Hello everyone, and thanks for joining us for the Stabilis Solutions, Inc. conference call covering our first quarter 2026 results. I'm Andrew Lewis Puhala, and I serve as Senior Vice President and CFO of Stabilis Solutions, Inc. With me on the line is our Executive Chairman, as well as Interim President and CEO, J. Casey Crenshaw. Yesterday, once the market had shut, we put out a press release that lays out our operational and financial results for the first quarter. That release can be found by the public in the Investor Relations area of our company site, stabilissolutions.com. Prior to getting started, I want to caution all of you that forward-looking statements, as defined under the Private Securities Reform Act of 1995 and other securities laws, will be part of this call. The company's expectations and beliefs as of today, 05/07/2026, form the basis for these forward-looking statements. Risks and uncertainties surround forward-looking statements, and those could lead to actual results differing materially from what has been projected. No obligation is taken on by the company to update or revise any forward-looking statements shared on this call. You can locate more details about factors that might lead to such differences in our SEC filings and in the press release that announces our results. We urge investors not to rely excessively on any forward-looking statements. Also, be aware that certain non-GAAP financial information might come up during this call. Reconciliations between the non-GAAP financial measures and the closest comparable GAAP measures are available in our earnings press release. A recording is being made of today's call, and a replay will be accessible. Having said that, I'll now turn things over to J. Casey Crenshaw so he can share his remarks.
Thanks, Andy, and good morning, everyone on the call today. Results for the first quarter show the transition we had anticipated after two sizable multiyear contracts wrapped up at the close of 2025 — those were in our marine market and in behind-the-meter power generation. As expected, that produced a near-term headwind to revenue and earnings during the quarter. Meanwhile, we kept seeing robust demand in the quarter for aerospace, along with emerging power generation possibilities tied to additional data center work. Although our financial results came in soft through this transition period, commercial activity remains highly encouraging. Demand for smaller-scale LNG and complete last-mile delivery offerings continued to grow, and our sales teams are engaging closely with both existing clients and companies we hope to serve across a range of end markets. What matters here is that the deals already signed, combined with the live set of prospects we are pursuing, provide increasing confidence that performance will strengthen as we move through the rest of 2026. With contract launches expected in the latter part of this year and talks with customers now at an advanced stage, we believe results will pick up considerably in the back half of 2026 — even before the sizable data center contract we told you about earlier this year is scheduled to begin in 2027. Just to remind everyone, that data center deal is a two-year contract worth at least an estimated $200 million, and it backs behind-the-meter power generation for a U.S. data center. We expect delivery to kick off in 2027 and continue through 2029. We view this win as solid proof of the strength of the Stabilis Solutions, Inc. platform and a significant move forward in our role within the fast-expanding distributed power market. With demand rising quickly for behind-the-meter power, bridge power, commissioning support, and long-lasting energy infrastructure, the need for flexible and dependable LNG solutions is obvious. That is precisely the space where Stabilis Solutions, Inc. holds a particularly strong position. What we bring to the table goes beyond just providing LNG — we offer a full end-to-end solution. That covers procurement, transportation, storage, regasification, and dependable final-mile service in places where customers require trustworthy energy infrastructure fast. One major strength of how we operate is that we aren't constrained only by what our own liquefaction plants can produce. By drawing LNG from multiple sources, we can reach customers throughout various parts of the United States, blending our own production assets with supply deals from third parties, transportation know-how, and mobile equipment. That kind of scalable capability matters a great deal as we go after bigger deals in data centers, aerospace, marine, and industrial sectors. In aerospace specifically, demand stayed robust. Commercial space clients are becoming more active, and as launches pick up and LNG needs rise, we're interacting more with the customers we already have. Aerospace, we still think, is a long-term growth avenue for Stabilis Solutions, Inc., backed by what we can offer: high-purity LNG, dependable delivery, and solutions tailored to clients whose technical demands are exacting. Now, on the Galveston LNG project — last