Good day, ladies and gentlemen, and welcome to the Q3 NFI 26 earnings conference call for Torrent Power Limited. Please be reminded that every participant's line will remain in listen-only mode, and following the presentation you will have a chance to pose questions. Should you require assistance at any point during this call, please alert an operator by pressing Star followed by zero on your touchtone phone. Kindly be aware that this conference is being recorded. I will now turn the conference over to Mr. Sourabh Mashwalla, Executive Director and CFO of Torrent Power Limited. Thank you, and the floor is yours, sir.

Saurabh Mashruwala executive
#2

Thank you. Good evening, everyone, and thanks for joining the Torrent Everything call — the Torrent power call for Q3 FY26. I'll begin by walking you through how we performed this quarter, and after that we'll open the phone lines for the Q and A session. We'll start by explaining the company's performance at the CBT level. Then we'll move on to tax expenses. On a separately reported basis, PBD for the quarter came in at 805 crores, versus 630 crores in the same quarter a year ago. That's an increase of 175 crores, roughly 28% on a reported basis. PBD for the comparable period last year included non recurring income of 77 crores from the sale of the cable business. As I mentioned for this one off, PBT for the quarter was 805 crores, compared with 553 crores in the equivalent quarter last year. That's a rise of 252 crores, or 46% on an adjusted basis; tax expenses were lower in the quarter because favorable directory orders received during the quarter qualify for the tax exemption. The business size factors that contributed to this quarter's performance are as follows. First, the contribution from the thermal generation business reported an increase of 163 crores, mainly due to three factors.

Saurabh Mashruwala executive
#3

To start, we received favorable orders from the regulators. Next, there was a reduction of 75 crores from merchant power and LNG sales, along with foreign currency fluctuation. Other expenses pushed costs up by as much as 35 crores. Secondly, the distribution business contributed 106 crores more, driven mainly by three things. First, an improvement at the TNDL office within the distribution franchisee units, partly offset by higher TND losses in the license distribution business. Second, the licensed distribution business got an additional boost from higher ROE and ROCE, thanks to capitalization of assets and better returns on equity under the new tariff regulations, plus other incentives. The third item was favorable orders from the regulator worth 41 crores. The third reason is that renewable generation contributed 24 crores more, mainly from higher PLF at the existing wind power projects due to better wind resources, together with the contribution from the newly commissioned solar capacity of 285 megawatts. The two other factors that brought profitability down came from two things. First, higher Michelin expenses and depreciation, partly offset by lower finance costs following the prepayment made in Q4 of FY25.

Saurabh Mashruwala executive
#4

That wraps up the walkthrough of the financial results for the quarter. Now, turning to the project side: first, during this quarter our pipeline grew by 500 megawatts, and for a 1.6-gigawatt thermal project a power purchase agreement and power supply agreement have been signed with MP Power Management Co. Ltd. The contract for the balance of plant machinery has been awarded for these projects. With the progressive commissioning of the 360-megawatt MSC DC project, the company's aggregate installed generation capacity came to 5 gigawatts as of 12/31/25, made up of 2.7 gigawatts from ASPs projects, close to 2 gigawatts of renewable capacity, and 62 megawatts of coal-based capacity. At the end of the quarter, the pipeline projects include 4 gigawatts of renewable capacity, 3.3 gigawatts of storage capacity, 1.6 gigawatts of coal-based capacity, and 2 transmission projects at Ka and the solar port. More details on the pipeline projects are summarized in our latest investor presentation, which is available on the website. That's all for this quarter. I now request the coordinator to open the Q&A session. We want everyone to stay safe and healthy. Thank you. Handing over to the operators.

operator operator
#5

Shall we move on to the Q and A?

Saurabh Mashruwala executive
#6

Yeah.

operator operator
#7

Thank you. Many thanks indeed, sir. Ladies and gentlemen, we are going to start with a session for questions and answers. Should anyone want to pose a question, they can press Star and one on their touchstone telephone. If you would like to take yourself out of the question queue, you can press Star and two. Ladies and gentlemen, we ask that you use handsets when asking a question. I will pause for a moment as the question queue assembles. Our first question comes from the line of Sukriti D. Patil from Eyesight Fin Trade Private Limited. Thank you. Please go ahead.

Sucrit Patil analyst
#8

Good evening, everyone. I’ve got a couple of questions. First, for Mr. Sourab: Torrent Power has grown in generation, distribution, and renewables. That kind of growth can put some strain on costs and cash flow. Looking ahead, how do you plan to weigh putting money into new renewable projects against keeping debt and margins in check? What unmistakable signs would indicate that it’s time to ease off expansion and concentrate more on financial discipline? I’d like to hear your perspective on that. Thank you.

