Good morning, everyone, and welcome to the Q1 presentation for Vow. As usual, our CFO, Cecilie Hekneby, is here with me today. She'll walk us through the numbers. I'm Gunnar Pedersen, the CEO of the company. We'll take you through some highlights. Cecilie will go through the figures with you, and then I'll return for a market and business update before we open things up for questions. Now, before we begin, I'd like to offer a few reflections. This quarter is the one-year anniversary for Cecilie and for me at Vow. We've had the pleasure of working with a highly competent team, and a very dedicated one, I'd say, for a full year now. As you can see in the report, our collective efforts have paid off. We've improved project follow-up procedures. We've improved financial discipline, improved transparency, and all of that leads to more predictable operational performance and also the improvements visible in the report. Our core operation continues to deliver solidly. This is driven by Maritime Solutions and Aftersales, and they are again fueled by the very strong activity in the cruise market on newbuild as well as an increasing fleet of vessels in operation.

Gunnar Pedersen executive
#2

As we speak, we're moving into a really intensive stretch when it comes to delivering and commissioning new vessels. Execution discipline is still a top priority for us. In Industrial Solutions, commissioning work has dominated the first quarter. Two big projects in Circular Solutions have run into some technical challenges, and those challenges are pushing the timelines out. Naturally, we're taking the corrective actions needed. We're seeing a lot of interest in our technology across the selected circular solution applications, which are biochar and end-of-life tires. For instance, a revised Phase 2 agreement for the Follum project was signed after Q1. When further final investment decisions will happen is still somewhat uncertain. Now, let me move to today's presentation and walk you through some additional details. First, the disclaimer. Please feel free to read it on your own. Then I'll begin with an executive summary. We've been putting a new operating model in place. It's streamlined, with three business units. That has produced very, very clear accountability as well as better control. For the group, we're seeing year-on-year revenue growth. We're also seeing strong improvement in profit, and that's mainly driven by the cruise activities.

Gunnar Pedersen executive
#3

Maritime Solutions serves as our primary growth driver. It brings in greater volume, and we're also seeing margin improvement driven in part by a smaller proportion of legacy projects. Aftersales revenues have hit a record high once again. That stems from an expanding installed base, and profitability also stays robust. As for Industrial Solutions, performance is, I'd say, broadly consistent with the updated assumptions. At the group level overall, order intake is strong, and our backlog gives us solid visibility. Vow secured a waiver for the covenant breach in Q1, and a new covenant framework was agreed starting Q2. At this point, Cecilie will walk us through some of the figures in greater detail. Thank you.

Cecilie Hekneby executive
#4

Good morning. I'll walk you through the financial figures for Q1, beginning with the group's key financials. Norwegian kroner serves as the reporting currency. The strong activity seen in Q4 carried over into the first quarter. As the graph on the left-hand side shows, reported revenue came in at 284 million. The Maritime Solutions segment was the primary growth driver, though it took a hit from foreign exchange effects after the NOK strengthened, while the Aftersales segment posted another quarter of record-high revenue. Revenue for the Industrial Solutions segment fell during the quarter, mainly because the two large Circular Solutions projects are now moving into the final, commissioning-intensive stages, which is also the chief reason total Q1 revenue landed below Q4's level, yet 16% higher than Q1 '25. Turning to the middle graph, operating performance keeps improving, with adjusted EBITDA of 23 million for the quarter, compared with negative 3 million 1 year earlier, and a positive trend versus Q4. No non-recurring items occurred in this year's first quarter. The graph on the right-hand side illustrates how the order backlog has developed.

