Thank you, and good evening everyone. Thanks for being on Torrent Power's quarter 2 earnings call. I'll start by reviewing how we performed financially and operationally during the quarter, and after that I'll give an update on the key growth initiatives and the projects currently under implementation. Following that, we'll open the floor for your questions. Let me begin with the company's performance at the PBT level, and then I'll cover the tax expenses for the quarter. Reported profit before tax for the quarter came in at INR 1,131 crores, against INR 979 crores in the same quarter of the previous year, which works out to an increase of INR 152 crores, a 15% growth year-on-year. Profit before tax for the quarter includes the following nonrecurring credit of INR 123 crores, arising from indemnity income that Nabha Power received from the seller with respect to the Mega status claim amounting to INR 115 crores. This follows the provisions of the share purchase agreement, under which any liability stemming from the Mega status claim can be recovered from the seller. Second, there was unwinding of LNG-related hedges connected with the IOCL LNG procurement contract. That unwinding was carried out in light of the force majeure announced by IOCL, and it produced a gain of INR 52 crores during the quarter. There was also a liquidated damage and write-off of charges paid on termination of the SECI XII project, amounting to INR 44 crores. The profit before tax for the corresponding quarter of last year includes a nonrecurring credit of INR 31 crores from receipt of a favorable order in our license distribution area, primarily related to the grant of carrying cost. If you exclude the impact of these nonrecurring items, adjusted profit before tax for the quarter stood at INR 1,008 crores, compared with INR 948 crores in the comparable quarter of the previous year. That was an increase of INR 60 crores on an adjusted basis, a 6% growth year-on-year. The tax rate for the quarter stood at 26%, compared with 24% in the corresponding quarter of the previous year. On business-wise factors contributing to the performance of our business segments, they are as follows: our thermal generation business delivered a resilient performance despite elevated gas prices, which were driven by geopolitical developments in the Middle East. Adjusted for the nonrecurring item in the current quarter, EBITDA was higher by INR 83 crores, primarily due to the first full quarter contribution from the Nabha Power acquisition, which contributed INR 142 crores to EBITDA during the quarter. Adjusting for the lease accounting followed in Nabha Power Limited, EBITDA for the quarter stood at INR 196 crores. This was partially offset by lower merchant power realization of INR 55 crores. Despite elevated gas prices during the quarter, the company maintained healthy operating margins in its merchant power operations. Moving to Distribution and Transmission. Distribution and Transmission delivered INR 99 crores in EBITDA for the quarter. That came mainly from a better contribution out of distribution operations, at INR 76 crores, helped along by the ROE increase stemming from capitalizing assets plus a higher return on equity under the new tariff regulations, along with other incentives. We also saw a better contribution from the distribution franchise business, thanks to volumes improving by 3% and T&D efficiency gains across every franchise business. The transmission project that was newly commissioned added INR 22 crores to EBITDA. Turning to renewables. Renewable operations put INR 148 crores into EBITDA, powered by better PLF at wind and solar plants and by capacity that was newly commissioned. Depreciation and finance costs also went up, and that pulled profit before tax down by INR 270 crores; the depreciation increase reflects higher capitalizations in the Renewables segment, and finance costs rose as well, following the Nabha acquisition and more capitalization. On the whole, the quarter shows operational resilience continuing and disciplined execution throughout our portfolio, even with a tough external environment. That wraps up the explanation of financial performance for the quarter. I'll move on now to updates on the various projects being implemented. Renewable energy projects totaling 240-megawatt peak were commissioned in the quarter, which lifted the company's aggregate installed generation capacity to 6.8 gigawatt as of 30th September '26. That figure comprised 2.7 gigawatt of gas, roughly 1.8 gigawatt of coal and about 2.3 gigawatt peak of renewable capacity. So on renewable energy, during the quarter, the company's subsidiaries received LOA for 3 new wind projects, each for a period of 25 years. 