Thanks very much, and a good morning to all of you. I'm Akhilesh Gandhi, speaking for Stellar Investor Relations. Can you hear me better at this point? Well then, I'd like to extend a warm welcome to each of you on this earnings conference call covering Vascon Engineers' fourth quarter and FY '26. We'll be walking you through the main operational and financial highlights for Q4 as well as the financial year that closed on March 31, 2026, and joining us on the line today is the senior management team from Vascon Engineers Limited. Present with us is Dr. Santosh Sundararajan, our Group CEO. We also have Mr. Raveesh Rao, who serves as Chief Executive Officer of the Real Estate segment, along with Mr. Somnath Biswas, our Chief Financial Officer. Before we get started, though, I want to make clear that certain forward-looking statements may be made on this call, and those rest entirely on the company's beliefs, opinions and expectations as they stand today. What is said during today's call should not be taken as a guarantee of future performance, and it carries unforeseen risks and uncertainties as well. In addition, the company assumes no obligation to update any forward-looking statements so as to reflect developments arising after such a statement is made. The documents concerning the company's financial performance, which include the investor presentation, are already available on the stock exchange and on the company website. At this point I'd like to hand things over to Dr. Santosh Sundararajan, who will give his opening remarks regarding how the company performed in the fourth quarter and the financial year that ended on 31 March 2026. Once his opening remarks are done, we'll open the floor for the question-and-answer session. Thank you, and the floor is yours, sir.
Good morning, everyone. It’s a pleasure to welcome all of you to Vascon Engineers’ earnings conference call for the fourth quarter and the financial year ending March 31, 2026. We appreciate your joining us today. I trust everyone has had a chance to go through our financial results and the investor presentation, both of which are now available on the stock exchange and on the company’s website. Before I turn to business performance, I want to note that FY ’26 was a special year for Vascon, since we marked 40 years of our journey. Across the last 4 decades, we have kept building the company with a strong emphasis on execution quality, financial discipline, long-term relationships and responsible growth. My sincere thanks go to all our clients, partners, employees, lenders and shareholders for their continued trust and support. Turning to performance for the year: FY ’26 delivered stable operational performance despite some temporary external challenges we encountered during the year. Revenue declined 12% compared with FY ’25; however, project execution conditions at our key sites have gradually begun to normalize. Throughout the year, the company stayed focused on execution discipline, productivity improvement, cost control and steady project progress. During the year, we meaningfully strengthened our banking relationships and our working capital position. As of today, total sanctioned working capital limits stand at approximately INR 745 crores, covering both fund-based and non-fund-based limits, of which INR 337 crores remains unutilized. In addition, SBI completed a revised assessment of our working capital facilities on improved commercial terms, including better collateral leverage and lower bank guarantee margins. Those improved terms have enhanced liquidity, made cash flow more efficient and strengthened our ability to mobilize projects faster. With stronger banking support now in place, our available working capital capacity can support execution of nearly INR 3,000 crores of additional EPC orders. Moving to our EPC business: the EPC segment remains the cornerstone of Vascon’s growth journey. Over the years, we have successfully completed more than 225 projects, spanning 45 million square feet across India. Our integrated turnkey execution model and in-house design and engineering capabilities remain key strengths for the company; we continue to focus on large high-value projects across health care, institutional, infrastructure, industrial and residential segments. Our strong execution track record has helped us build long-term relationships with marquee clients such as AIIMS, NBCC, CIDCO, MMRDA, Capgemini and Vedanta. During FY ’26, EPC revenue stood at approximately INR 928 crores. The moderation in EPC revenue during the year was mainly due to cash flow constraints in 2 major government projects and internal organization changes at a major private client, which affected on-site decisions and project schedules. During FY ’26, we secured new EPC orders worth approximately INR 762 crores across marquee projects such as Royal Rides, Saudamini in Haji Ali, MSEB in Navi Mumbai Municipal Corporation Specialty Hospital and Lotus Park in Ahmedabad. On top of that, we're currently L1 on 2 projects with a combined value of roughly INR 500 crores, and we expect the LOI shortly. Our total order book as of March 31, 2026 stands at about INR 2,717 crores, which works out to nearly 2.9x FY '26 EPC revenue, so it gives us strong revenue visibility across the next 2 to 3 