Thanks, everyone, and welcome on behalf of Ramaco Resources to the earnings conference call for our first quarter of 2026. Joining me this morning are Randy Atkins, who serves as our Chairman and CEO, Chris Blanchard, our EVP for Mine Planning and Development, Jason Fannin, our Chief Commercial Officer, and Mike Woloschuk, our EVP of Critical Mineral Operations. Before we get going, I want to read our usual cautionary statement. Some of what we discuss today falls under the definition of forward-looking statements under the Private Securities Litigation Reform Act of 1995. Such statements reflect what Ramaco expects regarding events yet to come. They carry risks, uncertainties, and other factors, a great many of which lie beyond Ramaco's control, and those could make actual results differ materially from what these forward-looking statements describe. Any such statement is valid only as of the moment it is given. Unless the law demands it, Ramaco assumes no duty to update or revise any forward-looking statement, whether because of fresh information, later events, or anything else. I also want to note that a reconciliation of the non-GAAP financial measures we intend to cover today appears in our press release, which you can view at our website, www.ramacoresources.com. Finally, I'd ask that each person on this call visit our website and download the investor presentation for today. Having said that, let me bring in our Chairman and CEO, Randy Atkins.

Randy Atkins executive
#2

Jeremy, thank you, and good morning to everyone joining us. I'd like to start by discussing our strategy for returning capital to shareholders and how we allocate it, because since the start of the year we've bought back a significant number of shares — something we hadn't done before. As stated in our release, so far this year we've repurchased about 2.6 million shares of Class A common stock at an average price of roughly $14.50 each, representing approximately 5% of our stock. At present, our shares continue to trade below last year's levels, when we raised equity both directly through a stock issuance last summer and indirectly through our convertible notes last fall. Looking ahead, we're also trading broadly in line with our met coal peers based on consensus estimates. As a dual-platform company, we currently see very little in our share price that reflects our rare earth or other critical mineral assets. Given that situation, we'll continue evaluating whether buying back shares is a wise use of the cash capital available to us. As of today, under the original $100 million authorization the Board granted us last year, we have about $63 million of remaining buying capacity. We also ended the first quarter with roughly $490 million in liquidity, an increase of about 310% compared with a year ago. Our balance sheet provides ample flexibility, allowing us to simultaneously consider further share repurchases, continued progress at our Brook Mine, or growth initiatives for our low-vol coals. Moving to the met coal business, we maintained strong cost control despite the same challenging market price conditions we've endured over the past year. Our shortfall this quarter came entirely on the top line. This was the third consecutive quarter of cash costs under $100 / ton; even with diesel prices rising this year, we've delivered that cost discipline without cutting wages or benefits for our miners, which we view as the most important thing. I'd note that on our mine cost, the conflict within Iran has naturally had a related effect on oil pricing and has pushed up the cost of all our fuel products; we've seen rack pricing climb to as high as $5.45/gal across our operations, up from roughly $2.50/gal at the end of last year. Based on our historical diesel and gasoline purchases and usage, on an annualized basis, Ramaco realizes about $1.50 / ton of cost increase for each $1 / gal of diesel fuel increase. That affects not only direct mine costs, but indirectly through third-party transportation costs for both our raw and clean coal. While we expect fuel prices to eventually subside sometime in the second half, at current levels the impact on our mining cost is approximately $4 / ton compared to earlier this year in 2026. Despite our continued solid operational performance, coal markets remain challenged, both in general and especially on pricing. Again, particularly when it comes to the high-vol side. Separately, we anticipate roughly 0.5 million tons of additional production in '27. Prices for high-vol coal did climb a bit in Q1 of 2026, yet from where we sit, today's indices are still weaker than can be sustained. One item I should call out, however, relates to the direction of pricing going forward. Finally, we are beginning to see the output cuts that a lot of people had expected for some time now, and that is taking place both at home and in other countries. Bankruptcies are showing up, along with reductions in output and distressed sale processes — and in each case, the participants range from sizable public producers to privately held ones. According to our estimates, approximately 2 million tons exited the domestic market in 2025, and for this year we expect about 3 million tons more, perhaps even beyond that. When some inflection point arrives, those output reductions will create an imbalance in supply, and we hope pricing will begin to respond. Every one of our growth initiatives tied to coal is focused on the low-vol markets. In the most recent quarter, we restarted operations at our Laurel Fork Mine, and this summer a third section will come online at our Berwind Mine. When fully producing, these efforts ought to add somewhere between 100,000 tons and 200,000 tons of low-vol across 2026, along with approximately half a million tons of extra production in 2027. Work is proceeding on the new rail loadout at the low-vol Maben complex, and completion is expected later in the year. After it begins operating, we foresee savings of about $20 / ton in trucking expenses. The loadout, of course, gives us more flexibility in deciding if and when to proceed with our Maben 1.5 million ton low-vol deep mine project, based on what the market requires. We have also said fairly little in recent months about our rare earth element and critical minerals initiatives. Even so, we have not been idle. I expect that in the second half, we will assess where things stand and announce a number of milestones. Mostly, we have been awaiting the revised conceptual study from Hatch, due in late June, and after that the technical geological report summary from Weir. Both pieces of analysis rely on our new patent-pending carbochlorination processing technique. As noted last quarter, our internal forecasts continue to indicate that this new flow sheet process will generate a meaningful increase in incremental revenue and free cash flow. That is compared, obviously, with the forecasts we released previously alongside Fluor about a year ago, which relied on a different solvent extraction processing technique; now that fresh independent analysis of the carbochlorination flow sheet is taking shape, we have ramped up work on potential offtake transactions and non-dilutive third-party financings. I will not get into details today, but we will disclose specifics once those transactions are, hopefully, completed. Advanced talks are underway with groups both in the U.S. and abroad, and those counterparties include both public and private entities. Also, the more detailed preliminary feasibility study that Hatch is likewise putting together remains scheduled to wrap up in late 2026. Out in Wyoming at the moment, the structure meant to house the pilot plant appears likely to be done over this summer, while the prefabricated equipment destined for the interior ought to start going in during the fall, and full pilot operations should get going in 2027, precisely as we said before. Last quarter, I mentioned as well that we were examining some reorganization options for Ramaco's wider corporate structure as we move further into our dual platform; that effort largely reflects what we expect once our critical mineral operations begin. So far we've finished a number of concrete legal and accounting steps to move this forward and have set up separate corporate entities within a holding company framework that currently sits beneath the parent, Ramaco Resources. One of the new companies will be called Ramaco Royalty. It is going to hold all of our mineral reserve infrastructure interests, intellectual property rights, and other related income-producing assets; that takes in our fee-owned reserves made up of metallurgical and thermal coals, as well as our rare earth and critical minerals. Likewise, this entity is going to hold our infrastructure assets in the East, such as our prep plants and rail loadouts; in the West, it is going to hold our pre-FEED infrastructure connected to the Brook Mine processing facility. On top of that, it will take in any possible rail infrastructure, plus the critical mineral and storage facility we've been working on together with Goldman Sachs. From what we can tell, this should form a singular collection of income-producing assets, especially those tied to rare earths, which will hand us a measure of optionality later on. The second company is named Ramaco Critical Mineral Resources; it is going to hold the production and sales operations for our Western Brook Mine rare earth critical minerals and thermal coal mining. Think of it as copying the same setup as our existing met coal development, production, and sales business in the East, except that it will concentrate entirely on our Western critical minerals. Ramaco Refining will be the third company. It is going to hold the carbochlorination separation facilities, which will be constructed so they can turn the Brook Mine critical mineral feedstocks into oxides and MREC. We're carrying out this reorganization both to ultimately lift shareholder value and to better reflect the differing, separate kinds of assets and operations we hold today and are building for the future. Each of these operations has its own distinct operating, financial, and capital market profiles, even though for now they will all run beneath the holding company structure of our parent, Ramaco Resources. Ideally, this structure will provide greater operational and financial flexibility as we build out differing, separate production, processing, and sales businesses in both the met coal and the critical mineral space. Our expectation is that the pieces of this restructuring will be in place during the back half of the year, and we'll go into greater detail on it then as well. Having said that, I'd like to return the discussion to the others on the team so they can address the financial picture, our operations, and the markets. First off, I'd ask Mike Woloschuk, who leads our critical mineral efforts, to provide a few updates on where things stand with rare earths, including roughly 0.5 million tons of additional production in '27. Mike?

