#1

Good day, everyone, and welcome to the Q2 and H1 FY '26 earnings conference call for Vascon Engineers Limited. <<operator_script>> Kindly be aware that this call is being recorded. At this point, I'll turn the conference over to Mr. Akhilesh Gandhi of Stellar Investor Relations. Thank you, and Mr. Gandhi, the floor is yours.

Akhilesh Gandhi unknown
#2

Thank you, Nirav, and a good morning to all of you. I'm Akhilesh Gandhi, speaking for Stellar Investor Relations, and I'm glad to welcome everyone to the Vascon Engineers earnings call covering Quarter 2 and H1 of FY '26. During this session, we'll walk through the main operational and financial highlights for both the second quarter and the half year that concluded on September 30, 2025. Joining us on the call is Vascon Engineers Limited's senior leadership: Dr. Santosh Sundararajan, our Group CEO, and alongside him, Mr. Somnath Biswas, who serves as Chief Financial Officer. Before we get started, please note that certain remarks on this call could be forward-looking in nature, resting entirely on the company's beliefs, opinions and expectations as they stand today. Anything said during today's call should not be taken as a guarantee of future performance, and it carries unforeseen risks and uncertainties as well. In addition, the company assumes no obligation to revise any forward-looking statements so as to reflect developments arising after such statements are made. Materials covering the company's financial performance, the investor presentation included, are already available on the stock exchange. I'll now hand things over to Dr. Santosh Sundararajan for his opening remarks on how the company performed in the second quarter and the half year ended September 30, 2025.

Akhilesh Gandhi unknown
#3

After that, we can begin the question-and-answer portion. Thank you, and I'll hand things over to you, sir.

Santosh Sundararajan executive
#4

Good morning, everyone. It's a pleasure to welcome all of you to Vascon Engineers' earnings conference call for the second quarter and half year ended September 30, 2025. We appreciate your time in joining us today. I trust you've had an opportunity to review our Q2 and H1 FY '26 results along with the investor presentation, which is available on the stock exchange and on the company's website. Our Q2 FY '26 performance held steady even though heavy and prolonged monsoons disrupted on-ground operations and slowed overall execution at multiple sites. Now that weather conditions are normalizing, site activity has started to pick up across the key projects and is supporting better execution and revenue momentum. The return of uninterrupted work is expected to further strengthen progress over the coming 2 quarters. Our 13% year-on-year revenue growth in H1 FY '26 reflects sustained execution performance and strong project management. Since H2 is traditionally more conducive for on-ground activity, we expect greater execution intensity going forward. This phase generally lets teams catch up on deferred tasks and drive higher productivity across projects. Building on this momentum, we have set out clear strategic goals and objectives for the remainder of the year.

Santosh Sundararajan executive
#5

EPC remains a major driver of our expansion, and we're aiming for 20% yearly growth in both EPC revenue and profit, backed by better execution efficiency and a broader project pipeline. We're also looking to bring in roughly INR 1,500 crores of fresh EPC orders in FY '26, which should further reinforce our order book and improve business visibility. Within Real Estate, our focus is on optimizing debt through a more cost-efficient structure so liquidity and financial flexibility improve. Simultaneously, we're speeding up completion of projects already underway to lift revenue conversion and profitability while preparing for forthcoming project launches. A simple principle anchors our growth framework: sustained growth powered by execution excellence and financial discipline. Supporting this is a solid working capital base with total sanction limits of INR 645 crores, covering both fund and non-fund based facilities, of which INR 271 crores is still unutilized, plus another INR 150 crores presently under appraisal. That unutilized working capital can back as much as INR 3,000 crores of additional EPC orders, ensuring predictable growth, steady momentum and healthy cash flow visibility in the near future. Now turning to our segmental performance. Our EPC business continues to be the cornerstone of our growth journey.

Santosh Sundararajan executive
#6

Across the years, we've established a solid track record, having successfully delivered more than 225 projects spanning over 45 million square feet of construction throughout India. A team of over 500 skilled professionals in our project management and engineering functions backs our execution strength. Beyond that, our in-house design and planning capabilities let us provide complete turnkey solutions that cover architectural design, structural engineering and execution. This integrated approach cuts reliance on outside agencies, accelerates decision-making and helps us preserve healthy margins. Our focus remains on large high-value civil construction contracts, particularly those from government bodies and reputed private players. A strong record of quality work and on-time delivery has helped us cultivate long-term relationships with marquee clients spanning health care, education, industrial and residential sectors. In Q2 FY '26, EPC revenue came in at INR 227 crores, a year-on-year increase of 14%, while H1 FY '26 revenue hit INR 431 crores, reflecting year-on-year growth of 10%. Growth overall stays modest, since early rainfall in Q1 and heavy rainfall across several regions in Q2 affected project execution and slowed our progress. Even with these weather-related disruptions, performance reflects our strong execution capabilities, resilient project management and a steady ramp-up across key sites as conditions begin to normalize.