years. Importantly, roughly 79% of that order book comes from government-backed projects, which means better receivable visibility and stronger payment security. Even though pricing competition in the EPC industry was aggressive during FY '26, the company stayed disciplined in how it bid, focusing on execution quality, margin protection, healthy cash flows and sustainable long-term growth, and that led to a relatively lower order book for the year. Looking ahead, given the current business environment, the company plans to go after projects somewhat more aggressively, with calibrated margin expectations, to strengthen order inflows and business growth. Turning to the real estate business. Operational progress across our real estate portfolio held steady during FY '26. Over the year, we achieved sales bookings of approximately 96,735 square feet, with a booking value of around INR 113 crores, while collections came in at approximately INR 132 crores. Our present portfolio includes projects like Tulip Phase III in Coimbatore, Tower of Ascend in Kharadi, Orchids Redevelopment in Santacruz and Goodlife in Talegaon. To further strengthen our real estate leadership team, the company has appointed Mr. Raveesh Rao as CEO for the real estate business. Mr. Rao holds a bachelor's degree in Electronics Engineering and also a Master's degree from the Indian Institute of Management, Kolkata. He carries over 20 years of extensive experience in the real estate sector, with strong expertise spanning P&L management, institutional fundraising, operational excellence, organizational transformation and customer-centric business growth. Before joining Vascon, he held leadership positions with well-known organizations such as Shapoorji Pallonji and Everstone Group. At the same time, our near-term pipeline remains strong, with projects like Powai, Prakash Housing Society and Tower of Future in Baner slated for launch soon. Moving to the financial performance of FY '26. The company reported consolidated total income of INR 984 crores for FY '26, against INR 1,090 crores in FY '25. The revenue decrease aligns with the factors covered in the opening remarks. EBITDA for FY '26 came in at INR 87 crores versus INR 100 crores in FY '25. PAT for FY '26 is INR 49 crores, compared with INR 126 crores in FY '25. The higher profit last year was mainly driven by exceptional gains from the sale of GMP. During the year, we strengthened our liquidity position, improved banking support, maintained a healthy order book, expanded strategic relationships and kept building a strong future project pipeline. As project work across our sites settles down more and more, and with better backing from the banks, solid availability of working capital and a robust order book, we see the business heading into a steadier phase of operations from here on. So with that, we are happy to take your questions now. Thank you.
Right, so my first question — not long ago I noticed a building that went up very quickly using something called precast and prefab technology. What I'd like to find out is whether we've taken up that kind of approach, or what your thinking is on it. Then second, regarding Mr. Raveesh Rao being appointed — I'd like to understand what the reasoning was behind that. And will you be pushing hard into the real estate division? That's what I'm curious about. Could you shed some light on it, please.
Sure. On your first question — look, precast and prefab do exist in the market. You know, these kinds of building techniques are quite common in Singapore and across much of Europe, since labor there costs far more than it does in India. Those countries also have the infrastructure needed to move huge volumes of precast slabs or components from the factory out to the job site. Here in India, we're still not at the point where this technology gets used to that degree. It has started to arrive, though — a few vendors are now capable of delivering it. We've tried this on a smaller scale in a handful of projects, but at this point doing an entire precast project generally costs more than going with the traditional cast-in-situ approach. Also, for most of our government projects, the construction design or technology choice sits with our client. It's only in our own real estate developments that we're the ones deciding which technology to use. As things stand, the residential projects we're handling in real estate don't really make it feasible for us to apply this. Still, we know this technology well. On the POA project, we've actually made progress and moved a step nearer to employing a different technology — one that blends steel, prestressed concrete, and ordinary steel, all three together. To be clear, I mean coal-formed or hot-rolled structural steel, but this departs from how others approach composite structures. It brings all three elements together, and we're testing that within our own project. Should it work out, we see it as a solid move Vascon will carry forward, landing somewhere between precast and cast-in-situ so that labor comes down while costs stay under control. Regarding your second question, look, on real estate we'll be aggressive—cautiously so. Over the past three or four years our stance has consistently been that we don't commit equity toward land purchases. Can you hear me?
Yes, sir.
