Home / Transcripts / Vow ASA (VOW) · November 19, 2025

Vow ASA (VOW) Earnings Call Transcript

November 19, 2025

Oslo Bors NO Industrials Commercial Services and Supplies earnings 43 min

Earnings Call Speaker Segments

Gunnar Pedersen executive
#1

Good morning, everyone, and welcome to the third quarter presentation for Vow. Because of technical problems with the network in the auditorium, we had to move at the last minute into this conference room. So it's a bit crowded in here, but we certainly hope everything is working to your satisfaction and that all of you are receiving this webcast. Today, Cecilie Hekneby is with me, our CFO, to present the financials. My name is Gunnar Pedersen. I'm the CEO of Vow. First, I'm going to share some highlights with you. Cecilie will take you through the financials. I'll come back with the market and business update before we go into the summary and outlook and finally, open up for questions. So starting off with Q3. Q3 was a very busy quarter across the whole company, especially in Maritime Solutions, where we had record high revenues. We also continued our structured assessment of the company. And in Q3, specifically, we did some deep dives into the big industrial projects. What we found was that 2 big projects had underestimated cost to completion, which has impacted the margins and also leading to a reversal of revenue.

Gunnar Pedersen executive
#2

Cecilie is going to walk you through the specifics on that. And it was also published in a notice earlier in October. So within the Maritime Solutions segment, revenue hit a record high, and margins developed very positively as well — maybe somewhat on the very high side relative to what you'd ordinarily expect. That comes from a smaller share of legacy contracts, and also from the project mix. So many equipment deliveries — different equipment types carry different margins — and this quarter has been very fortunate, or favorable, when it comes to the mix. The Aftersales segment keeps developing positively, with margins improving, while volumes are roughly the same as in the third quarter last year. Year-to-date, though, Aftersales shows good growth. Our Industrial segment has been dealing with challenges regarding underestimated cost of completion, as mentioned. On a high note, what we've formally talked about as the large reactor from Evensen was finally delivered last week. So we're very pleased with that. Some questions have come in about this. It doesn't have a big impact on revenue, but it does have a very positive effect on cash flow, since it triggers some payment milestones.

Gunnar Pedersen executive
#3

Our liquidity position is much stronger now, thanks to really healthy inflows. On top of that, we've managed to clear the payments that were owed to our vendors. It's also worth pointing out that the covenants got waived for Q3. Our total order backlog sits at NOK 1,449 million, plus a further NOK 134 million in options. That gives us really solid visibility going forward. Order intake at the close of the third quarter comes to NOK 1,082 million. Maybe I should note that the reactor delivery happened after the quarter ended. With that, I think I can hand things over to Cecilie for the financials, and then I'll return for the market update. Cecilie?

Cecilie Margrethe Braend Hekneby executive
#4

Good morning. I'll bring you up to speed on the financial figures. This is merely an executive summary that essentially captures what Gunnar has just covered. So, before I begin the walk-through of the financials, I want to touch on the notification that was published in October, and there are particular events that resulted in that announcement. As set out in the stock market announcement, a review of the 2 major circular solution projects showed that the total cost to completion next year had been underestimated. Lower project margins combined with technical reporting of progress on costs resulted in a revenue reversal during the quarter. Those 2 projects make up a major part of -- within the Industrial Solutions segment, and the preliminary consolidated figures for the group pointed to a lower-than-expected EBITDA for the quarter. This was still at an early stage in our preparation for the third quarter reporting, but we viewed it as inside information that could not be delayed, so we issued a trading update. Phase 1 of Follum and Rhode Island stand as significant milestones for our pyrolysis technology, and an SVP Program Director was appointed at the end of September to strengthen coordination, execution and financial control for the projects, reporting directly to Gunnar.

Cecilie Margrethe Braend Hekneby executive
#5

He and his team then carried out a full review of the scope that remained, the risks, and the handover requirements, and they found that the total cost to complete had been underestimated. And because of that reassessment, a onetime cost increase was recognized in Q3. So how does this affect revenue? Revenue from projects gets recognized based on the estimated total gross margin for the project, in line with technical reporting of progress. The contracts for these 2 projects are mostly fixed price, with limited flexibility for price adjustments. The updated cost estimates therefore resulted in a lower total gross margin and, as a result, a reversal of revenues recognized previously, though with no cash effect. Circular Solutions is a key area within the Industrial Solutions segment, delivering to the industrial scale pyrolysis market, which is still maturing. With these 2 projects now at the final stage, we expect greater cost visibility and tighter cost management going forward. We aim to be transparent in our reporting, but I understand that following the financial development over the last quarters may be challenging. Vow has been in a challenging financial position. And since I started in May, my team and I have worked diligently to secure consistent and precise reporting so as to get control and provide insight.