Mike Woloschuk executive
#3

Alright, thanks, Randy. During Q1, we kept moving forward with Hatch on the conceptual study for the carbochlorination flow sheet. The main engineering deliverables for that effort were finished and issued during the quarter. The mineralized coal from Brook Mine that serves as a critical reagent in this process is expected to make a major contribution to rare earth element output, since the enriched coal seams are being directed toward that purpose. We found ways to boost chlorine recycling, and we also found additional opportunities that will be reflected in the final study report, which is expected in late June. As third-party metallurgical testing proceeds, we submitted important analytical and equipment orders so we can outfit our in-house geometallurgical laboratory at the iCAM facility. That should allow a greater volume of test work and assay results to come through with quicker turnaround than what external labs provide. We expect internal geometallurgical testing to pick up in early Q2 to assist the coming stages of this project; during Q1, we finished drilling 33 holes totaling more than 9,300 ft of core. Those drill programs consist of 27 infill drill holes plus six water monitoring holes; right now, four drill rigs are on site, and we expect drilling to keep going through year-end; altogether, we have now drilled 174 holes and 35,000 ft of core since the program began. Work on the pilot plant building covered finishing the foundation systems that support the floor slab, with the full building projected to be done in late summer and early fall. Construction of our coal storage facility is part of this, including completion of the foundation, the stem walls, and lateral reinforced tension members. That entire structure should be finished this month. All in all, we continue to be very enthusiastic about the Brook Mine opportunity tied to the carbochlorination flow sheet. Naturally, we will be able to say more about it once we receive the Hatch and Weir reports, which are expected soon. Our broader timeline is unchanged from what we have already shared; in the latter half of this year, we look forward to achieving meaningful progress both on finishing the pilot plant build-out and on the pre-feasibility study. At this point, I want to hand the call over to our Chief Financial Officer, Jeremy Sussman.

