Thanks — on behalf of Ramico Resources, I want to say welcome to each of you joining this call about our second quarter 2026 earnings. Here with me today are Randy Atkins, our Chairman and CEO; Mike Woloszak, who is our EVP of Critical Mineral Operations; Oren Atkins, our SVP of Critical Mineral Sales; Chris Blanchard, our EVP for Mine Planning and Development; and Jason Fanning, our Chief Commercial Officer of Metcall. Before we begin, I need to give the customary cautionary statement. Some topics discussed today qualify as forward-looking statements under the Private Securities Litigation Reform Act of 1995. Such statements reflect what Ramico expects regarding events still to come. They involve risks, uncertainties, and other factors, many of which Ramico cannot control, and those may cause actual outcomes to differ materially from what those statements anticipate, with average adjusted EBITDA projected in a range of $600 million to $1.3 billion. A forward-looking statement speaks only as of the day it is issued, and except where legally required, Ramico has no obligation to update or revise any such statement, whether due to fresh information, later events, or any other reason. I'd also point out that a reconciliation of the non-GAAP financial measures we plan to discuss today is included in our press release, available at www.ramicoresources.com. And lastly, I'd encourage all listeners to go to our website and download today's investor presentation. With that, I'll turn things over to our Chairman and CEO, Randy Atkins. Thank you all for joining us this morning; we have a lot to get through. First, on the critical mineral front, as you know, last week we released the much-anticipated Hatch conceptual study along with the shareholder letter, and both can be found on our website. The Brook Mine project in full is transformative, both for Ramico and for the country; it also demonstrates what is genuinely required to develop, construct, and finance a major supply chain solution to the stranglehold China has over the West in critical minerals. At Ramico, we've been working on this for roughly six years. We think we've passed the halfway point toward commercial production. Realistically, catching up to the Chinese—who have pursued this for over thirty years—will require the U.S. a number of years. As you know, last fall we shifted direction to test carbochlorination using coal-based feedstock. We've now reached a method for processing ROAR. That takes us beyond simply being an upstream feedstock provider and puts us in position to potentially become a large-scale midstream refiner as well. The refinery is without question the largest and most expensive project we have ever considered, but it also represents a unique long-term potential profit center on a transformative scale. Regarding our commodity businesses, whether critical minerals or met coal, we remain conservative in our fundamental approach. This project will receive that same treatment. Put simply, now that we grasp both how to process and which oxides, metals, and emmericks we can produce, going forward we'll work to improve the refining methods so they stand on firmer financial ground. We'll also seek to refine the refinery's build cost along with its build timeline. Regarding financing, let's be sure the framing is correct. The refinery's heaviest capital outlay remains over 2 years off, and we're deliberately structuring that runway so the project can be funded in the manner most favorable to our shareholders. As previously stated, talks with the government have been ongoing. The government's financial backing has been awaiting completion of independent third-party diligence; beyond that, the procurement offtake counterparties, including the applicable federal agencies, quite sensibly were also holding off on the Hatch study before moving; with the Hatch report now in hand, we're set to advance these discussions with OPTEC and the commercial financing counterparties. Essentially, last week a path at last emerged, enabling us to proceed and truly drive these talks toward some form of resolution. I won't revisit each figure already set out in that letter from last week — I'll merely highlight several milestones. Hatch was tasked with examining the Brook project under two distinct plant feed scenarios. The first stood at 1.8 million, whereas the second was larger, at 3.5 million tons of feedstock. What drove the larger scenario was largely about supplying additional feedstock output to satisfy domestic government supply chain needs. Whether expanded or reduced, this project stays, and always has been, extremely scalable. Initially, the coal output permitted at our mine here was 8 million tons, and afterward we lowered that number to 2 million tons before its shift into a rare earth venture. As I'll mention, our deposit contains sufficient feedstock to endure for generations, so a boost in output is always an option. If the economics or the timing require it, we can similarly trim the tonnage we mine and the oxide we produce initially, then ramp production up afterward. Thus, based on what demand appears to be ahead and whether financing can be obtained, we'd be able to tune production higher or lower. Ramico's efforts to de-risk the project — encompassing off-take agreements and, of course, financing — will determine how big the facility is when it first starts up. If this company has one defining quality, it's that nearly every day we change the play at the line of scrimmage. Thank you. Drawing on the capital and operating cost figures that Hatch supplied for those two alternative feedstocks, our internal modeling of the Brook Mine pointed to a potential NPV of roughly $3.4 billion to $8 billion, plus average adjusted EBITDA between $600 million and $1.3 billion. Set against FLUR's 2025 studies, both of those numbers represent a substantial increase. I'd add as well that these figures leave out any uplift that might arise from introducing e-waste into the feedstock. According to Hatch, versus the FLUR report issued 12 months ago, the timeline has been stretched out and the capital costs have risen. Profitability has trended the same way. Of course, as we proceed with testing, optimization, and engineering work, our goal will be to shorten and reduce both the schedule and the spending. One criticism of last year's flu report was that scanned-in production figured too heavily in our plans. Analyses from Hatch and from us alike now show that roughly 75% of the revenue we might generate would tie to key critical minerals whose main demand stems from the semiconductor industry. Our growth path would thus be tied to a range of key markets too, be it data centers or AI. In fact, at the output levels we project, the Brook Mine could potentially meet a multiple of the whole country's requirement for gallium — the strategic critical element — along with the related products used throughout these industries. On the subject of independent report milestones, we expect to put out a report on e-waste this fall. and the way it gets used, with a new SK-1300 compliant technical report summary coming afterward, before the year is out. That document is going to fold in the Hatch flow sheet together with the benchmark scale test work now underway.