month we told everyone that we chose to cancel an offtake agreement tied to our planned Galveston LNG facility. While negotiating with potential financing partners, they asked us to revise that offtake agreement as a condition for the financing to proceed. The customer would not accept the change we wanted, so we decided to walk away from the contract. Although this has pushed back when the project is expected to be completed, I want to state plainly that our commitment to the Galveston LNG project has not wavered. Right now we are holding active conversations with additional prospective buyers about purchasing the capacity that is available; on top of that, we keep voicing our backing for this project. Galveston LNG is still a key piece of the strategy through which we intend to build value over the long term, especially given our aim of meeting lasting, multiyear demand in the Port of Galveston along with the wider Gulf Coast marine market. That said, I should stress that Galveston is merely a single element within our broader growth plan. On the platform we currently run, we continue to find significant opportunities for organic growth, including distributed power for data centers, aerospace fuel, and LNG for industrial uses. As we look ahead, we view 2026 as a temporary low point for the business while we work through this transition and prepare for new contracts and opportunities to ramp up beginning in 2026. Demand remains strong, our customer engagement is active, and the contracts we have won set the stage for recovery in 2026 and substantial growth in 2027. We remain committed to converting current and future demand into durable, profitable expansion, while maintaining strict financial controls and creating enduring shareholder value. From our perspective, Stabilis Solutions, Inc. holds a solid foothold in multiple rapidly expanding end markets, and we look forward to providing updates on our advancements in upcoming quarters. With that, I'll now pass the call to Andy, who will review our financial results thoroughly.
Thank you, Casey. I'll start by walking through how we performed in the first quarter, and then I'll give you an update on the balance sheet, cash flow, liquidity, and capital spending. Revenue for the first quarter came in at $10.4 million, which is a drop of roughly 40% from 2025. The decline on a year-over-year basis was mainly the result of a 41% fall in LNG gallons sold along with weaker rental and service revenue, partly offset by a modest rise in the underlying commodity price. Looking at the end-market level, we had no marine customer revenues at all during the quarter, and behind-the-meter power generation revenues were immaterial because the large multiyear contracts wrapped up late last year. Growth in aerospace persisted, along with gains in other legacy markets, and those two areas helped counterbalance the decline — revenue there rose 31% and 26%, respectively, measured against 2025. For the first quarter, adjusted EBITDA landed at negative $700 thousand, compared with positive $2.1 million during the equivalent stretch a year before. The main driver of that drop was the conclusion of the two sizable multiyear contracts. Worth noting as well: roughly $1.5 million in vessel charter costs incurred during the period are excluded from our first quarter adjusted EBITDA. Those expenses relate to a non-Jones Act vessel lease we entered into in 2025, which we arranged in anticipation of supporting logistics requirements tied to our marine bunkering contract that was completed previously. At the moment, our focus is on getting that vessel fully subchartered, and while that process plays out, we've arranged to lease it back from the lessor at a reduced cost. As long as no subcharter deal has been signed — and we anticipate one landing in the second quarter — these lease expenses will continue showing up in our cost of revenue, and we intend to treat them as an extraordinary item and strip them out of adjusted EBITDA. Shifting to cash flow and liquidity: operations generated $12.4 million in cash during the quarter. Within that number is $15 million in advance payments received from a customer, connected to our behind-the-meter data center contract that kicks off in 2027. Those funds are earmarked solely for equipment and other prep work on that project. When the quarter closed, we had $17.2 million in total liquidity. That figure breaks down as $13.7 million in total cash — $10.6 million of which is restricted — along with $3.5 million available through our credit agreements. On capital expenditures, we spent $5.3 million in the quarter, primarily on equipment purchases connected to the large data center project we have coming up. Going forward, we anticipate putting another $10 million to $12 million of capital toward equipment and guaranteed supply for that project. We expect to cover these investments using the advance payments we got in the first quarter, plus further advance payments we anticipate collecting as the year goes on. That wraps up our prepared remarks; we'll now open the call for questions.