Cecilie Hekneby executive
#5

Closing out the quarter, our order backlog stood at 1.8 billion, which gives us solid visibility. Now let's dig into how revenue developed. In Q1, total revenue came in at 284 million, which is 39 million higher than Q1 '25. That 16% growth came from strong results in Maritime Solutions and Aftersales. Within the Maritime Solutions segment, revenue was 162 million, 59 million above the figure from 1 year earlier, reflecting higher delivery volumes to shipyards and advancement on big newbuilding contracts, though it was adversely affected by NOK strengthening during the period. That currency effect was mostly tied to legacy contracts lacking protection against currency fluctuation. Revenue from new contracts carrying revised terms and conditions keeps growing in share, reaching 74% this quarter. Aftersales carried on its positive trajectory and once more hit record levels, posting revenues of 66 million in the quarter, 7 million more than in first quarter last year. This 12% revenue gain mirrors steady expansion from a rising count of vessels operating with Scanship equipment, plus continued growth in sales of chemicals and spares. In the Industrial Solutions segment, revenue of 57 million was 27 million lower than 1 year earlier. This periodic revenue decline is mainly attributable to the two large Circular Solutions projects, which are now moving into their final stages.

Cecilie Hekneby executive
#6

When those projects get close to finishing, the revenue mix moves toward commissioning and testing work, and that kind of work usually has lower revenue intensity than the earlier execution phases. Turning to the operational key figures, the positive revenue development comes through as gross profit of 83 million for the quarter, which is 23 million higher than 1 year earlier, along with better margins. Employee expenses, adjusted for non-recurring items, are 1.4 million lower than in Q1 last year, which shows a leaner cost base even with higher activity. The Q1 '25 numbers had 3.8 million in one-off management change cost. This quarter there were no such items. Other operating expenses came down by 1.5 million, helped by ongoing cost-saving initiatives. The profit improvement program keeps delivering results. After the adjusted organization and the streamlining of administration and support processes, a downsizing process affected 9 FTEs, and it was initiated in the quarter and carried out in Q2. There will be some non-recurring items tied to the downsizing process in the Q2 report. The annual financial effect of the downsizing process is roughly 12 million. To secure future growth, though, we will strengthen the organization with some operational and project execution roles going forward. Adjusted EBITDA rose to 23 million in the quarter, up from negative 3 million 1 year earlier, driven by the solid growth in gross profit and cost discipline.

Cecilie Hekneby executive
#7

Let's walk through this table that lays out the financial performance. Revenue is up by 39 million compared with Q1 of last year. EBITDA is higher by 29 million, and the result before tax has risen by 30 million. The bottom line, though, is negative, and there's still work left to do, but it's good to see the turnaround moving forward. Depreciation and amortization for the first quarter are roughly consistent with the same period a year earlier. Capex intensity mirrors the elevated investment levels of prior years. Lower interest expense makes a positive contribution, yet other financial items take a hit from foreign exchange movements, dragging down the financial result. Most of the FX movements are unrealized effects, which means they represent accounting adjustments rather than an actual cash impact. Vow reports in Norwegian kroner, while the majority of contracts are denominated in euro. A substantial portion of project costs sit in the contract currency and constitute a natural hedge, but big swings in foreign exchange rates, like what we've seen this quarter, have affected the financial result, and we're examining ways to reduce and mitigate this risk. Let's turn to the balance sheet. As the table shows, cash has gone down.

Cecilie Hekneby executive
#8

Our available liquidity is made up of a cash balance of 13 million and undrawn credit lines totaling 67 million as of the end of the quarter, which is down from 136 million at year-end '25. That decline comes from timing effects between outgoing and incoming payments during a period of very high project activity. During the first quarter, we had high delivery volumes to shipyard, with milestone invoicing occurring toward quarter-end and collection happening after the quarter, which led to increased trade receivables, though these were lower than 1 year earlier thanks to improved debt collection processes. Liabilities to trade creditors have been normalized, and balances that were previously outstanding are now significantly reduced. Interest-bearing debt is up from year-end because of higher use of overdraft facilities to support the project deliveries, but it is significantly lower year-on-year, driven by term loan repayment and stronger working capital management. Debt is now reclassified to long-term following the waiver for Q1 in quarter and the new covenant structure from Q2, which was agreed before quarter-end. The term loan matures in August '27, and subsequent to the quarter we have initiated a refinancing process. Liquidity improved significantly toward the end of '25 following large milestone payments, and we began the year with 136 million in available liquidity and finished the quarter with 67.