Later this year we'll file that year-end documentation, and then a complete pre-feasibility study arrives in spring 2027 — the following official milestone in reducing risk on this project. Something we constantly keep in mind is that the Brook Mine fundamentally began as a one-of-a-kind upstream geological opportunity. It has, as previously mentioned, been described as the country's biggest unconventional rare earth and critical mineral deposit. On approximately just a third of the mine's overall acreage, even under the permits we hold right now, we ought to be running that mine for generations. Beyond that, we're partnering with independent testing laboratories to find commercial-grade quantities of additional critical minerals and rare earth elements in the deposit that haven't been made public so far. Should independent assays and tests verify deposits of commercial size, we'll fold those into our product mix going forward. Eighth, our internal work has uncovered over 50 of these minerals and REEs in the deposit; and, as Mike Woloszek will explain, building at our pilot plant remains on track to finish later this year, with full-scale operations anticipated to begin in 27. This autumn we'll begin relocating assorted lab operations into the new facility, speeding up both our testing capability and our timing; at this point I want to discuss our legacy meteorological business. As you've heard from several of our other publicly traded coal peers, weakness in the market has persisted across the majority of U.S. coal qualities, particularly the highball coals. At present, too much domestic production is competing for a constrained export market. The low-volume coals, on the other hand, have demonstrated ongoing relative strength. Mirroring that market reality, our board in June gave the go-ahead for capital on the $25 million development of the first two underground sections at our Maven complex. Deployment of that capital happens across the coming 12 months, divided evenly between this year and 2027. We expect that by the close of 27, this two-section deep expansion at Maven will contribute roughly 600,000 tons of production when running at full capacity. These are tons capable of delivering cash margins approximately twice the company's overall second quarter margins. Alongside our current surface production at Maven, that also means a million tons of annualized production by 27. there's potential down the road to add two more deep sections of MABEN; doing so would lift our low vol capacity by an additional 600,000 tons, bringing the MABEN complex to roughly 1.5 million tons of low vol production in total. And to round out our broader low-ball growth plans, we'd pair Mabin with the growth at Berwyn we announced earlier. That involves adding 300,000 tons in 27 at the Berwyn number three section; the three Berwyn sections would then reach 900,000 tons of yearly production, with the option of a fourth section adding another 300,000 tons. Once those four sections join Berwyn's Laurel Fork mine, another complex emerges with a 1.5 million ton production slate. At that point, Berwyn would achieve the same production level in the future as Maven, giving us a total of 3 million tons per year of low-vol output from the two complexes combined. Plus, when you add that to the over 3 million tons at Elk Creek and Knox Creek, we end up with a well-balanced medium-term portfolio exceeding 6 million tons of overall production, which is up from where we stand now at approximately 4 million tons. The strategic goal of raising low vol to 50% from roughly 25% at present is laid out in our investor slide. I'd also like to give credit to our Meteorological Operations Team. Mine cost during the second quarter came to $99 a ton, marking the fourth quarter in a row of cash costs below $100. We managed this even though diesel prices rose by about 33% quarter over quarter during Q2. Our costs are still positioned in the first quartile of U.S. met coal cost curves. I'll wrap up by touching on a few of our balance sheet metrics; regarding our strategy for shareholder return and capital allocation, we repurchased a substantial quantity of stock for the first time this year. We have now bought back over 8% of our Class A shares for roughly $66 million; in our view, this represents a sensible deployment of liquidity, since we believe our share price is currently undervalued. We also closed the quarter with record liquidity exceeding $400 million following those buybacks. Thanks to our strong liquidity position, we now also have the capacity to be holding approximately $100 million in stockpiled coal inventory as of June 30, ready to be sold at improved pricing once market conditions get better. To sum up, this quarter has brought a number of favorable developments for us as we start rolling out transformative growth opportunities across both our coal and critical mineral platforms. With that said, I'd like to hand things back to the rest of our team to go over finances, operations and markets. And to kick that off, I'm going to have Mike Woloszek, who heads our critical mineral efforts, lead and give some updates on the progress we've made there.