Yes. So we won't be putting equity in to purchase land. What we'll do is joint ventures or redevelopments. So we see that as contracting, but elevated — basically, on top of the contracting piece, we handle sales and marketing and run something like a DP model, or — overall, the margins we expect from this model are higher than what we get from the EPC work we do for others. And so we'll stay with this. We have a brand that's well established in this part of the country. Right now we operate only in Pune, Mumbai and Coimbatore. And we already have some work lined up. We want to make sure we don't borrow too much and run into a cash flow problem; so we're not in any hurry, not a desperate hurry of any kind. But at the same time, real estate will grow. It has to do far more than it does currently; it hasn't yet reached the levels we're capable of or that we should be doing even just to sustain overheads. And so we felt some leadership was needed. We did have Mr. Rajesh Mhatre, who was with us 2, 3 years ago. He moved on after that and we didn't appoint a CEO. <<inaudible>> We really felt <<inaudible>>.
Our margins may also fall short of what we want, but we're ready to accept a somewhat lower level — around 10% or 11% — so that we can secure the orders. In that kind of scenario, though, what does your bidding approach look like, and what's your strategy? Also, when projects slip because of the government or other problems, how are you — operationally speaking — improving efficiency and sharpening cost focus on those, considering the conditions we'll face over the coming two years?
Certainly. You see, there are two parts to this question. First, you're completely correct. What I mean is, we're now quite concerned that inflation will climb. We haven't yet felt the war's impact, and it will become apparent over the next several months. In certain respects, certainly, margins will take a hit. I can't say we're able to shield ourselves on all fronts, but fortunately, the majority of our government projects carry inflation-linked indices, which provide escalations as we move forward with the work each month; these indices also address labor to some degree, though not so directly that we can incorporate the precise inflation figure observed in labor, yet they do get revised monthly. At times it's the Equitability Index. At other times it's the Central Index from Delhi. Regardless of which index the contract specifies, this means we'd be reimbursed fairly well for overall cost increases—both materials and labor. On the private side, it's true that labor typically isn't covered. Fortunately, though, our current exposure to the private sector isn't significant. So we'll be pursuing projects. Yes, we'll aim to be aggressive about margins, since we haven't secured as many orders as we'd hoped. Still, we'll seek out projects that protect us on escalations; and regarding the second part of your question, for the delays that have occurred at the site, escalations will again be available to us. But if we get a call, and certain situations arise, then yes—on those particular projects, a small margin impact could occur. If there's a six-month delay, perhaps around 0.5 basis point would be affected, since escalations will be covered for us, but recovering the expense of having crews sit idle on site during that stretch is difficult, even though we'll be filing our claims. In the end, a number of these matters will end up in arbitration. Should we prevail there, we might recover considerably more than the profit we had projected; but to be conservative, we could see roughly a 0.5% reduction across 1 or 2 projects.
And a final question, and then I'll rejoin the queue. We've got the preferential shares, right, at INR 40. Those shares are being raised, okay? Could you explain what it's for? And what's your thinking — even though it's quite a small amount of capital, still, over a period of time, what's the thought process behind it and its purpose?
So, you'd know that more than a year ago we attempted a QIP; that didn't go through. Prices then declined. Throughout the last 2 years, we've been stating that we do require some equity capital, particularly on the real estate side, since we don't — we either seek project level equity or we seek company level equity instead of borrowing at a very nascent stage for the real estate. So, that QIP didn't pan through; we were waiting; now at this point, we did get a strategic investor who is very bullish on the company, who is also strategic and would ideally be helping us with certain projects and growth going forward. And so — and Mr. Vasudevan and family then, they also felt it's the right time with the share price had dropped to as low as INR 40. They also felt it's a time that they need to back the company and raise their holding a little bit as much as they could. So, a combination of these 2, I think we came up with this INR 80 crores; we do not want to go much higher and dilute at low share price. At the same time, a little bit of breather equity within the company is welcome at this stage. So, all factors put together, we took this call.
Basically, I had a few questions about how well you execute and the quality of the balance sheet. From an execution standpoint, looking at the company, annual construction throughput is going to ramp up, and we'd need more investment in machinery, right? So it would be helpful if you could share the CapEx plans for FY '26 and FY '27. So what we'll be planning and what we've done in FY '26, sorry?