Jeremy Sussman executive
#4

Thanks, Mike. Turning to our balance sheet first, I’m happy to say that because liquidity at the close of 2025 was a record, we were able to take advantage of an opportunity and buy back $37 million of stock since the start of this year. That cuts our outstanding shares by 2.5 million shares in practical terms. Like Randy mentioned, so long as we think our shares are still significantly undervalued, we’ll keep seeking chances to buy back stock when it benefits us; we closed Q1 with nearly $500 million of liquidity, giving us one of the strongest balance sheets in the sector. On Q1 performance, as Chris will cover, operations once again came in solid, with cash costs per ton sold at $98. Every one of our main peers has reported Q1 results by now. I’m proud to say that at $98/ton, our cash costs remain in the first quartile of the U.S. cash cost curve among our Central Appalachian met coal peers; that number stands out even more when you factor in both higher diesel costs and weather-related transportation problems, which hurt our total sales by over 50,000 tons during Q1. Cash margins in Q1 were $16/ton, down from $24/ton in the same quarter of 2025. The reason was lower realized prices—$114/ton versus $122/ton in Q1 of 2025. As Jason will explain, domestic high-vol markets are still weak. Even though Australian benchmark pricing rose $50/ton year-over-year in Q1 of 2026, US high-vol indices dropped to $20/ton over that same period. Honestly, we see this trend as unsustainable, given the losses showing up among higher cost producers. Our Q1 production declined slightly versus the same quarter last year, since we keep applying production discipline amid tough market conditions. On our financial results, Q1 adjusted EBITDA came to -$1.8 million, versus $10 million in Q1 of 2025. Class A EPS recorded a $0.30 loss in Q1 against a $0.19 loss in last year’s comparable period. Going forward, we are reaffirming all key 2026 operational guidance, including production, tons sold, and cash costs. For second quarter 2026 guidance, we expect higher shipments, between 900,000 tons and 1 million tons. We expect cash costs near the upper end of the full-year range in Q2 because of elevated fuel costs tied to the Iranian conflict. Looking ahead, our strong balance sheet and first quartile cash cost position give us significant optionality to invest in both our coal and rare earth elements business, while also letting us keep opportunistically repurchasing shares. As of March 31st, we held over 1 million tons in inventory, which should give us a meaningful working capital tailwind if markets improve during the year as we expect. Having said that, I want to hand the call over once more to Chris Blanchard, who serves as our EVP for Mine Planning and Development.

Chris Blanchard executive
#5

Thank you, Jeremy. Ahead of getting into a few of our operational figures and what we've accomplished in recent months, I'd like to give a shout-out to our coal miners for the meaningful gains they made in safety and compliance during 2026 versus the equivalent stretch a year earlier. We still have plenty of work ahead of us on the path toward the ultimate target of zero incidents, but 2026 year-to-date results have come in 250% better than the comparable period in 2025, putting us back on the continuous improvement path that has characterized most of our history. In a market this tough, it serves as a reminder that a safe mine is a productive mine, and productive mines generally carry lower costs too. Moving on to those performance metrics, we've managed to hold cash costs at acceptable levels at our operation even with pressure on our operating supply costs. To be specific, the spike in diesel fuel prices caused by the Iranian conflict hurt first quarter costs by roughly $1.50 / ton sold relative to where they would have been otherwise. Although fuel prices have come down from their peak, they're still higher than they were at the start of the year, and we're keeping a close watch on that. On the supply front as well, raw tungsten prices have risen roughly 350% in 2026 because of Chinese export controls; that's driven the cost of our mining bits and tools up by almost 100%, which hits our underground mines especially hard. We keep working with our main suppliers to offset these cost increases and others wherever we can. Because coal pricing is so weak on the high-vol side of the business, we've scaled back production at our Elk Creek Complex both to control physical inventory and to avoid putting more tons into a marginal market. We're still watching market conditions and might cut further during the year should that be justified; at our low-vol operations, though, we keep working to bring on new low-cost production and to reduce our existing operating costs there. Over at the Berwind Complex, the first of two new air shafts is close to finished at our Berwind P4 mine. Excavation of the second shaft will begin right after the first one, and we anticipate having both shafts online and running by late August. That ventilation upgrade will let us ramp the Berwind mine with one more full super section and lift output at this mine to 900,000 to 1 million clean tons per year. Even while that ventilation work continues, we brought our idled Laurel Fork low-vol mine back online during April. Ramp-up at this single-section mine is still progressing and is currently on budget. Turning to our Maben low-vol complex, we've kicked off the Norfolk Southern rail load-out project. All the major materials have been procured, and excavation for the load-out belts is already in progress. The unit train load-out should be up and running at full capacity during Q4 of 2026, which will wipe out every trucking logistics expense at our Maben mine and bring projected cash costs in the rail car down to the same low levels seen at the rest of Ramaco's mines. That ought to make it simpler for Maben product to enter domestic metallurgical coal markets as we sign contracts for 2027. At Maben, permitting and early development work carries on for the upcoming underground mines that are planned at this complex. Going forward, our focus remains on the things we can exercise some control over, specifically volume and costs. We are getting ourselves into position to swiftly take advantage of market upturns or shortfalls experienced by other producers; to talk about the coal and critical mineral markets, I'd like to hand the call over now to Jason Fannin, Chief Commercial Officer.