Cecilie Hekneby executive
#9

Like I mentioned during the Q4 presentation, we anticipated fluctuations in liquidity over the quarter, driven by heavy project activity, with supplier payments and milestone invoicing happening in the quarter and collections coming after it. That high activity and those timing differences tie up working capital in receivables and payables, but they support stronger operating cash flow down the road. We managed the working capital requirement by making greater use of overdraft facilities while continuing to focus on improving working capital efficiency. We keep a close eye on working capital and over the last year have worked diligently to improve our tools and processes for forecasting liquidity and assessing working capital needs. Now, in May, we have all-time high delivery volumes on a maritime project, which is causing a peak in working capital requirements over the next 2 months. To mitigate this, we've agreed with our bank to temporarily raise the overdraft facility during the summer. Liquidity should normalize starting in July, when milestone payments come in, and improve through the rest of '26 as profit improvement measures keep materializing. That was a walkthrough of the key financial development in the quarter. Before I hand the floor to Gunnar, I'd like to share a few reflections on the financial development in Vow over the last year.

Cecilie Hekneby executive
#10

Back when I walked through the Q1 numbers in May of last year, I had only been in the role for 2 weeks. It quickly became obvious that my biggest priorities were handling liquidity and covenants, along with reporting that was secure, consistent, and precise. I'm glad to see how that has developed positively, and how we handle working capital now, the better collection processes, and the way this has become part of how we operate throughout the group. We've had close, constructive talks with our bank, and the fresh covenant structure we settled on during the quarter marks a positive move forward. I take real pride in the finance team, who have worked hard to raise the quality of financial reporting so we gain control and can offer insight. Our profit improvement program is now producing tangible results, with a leaner cost base and restructuring that continues. Meanwhile, we're rebalancing capacity and strengthening project execution to underpin future growth. We're moving out of restructuring into a steadier, more profitable operation, though there's still work left to do. It's great to see everybody at Vow heading the same way, building a healthy and profitable company step-by-step. The turnaround is in progress.

Cecilie Hekneby executive
#11

I'll now hand things over to Gunnar.

Gunnar Pedersen executive
#12

I'm just going to adjust my mic — I nearly got it there. Now, moving on to a business and market update, and I'll begin with Maritime Solutions, picking up from what Cecilie said. The team has done impressive work. In Q1, as you can see in the lower left-hand side, the pie chart for Maritime Solutions, revenue came in at roughly 161 million Norwegian, which means it represents approximately 57% of group revenue. In the center matrix, you can see strong revenue growth for Maritime Solutions, and you can also see strong profit growth, as I mentioned, following a sharp drop in the legacy share of revenue, and you can also see solid order intake along with a very robust backlog. The cruise industry keeps performing well. I think it's fair to say that we are also performing well, with very high volumes, but at the same time with increased delivery precision from our team. The cruise business is still growing. They keep building new vessels, and on the right-hand side, you can see an example of that — that is the Norwegian Luna, which left the yard and was taken over by the cruise line in Q1 this year.

Gunnar Pedersen executive
#13

Turning to contract development at Maritime Solutions, during Q1 we signed one worth €27 million. That covers four vessels. Deliveries, as I recall, will begin in 2027 and run through 2029 for these ships. Our total backlog at Maritime Solutions now stands at roughly 1.6. The graphic at the top right of your screen shows how that backlog revenue is expected to be distributed. At the bottom right, you can see how the mix of new versus legacy contracts is projected to develop going forward as of Q1. Roughly 74% of Q1 revenues came from new contracts, and through the rest of the year that figure should hover in the 70-some percent area until the fourth quarter, when it steps down further. We serve as a trusted technology provider to every major cruise line and the large yards. The graphic on the left shows that we have delivered main systems to seven vessels so far in Q1. Altogether, 13 vessels are planned for 2026. Most of them will enter operation at some point in '28-'29, except for Hurtigruten at the very bottom, which is a retrofit.

