Home / Transcripts / Stabilis Solutions, Inc. (SLNG) · March 5, 2026

Stabilis Solutions, Inc. (SLNG) Earnings Call Transcript

March 5, 2026

NASDAQ US Energy Oil, Gas and Consumable Fuels earnings 53 min

Earnings Call Speaker Segments

Andy Puhala executive
#1

Hello, everyone. This is the conference call covering our results for the fourth quarter of 2025. I am Andy Puhala, and I serve as Senior Vice President and CFO of Stabilis. With me on the line is Casey Crenshaw, our Executive Chairman, Interim President, and CEO. Yesterday, once the market had closed, we put out a press release covering how we performed operationally and financially in the fourth quarter and across the full year. You can access that release publicly through the investor relations portion of our company site, stabilis-solutions.com. Prior to getting started, please be aware that forward-looking statements will be part of what we discuss on this call, as defined under the Private Securities Litigation Reform Act of 1995 along with other securities laws; such statements reflect the company's expectations and beliefs as they stand today, March 5th, 2026. Risks and uncertainties surround these forward-looking statements, and those could lead actual results to come in materially different from what we have projected. No obligation is undertaken by the company to update or revise any forward-looking statements shared on today's call. You can locate more details about the factors that might produce those differences in our SEC filings as well as in the press release where we announced our results. We urge investors not to put undue reliance on any forward-looking statements. Also, keep in mind that certain non-GAAP financial information may come up during this call. Reconciliations showing how those non-GAAP financial measures compare to the most comparable GAAP measures are available in our earnings press release. A recording is being made of today's call, and a replay will be offered. Having said all that, I'll turn things over to Casey Crenshaw for his remarks.

Casey Crenshaw executive
#2

Thanks, Andy. Morning, everyone, and thanks for joining the call. We finished 2025 with solid execution, having successfully completed the wind-down of operations under two sizable multiyear agreements: the marine bunkering deal for truck-to-ship service with Carnival Corporation, plus our arrangement with a top global supplier of mobile power generation that serves an electrical cooperative in Louisiana. With those agreements completed, revenue and Adjusted EBITDA for the fourth quarter fell compared with the prior year. Roughly 28% of fourth quarter revenues were removed because those contracts wrapped up during the quarter. In each instance, we're well positioned to keep serving these customers as they evaluate what they'll need going forward from our integrated last-mile LNG solutions. The fact that they continue to engage with us speaks to our platform as well as the caliber of our team and our people. Looking ahead to 2026, demand across our key markets remains substantial and keeps growing. Even so, we anticipate weaker revenues and profitability during the first half as we bridge toward the launch of a number of new customer contracts, which should get underway in mid-2026 and early 2027. On February 17th, we announced an award worth an estimated $200 million over two years to provide behind-the-meter power generation support for a U.S. data center. Once it starts, it will be the biggest contract the company has ever had in operation. Deliveries kick off in the first quarter of 2027 and should run through the first quarter of 2029. With the United States making historic investments in data center infrastructure, the fast-growing power requirements of these facilities open up a considerable opportunity for behind-the-meter power generation fueled by LNG. During the last several months, customer interest has risen noticeably in our LNG for both commissioning and bridge power at U.S. data centers where neither pipeline-delivered gas nor electrical power is accessible. In such settings, our last-mile LNG solutions network offers a highly dependable answer. Demand is strong in our aerospace market as well, where commercial launch activity continues at a robust pace. Our commercial team keeps chasing opportunities with both new and existing customers in that sector. Meanwhile, we're working toward FID on the Galveston liquefaction project. We're likewise seeing robust long-term demand trends for marine bunkering offtake. Our efforts continue toward a final investment decision on the Galveston facility. We're actively talking and negotiating with prospective project equity sponsors and lenders regarding the financing structure; at the same time, we've locked in customer offtake commitments covering 56% of the facility's planned capacity and are working to sell what remains; we're still engaged with our advisors on a special purpose vehicle structure funded through project-level debt and equity from third-party investors; that structure should deliver long-term value for all stakeholders while letting Stabilis keep growing our core operations as end market demand for flexible LNG fuel solutions speeds up. While we move closer to reaching FID, our teams are busy with engineering and design work, plus placing orders for long lead time items so the project schedule stays on track. Our commitment stands to give shareholders updates on a periodic basis whenever significant project milestones are hit. To sum up, for Stabilis, 2026 is a key year of transition. Hitting FID at our Galveston liquefaction facility will serve as a foundational milestone, putting the company in position for meaningful change and long-term value creation. Meanwhile, our commercial and operational teams stay intensely focused on delivering best-in-class service, reliability, and quality throughout our other growth markets. The contracts we have in hand give strong visibility into sustainable multiyear growth starting in 2027, with momentum building as we move through late 2026. As always, we stay committed to creating sustainable long-term value for our shareholders and look forward to keeping you updated in the quarters ahead. With that, I'll hand the call over to Andy for a detailed review of our financial performance.