100-megawatt from SJVN at a tariff of INR 3.89 per unit. 150 megawatt under SECI XX at a tariff of INR 3.85 per unit and 250 megawatts from MPPMCL at a tariff of INR 4.16 per unit. Also, as of 30th September, renewable energy projects of 4.4 gigawatts sit under implementation, and these should be commissioned progressively, with about 1 to 1.2 gigawatt in FY '27 fiscal, 1.4 to 1.6 gigawatt in the next fiscal, FY '28, and the remaining capacity by FY '29. CapEx of INR 1,850 crores was incurred in the current quarter, against INR 1,550 crores in the previous quarter and INR 1,630 crores in the same quarter a year earlier. Out of the total CapEx of INR 30,600 crores for the renewable projects under implementation, a cumulative CapEx of INR 10,000 crores has been incurred up to 30th September 2026. In FY '27, total CapEx of approximately INR 10,000 crores is expected for renewable projects, compared with roughly INR 6,500 crores in FY '26. Moving on to the implementation update for the Anuppur Thermal Power project of 1.6 gigawatt. Activities are proceeding as expected, and the major milestones reached in the quarter were execution of the BTG and the BoP contracts. By 30th September 2026, capital expenditure totaling INR 800 crores had been spent. As for transmission, the Solapur transmission project is currently being implemented and should come online this year. Up to 30th September 2026, cumulative CapEx of INR 400 crores has been incurred. More information about pipeline projects is summarised in our latest investor presentation, which you can now find on our website. That covers everything for this quarter, and I wish each of you a very happy Diwali along with a safe and healthy holiday season ahead. At this point I'd like to ask the coordinator to please open the lines for the question and answer session. Thank you.
First thing I'd like to ask: could you give us the operating EBITDA and the accounting EBITDA for Nabha Power in the quarter? You did mention it, but I believe I missed it.
That comes to INR 142 crores.
Does that figure refer to accounting EBITDA or operating EBITDA?
Well, that number follows the lease accounting that Nabha Power applies. Were I to use PPE accounting instead, the figure would come to roughly INR 196 crores.
INR 196 crores. Got it, sir. And could you help us get a handle on the EBITDA rise in generation on a Q-o-Q basis this quarter? It's quite a sharp jump, isn't it? I realize there's a one-off in there. Could you walk us through it? Q-o-Q, yes.
Pardon?
Sir, generation and segmental EBITDA rose from INR 3.7 billion during Q1 FY '27 to INR 7.1 billion during Q2 FY '27. Could you break that down for merchant — what contributed how much — and walk us through the sequential movement in EBITDA?
So essentially, Mohit, if you look at it, I think Vikas mentioned that one-off item of INR 115 crores at Nabha, and it is being captured in EBITDA. So once you take that out, every other business has performed in line with expectations.
For my final question, I believe it concerns the renewables portfolio, where the EBITDA margin is lower, and I think that's mainly because one factor is the liquidated damages that get paid, correct? Is that — is there anything beyond that?
No. So once you adjust for INR 44 crores, I think our EBITDA margin is pretty healthy; and let me tell you, we have one project that's been operationalized, which is Airpower, where we're selling into the merchant market, a wind project, and realizations there are very good. So effectively, our EBITDA margins will rise going forward.
Got it. For the final question, could you share how many merchant units were sold during the quarter, along with realization and the spread, if that's available?
So you're asking for MUs? Million units?
Yes, MUs.
So across the quarter, we sold roughly 530 MUs. And when I look at the realization per unit, it came in at about INR 24.
Do you have any sense of the spread?
Any thoughts on the—sorry, could you repeat that?
Do you have any details on the spread — the spread, and how much spread you generated in merchant?
The spread would land somewhere between INR 4.7 and INR 5.
Got it, sir.
Quite a few details came up during the opening remarks. My line dropped partway through. I just wanted to check whether you could share Nabha's total revenue for the quarter. I heard the EBITDA figure of INR 1.42 billion under lease accounting. Clearly, depreciation won't apply there, but what does interest do to Nabha? So perhaps — and is that roughly the recurring amount we can expect as EBITDA contribution of INR 1.42 billion? Is that the clean figure we should be working with going forward?