Jason Fannin executive
#6

Thanks, Chris, and good morning, everyone. I'll use today's comments to walk through three things: first, how we performed on sales during Q1; second, where we currently sit on 2026 met coal sales and how the market looks to us; and third, an update on our marketing activities and the progress we're making at the Brook Mine critical minerals project. Starting with the seaborne metallurgical coal market, I'd like to begin by discussing Q1 indices along with the pricing dynamics. Although benchmark indices were generally higher, the pricing we actually realized during Q1 landed a bit under what we achieved the quarter before. There are two straightforward reasons for that: the specific geographies and indices that our book was both sold into and priced against, along with certain operational headwinds that won't recur. Turning to indices: the PLV headline figure rose 17% during Q1, yet for the majority of our export tonnage, the relevant benchmarks gained just about 6% from one quarter to the next. Those transactions priced off US high-vol indices, and right now those sit roughly 35% under the PLV index while remaining sharply out of line with where they've historically stood relative to PLV. High-volatile coal sent to domestic customers accounted for an additional 25% of what we sold in Q1, and naturally that pricing came in around 8.5% lower than a year earlier. Asia received 55% of our Q1 exports — a company record for share. Business tied to PLV accounted for roughly 15% of total Q1 volumes, and that figure would have been higher—another 6% of overall Q1 volume—except that a sizable PLV-linked shipment was pushed into the beginning of Q2 because of logistics backups caused by weather. As we move through Q2, shipping more under PLV-linked contracts ought to lift export realizations relative to Q1. Operationally, our capacity to complete planned coal deliveries on schedule suffered during January and February when severe weather disrupted rail networks at both CSX and Norfolk Southern, with certain higher-priced domestic specialty orders among those pushed to Q2. Looking at Q2, we anticipate higher total shipment volumes, since our Great Lakes business is now running at full flow and the rail and weather disruptions that hampered Q1 execution have returned to normal. Regarding Q2 pricing, our plan is to shift roughly 70%-75% of committed volumes into the seaborne market. Of the export tons, approximately 25% will be priced using the PLV index. A further 25% will be on fixed pricing, and the rest of the seaborne volumes will be divided in roughly equal parts, priced against the US low-vol index and the US high-vol index respectively. Now looking at our sales position for all of 2026, we've locked in commitments totaling 3.5 million tons. At the midpoint, that's around 90% of what we intend to produce for the year. Domestic buyers make up 1.1 million tons, at an average fixed price of $138 / ton. We've got 2.4 million tons in export commitments overall. That breaks down as 1 million tons locked in at a fixed price averaging $107 per ton, plus 1.4 million tons tied to index-linked pricing. By the close of Q1, roughly 650,000 tons of our yearly index-based volume had already shipped, leaving somewhere around 1.75 million tons still to be priced. Turning to the back half of 2026, we feel good about where the met coal market is heading. On the demand front, steel prices have climbed and hot metal output has gotten a lift thanks to protectionist measures in the U.S. and Europe. At the same time, India's crude steel production is projected to grow 8%-9% in 2026 versus the prior year. In what counts as one of the most encouraging signs for seaborne coking coal demand in quite a while, China's steel exports dropped almost 10% year-over-year through April. Should that slowdown hold, it would provide meaningful backing for steel prices worldwide and for blast furnace mill margins. Turning to supply, we anticipate that high-vol coking coal output will keep shrinking over the course of the year, which ought to shrink the broad gap separating U.S. high-vol indices from Australian indices. Randy and Jeremy have already identified several Appalachian and Australian producers that have filed for bankruptcy, cut back output, or put some sales up for sale. As the year unfolds, this anticipated supply reduction will make itself felt. On Australia specifically, our view is that present PLV levels can be sustained and in fact have more room to rise as the year progresses. That view rests on limited capital investment, steep royalty taxes, and ongoing production problems and disruptions, all set against firming global steel markets. Shifting to our Brook Mine, we keep pushing our critical minerals marketing program forward with growing momentum. Our enlarged marketing team is busy reaching out to prospective customers and partners both in the U.S. and abroad across the entire Brook Mine product portfolio; we aim to announce a range of counterparty MOU transactions in the quarter ahead. Once we're producing additional material at lab and pilot scale in 2027, our expectation is that these MOU frameworks will progress into binding commercial contracts; at that point, I'll return the line to the operator so we can begin the Q&A section of this call. Operator?