Andy Puhala executive
#3

Thanks, Casey. I'll start by walking through how we did in the fourth quarter, then give you an update on the balance sheet and liquidity. Revenue for Q4 came in 23% lower than the same period a year ago, which reflected a 22% drop in gallons of LNG sold along with reduced rental and service revenue. Looking at our end markets, marine bunkering revenues were down 42% versus a year earlier, and power generation revenues declined 56% because the large multiyear contracts in both of those markets wrapped up. Partially offsetting that, aerospace revenues grew 17% and industrial revenues grew 12% compared with the same quarter last year. Adjusted EBITDA for the fourth quarter was $1.5 million, versus $4 million a year ago. Adjusted EBITDA margin was 11.5%, down from 23.2% in last year's fourth quarter. The main reasons for the drop in our Adjusted EBITDA margin are the wrapping up of the two large contracts, a favorable SG&A adjustment that won't recur, and a gain on an asset sale, with both of those items landing in the prior-year quarter. Cash generated from operations was about $670,000 for the quarter. We ended the quarter with $10.2 million in liquidity, made up of $7.5 million in cash and roughly $2.7 million of availability under our credit facilities. CapEx came to $3.1 million in the quarter, mostly tied to early engineering and design work plus long lead items for the proposed Galveston LNG liquefaction facility and the related Jones Act LNG bunker barge. Assuming project financing is secured and the company reaches FID on the project, we expect future funding needs for the project to be satisfied through financing at the project level; during the first quarter of 2026, we expect to put $1 million-$2 million of extra capital into the project as well as routine maintenance CapEx. On top of that, we anticipate investing more capital in mobile equipment and related assets needed for the significant data center contract that's scheduled to kick off in early 2027. Prepayments from the customer will fund this capital investment. That wraps up our prepared remarks. Operator, please open the line for Q&A.

Martin Malloy analyst
#4

Morning, everyone. Congrats on everything you've accomplished with the data center side of things, plus Galveston LNG and Aerospace. There's a lot going on here, and plenty of encouraging developments. My first question concerns data centers. I believe people increasingly understand that behind-the-meter power for such facilities could be needed across a longer stretch of time, alongside certain short-term backup power requirements. Could you share what you're observing when it comes to customer demand within the data center market? From what I understand, the contract you mentioned runs two years initially. Could you discuss the chances of extending it?

Casey Crenshaw executive
#5

Yes, absolutely. Glad to. Also, thank you for being here today — I value your input and your coverage of the company. Regarding the last-mile LNG answer for behind-the-meter data centers, or the high-speed computing space, there are actually several distinct areas where Stabilis can play a strong role. I'll go from shortest to longest in terms of duration. Number one involves commissioning those facilities, where the volume might be 50 MW-100 MW and the duration might run three to nine months, while they're getting commissioning blocks of these data centers up and running; that's one category of activity, and during that window they might be waiting on, you know, a different gas pipeline or a different power or electrical hookup. They're attempting to commission the facilities ahead of that, whether that's the water, the cooling, and all the various items they're commissioning. Number two, which resembles this other project, is something we refer to as a bridge solution, in which we deliver a last mile LNG answer to a power generation company, and that company delivers either a two to five year bridging answer while they wait for the natural gas line, pipeline or the power lines to reach the facility. It's possible that scheduling doesn't come together perfectly, and those contracts get extensions. Last, there's a rising amount of permanent, you know, natural gas power generation for data centers, and LNG turns into a backup answer for those; they've got a pipeline hooked up; they've got natural gas. Their generators run on natural gas, yet they bring in LNG as a backup answer in case there's any outage or trouble with the pipeline. Hopefully that clarified the sort of three different sectors and sort of where we play within the behind-the-meter space for data centers specifically. I'd like to add that Stabilis is actively delivering distributed power activities across all sorts of applications, not only data centers. Data centers are certainly a growing area for the company at present.