Thanks, Randy. It was a packed quarter for us, and the biggest priority was teaming up with Hatch to finish the carbachlorination study. What that study showed is that the Brook Mine project has extraordinary potential. Let me begin by explaining the reasoning behind choosing a carbochlorination flow sheet for the Brook deposit. At Brookmine, we have rare earths along with other high-value critical minerals, including gallium, scandium, and germanium. A portion of those high-value critical minerals sits within carbonaceous kaolinite clays. To extract these critical minerals, the kaolinite mineral structure has to be altered. With carbochlorination, that change also generates additional income, since a modest amount of volatile aluminum and silica chlorides are turned into high purity alumina and high purity silica. What's left of those chlorides helps regenerate most of the chlorine needed by the process, so makeup chlorine requirements stay low. The flow sheet is designed so mineralized brook coal is the feed for carb chlorination, serving as both the critical minerals source and the reducing agent; in other words, the coal acts as plant feed and reagent simultaneously. About 75% of the revenues from this flow sheet come from non-rare earth critical minerals. That ties directly to the unconventional geology of this deposit, and it explains why TREO grades by themselves are not a meaningful gauge of asset quality. On top of that, we can increase HPA and HPS production whenever the market calls for it, needing only incremental capital to raise conversion of those chlorides into oxides. There is no need for us to raise the feed going into the plant. Carboclorination has had commercial demonstration for over 70 years. There is nothing novel about this process. What we are doing is adapting proven technology to this feed material, since it aligns with the geometallurgical response of the Brook Mine. The first round of tests produced average extractions above 90% for every targeted critical mineral, and third-party independent testing verified those results. Later testing delivered even stronger extractions, yet third-party laboratories remain a timing bottleneck. To boost test volumes substantially and cut turnaround times, we have been constructing our own analytical and metallurgical testing facility on site. Our analytical lab is operational now, and we expect internal carbon chlorination testing to begin this quarter. Our in-house testing will center on getting the best possible separation of the metal chlorides in the carbocombination, and those findings will feed into the following stage of the study as well as the pilot plant's design; we've hired a seasoned lab manager to grow the team and run day-to-day laboratory work. As Randy mentioned, we're looking at extra value that isn't captured in the study's numbers. We've identified trade-off studies focused on reducing both capital and operating costs, and on adding e-waste into the mix to raise recovery of the critical minerals we're targeting. HATCH's study called that out as an opportunity. How gallium and germanium chlorides behave thermodynamically under the operating conditions we're planning is already well understood. Neither of these elements is stable, and each one escapes effectively into the off-gas stream, where the equipment we've already named in the flow sheet is able to trap it. That means co-processing a controlled e-waste fraction calls for no additional reaction chemistry. Based on preliminary projections, introducing small amounts of e-waste to the feed mixture ought to produce a sizable increase in gallium and germanium production, while requiring only very limited adjustments to how the process operates. The Hatch Team has now begun the initial design stage for the Carbochlorination Pilot Plant, and during this quarter they will deliver a package to Zeton so that detailed design work can proceed. Meanwhile, at the site of the pilot plant, excavation, piling, and part of the foundation work were completed over the quarter. During this quarter, we expect to wrap up the remaining deep foundations along with the slab-on-grade foundation work. The building steel meant to house the pilot and research equipment should be finished in Q4. During Q2, we added more drill rigs at the site. As of the quarter's end, 56 holes have been drilled this year, and our infill drilling program has been updated to 24. The aim is to target part of the 4,500 acre permitted area so that resource confidence can be raised from inferred to indicated, which would back the pre-feasibility study. We've grown our in-house capabilities for geology logging and sampling, and we expect to be running in-house assays on drill core during this quarter. WSP, working outside the HATH scope, advanced a number of key technical workstreams. Those included shaping the mine footprint, determining where the tailing storage facility should sit, and examining borehole positions. Geotechnical and properties assessments are likewise in progress to inform TSF siting. With that, let me hand things over to Oren Atkins, who serves as our SVP of Sales for Critical Minerals. Thank you, Mike, and good morning to everyone. I'll provide a commercial update regarding our Brook Mine, where our approach to critical minerals sales continues gaining ground on several fronts. Beyond the technical efforts supporting the HATH conceptual study we recently published, we have assembled a committed in-house marketing and sales group focused on the Brookmine materials. An experienced set of industry consultants and lobbyists backs this team. Since no fewer than 20 distinct high-value basket materials feed into countless industry supply chains, reaching out and being visible has ranked among our top priorities. Toward that goal, the team has completed more than 30 NDAs tied to possible offtake and technical engagement, and talks about offtake are underway with counterparties covering each material that will be produced at the Brook facility. Thanks to relationships already built throughout the downstream supply chains, we anticipate that commercial progress will move forward alongside our technical development read a hatch report, with further MOUs set to be revealed soon. One other thing worth pointing out is that we found the critical mineral deposit at Brook Mine together with the U.S. government. SEMICO keeps strengthening ties with several government agencies in order to back their strategic efforts to bring Western critical mineral supply chains onshore. Several of the materials we work with go into defense uses, and those have faced export limits. Because of that, we talk with the Department of War on an ongoing basis so that we line up with what their supply chains require. As Mike mentioned, we anticipate that the carb chlorination approach will produce greater amounts of high purity gallium, germanium, and silica products. The thing that has us excited is that the main demand drivers for what we produce sit in the semiconductor, technology, and defense sectors. These products are in high demand, since Brook could be the first primary source mine for gallium anywhere in the world. That comes at a moment when 3 years have passed since China shipped gallium to North America. Right now we're holding active talks with possible off-takers, everything from big gallium purification and distribution outfits to makers of wafers, power devices, and RF. Valuable HPA and HPS also come out of the carboyl chlorination process, made from what used to be GANJ material. HPA has many uses spanning substrate, semiconductor, ceramics, yet the fastest growing demand is for batteries. Ramico is talking with technology and battery companies, at home and overseas, to secure offtake for this material. High purity silica likewise reaches into the semiconductor and battery industries, giving crossover of several value materials to prospective off-take customers. When it comes to scandium, solid oxide fuel cells keep driving demand upward, and Brook sits in a strong position to supply domestic feedstocks to this expanding industry. We're in talks with a large company in this space regarding both offtake and a circular arrangement of responsibilities.
We're recovering materials from used fuel cells. Gandium additionally boosts the strength-to-weight properties of metal alloys, and a dependable domestic source from Brook might open the door to creating novel alloys for defense, space, aerospace, and auto uses. Ramico has brought on an industry consultant possessing many years of expertise in developing scandium alloys, which has significantly sped up our entry into these supply chains. And right now we're talking with two material developers who are working to standardize new aluminum and titanium alloys with defined end-use applications. Turning to rare earths, our Emric contains a mix of light and heavy rare earths, which makes it a distinctive, valuable product in the market. We're under NDA and speaking with several separation companies, both within the country and overseas in allied nations, and our main goal is to confirm the technical suitability of those facilities to separate every one of our rare earth oxides, or each of our rare earths, into sellable oxides. We put out an MOU with RE Alloys for offtake and separation of EMRIC and are talking with several other companies to lock in comparable separation and offtake deals. Finally, I'd like to point out that e-waste was flagged as an opportunity in the HATCH conceptual study, since the carbochlorination facility gives us the flexibility to feed a variety of these mineral-rich materials into our feedstock ore to increase critical mineral yields and production; we're in active talks not just with e-waste providers to supply materials, but also with offtake customers to build a circular setup for recycling used materials or manufacturing waste. Two groups have already shipped materials to our Brook facility for testing, so we're actively pursuing the technical and economic feasibility of adding recycled materials into our carbon chlorination facility; now that the technical and economic information from the patch report is public, expect things to speed up on various supply agreements soon; with that, thanks for your time, and I'll hand it over to Chris to discuss our operations.