Tyler Bisset analyst
#7

Hi everyone, Tyler Bisset here, filling in for Brian. We appreciate you fielding our questions. Thanks for all the detail regarding how the higher cost on the coal side has had an effect. So, looking ahead to the remainder of the year, it seems likely that some operations with elevated costs are being restarted. What's your view on how costs will trend during the back half of the year? Could you walk us through the various puts and takes?

Randy Atkins executive
#8

Chris, would you take that one? Brian, I mean, what we're restarting at the Berwind Mine isn't really something I'd call a high-cost operation; in fact, it's among our better cost products. Chris, could you provide a bit more detail?

Chris Blanchard executive
#9

Right. So during the prior year, we of course placed the Laurel Fork Mine into an idled state, and that's the operation we brought back online in April. The only reason it's running again is to bridge us until that ventilation project at Berwind Mine that I mentioned wraps up. We're treating it as a base for recruiting the crew that will afterward move across to Berwind, so we can avoid going through the very same production and hiring escalation at Berwind that would typically occur had we held off until September to launch that section. Rather than absorb that typical step-by-step increase while you're dealing with the slower output build at Berwind, we've opted to get it out of the way now; the tonnage Laurel Fork turns out from April through August is fairly modest. Please don't think of it as moving cost by more than about $1 in total on the low-ball side of the business. In the end, once Berwind is up and running, that mine has traditionally ranked among the cheapest producers we have in the portfolio.

Tyler Bisset analyst
#10

Great. That's really useful. Regarding the sales commitments, I understand they account for roughly 90% of the midpoint of your production guidance, yet only 80% of the midpoint of your sales guidance. What makes you confident you'll be able to secure those additional volumes to hit your sales guidance for the year? And again, what are the puts and takes through the rest of the year, I suppose?

Randy Atkins executive
#11

Sure. Jason, do you want to handle that?

Jason Fannin executive
#12

Right, absolutely. Tyler, Jason here. Yeah, we're definitely already starting to see demand pick up, and I think a big part of that is simply because conditions are getting better across a range of regions and steel markets. In Europe especially, there have been some shifts, with demand there growing more gradually. We feel pretty good about what we're observing, and it isn't coming from China as far as the demand that's beginning to show up, particularly into the Pacific — as we mentioned, the Maben load-out is ramping up, and this quarter we actually have our first Maben cargo moving by seaborne into the Pacific versus PLV. I think it's both the high-vol and low-vol sides there. Again, we're staying prudent on the high-vol, but demand is starting to improve. We just need to be disciplined when it comes to pricing.

Tyler Bisset analyst
#13

Okay, thanks. I'll hand things over now.

Randy Atkins executive
#14

Appreciate it, Brian.

Jeff Grampp analyst
#15

Good morning, everyone. I appreciate you making room for me. My question has to do with the possibility of offtake agreements or MOUs over at Brook. I realize you're not able to share a great deal on that front today, but I'm wondering whether certain products are drawing stronger interest than others, and which ones you'd consider more executable in the short term. Thanks.

Randy Atkins executive
#16

Yes. As I mentioned before, naturally I don't want to push my luck by going too deep into particulars, but what I'd say is that, broadly speaking, the products a lot of our prospective customers have their eyes on are gallium and scandium. In fact, we've been fairly encouraged by how much interest scandium has attracted, given that our portfolio has drawn some criticism over it previously.

Jeff Grampp analyst
#17

Understood. Thanks for that. For my next question, since your balance sheet is in such solid shape, I'd like to hear how you're thinking about M&A — and perhaps split that into two parts: possibilities on the met coal front, where there's some short-term distress right now, and then anything on the critical minerals reserve front that could be worth a look.

Randy Atkins executive
#18

Absolutely. Like I've joked in the past, when it comes to M&A, the M isn't really our thing, but the A is something we're glad to consider. Being opportunistic is honestly part of our DNA, and we've made acquisitions — especially of reserves we believed could be picked up at an advantageous moment. Several months back, we acquired a big portfolio from Coronado. Over the years, we've made other similar purchases. I'd say the landscape is getting richer in targets, if you want to put it that way. We're definitely out there searching. And if something looks like it makes sense, we'll pull the trigger — provided, again, that the price is opportunistic, which today's market conditions would appear to support. There could be a handful of assets you might be able to acquire on an advantage basis.

Jeff Grampp analyst
#19

Okay, that makes sense. Thanks for that explanation. We’ll keep watching for updates.

Randy Atkins executive
#20

Thanks.

Davis Sunderland analyst
#21

Hi there, good morning, everyone. We really appreciate you making the time, and thanks for fielding our questions. Perhaps the two of you could help me out here. To start, I recall that earlier this year, you both mentioned something about backlogs at the national labs, along with certain other third-party testing sites. My question is whether those have gotten better, gotten worse, remained unchanged, or if you have any other perspective you could share regarding how things look for the remainder of the year. After that, I have 1 follow-up.

