilot plant will serve as an asset we intend to keep operating for many years to come, as necessary, for testing and ongoing optimization, similar to other facilities. When companies have pilot plants onsite, it truly becomes a long-term asset for the business.
Yeah, I'd like to jump in here and say that, you know, there's a great deal we're working on out of public view that we don't put out there every single day. You know, we've been at this for roughly — I believe we're approaching year 7 now — so the volume of that unseen effort is far greater than what might be apparent at first glance.
Understood. Fellas, thanks for that detail. I'll chime in again as well.
Appreciate it, operator. Morning, everybody. Quite a bit has already been covered. I suppose, at a broad level, what would you folks need to observe regarding the pilot plant operation, discussions with customers, and so forth, before you'd feel sufficiently at ease to proceed toward full commercialization? Is it still your expectation to reach that decision by the close of next year, perhaps?
Absolutely. I'll offer a remark at a broad level, likely from the perspective of finance and strategy. I'll have Mike speak at a broad level about the technical dimension. Naturally, like any typical development undertaking, especially within a new business line, we're going to need to see validation that customers accept our product, pricing that suits our product, and suitable contracts, ideally structured over the long term, that lay the groundwork for standard financing arrangements. You know, this won't be a cheap undertaking. We recognize that; it's a project of critical importance, not just, naturally, for Ramaco, but honestly, we believe for the nation. We'll proceed with every deliberate measure. We aren't gunslingers; we aren't promoters in the sense of attempting to race ahead of markets that don't exist. I believe we'll apply the same type of cautious discipline we've employed in our metallurgical coal operations to guarantee we have a market for the product we'll construct; we'll finance it in a conservative manner, and we'll strive to ensure it runs efficiently and at minimal cost. Mike, I'll have you continue from here.
Absolutely. In my view, there are two reasons for running a pilot. First, it makes sense for us to demonstrate that our flow sheet is effective and that we're able to generate product meeting the specifications our off-takers require. Many commercial plants and projects get constructed without any piloting at all. Because our deposit is unconventional, doing this gives people reassurance that our flow sheet is technically sound and that we can hit the product spec. That's genuinely what I'm trying to accomplish — technical validation — and it's the reason we're doing a pilot.
Thanks for that, guys. I've got maybe just a single question regarding the met coal segment. So, the revised guidance for sales across the entire year appears to imply roughly 900,000 tons to 1.2 million tons being delivered during Q4. And it seems around 3.9 million tons are committed, if I'm not mistaken. In your view, where will you eventually land inside that band? What might be the positive or negative factors affecting that?
Hi, Nate. Like Randy mentioned and Chris also noted, operations at the mines are performing excellently, yet clearly, we've kept on essentially optimizing output, since we simply won't offload it at a loss in the spot market. For sure, we have material sitting in inventory and the capacity to reach the top part of that range. Much like Q3, when you observed us clearly arriving somewhat nearer to the bottom portion of the range for shipments, we'll keep watching the market and basically observe how it all plays out. I'd say likely most of that range is honestly driven by market conditions.
Yeah, Nate, something we consistently notice when Q4 comes around is that, at minimum across the past 2 years, many of the domestic steel players have honestly purchased too little as they head into procuring their original contracts. Once you reach Q4, they've got to make up ground. That may be especially the case during a year featuring supply rationalization. As you're quite aware, that's what we've witnessed. Quite a few suppliers out there have either scaled back or, frankly, gone bankrupt. How Q4 unfolds should prove interesting, I think.
Okay, that's really useful, guys. Thanks for taking the time, and good luck during the fourth quarter.
Thank you.
Hi, everyone. I appreciate you answering my question. At the Brook Mine, your portfolio of critical minerals is quite varied. The pilot prototype you're putting together in Ontario — is it meant to handle every kind of mineral in your lineup, or might you require extra partnerships down the road to deal with certain rarer metals? Some added detail on this would be great.
Sure, we don't expect to bring in any partners. Lately there's been discussion, I'd say, about whether there's a chance to extract another element from this combination. You're correct. This basket is extremely distinctive. Yttrium has drawn interest, possibly samarium, plus other elements. Gadolinium has come up too. One advantage of a pilot plant, I'd say, is the adaptability it offers for trying out additional items; we're building it with that in mind, so the pilot plant gives us that flexibility — should we choose to attach something in order to test or to validate, that option is available to us.