Martin Malloy analyst
#6

All right. I was curious whether you could perhaps. You know, the size of this contract far exceeds anything we've previously observed. Would you be willing to discuss any elements we ought to take into account when evaluating EBITDA margins for a contract of this type — things that might push it higher, lower, or roughly in line with what we've historically seen? Perhaps not this particular contract, but more broadly, those bigger contracts you may be considering.

Casey Crenshaw executive
#7

Well, a few separate items we've addressed on this particular one. First, getting the client to back us on extra CapEx tied to carrying out the project and being able to deliver around, you know, bringing in third-party supply, and so forth; we've built the agreement to maximize the solution around really solid outcomes for the client while shielding the downside for Stabilis should any delay or service gap arise. We've accomplished that by having customers provide us with credit enhancing features to assist us on the CapEx and the OpEx connected to securing the supply that supports them. That's one item we've done sort of as a way to mitigate risk. When I consider EBITDA margins and some of those matters, I sense it aligns with the historical business; we'd rather not disclose any project-based specific details regarding that beyond recognizing that it wouldn't be fair to the clients and stakeholders. It's nothing other than what historically would be offered, except that they extend considerable credit enhancement to safeguard us should any scheduling delays occur.

Martin Malloy analyst
#8

Excellent. Thanks a lot. That was quite useful. I'll rejoin the queue.

Tate Sullivan analyst
#9

Hello there. Thanks. Good afternoon. This picks up on what you just said regarding the two-year contract and the projected $200 million in revenue. Is that figure built on forward pricing for the LNG you supply, or could you walk us through a bit how that $200 million gets generated?

Casey Crenshaw executive
#10

Yes. I appreciate the question, and I appreciate you joining the call today. That's a fair question. It's derived from what we expect the LNG to cost plus every other expense tied to getting it delivered, and it reflects the demand they've told us to anticipate across that two-year period — no extensions or anything of that sort. There's a... I'm hoping that addresses what you asked.

Tate Sullivan analyst
#11

All right, and thanks. So, whenever you're speaking with customers — say, someone who owns or runs a data center — how does the conversation around price go when they're weighing diesel generators against backup energy storage systems? Or, put another way, how do you handle it if customers raise pricing worries about LNG?

Casey Crenshaw executive
#12

Well, I think that's...

Tate Sullivan analyst
#13

...solutions?

Casey Crenshaw executive
#14

Yeah, I believe that's an excellent question. When we genuinely consider it — and I hope we're making this clear to all of you — there are, you know, three distinct areas in which LNG can truly play a role. The first is the shorter term, you know, 3 months to 1 year, where we handle the commissioning and provide support for the power generation needed during commissioning. That's probably the area least sensitive to price. Bridging is more sensitive to price. That last area is the most price sensitive if you've got a permanent installed power base. You know, these projects are competitive. They're examining what their kilowatt per hour and all of that comes to. You know, we're always at ease competing with diesel, but when you look at, kind of, you know, grid cost power or you're considering pipeline costs, those are typically less expensive than a turnkey LNG solution.

Tate Sullivan analyst
#15

All right. I appreciate the context you provided. Thanks. Take care.

Casey Crenshaw executive
#16

Thanks.

Bill Dezellem analyst
#17

Thanks. I've got several questions. To start, could you explain how you'll deliver $200 million in revenues tied to this big contract? I assume that won't be coming from George West. Please just walk us through, realistically, how this plays out.