Randy Atkins executive
#22

Absolutely. So, I'll have Mike walk through the fine-grained specifics, but something fairly significant is that testing is now beginning to be brought in-house at our own operations at the research facility we have in Wyoming. My hope is that, as we clearly gain additional room there, we'll be in a position to handle a substantial portion of at least the early-stage testing ourselves in Wyoming. Naturally, when the pilot facility is up and running, we'll be conducting a tremendous amount of testing. When it comes to the third-party organizations, Mike, would you like to speak to that?

Mike Woloschuk executive
#23

Honestly, this continues to be a problem for us. My sense is that there's a great deal going on with critical minerals here at home, and the labs have no spare capacity. We spotted this, you know, 2 quarters back, which is why we're building out our own facilities. Running our own tests should ease some of the difficulties the whole industry confronts when it comes to how much lab capacity is available.

Davis Sunderland analyst
#24

That's really useful, and I appreciate it from both of you. For my follow-up — and I completely understand that additional information is coming later in the year — I wanted to ask you, Randy, whether you could expand on the thinking behind how you've split things up in this reorganization. Specifically, why structure it around assets rather than products? Any other perspective on that particular approach would be great. Thanks so much, guys.

Randy Atkins executive
#25

Absolutely, happy to. As we began moving through this effort of essentially operating a dual platform containing two separate critical minerals — and coal, naturally, now counts as a critical mineral too — the rare earths along with their neighboring critical minerals are clearly seen in a completely different way compared to the coal operation. It goes without saying that if you look back at companies trading publicly in the rare earth sector, their multiples differed somewhat from those of coal businesses. Eventually, I believe it would be logical to release the value held within our different assets, allowing them to be valued separately in the market rather than sitting inside what amounts to a conglomerate framework. When I was younger, I observed plenty of conglomerates, and I recall how complex they were — hard for analysts to track, naturally, since in many instances the businesses involved had nothing in common. While every one of our operations ties back to mining to some degree, the processing side of the rare earth operation is certainly nothing like anything in the coal sector. Another distinctive factor is that, in contrast to many peers, we hold a fairly significant quantity of reserve assets in both coal and rare earths. We have an enormous reserve base in Wyoming. Honestly, very few organizations can demonstrate a revenue stream derived from distinctive assets such as coal and rare earths together; we believe that eventually — though our B-Stock currently trades in a comparable manner — we'll likely be in a position to place many of the infrastructure assets we hold across both the East and the West into this platform, which might become a highly attractive royalty play. That's roughly the logic, at least regarding that piece of it. The refinery operation is a distinct business, naturally, and carries different multiples. It leans more toward being a commoditized operation. From a CapEx perspective, it will certainly represent the largest expenditure among all our development initiatives. We won't finalize those figures until we release something independently from Hatch next month. You can safely assume that a rare earth processing facility demands a very large capital outlay. So then, obviously, the mining and sales operations we're going to carry out in the West are, again, going to be quite comparable in both concept and execution to those we run in the East. I believe we'll end up with a fascinating mix of various entities; at this moment we don't have any particular plans, you know, beyond simply getting everything more or less arranged and placed into distinct buckets and distinct entities. That, in turn, gives us the optionality to later determine what the most advantageous route is for recognizing value on behalf of our shareholders. I think, you know, we hold a number of different assets that I believe could deliver some genuinely compelling value to our shareholders as we go forward.

Davis Sunderland analyst
#26

That's excellent. Many thanks. I'll relay that.

Carlos de Alba analyst
#27

Yeah, thanks a lot. Morning, everybody. Could you perhaps go into a bit more detail about the reasoning behind splitting up, within the restructuring you're carrying out, the Ramaco Refining Business from the Brook Mine critical mineral feedstocks and the Ramaco Critical Minerals, since presumably those operations are pretty well integrated?

Randy Atkins executive
#28

Yeah. Excellent question, Carlos. I attempted to tackle that when I responded to the previous remark. Again, the refining side of critical minerals, as you're fully aware, is a completely different animal compared with the sort of processing side tied to the coal business. I believe that lumping and bundling the refining in with the mining and sales, potentially, means combining two distinct kinds of operations, which once more, might trade at differing multiples assuming they stood as independent operations. I believe that offering a platform for rare earth sales and mining is going to be one platform that I think will be fairly straightforward to grasp. I believe the Refining business, once separated into its own entity, gives us some alternative approaches for looking at both how to finance it, and how to run it. I believe it hands us some choices that we are currently seriously chasing across a number of different fronts, which I'm not able to really discuss.

Carlos de Alba analyst
#29

Alright, fine. We'll hold off for more specifics later on, then. And maybe one more thing — it has to do with thermal coal, mining, at the Brook Mine. That's a really significant byproduct that's going to support the project's economics. Could you share any update with us?

Randy Atkins executive
#30

Yeah

Carlos de Alba analyst
#31

Regarding the customer discussions, and the offtakes or MOUs for that thermal coal volume?