So I think, Sumit, your first question concerned revenue at Nabha in Q2, correct? That came to roughly INR 1,100 crores, but I think we ought to view it more through an EBITDA lens, since this is a 2-part tariff PPA. I think any full cost increase will raise my revenues and the reverse as well. So I think we should look at it on an EBITDA basis. Now I think your second question had to do with what the recurring EBITDA is; so if I view it on a lease accounting basis, we recorded EBITDA of INR 142 crores. But if I view it from a normal accounting standpoint, which is how all other power plants are handled, it comes to around INR 200 crores. So annualizing that will be difficult for you. But I think when we acquired this Nabha Power Plant, we had stated that recurring EBITDA ought to be around INR 1,000 crores for the full year, which we expect should — we should be getting on a full year basis.
All right, sir, so — but if I'm counting it in EBITDA terms, from a P&L perspective, I should probably include roughly INR 700 crores or thereabouts, right?
The capital charge came to INR 54 crores, and that isn't being accounted for, so you're able to annualize that portion.
All right. How much is being allocated toward interest that relates to the Nabha Power project?
By interest, do you mean the debt that you've taken on?
Yeah, yeah. On interest — what's been added to interest this time around through the Nabha acquisition?
Okay, so — Nabha on its own carries an interest cost of roughly INR 70 crores; and beyond that, we also took on borrowing to buy this entity, which comes to about another INR 70 crores.
All right. Could you also give me some clarity around the other income figures? Specifically, what's the one-time item included in other income that's been reported at around INR 249 crores?
Well, it breaks down into 2 pieces. The first is INR 115 crores, the indemnity amount we got from the seller. The second piece is the unwinding of hedging that we carried out, which comes to roughly INR 52 crores.
What exactly is this hedging being unwound for?
We had an IOCL LNG contract, and owing to those geopolitical tensions, IOCL invoked force majeure. What we had done was hedge this gas essentially on the Brent side, since it is linked to Brent; we had put hedges in place to cover the Brent, and those we unwound because the gas was not being supplied.
All right. And apologies, in case this has come up already, but could you quickly go over again what the change was in merchant contribution during Q2 compared with the prior quarter?
It came in INR 55 crores lower.
Lower.
Yes. INR 55 crores lower.
That's right.
All right. All right. And in your opening remarks you brought up something regarding a SECI bid where a project had to be pulled out and some termination fee was paid. How large is that project? And what can you tell us about it?
It was the SECI XII project, a 300-megawatt wind project, and we terminated it, which led to an outflow of INR 44 crores in the quarter.
What led to it being terminated? What's the background there?
Essentially, there were quite a few delays when it came to evacuation challenges. And on top of that, the tariff wasn't all that good either. But since — mainly since evacuation challenges were the issue, we ended up terminating that contract.
And that was during the LOA stage?
No, it was during the PPA stage.
So a PPA project is able to be terminated. So what’s the rule in this case? I mean, what — in what way can someone terminate a PPA? So what does the breakup fee come to? How does it work?
We settled liquidated damages, correct? So roughly INR 40 crores in liquidated damages was paid by us.
All right. All right.
I have one more question, a follow-up on this, regarding the SECI XII and SECI XIII projects, I believe. The tariff there was, as I recall, INR 2.97. So if we've got it right, there were delays related to connectivity, and you decided to pay the termination charges. So now you'll operate it on a merchant basis and possibly convert it into a different PPA down the road. Is that the thinking, perhaps at higher tariffs? And why — if the returns were lower, why would you even consider bidding at such a low tariff in the first place?
Well, first of all, I think this is a PPA termination. The project itself is still going. And the termination of the PPA came about because there was a delay. And we do have the chance to sign another PPA or to use this capacity on a merchant basis. So looked at that way, I think it isn't really a major negative for us.
All right. And then second, regarding a few of the longer-term projects you've got, such as the pumped storage project and a thermal pipeline. So about the pumped storage project, could you — clearly, there's plenty of news coming out. Could you bring us up to date on precisely where things stand right now? What options are you looking at, perhaps different sites or anything like that? Any update at all you can give on this?
Look, I think with the pumped storage, the project is clearly in its early phases and some preliminary work at the site has begun. We've also issued a press release setting out the company's position, and steps are being taken to deal with shareholder — stakeholder concerns. So we keep engaging with the stakeholders involved, including the local community and the general public, to clear up any worries they may have. So, to this point, I think the situation remains quite fluid, and we are talking things through and attempting to resolve those concerns.