Casey Crenshaw executive
#18

Bill, I appreciate that question, and I think it'll help clear things up. Our own liquefaction plants won't be serving this project's region; instead we're relying on our third-party network — we talk about that network often at Stabilis, given our acquisitions and how Stabilis was built through several companies that lacked their own liquefaction capacity and consistently relied on third parties. We're drawing on third-party liquefaction offtake agreements, and we deliver the turnkey LNG solution — handling logistics, then on-site storage and regasification of the molecule back into the gas estate so it reaches the generator. That's how we're getting it done. LNG exists in those areas and markets, which really gives a clear illustration of why Stabilis stands out as unique and special: we possess our own liquefiers, and we can also offer this sort of turnkey solution even when we aren't producing the LNG ourselves. I hope that addresses it. Right, it isn't located in the Gulf Coast region, though because of certain confidentiality protections, we don't disclose its location within the U.S. or North America.

Bill Dezellem analyst
#19

So with that in mind, Casey, is there any reason you couldn't handle, say, hundreds of contracts like these? I get that hundreds aren't sitting out there, but since it isn't your molecule being used up, is the number basically unlimited?

Casey Crenshaw executive
#20

Down the road, yes. Bill, that's a terrific question. Let's go back and break it into those three sorts of options. The first is commissioning. We're able to do plenty of those. Those are genuinely solid, you know, six months to one year projects. Genuinely solid. There's plenty of that out there. We're involved in lots of discussions about that. This bridging project is genuinely solid too. Yes, we can handle quite a few more. Our liquefiers don't cap it, though there's a certain ceiling on the total LNG available across the various regions and on how far we can truck it. What happens is it turns into something more sensitive to price. Then, when you consider the backup solution over a longer term, that's where, you know, the economics of these facilities, the length of their bridging, what their timeline looks like, all feeds into the price they're prepared to pay and how far we must move it to deliver that. The first phase, commissioning, testing, plenty of opportunity, plenty of availability, just genuinely robust. Bridging, somewhat less, two to five years. Some projects will definitely do that; we do think we can scale that too. The backup is a genuinely robust longer-term opportunity, where they truly don't want to run backup on diesel if they can avoid it. They want to keep running their backup on natural gas, and they want to be switching between grid prices and their own behind-the-meter power generation — that's kind of the ideal setup for these data centers. You know, they're still, you know, honestly, we're still at early stages in figuring out how to optimize the power for all of these, and they're just trying to get them in. What excites us at Stabilis is that we're an active participant in the distributed power market. This is the data center side of it. We're excited that we're working on it. We've been discussing it with you folks. We're just as excited about the aerospace business. We're just as excited about the marine bunkering activity and what we're seeing there. This is an area where we're recently seeing contracting activity, and we're delighted to be able to share with you folks some tangible contracted success around the space. In the data center, distributed power, we've been in it, doing it, and continuing to do it.

Bill Dezellem analyst
#21

Thanks. Before we move on to marine bunkering, I've got one more question about data centers. At some point, does rolling stock become a constraint because of how much production capacity exists, or is that genuinely not a problem? What I'm really attempting to figure out is what additional constraints exist apart from the ones you so accurately described when answering my earlier question.

Casey Crenshaw executive
#22

Every one of the three. The first is supply from third parties or supply we generate ourselves. A number of these projects have long enough timelines that they might ask us to put liquefaction close by — bridging, essentially, where they'd say, "Hey, would you look into siting a plant closer to the facility and trucking it in?" So it's molecule availability, followed by the logistics equipment, and then the equipment for on-site storage and regasification. Each of those three acts as a gating item, and what really drives them is the volume the site requires and how far away it is. We enter this process holding the biggest logistics fleet and regasification fleet in the country, thanks to Stabilis having consolidated and operated in this space across a number of end markets for years. Within the United States, we have the biggest cryogenic fleet and regasification storage fleet. That's an advantage we inherently have. As growth in this space keeps outpacing what our logistics and on-site storage equipment and even liquefaction can handle, these customers collaborate with us to bolster and strengthen the credit behind the contracts so this solution becomes possible — which is what happened in this project, where they were supportive in how they approached the contracting; in this contract we've talked about, we're adding logistics equipment. We're adding, you know, something like N+3 protection around on-site storage and regasification. You know, they're extremely supportive about making sure everything is in place that performs for their data center needs.