Randy Atkins executive
#32

Yes. We're doing that now, and naturally, we'd be glad to let Jason speak to it too. At this moment we're in talks with quite a few utility groups about possible offtakes. We're also looking into the longer term, at some options that might allow the thermal coal to be used on-site in certain ways, which I won't go into at this point. That might prove interesting. I think, as it pertains to the mining itself, we don't truly want to take on full scale mining at present, even though we would presumably be capable of moving a thermal product, since what we don't want is to end up with big stockpiles of critical mineral feedstock that we can't effectively process until we have, of course, an actual commercial facility. We're positioning ourselves so the thermal coal can be moved roughly in sequence and in sync with our critical mineral processing and mining operations. As you rightly point out, it goes without saying that our economics out there are interesting, because what would normally be waste in a critical mineral operation — in our case, the byproduct, of course, is coal — we can sell that at economics even on current thermal prices, which would essentially cover pretty much all the mining for all the products, inclusive of the critical minerals.

Carlos de Alba analyst
#33

Excellent, thanks a lot.

Randy Atkins executive
#34

Thanks, Carlos.

Nathan Martin analyst
#35

Thanks, operator. Morning, everybody. I just have a clarification question to kick things off. In the past, you described the mid-year report we're expecting from Hatch as a Preliminary Economic Assessment. At this point it sounds like you're calling it a revised conceptual study. Perhaps there's no distinction, but I wanted to confirm whether any of the data in that report is expected to change.

Randy Atkins executive
#36

Both the brief and the detailed response is that no change should be expected in the data that gets produced for the report. The commercial and technical feasibility it contains will match what was worked up when the Fluor report came out last year using the solvent extraction technique. To be honest, the nomenclature shift is driven by a compliance consideration — keeping things in regulatory formality with S-K 1300, under which the SEC has indicated that studies of this kind ought to be characterized as a conceptual study rather than the earlier nomenclature, which was PEA.

Nathan Martin analyst
#37

All right, understood, Randy. Thanks for that. Jason, I've got something for you. You provided quite a bit of useful information, I believe, regarding anticipated sales for the remainder of the year. I may have overlooked it, but once more, you folks brought up the reduced net back realizations on export sales into Asia during the first quarter, which stemmed from the elevated freight rates. How much of your unsold volume do you anticipate being sold on a CFR basis, and could freight rates also be affected if they stay elevated?

Jason Fannin executive
#38

Yes, Nate, Jason here. Thank you. We actually tend to sell very little on a CFR basis, but the place we noticed the effect, naturally, going into the Pacific was on recognized freight differentials there against the Australian shipments. It absolutely did. We had a number of solid pricing mechanisms in Q1 arranged well before the Iranian conflict. After we began seeing the consequences of that, it was incorporated into the overall mechanism, and that's where the hit showed up. Certainly, once more, because we had one large shipment slip out of the very end of the quarter, that was disappointing, and it had an impact on this as well. Also, Q1 is typically our usually lower domestic out sales when it comes to total volume out the door. All those factors kind of converged, resulting in the impact on that pricing.

Nathan Martin analyst
#39

Alright. And Jason, you brought up the domestic side. I noticed domestic tonnage held steady at 1.1 million tons, but from what I understand, pricing declined roughly $4 compared with the prior quarter. Is there anything particular you can share about what caused that shift? And with a bit of unsold tonnage still available, are you anticipating any further domestic sales at this point?

Jason Fannin executive
#40

Yes, sir. Regarding your first question about the price movement. Nothing has really shifted there, you know, when it comes to the customers, the structures, all of that sort of thing. You know, we're labeling certain fees in a different way than we used to just so we can get cleaner apples-to-apples pricing comparisons within our book. That accounts for the whole of that change on that overall price on the domestic side. Yeah, and on the, you know, uptick in the domestics, we've noticed a couple points of interest, as you might expect on the high-vol side, simply because of operations that have either already closed or are reducing output or are in the middle of closing down. Obviously, we take that as a positive sign. You know, Elk Creek has a great reputation in the domestic market, and we usually get one of the first phone calls when folks need a high-vol, and we're already seeing that. We see that as very positive, certainly for the second half.

Nathan Martin analyst
#41

Okay, that's really useful. I'll share it with the team. Thanks for making time, and good luck.

Jason Fannin executive
#42

Thanks.

Nick Giles analyst
#43

Nick Giles here, calling in from B. Riley — thanks, operator. To start, apologies if the prepared remarks already covered this, but could you give us a breakdown of CapEx, or separate out the met coal CapEx into sustaining versus growth? And then regarding growth, what's included as of today, and which additional levers can you pull to ultimately boost low-vol exposure — plus what does that capital intensity end up looking like? Thanks.

Randy Atkins executive
#44

Jeremy, go ahead and handle this one.

Jeremy Sussman executive
#45

Hi Nick. If we look at what we're guiding for CapEx this year, it splits almost evenly, roughly 50/50, between what I'd describe as upkeep on the coal side and then expansion across coal as well as rare earth and critical minerals. On coal, I'd figure around $10-$11 per ton, so let's say roughly $45 million of maintenance capital, plus about another $20 million for our low-vol growth this year — that's clearly the third section at Berwind, along with the rail load out at Maben — and then, naturally, what's left goes toward rare earths. On the growth side, as you pointed out, our coal focus is really centered on low-vol. Ultimately that means bringing the Berwind mine up to four sections. If we decide to, we could go underground at the Maben complex, which would add as much as another 1.5 million tons. Everything here depends on the market. We're beginning to see some encouraging signals going forward, and certainly as we progress through the year and begin budgeting for 2027, these are clearly items we'll examine closely.

