In Q4 FY '26, Torrent Power Limited reported a PBT of INR 547 crores, down from INR 619 crores YoY, primarily due to nonrecurring provisions of INR 171 crores. Adjusted PBT showed an increase to INR 718 crores from INR 790 crores YoY, reflecting a solid operational performance despite regulatory challenges. Management maintained a positive outlook on future earnings, citing improved ROE and ROCE driven by regulatory changes, while signaling a higher CapEx expectation for FY '27, indicating growth potential in renewable and distribution segments.
What topics did Torrent Power Limited cover?
- Regulatory Changes Impacting ROE: Management highlighted that the new regulatory framework allows for an increase in ROE from 14% to a potential 15%, contingent on performance-based incentives. They stated, "the effective ROE up from 14% to 15%" under the new regime, which could enhance profitability going forward.
- CapEx Expectations for FY '27: Management indicated that CapEx for FY '27 would be "definitely much, much higher" than the previous year, driven by ongoing projects in renewables and distribution. This suggests a robust growth trajectory and commitment to expanding operational capacity.
- Gas Supply and Pricing Concerns: Management confirmed that they have contracted 3 cargoes for summer demand and stated, "availability is not the issue" despite current price volatility. However, they acknowledged that high gas prices could impact profitability in the merchant market.
- Impact of One-off Items on Earnings: The reported PBT was affected by a one-off provision of INR 171 crores, which management expects to be approved in the future. They noted, "we are reasonably certain that the current matter will also be approved in our reward," indicating potential for earnings recovery.
- Renewable Segment Performance: The renewable segment's EBITDA was lower YoY due to the expiration of government incentives, with management stating, "there was a reduction in GBI income" impacting profitability. This raises concerns about sustaining growth in this segment.
What were Torrent Power Limited's May 13, 2026 results?
- PBT: INR 547 crores (vs INR 619 crores YoY, down 11.6%)
- Adjusted PBT: INR 718 crores (vs INR 790 crores YoY, up 12.5%)
- CapEx for FY '26: INR 8,650 crores (includes INR 6,500 crores for renewables)
- Expected CapEx for FY '27: Higher than INR 8,650 crores (management's guidance)
- EBITDA: INR 1,320 crores (reported for Q4 FY '26)
- Regulatory Gap Reduction: INR 800 crores (improvement in operational efficiency)
Torrent Power's Q4 FY '26 results reflect a mixed performance with regulatory changes potentially benefiting future profitability. The significant CapEx plans signal growth, but challenges in the renewable segment and gas pricing volatility present risks. Investors should monitor regulatory approvals and project execution timelines as key catalysts for future performance.
Earnings Call Speaker Segments
Good day, ladies and gentlemen, and welcome to the Q4 FY '26 earnings conference call for Torrent Power Limited. Joining us from the management team are Mr. Saurabh Mashruwala, Executive Director and CFO; Mr. Rishi Shah, GM Finance; and Mr. Jayprakash Khanwani, AGM Finance. <<operator_script>> We ask that you be aware this call is being recorded. At this point, I'll turn things over to Mr. Saurabh Mashruwala. Thank you, and the floor is yours, sir.
Thank you very much. Good morning, everyone, and I appreciate your joining Torrent Power's earnings call for Q4 FY '26. To start, I'll walk you through how we performed during the quarter, and afterward we'd be glad to take your questions. We'll go over the company's performance, and then I'll separately cover the tax expenses. PBT for the quarter came in at INR 547 crores, versus INR 619 crores in the same quarter a year ago — a decline of INR 72 crores. Included in the current quarter's PBT are nonrecurring provisions of INR 171 crores, which arose from capping our risk cost for the power project in FY '24-'25 to a quarter. A similar reception was imposed in earlier years too, which we contested and which was later approved in our favor. Consequently, INR 273 crores was recognized in the P&L in the previous quarter of the current year. Out of prudence, a provision has been recognized in the current quarter. This past fiscal, we are reasonably certain that the present matter will likewise be approved in our reward. Excluding this one-off, PBT for the quarter stood at INR 718 crores, against INR 790 crores in the comparable part of last year — an increase of INR 99 crores, that is INR 16 crores on an adjustable basis.
Tax expenses came in lower in the same quarter a year earlier because of a noncash reversal of deferred liabilities amounting to INR 637 crores. Also, the deferred tax liability isn't comparable. On performance, the business-side factors are as follows: first, favorable orders from the regulators were repeated, which approved the prior year's carrying cost of INR 186 crores; the system incentive for solar rooftop installation in Ahmedabad and Surat added INR 58 crores; production in T&D selling within license distribution units stemmed from a significant reduction in normative parameters by <<inaudible>>, partly offset by an improvement in distribution license versus the franchisee business of INR 15 crores. In addition, the license distribution business's contribution was helped by higher ROE and ROCE thanks to the capitalized basis and a higher rate of return on equity under the new direct regulations, along with their incentive increase of INR 15 crores. We'd like to use this opportunity to inform you about certain <<inaudible>> tariff regulation regarding the allowance of ROE and ROTE once the assets are capitalized. Two situations exist: one, of course, applies to assets capitalized on or after 2025. Retails are now permitted on a return on capital number basis, where tendering beyond equity is pointed at a base ROE rate of 13%, which may rise to 15% depending on achievement of the incentive <<inaudible>>.