Bill Dezellem analyst
#23

Okay, thanks. Turning to the Galveston facility — given that we're discussing a final investment decision before this month wraps up, it really appears completely on schedule. Let me frame it from the pessimistic angle: at this stage, with only 25 or 6 days left before the quarter closes, what might throw it off course?

Casey Crenshaw executive
#24

Well, ideally, we've already mapped it all out. A few separate pieces are being handled together. First, there's the extra offtake. We previously stated 56% of the offtake is under contract. Right now we're in ongoing talks with customers to contract the remaining portion of the facility. Securing the rest of the facility's offtake, as agreed, helps optimize the project's capital structure. Second, regarding the capital structure, we're actively negotiating with our capital partners — covering both the term debt component and the preferred equity, essentially the sponsor, within the SPV. These pieces operate alongside the offtake, so we're handling everything as a single effort, and we're aiming to keep the timeline aligned with what the clients who've already signed need it to be. Long lead items, the engineering — we keep pushing forward on those while we try to get everything locked down and finalized. You know, one thing that could disrupt the timeline would be a global war, which we happened to start this past weekend — or rather, which started this past weekend. That shifts the conversation. We believe it strengthens the case for stable, low price, consistent fuel in the United States, particularly in the Houston Ship Channel. We believe this benefits the project over the long term and demonstrates why Stabilis — which is Greek for stable — means that having capacity and supply in the Houston Ship Channel, Galveston area is positive for the United States and for the customers that call on these ports. We view it as an enhancer, but it certainly is a new variable that got inserted into the process this week. I hope I've laid it out. There's the commercial side, there's the financing matched with that, and then there's simply the lead time and execution for the current clients that hold the 56% of the offtake. Then there are third-party factors at play, such as the conflict in the Middle East, which is driving up the global cost of LNG, which is making the LNG that we can produce more optimal for our clients to contract.

Bill Dezellem analyst
#25

That helps me out. Now, about the Carnival contract not getting renewed — it used to be shore-to-ship or truck-to-ship, right? Could you take us through why they've decided not to renew, and then explain what they'll use for fuel in the interim, until the Galveston plant is operational?

Casey Crenshaw executive
#26

Of course. Let me share a bit of detail. We can't speak on behalf of our client, but I can tell you what we understand. What we feel fairly at ease sharing with you folks is that an extension of that contract would have been their preference. The Jones Act vessel they'd separately contracted — the one we delivered to, the one that brought them the fuel — was going to stop being available to them beginning in 2026, and it was that vessel's availability for this project that caused the extension to fall through. Through verbal agreements and letter agreements, they'd told us an extension was what they wanted, but it hinged on that vessel being available. Once it wasn't, their capacity to extend changed. Over the medium term — short term, rather — their options are either getting their vessel rerouted to a location where LNG might be obtainable, maybe the Bahamas, or working out a different routing, or else they'll need marine gas oil, known as MGO, which is what we call MGO, their substitute fuel source. Does that cover your question, or is there anything you'd like to follow up on?

Bill Dezellem analyst
#27

That does address what I asked, though perhaps it points up how little bunkering equipment exists — something I honestly hadn't recognized or grasped. So for my last question, could you walk through how supply and demand work for the bunkering vessels currently out there, how uncommon or common they are, and the reason this specific bunkering vessel could no longer stay on to fulfill the contract?

Casey Crenshaw executive
#28

Of course. The clearest frame is probably the level of development across the various bunkering markets. In my view, the most developed bunkering market for Jones Act bunkering vessels sits in Florida, or the southern United States around Florida. That region adopted it first and got there earliest. My figure might be off by one, but I believe roughly 5 Jones Act vessels are doing LNG bunkering in the United States, and every one of them is in Savannah or in Georgia on down through Florida; that's what's available for Jones Act LNG bunkering vessels in the United States. There are 5, and those are 5 or 6, and all of them are located in that area. That area got built out first. One factor behind our enthusiasm for bringing this to the Gulf Coast and eventually to other regions is that the technology isn't new. It's already adopted and it works. What's lacking is vessels. That vessel could be relocated back and had ample work waiting in that region.