Saurabh Mashruwala executive
#9

Right. On the financial discipline side, if you take a look at our leverage ratio, it's fairly comfortable. Our net debt-to-equity ratio, for instance, stands at 0.40 as of March 25, and net debt to EBITDA is 1.41. So the company is under-leveraged at present, and even with this investment, our leverage will stay comfortable, I'd say, given the investment plan we currently have. So we're keeping financial discipline in place and working to improve our return on liquidity as well as ROCE down the road, once all these projects in the pipeline are implemented. Right.

Sucrit Patil analyst
#10

Thanks. My second question for Mr. Shah is along the same lines again. I just want to get a sense of your plan of action, basically, given that these fuel cost and regulatory changes can have some impact on profits, I believe. What financial disciplines do you apply to protect the returns? For instance, do you have a minimum margin requirement, a debt ratio that you know you won't cross, or cash cycle targets in mind? How do those rules shape your investment and decision-making process? That's what I'd like to understand. Thank you.

Saurabh Mashruwala executive
#11

Typically, the financing for new projects is structured at a 70-30 split, or sometimes 75-25, or an 82 ratio. So that's generally how we approach financing. If you look at the sector itself, there are plenty of investment opportunities rising as the sectors grow. And yes, we do have an investment plan, but we remain mindful of our financial metrics. I'd mention the debt-equity ratio and net debt to beta ratio, which are very comfortable, and if you look at peers, they are also moving quite aggressively. So our ratios will definitely be at the lower end compared with peers, and we'll be comfortable with those kinds of leverage ratios.

Sucrit Patil analyst
#12

Thanks, and all the best to you.

Saurabh Mashruwala executive
#13

I really appreciate it.

operator operator
#14

Thanks. The next person in the queue is Sumit Kishore with Access Capital. Your line is open.

Sumit Kishore analyst
#15

Good evening, and thank you for the chance to speak. First off, I'd say the P and L performance this quarter has been quite strong. I just want to get a handle on a few of the numbers. You said there's greater contribution from gas based power plants, driven by some regulatory benefit as well as higher merchant and LNG sales contribution in the quarter. How large is that regulatory benefit? And based on the PLF numbers, we hadn't really seen much merchant generation in Q3. So is that 75 crore figure you mentioned mostly coming from LNG gains? That's my first question.

Saurabh Mashruwala executive
#16

So is the merchant LNG contribution lower this quarter? It isn't higher. That, I'd say, is the point we want to clear up. Basically, it's down by 75 crores against the same quarter a year ago. We received some favorable orders from the regulator, and that, I would say, boosted the company's bottom line by close to roughly 270 crores.

Sumit Kishore analyst
#17

Right, so that pretty much covers how much better things came in. 70, is that right?

Saurabh Mashruwala executive
#18

Yeah.

Sumit Kishore analyst
#19

What was the reason for that, and what did the regulatory item concern?

Saurabh Mashruwala executive
#20

This is one of the generation projects.

Sumit Kishore analyst
#21

Which one was that? Sujan. You know, Sujan isn't, I mean.

Saurabh Mashruwala executive
#22

This is a gas-based generation project. We, we have.

Sumit Kishore analyst
#23

Which gas-based generation project, Sujan—or, you know, whatever it is? And what's the reason this regulatory benefit suddenly appeared? What's the backstory here? This is what accounts for the whole profit beat in the quarter.

Saurabh Mashruwala executive
#24

Could you walk us through that?

Sumit Kishore analyst
#25

Second question — it concerns capex. Essentially, on the renewables side, over the nine months of this financial year so far, how much CAPEX have you spent, and what does your CWIP in renewables stand at as of December end? Also, has the pace of CAPEX in renewables picked up at all during the third quarter?

Saurabh Mashruwala executive
#26

Yes, CAPEX has also picked up in the third quarter, since we need to implement a lot of projects at the same time. So over the last one or two quarters there has been an increase in CAPEX, and that pace is going to keep going going forward as well, because we have a pipeline of renewable projects, and there is a renewable project, a pump storage project and a coal project that are going to be implemented. Implemented. So CAPEX has picked up as well. So, Sumit, just to add, in Q3 renewable projects we incurred a capex of 1750 crores. If I look at the YTD number, it was around 3100 crores. So you can understand the increase in the renewable projects capex, so 3100 crores YTD, which means for six months we would be around 1500 crores of capex. In this quarter alone we have done 1700 crores of capex.

Sumit Kishore analyst
#27

Great. That’s exactly what I was hoping to hear.

Saurabh Mashruwala executive
#28

Yeah, that's perfect.

Sumit Kishore analyst
#29

So capex is picking up, and with transmission constraints and all the rest of it factored in, for the 4.3 gigawatt renewable energy pipeline that's under construction, how should commissioning phase out — say for the fourth quarter, the next financial year, and the year after that? I mean, if you could give us a broad sense of how you see it.