Compared with the fixed ROE of 14% under the earlier regime, that's the picture. When it comes to assets capitalized before 2025, the situation permits a return on equity on the equity base that carries on under the prior framework. But the regulatory-allowed incentive approved on these assets also hinges on hitting the incenting milestone, which has in fact pushed the effective ROE up from 14% to 15%. The point is that our performance, with incentives included, should not be set alongside this ROE — those come on top of the incentives that were available and were already allowed through sales in controllable expenses. Depending on how the license subscription business performs, this effectively has the probability to lift ROE by 1% annually. The regulatory gap for the company has also been cut by almost INR 800 crores, supported by better operational efficiency as well as lower power purchase cost, with <<inaudible>> staying the same as of last year. Contribution from the thermal generation business, adjusted for nonrecurring items, fell by INR 90 crores, mainly due to two factors: first, additional O&M expenses incurred in the quarter on a sort of scheduled maintenance; and second, reversal of certain provisions made during the corresponding quarter of last year under the thermal generation side.
The third factor is really a contribution from the renewal division that was reduced by INR 20 crores, mainly because of income from the generation incentive tied to achieving the statutory time, and an allowance was made for that incentive. The remaining factors behind lower profitability came from higher expenses and depreciation — driven by <<inaudible>> within the renewable segment — along with increased finance costs, which were baked by the higher capitalization and the related borrowings. That wraps up the explanation of the financial performance for the quarter. Now moving to the project updates. Progress toward commissioning of the company's 67-megawatt project capacity stood at 5.1 gigawatt as of March 31, '26, made up of 2.7 giga, 2 gigawatt of renewables and 62 megawatts of GS capacity. A project got commissioned during the quarter. For <<inaudible>> 1.6 project in MP, work is underway, and the following major milestones have been achieved: first, a powerful agreement executive with Power Management Company Limited; second, later <<inaudible>> issue of boiler, turbine and generator as well as balance of plant and clearance for the project. The second project update concerns the hydro pump or hydro project — 3 gigawatt of hydro capacity. Activities are underway, where the following major milestone has been achieved.
We've also signed one more storage facility agreement with MS. Next, the type of award that was issued for a civil and hydromechanical package, along with electric and mechanical <<inaudible>>; and third, environmental clearance was achieved for the project. Following the acquisition mentioned above, CP comps are in progress at this moment, and the transaction should close during the current quarter. Besides these renewable projects, the 4 gigawatt and transmission project of Solapur are under implementation. More details on the pipeline projects are summarized in our latest investor presentation, which is available on our website. That covers everything for this quarter. I would now ask the coordinator to open the line for the Q&A session. We want everyone to stay safe and healthy. Thank you very much. Back to the operator.
<<operator_script>> Our first question comes from Mohit Kumar at ICICI Securities.
To start off, could you walk us through that one-time item in the quarter's generation once more and clarify what exactly it was? I believe you referred to <<inaudible>>, but I missed it — I wasn't able to follow that part here.
The one-off item is essentially the second part of this call, and we kept it for FY '24/'25, and in the last quarter — we got it in the last quarter of March. So in the last of March, they kept the power <<inaudible>> particularly. And they released — they made a of around INR 71 crores. That is one-off items for most in power projects. But as we highlighted, we informed that in the earlier quarter, a similar allowance was given by INR 273 crores. We made a provision of the year which was allowed by the regulators in the previous part. So we are hopeful that this will also get approved in due course.
Got it. And this order came in during the March quarter — is that correct?
March, right. Prior to March. Prior to March '26.
Got it. For my second question, could you give us some help on gas availability and clear up whether there's an earnings risk to the others — any risk that gas won't be available for our gas-based power plants in FY '27?
And yes, as we mentioned before, we've contracted 3 cargoes to cover summer demand, so those shipments are secured. The conflict between the U.S. and Iran isn't affecting us. So for summer demand — to meet it, we've contracted 3 cargoes, and of those, 2 have already arrived. The next cargo should come in June, again for meeting summer demand. So that stays the same. Looking ahead, prices have risen somewhat. What we expect, naturally, is that things will settle down over time and supply will begin — supply will flow, I'd say, from the state of <<inaudible>>. And on supply, our view is that gas — there's ample gas in the market, although the price — given the current situation, the price has gone up. But on supply, it's not a major concern, I'd say. So availability isn't the issue. We'll keep working toward the fixed cost base with visibility as. Price this year is somewhat higher.
Stabilization is going to require a bit of time.
Then my final question concerns the CapEx you carried out in F '26. Could you give us that figure, along with the state-wise CapEx, plus what you expect CapEx to be in '27?
Regarding that, would it be possible for me to provide the more comprehensive figures, or is it the quarterly figures that you'd prefer?