Bill Dezellem analyst
#29

That's useful. Thanks, and best of luck with the FID process.

Ed Arce analyst
#30

Morning, Casey and Andy. I've had a stake in Stabilis for a number of years, likely dating back to GTLS Chart Industries, the first investment. I just have one brief question, a solid follow-up. I notice you've chartered or leased a ship from Seaspan, the Garibaldi. I'm curious how that fits within the SLNG picture, given it can't bunker the United States, though it could bunker spots in the Caribbean or the Panama Canal. Hello?

Ed Arce analyst
#31

just star one. How do I do it? Hello?

Ed Arce analyst
#32

Okay.

Casey Crenshaw executive
#33

Hello.

Casey Crenshaw executive
#34

Hey, guys.

Andy Puhala executive
#35

Andy, it's Andy.

Casey Crenshaw executive
#36

Sorry.

Andy Puhala executive
#37

Casey.

Casey Crenshaw executive
#38

My apologies for that.

Ed Arce analyst
#39

I've owned shares for quite a while. This is my first time on the line as well. So, everyone, I've been invested going back to the GTLS era. The company is something I genuinely appreciate. Things are going great. There's one thing I'd like to ask, and it ties in nicely with what was just asked. I noticed we took a lease on a bunkering vessel, though it isn't Jones Act approved, I understand. Could you share any news about it? What purpose will it serve? Is it possible we won't end up using it, or what?

Casey Crenshaw executive
#40

So, that matter is still underway; we hope to revisit it with all of you on the upcoming call.

Ed Arce analyst
#41

All right.

Casey Crenshaw executive
#42

we have an initiative aimed at doing what we can to back our clients and customers. We'll follow up with you later regarding the specifics of it.

Ed Arce analyst
#43

All right.

Casey Crenshaw executive
#44

That's something we aren't ready to discuss at this point.

Ed Arce analyst
#45

All right, I’ll talk with you both afterward.

Casey Crenshaw executive
#46

We’re glad you could take part, and we’re grateful that you’re an investor and that you’re engaged on today’s call. Thank you.

Andy Puhala executive
#47

Yes. Appreciate it, Ed.

Ed Arce analyst
#48

All right. Many thanks. Goodbye.

Martin Malloy analyst
#49

I appreciate you letting me ask a second question. I just wanted to pose something broader when it comes to aerospace. I suppose people have talked for a long time about the possibility that we'd see additional activity on the contracting front in aerospace. So now that demand has grown for LNG, for data centers, for manufacturing, for bunkering, has anything shifted in how aerospace companies, space companies, think about their LNG supply and perhaps look to lock it in through a contract, gaining greater visibility into supply security?

Casey Crenshaw executive
#50

All right, I'll kick things off, and then I'll let Andy jump in on this. For instance, we do have contracted work that we perform with them, and that work happens under 1-year contracts that get re-extended, and so on; we hold a number of contracts within the space. When we discuss contracting, what we mean is multiyear take-or-pay style negotiations. We are under contract. Those simply aren't multiyear take-or-pay arrangements. You know, this is an exciting period for them. Their commercial consistency in really, you know, generating profit and launching things and how that fits with satellites and what their overall business looks like and how that connects with data center AI type growth and macro, they're really aligned. On activity, they're actually converging, not diverging. We do believe there will be substantial need for closer supply, both in Florida and in the other regions where they launch and how they handle that; beyond that, fuel quality varies depending on what their rockets require and how they require it. We keep working with all of our clients in that space on how we can install, you know, liquefiers built for specific purposes for them, how we can sign longer-term contracts. As they keep expanding their needs and build out more consistent flights, I believe that's turning into more and more of a question and a concern. You know, clearly some of them prefer to self-perform everything. Some of them would rather do more outsourcing. You know, I think there's simply a mix there. I'm not trying to dodge giving a direct answer, but I do want to note that we are contracted with these strong companies. We do anticipate meaningful growth in overall revenue in 2026 compared with 2025, you know, above, you know, 30%+ growth, perhaps closer to 40% growth in that space. That's what we expect, and we are watching it expand. As of today, we don't have line of sight on placing an asset for one of them yet, meaning a liquefier that's fit for purpose. We are actively holding discussions with that being available. We just haven't gotten that contracted yet.