Saurabh Mashruwala executive
#30

So we can provide a rough sense of things: for the coming year, we expect to commission somewhere around 1.2 to 1.5 gigawatts next year, and I think at a similar pace—that's what we can look forward to next year as well, and the year after that too.

Sumit Kishore analyst
#31

So FY26 is going to be a pretty soft year when it comes to renewable capacity compared with other years.

Saurabh Mashruwala executive
#32

Yeah.

Sumit Kishore analyst
#33

Alright. Alright, and let me ask just one additional thing. You know, over the past 15 days our demand growth has been pretty weak. I mean, once we got past 22nd of January, it has again turned rather flat in terms of demand growth for roughly 15-plus days, based on the last check we did. I mean, is that something all of you have been seeing as well? Is there some particular cause, and is there any likelihood of Section 11 being put in place as we move into a stronger demand stretch this year too? I mean, what's your read on it?

Saurabh Mashruwala executive
#34

So you could call it an exception, an aberration, I’d say, since if GDP is to expand at 6.5 to 7%, electricity demand must rise along a comparable path. If it doesn’t, GDP wouldn’t be expanding at that particular rate. There are basically two factors: first, demand at the end of the period was extremely strong, and the base was extremely strong last year. Second, the extended monsoon this year has weighed on power demand. But this can’t be the situation every year, I can say that, so it must expand in line with GDP growth. That’s what I’d say. So the current year should be ignored. One should treat it as a hybridization kind of a thing, and one should not focus on the present demand scenario.

Sumit Kishore analyst
#35

I would say we're right back at full reach, so to speak. This has only been going on for the last 15 days. We aren't seeing demand growth. My hope is that this won't keep up. Many thanks, and I wish each of you the very best.

Saurabh Mashruwala executive
#36

I appreciate it.

operator operator
#37

Thanks. Our next question is from Satyadeep Jain at Ambit Capital. Please go ahead.

Satyadeep Jain analyst
#38

Hello, and thanks. First, I'd like to get a handle on how the DISCOMs did on unit sales within the discom. So, on the whole, we recognize that power demand was fairly flat through the quarter. When I look at Ahmedabad, Surat, and really most regions, you're seeing a decline. In your view, is that what's causing the drop? Is it behind the meter? Or is something else behind this decrease? Year over year, and then perhaps you could speak a bit more about the ROE increase you've seen historically? If I'm not wrong, it was 14%, and you're saying that this year, the rise in ROE for the Discom, along with some one-off of 41cr, has driven this nearly 20% YoY growth in EBITDA in discount even though unit purchases fell. Could you explain this power with discount.

Saurabh Mashruwala executive
#39

On the demand side, performance? Yeah, demand is absolutely softer this quarter. But, as I said earlier on this call, that's sort of an aberration, since last year's base was really elevated because of the extended monsoon. So you're seeing both effects combined in demand, though we treat this as an aberration. Because GDP and power demand have to move together, in step with GDP. So it has to be there. Demand will certainly come, and at least 5, 6% demand is what one can see next year in terms of what we were trying to.

Satyadeep Jain analyst
#40

We comprehend the situation in Ahmedabad and Surat. We realize that power demand has been plundered. Yet Gujarat has still posted year-over-year demand growth that is positive in the third quarter. So what exactly is causing this drop in particular pockets? Is it mostly residential, rooftop, or something else? I'm just trying to get a handle on the year-over-year decrease in your sector.

Saurabh Mashruwala executive
#41

Satyav, if you really dig into it and break it down: Ahmedabad leans more residential and less commercial. The extended monsoon season helped, and winter was quite good too. Normally demand declines during this quarter. And this year in particular, thanks to a strong winter, demand in Ahmedabad has fallen. Now if you look at Surat, that market is more industrial in nature. But it too has taken a hit since the diamond industry isn't in good shape. Textiles aren't performing well either, and that's why Surat has also been affected. Turning to DNH, it has posted some growth. Still, owing to the industrial activity there, it hasn't delivered the growth it used to report at roughly 3 to 4%. So I'd say mixed factors are at play in each area. You need to examine the mix of industrial, commercial and residential in each one.

Satyadeep Jain analyst
#42

All right, regarding the one-off scheme to increase the regulated return — could you perhaps…

Saurabh Mashruwala executive
#43

To return to what you asked before: you mentioned demand has fallen while our ROEs went up. Let me clarify first that profitability for the license distribution businesses doesn't really hinge on unit growth. What it hinges on more is the capitalization we do as we earn ROEs. So I'd say demand and return profitability aren't correlated. Second, the regulated carrying cost order: if you look at our regulatory asset — yes, on the regulatory asset we do earn some carrying cost. But we book that carrying cost once the regulators approve it. So orders like this will likely keep coming, I'd say. That's all we can say at this point. Hello. Hello.

operator operator
#44

Hello. Sir, that participant has exited the queue. All right, the next question is from Dhruv Muchil with HDFC amc. You may proceed.