You want the complete-year figures for '26, right? Yes, the full-year specifics.
Right. So for license distribution and franchise, we incurred CapEx of nearly INR 1,600 crores across the full year. <<inaudible>> since <<inaudible>> has got commission and is under construction at the moment, we spent roughly INR 550 crores on transmission projects. On the thermal project, especially the coal-based one, our CapEx came to about INR 500 crores. Renewables account for a substantial chunk — close to INR 6,500 crores of CapEx went into the renewables.
Got it. And what should we expect for the CapEx figure in F '27?
It’s certainly going to be above that. So I’d put it as clearly far, far above this figure.
Does that come to twice this figure?
So Mohit, we really can’t provide any guidance as such. But in the investor PPT we’ve uploaded, there’s a COD date for each project. Offering guidance would be hard to do. What we can say, though, is that this year’s CapEx and the CapEx for next year will both be above what we incurred in FY '26.
<<operator_script>> Our following question comes from Sumit Kishore at Axis Capital.
Let me start with gas once more. It's encouraging to hear that 2 of the 3 gas cargoes have arrived. Which source countries are supplying the gas at present? And regarding the LNG sourcing agreement — with BP JERA, as I recall, starting in 2027 — did that involve Middle East countries, or does the product not specify where sourcing comes from?
Regarding the cargo — 2 cargoes — what we have is this: it isn't sourced from the Strait of Hormuz. It comes from elsewhere. So the cargoes are arriving. A third cargo as well, we anticipate securing it. So as we see it right now, that shouldn't present a problem. As for the support beginning in calendar '27, that effort is proceeding with BP and JERA. And hopefully matters will settle into normal <<inaudible>>, and securing supply from FY '27 onward shouldn't pose any material difficulty.
How many cargoes will BP JERA handle in the upcoming financial year?
All right, so when you add the two of them together, that comes to roughly 10 cargoes in each calendar year.
Regarding gas — does that apply just to Torrent Power, or does it cover Torrent Gas as well?
There's also going to be an allocation we need to make for Torrent Gas as well.
What would that come to?
Five shipments are designated for Torrent Power.
Understood. And sir, from what I understand, the pricing in the contract for the 3 cargoes tied to summer demand this year comes in at roughly $10 — is that right?
Sumit, we can't provide you with an exact price, but all of these are fixed cargoes, so they aren't as high as what we're seeing on spot pricing. We're below that spot level.
Moving to the second question, which concerns the T&D segment: you walked through a few nonrecurring items in the quarter. What interests me more, though, is whether, once the return framework has shifted, a like-for-like calculation of your return under the new regime against the old one shows that it is ROE accretive — and if so, to what degree? If you could shed some light on that specific point, I'd appreciate it.
Yes, I'll take that one. Essentially, when you look at it, the ROE framework used to be a flat 14%, and now it's been moved over to ROCE. But assets that were capitalized before 2025 will also earn incremental incentives, provided we're able to perform. So looking at the current year, the ROE is better than what we would have earned under the previous framework. Now those incremental incentives will hinge on the performance-based incentives, meaning if you can manage that or if you're able to secure it, you'll have a higher incremental ROE. Assuming we're able to hit those performance-based parameters, the ROE will definitely be higher than what we got under the previous framework.
Look, you already rank among the top operating DISCOMs anywhere in the country. I mean, T&D losses sit at 1.5%, if my memory serves. So how much more improvement is really possible? What does the performance...
Right, so it isn’t just T&D losses, Sumit. There’s a whole set of factors involved, and that also covers how available your network is. It also covers smart meters and how you’re getting that done. It also definitely addresses T&D losses and all of that. It also addresses our collection efficiencies. So milestones are being set.
Our goal, then, is to accomplish as much of that milestone as possible, in whatever way the current <<inaudible>> allocates it.
Understood. Now, turning to the final question about the renewables segment. In the quarter, PPD IP for renewables saw a decline compared with a year earlier. So is curtailment also having an impact on you? And how are you positioned regarding evacuation for the 4.3 gigawatt peak that is currently under implementation? Also, how would you phase out the capacity addition following what was, if I may put it this way, a rather lackluster year for capacity addition in power at 250-megawatt plus? What does it look like through FY '27/'28? And what is the phasing? How much will arrive in the first half versus the second half of the year? Could you give some color?
So this scenario doesn’t affect us, I’d say. We have those PPAs in place. So we’re not concerned in the least. All of it is open capacity — very open capacity. So there’s no curtailment, I would say, in the renewable power project supply we have. So we’re not affected. And we don’t anticipate any impact down the road either, on account of curtailment.
On the phasing question, Sumit: what we expect, in effect, is commissioning of 1.2 to 1.4 gigawatts during next year. As for how that phasing breaks down, our investor PPT broadly lays out the projects that should come through, together with the months in which they are expected to arrive. That PPT is there for you to refer to.
The next question comes from Satyadeep Jain of Ambit Capital.