Santosh Sundararajan executive
#7

We're happy to report that Vascon has signed a strategic MOU with Adani Limited using an early engagement model, running for a period of 5 years. Through this arrangement, Vascon will be involved from the design stage all the way through execution on select projects, adding up to roughly 13 million square feet in Mumbai. The collaboration envisions Vascon's ongoing projects equal to about 30% of our annual turnover. We expect this long-term partnership to enhance our business pipeline and to strengthen our position in large-scale infrastructure and real estate projects. In April 2025, we received a new order from Royal Rides Private Limited worth INR 225 crores, to be executed over the next 3 years. Also, during Q2, we secured an order of INR 161 crores from MSEB for the redevelopment of Saudamini building at Hajiali, which further strengthens our presence in the high-value redevelopment segment. As of September 30, 2025, our order book stands at INR 2,800 crores, which is 2.8x our FY '25 EPC revenue, offering strong visibility for the next 2 to 3 years. The breakup of our current order book is as follows: INR 2,411 crores from external EPC contracts, INR 389 crores from internal real estate projects. About 74% of the total orders come from government-backed projects, ensuring timely payment and strong cash flows.

Santosh Sundararajan executive
#8

Here's where things stand for the Real Estate segment. Through H1 FY '26, we keep making steady headway on the projects we have underway. In this half year, fresh sales bookings came to 64,541 square feet, with a booking value totaling INR 74 crores, alongside collections of roughly INR 88 crores. Those figures will show up in the financials once revenue is recognized, but on-the-ground operational activity has been quite robust. At present, 4 real estate projects are under active development, spanning a total salable area of 0.78 million square feet, and 0.65 million square feet of that is attributable to Vascon. The projects are Tulip Phase 3 at Coimbatore, GoodLife at Talegaon, Tower of Ascend at Kharadi and Orchids at Santacruz. To date, we have sold 0.46 million square feet, generating total sales worth INR 291 crores, and have collected INR 221 crores. Of that, INR 116 crores in revenue has already been recognized from Tulips and GoodLife. Going forward, our near-term real estate pipeline looks strong, comprising a JV residential project in Powai, a 4-acre development in Kharadi and Tower of Future, a commercial project in Baner, Pashan, Prakash Housing Society in Santacruz. Combined, these projects provide 0.82 million square feet of saleable area, amounting to INR 1,110 crores in sales potential attributable to Vascon.

Santosh Sundararajan executive
#9

Since our ongoing projects are moving along nicely and we have a solid pipeline in place, we feel confident that the Real Estate segment will deliver a meaningful and consistent contribution starting this year. Now, on to the company's financial performance. For Q2 FY '26, the company posted a consolidated income of INR 229 crores, which is 14% growth year-on-year compared with INR 202 crores in Q2 FY '25. EBITDA for the quarter came to INR 20 crores, versus INR 17 crores during the same period last year. EPC EBITDA margin held steady at roughly 9% to 10%, while Real Estate EBITDA margins fell because of elevated marketing costs incurred during the first half ending September. Profit after tax was INR 11 crores, against INR 8 crores in Q2 FY '25 for continued operations, a 44% increase backed by stronger cost efficiency measures. Turning to the half-yearly performance, the company reported consolidated total income of INR 471 crores, compared with INR 400 crores in H1 FY '25, which works out to 18% growth year-on-year and includes profit from the sale of Ascent Hotels. EBITDA for the half year, excluding profit from the Ascent sale, stood at INR 36 crores as against INR 34 crores.

Santosh Sundararajan executive
#10

For continuing operations, profit after tax reached INR 34 crores, versus INR 17 crores during H1 FY '25. In closing, our solid financial results, a strong EPC order book and a healthy balance sheet reinforce our outlook. Through disciplined execution, innovation and a committed team, we are well placed for sustained progress, and we are confident of delivering 20% growth in our EPC segment over the coming years. With that, we are now happy to take your questions. Thank you.