Yes, in EPC our CapEx is no more than 4% to 5% of the top line. That's all we'd need to put in for machinery or shuttering equipment that we'd require at an early stage when a project begins. If your goal is somewhere between INR 1,000 crores and INR 1,200 crores next year, our CapEx need would be roughly INR 50 crores only. And to finance that CapEx too — the nice thing about EPC is that clients typically give us advances backed by bank guarantees. So if anything, we wouldn't need outside borrowing to cover that CapEx. Beyond that, we currently hold a fair amount of assets inside the company. So this INR 50 crores might actually shrink somewhat. We'd assess it on a case-by-case basis, depending on the type of projects. At times a project calls for particular shuttering materials, such as Mivan or Table Forms, and our stock of those may fall short, forcing us to put money in. Other projects don't require that sort of outlay. If cranes and other machinery are already on hand with us, then the CapEx or investment needed to launch a project can be considerably smaller. Still, by and large, funding isn't a major concern for us, since we receive advances from our clients.
Sir, understood. Let me move on to the following question, sir. FY '26 looks like it will be somewhat softer than we first thought on a few metrics. So internally, have we made any changes at the organizational or process level aimed at better execution and project selection, and at improving how consistent we are going forward?
Honestly, look, we've enjoyed a solid run with the government over the past 3, 4 years. We've consistently held the view — we're quite bullish on doing work for the government. Payments have always come on time; this is the first instance; and to be honest, when we make projections, we do also build in roughly a 7%, 8% to 10% probability that one project might get stuck or not pay on schedule. We factor that in a little before we project our numbers; but it was truly unfortunate that 3 projects at once, 3 large projects, which were being executed, which were running at full speed, all at once stopped paying us. And so we had to — we had no option but to accept the shrinkage. As I said, otherwise we would have had to pump in money, which we did not want to do. And so we said, let's accept it. Going forward, as far as seeking projects goes, we've always been careful; we've always tried to seek out projects with better pay masters, such as hospitals, which normally don't stop, or projects in Tier 3, Tier 2 areas where there's no political sensitivity, and good quality private clients. So, that is what even our current order book reflects. So, I think on that count, it's simply bad luck that last year elections in Bihar brought about this situation in Bihar. I mean, at the end of the day, I would say, we are exposed to some of these risks, fingers crossed. Moving ahead, our bidding strategy would stay pretty much the same. I don't think we've bid badly on that count; it's a bit of bad luck, which I hope won't happen again for us this year.
To add to that, essentially, whichever shortfall you're referring to and whatever you projected, it isn't because we lack internal capability or anything of that sort. This is purely a strategic decision we made not to put money in or invest our equity capital to run the government project. Otherwise that figure would have been higher, but there's no sense in putting money in and then building up a huge receivable in the system; so that's a strategic decision we've made. It isn't — the shortfall isn't because of internal capability or anything like that. So we're very capable of executing more than what we've done as of now.
Got it, sir. So then, when we think about FY '27, how should we view revenue growth and the order book, and also our debt levels as we move ahead?
Yes. Yes. So FY '27 — again, now is the moment to stick our neck out. What I'd say is we were going to do INR 1,200 crores last year; we've slipped. We're below INR 1,000 crores. Our target would be to hit INR 1,200 crores as our top line in this coming year, including real estate and EPC. EPC ought to cross INR 1,000 crores. Real estate ought to cross INR 200 crores. Taken together, a target of INR 1,200 crores is what we've internally looked at. And as I mentioned, this is after buffering in a bit of pessimism inside. We don't want to be overly optimistic. What was the second part of the question?
Yes. Regarding order booking?
On order booking, right now our order backlog stands at INR 2,700 crores, and that is definitely below the level we're aiming for. As I said in my remarks, we are currently L1 on roughly INR 500 crores. Hopefully within the next few days we'll be able to back those orders, so this order backlog will rise to INR 3,200 crores. Last year we wanted to take an order book of INR 1,500 crores. We achieved INR 760 crores. If we add this INR 500 crores, it still comes to INR 1,260 crores. There remains a shortfall of around INR 200 crores, but that would be what it was for the previous year. This year we want to take another INR 1,500 crores, excluding the INR 500 crores I'm talking about. So we want to finish the year at about INR 4,000 crores, which is what we wanted to do last year, but we want to end this year with roughly INR 4,000 crores of order backlog, close to INR 4,000 crores.