Just to clarify the one-offs first. So if I heard that right, generation reported — reported EBITDA losses of INR 39 crores. You've applied a one-off of INR 171 crores, so that gets <<inaudible>>. But even so, that's maybe INR 120 crores, INR 130 crores of adjusted EBITDA, which is typically below what you generate on the regulated assets. So what's driving that? Or is there something else we're missing? And second, on the one-off, just to clarify. So with 11,000-odd crores of transmission distribution EBITDA, you're saying there's INR 186 crores of one-off in there. Just a clarification on the one-offs.
So Generation — as you correctly pointed out, that INR 171 crores was a charge booked in the generation business, and it hit generation EBITDA. If you strip that out, there's roughly INR 90 crores of reduction, largely driven by the sector on higher O&M expenses due to actual maintenance. And we made certain provisions last year — I mean, we revised certain provisions last year, and that isn't the situation this year. Most of it affects generation EBITDA. On distribution, we received the <<inaudible>> order in March, and we've booked distribution income of INR 186 crores. That's the big picture, I'd say. It's not really — we don't view it as a one-off, because each year we get carrying costs stemming from the regulatory assets we've built up to date. So it will be a routine feature, and we continue to receive this in the order as and when the certain items get approved in our favor.
All right, moving to the second item, the gas business. You said 10 cargoes have been contracted, and a portion of those will go to Torrent Gas and Torrent Power. I just want to get a handle on how you're required to demonstrate availability. Because 7 or 8 cargoes for Torrent Power won't be enough to show 80%, 85% availability. What exactly must you show in order to earn the full carrying cost? I'm just trying to understand how that process works. And then, at today's gas prices, do you see any potential whatsoever for selling in HTM ? Are you seeing any demand in HTM ? Or do you see any possibility for LNG trading at the current spot levels?
We have 10 cargoes contracted from that point onward, and we’ve booked those 10 cargoes. Still, whenever we need supply, we can generally purchase through the spot market or by other means. Those are simply the cargoes that are available. There are always chances to purchase additional cargo as well, since as demand increases—we’re seeing that demand come in—and prices are reasonable. So yes, curtailment will rise depending on demand and pricing going forward.
And Satyadeep, just to add to that. Basically, if you look at it over the last 4 or 5 years, the average PLF of my PPA-based, gas-based thermal power plants has been roughly 30% to 35%. If I assume that kind of PLF going forward as well, then 6 to 7 cargoes are enough to take care of that. Basically, all of these cargoes are take-or-pay contracts. So if you assume 85% PLF and book your cargoes, and if the DISCOM doesn't lift them, then you're looking at take-or-pay MLDs or take-or-pay curtailments. So what you try to do is manage the flexibility of gas based on DISCOM demand. And as Saurabh rightly mentioned, we anyway have spot available if there's a need for cargoes.
And gas is there for the taking. So showing that it’s available isn’t a problem at all — we’ve already proven that earlier when we talked about being above 4,000 PLF. So proving the capability isn’t an issue. We’ll always be able to show availability, because there’s always plenty of gas on the market.
So you’re basically trying to present availability using PLFs you may be expecting. And if demand comes in stronger, since the availability needs to line up with the schedule, then in that situation you’d simply book cargoes on spot and show availability. Is that — because otherwise, there will be under recoveries, there is...
It's always accessible. So pricing is the real question — what price the gas can be obtained at. If the price is reasonable, we import the gas every time, and that's what we did before as well. And we have a decent amount of coverage available starting next year. So to show availability, we don't anticipate any problem.
So could we potentially extend at all at the prices we have now, or with LNG trading at the current scope—are you seeing anything in the near term?
So look, I think with prices where they are right now, selling power at merchant rates with gas at around $20 or $16 is going to be very difficult. If LNG prices fall, and demand holds up given what we've witnessed over the last 2 months, then there might be an opportunity down the road. But for that to happen, international market LNG prices need to come down.
And on LNG trading, things have slowed down given the current scope. Are you...
At the moment, we don’t have many cargoes booked, so there’s no inventory with us right now for our trading business.
Alright, and then just one last thing, very quickly, on leverage. You've clearly taken advantage of the flexibility by putting capital to work for Nabha Power and for MP as well. With the leverage you're seeing at this point, is there a possibility — are you considering putting more capital into any new thermal bids or any other opportunity? Or do you feel, for the time being, that you're comfortable where you are and will perhaps just carry out the projects you already have?
No. So when you look at the power on an investment sale right now, and our leverage ratio is quite comfortable, and the comp CapEx also, we don't see that the leverage will exceed beyond our size. So there is enough cushion available, which is the balance sheet, to take up more project that we are getting the good returns also. So there is no restriction, I would say, in terms of leveraging to take up any further opportunities for investors.
And Satyadeep, these thermal projects usually have an investment cycle of about 5 or 6 years, as you're seeing. So at present, the CapEx cycle, or the committed CapEx we have boosted for FY '21/'22 — and if you actually look at it based on current profitability and the new projects coming in, leverage is under control. And once a project is commissioned, that falls off significantly and EBITDA begins to come in. So we believe there's still room for us to take on incremental projects as far as thermal goes, or renewable, given that new projects will start giving us EBITDA or cash flows as soon as they commission.