Morning. For my first question, I'd like to spend a moment on those agreements you're wrapping up that might kick off in 2Q, though it sounds like their effect on this year's back half is certain, coming from behind-the-meter power. Can you give us the scale of them — specifically for the 2 contracts that got terminated in last year's fourth quarter? And when it comes to behind-the-meter power, will this serve as a bridge-type setup until the pipeline gets connected at these sites, and afterward might there be chances for backup-related agreements?
Morning, and thanks for being here today. I'll attempt to address what amounts to 2 questions. To begin, regarding the category of agreement for distributed power, our discussion frames it as either commissioning power, bridge power, or a more permanent backup tied to behind-the-meter applications and distributed power. This one leans toward a commissioning project, typically a 6- to 12-month undertaking that we expect to launch at the close of this year's second quarter and continue until the year ends. Given the commitments we hold, we do expect to be able to substitute for the agreements that concluded at the close of last year across the back half of the year. Without venturing too far into forward-looking statements, we expect to be able to substitute for that on the P&L, and that comes before we factor in the contracted demand beginning in Q1 of next year, which carries meaningful size too.
Great, thanks. Now, regarding the Galveston LNG project, it sounds as though you're in active talks with offtakers to fill the gap left by the canceled contract. Could the prior offtaker come back and sign an offtake deal again? And separately, do you feel comfortable that the terms in your other offtake contracts won't require changes for project financing?
Yes, excellent question. I'll address the second part first. The offtake agreement in place right now fits nicely with the construction schedule for the project and doesn't introduce risk around when construction wraps up or when startup occurs, so that contract sits in a good spot. Turning to your first question, we strongly expect that the customer whose contract we had to cancel will come back and do business with us at Galveston once we're further along or the plant is finished. Whether they'll be included in the offtake that supports the financing, or instead become a spot market customer after construction, we don't know at this point, but we're actively engaged with that customer. Timelines, the Iran war, and various other events brought about delays and problems regarding dates and how those would impact financing, which is what made exiting that contract necessary. Thank you.
Hello, Bill, good morning.
Morning to you. I'd like to dig a bit deeper into that new data center contract. As I understood it, you described it as a commissioning contract set to kick off in Q2 and essentially run all the way through Q4. Is that right? And assuming it is, did you go straight to the data center on this one, or was there some kind of middleman handling the power side who brought you in?
Correct. The project you're referring to falls more into the category of construction commissioning. With every one of these projects, we're involved alongside both the end user and the provider — typically we're working with both parties. There are many projects of this type that I'd describe as construction commissioning, and from our standpoint those tend to run six to twelve months, depending on whether you're only commissioning Phase One or on which systems you'll be handling the commissioning work. That's what we expect this project to be. It's not the same as the one launching next year, which is more of a bridge power solution and runs longer. Each of these carries minimum time periods, with possible extensions tied to what's going on with their schedule and so forth.
Does the monthly revenue from that initial commissioning deal come close in size to the monthly revenue the bridge will generate, with the only real difference being that it lasts for less time? Or do the two data centers differ in scale, which would make this situation quite distinct?
What I'd say is that the bridge is really characterized by the number of megawatts we deliver, and those megawatts come at a steady, uninterrupted rate. As for the commissioning project, which kicks off this quarter and continues through the back half of this year, it involves fewer megawatts overall and fewer gallons tied to that, though it's still a sizable undertaking. The point we hoped to make is what we expect for the recovery: the low point arriving in the first and second quarters, followed by the business climbing back up as we move into 2026. That's the message we're aiming to emphasize for our shareholders and stakeholders.
Thanks for that, Casey. You said there are plenty of other agreements similar to this one. Everybody's hearing about data centers coming online; a lot of commissioning work is going on. Tell us about the opportunity pipeline on the data center side, since you've announced 2 of them in recent months.