Martin Malloy analyst
#51

Nice, thanks a lot. That's quite useful. I appreciate that.

Spencer Lehman analyst
#52

Hello there, and good morning. I'm really enthusiastic, you know, about the things you folks are working on and what you have in the pipeline. In a way it's the fulfillment of a lifelong wish after so many years. I just hit 90, so I figure perhaps I'll have the opportunity to see all of this unfold. I'm curious whether you've thought about the option, rather than doing this on your own, of possibly combining with a bigger firm whose balance sheet could supply all the funding. Seems like that train has already departed, correct? Is that still something you're weighing, or do you believe you're able to manage the entire effort? For a company this small it strikes me as fairly bold, but do you feel quite assured?

Casey Crenshaw executive
#53

Yes, Spencer, that's right. To begin with, thank you simply for being an investor with us over the long haul; our excitement exceeds yours since we firmly believe that this turnkey LNG solutions approach is truly a transformative force across all three of these expanding markets — aerospace, plus the distributed power, you know, and marine bunkering; we are just, you know, incredibly thrilled about that.

Spencer Lehman analyst
#54

Yeah.

Casey Crenshaw executive
#55

So, as I see it, regarding the marine bunkering project, where a significant amount of infrastructure work is underway at present, we've discussed ways to fund it via a special purpose vehicle for project financing. In our view, that represents the optimal capital structure, since it lets us keep our equity while we believe that equity isn't fully reflected in the opportunities and growth of Stabilis. It permits growth without any substantial dilution, you know. That path still strikes us as the correct one. Turning to distributed power, customers back us and their credit strength helps us pursue that growth alongside them. As for space, we are absolutely — or aerospace — ready to contribute certain assets and take certain actions should they ask us to do so under contract. Putting on debt, strengthening the capital structure, or truly doing whatever frees up value for the shareholders is not something we oppose. Beyond that, freeing up that value for the shareholders is our obligation. You won't catch anyone on the management team saying we'd never do something — never say never about anything. What we aim for is profitable expansion of the company across these three major end markets we're talking about, and we want you shareholders to understand that growing the company is our desire; we see this as a growth area where infrastructure alone offers every sort of expansion. As various financial markets allow us to achieve that, you know, going out and doing it is our duty, and that's what we plan to do. Thanks for the question. At this moment, we believe the clients and contracts give us sufficient backing, though we don't wish to suggest there's any negative angle to anything apart from profitable growth for our shareholders and for our stakeholders.

Spencer Lehman analyst
#56

All right, thanks. That response strikes me as quite strong. It makes me glad to see you working to hold dilution down as much as possible. I really appreciate it.

Casey Crenshaw executive
#57

On that point, we see things the same way.

Spencer Lehman analyst
#58

Alright then, go ahead and take it away.

Casey Crenshaw executive
#59

Thanks, Spencer — glad you could be with us today. Unfortunately, the call dropped on our end.

Spencer Lehman analyst
#60

Yeah, all right. That makes sense.

George Berman analyst
#61

Morning, everyone. I'd like to add my voice to the folks who spoke before me in congratulating you on a job that was very, very well done. In my view, the outlook for us is clearly brightening and improving. There's one specific thing I wanted to raise — I've gone over this a few times with your CFO. On your balance sheet, we hold an ownership stake worth roughly $10 million, and it generates around $1 million annually through a China joint venture. Could there be an opportunity to perhaps monetize it? My sense is that would provide some welcome firepower for the projects you have underway now.

Casey Crenshaw executive
#62

Well, I'm grateful you asked, and that stake — through the partnership with BOMCO and our joint venture in China — is something we take real pride in. The team makes us proud, and being partners with BOMCO in that business is a pleasure. Since we aren't the majority shareholder — we're a partner with substantial board representation — we don't have full control over the ideal timing for monetizing that strategic asset. The joint venture agreement contains particular provisions permitting monetization during certain windows, and those provisions are quite specific. It's a fantastic company. My view is that it could be. The downside, I'd say, is that the geopolitical difficulties tied to China at present make it somewhat of a question — is now the most optimized moment to act there, or not? Would waiting until conditions normalize further be wiser? Might that yield a better step-up value? It's an excellent company. Over there, BOMCO is a terrific group. As you may know, that was among the pieces of the existing company that Stabilis reverse merged into, and it was, you know, one of the sole assets within the company at the time we reverse merged into it; having it is a delight. Both Andy and I serve as board members, we're actively involved in it, and we have an executive who keeps watch over it and is in China working on it on our behalf.