At present, our CapEx is pretty well balanced. So any extra project that comes into <<inaudible>> of our CapEx, we'll be able to handle it.
Our following question comes from <<inaudible>> at <<inaudible>>.
I have a couple of questions. My first one is for Mr. Saurabh: from where you sit, how is Torrent Power getting ready to seize upcoming opportunities in renewables and distribution while tackling issues like regulatory uncertainty, fuel cost volatility and capital intensity? Which strategic levers are you going to put in place that we'll see over the next few quarters, ones that will help you sustain growth and keep profitability stable? That's my first question. I'll pose my second one after this.
When it comes to how we plan to invest, as you're aware, we've already made public a plan involving 4 gigawatt of capacity and INR 28,000 crores of CapEx. That also covers the .6 gigawatt with INR 23,000 crores. <<inaudible>> That adds up to 3 gigawatts, with roughly INR 14,000 crores of investment going down. Distribution CapEx carries on occurring, a steady CapEx spread across our whole distribution territory. And for at least 5 years ahead, we anticipate around INR 2,000 crores of CapEx. We're carrying this out right now. So as far as the CapEx plan goes, ours is a pretty solid one, and we're now looking at Torrent Power -- what I mean is, the power sector is in an investment phase at present, with good opportunities out there and good projects out there. So we're always prepared to -- and our balance is very strong, the balance sheet. And per room is there for additional investment as well. So I'd say we're fairly comfortable when it comes to our investment strategy.
And Rishi Shah, here's my second question for you: what upgrades are being made in financial reporting and analytics that will sharpen decision-making and strengthen investor confidence? In the quarters ahead, how do you expect technology and automation to help drive faster and more accurate financial operations?
When it comes to the decision and everything around that, as I said earlier in my remarks, our success in the investment phase — good opportunities exist for players like us, and the leverage ratios are comfortable as well. So that's not — and demand is going to be strong too. If you look at the power demand CAGR over the last 10 years, it's roughly 6% CAGR. And the same thing will — we will see that same momentum carrying on. Since we have a very balanced portfolio of license distribution, franchise distribution, and generation, we have a two-part tariff available for our key projects, basically as we plan. And you have some open capacity. So all kinds of levers are available to achieve good performance going forward.
Our next question comes from the line of Sami at Avendus Spark.
Yes. Can you hear me?
Correct.
So given the adjustments we'll be making in the generation segment and the distribution segment for that period, what would adjusted EBITDA be for 4Q FY '26, sir? What's the adjusted EBITDA figure?
For the quarter, reported EBITDA came in at INR 1,320 crores. And there's a one-off of INR 171 crores that we were charged. So INR 171 crores was included in the reported EBITDA. That gives us the adjusted EBITDA for the current quarter.
Sir, regarding that INR 186 crores adjustment in the transmission and distribution segment?
So I covered this. Usually it's higher. Because we hold a regulatory asset, that's inevitable since we'll recover the carrying cost as most orders come through. So I'd call it a standard feature. It shouldn't really be viewed as a one-off. That's what our — so it's a standard feature. I'd say it applies not just to this distribution company, since they're selling regulatory assets, and each year they'll approve our carrying costs.
So, as Saurabh explained, we aren’t treating that as a one-off.
Alright, regarding the generation segment, after I adjust for that INR 171 crores, we posted minus INR 39 crores. That brings adjusted EBITDA to INR 132 crores plus, versus INR 233 crores in the same quarter of FY '25 — that's the fourth quarter. So the decline you're referring to, what's the reason for it, sir — did I miss that?
The first factor relates to planned maintenance work at our gas facilities during the quarter, and that added INR 50 crores in extra costs. There was also a reversal that had boosted the same quarter a year earlier — that isn't happening in the present quarter — and it affected how the generation business performed.
Right. And normally, this segment does see some LNG gain or merchant gain? I take it that kind of number isn't present in this particular quarter?
The fourth quarter is always a winter month. The winter quarter would have less mercantile and LNG sales. So if you compare both quarters—the same quarter last year and the current quarter—there were no material gains to report, I would say. There will be some gain, but not material, I would say, which we can talk about.
All right, and just to nail down one last point about the SUGEN power purchase cost — the thing producing that INR 171 crore figure. So does it come down to the regulator not having approved yet the additional INR 171 crores of cost that was incurred in FY '24?
In effect, they've imposed a ceiling on the cost. They've signed off up to a particular amount. Past that level, they've stated that, as things stand right now, they aren't granting approval. But we will — comparable circumstances have arisen before as well. And during the previous quarter, in Q2, they did approve — they lifted the cap and cleared the entire power purchase cost. So our expectation is that we'll lodge an appeal, and the ruling will land on our side as we move ahead.
All right, turning to renewables segment EBITDA — it's at INR 186 crores. That's actually lower than the same quarter a year ago, even with the capacity additions. So how are we supposed to read that?