Sir, carrying on with the order book, would the execution in FY '27 lean toward H1 or H2, sir? How ought we to think about that?
Execution always leans toward H2 in our — I mean, if you look back historically, across all our numbers, quarter 2 is rains. Quarter 1 is really just about ramping up. It's in quarter 3 and quarter 4 that the numbers genuinely land. Only last year was an anomaly for us, because we were doing — we were on that push to hit INR 1,200 crores, INR 1,100 crores plus on EPC, 1,100 crores on EPC. And Q1 and Q2 were going along fine. Q3 and Q4, thanks to these cash flow issues, hit us badly. But absent such things happening, execution generally always leans toward H2.
Got it. Sir, earlier management said — we mentioned the L1 on a sizable order L1; so could you give us an update on how much of that has turned into a final order in our books? And what about the current bid pipeline? How does that look?
Yes; so we received roughly INR 300 crores over the last 3, 4 months through orders, which we have already declared. Right now, we are L1 on about INR 500 crores, which we hope to receive soon. Beyond that, we are actually also bidding aggressively and are at the last stage for around INR 2,000 crores of orders. 3, 4 big projects, which we are very hopeful to bag. But again, it might take a couple of months before those decisions come out from the client.
Sir, my final one would be an accounting question, sir, regarding the balance sheet. Sir, concerning those line items for loans and other financial assets, is there any portion tied to old receivables, advances, or any such amounts that will take longer to recover within that?
No, no. Nothing at all. I mean, we continue making provisions for — I mean, our auditors ensure that we continue making provisions for really old receivables or stuck receivables on the EPC side. So generally, whatever receivables sit in the book, we do consider them good, and we do not view them as under risk at this point of time.
We also have an internal policy for bucket provisioning. So regardless of how old the receivable is, we are still chasing it, and we remain quite hopeful that this will get resolved. That said, as a matter of prudent policy, we have continued to make some bucket provision, so there will be no shock should any eventuality arise, which is very unlikely, but that is not going to have any further impact.
Yes. So just on the cash side, okay, over the last 1 year, debt has gone up by roughly INR 85 crores, right? We had INR 50 crores of PAT, okay. What were the main investments we made in FY '26, and in which businesses or locations? Second, could you also state the operating cash generated by the EPC business and by the real estate business separately, just so there's clarity on where the money is going and where it isn't?
So the enhancement aim — the augmentation of debt has mainly gone into real estate, because as we communicated earlier as well, since we dropped the QIP plan, obviously real estate needed some capital inflow. Otherwise, it could not have gone through. So that we already communicated on the earlier conference call too. Whatever debt has been raised has mostly been — it has been put into the real estate business only, to maintain project continuity and all these things. EPC operating cash flow is 20 — it is INR 20 crores negative, and RE is INR 100 crores negative, because the money has been pumped into the increased. That's it.
No, EPC stands at minus INR 20 crores — that operating cash flow figure you're mentioning — and what's the real estate number?
INR 100 crores.
All right, and regarding our residential projects, what about the execution side and the thinking behind it, since a few of these projects are still selling quite slowly, right? Is there anything we can do, meaning...
Well, your observation is essentially right, so that's — the first thing we did was bring Raveesh into our system to lift sales, that was the very first step. And we're fairly hopeful this will — look, basically, if you look at it, sales are slow where Orchid is concerned. Apart from that, the other projects are more or less, whatever is ongoing, the sales are clearly done, some closure and parcel, which always exists. Some 5%, 10% always remains, and that gets sold at a later stage. But with Orchid, what's happening is that this is after a long — eventually, these are fast redevelopment projects in Bombay. So, the typical mindset in a Bombay redevelopment project is that unless the project reaches a reasonable level, the attraction doesn't — to be very fair enough. So right now we're at each lap level. Plenty of inquiries are coming in. So that traction is quite substantial now. And at the same time, the number you're talking about is only the sales we're discussing, which has been registered. But there are a couple of — a good amount of bookings are there, a couple of them, which still aren't registered; that's why it isn't coming into the report portfolio; so the actual number is slightly heavy, higher than what you're talking about. But at the same time, that inquiry level has risen drastically, and we're hoping to convert this inquiry into sales pretty soon. So we have our internal target month-on-month and quarter-on-quarter. Raveesh is following up aggressively and he's tracking all the channel partners and the system to get it done, executed properly. So we're quite focused on getting these sales converted.