Alright, that's quite useful. Thanks a lot.
Good morning, everyone. I'd like to discuss the permitting aspect. Could you provide some insight into how long it will take to secure permits for the rest of the mine to support the higher throughput objectives you've mentioned?
We're currently in discussions with certain federal agencies regarding permits. Naturally, we've been in continuous communication at the state level. We've just obtained our subsequent five-year renewal for the initial mine permit, which honestly allows us to keep doing all that we intend without needing any additional modification. What we're working on at present, and perhaps I'll let Chris elaborate a bit, is that we're crafting our mine plans concerning the rest of our 16,000-acre property. Naturally, the initial mine plans encompassed roughly a third of that or less. After those plans are finalized, we'll move forward, likely with a mix of both federal and state expanded permitting. Chris, perhaps you could share a few words about your mine planning.
Sure, I’ll just piggyback on Randy’s comments with a bit more detail. The permitted zones we already hold are extremely large. At the base rate, that supports roughly a 30-year mine plan, and depending on the ultimate size we pick for mining at Brook inside the permitted footprint, we could run two or three fleets. Making that happen would need only small changes to the permit related to how the mine is staged, rather than requiring the whole property to be permitted from day one. There’s plenty of runway ahead of us; we’re drilling every testing well needed for water beyond that permitted boundary, and honestly, to reach greater depths too; given how much ground we control at Brook, that isn’t even something we’re worried about at the start on the initial mine permit.
Okay, so one point worth making here — considering just how enormous this deposit is, the lifespan of the mine really hinges on how fast we extract. At one extreme, we're likely looking at beyond 150 years of mine life. Should we choose to speed up extraction, then naturally that figure shrinks, and it all depends on the yearly pace we set for mining. Right now, we've got far more than we could possibly need. What's really intriguing — and I'd throw in another angle here regarding permits — is this: up to now, honestly, we've only examined what you might call a standard Powder River surface mining approach, the kind where we core drill to roughly 150 ft, 200 ft. But we've found — or really, NETL assisted us in finding — that deposits extend far deeper. Some cores we've taken recently revealed significantly greater concentrations at depths around 500 ft to 600 ft in certain parts of the site. Beyond what exists near the surface, there's potentially a vast, largely untouched and unexamined zone lying much further underground, which could suit an entirely different extraction method. We've discussed previously the idea of employing some version of in situ injection well mining to reach the deeper material, and that would likely involve a separate permitting process. All of this just goes to show the true scale of this deposit.
That's genuinely fascinating. Thanks a lot. Appreciate it. Just one brief follow-up question. Randy, you brought up keeping an eye out for bolt-on acquisitions that could be opportunistic. Could you give us a bit of insight into the types of opportunities you're seeking, and how you would describe the acquisition market's overall appeal? Thanks.
Yeah. I mean, whenever the topic of M&A opportunities comes up, you know, I always joke that the M part doesn't really interest us much, but we'll certainly consider the A. You know, in the past we've sort of run a program of acquiring assets somewhat opportunistically, whether reserves or infrastructure within the coal space, that add to our value, and that we can obtain on an advantageous basis, perhaps because of market distress affecting others. Honestly, we're currently evaluating a few of those. We've also completed a small acquisition, frankly, in the Brook Mine area, where roughly 1,200 acres of surface property was purchased by us on top of what we already hold, which is going to give us considerable optionality for planning purposes regarding where we might want to locate some of the industrial areas there; we're constantly watching, but we tend to be a fairly opportunistic buyer.
Got it. Thanks for making room for us, folks. We really value it.
Likewise, thank you.
I want to express my gratitude to each of you for joining us on this call. I know it ran somewhat longer than the quarterly calls we usually hold, but going ahead, what we're essentially doing is walking through two distinct operations, and each one matters a great deal. Thank you for your patience with us, and we will definitely be eager to keep all of you updated as we go along. We look forward to speaking with you again on our next call once the year has ended. Take care.
That brings this call to a close. We appreciate your joining us for today's presentation. You're free to disconnect at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ramaco Resources, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Ramaco Resources, Inc. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.