Yeah, the figure is fairly flat. There's been some decrease, and that's due to the GBI — even one of the projects is expiring. That drives it up. So we — there is — the real reason was the sizable drop in GBI income. So that's what hit EBITDA for this quarter.
My apologies — I missed that. Could you tell me what the GBI income is?
The incentive that the government provides for renewable projects over a set period, 7 to 10 years, has expired. The facilities that benefited from it were completed. So it wasn't available in the current quarter. That enables the profitable renewable segment.
Got it, sir. So at what point will Nabha Power’s numbers start being consolidated?
We anticipate being able to close the transaction during June, since Nabha LNG is currently working through CP compliance and commissioning <<inaudible>>. So as soon as that takes place, we'll fold the transaction in before the end of the current quarter. As a result, we expect the June figures to incorporate the Nabha Power project.
All right. So for 1Q '27, will Nabha be consolidated?
Yes, that's what we currently expect.
All right, sir. And the last question concerns our gas supply. If I have this right, there are 3 cargoes from IC and Reliance, plus 3 cargoes for the summer demand. We also have that Japan cargo that we booked starting in calendar year FY '27. So, if I understand correctly, with all of these cargoes, would we be able to first ensure availability for SUGEN in FY '27, and also generate power during the summertime over the next 1 year as well?
No, that's not quite right. On your first point about the UCL and gas, it isn't 3 cargoes. IOCL is currently in the <<inaudible>> — they were sourcing the gas from Qatar. So as things stand, nobody is obtaining gas from IOCL. Regarding ONGC and Reliance Gas, which is domestic gas, the government has pulled the cargo — pulled all of that gas — so it can be supplied to private-sector requirements, things like CGD and fertilizer. Power sector therefore comes later. That gas isn't available to the power sector. So we aren't getting the gas, since the government has pulled Reliance's and ONGC's gas. So it isn't available. As for your points on 3 cargoes — yes, we have received the 2 cargoes, and One cargo is expected in mid of June. For any additional requirement, we can meet it for <<inaudible>> or perhaps through short-time contracts, which we've managed to do for the balance feed of the year. And as for cargoes coming from Japan and BP basically, we'll keep receiving those from the next year and onwards.
That’s going to keep going.
So at this point, with the 3 cargoes we're receiving from summer demand, we're covering availability for SUGEN and UNOSUGEN, and we'll also be able to generate from the DGEN plant if needed. Is that understanding correct, sir?
So, we’ve got 3 cargoes, and those are available for our distribution. We’re optimizing our business requirement and supply to satisfy the availability criteria. Any extra gas that comes available from this optimization is going to be used for the merchant seller.
And in one of your replies, you said that in the merchant market, at $16 to $20, making money is difficult. I'm just wondering — since it will come to a variable cost of around INR 19, merchant prices in the high-priced DAM market will be above that. So I'm just wondering why you would say that?
No, we're not claiming it'll be difficult. What we're saying is that things would be hard on the RTC business. But in the peak market — that's the market we're targeting — we can do something regarding the fee market, not the RTC.
The thing is, you can't just purchase a cargo purely to serve the peak market. That means you need a certain baseline level of demand for RTC, and that's what lets you book the cargo first and then supply it. In other words, buying a cargo isn't something you do for the peak market. On top of that, there are logistical issues in play as well.
So when it comes to our peak cargo, we’re optimizing the demand requirement across the board, and then we go ahead and execute it.
Alright, so two last questions here. Once that Japan BP cargo starts arriving next year, would we feel sufficiently covered across the entire year when it comes to depending on the summer cargo? Is that the correct way to look at it?
Right, with that JERA and BP cargo, yes. And on top of that, spot cargo purchases remain an option for us at any time, along with short-term contracts, and that will be sufficient to cover the availability needs at SUGEN and UNOSUGEN.
All right, that wraps it up. Sorry—one final question. Regarding those 3 summer cargoes, we mentioned securing 2. So would that indicate this is coming from the <<inaudible>> source?
That's correct.
The final cargo we anticipate in June would also be <<inaudible>>, so it might not be affected. Is that the correct understanding?
That's correct.
Our next question comes from Anuj Upadhyay, who is on the line from Investec India.
Just to clarify one thing about the CapEx guidance you brought up. So roughly speaking, you said it's about INR 28,000 crores for renewables, INR 26,000 crores for whole, and INR 14,000 crores was for the PSP. That brings the total to roughly INR 68,000 crores, plus your usual distribution CapEx of around INR 1,500 crores or INR 2,000 crores per annum. That brings the total to INR 80,000 crores over a period of 5 years. Is that a fair assumption if we assume that annually there's no upward change in the range of 15 to 20...
On coal, you mentioned INR 26,000 crores—that's roughly INR 26,000 crores. Just one correction there.
Right, right. INR 26,000 crores, sir. So that comes to INR 80,000 crores across the coming 5 years. Would that be a fair assumption?
Yeah, that type of assumption is fair to make. We're currently working with..