Thank you, Oren. Let me take us back east for a moment and walk through how the metallurgical coal segment performed. To start, I'm happy to share that our safety and compliance results stayed solid during Q2 and showed significant improvement versus what we posted in 2025. If you look at the numbers, incidents came in 58% lower in 2026 across the same stretch of 2025, which works out to a 54% drop in our total reportable incident rate on a year-to-date basis. Employee turnover at the mines has also come down meaningfully through this extended period of weak market conditions. Having fewer open positions and a steadier crew has clearly helped drive the gains we're seeing in safety. Turning to operations, we're still holding cash costs at a reasonably acceptable level, below $100 across the whole company. That's been achieved even with the pressure from persistently expensive fuel, which ranks among our biggest single direct cost items, along with the extra pass-through expenses tied to transportation and logistics. We kicked off the year paying roughly $2.50 per gallon for diesel, then averaged $4.64 per gallon during Q2, with a high point of $5.71. Thankfully, prices eased back in late June and early July. But on the downside, renewed tensions in the Middle East have driven diesel pricing up to $4.71 as of the start of this week, which is actually above where Q2 averaged. Given our usage and our production mix and levels, every dollar of diesel translates into more than a dollar of added produced coal costs. Just the diesel factor alone in Q2, measured against where we started 2026, came to about $3 per ton produced. We're happy with how cash costs came in, but it's clear they would have looked even better without these outside pressures. Our Elk Creek complex delivered strong cash cost and productivity results below $100. The main Berwyn mine likewise came in on plan or a touch ahead of our Q2 forecast for produced tons and cash costs. As Randy noted, we've added more low-vol output from our Laurel Fork Pocahontas No. 3 mine, which supplies the Berwyn Prep Plant. Most of the ramp-up and restart expenses are now behind us, and although the Orel Fork mine hasn't yet reached the productivity levels of Berwyn, it keeps getting better each month. Keep in mind that Laurel Fork output serves as a bridge for labor and capital equipment until the third section at Berwyn is ready to go. That gives us future optionality for extra low volatile flex production should we decide to keep running it. On the Berwyn Mine ramp-up, work on the ventilation projects carried on through Q2. The intake shaft is fully excavated, and the concrete liner is 46% built and poured. After the liner wraps up, we'll install the new mine fan and then adjust and optimize mine ventilation for the third section. We experienced a delay of roughly 3 weeks in the shaft excavation, yet we continue to expect that the third section at Berwyn will come online very early in Q4 of this year. Over at our Mabin operations, there's a considerable amount of work happening right now aimed at expanding our low vol portfolio, where supply side fundamentals look much stronger and there could even be shortages of the highest quality low vol culls; as we mentioned on our previous call, the Maven Batchway Loadout Project has advanced and that effort is ongoing; a Q4 start up for the rail loadout at Maven remains on schedule. The near term effect from that will be about $20 for each clean ton in reduced transportation costs on coal produced at Maven. And when looking at total company cash cost, the savings from the Maven loadout will bring overall cash costs down by nearly $2 per ton across the mines currently producing; we're pulling capital that had been planned for 2027 forward into 2026 so we can capitalize on the Maven loadout, which will soon be activated, along with the superior quality low vol reserves we hold at this complex. Field work has started on the surface excavations and the electrical infrastructure installation for our first mine, which sits in the Beckley Seam. Coal that is low sulfur, low ash, and high CSR ought to complement our operating Sewell Seam surface mine at Highwell Miner. Every piece of mining equipment needed for the first section has either been procured or moved over from idle operations. We project first production in early 27, with the possibility of some incremental tons late this year. The second underground low-vol section should begin operating in the latter half of 27. Once we reach the end of 27, we could potentially be producing more than 1.1 million tons of incremental low vol coal on an annualized basis, above where we are now. That figure combines the third section at Berwyn, two sections at Maven, and the possible continuation of the Laurel Fork mine. Balancing out this low vol growth, we keep encountering difficulties on the high vol side, which is oversupplied. We have taken the proactive step of idling one of our three stone coal sections at Elk Creek. We're directing that labor and the idle equipment toward strengthening our workforce and reducing overall maintenance capital spending across the company. We expect high vol production to decline year over year overall, though low vol growth will offset that, and it will also favorably rebalance our production portfolio in a positive way, a positive direction. Within the next few months, we ought to start gaining some clarity on 2027 domestic pricing, and we may make further adjustments to hot ball production as a result. Now I'd like to hand the call over to our Chief Commercial Officer, Jason Fannin, to talk about the markets and their dynamics. Thanks, Chris, and good morning, everyone. Today, I'll go over our Q2 sales results, give an update on our 2026 Metco sales position, and share the market outlook. Then I'll take a few minutes to discuss the commercial approach supporting our low vol growth initiatives. Beginning with what we delivered in Q2, as I see it, realized prices rose by $2 per ton compared with Q1, driven by stronger shipment volumes in both domestic and PLV-linked categories. Now turning to how pricing looks for Q3, LV-linked tonnage should account for approximately 22% of total volumes, up from about 15% in each of Q1 and Q2. As for where we stand on total 2026 sales, when Q3 began we had commitments in hand totaling 3.8 million tons, which represents roughly 97% of production at the upper end of our revised