Dhruv Muchhal analyst
#45

Yes sir, thank you very much. Most of my questions were already covered by Sumit and Satya, so these are probably just a few follow-ups. In your opening remarks, you brought up distribution. Profitability has also gotten better thanks to higher capitalization and a higher roe. So have ROE rates changed at all in any of these circles?

Saurabh Mashruwala executive
#46

Yes, that comes out to between 14% and 15.55%.

Dhruv Muchhal analyst
#47

Alright, so in Gujarat, that figure went up from 14 to 15.5.

Saurabh Mashruwala executive
#48

Yeah, ROC is essentially 14 to 15.5.

Dhruv Muchhal analyst
#49

All right. And does that apply during the upcoming tariff period — meaning the 3 to 5 years — or is it just for one period? Okay, perfect, understood. And you mentioned, does this also cover your thermal asset engine, or is it solely for distribution? No, that applies solely to distribution. Okay. And the second item concerns the renewable through just to.

Saurabh Mashruwala executive
#50

I should clarify that as well — this would apply to M Gen too, since it falls under distribution.

Dhruv Muchhal analyst
#51

Yes, that falls under distribution. All right, great. Moving to the next question, which concerns renewable execution. You currently have a reasonably solid pipeline of wind and hybrid assets slated for execution in FY27, according to your PPT. So there's, I believe, SECI 15, then the TPDL project, and the IMCL project. We're picking up on quite a few sector challenges right now, a mix of transmission problems and wind execution problems, and your near-term visibility comes mainly from wind and hybrids. So could you give us a bit more detail on, maybe I don't know, what share of the land you've already secured. The. The amount of transmission capacity you already have in hand, which would give you confidence that this 1.2 1.5 gigahertz can actually materialize.

Saurabh Mashruwala executive
#52

When it comes to land, we're in a reasonably good position. All right. Land isn't the problem. The only thing is that the row issue everyone may be dealing with, we may deal with too, but we have to manage those issues, and we have to carry out our exhibition plan.

Dhruv Muchhal analyst
#53

Okay. So since it involves both wind and transmission, and the difficulty there appears even greater than with solar plus transmission, I just wanted to get a sense of how confident you are regarding the commissioning targets—whether we feel comfortable with them.

Saurabh Mashruwala executive
#54

At this moment, I would say that in terms of implementing the 1.2 to 1.45 GHz project next year.

Dhruv Muchhal analyst
#55

All right. So the recoupments would likely become available, even the equipment. But regarding transmission — do you already hold transmission access, or is that still in the application stage and awaiting commissioning?

Saurabh Mashruwala executive
#56

For the bulk of the project, I'd say connectivity is fully available.

Dhruv Muchhal analyst
#57

All right. I believe that physical substation has most likely been commissioned already.

Saurabh Mashruwala executive
#58

That appears to be the case. So, I think those—there are two aspects here. First, you've got the connectivity that hasn't been commissioned yet. So a portion of our projects will connect to substations that are already commissioned. Some of our projects have connectivity where either augmentation or a brand-new substation is being commissioned. So it'll be a combination of both.

Dhruv Muchhal analyst
#59

All right, but going by your evaluation — looking at each substation and each project individually — you're fairly confident about 1 point to 1.5 gigawatt?

Saurabh Mashruwala executive
#60

Yeah. Yes.

Dhruv Muchhal analyst
#61

Broadly speaking, across the industry as a whole, bidding activity has been weak. If you bring 1.2 online this year and another 1.2 next year, then you've essentially worked your way through the contracted pipeline — CNI projects included, naturally, those are already wrapped up — and the merchant capacity as well. So what's our view here? How do you see visibility past that point, given that, well, we treat this as a platform business. So what would visibility look like beyond, say, the coming two years?

Saurabh Mashruwala executive
#62

We're bidding on the bulk of the project, I'd say, though we hold ourselves to the threshold IRR. Looking at the last Q3, we brought on roughly 100 megawatts of additional incremental capacity. So we continue bidding, and we continue targeting those larger capacities. That applies going forward as well.

Dhruv Muchhal analyst
#63

I was wondering whether you could perhaps push harder on the CNI project side until the utilization bidding takes place, or is that a limited market and probably so we are already aggressive.

Saurabh Mashruwala executive
#64

Basically, we're present in all of the bids, or the majority of the C and I consumers. The commercial side is what really matters here. Should the commercials work out, we will definitely want to secure capacity, as we said before. And I think our goal is to get to 10 GHz of renewable capacities, which we view as something we will definitely want to lock in if the commercials are favorable. We've also observed that for 1.5 years, capacity wasn't suddenly growing. Within six months, we would have built up 3 gigawatts of capacity. So those opportunities exist in the market, and whenever they become available, we'll be able to seize them.