George Berman analyst
#63

That amount of more than $1 million annually he gets is also not something to dismiss lightly.

Casey Crenshaw executive
#64

We take pride in their results and the steadiness with which they deliver to shareholders a cash dividend tied to that business.

George Berman analyst
#65

All right. At the moment, you've got that single large facility in place — George, Texas, I think it is — making LNG. And on a conference call last year, you noted that the equipment needed for a second one had already been bought. Has anything moved forward on that? Does it fit into the big picture at this point, in terms of where it would go?

Casey Crenshaw executive
#66

Yes, it does. We own two liquefiers — one located in Port Allen, right close to Baton Rouge, Louisiana, and another in George West, Texas. After that, we purchased an entire extra plant — we refer to it as a train, a plant, or a liquefier — that still needs installation. George West is the ideal spot for putting it in; that's where we'd prefer to place it, since construction costs run lower there and we gain the advantages of infrastructure that's already in place. That said, we have marine clients, distributed power clients, and space clients, and all of them are considering whether they might want it located closer to their offtake agreement. So we've kept it as an asset that isn't installed yet, trying to determine where the most interested customer and client would want it, with the longest term — you know, opportunity and offtake being. It's ready to deploy, and no decision has been finalized about where that deployment happens, because we haven't gotten the customer finalization on where to put it.

George Berman analyst
#67

Correct. You might put it, or we might put it, that at this moment you're essentially the one steering, taking in bids, and whichever option serves the company best, you're free to accept it and move forward.

Casey Crenshaw executive
#68

That's right. Thanks for saying that; our view is that the ones steering are our customers. All we're doing is waiting to see which of them wants that availability along with that certainty of supply. In a sense, we answer to them, yet holding this and being able to roll it out fast compared with a greenfield application makes it a strategic asset of real value.

George Berman analyst
#69

Correct. Correct. And Mr. Crenshaw, I also want to express gratitude for stepping into that leadership role. In my view, we are certainly headed in the proper direction, and I will be eager to see considerably stronger share values once the funding comes together for these major on-the-ground opportunities.

Casey Crenshaw executive
#70

I certainly share the view that this is a fantastic group we have. I too am anticipating better stock prices for each of us. The management group we have is remarkable. Andy, as CFO, you will have plenty of chances to talk with him. Our team's composition includes Matt and Stage and Koby, and honestly I could keep naming people endlessly. The thing is, listing individuals is tough since we would need to list every single one; our team is unbelievable, the most capable turnkey LNG solutions group anywhere in the world. Across those three primary markets we reference, nobody has a better team than us, full stop. Taking that and directing it toward the highest-profit expansion and the highest-profit ventures is what we must continue pursuing and refining on behalf of the shareholders. We have a wonderful team, a wonderful collection of assets, a wonderful collection of logistics, facilities and customers and end markets, and we feel so fortunate to have every one of our excellent clients. We are putting in effort to retain them. Despite the fact that those 2 contracts ended, you know, the reality that we remain engaged with both customers and active with both customers demonstrates, as we mentioned before, something about our company and our team and our people. I appreciate you pointing that out.

George Berman analyst
#71

We should sign today. Thank you.

Casey Crenshaw executive
#72

Thank you.

Andy Puhala executive
#73

I appreciate everyone being on the call today and backing the company. As we have updates to give, we’re eager to keep you informed, and we also look forward to talking with you during next quarter’s call. Thanks.

Andy Puhala executive
#74

Thank you.

Operator operator
#75

That wraps up the earnings conference call for Stabilis Solutions covering the fourth quarter of 2025. You can go ahead and hang up now, and we hope the rest of your day is great.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Stabilis Solutions, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Stabilis Solutions, Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.