All right. And one more point regarding the residential business. If I — I mean, what is it that our brand ought to represent, because we've had a CEO broadly in charge of that business, right? And at present the new CEO also brings a fairly solid profile, right, if we consider his background and all of that. Yet in some way this business hasn't truly expanded. And in the past, we faced financial limitations. But which priorities are we laying down for him? And also, where do we want the brand to stand? Because eventually, sales momentum and sales value, or the per square feet figure, hinge on how strong the brand is, right? So on that point, what are we contemplating doing? A few thoughts on that would be useful; and how are we viewing our own brand, or what are we attempting to build?
So, I think — look, we do have a strong brand. I don't — brand recall has kind of declined over the last few years; but even now in Pune, this brand remains a very strong one. We have never lost value on our brand. The construction quality of the projects we deliver is very well recognized by customers. But you're right that with this brand, we've been underperforming in real estate across the last 3, 4 years; it has taken us 1 or 2 years longer than we expected to get this part of the business moving. I mean, in 2016, '17, we were down in both lines of business. Then we gave the EPC business a flip, which has sort of reached levels of organic growth. The real estate at INR 100 crores and INR 200 crores levels of execution, whereas the EPC was doing INR 300 crores, INR 350 crores, and covering the overhead was not sustainable at that point of time. The real estate sat in that same situation for us, at the bottom of the curve, where we're doing only INR 100 crores, INR 200 crores a year; and turnovers like this will not do justice to the Vascon brand, will not cover our real estate overheads. And so that is definitely not where we want to be. We should be crossing INR 300 crores, INR 400 crores, where we will then be seeing good PBTs coming from the real estate side. Along these lines, however, look, we don't — we are facing somewhat slow sales, as you mentioned, in both Talegaon, which took us a year plus, and now in Orchids. We also made a decision — similar to what happened in EPC, we made a decision last year that we don't want to borrow an additional INR 100 crores and start 2 more projects before we get our house in order with regard to Orchids and a couple of the older projects; so, we said we would take a pause for a few months. We do have the Powai launch and we do have the Prakash launch, and both are scheduled for this year, which will then help us reach much higher turnovers going forward. And yes, so it has been slower than we would have liked; it is much lower than where it ought to be for the Vascon brand. We are very much aware of that. And so that is why we are reenergizing the team with a new sales team under Raveesh and giving it a fresh push so that over the next 2, 3 years, we begin climbing the curve and then don't look back.
Sir, I wanted to ask about the real estate side, and this is my first one. For whatever value the projects in the pipeline hold, both those currently under construction and the future ones, if you could help us understand the presales and collections over the next 2 to 3 years, year by year, that would help us understand the cash flows; that's my first question.
Look, Rusmik, to address the first part of your question, there are 4 projects currently ongoing and another 4 in the pipeline. If you look at those 4 ongoing projects, which have substantial sales and all of that, even though it is not being recognized in the system, the whole of this project has a total top line of close to INR 600 crores, of which INR 125 crores has been recognized and another INR 475 crores is to be recognized over a span of 18 to 24 months, max to max; and then the other 4 are also in the pipeline, of which Powai is to be announced very soon. It is on the verge of launch. And probably in Q2 or Q3, Prakash will also be launched. But for whatever the 4 projects in the pipeline are, the total top line is almost INR 1,100 crores, which will be spent over a horizon of the next 4 years, you can take that.
All right. All right. And given that in real estate you recognize revenue only after a project is finished and handed over, how do the timelines work out? Actually, is the Walkeshwar handover taking place in FY '27, '28, or does it fall in spring of FY '29?
No, no, that — for whatever those 4 ongoing projects I was mentioning, they will bring in close to INR 500 crores of revenue that will be recognized. So of that, 50%, more than 50% we expect to recognize in FY '26, '27 and the remaining 50% in '27, '28.