Cecilie Margrethe Braend Hekneby executive
#6

This slide summarizes everything I've just covered, and now I'll walk through the quarter's figures, beginning with the group's key financials. Our reporting currency is Norwegian kroner. Reported revenue for the quarter came in at NOK 214 million, versus NOK 267 million 1 year earlier. On the left-hand graph, you'll notice minus NOK 6 million in revenue for the Industrial Solutions segment, which reflects a revenue reversal along with softer performance across the rest of that segment, while the Maritime Solutions segment posted higher revenues and Aftersales held steady. Turning to the middle graph, adjusted EBITDA was negative NOK 29 million, significantly affected by how the Industrial Solutions segment performed financially. At NOK 1.4 billion, the order backlog is still strong and provides solid visibility. Total revenue reached NOK 214 million, a drop of NOK 53 million from Q3 '24, with the Industrial Solutions segment weighing heavily. However, the Maritime Solutions segment's revenue of NOK 166 million marks an all-time high, driven by progress on large newbuilding contracts, and is up NOK 73 million versus last year. Maritime Solutions' year-to-date figures are affected by the catch-up effect in Q2.

Cecilie Margrethe Braend Hekneby executive
#7

Aftersales turned in a solid contribution of NOK 54 million for the quarter. That's a 3% increase over the third quarter of last year, and 11% higher year-to-date. In the Industrial Solutions segment, revenue fell NOK 128 million versus Q3 last year and NOK 136 million year-to-date, driven by the cost of kits and lower margins on the 2 projects, along with soft performance across the rest of that segment. Now let's go to the operational key figures for the quarter. As I explained, revenue is heavily affected by the revised cost of completion estimates, which overshadowed strong results in Maritime Solutions and Aftersales. I'd like to draw attention to how gross profit and employee expenses developed. Since we're a project organization, employee hours tied to specific projects get attributed to the cost of goods sold. Over the year, the group has made improvements in its time tracking and hourly rate position. With employee hours attributed more accurately to specific projects, a bigger portion of personnel cost is now classified under COGS as recovery hours. That, in turn, brings project costs and actual resource usage into better alignment, giving us improved insight and a stronger basis for pricing projects. So reported employee expenses vary with project activity and the hours allocated to projects, and they're down NOK 17 million from Q3 last year.

Cecilie Margrethe Braend Hekneby executive
#8

Gross employee expenses, which include recovery hours, came to NOK 58 million this quarter, versus NOK 64 million a year ago. There's also an effect on employee expenses from a shift in how holiday pay is allocated relative to last year — that means a higher cost in Q2 this year and a lower one in this quarter, tracking when staff were actually away on holiday, which affects production. Within the quarter, NOK 2.5 million of nonrecurring items relate to employee expenses. Other operating expenses reached NOK 21 million, which is NOK 3 million above last year. Group EBITDA was negative NOK 31 million, a touch above the preliminary EBITDA figure given in the October trading update. EBITDA adjusted for nonrecurring expenses stood at minus NOK 29 million. Now let's go through how the segments developed. Vow has 3 business segments — Maritime Solutions, Aftersales and Industrial Solutions — plus Administrative, which holds expenses that aren't allocated to the business segments. No nonrecurring items appeared in the business segments. The NOK 2.8 million nonrecurring expense this quarter sits in the Admin segment. Adjusted EBITDA for Maritime Solutions was NOK 29 million in Q3, compared with NOK 7 million 1 year earlier, driven by strong revenue development from high delivery volumes as well as rising margins as legacy contracts shrink and get replaced by new contracts carrying revised terms and conditions.

Cecilie Margrethe Braend Hekneby executive
#9

The order book of NOK 1.2 billion is solid and gives us long visibility. Gunnar will go through some specifics about that in his section. Aftersales keeps expanding as more vessels in operation carry Vow systems. Adjusted EBITDA came in at NOK 10 million for the quarter, compared with NOK 7 million a year ago, which means an adjusted EBITDA margin of 17%, versus 13% 1 year earlier. The Industrial Solutions segment took a hit from the cost updates and lower margins, along with weak performance during the quarter in the segment's other parts, resulting in negative EBITDA of NOK 65 million for the quarter. Going forward, the focus in this segment is on chosen opportunities with less risk and exposure profiling. Now to the financial performance for the quarter. As we can see, financial costs are lower. Financial items for the quarter were negative NOK 13 million, or NOK 1 million less than last year. Interest costs were NOK 12 million, a decrease of NOK 5 million from Q3 last year. We had a net foreign exchange loss of NOK 1 million in the quarter, compared with a gain of NOK 3 million last year.