So I think there were some alternatives — when you were assessing this project, I'm certain you'd have looked at other sites as well. Could it be that you also have some other sites under consideration for this project?
Well, it's really too early at this point to get into those kinds of discussions. As I mentioned, the project sits at a very early preliminary stage, and we're kind of trying to ease some of the concerns that have been raised. We've also provided some details in the press release; so at this stage, I think considering alternatives would be a bit premature.
All right, that's reasonable. And finally, regarding the thermal pipeline, you've already got the Madhya Pradesh project. Are there — are there additional projects that you're actively taking part in or assessing within that pipeline? Could we perhaps consider some chance of another project, given the balance sheet leverage and everything else you have? I'm just trying to understand how you're planning to build any future thermal pipeline.
So, Satyadeep, we do assess bids, and they keep coming in. And when they sit at commercial levels that appeal to us, we'd want to take part. On the leverage question, I think these are all contracts with long gestation periods; and if you look internally, I think we're comfortable where leverage is concerned.
Am I audible?
Yes.
Yes.
Yes, sir. Sir, I have just a couple of questions. First, sir, I wanted to get a sense of this quarter — the EBITDA margins have come down, and some power purchase cost has risen, and G&A expenses have risen too. But could you just give some color? Is there a particular reason this happened? And will it keep happening going forward? Or how do you see EBITDA margins ahead?
So Yash, if you look at the nature of our business, if you look at our license distribution or franchise distribution business, my coal — my power purchase cost is a pass-through for me. Even in my generation of gas and coal, all of those are pass-through. So what happens is that if my power purchase cost rises, my revenue rises as well. And typically, mathematically, EBITDA margins will come down. So effectively, I mean, we should not look at it purely from an EBITDA margin perspective, given that 60% of our business comes from the distribution business.
All right. All right, sir. And moving along on this — let's say, carrying on with this point, I just wanted to ask, let's say, for this quarter, like it was also mentioned earlier in the opening remarks, but I just wanted — the finance cost has risen. And looking at, let's say, the tax rate has risen as well. So on these two points, could you just explain why the finance cost has risen, why — are there any additional borrowings, and for what reasons?
Yes, yes. So Yash, basically, when we acquired Nabha, we borrowed at the Torrent Power level. So because of that borrowing, the finance cost has risen, plus Nabha itself had about INR 3,000 crores of borrowing, and because of that, on a consol basis, the finance cost has risen. And there was some capitalization during the quarter, and because of that the interest cost has risen. So I think these are two or three broad reasons why the finance cost has risen.
Understood. Understood. And sir, regarding the tax rate, it rose by only 1%, but speaking generally, did anything one-off occur during this quarter?
No, essentially we are moving to the new tax regime. So on a consolidated basis, it has risen a bit since a few subsidiaries are turning profitable, which will carry some tax impact.
Understood, sir. Understood. Wishing you all the best.
What I mainly want to ask about is how the pumped storage project and the coal-based power plant are being financed at financial closure. Is the funding happening through an SPV structure, or does it sit on the balance sheet?
Yes. So Mohit, financial closure for both of our projects has been achieved on an SPV basis by way of long-term loans that are tied up; and when I refer to long-term loans, these are all loans of 20 or 25 years that you have tied up.
Got it. For my second question, could you give an update on where things stand with the 800 megawatts that I believe we're meant to put in place as a replacement for the Ahmedabad coal-based power plant that's being retired?
Right now, the allocation has come through. It's still too early for us to say anything about it at this point.
Got it. Got it. Best of luck.
Can you hear me?
Yes.
So first, regarding cash flows — when I look at receivables, that balance has risen by nearly 80% by year-end. Is there a particular reason for that, since it happened around the Nabha acquisition? Any thoughts on that?
Mainly it's due to the Nabha acquisition. And normally, in license distribution businesses, owing to the high power demand season, in Q1 and Q2 those go up and afterward they can begin liquidating. So essentially there are 2 reasons.
All right, so we do anticipate it settling down across the year and then returning to...?
So Nabha would stay as it is. The rest ought to return to normal.
Got it. One more point about the distribution business: when I look at the units sold in the PPT, there isn't much change, yet revenue from distribution has still risen, so does that come purely from the power purchase pass-through? And if that's the case...