guidance. Our fixed price book for 2026 now sits at 2.5 million tons, at a blended price of $121 per ton. Beyond that, we hold another 1.3 million export tons tied to index-linked arrangements, scheduled for delivery during the second half of the year. Shifting to the outlook for seaborne metallurgical coal, average pricing across the Pacific and Atlantic basins was essentially unchanged in Q2 relative to Q1, though PLV surrendered part of its value during July. Even so, as Q3 gets underway, U.S. indices have mostly held their price levels, gaining in relativity versus BLV. On the supply and demand balance, worldwide supply of prime hard-cooking coal keeps shrinking. Australian shipments stay far under their historical norms, held back by constrained capital investment, heavy royalty obligations, and repeated production disruptions. Safety-related mine shutdowns in China's Shaanxi province earlier in Q2 likewise pulled significant coking coal supply out of the Pacific market. A large share of that was low ash, low sulfur, high CSR material that is hard to replace. All things considered, we see supply-side factors establishing a fairly solid floor around present POV levels. That leads me into the commercial angle of the lowball strategy and the Maven development plans that Randy and Chris have each already described. Starting in early Q2 2025, U.S. lowball pricing has held a persistent and frequently sizeable premium over U.S. highball indices. From a marketing perspective, Maven volumes have already been successfully trialed in the domestic market this year, and we intend to keep growing our trial volumes into more North American mills across 2027. In the same way, Asian steel producers show strong interest in locking in premium U.S. lowball supply. Our inaugural seaborne trial cargo of MAVEN is due to reach India later this week, and it will go through industrial consumption later this month and on into September; we are likewise negotiating to provide a trial cargo of Mabin to Northeast Asia in Q4. To close out the Metco side, we are now entering the early stage of the domestic negotiating season. While we won't get into specifics on those today, our focus stays on boosting the value of our sales portfolio; with that, I'll hand the call over to our Chief Financial Officer, Jeremy Sussman, to review and discuss our financial metrics.
Thanks, Jason. I'll start with the balance sheet, and I want to echo what Randy said. Since the beginning of this year, our strong liquidity has allowed us to repurchase $66 million of stock opportunistically; that action has reduced our shares outstanding by roughly 8%, or nearly 5 million shares, so we now have fewer than 52 million shares outstanding. We still have authorization left for buybacks. As Randy mentioned, we'll continue to assess opportunistic repurchases as a prudent use of capital, depending on conditions. I'd point out that we ended Q2 with one of the strongest balance sheets in the public MetPoll space, with more than $400 million in liquidity even after all those buybacks. Beyond that, as of June 30th, we held roughly 1 million tons of coal in inventory, which should provide a meaningful working capital tailwind if markets strengthen through the year as we anticipate. Going forward, this strong balance sheet and cash position gives us the flexibility to invest in our coal and rare earth element products. business at the same time; turning to second quarter operational performance, High cost results came in extremely solid once again in this difficult market, with cash cost per ton sold of $99. That figure is particularly impressive when you consider the effect of higher diesel costs. Second quarter cash margins of $17 per ton declined from $20 per ton in the same period of 2025. The cause was lower realized prices of $116 per ton, a 6% drop from $123 per ton in Q2 of 2025. As Jason discussed, U.S. high vol markets remain weak. Although Australian benchmark pricing rose by more than $50 per ton year-on-year in Q2, U.S. highball indices fell about $10 per ton over that same period. Frankly, we view this trend as unsustainable, given the losses appearing among higher-cost producers. Our Q2 production levels slipped modestly versus the same period a year ago as we continue to exercise discipline on output from higher cost operations amid challenging market conditions. For example, we proactively idled one section at our high-vol stone coal mine at our Elk Creek complex; on the financial side, Q2 adjusted EBITDA was $6 million versus $9 million in Q2 of 25. Class A EPS showed a $0.26 loss in Q2 versus a $0.29 loss in the same period of last year. Turning to the outlook, we're providing several guidance updates related to our strategic shift to grow low vol metallurgical coal production to approximately 50% of our overall slate. Given continued weakness in current market conditions, full year 2026 production guidance is now 3.6 to 3.9 million tons, down from 3.7 to 4.1 million tons. Full year 2026 sales guidance is being reduced accordingly to 4.0 to 4.3 million tons, down from 4.1 to 4.5 million tons. million tons. Despite output being reduced, we are holding the midpoint of our full-year 2026 guidance for cash cost per ton sold at $96 to $99 per ton, versus $95 to $100 per ton previously. For full year 2026, capital expenditures are now projected to come in at $92 to $97 million, compared with $85 to $90 million before. That $7 million rise reflects funds being deployed this year on the Maven Underground Low Vault Road project, which the Board recently approved. We are making minor revisions to the rest of our non-operational full-year 2026 guidance, and those are available in our detailed guidance tables. Turning to the third quarter of 2026, we expect coal shipments of between 950,000 and 1.1 million tons, and we can increase that figure should market conditions warrant it. Third quarter cash costs should also trend toward the upper end of the full year range, reflecting continued elevated diesel costs linked to the Iranian conflict. Class A EPS posted a $0.26 loss in Q2, against a $0.29 loss in the prior-year period. In short, our financial position is strong enough to move forward in multiple directions as we work through the continued challenging met coal markets and strongly advance our emerging critical minerals business. With that, I'd like to hand the call back to the operator now for the question and answer session.