Cecilie Margrethe Braend Hekneby executive
#10

Vow reports its figures in Norwegian kroner, though the majority of its contracts are denominated in euro. Roughly 60% of project costs sit in the contract currency, which acts as a natural hedge. Exchange rate swings can still affect key financial figures, however, and we've begun examining options for mitigating that risk. Depreciation for the quarter came to NOK 12 million, which is NOK 2 million lower than in the third quarter of last year. I'd also like to point out that, after Vow's shares in Vow Green Metals were sold in June, a NOK 3 million share of net loss and a NOK 1 million gain are recognized in the year-to-date figures. Turning to the balance sheet, I want to call attention to how trade receivables and trade creditors have developed. Since joining in May, a key priority for me has been managing working capital through better processes for collecting debt and paying vendors. Trade receivable bills are down NOK 75 million year-to-date, and the cash gathered has gone toward settling overdue supply debt and other liabilities. Trade creditors are also down NOK 102 million year-to-date. Prepayments to vendors have fallen significantly as well.

Cecilie Margrethe Braend Hekneby executive
#11

With overdue debt now settled, our working capital keeps strengthening, and net working capital is down NOK 32 million year-to-date. Interest-bearing debt of NOK 557 million, leasing included, has risen NOK 87 million year-to-date, driven by greater drawdowns on the credit facilities and partly offset by lower borrowings. The DnB term loan stood at NOK 195 million by the end of September, compared with NOK 262 million at year-end '24. The group secured a waiver on the 12 months rolling EBITDA ratio covenant, and our dialogue with DnB remains close and constructive. Turning to cash flow, we entered 2025 with NOK 46 million in cash and had NOK 34 million at the close of June. By the end of September, cash came to NOK 23 million, plus NOK 26 million of available liquidity. The quarter saw high activity, and the illustration shows the quarter's main developments. Over the quarter, trade receivables brought in NOK 80 million. Beyond milestone payments, we managed to collect overdue receivables. That cash went toward repaying overdue trade payables and other current debt, consistent with management's focus, as well as loan repayments and interest.

Cecilie Margrethe Braend Hekneby executive
#12

With the overdue payables now settled, the company's overall financial standing is stronger. Liquidity is coming up notably during the fourth quarter, helped by sizable milestone payments from both the maritime and industrial sides, and it pleases me to see the steps being taken beginning to deliver results. During the Q2 presentation in August, we told you that a profit improvement program had been launched. Its goal is tighter cost control, better profitability and greater operational efficiency. We have pinpointed specific measures and laid out a number of hypotheses. Examples include cost reduction, operational efficiency, service cost and indirect spending. That program is being rolled out and forms part of the budgeting work for next year. It proceeds according to feasibility and anticipated impact, and a number of actions have already been carried out. That was a fairly detailed run-through of how the finances developed in the quarter, and now Gunnar will bring you a market and business update.

Gunnar Pedersen executive
#13

Thanks, Cecilie. We're kicking off this market and business update by looking at Maritime Solutions. As the graphics in the bottom left-hand corner show, Maritime accounts for roughly 53% of revenue so far this year, at NOK 365 million. The key contract signed during this period is worth EUR 11.5 million and covers advanced environmental systems. On top of that, there are a number of smaller contracts totaling EUR 2.9 million for various other deliveries. The order backlog is very strong at NOK 1.2 billion, which is up 49% from the third quarter of last year. And margins, as I mentioned, came in at 17.7% EBITDA in the quarter, which is very positive. As I said, that's driven by very high equipment delivery volumes, along with a favorable mix in those deliveries. So turning to Maritime contract development and a bit more on the backlog: we've spoken about legacy projects in earlier presentations, and we've had questions about these legacy contracts. So how much revenue comes from legacy contracts, and when will you finish those deliveries? On the graph at the lower right, you can see how this plays out.