Dhruv Muchhal analyst
#65

Sure. And only one thing to clarify: the 1.2 and 1.4 — is that measured at AC level, or is it at BC level? Is that megawatt peak, or megawatt? This is at DC level. Okay, many thanks. Thanks, and best of luck. Thanks.

operator operator
#66

Thanks. Satya Deep Jain from Ambit Capital has the next question. Go ahead, please.

Satyadeep Jain analyst
#67

Hi, apologies — my line dropped. One question about the PSP: in the presentation you referenced October 28th as the SEO date, and I just wanted to get a handle on that, since it looks aggressive given it's two and a half years away. How do you view that timeline compared with what we typically hear in the — what we're seeing and hearing from others across the industry? And where do you stand on readiness to get this done within two and a half years?

Saurabh Mashruwala executive
#68

We’re getting ourselves ready for the execution contract. I’d say the major contract has been awarded for the PSP project. So there may be some delay. But as of now, we call it—the key contract has been given.

Satyadeep Jain analyst
#69

So per the agreement with MSC DCL, the deadline is October 28. Right. And this — there can be an extension to it, based on that. So that's the extent to which there can be one. For how long? What does the agreement typically say regarding an extension? Does it have to be for some particular reasons?

Saurabh Mashruwala executive
#70

Transmission capacity isn't there, and their subscription might not be set up yet. So for those kinds of situations, an extension will be granted.

Satyadeep Jain analyst
#71

Okay, back to the discom topic. Roe, you brought this up as well, and I want to get clarity on it. There’s a one-off item you mentioned regarding the discom. So is that 41 cr at the PAC level, and is the 270 crore you referred to in generation also at the PAC level? Could you explain that?

Saurabh Mashruwala executive
#72

All of those remain at the TBD level, at TBD levels.

Satyadeep Jain analyst
#73

Generation came in at 270cr. Unisugen was PBT, and the 41cr at the discom was PBT as well.

Saurabh Mashruwala executive
#74

Yes.

Satyadeep Jain analyst
#75

And just on this, on one or two renewable projects where you're seeking sod SEO, the extension there is mainly due to a lack of transmission. With these projects, everything is installed on the ground. You're simply waiting on transmission, something like that.

Saurabh Mashruwala executive
#76

So if — if you're noticing that a transmission project is slipping, and you've already put everything in place on the ground, then effectively you're racking up indirect costs that nobody is going to reimburse you for. So you're always going to calibrate how you implement based on when you expect the transmission to be commissioned. Every project is aligned with the transmission coming. It's basically the same situation with the transmission line.

Satyadeep Jain analyst
#77

So for those 2 projects where you're asking for an extension — SECI 12 and the MSC DCL one, perhaps — how much of a delay are you expecting here? This is all transmission-related, in which. Where is that located?

Saurabh Mashruwala executive
#78

No, no. So I think each project has its own set of issues. With MSC dcl, we’ve already commissioned a portion — only some part of it is still pending, and that isn’t due to transmission. It’s due to some other factors. Okay. As for Sec 12, that’s because transmission isn’t ready — the evacuation portion of it isn’t ready. So every project will have its own nuances, and because of that there are certain pluses and minuses.

Satyadeep Jain analyst
#79

Right, so at the moment you don't. Surely you have at least some visibility into SECI 12, or is it your expectation that this lands in FY27 — is that right?

Saurabh Mashruwala executive
#80

Yes, yes, yes, certainly.

Satyadeep Jain analyst
#81

Alright. Thanks a lot.

operator operator
#82

Thanks. The next question we have is from Atul Tiwari of JP Morgan. Go right ahead.

Atul Tiwari analyst
#83

Yes, thank you very much. First, I wanted to ask whether you recorded any revenue from the NBVN contract during this quarter. My assumption is that there was some take-and-pay element, and the contract was supposed to.

Saurabh Mashruwala executive
#84

So we had expected to be done by October. Right. No — the contract actually ended in September. That was Q2. As a result, we didn't record any income in Q3. All right. Understood.

Atul Tiwari analyst
#85

And that 270 crore rupees — what time period does it cover? Is it just for this year, or does it span the past few years? And how much of it will keep recurring going forward?

Saurabh Mashruwala executive
#86

To put it simply, this isn't recurring — it's a one-time thing.

Atul Tiwari analyst
#87

Oh. All right.

Saurabh Mashruwala executive
#88

Alright.

Atul Tiwari analyst
#89

Appreciate it.

operator operator
#90

Thanks. We’ll take our next question from Ketan Jen at Evidence Park. Please go ahead.

Ketan Jain analyst
#91

Thanks. Thanks, sir. So to clarify the earlier question: even though the 41 crores favorable order, is the distribution also one-time, or does it recur?