Hi everyone, Tyler Bissett here filling in for Brian. Appreciate you letting us ask a few things. Really useful perspective on the met coal market, and it seems like U.S. met coal pricing has come down somewhat through 3Q so far, though it's stayed fairly steady. So I'm wondering what your thinking is regarding realized price for the rest of the year. Would it be reasonable to expect only modest gains on realized prices before that wider move into the low vol market happens? Yeah, hello, Tyler; Jason speaking. I'd agree with that. Like I said earlier, roughly 1.3 million tons are tied to indices spanning a wide range of them in the back half, and naturally the rest of our committed tons sit domestic at a set price, but yeah, I believe that statement holds, they are where they are right now until we start to see some upward movement, at minimum in the U.S. indices, you know.
Pretty much flat. Tyler, this is Jeremy. One more thing I'd mention — the tables in our guidance reflect where things stood on June 30th. Since that point, we've managed to bring in a bit of additional domestic tonnage. As you're aware, steel capacity utilization is quite elevated at the moment, sitting at multi-year peaks, and meanwhile a few suppliers have stumbled. So my view is that this should help counterbalance part of the softness we're observing in the indices.
Great, thanks, and I really value the extra detail you gave about the offtake talks. Could you share anything further about the timing for when we might get some offtake announcements with MOUs that carry more weight? I'd also like to know what early reactions customers have had to the updated schedule and the flow sheet. Beyond that, what has to occur for those MOU arrangements to become agreements that are more final and binding, especially as it relates to reaching a possible FID down the line? And finally, how much worry are customers expressing about the China rare earth export control suspension ending in November? Thanks.
Warren, would you like to kick things off on that, and after that I'll make a few comments? Yeah, absolutely.
On the questions we've gotten regarding scheduling and MOUs, let me say a few things: for a number of them, we intend to put out announcements as we get closer to year-end, so they should come before this year is over. As for how customers feel about our timeline, my guess is that just about everybody, ourselves included, would love for all of these minerals to have been on hand already. At the same time, people get it that building a refinery at that scale and racing to keep pace with a China that sits 30 years in front of us is not something that happens quickly, so the market has been fairly patient, and they're eager to lock in domestic supply over the long haul. Regarding your point about concerns related to the Chinese export ban: it seems quite clear by now that, whether we call it an export ban or not, China has essentially revealed its readiness to wield rare earths as a tool of geopolitics. For any company whose manufacturing operations depend on reliability, that makes China an unreliable choice as a partner. So even setting aside conversations about stability backed by public agreements, businesses in the private sector are coming to understand that they too must secure that kind of stability, and that means seeking out supplies from within their own country.
Also, on the question you raised about deciding on the investment, I'll add my thoughts; we're a long way off from that stage. What I'd say is that the standard engineering critical path indicates that following the PFS study, you'd have the bulk of the engineering work plus final cost figures, which would let everyone see what the capex picture looks like. And in all likelihood OPEX too. As Owen mentioned, clearly we intend to secure a figure — ideally secure a figure — for a variety of procurement agreements in the interim. After that, I believe, based on how this shapes up in terms of, uh, possible cash flow potential, we'll likely have various choices available to weigh, whether governmental or private regarding how we finance it. As I mentioned, given 75% margins right now, without actually, you know, adding any layering for enhancement from e-waste or other kinds of opportunities, financially, at minimum on paper, it holds up as a fairly robust project. What needs to happen in the interim is to genuinely put some reality behind that, which stems primarily from procurement and optimization of all the engineering and construction costs. So that's — I'd say if we were speaking of probably next summer, that would be a moment when I think we could have a somewhat more informed conversation.
log on investment decisions. Appreciate it, Kyle. I'll turn it over.
Hello, good afternoon, and I appreciate you taking my questions. I wanted to follow up a bit on the offtake topic, the offtake conversations. A significant shift from the HASH report involved adding high purity alumina and silica into the product lineup. I'm curious whether you foresee any shadowing, and whether you'd lock in an offtake deal for HBA or HBS, considering how large the production is, or if it should end up fairly comparable to what you're doing with MREC and the other rare earth elements? Thank you.
I'll have Oren begin, and afterward Mike can weigh in. Yes. Briefly, this is a product with demand spanning multiple sectors, so it's not unlike the marketing work we're doing for our other products; therefore, no, we don't anticipate it being any different in our talks with Oren, offtake counterparties for HPA or HPS. Mike, is there anything else you'd like to add? Yes, look, I believe the great thing about this flow sheet for this kind of deposit is that we can dial it up or down without altering what moves through the plant. You know, as final products, HPA and HPS make up only around 5% of what we produce, and we're regenerating chlorine from the remainder. So with the aluminum chloride, we can make more, or we can employ it to recycle chlorine. That leaves us with a fair amount of flexibility.
Understood. No, that's really useful. And just to finish up, I wanted to ask about the upside potential for e-waste. Could you perhaps help me grasp the possible benefit there in financial or operational terms?
So I'll have Mike begin on the operations side, and maybe Jeremy can speak a bit to the financial side. Go ahead, Mike.
Yeah, so I'd say the typical focus for e-waste recyclers is precious metals, and what they end up with is a material they care about less since processing it is harder. That's actually the material we're going after. High gallium, high germanium e-waste — we've run some internal analysis. Just tiny quantities of this stuff can move the needle considerably on the financial side. Like Oren mentioned, we're bringing in these materials so we can test them, assay them, get a better handle on how much is available out there, how the metallurgy behaves in our flow sheet, and after that we're hoping to work it into upcoming studies.