Absolutely, Bill. We're definitely enthusiastic, and we feel good about the outlook. Go back roughly 18 months, and the thinking was that every bit of power would arrive on schedule or ahead of it, and pipelines would be installed on schedule or ahead of it; then what actually occurred is natural delays — construction slippage and other causes — slipping into this enormous infrastructure buildout everyone is aware of. As that works its way downstream, first comes power generation and backup power solutions, and at this point we're arriving at the question of how you supply the natural gas required for commissioning, startup, or bridges. This commissioning work has us genuinely excited, since that's where we step in and help the data center commission its project — testing every cooling system and the rest — while they wait on either the final gas pipeline or the grid connection. Ideally, it's a grid connection with inexpensive power that never goes down; second would be behind-the-meter with a pipeline. Stabilis Solutions, Inc. can take part by supplying commissioning, backup, or bridge, and that's the area we're focused on. We're seeing additional commissioning work in Q1 of this year. That's where things are happening with our customers, with certain people discussing the longer-term bridge. However, the longer-term bridge isn't the ideal answer for the client, so activity there is lower compared with 6- to 12-month commissioning work. We have several of those in progress.
Basically, we have arrived at this situation due to holdups. One approach to consider these commissioning chances is that they might be set to go live following testing, perhaps in the fourth quarter, but should the grid or the pipeline lack readiness, then your commissioning agreement shifts into a bridge contract. Is that probable?
That is a solid perspective. Another perspective is that their commissioning could occur in modular setups; they might have power hooked up to one of the modular ideas and then advance to the subsequent stage of commissioning the next hub close by, since it typically comes in clusters or hubs. We do not anticipate it being merely a brief scenario. Next, you will encounter outages and other backup requirements to sustain the dependability they are dedicated to, and that will generate extra work for LNG well past the construction and bridge stages. Picture them as modular — 80 megawatts, 50 megawatts, 100 megawatts — constructed modularly, piled around one another, and we are delivering unit work for units within the system.
I have one thing I'd like to ask about regarding putting that vessel out on a subcharter. When do you think that will take place?
That's a fair question. That charter was originally arranged to serve our customer in Galveston. For several reasons, we wound up with that customer choosing another option; we had thought we'd be able to subcharter that vessel very quickly, but the conflict in Iran threw a wrench into rechartering efforts and caused a postponement. Our expectation is that it will occur during the second quarter, with an effective date falling in the third quarter. We don't anticipate earning a large profit from the subcharter, so our expectation is that it will be net neutral.
Morning, everyone.
Morning. How's it going?
That's fair. I have two or three things I'd like to ask about. To start, with crude and LNG stacking up, plenty of discussion is circulating regarding certain nations entering the Gulf of America to collect their crude and LNG. At this moment, can your company take advantage of that situation?
Absolutely. We're glad you asked. For our Galveston LNG bunkering — dependable, steady supply available there for marine bunkering operations — the macro backdrop has never looked stronger than it does right now. The conflict has disrupted the schedule for our vessel subcharter to some degree and may cause minor construction delays, but the surrounding macro is incredibly robust; it confirms our need for additional LNG, purpose-built bunkering capacity afloat along the Gulf Coast. Our customers understand this, and our commercial team is putting in serious effort. Contract length, credit quality, and how those align with project financing are what we're focused on at present. Nobody is questioning that the project is needed, with a Jones Act vessel in the Houston Ship Channel. The conflict, along with LNG pricing, also advances our purpose-built supply for aerospace and the worth of what these aerospace clients are accomplishing with telecommunications and other technologies. This strengthens even more the requirement for a U.S. presence to succeed in aerospace. Finally, it drives home that U.S. natural gas and LNG pricing for behind-the-meter power serving AI data center operations holds an edge over data centers priced globally. That advantage is ours today, and considering worldwide oil and LNG prices on a TTF or JKM basis, U.S. data centers become even more competitive whether they rely on on-grid power, pipeline, or LNG; it reaffirms the logic behind all three of our growth legs. This wasn't a strong quarter — we don't intend to downplay that — yet we're enthusiastic about the second half of the year and the next year, and about marine, aerospace, and behind-the-meter power; we're putting tremendous effort into our Galveston LNG bunkering project, and we feel just as enthusiastic about aerospace and behind-the-meter power.