Okay, okay. Glad to hear that. For my second question, sir, I'd like to ask about the MoU signed with Adani Group for execution — can you share some detail on the possible revenue and the EBITDA margins this MOU could generate over the coming 2 to 3 years?
I'm truly sorry, but we honestly lack any firm figures that would allow us to respond to that. The MoU with Adani is quite open-ended. They picked us as one of their partners. Every time we speak with them, there's an enormous pipeline of projects. The numbers might be staggering if I began listing what we are discussing with them. Still, until shovels actually hit the dirt on these projects and we've got a firm purchase order, we'd rather not guess at what the volumes might become. Right now we're in discussions with them on a minimum of four or five projects. Things are moving more slowly. All of these are projects where their approach has been to bring a construction partner in very early — and we're seeing the same thing, that they want us engaged at a really nascent point in the project. Approvals haven't come through yet on these projects. Their team is still working through the detailed planning and design. They simply want us present alongside them throughout all these meetings, so that we contribute value at each stage, meaning that when construction time arrives, the design is highly buildable—something Vascon, as the construction partner, has been aware of right from the start, from the project's conceptual phase. That's how they operate. As a result, we've received invitations to numerous meetings of this kind and are taking part in many of them. Even so, we remain several months out from any of these projects actually commencing work on site; once that occurs and we hold an LOI stating the value, we'll begin providing numbers.
But as things stand right now, the only figures we have are this: whatever those 4 or 5 projects assigned to us are, the area-wise value comes to roughly 13 million square feet; that's the number in hand. Still, once you narrow things down to the precise contract value and all of that, only then will we be able to figure out what sort of EBITDA margin we're getting on these.
All right, just a quick clarification. Are these entirely EPC projects, or real estate projects where you're partnering with them?
In our case, they're all EPC projects.
Alright, so can we safely assume the margins won't actually be squeezed relative to whatever margins you're earning right now in the EPC business, and that at least those should come through once these orders materialize?
Yes. I mean, look, if the margin is going to be — we're already at a point where we were looking at 13%, 14%, and we're saying we'll bring it down to 12% and 11% to be somewhat aggressive this year. So if they expect us to compromise past that on margin, then the choice remains ours. I don't think we want to be working for free.
All right. All right. And one more thing, sir — suppose, just hypothetically, you received an order worth INR 1,000 crores; do you have the bandwidth to execute it? Or, to put it another way, at full utilization what annual contracts can you all generate or execute on the EPC side in revenue terms, if you could just help us out?
Yes. Right now, actually, on the bandwidth side we're a bit flush, since we had scaled up. Last year we were going to do INR 1,100 crores. We were very much equipped for that. And then we underperformed for the reasons we've already mentioned. So going forward, our ability to execute up to about INR 1,500 crores at this point of time is not a problem at all on a per-year basis when it comes to assets, CapEx, senior staff. We are well equipped to reach those kinds of numbers. So that is not a challenge. As Somnath pointed out, the reason for last year's lower numbers really had nothing to do with execution capability.
All right, all right. And one final question, sir: what BG limits do we have at present? And how far can you actually fund the projects yourself using those BG limits?
Look, as of today, we hold an unutilized BG limit of roughly INR 350 crores. So besides the BG, the total working capital limit we currently have stands at close to INR 750 crores, and out of that, over INR 300 crores of BG limit remains unutilized, which can comfortably support a fairly good number of projects.
I appreciate all of you being here today and for the backing you keep giving to Vascon. Even with short-term execution difficulties in the latter half of last year, that period remained significant for us, as we improved our liquidity, deepened our banking ties and reinforced our overall foundation. As project sites steadily return to normal, with a solid order book on hand and execution gaining pace, we stay confident in the opportunities that lie ahead and in our capacity to achieve lasting long-term growth. Thank you for your support. Thank you for believing in the company. I look forward to speaking with all of you again next quarter.
Thank you, sir, and thank you to the members of management. That brings this conference to a close on behalf of Vascon Engineers. We appreciate your joining us, and you can disconnect your lines at this time. Thank you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Vascon Engineers Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Vascon Engineers Limited earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.