That is one.
So what would you say is the steady growth rate we can look forward to here, once you combine the unit growth with the stable pass-through of power purchase costs?
No; so I think, Harsh, when you consider profitability growth, several levers drive it within the license distribution business. One is volume growth, naturally, and that brings about your CapEx — meaning CapEx will be higher down the road. Beyond that, there are additional savings on the T&D and O&M expense side.
Right. Right, so should we expect this kind of trend to keep going when it comes to the rise stemming from power purchase pass-through?
Well, with power purchase pass-through, should the cost of power purchase fall, my revenues will fall as well, yet volumes won't be affected by that.
Right, so I'll ask again: should we expect volumes to rise from here? That's the key question.
Well, we don't really provide forward-looking statements as such, but I think on a very steady-state basis, 4%, 5% is what you should look at; that's more comparable to GDP growth. And then there's a GDP factor, which typically lifts electricity demand.
Got it, sir.
Sorry, I came in late. If this is something that keeps coming up, please accept my apologies.
Bharani, your voice — could you move closer to the speaker? The thing is, we can't hear you well.
Is it better now?
Slightly better.
All right. I'll speak up as much as I can. No, someone was telling me I came in a bit late, so I apologize if I repeat anything. What I'd like to get at is the reason underneath why our merchant gains came in lower, even though the industry has seen strong power demand and other gas utilities have gained from that.
I believe you're correct that power demand was really robust in H1 of this year. Yet when you examine it, gas prices are also quite elevated. So our ability to sell into the merchant market was quite constrained; in fact, my way of looking at it is that even with gas prices at these elevated levels, we still managed decent profits as far as the merchant market goes.
But I did hear you say we generated a spread of roughly INR 4 to INR 5 for each unit. Why weren't we able to produce more and capture that spread?
No, no. All right, so here's how it looks: daytime power demand — I mean, the slots offering attractive profit — those selling rates are quite low. As a result, the units you can sell in those slots would be fewer. Because solar power flows in during daytime hours, prices typically fall in the merchant markets. So the units you're able to sell at such high LNG prices would be smaller.
All right. Your voice kept cutting out, but if I've got it right, you're saying the window should be used to capitalize on elevated prices just during the evening hours, and that's the product you're offering?
Correct, correct. In the peak hours.
All right. Could you bring us up to date on how much gas is available in general for merchant plants and for PPA projects such as SUGEN and UNOSUGEN — what gas availability stands at right now in terms of the number of cargoes? And how much PLF can we look forward to from DGEN, SUGEN and UNOSUGEN over the coming 1 year?
Well, as you may recall, we had said publicly that we have contracted cargoes, or 10 cargoes per annum, beginning in calendar year '27; so starting next year, those cargoes would come to us for our Torrent Power business and part of our Torrent Gas business. So where my PPA capacities are concerned, the liability under the PPA ought to be covered by these cargoes. On the merchant side, we will see how the merchant market performs and how LNG prices perform, and we would want to lock in the cargoes for the next year. And in any case, this year will be a low power demand scenario. So I think selling on the merchant market with LNG prices this high would be difficult for you.
So with these 10 cargoes, will you be able to generate decent returns during next year's high demand period?
No, so okay. Of those 10 cargoes, some are allocated to Torrent Gas, and certain cargoes are available for Torrent Power, which are typically earmarked for my license distribution businesses. So using it for DGEN, we'll look at it if not — I mean, they are not willing to lift it up, then we'll look at it; but as of now, they are earmarked for our distribution businesses.
Okay. No, what prompted my question is that my impression, even looking at this year, is that the fact we hadn't booked those kinds of cargoes for DGEN is among the reasons we couldn't capitalize on the situation of high power demand, since those cargoes would have been priced at a fixed rate below the market price. So I was wondering whether, if we have sufficient cargoes at a fixed price below market price for next year, we'd be in a position to benefit next year. That's the reason I asked that.
Yes, that's right. So when you enter a long-term contract, all of these are variable contracts. A fixed price contract can't be done on a long-term basis.
Sure.