Operator operator
#11

<<operator_script>> Our first question comes from Himanshu, whose line we can't quite make out.

Analyst analyst
#12

I'd like to understand the Adani agreement a bit better, if that's alright. So, as we've said, there are 3 projects under this model, correct? When do we begin executing those projects, and we've mentioned that we'll be involved starting from the design stage. Also, what's the longer-term outlook for this entire relationship? Some perspective on that would be helpful. And yes, how will cost escalations and matters like that be dealt with across this venture?

Santosh Sundararajan executive
#13

At this point, we have a very preliminary arrangement with them for early involvement. They've pinpointed a large number of parcels in Bombay. The scope and value of those projects go well beyond what Vascon alone might be able to execute, since they have very large projects in Bombay and NCR and a few cities across the country. So right now we're in discussions with them regarding 3 or 4 projects. We have an NDA in place, which means we can't disclose the exact details of which projects we're working on at this stage. For these to turn into construction and revenue, my guess is that it's at least 6 to 8 months off, because these projects are at a nascent stage now. And as I said, they want us involved early so that we take part — at least passively, if not actively — in the design process, so that the constructability of these projects is looked at from the contracting angle upfront. That's what Adani has discussed with us. They've chosen not just us, but I think a few more contractors in the market as selected partners — about 8 to 10 of us.

Santosh Sundararajan executive
#14

They recognize that there's a tremendous volume of construction work lined up. So their aim is to move away from the conventional tender-floating approach, where 5 or 6 bids get invited when construction begins. Instead, they might keep partners already lined up and decide periodically which partner receives which project. That's the extent of what we know right now, and we've begun working alongside them, offering design guidance on a handful of projects. Looking ahead — as we've said internally and publicly declared, we're targeting roughly 30% of our order book or execution to come from them. But that will hinge, as things progress, on what the terms turn out to be and how satisfied we are with those terms being offered. So the precise terms of engagement remain unclear at this moment. They'll only become clear once our first contract is ready for execution, perhaps 6 to 8 months from now.

Analyst analyst
#15

And just to clarify one thing — will we only be taking part in projects right from the design stage? I mean, generally the criteria we've had historically was that we want to get involved in projects where we come in very early, at the design or redesign stage, so that we can do our own engineering and showcase those skills. So will that metric still apply here as well — that we'll only be working from the design stage — or has there been any change, okay?

Santosh Sundararajan executive
#16

No. Actually, in this case, the client brought us in early — they want to draw on our design inputs and our construction expertise. So we're involved at a much earlier point, at the design stage, and even the projects we've begun working on are all still at design stage. As I mentioned, they won't get to construction for at least 6 to 8 months. So yes, we're engaged from the design stage onward, but the contract type will be settled as things progress. It may not be a design and build contract on our side, or the EPC mode we take from government. It could be a different mode altogether. So we've had very preliminary discussions, and there's nothing to share at this point in time. Once we have a contract that we've proofread between us and are on the verge of signing, we can share the contract terms. Those things are still somewhat open. That said, we've met the management at Adani. They've made it abundantly clear that they have a massive construction pipeline, which in their view can't be executed unless they partner with a few good contractors and treat them as partners alongside them.

Santosh Sundararajan executive
#17

We went through 3 rounds of shortlisting, and we were selected for it. So actually, there's a tremendous volume of work available with them on their own. It remains to be seen what terms apply, how much we can take on, and how much we wish to take on from that.

Analyst analyst
#18

And one more thing—regarding the cash flows on these projects, will the government determine them, or will the government—I mean, the agreement is going to be between us and Adani, and Adani will pay us the cash flow? Or how does it flow, in what way?

Santosh Sundararajan executive
#19

Right, right. This is strictly a deal between Vascon and Adani. The government isn't part of it at all. So the project, say, is taken by Adani from the government side, or whoever might be Adani's partner. But our contract is going to be with Adani alone. That means our cash flows will hinge on how Adani pays us, or on the terms that get built in.

Analyst analyst
#20

You've got it.

Santosh Sundararajan executive
#21

They already possess quite a few land parcels too. So in many of these projects, the government isn't involved at all. They've picked up numerous city-side land parcels in prime spots across many cities, a huge amount in Mumbai and in NCR. So they'll be developing those. So our arrangement is directly with Adani. Adani would be the one paying us.

Analyst analyst
#22

Right. And suppose those city-centric projects end up being sold by Adani — okay, or residential projects, or whatever it is they do. In that case, the payment terms would follow along the same lines as project execution unfolds. Would that be how it works, or would we even see construction-linked payments coming to us?