Yes, great question. So what I'd tell you is we're not able to provide specifics right now until we've progressed a bit further, but our belief is it'll be quite meaningful across the board — NPV, IRR, payback, cash flows, margins, and so on — enough so that we intend to definitely put out an interim study featuring e-waste economics before this year ends; we wouldn't bother doing that if we didn't consider it material.
Understood. Thanks for your time, and I wish you the best going forward.
Hello, and thank you so much for fielding my question. I had a few things I wanted to ask regarding that updated report you released last week. What caught my attention was what looks like a fairly major change in end markets — roughly 75% of the revenue projected from Brookmine will now be connected to semiconductors and high-end chip manufacturing. Could you walk us through how that situation developed? Is it purely a consequence of the revised chlorinization process, and the fact that you can now more effectively extract metals such as gallium and germanium? Or is there perhaps also a strategic element at play, aligning yourselves with those high-end growth verticals that these minerals will ultimately serve? Thank you. Yes, um. What I believe we came to understand, as the project progressed and we conducted additional geological and mineralogical analysis plus metallurgical testing, was that we have a kaolinite clay capable of producing revenue within this flow sheet — something the earlier flow sheet wasn't capturing. As you pointed out, recoveries improve under this flow sheet, and we can turn out a wider suite of products that carry real value. In our view, this flow sheet suits this deposit best, given its geology and mineralogy; and as was noted, the technology is currently proven within the titanium sector, yet during the 70s and 80s, pilot testing took place on aluminum-type ores and worked on a technical level. Naturally, though, the focus then was a single commodity — aluminum — which carried a lower price, whereas with our basket and the additional materials we're able to produce, that's what changes the economics for us.
Hey everyone, thanks for making the time. I was wondering about the timeline for Brooke — I believe you touched on a few different points suggesting that the initial expectations for, I think, 2031 might turn out to be somewhat conservative. I was hoping you could expand on what some of those early identified levers might be that could speed up that timeline. Mike, go ahead. Yes, sure. I guess what has shifted since this point last year is, well, the large power transformers come with a lengthy delivery window — somewhere between two and four years. And we've received independent opinions on that from more than one engineering firm. The explanation for it is that these units are highly customized, manufacturing capacity is presently constrained, and there's competition from AI data centers and renewable energy products. How that picture looks a year from now, maybe it improves, and I think that might present an opportunity. But the primary factor behind the schedule being pushed out is the supply chain for large power transformers. Found it, understood. Appreciate the context there. As my follow-up, you've mentioned that you've been active repurchasing shares. So far in this year, the stock has been somewhat under the prices where you've bought. Would it be a fairly safe assumption that we should look for you to stay active with the buyback, and more broadly, how at ease are you leaning in on that, given the capital spending requirements of the current business and Brook across the coming couple of years?
Our approach to spending is fairly holistic. A $100 million buyback got the Board's approval; roughly two-thirds of it has been used. We still hold optionality plus dry powder for additional repurchases if we decide to go that route. And naturally, we've said we intended to add a bit more of the lower vol output, based on what the market looked like to us. That comes to roughly a $25 million outlay. So my thinking is we'll aim to strike a balance between these as things move ahead, seeing what proves best. Clearly, allocating capital toward the balance sheet delivers one form of return, if you will, while directing money into longer-term assets offers a pathway for earnings potential well into the future. So we'd like to weigh both of those factors and, clearly, not reveal anything past what we've already stated regarding production.
Yes, thanks. I wanted to build on the previous question and perhaps dig a bit further. Ramico has gone through an internal reorganization, but I was wondering what your current thinking is regarding a possible spin-off of the rare earths operation. When might a move like that be logical? And how should investors view the eventual equity requirement? that will go toward the Brook Mine at full development.
I'd say there are really two separate questions there. The first concerns the reorg. We've already signaled that we're positioning ourselves to operate in distinct silos. One is clearly a met silo, and another could be a critical mineral silo, which honestly may split into two. two components. One would handle refining, while the other would cover mining and marketing. sort of echoing once more what we have in the east. Then the remaining silo would consist of our royalty interests, which would naturally encompass the reserve assets in the east, the Brook Mine reserves here, plus infrastructure assets. That's basically how we're structuring ourselves. As for when we'd act on any of it, following a typical capital markets. deal framework, you'd likely want to move forward once each silo has greater risk mitigation. ideally with some revenue, we hope, supporting each of those figures. So that's a somewhat vague response regarding timing, though it's pretty simple in that you shouldn't spin things off before they can function independently; when it comes to equity checks. I believe it will depend on how we ultimately structure this financing, and we still have a long path ahead before determining which which route is best. There are possibilities that don't involve equity checks; those tend to be more sovereign-style financings. And there are options that would involve equity checks, though the way that equity enters could take forms such as procurement agreements, potentially with advance payments, other supplier arrangements, joint ventures, and so on. We're getting ahead of ourselves on that point at the moment, particularly on the private side.
No, I appreciate that, Randy. Perhaps one thing you're hinting at is clearly offtake — binding offtake contracts. Do you figure those would need some kind of sampling from the pilot plant, or might we see something binding before we sort of obtain those first samples?
Yes, I mean, look, regarding offtake, I mean, discussions are happening right now. I mean, we'll have MOUs signed shortly, and that's well ahead of the deadline. And by shortly, I mean certainly within the next several weeks and months; so clearly that's well ahead of the pilot plant's samples. You know, you've witnessed plenty of deals in the critical mineral sector, you know, built on, you know, a process that could or couldn't pan out several years later. And those deals hinge on obviously quality parameters, successful testing, and so on. So, you know, from now until, you know, when the pilot plant starts producing samples, we're confident we can accomplish significant work — whether that's offtake, financing, et cetera, areas where we can de-risk this. And, of course, it will hinge on quality testing from the pilot plant, but that's simply part of the normal course of business.