Saurabh Mashruwala executive
#92

Take a look at this. As I mentioned during my earlier call, we hold certain regulatory assets, and those assets bear the carrying cost. So we continue to receive orders of this type — favorable rulings on carrying cost — on a regular basis. That's all we can say at this point. This relates to Ahmedabad and Surat.

Ketan Jain analyst
#93

Could you share the capex figure for RE? And if possible, break out the total capex separately for licensee, franchisee, and RE.

Saurabh Mashruwala executive
#94

Are you asking about the figure for this quarter, or on a cumulative ITD basis?

Ketan Jain analyst
#95

Nine months cumulative, sir.

Saurabh Mashruwala executive
#96

For the cumulative nine months, it's roughly in the thousands. License and franchise together came to about 1100 crores — essentially those two combined.

Ketan Jain analyst
#97

Alright.

Saurabh Mashruwala executive
#98

Transmission came in at roughly 240 crores. Code project accounts for about 200 crores. On ESC, we incurred approximately 300 crores, and renewal, as we explained, around 3,100 crores. That's essentially the capex we've incurred — I mean, across nine months.

Ketan Jain analyst
#99

What was it you mentioned following transmission? Sir, I wasn’t able to get that number.

Saurabh Mashruwala executive
#100

After the transmission piece, we move on to the thermal project and the coal project — essentially, 400 crores.

Ketan Jain analyst
#101

400 crores. All right. Yeah, so that comes to 4200. So roughly 4000. Then what is the FY26 target?

Saurabh Mashruwala executive
#102

Pardon me?

Ketan Jain analyst
#103

What's the capex target for FY26?

Saurabh Mashruwala executive
#104

Regarding FY26, we aren’t providing any target.

Ketan Jain analyst
#105

Even so, our run rate should be comparable to what we saw in the third quarter.

Saurabh Mashruwala executive
#106

Yeah. If you look at Q3, the run rate has gone up. So we'd expect a similar pace going forward as well.

Ketan Jain analyst
#107

Alright sir, that wraps it up.

Saurabh Mashruwala executive
#108

I appreciate that.

operator operator
#109

Thanks. We’ll take the next question from Bharani V at Evidence Park. Please go ahead.

Bharani V analyst
#110

Good evening. Can you hear me? Yes.

Saurabh Mashruwala executive
#111

Right.

Bharani V analyst
#112

Let me just clear up one point. Those figures — 270 crores, negative 77 crores on generation, and 41 crores on distribution — all of them are PBT numbers, correct? Could you provide the matching EBITDA figure for each of those three? Sir, are you asking about the third quarter?

Saurabh Mashruwala executive
#113

It's, it's provided in the. We also provide the segment analysis where those EBITDA figures appear. No.

Bharani V analyst
#114

So that extra 270 crores is PPT. So specifically, what would the incremental amount be on the EBITDA side from this one-time regulatory impact?

Saurabh Mashruwala executive
#115

That figure represents EBITDA alone. So when it comes to EBITDA and PBT, there's no distinction between the two. All right.

Bharani V analyst
#116

The second question concerns—and naturally, others have raised this too—the character of that favorable regulatory order on un. Could you possibly shed some light on that? Hello.

operator operator
#117

Over to you, Mr. Berani.

Saurabh Mashruwala executive
#118

We have described 41 rule, that order on carrying costs which continues to arrive since regulatory assets are being carried by us.

Bharani V analyst
#119

My question relates to that 270 crores of favorable regulatory income that we booked because of euros. Could you just explain what that was related to?

Saurabh Mashruwala executive
#120

We’ll explain. We’re not able to explain at this moment right now.

Bharani V analyst
#121

Alright, for my last question, it's about that 41 crores on the distribution side—you brought it up at some point. I believe you also said the ROE went up from 14% to 15.5. Did I hear that correctly?

Saurabh Mashruwala executive
#122

Oh, that's return on equity. Essentially, this carrying cost order is necessary.

Bharani V analyst
#123

Alright, so return on equity went up from 14 to 15.5.

Saurabh Mashruwala executive
#124

ROCE is now ROCE basically not ROCE.

Bharani V analyst
#125

That part is neutral.

Saurabh Mashruwala executive
#126

Is that correct?

Bharani V analyst
#127

The ROE figure is going to stay the same, since this is simply another method of compensation. Even so, the — the — the. Net profitability measured at the ROE level is still going to come out the same.

Saurabh Mashruwala executive
#128

So Bharani is essentially earning 14 or 15 and a half. The regulator has set certain milestones. If those milestones are met, you can earn up to 15 and a half percent. So different parameters have been defined.

Bharani V analyst
#129

So here's what I want to ask. In the past, our compensation was tied to ROE, and that ROE was set at 14% under regulation.