Santosh Sundararajan executive
#23

Yeah, absolutely — very much so.

Analyst analyst
#24

Alright, and finally, a question about Santacruz — that project we launched, I believe, in Q1. Sales there remain quite weak: 0.1 million square feet sold out of the 0.7 million square feet we have available. Is there a particular reason? It appears to be moving rather slowly.

Santosh Sundararajan executive
#25

Yeah, sales for that project are moving slowly right now. I think there's a bit of — we need to get above ground and see the residential flats taking shape. We're roughly 2, 3 months away from that stage. And so, for the last 3 months, we've also consciously held back from cutting prices just to sell. We just need a few crores to get to a point where construction runs at full pace and the sample flat is ready. After that, we'll push sales to the market again. We didn't see the point in getting somewhat desperate and reducing prices right now. The amount needed to get to a sample flat isn't much. So we want to wait, then push at the right price. But you're right — it's slower than what we'd hoped for at launch.

Operator operator
#26

The following question comes from <<inaudible>> Saraf, representing Nidhi Family Office.

Analyst analyst
#27

I've got a single question about the order book. We've referenced INR 1,500 crores to INR 2,000 crores for all of FY '26. So what would that amount to for the rest of the year — that is, the 4 months still left?

Santosh Sundararajan executive
#28

Right now, on the 2 projects we secured this year, we've captured just roughly INR 400 crores. So against a target of INR 1,500 crores, that leaves us with a shortfall of at least INR 1,100 crores at this moment. So yes, over the next 5 months, the minimum target is INR 1,100 crores. Hopefully more than that — we'll have to push and we're working on it.

Analyst analyst
#29

Alright, and can you also shed some light on what’s behind that visibility for us? Would that be the Adani project we’re hoping to acquire, or would it be the other one?

Santosh Sundararajan executive
#30

The Adani projects we're currently engaged with are already quite substantial in terms of value. But as I mentioned, those won't reach the construction phase until 6 to 8 months from now. Consistent with how we operate, whether it's our own real estate or any project at all, we don't add it to our order book until an agreement or an LOI is in place and it's ready for construction. So right now, we aren't counting anything from Adani in our order book. And with regard to this INR 1,100 crores, I don't expect it before March or April — I don't see even INR 1 crore arriving from Adani. Perhaps starting next year, order pipelines from Adani will come to us and give our order book a boost, but not in this year.

Analyst analyst
#31

Understood. All right, all right, and one final item. The company has performed quite well and we do have that arrangement in place with Adani, so I was hoping to get some clarity on the KMP transactions involving shares. We have noticed that during September and October, the KMPs have sold a fairly large number of shares. If you could shed some light on the reason behind that, it would be quite useful.

Santosh Sundararajan executive
#32

Okay, so there's one thing you need to keep in mind: you have to look at KMP shareholdings across a stretch of time, not at what we sell, since we've got ESOPs coming due next month. Those ESOPs will have to be bought by us, and we'll be paying heavy taxes on them. So a very large amount of cash flow is required, even though they're priced below the market. For folks like Somnath, myself, and the rest of the senior team at the company, we'd now need to generate that cash this month — within the next 15 days — to buy those shares, the fresh shares the company issues. So when the time is right, a small part of what we hold — actually, a small part of what we'd be acquiring — we'd have no option but to sell in order to generate some cash flow for ourselves. That is the sole reason behind KMP. Apart from that, we aren't speculating right now. There's a long run we're willing to wait for, and we're well aware that even over the short to medium term, plenty of upside remains in the share price. As a matter of fact, in our view it's still very, very undervalued.

Santosh Sundararajan executive
#33

So that's the sole cause of the minimal cash flows.

Analyst analyst
#34

Understood — that's really useful. One final point about the order book. The INR 1,100 crores you referenced would largely leave out Adani. Could you share a bit more on what underpins our confidence, since just about 4 months remain in the year, and we trust we've set a fairly aggressive target for our order book.

Santosh Sundararajan executive
#35

Yes. So, I mean, look, to be honest, there’s no way I can tell you that we will bag it and that we are 100% sure, because at the end of the day, we have to participate and come L1 and the levels of desperation we want to show. I mentioned on the previous call as well, we have dropped our own margin expectations by a couple of basis points because we haven’t bagged orders — significant orders in the last 12 months. And so there is a little bit of — I wouldn’t call it desperation, but a little bit of urgency in booking about INR 1,000 crores. So having said that, there is no visibility, in the sense we know where all we have bid, a few bids where we are confident we have bid aggressively. They should open up in the short term and hopefully come in our favor, both in the private and government sector. But until these bids are open and we are L1 awarded, there is no guarantee on any of this. So more than confidence or — I mean, it is just a need we have to book.