Yeah. I just wanted to follow up on the renewable capacity addition plans for this year and the next fiscal, since you've already done close to, what, more than 300 megawatt — megawatt peak — in the first half of the year. Do you still expect to be on track to commission the 1.2 gigawatt you'd indicated earlier for FY '27, and what are your capacity addition plans for the next fiscal?
Yes. Right now we are — I believe we're on track to hit 1 to 1.2 gigawatt of commissioning. Usually Q2 is a slightly lower year — I mean, a lower number, because of the rains and all. But H1, we should pick up — H2, sorry.
All right. So then for next year, you'd be at roughly 1.5-odd gigawatts, is that what?
What we've said publicly, I believe, is a range of 1.4 to 1.6 gigawatts.
All right. All right. Any remarks — there was that story about a private-sector company receiving a 25-year parallel distribution license covering areas around Gurgaon. The state has pushed back, but has anything moved forward on parallel licensing as a result of that?
No, there's nothing at this point that we can comment on.
Understood. All right.
Regarding those gas cargoes we've signed up for across the coming calendar year, might you offer a rough ballpark figure for the landed price? I'm asking, that is, on the basis of the contracts you've put together that are tied to crude and other indices?
Well, Vishal, those cargoes are tied to Dated Brent crude, and that is variable. That makes it hard to hand you a pricing point. It's a slope against crude, and the slope figures aren't something we disclose; even so, I believe where the slopes are concerned we're very competitive.
All right. On the volume side, what would those 10 cargoes add up to? And how much of that would Torrent Power account for?
So out of those 10 per annum, Torrent Power ought to receive roughly 4 to 5 cargoes.
All right. And how much would that be in terms of MMBtus or Bcf?
The cargo holds 3.2 TBtu of gas units.
All right. One more thing about renewables, specifically the C&I contracts we hold. What's the installation timeline? In other words, when will these C&I projects be commissioned? And what kind of structure have you signed up for? Some rough estimates would really help here.
On C&I projects, well, we have several PPAs in place, so pinning down a specific commissioning year is hard; still, if you look at how we operate, projects keep getting executed or brought online each quarter. And that ought to be — every one of my C&I projects that's currently tied up should, I believe, be commissioned by '29. It will, though, happen progressively across the next 2 years.
All right.
Only a few questions. First, to go back over the thermal generation EBITDA figure you reported at nearly INR 710 crores: after you strip out those two one-offs you referred to, INR 115 crores from Nabha Power and INR 52 crores from the IOCL transaction, it looks like generation EBITDA has dropped fairly sharply, on both a quarter-on-quarter and a year-on-year basis. So is there something I'm overlooking in those 2 comparison bases — the second quarter of last year and also the first quarter of this year — were there one-offs in those periods too that we ought to be adjusting for?
So once you adjust for both of those, that INR 110 crore (sic) INR 710 crores figure ought to come out at about INR 543 crores, INR 540 crores, and against Q2 of last year, which was roughly INR 460 crores, that gives growth of INR 83 crores year on year. As we said, this carries an impact of roughly INR 55 crores on 4% profit. But thanks to the Nabha acquisition, INR 83 crores is the delta.
Right, sir. And on a quarter-on-quarter basis, it's clearly risen by roughly INR 170 crores versus the prior quarter...
That's Nabha, since...
All of that comes from Nabha. Sure. And then, secondly, just now, a few news reports hint that there might be some — there are concerns regarding your 3-gigawatt PSP project in Maharashtra because of forest cutting. Could you say something about that? Is any delay showing up in that PSP project, or is everything on track, sir?
Shirom, we already answered that earlier in this same call. So were you on the call when we...
Sorry, I may have missed that part. Perhaps I wasn't on the call when it came up. I joined a bit late.
Right. At a high level, I'd say the project is still at a very preliminary stage. And we're sort of — we've already set out the company's position in a press release; we're aware of the concerns that have been raised, and we're engaging with the concerned stakeholders to address those concerns; so at this point, I'd say the matter is very fluid and dynamic, and we'll keep watching for developments.
Understood, sir. And how about this — in the same quarter, the first half of last year included that NVVN contract on your merchant side. Should we expect any additional medium-term contracts to be signed going forward, or is nothing like that on the horizon?