Randy Atkins executive
#46

Right, so I suppose I'll just tack a little ending onto Jeremy's remarks. As you know, Jason brought up that one of our Maben cargoes is heading out by sea during this quarter. We consider that significant, since if we're able to build up the Maben name in markets abroad, that will matter a great deal for volumes in low-vol, which are going to come in far above what we've seen in the past. That looks like a real positive to us. And naturally, from a liquidity standpoint, we're in a position to kick off the Maben deep expansion the moment we feel we have enough clarity from market signals to be confident that, once it's in place, we'll have a solid market when we begin genuine full commercial production.

Nick Giles analyst
#47

Understood. Appreciate it, everyone. Perhaps just a single additional point to clear up. My understanding is that 15% of met shipments this quarter were tied to PLV. What might that figure look like in 2Q? Once Berwind, you know, sort of scales up later in the year, where ought we to anticipate it landing?

Randy Atkins executive
#48

Jason, would you like to handle that?

Jason Fannin executive
#49

Yes, of course. Nick, Jason here. For Q2, as things stand, our projection based on what's already committed comes to roughly 25% for exports. On a PLV basis, I believe that works out to just a bit above 20% of total volumes. Naturally, there are still a few tons that need to find a home in Q2, and we'll be looking at that market for them. Regarding the back half, here's what I can share. First, very late in Q1 we signed a term high-vol deal that has only just begun against PLV. It will run across the whole year, and we'll see the effect, with more of it showing up in Q2 and then in the back half. Randy and I both brought up the Maben trial taking place this quarter. Our hope is that it brings in additional business on that side. On top of that, I can tell you we are in talks right now with a single large term customer about PLV linked business, aiming to add more cargoes during the second half. Given where things stand today, my expectation is that it will go up; putting an exact figure on it at this moment is just difficult.

Nick Giles analyst
#50

Nick, understood — glad that was useful. If there's room for one more question, I'd like to ask it. When you consider the carbochlorination process and the intellectual property you're developing around it, does the patent coverage end up centering on the chemistry itself, or on how it's applied to coal-hosted material? I'm simply trying to understand what you'd be defending in the end, particularly since some of your competitors are also looking into processing. Thanks.

Randy Atkins executive
#51

Randy: Absolutely, Nick. I'll hand it to Mike to explain in a bit more depth, but the short answer is that both of our IP strategies are meant to be wide and comprehensive. Everything you just mentioned would fall inside them. Whatever we can treat as trade secrets, we'll safeguard, since I believe we're going to end up with a rather distinctive process that might eventually be deployable not just for our own coals, but for other coals and other products tied to coal. If we manage to get it fully worked out, it's a fairly effective mousetrap. That's the reason, as I said before, that we'll have some quite compelling assets that we expect will be, in a sense, transferred into our Ramaco Royalty entity — that covers the royalties plus possible IP revenue stemming from them, which in my view could become a very significant source of income for us down the road.

Nick Giles analyst
#52

Everyone, thanks for the update, and I wish you ongoing success.

Randy Atkins executive
#53

Mike, would you like to add anything further regarding the intellectual property angle, specifically when it comes to the finer details about the processes themselves?

Mike Woloschuk executive
#54

Yes. Let me just mention that you brought up a few points. When it comes to rare earth elements and critical minerals found in coal and carbonaceous clays, we certainly want to secure this technology. The intellectual property also covers the extraction and purification of certain critical minerals. The great thing about this deposit is that we don't have to buy a reagent. It's already present and mineralized. If you had to buy coal as a reagent or carbon for this reaction, we make it for a fraction of the price, and we're getting a substantial portion of our critical minerals out of the coal itself. That's what the IP covers.

Nick Giles analyst
#55

Understood. Thanks for explaining that, Mike. It's clearer now. I appreciate it.

Randy Atkins executive
#56

Sure. So, to start, I'd like to express my gratitude to everybody who's with us today. Like we mentioned before, our expectation is that by the close of the coming month — though it might just push into July, possibly where the Weir report is concerned — we will definitely have gotten something from Hatch as well as Weir, and in our view that represents a fairly important milestone. Once that happens, we're thinking we'll likely return to the market with a standalone report, one that gets released in written form, and we'll probably also think about holding a somewhat separate, distinct call where we can definitely take questions from analysts and shareholders alike. My expectation is that this would occur at some point in July, most likely; it would come ahead of our Q2 earnings call, which we'd anticipate taking place in early August. So with that, I want to thank everyone once more for participating on today's call, and we look forward to catching up again soon. Thanks so much.

Operator operator
#57

That brings this call to an end. We appreciate everyone joining us for today's presentation. You're free to hang up at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ramaco Resources, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Ramaco Resources, Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.