Gunnar Pedersen executive
#14

That's going to happen sooner. Commissioning work is really heavy right now, and it's at its peak at this moment. You'll recall that one vessel, the Norwegian Luna, was delivered in Q1. All told, 10 vessels will be delivered across the year, and a lot of them are coming before summer. In the center graphics, you can see the main European yards. Those are our contract partners, and they're extremely busy, both with constructing vessels and with getting ready — sourcing suppliers and so forth — for vessels still to come. We'll come back to that. On the right-hand side, yeah, I forgot to mention there's a bit of activity in Asia too when it comes to cruise, though it isn't major activity at this point. In the right-hand graphics, you can see that we currently have 34 vessels under contract. My understanding is that's the same figure as last quarter. There are seven options as well, which I also believe is the same figure. 53 are being actively bid for, a touch higher than last quarter. As you can see, the estimated delivery of the last of those falls in 2044, believe it or not. With that, I think we'll move into Aftersales. Aftersales brought in roughly 65 million Norwegian in revenue during Q1, which accounts for about 23% of total revenue, as the pie chart on the lower left shows.

Gunnar Pedersen executive
#15

What this tells us is that in cruise, aftermarket business now accounts for roughly 50%, or nearly 50%, of new sales. The aftermarket figures shown here are entirely tied to maritime, and they consist of consumables like chemicals and filters, along with spare parts and services. On the graph at the right, you'll notice we posted record sales in Q1, up 14% year on year. Margin also came in better than a year earlier, a bit lower in Q4, which stems partly from the activity mix and partly from added costs tied to trade shows showing up in the Q1 figures. As more new vessels join the operating fleet, this segment should keep delivering structural growth. It's repeat business, and margins are typically healthy. Turning to Industrial Solutions, as I mentioned, performance is broadly in line with expectations. On the lower left you can see revenue of 56 million in Q1, roughly 20% of group revenue. Food safety and heat treatments within the traditional industrial parts account for about half of that, while the two large Circular Solutions projects make up the remaining half. The margin improvement in Q1 comes mainly from our heat treatment activities.

Gunnar Pedersen executive
#16

Like I mentioned, technical problems have cropped up on both of the Circular Solution projects, and those are what's holding things up. On Follum, every mechanical fix and programming change that's needed should wrap up during Q2, and it's my sincere hope that, at this very moment as we hold this call, they're on the verge of resuming production. With regard to the Rhode Island projects, we've been working alongside the customer and the supplier of certain downstream technology that was the source of some trouble. Each of these is a first-of-a-kind configuration, so naturally you end up collaborating closely with both your customers and your suppliers. You have to anticipate problems, but I'm confident we'll resolve them and keep moving forward. Naturally, we keep a close watch on the financial exposure that incidents such as these create. We do expect to wrap up the 2 Circular Solution projects in 2026, which is consistent with what we anticipated. When it comes to new projects going forward, we expect better margins as well as reduced risk. Contract development for Industrial Solutions. The heat treatment market remains somewhat soft, particularly when measured against the boom of 2022 to 2023. A wave of electrification swept through European industry after gas prices spiked so dramatically at that time.

Gunnar Pedersen executive
#17

On Circular Solutions, what we're seeing in the activities really backs up our updated emphasis on biochar and end-of-life tires as the initial applications. Årbyen has gone through their Follum Phase 2 project and signed a revised contract. So that means their intentions have been reconfirmed. The revised Phase 2 agreement also lines up well with our updated strategy, which, as we mentioned earlier, centers on our core equipment and our process expertise. With Murfitts Industries, the positive trend is continuing. They've run small-scale trials using end-of-life tires, and now they're getting ready for a final investment decision on what they refer to as a single-line, commercial-scale demonstration plant, though the timing remains somewhat uncertain. Going forward, finishing the two Circular Solution projects will give us a platform for future opportunities. Our very close work with Årbyen Industries carries on, and we think that in itself presents a very strong opportunity for us. On heat treatment and food safety, cycle times are shorter and contracts are smaller too, so new orders don't really contribute much to the backlog. Overall, we expect some reduction in our backlog before it picks up again. To sum up, in the conversations we've had with all the big yards, the big cruise lines, they all confirm the very strong market development within cruise.