No. Shirom, generally speaking, Q3 and Q4 are quarters when power demand across the country is lower. So we don't anticipate any significant contracts coming through in Q3 and Q4. Normally, Q1 and Q2 are quarters of high growth or high power demand. So going forward, some contracts could come in. But that will again hinge on what LNG prices are. So the situation is very dynamic.
Okay, sir. And just as a final question, your wind PLFs have risen quite a bit this time even though the monsoons were weaker; so is there any specific factor behind the higher wind PLF you saw this year or this quarter?
Well, Shirom, I'd say wind resource was quite good over this quarter. Usually it isn't tied to monsoons, since past a certain wind velocity the turbine shuts down; so if the wind sits within a band where turbines can operate, I think you'll see a better PLF.
I understand, sir; so only this time, you had wind speeds that were better suited to your PLF compared with earlier quarters. Is that correct? Yes. Understood, sir. Great.
Just one final question about Nabha Power's EBITDA per unit, given the PLF that all of you have reported. EBITDA per unit appears somewhat lower, at roughly INR 0.5 to INR 0.6 per unit, while historically this plant has been running closer to INR 0.8 per unit; is there any specific reason why EBITDA per unit has come in a bit lower this quarter?
So some timing differences have played a part — and if you look at EBITDA, or EBITDA per unit as well, it is slightly lower, but I think that should get ironed out as we go forward.
So, in your view, what kind of steady-state figure could we reasonably watch for this plant?
What I believe people should focus on is an EBITDA run rate of INR 1,000 crores annually, measured year over year.
And with these PLFs, it's roughly about 85% to 87%, is that right? Or could it actually be lower than that?
I don't think PLF would make much difference. It's more about PAF, where you guide the fixed cost. So in my view, PAF is a better barometer for looking at the EBITDA.
Understood, sir; and that ought to stay — carry on at comparable levels as we move ahead? No.
Yes, it should.
Great, understood, sir.
Congratulations on the results. Looking at gas-based power generation, how do you view the viability of peak power generation at today's gas price and LNG prices, particularly spot prices? And how do you see the PLF for gas power generation playing out in the second half? Another thought: regarding your overall mix of power generation across fuel categories, given the rising share of solar, wind and hybrid, can we expect ROCE and ROE to rise on a consolidated basis?
So, Ramesh, I think on the first question you raised, as far as PLFs go, it comes down to 2 factors. The first is what LNG prices are in the market. And the second is power prices in the market for the merchant portfolio. Where the PPA is concerned, PLF doesn't affect my profitability because these are all 62 PPAs. So it doesn't affect my profitability. I think it's very hard for us to give you a specific answer on PLF levels going forward. On your second question, which was — if you could just repeat it, that would help.
Yeah. So when you look at your...
ROE...
Yes, regarding the percentage share across the various fuel categories, including solar, wind and hybrid, we are seeing growth in the share of solar, wind and hybrid. So on a blended, consolidated basis, would that meaningfully enhance your ROCE and ROE?
No. So I think profitability share from those businesses would not be very high, which can affect my ROE, ROCE. But typically, in a renewable project, the ROCE, ROEs are a bit lower at the start and then they begin catching up. So with renewable projects coming in, there should be some impact on the ROE, ROCE on a consolidated basis, and then it begins picking up once the projects are commissioned after a year or 2.
All right, one final question about the subsidiary: could you tell us what the PLF is and what the ROE is for that subsidiary?
Which subsidiary are you referring to?
The NPL.
Nabha Power?
Yes.
So for Nabha Power, as we mentioned, the EBITDA that was recorded came to INR 142 crores.
All right, on shareholders' equity and ROE, could you share that figure?
In my view, it's too soon to say anything. That's only 1 quarter.
All right then, sir. Best of luck to you.
Thanks.
Yes, so thanks. As a final thought, I'd say it's been a steady quarter, with really solid revenue growth and a margin that stayed very stable. So I'll take this chance to wish all of you a very happy Diwali once more, and thank you very much.
Much appreciated. That brings this conference to a close on behalf of Torrent Power Limited. Ladies and gentlemen, we thank you for being with us. Your lines can be disconnected now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Torrent Power Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Torrent Power Limited earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.