All right. And I realize that, to put it plainly, I think likely from the second or third year onward, CapEx will be heavy, depending on which milestone we reach in the construction phase. So any...
That's correct.
Alright, alright, that's fair, sir. And then the second thing, sir, regarding connectivity. Could you just explain how the connectivity arrangements are positioned for the renewable projects coming up?
For most of the projects, connectivity is already in place at this point. So connectivity isn't the problem — it's the upcoming transition that needs to arrive on schedule, so we can carry out or implement all our renewable projects on time, in line with the expected schedule, I'd say. Other than that, connectivity isn't a problem for our renewable projects that are available for just about most of the projects, I would say.
Alright, sir. Finally, is there any update regarding the panel that’s assessing?
We aren’t doing any more development right now.
Our next question comes from Lapur at Jefferies India.
Sir, I just wanted to ask about the gain on merchant LNG. You mentioned that, naturally, 4Q wasn’t material. But across the full year, could you perhaps put a number on what the total gain was for the year, and also how many merchant units there were overall?
We don’t split it into LNG sales and merchant. If I look at the combined gains from both, that would come to roughly INR 675 crores for the full year. As for the units we sold, that would be about 1,400 MUs.
Understood, sir. And just so I’m clear about your Nabha Power acquisition — this is an INR 6,900 crores acquisition. What would the debt component and the equity component be? Do you have a rough split in mind? And second, on Nabha, how much of this would add to your fixed asset base going forward? And third, what tariffs are you looking at for Nabha Power, for that plant?
To be exact, the enterprise value of this acquisition, as we announced, comes to roughly INR 6,800 crores. And as for equity value, we currently have INR 3,400 crores — that remainder represents the equity value. Funding the project will take somewhere between INR 3,000 crores and INR 4,000 crores, that's the plan. Tariffs, meanwhile, will essentially work as a two-part carry. So variable cost gets passed through. That's precisely how Nabha's business model works.
Could you give us some idea of which tariffs you're anticipating, particularly on that specific side?
Right now we don’t have that information available, but we can share it off-line.
Our next question comes from Dhruv Muchhal, who is on the line from HDFC AMC.
Sir, I have a couple of questions regarding the renewable pipeline. Regarding that MSEDCL project, what is the expected COD?
So really, look, of that 67 megawatts, the bulk of the capacity we've commissioned, but some hasn't been commissioned owing to where the land the government gave us is situated — it isn't ideal or suitable. As a result, we've requested a replacement from the government. Essentially, it was leased land that the government provided. So we're expecting the government to replace it, and we anticipate that within the next 6 to 9 months, I think, it ought to be replaced.
So partial billing is possible for whatever share of the capacity you've already commissioned?
Regarding the commission, billing has begun on our side. So noncommissioning isn’t a problem, since we <<inaudible>> situated projects across various locations. We have a solar project in the <<inaudible>> area. Therefore, as soon as that matter gets resolved — in fact, for all the capital we’ve commissioned, billing is starting as well.
Understood. And sir, regarding the COD for the well project?
Regarding COD, as we noted, we've applied an extension there. That's going to take a bit of time.
So should I be expecting that around fiscal year '27 to '28, let's say?
By 27, I believe — ahead of March '27 — it could very well improve substantially.
And sir, are you still moving forward with that merchant power project — the 600-megawatt one? Or has anything changed?
So that project is underway. But Dhruv, if you think back to our previous conversations, what we've been saying is that at present all of that capacity is merchant — we're in the process of commissioning those units. However, as we move forward, whenever we win any tender or bid, we'll assign that capacity to those bids. So in practice, it may not stay merchant for the entire life of the project.
Right, go ahead with building the project and all of that. You're moving forward at..
Yes.
Yeah, yeah.
Finally, we've noticed that many developers are moving toward batteries, since you also have plenty of dry projects as well as hybrid ones. So are there any changes in how your projects are configured? And are you perhaps seeing any reduction in cost or some improvement in IRS?
Not right now. Most of the projects, I'd say, come with a modest battery. So a few of our hybrid or RTC projects already include a metric component. Those aren't especially big, though. So the cost impact won't be a major shift.
Our next follow-up question comes from Mohit Kumar at ICICI Securities.
Sir, just a couple of clarifications. First, did you book the generation-based incentive for RE, primarily in Q4? Is that understanding correct?
No, this was spread across...
Regarding the year.
Throughout the year, in each quarter.
Got it. The second question was...
Basically, one of the projects — the timing of the year and the amount were used. So that's what has been discontinued starting with the last quarter, the last quarter of last year.
Got it, sir. With the VA portfolio in mind, how do you view the effect of DSM, the new regulation? And could you help us understand where things currently stand with that new regulation?
It hasn't been — our portfolio hasn't been weighted heavily in any one area. I'd describe it as balanced. When you consider the 4 gigawatt capacity that we're commissioning, close to 50% comes from green, and 50% comes from solar. I wouldn't call it a green portfolio, honestly.
What does the current portfolio look like?
Pardon me?