Understood — I appreciate that, Jeremy. If I could squeeze in one more question: when you look at your low-vol output more broadly, it's obviously going to grow over the coming quarters. How willing are you to earmark some of that low-vol production — or any incremental low-vol tons — to serve buyers here at home, rather than holding it back for shipments abroad? Thank you.
Hi there, Jason here. That's a fair question. During his remarks, Chris noted that Maven Reserve — given both its location and its geology — is a southern West Virginia low-vol with a higher CSR, and we've already seen it sell into the domestic market quite successfully this year. Looking ahead to 27, my expectation is that demand will be strong once discussions with customers in that market advance further. That said, it definitely carries value on the export front as well. As I mentioned, a trial is set to get underway in India soon. For Northeast Asia, a trial quantity has been requested. NQ4 — and the CSR testing results we've gotten on the coal have been excellent too. On the export side, it also serves as an offset against our NS platform that's already in place, helping with demerge costs, blending up qualities, that sort of thing. So there are plenty of favorable elements as it joins our book. To put it briefly, though, my anticipation is strong performance across both of those markets. The outcome really hinges on where that ultimate figure settles, as talks continue regarding the coming year and advance concerning further test shipments abroad.
Got it. Appreciate that, Jason. Alright folks, thanks for the information, and keep up the good work.
Thank you, operator. Morning everybody. To piggyback on that question about the domestic side, Jeremy, I believe you said something about bringing in additional domestic volume since the quarter closed. Our expectation is pricing comparable to the 138 you currently have in place for existing commitments. And what's your projection for domestic tonnage shipped during the second half compared with the first half? Thanks.
Hey, Nate, Jason here. Sure — regarding pricing, it's basically consistent with what we've already locked in; we're simply adding more tons onto certain current agreements with customers we already have for this year. To reiterate what Jeremy said, we're picking up some of the burden from other operations that have dropped off or are still having difficulties. So on the back-end side, that share will rise incrementally and, as Jeremy noted before, account for a larger portion of our sales during the second half.
In terms of tonnage? Sure — on that subject, using the 1.1 million tons in the guidance tables, the figure would have landed at approximately a pro rata amount; I'd put it at about 550,000 domestic tons shipped in the first half, divided fairly evenly across Q1 and Q2. But like we mentioned, you know, we've managed to add some extra tons on top, so, you know, it'll be higher by 100,000 plus, give or take.
Plus, clearly, we'll refresh those guidance tables come next quarter. Okay. That's really useful, fellas. Thanks for that. Now moving over to costs in the Metco segment, Chris — Chris, I believe your comment was that diesel costs, or rather elevated diesel costs, tacked on approximately $3 per ton relative to what you'd initially anticipated, perhaps. To start, can you just verify that, and separately you brought up that with the rail loadout at Mabin slated to come online, as I recall, during Q4, that's going to matter a great deal. It ought to bring total operations cost per ton down by roughly $2 compared with how we're running today. Once more, just confirm both of those are right. And after that, when we consider how that might carry into 2027 — once again, you folks have managed to offset those diesel expenses nicely in the current year, holding the four-year cost per ton guidance in place. Would it be fair to conclude, then, that in 2027, you know, cost per ton ought to decline? You know, perhaps just running the numbers to somewhere in the mid-90s.
I'll take the second piece regarding 27, Chris. Yeah, yeah; so I was attempting to work out which portion of that question to address first, but you were discussing math — you know, your check on the math is roughly correct, so so far this year across seven months, the higher diesel fuel cost — both as a direct purchase and as the, you know, kind of diesel fuel escalators on trucking and rails — has pushed our costs up by roughly $3 a clean ton compared with where we'd have landed if diesel had remained flat year over year. So we're at approximately a dollar, slightly more than a dollar all in per dollar of diesel fuel cost increase or decline. So, you know, when we watch the rack price rise or fall, you can work out the math on what that impact is. And then, you know, you may need to do a bit of rounding; on the Maven loadout, but basically if you've got slightly more than 300,000 tons of annual production at Maven right now and you're saving $20 a ton on that within our total 4.1 book of sales,.
There's a bit of rounding involved, yet that's the mechanism by which you arrive at a weighted average decrease of slightly under 2, which gets rounded up to $2 per ton. Yes. So, regarding your question on 27, that's a fair thing to ask. Honestly, I don't believe we're at the point of providing official guidance. Still, the way I tend to frame it is this: if you strip out the diesel effect, we're currently sitting around the mid-90s. Once the rail loadout possibly begins operations, you're correct that this essentially delivers an additional $1 or $2 per ton across the whole company. But clearly, we're adding low vol tons in the coming year, and from a cost standpoint, I'd characterize those as marginally higher than what we currently see. Yet, as Randy pointed out, looking at it through a margin lens, if we were making spot sales today out of those incremental funds, the figure would be roughly twice what we presently receive. Naturally, there are some positives and negatives in the coming year, but I suppose, at least in a conceptual sense, what you're contemplating is, uh, uh,.
So, conceptually speaking, that's the way to look at it, right? OK, that's good. That's really useful, folks. Thanks for spending the time. I'll hand it over.
Well, once again, thanks to all of you for joining today's call, and we're eager to share updates with everyone as we keep progressing. Many thanks.
That brings us to the end of today's conference call and presentation. We appreciate your participation. You are free to disconnect your lines at this time. This live transcript is generated automatically, with no human involvement or review.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ramaco Resources, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Ramaco Resources, Inc. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.