Gunnar Pedersen executive
#14

The top dark blue segment on the left comes from new contracts, while the lower portion derives from legacy contracts. So if we look at Q3, 35% of revenue originates from new contracts, and the remaining 65% comes from legacy contracts. You can also see — and this rests on estimates of when deliveries occur and so forth — we've put together an estimate of how this will unfold through 2026 and on into 2027. So you can see, for instance, that in the fourth quarter, new contracts will be roughly 43%, and so forth. It may move around somewhat. That hinges on the contracts and their delivery timing. That's the reason you notice some fluctuation in the split between new and legacy contracts. It's also true that we might even sign new contracts that are legacy contracts, meaning options — options that bind us on price, but options that have been valid since quite a few years ago. At present, one option remains that we will classify as a legacy contract. Yes, I believe that's about the best explanation I can offer right now regarding legacy contracts and that topic.

Gunnar Pedersen executive
#15

Now, if we look at the backlog and the pipeline, the graph on the right-hand side indicates the scheduled delivery dates for vessels from the yard to the cruise line. Normally, we deliver equipment 18, 24 months ahead of that, though at times it can be as little as a year or even less than that, depending on the type of project. But this is typical. So this year, there's 10 vessels, next year in '26, another 10. '27, there are 7 vessels to be delivered that are under contract, there's 2 that we're bidding for. And you can see going out in time how this grows. So '28, bidding for 7, another 3 -- no, 7 under contract and another 3 that we are bidding for. And '29, 1 under contract, 1 option and 13 that we are bidding for. So at present, the backlog is 37 confirmed orders for cruise ships and 1 option. The tendering activity, currently activity tenders, 59 new builds and 4 retrofits. So it is a very active market, and it has a very good visibility. So we hold a leading position, and we are maintaining our market shares. Looking at where we have delivered equipment this year, in total, we are going to deliver to 18 vessels, 13 have been delivered, another 5 systems remain to be delivered in Q4.

Gunnar Pedersen executive
#16

Q4 is shaping up to be quite busy for us as well. If you look at the lower left-hand side, you'll see which cruise lines we've delivered to you or are in the process of delivering to this year. Basically, it's all the major players. Then on your right-hand side, there's Norwegian Aqua. It was commissioned in February this year — so handed over to the customer in February this year. It can accommodate roughly 5,200 people, passengers and crew combined. The ship was built at Fincantieri's Marghera yard, and we delivered a complete scope of traditional systems on this vessel, covering both advanced wastewater processing and waste disposal. This is number 3 in a series of 6 vessels that they're building for NCL. So this year, we've commissioned 9 vessels. There's 1 more remaining for the fourth quarter. You can also see at the bottom here which cruise lines they're being commissioned for or delivered to. So all the major ones appear here too. And of course, that means another 10 vessels entering into aftersales. I had the chance to meet with several of the big cruise lines during the third quarter.

Gunnar Pedersen executive
#17

Of course, the meetings and conversations have been quite interesting. It's abundantly clear that systems functioning well are essential for their operations. In certain instances, should these systems fail, they are unable to run the vessels. In fact, that applies in a good number of cases. Generally, our customers say they're highly pleased with both our systems and the support we provide after sales. Yet, as is always the case, there's room to improve, so we view this as an opportunity and are actively addressing these opportunities to ensure customers are even happier going forward. As you'll notice on the bottom left, aftersales made up 25% of revenue thus far in 2025. On the right-hand side, we observe solid progress over time: Q3 54 compared with 53 in Q3 of last year. That isn't a large jump. However, looking at the year to date, growth there is fairly strong too. It fluctuates somewhat over time regarding when spare parts are ordered, when services are ordered, and likewise for chemicals used in the systems. So, solid progress over time. In the graph as well, the metrics show quite healthy margins at present, and we're very pleased about that.

Gunnar Pedersen executive
#18

A portion of that stems from elevated volume throughout the year, which produces an effect. But I consider this a healthy level. Now turning to Industrial Solutions. The Industrial Solutions segment, once more, as you can view in the lower left, represents roughly 22% of our revenue in the third quarter, so NOK 150 million. It is made up of the primary subsegments Circular Solutions and Thermal Heat Treatment. Two major projects inside Circular Solutions account for most of the revenues. We have already addressed the deep dive and how the margins are affected by that. Naturally, it is very unfortunate when we discover such issues in the projects. And naturally, we have taken several steps to make sure we learn from these. Both of them are first of a kind projects. So it really matters that we use our time wisely and learn as much as we can from them. The effects, I think, we discussed earlier in the presentation. Just to touch on thermal heat treatment, we still see a soft market in Q3, not so much because of energy prices anymore, but due to other uncertainties. However, we do see positive indications tied to both the defense industry and aluminum, and we will probably return to that on the next slide.