With the portfolio we already have, how do you view the effect of this? Do you see the...
60% — actually, 40% solar here. Yeah, there are certain entities when it comes to PLF, I'd say.
Got it — I'll take that offline. For my third question, sir: are you seeing the incremental thermal bidding opportunity for the states, and are we looking to bid for it?
Yes. A couple of states are considering announcing thermal capacity. So we’re actively looking into it.
Got it. My final question concerns the merchant capacity that's being disclosed on the RE side. Are you considering any particular mix of solar and wind? And do you still intend to add battery to that, so you can secure a better tariff?
If you examine our track record and how we've been bidding over the past 2 years, I'd put it this way: we lean more toward a complex project such as a hydro project or <<inaudible>> type of project. Those are the kinds of projects we're concentrating on more, so that we can achieve better — or equal or better compared with the year, or higher.
Sir, my question concerned the main capacity for your 3-megawatt peak that you referenced in the PPT. Are you building this <<inaudible>> with wind and solar? And are you also considering adding a battery to it?
Mohit, when you look at that 63 megawatts, the wind portion will be a bit larger, and some of it is solar. At present, we aren't considering any battery usage there. So in the future, if that becomes necessary, we might add it. But right now, we aren't adding any battery, since it's mostly wind, which is generally during hours without sun and where you can achieve better returns.
Moving on, our next question comes from Nhil Oswal with PGM India.
Sir, is any of our present capacity currently committed on the C&I side? Are there plans to commit a substantial amount of capacity there going forward? And how do you see the C&I segment?
No. So right now we've got roughly 860 megawatts of E&I projects that are under construction. We continue to explore locking in C&I with C&I consumers whenever those opportunities come up. So we're open to contracting additional capacity. But at this point, 860 megawatts of C&I projects are under construction for us.
Our next follow-up question comes from Aditya Birla.
Can everyone hear me?
Yeah, yeah.
Sir, I’d just like to get a sense of how you view the gas-fired plant business over the longer term. LNG as a fuel has turned out to be costly for India, and that is among the reasons Indian plants have been operating at 15%, 20% PLF. And there is also the anticipated global gas that was supposed to arrive in 2027 because of added liquefaction capacity, and you do run where that has likewise been favorable going forward. So I just want to understand what PLF you expect over the long run?
So essentially, you're correct — there's gas that's coming in, and a lot of equipment is going to flow in. Perhaps, due to the Iran war, there will be some pushback when it comes to timing, I'd say, though not regarding availability going forward. Apart from that, we don't see any shift in the situation — just some timing being delayed, I would say, and more gas being flown, I'd say. So as far as PLF goes, predicting the PLF would be difficult. But gas availability may not be a problem going forward. On price — we have to keep an eye on the price and then take our call.
Also, if you examine our portfolio, roughly 50% of the gas portfolio has long-term PPAs signed with our own DISCOMs. That means we earn a fixed cost under the availability business, so that part shouldn't be a problem. When it comes to merchant capacities, we capitalize on short-term pricing mismatches. This year things are somewhat steady owing to the very high cost of LNG. However, over the last 4 to 5 years, we have managed to earn decent profits from the merchant capacity we hold. Therefore, our expectation going forward is that once all of this subsides, demand in India as a market should pick up. Power will always remain in deficit going forward, which will let us benefit from our merchant capacities. That is what we expect right now.
Our next question comes from the line of Savi with Avendus Spark.
Yes. There's one question I forgot to ask. Once we get past June of this year, where does the cash come from that we'll need in order to demonstrate availability at <<inaudible>>?
This is essentially short-term. Basically, we need to purchase from the short-term market, meaning we do the short-term contracts. So gas is available. Gas isn't the issue. Basically, it comes down to at what size we are getting gas.
My sense is that what's being asked about is the price rather than whether we have gas available. So to show that availability on our side, gas is in ample supply. Then the question becomes whether the DISCOM wants to take that gas and use the electricity at an elevated rate, or whether they can handle it by purchasing from the merchant market — that balancing is something they'll have to work out. So when it comes to our plant being available, there's no gas shortage. The only issue is the price we hire it at.
Okay. So when you mention spot, that would be gas sourced from IDFC, something along those lines? Or...
No, spot cargoes. What he means is spot cargoes. At present, domestic gas isn't available because the government has pulled everything. So we have to bring in the gas.
Got it. So once those tenders go out, you'd be able to step in on short notice?
What kind of tenders are those?
The spot cargo.
Right, right. So we continue doing this — when you're buying cargoes, we usually issue a tender in the global market, and then we put it out to bid.
Since no more questions have come in, I'll pass things over to Mr. Saurabh Mashruwala now for his closing remarks.
Thanks to all of you for being on this Torrent Power earnings call. We want each of you to remain safe and well — thank you very much.
Thanks a lot. That brings us to the end of this conference on behalf of Torrent Power Limited. We appreciate your participation, and at this point you can go ahead and disconnect your lines.
Thanks.
Thank you, sir.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Torrent Power Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Torrent Power Limited earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.