Santosh Sundararajan executive
#36

Therefore, whether the company survives hinges on our securing a reasonable number of orders over the coming few months. So we will put in the work, and with luck on our side too, hopefully. That is really all I can say. It has to be done.

Somnath Biswas executive
#37

There's also this other point: if you check our presentation, we now have a substantial working capital line available to us, in terms of the PGs and all of that. So we're much more aggressive when it comes to bidding on projects. Before, we were somewhat selective because bids, PGs and those things were scarce. But at this point we bid aggressively on whatever comes within our towns and conditions — we're bidding aggressively. So the probability will be somewhat higher than the probability we had a couple of years back — a couple of months back.

Operator operator
#38

Our next question comes from Prateek with Aart Ventures.

Prateek Bhandari analyst
#39

Can everyone hear me?

Operator operator
#40

We’re able to hear you, though the audio is cutting out. The participant’s line disconnected. <<operator_script>> Our next question comes from Viral at YES Investments.

Viral Shah analyst
#41

Right, I had a few questions. With the first-half slowdown caused by the rains, can we make that up in the second half so we hit our guidance of 20%, 25% revenue growth?

Santosh Sundararajan executive
#42

Yeah, we've actually gone through things internally and locked in our targets for H2. From that internal meeting, it really looks like the jobs have all been scaled up and are moving at a good pace. So barring anything unforeseen, we should be able to hit INR 1,200 crores on the EPC side, which works out to 20% growth versus last year. So yes, we're still feeling positive about that.

Somnath Biswas executive
#43

There's also another angle here — if you look at the year-on-year figure as well, in the first half, you see, whatever the annual target is, H1 accounts for 35% to 40% of it, and the remaining 60% only arrives in the second half. That's how it has traditionally worked, historically speaking. So we feel quite confident that we'll be able to make up this number.

Operator operator
#44

<<operator_script>> Our next question comes from Raj Doshi, an individual investor.

Analyst analyst
#45

My question concerns the target revenue and EBITDA margin for FY '26 and '27. With competitive pressure having increased, what would the target be?

Santosh Sundararajan executive
#46

For this year, then, we're expecting EPC revenue of INR 1,200 crores, as I mentioned. And the EBITDA we currently run at roughly 10%, we'd like to bring that up to somewhere around 10% to 12% this year, since execution will come from the old projects we already have in hand. But looking ahead, next year we'd be aiming again for 20% growth in revenue. So INR 1,200 crores ought to cross INR 1,400 crores next year — that's our target. As for margins, you can expect them to decline by no more than 0.5 basis point on average, even if we lose a couple of basis points on the new projects we take on over the course of next year. So that's what we'd be looking at — 0.5 to 0.75 basis points at most. And it should help us out a little as well.

Analyst analyst
#47

All right, and the next thing I want to ask about concerns the Thane line. Is there any news there?

Santosh Sundararajan executive
#48

No, there isn’t really any update worth giving. For those who haven’t heard the company’s plans — the near-term plans of the company — it stays the same that we will — first, there’s an acquisition still pending from the government for a corridor that runs through this land, and roughly 40 acres is to be taken up by them. We’re waiting for that to play out. Clearly, I mean, we — the elections will take place in December, hopefully, and only after that will things stabilize. So that is still pending, with no movement on that front. On the front of acquiring a contiguous 20-acre parcel that touches the road, what’s happening on the ground — this is a slow process of identifying the landowners and negotiating the closing. We have partners working on this for us on the ground. But we aren’t yet at a stage to say we have acquired anywhere; the 20 continues, and we will be compounding it and then launching something, but not yet. It’s still recently far away.

Operator operator
#49

Our next question comes from Prateek Bhandari, who is calling in from Aart Ventures.

Prateek Bhandari analyst
#50

I just want to make sure I have this right — you said we're expecting roughly INR 1,100 crores of order inflow over the next 8 months. So have you put in bids for any of those projects? And what does the bid pipeline look like? Also, which sector are you expecting this inflow from — government or private? That's my first question.