And that leads me right into my next one. Andy, my understanding is that IR still falls under your responsibilities. Given everything going on at the moment — the data center news was plastered across Fox Business this morning — this topic is incredibly hot right now. Shouldn't this be the moment to raise a bit of awareness around your story? Do you have any plans for that? You genuinely are turning into an AI company — and I don't mean to overhype it — so are there any plans to spread the word?
This morning we kicked things off by discussing what's under contract and our efforts on commissioning and bridge — the various flavors of the behind-the-meter power narrative; we've got three growth stories: marine, which is truly thrilling; aerospace; and behind-the-meter. As you point out, it matters that these represent three thrilling growth platforms through which we're bringing advantaged U.S. LNG to the market. We're getting the word out about our activities, and we're hopeful that in time, as the growth we expect for next year materializes, and as the Galveston project comes online — advancing it to FID, then on through construction — we think folks will be able to run the numbers on what that adds up to and grasp the value the way we do; we can't make people believe in it to the degree that we do; all we can do is communicate our efforts. I'll hand things over to Andy now for some further remarks regarding investor relations.
I appreciate you asking that. When you look at how we think about it, the top thing we care about is proving it through what the company actually delivers — expanding revenue, expanding earnings — and after that, the share price will handle itself. That comes first. Second, once we have more thrilling developments to share, we do plan to go out and put more effort into getting the message across. We believe it matters to both produce the outcomes and to ensure we're getting them across. On the corporate governance side, we keep filing and keep the company situated the right way in that regard.
I'd like to ask a follow-up about the data center commissioning. Is that the same facility where the bridge work is happening?
No — it's an entirely separate project, in another region, with a different customer.
For this commissioning, will George West capacity be utilized, or will third parties be involved?
Doing both is always an option; that is the advantage of having your own supply available for backup and reliability, ensuring you can deliver. As the primary source, this project is not an offtake. Neither of these qualifies. A significant portion of our own offtake is being pulled into industrial projects as well as aerospace. That is our current way of thinking about the mix.
What makes these two data center initiatives really excellent is that George West molecules aren't involved at all, meaning they won't take up all of our capacity. That lets us expand the top line and keep growing the business without waiting around for our internal production capacity to be expanded. That's another reason it's fantastic.
For the bridge power arrangement tied to that other data center, is the third-party electricity supplier going to be the same company you signed with?
Our relationships span a wide range of electricity suppliers as well as many end users operating data centers. Because of confidentiality obligations and the sensitivity of competitive details, we would rather not disclose specifics at that granularity.
You brought up aerospace activity and how strong it is. When do you now figure George West volumes are going to be fully consumed once more?
There's going to be a bit of capacity available at George West. Our expectation is that we get nearer to a steady offtake — 100% utilization isn't something we anticipate — yet we're heading toward sensible utilization during this year's third and fourth quarters. When those two projects wrapped up, we were considerably down; both of our production facilities relied heavily on them as offtakers. Pull-through and usage are climbing at a steady pace, and we expect that to occur across the third and fourth quarters — not at full utilization, though at levels in line with what prior periods have shown us.
If we consider the revenue and earnings profile from what we're running today, before adding the new contract for next year, is that contract going to rely on George West molecules?
As things stand, it doesn't have to. It's going to be incremental.
Thanks once more, to both of you, for fielding these additional questions.
Happy to do so. We appreciate your being on the call.
I want to thank each of you for being on today's call. We're grateful for the attention you show our company and for the ongoing backing, and we're eager to share news about what we're working on whenever it's available and to speak with you once more in 3 months' time. Many thanks to all of you.
Appreciate it. That brings us to the end of the Stabilis Solutions, Inc. first quarter 2026 earnings conference call for today. You can go ahead and hang up your line now, and enjoy the rest of your day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Stabilis Solutions, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Stabilis Solutions, Inc. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.