Saurabh Mashruwala executive
#130

The target has shifted from 14 to 15 and a half, though the methodology itself has changed — it's ROCE now rather than ROE. That said, 15 and a half is also an ROE figure, but there are certain slabs involved. So if you hit a particular level, you can earn an incremental 25 basis points. Reach a different level, and the incremental gain is 50 basis points. Effectively, then, both 14 and 15 and a half are ROE numbers. The regulator, however, has moved from ROE to ROCE.

Bharani V analyst
#131

Alright, I'll follow up on that outside this call. That's fine. Thanks very much. Best of luck.

operator operator
#132

Thanks. The next question is from Aniket Mittal of SBI Mutual fund. Go right ahead.

Aniket Mittal analyst
#133

Yeah, actually that's exactly one clarification I was hoping for. So this is on an all-in basis. With this new NYT order, what's the ROE increase we're effectively seeing in Ahmedabad and Surat?

Saurabh Mashruwala executive
#134

Just a moment. So, Aniket, the main point we're making is that 14 is an ROE. 15 and a half percent is also an ROE. The methodology has been shifted — from ROE to ROCE, that's the first thing. Second, another regulator has set a base ROE or ROCE on equity. Then there are specific milestones, and if you hit those, your return on equity goes up, and the top one you can reach is 15 and a half percent.

Aniket Mittal analyst
#135

So are we — are we trending in line with that one? I'm just trying to get a clear picture here. When we look at the incremental delta in Roe, does it come to 150 for us, or does it land somewhere in the middle?

Saurabh Mashruwala executive
#136

Our target would be an incremental delta of 150 basis points. In certain years, if those milestones aren't being hit, you might not be able to achieve base. So it could come in slightly lower.

Aniket Mittal analyst
#137

All right, my remaining question concerns Bhiwandi — the B1D franchise agreement, as I understand it, runs through January 27, so roughly a year out. I just hoped to get a sense of how those talks are going. What's the thinking on that franchise agreement as we move ahead?

Saurabh Mashruwala executive
#138

Right now, we’re in discussions with MSC DPL regarding the extension.

Aniket Mittal analyst
#139

All right, all right, that's fair. And just one final question. What would the total regulatory assets on Ahmedabad and Surat be at present? As of right now.

Saurabh Mashruwala executive
#140

It'll be approximately. Issue. One moment. So roughly 3000 crores.

Aniket Mittal analyst
#141

All right, that's fair enough. Thanks.

operator operator
#142

Thanks. The next question is from Anuj Apad at Investic. Go ahead. Yeah.

Anuj Upadhyay analyst
#143

Hi there, and thanks for the chance to ask. Could you expand a bit more on that LNG sale agreement we signed with JIRA covering 0.27 mm TPA? Of the fuels across our gas basin, how much have we locked in, and over what period?

Saurabh Mashruwala executive
#144

It's roughly 0.27 MTPA, and that's what we've laid out — beginning with 4 cargoes, running from 2027 through 2037, under the 10-year contract we hold.

Anuj Upadhyay analyst
#145

So you're saying it's 0.27 cumulative per annum, and that's what we're doing. Okay. And with that, how much of the total requirement does that cover? Hello.

Saurabh Mashruwala executive
#146

So that requirement is going to land at roughly 25%.

Anuj Upadhyay analyst
#147

Alright. Alright. And regarding pricing, how are these contracts structured exactly — are they fixed, or are they flexible?

Saurabh Mashruwala executive
#148

Regarding the brand?

Anuj Upadhyay analyst
#149

Understood, understood. And second, regarding SMK, is there any timeline for when we can reach — we're aiming to hit break even there, or anything on profitability. So really it's not exactly about how profitable lays is over there. It's been roughly four or five years since we took over the circle. So how are things moving along there, in terms of profitability.

Saurabh Mashruwala executive
#150

Regarding those losses, if you look at it, we've already gotten to roughly the 20% mark. So yeah, I'd say we're close to breaking even.

Anuj Upadhyay analyst
#151

So at that point. Break-even should be occurring next year, sir — FY27, yes. Okay. And what amount of capex would you be having?

Saurabh Mashruwala executive
#152

Thus far, spending on Smkullah figures has been tracked on a community basis.

Anuj Upadhyay analyst
#153

And is there any update at all on parallel licensing?

Saurabh Mashruwala executive
#154

At this moment, there is nothing further to update.

Anuj Upadhyay analyst
#155

Alright, that's all. Thanks.

operator operator
#156

Appreciate it. We now have a question from Dhruv Muchal of HDFC amc, who is on the line. The floor is yours.

Dhruv Muchhal analyst
#157

Yeah, my apologies — I skipped over the MIT regulation. To be clear, I was going through that regulation. The switch to the return on capital employed approach applies only to capitalizations after April 25th. Do I have that right?