Gunnar Pedersen executive
#19

Regarding industrial contract development—circular and thermal heat treatment again—the order backlog is at NOK 212 million, with NOK 152 million from circular and NOK 60 million spread across the remaining subsegments. We've occasionally been asked about certain projects discussed in prior presentations, like end-of-life tires. I picked that one to give you a specific update. FEED studies are now done, and we're awaiting final investment decisions from one of the major customers. They, in turn, are now waiting on the last piece of the puzzle: the permitting. That permitting is expected to be due by the end of the quarter. In thermal heat treatment, we're seeing a pipeline that's improving, with opportunities, and some of those opportunities have led to RFQs, and some of those RFQs have now also produced active bids in thermal heat treatment. So the volume of active bids is actually quite high, and that development is pleasing to see. VGM, Vow Green Metals, came up earlier today. I have to say they're gaining momentum now, and commissioning is ongoing at Follum for Phase 1.

Gunnar Pedersen executive
#20

Work on Phase 2 is still underway, involving our own teams as well as VGM and other parties. The big reactor — which is in fact a component of Phase 2 — arrived last Thursday. That's the unit shown in the picture. It's the large white plastic-wrapped item. So 60 tonne of equipment is being hoisted into the production facility. Things are therefore looking good. I think it's also worth pointing out that VGM received EUR 26.2 million from the EU Innovation Fund for construction of a new large-scale biocarbon production facility in Norway. That is, of course, very interesting from our perspective. It reinforces the favourable trend in the metallurgic market segment for biocarbon. And I believe we're well positioned to keep participating in that trend. We also said that our strategies are being revisited during the second half of the year, although that work isn't finished yet. I think I can give you a few glimpses today of where we're heading. It will surprise no one that in the Maritime segment we very much aim to boost our competitiveness. We're also continuing to bring in new technology — new and sustainable technology — into the waste disposal portion of that market as well. And we'll keep building out our aftersales services.

Gunnar Pedersen executive
#21

So within the industry, and now backed by a clearer strategic direction, I'd say. Our approach will be more selective regarding which prospects we pursue and the contract formats we use in that industry segment. And with a solid operational foundation in place, I think we're ready to shift from analysis into execution — delivering improvements, seizing opportunities, and creating long-term value as well. We also believe it matters, both to us and to our investors, that we can provide a better overview and greater predictability around the development and the value we're generating. Internally, it's very helpful, I can tell you, for understanding delivery costs, allocating cost to the right place, and so on. So that work will carry on. And I certainly hope you'll see the results of it as we go along. The strategy work is set to wrap up by the end of Q4. So we'll come back with more information on that. So finally, summary and outlook. Our customers confirmed very strong market development in cruise, and the yards are in fact still expecting to close several contracts that we're actively bidding on during the fourth quarter.

Gunnar Pedersen executive
#22

Our strong market position has held up. Beyond that, margins are trending favorably, and we expect that to carry on as legacy contracts make up a smaller portion, just as the earlier slide showed. Aftersales margins are healthy, and our active fleet keeps expanding, which will keep driving growth in that segment. The strategy review will wrap up during the fourth quarter. And with far better oversight and control of the financial picture, I'm confident liquidity will keep developing very positively as well. Naturally, we do all of this in very close collaboration with our bank. That brings the presentation to a close, and we'll now take your questions.

Speaker unknown
#23

Thank you. We already have a good number of questions from those joining us online. Just a quick reminder that if you're watching online, you can submit your questions by typing them on your screen. But first, let me check—are there any questions from the audience here in Oslo? It doesn't seem so. While you're thinking about that, let's go to the online audience. The first question concerns the backlog and pipeline in Maritime Solutions. One attentive viewer says he compared the Q2 presentation with the current one, and it appears that some of the bidding, some of the contracts you're bidding for '26 and '27 have been taken off the chart this time. Is that correct?

Gunnar Pedersen executive
#24

Honestly, I don't have full clarity on the specifics, but to the best of my understanding of what you're asking — when a contract goes to someone else, my expectation is that it simply drops off the charts rather than being recorded as a contract. According to outside analysts, in advanced wastewater processing we've seen signals pointing to a market share somewhere between 60% and 80%. That means there are deals we lose. And in waste disposal, that figure runs a bit lower.

Speaker unknown
#25

Next, on the liquidity question: you ended the quarter with NOK 22.7 million in cash. Will you need to raise additional funds?