Santosh Sundararajan executive
#51

Right now, we've bid on projects worth more than roughly INR 5,000 crores to INR 6,000 crores where the bids haven't been opened yet. So our hope is that — and a few of these are larger projects, so even if one comes through, that's INR 700 crores to INR 800 crores from a single project. So we're hoping at least one out of those 4 or 5 projects lands, plus a couple of smaller ones — and by small I mean INR 200 crores to INR 300 crores — and then our order target can be met, across both private and government at this point of time. And so, as I said, we're hopeful — we're not claiming this is already in hand. It's a target. And hopefully we can even exceed the target, or at least hit it.

Prateek Bhandari analyst
#52

Okay. And on the Real Estate division side, looking back over the past 2 to 3 quarters, some of those other tools — maybe this time we've referenced the increased marketing spend. So when might we see this vertical of yours start producing some meaningful figures?

Santosh Sundararajan executive
#53

Yeah, it has been taking — I mean, our hope is that starting next year, we’ll see revenue growth that’s sustained year on year, and only at that point will profits show up as well. What happens is, if we deliver — this was the situation in our EPC segment in 2017, ’18, ’19, when we were stuck, and then COVID hit, and we were stuck at INR 300 crores to INR 400 crores of revenue. At those levels, EPC was never going to generate profits, because our fixed costs were only just about being covered. But once revenue jumped past INR 500 and now INR 1,000, INR 1,200 crores, INR 1,400 crores, that’s when we’re able to see 8%, 9%, and inching toward 10% profits in EPC. We were hoping for that same kind of trajectory on Real Estate to begin next year. But you’re right that it’s taking somewhat longer, certain approvals are taking somewhat longer. Sales are more sluggish than we hoped for. So overall, next year should still be profitable, but the truly sustained revenue of more than INR 200 crores, INR 300 crores coming from real estate year on year should happen from the year after next.

Santosh Sundararajan executive
#54

So once that INR 300 crores gets going, we’ll start seeing the profits. Gross profits across these real estate projects are far bigger than what our EPC projects bring in. That’s the reason we’re involved in real estate—they’re double. Even with land not on our books, and even where we’ve got private equity from partners in a few of these projects to fund the TDR and so on. Despite all of that, on our share alone, the gross profits come to twice what EPC gives us. But it does take time before this turns into meaningful revenue. So hopefully, in another couple of years, we’ll get there. We have projects in hand, and we’re tying up additional projects. So there is <<foreign_lang>> somewhat slower than we’d hoped, but it is there, and it has to happen.

Prateek Bhandari analyst
#55

Okay, so one final question about the FY '26 guidance. You mentioned EPC would deliver 20% top line growth on FY '25, which works out to roughly INR 1,200 crores. Then for FY '27, you said 20% growth over FY '26. Was that figure for the consolidated business or just for the EPC piece you're referring to, given that Real Estate still isn't contributing anything for us? You also noted there would be a margin drop of a couple of basis points because some orders couldn't be secured and you plan to shift your strategy. So I just wanted clarity on that.

Santosh Sundararajan executive
#56

So what I’m referring to is EPC — INR 1,200 crores in the current year, and then an additional 20%, taking it to INR 1,400 plus, in the following year; that’s the EPC top line I’m setting a target for. And as I said, although we may pursue INR 1,000 crores of orders at present at a margin a couple of basis points lower, this will only translate. We do have — the present order book sits at old margins. And hopefully, going forward we’ll also be able to secure some projects at decent margins. So — and in the current year, our margin would not hinge on what new projects we secure. So this year’s margin depends purely on the old projects we are executing. Looking ahead, in the following year, as I said, this might translate into a 0.5 to 0.75 basis point drop in our EBITDA. But if we reach INR 1,400 plus, the scale — our fixed cost being spread across higher revenue should make up for that. So I think our EBITDA could stay the same if growth occurs, with one aspect offsetting the other.

Operator operator
#57

<<operator_script>> Since we don't have any more questions, I'd like to turn the conference back over to Dr. Santosh Sundararajan for some closing remarks.

Santosh Sundararajan executive
#58

Thanks to all of you for joining. We're pretty enthusiastic about what lies ahead in the near term and the midterm for EPC as well as Real Estate. I'll talk with you again next quarter. Appreciate your participation, and thank you for placing your trust in the company.

Operator operator
#59

Much appreciated. That brings us to the end of this call for Vascon Engineers Limited. Thanks for being with us, and you can go ahead and disconnect your lines at this point. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Vascon Engineers Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Vascon Engineers Limited earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.