Saurabh Mashruwala executive
#158

Yes.

Dhruv Muchhal analyst
#159

Essentially, this is a forward-looking change, you know? On the older assets, you keep earning the ROE the way you did before. Sure, the rate itself has shifted, but once you get to incremental assets that are capitalized, it switches over to the ROCE model.

Saurabh Mashruwala executive
#160

Yes, yes. That's exactly right.

Dhruv Muchhal analyst
#161

Perfect sir. That’s the only clarification needed. Thank you sir.

operator operator
#162

Thanks. We’ll take our next question from Arul Selman at Bajaj Life Insurance limited. Go ahead, please.

Arul Selvan analyst
#163

Hello there. I hope you can hear me clearly.

operator operator
#164

Yes, you are, sir.

Arul Selvan analyst
#165

Yeah, so this continues from the earlier question someone raised. It concerns the step-by-step milestones that need to be hit in order to reach that 150 basis points of Delta on the ROE. Could you give us a sense of what those milestones actually look like — what has to be accomplished before we can capture that 150 basis point delta?

Saurabh Mashruwala executive
#166

Arun, the milestones tie back to operational efficiencies — things like your ADNC laws, your sipi, your size, and your other parameters that connect to how efficiently you operate.

Arul Selvan analyst
#167

Okay. Okay. And is there a specific timeline you need to hit for that, or is it more of a case where you just get it.

Saurabh Mashruwala executive
#168

How did we do for the year?

Arul Selvan analyst
#169

All right, all right, all right. Now I was wondering whether there’s some normative level we’ll need to hit each particular year before we qualify for those Incentives.

Saurabh Mashruwala executive
#170

Those normative levels are in place, and hitting them as usual will earn you an additional incentive.

Arul Selvan analyst
#171

Alright. Alright. Then another thing I wanted to ask about, again regarding the Biwindi distribution franchise: are there any renewal provisions written into the current agreement, or would it work more like a brand-new tender that the government would need to call for the existing reception franchise to be renewed?

Saurabh Mashruwala executive
#172

As we already mentioned in the investor PPT, there's an option to extend it by 5 years if both sides agree. So the virtual discussion is currently underway, but it can be accepted for another five years.

Arul Selvan analyst
#173

All right, all right. So with any luck, we ought to get some word on that prior to February 2020. So I'm just asking whether there might be any clause for a deemed extension if—if nothing at all comes out about it.

Saurabh Mashruwala executive
#174

There’s no clause providing for an automatic extension. We need to talk with MSC dc.

Arul Selvan analyst
#175

Alright.

Saurabh Mashruwala executive
#176

Alright.

Arul Selvan analyst
#177

And finally, on parallel licensing, I’m just trying to get a sense of how much capital you might be able to invest if those parallel licensing applications were permitted, roughly speaking, in terms of—

Saurabh Mashruwala executive
#178

My view is that commenting on that would be premature until an award is actually made. I believe we ought to get the first matter settled first, and after that we can talk it through. It also hinges on the area — whether that area is large or small. So everything really hinges on the approval we receive for the specific area.

Arul Selvan analyst
#179

Alright. Alright. Yes, thanks.

operator operator
#180

Thank you. The next question is from Varani V at evidence. Please go ahead.

Bharani V analyst
#181

Yes, thanks for following up on that. Is there any short-term gas tender in the market at the moment? We heard something is coming up from Tamil Nadu. Could you please elaborate on whether there is any short-term one?

Saurabh Mashruwala executive
#182

Just recently, 19 tenders were closed. No, no, I believe so. I think Bani won't be in a position to comment on that. I mean, as far as the future part goes.

Bharani V analyst
#183

Right. No — what I'm getting at is whether there are gas tenders out there similar to that NVBS-style tender.

Saurabh Mashruwala executive
#184

No, not at the moment in the way NVV has tendered. But look, once summer arrives, Discoms usually continue entering into short-term contracts to procure power for their needs. So that's a normal thing that takes place.

Bharani V analyst
#185

Sure. And in this case, there’s a chance that something such as NVV and tender may also arise this year.

Saurabh Mashruwala executive
#186

I'll make a remark right now.

Bharani V analyst
#187

Alright, absolutely — thanks a lot.

operator operator
#188

Thank you, ladies and gentlemen. Since there are no further questions, I’d like to turn the conference back over to Mr. Saurabh for his closing remarks. Thank you. And over to you, sir.

Saurabh Mashruwala executive
#189

Thanks for joining the Torrent Power call. We remain—we want everyone to stay safe and healthy. Thank you very much.

operator operator
#190

Much appreciated, sir. Everyone, thank you very much indeed. On behalf of Torrent Power Ltd., ladies and gentlemen, this conference is now over. We appreciate your participation. Lines can be disconnected at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Torrent Power Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Torrent Power Limited earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.