Cecilie Margrethe Braend Hekneby executive
#26

On the liquidity side, things are looking better, and I’m quite pleased with how the quarter developed: we’ve now cleared the overdue payments owed to vendors, and we’ve also succeeded in collecting receivables that were past due. With substantial milestone payments arriving in the fourth quarter, liquidity is now trending in a very favorable direction.

Speaker unknown
#27

And should we expect additional surprises when it comes to industrials? Or would you say you now have a clearer grasp of what the underlying issues are?

Gunnar Pedersen executive
#28

It would be pretty foolish of me to promise anything. These are first-of-a-kind projects. But given the thorough deep dive we've done on them, I'm fairly confident that we understand what work remains and what that remaining work will cost. So that's not what we've seen here. And I think anyone who works with new technologies and new markets gets that there can be smaller hiccups along the way. We're well prepared for that. We're actually planning for some of these and looking to find them as early as possible. And in most cases, I think I can say we also have alternative solutions ready for that. So I don't expect any big ones.

Speaker unknown
#29

You also brought up a big industrials customer that's waiting on permitting. Any signals that, if that permit comes through, they'll go ahead with you?

Gunnar Pedersen executive
#30

Yes.

Speaker unknown
#31

Then, you’ve brought up before quite a few studies from 4 or 5 years ago — studies named Unipetrol, Repsol. What can you tell us about those studies and the early projects? What’s their status?

Gunnar Pedersen executive
#32

Yes. Those are quite interesting. All of these studies, since they’re based on varying kinds of feedstock, plus how you run the process and what output you’re aiming for. And certainly, I think our customers take lessons from them. In certain cases, we actually run tests for them, and we sample whatever is produced in order to certify quality, to examine emission types and so forth, and that gets used as part of permitting. So I’d say we’ve learned plenty regarding different applications of the technology. And it’s also quite clear to me that our customers are learning as they go, figuring out what will be a business case for them or not. And I think if you look across the industry and the various studies that get done, it’s sort of converging on what everyone believes will be a very profitable one, at least initially, and what could potentially become very profitable later on.

Speaker unknown
#33

We have 2 additional questions coming in from the online audience. So I suppose we're getting close to wrapping up the Q&A portion, but let's go ahead and take the next one. When it comes to Maritime Solutions, what's the installed base — both in terms of how many vessels and how many systems?

Gunnar Pedersen executive
#34

I've been told a figure at some point, though it's slipped my mind, and it's actually a fairly substantial count of systems. So we're talking hundreds.

Speaker unknown
#35

There's also a follow-up question about our cash and liquidity position. Could you give us more detail on what you anticipate for cash inflow in Q4?

Cecilie Margrethe Braend Hekneby executive
#36

We aren't giving guidance on where cash will stand at year-end. Still, as I laid out earlier, we're — I feel good about how things are trending. It's been pretty tough for the company over the years. Even so, we're seeing a meaningful improvement. So I'm eager to report the fourth quarter.

Speaker unknown
#37

And then there's actually one additional point. You've discussed before getting back to 15% EBITDA. Now you're reporting 17% to 18% for both cruise projects and aftersales. Going forward, what margin expansion do you anticipate?

Gunnar Pedersen executive
#38

We don't provide guidance on that either, I believe, but healthy margins are showing up in certain areas. And we're certainly striving to keep getting better. It's also worth noting that when we can, say, lower the cost of manufacturing and delivering equipment, a portion of those gains has to go toward sharpening our competitiveness so we remain competitive. With high market shares, the one thing you can count on is that rivals are eager, and they'll pull out all the stops. So you have to lean forward, keep working on cost, and be ready to pass along part of your improvements.

Speaker unknown
#39

And then there's another point. Since the covenants rely on net interest-bearing debt over EBITDA on a rolling 12 months basis, you'd probably breach them several quarters before the maturity. What's your plan for tackling that issue?

Cecilie Margrethe Braend Hekneby executive
#40

So, we're talking closely and constructively with DnB. We're working on it — we're seeing better liquidity. We're working toward building a company that's more profitable. And I'm confident that, together, we'll find a good path.

Speaker unknown
#41

Appreciate it. That’s all the questions we have. I’ll hand it back to you.

Cecilie Margrethe Braend Hekneby executive
#42

I appreciate it.

Gunnar Pedersen executive
#43

All right, thanks to all of you for tuning in.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Vow ASA transcript - plus 131,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Vow ASA earnings transcripts and 131,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.