Gunnar Pedersen executive
#18

Given this elevated level of activity and, naturally, the very strong position we hold in the market, we do anticipate that the positive trajectory for Maritime Solutions will carry on. Through 2026, the proportion of legacy projects should remain fairly steady. When it comes to Aftersales, structural growth will keep going as we bring new vessels into service. Once the two Circular Solution projects are finished, they will show the technology working at industry scale. That opens up a great many opportunities for us going forward. In short, carrying out our revised strategy in a disciplined manner is boosting profitability and lowering risk. With that, we conclude our presentation, and I appreciate your attention. I do think we are ready for questions. Thank you. Quite a few questions have come our way. A number of them actually arrived ahead of the presentation, so they may already have been answered or at least touched upon, but let's begin at the top. One question concerns the cruise industry and the contracts in that area. For the vessels currently being bid, what is the average contract value per ship, and historically, what has the average win rate been on those tenders? Oh, that is a big question. Contract size differs according to vessel size, ranging from some ships we hold contracts for with 1,500 people on board, up to the large one, which carries close to 10,000 people on board in total — 9,970 to be precise.

Gunnar Pedersen executive
#19

That's a wide range, roughly 100 to 140 million, just off the top of my head. On the second part of your question, could you say that again, please? What was your typical success rate? The success rate. When we calculate it using certain public information at year-end, it appears we hold somewhere between 66% and 70% market share. Our hit rate on projects is really strong. I should note, however, that we don't really play in the market for very small vessels, below 2- to 300 passengers, so those aren't included in the figures. There are a number of questions regarding Follum, the Phase 2 with Årbyen. Some are quite specific, and one concerns the contract value. The question is whether we should expect a contract value contribution to Vow for Phase 2 broadly similar to Phase 1, that is, around 335 million NOK? For Phase 2, I think the contract value has been made public at an earlier point. It started as a change order for Phase 1 and has now been renegotiated. The scope is somewhat lower than in the initial contract, in line with our new and more focused strategy.

Gunnar Pedersen executive
#20

If no significant Industrial Solutions contracts come through during the next couple of years, would engineers in that segment then be shifted over to Maritime Solutions projects? Naturally, we deploy our people wherever they're needed most and where they deliver the greatest impact. At present, they're fully occupied, and they'll stay that way at least through the year thanks to the contracts already underway, and we do anticipate additional contracts. Yes, we'll relocate resources wherever it makes sense for us. One more question about industrials. They posted a negative EBITDA this quarter. At what point do you anticipate EBITDA turning positive in that segment?

Cecilie Hekneby executive
#21

Those two Circular Solution contracts were signed a number of years back. What we're concentrated on at this point is getting them finished. Naturally, we'll dedicate resources to ensure that happens. Our goal, naturally, is that we'll also reach green figures within Industrial Solution, and we're examining ways to achieve cost reductions in that segment as well. What we're really focused on is finishing the commitment we have with the best result possible, and that should give us a solid basis for fresh projects and fresh revenue from it.

Gunnar Pedersen executive
#22

Let me add something to that. Since these are the first deliveries of these systems, it's quite clear we'll also move down the learning curve, improving the projects, collaborating with the supply chain and so on, to reach precisely what Cecilie mentioned — a reduction in cost on this. When it comes to future projects, we do expect lower market prices as well as better profitability. A couple of questions on corporate strategy. Last time you said a strategic review of the food safety business had been initiated. You didn't bring that up today. Where does that stand? The answer is that it's still ongoing. There's also a reference to, I believe, rumors or speculation that have appeared perhaps in chat forums regarding a possible spin-off of Scanship. Do you see any heightened interest from, for example, Kongsberg Maritime on that front? I have still not had any discussions with Kongsberg Maritime about the matter. No, but we did say that we're following our new operating model and the new organizational structure, and we're splitting this up somewhat. That will make it simpler for us when it comes to reporting financial figures and monitoring the results.

Gunnar Pedersen executive
#23

We've gotten a fair number of questions regarding liquidity and where our cash stands. You mentioned that liquidity ought to return to normal starting in July as milestone payments come in. Which milestones are the main drivers here, and what's the impact if they get delayed? And what level would you view as normalized?

Cecilie Hekneby executive
#24

Yes. We've got a big volume of deliveries coming in this quarter, and it's hitting its peak right now in May. My understanding is that there are 500 items that need to be delivered. Payment comes 30 or 60 days after delivery. Naturally, we pay our suppliers ahead of delivery. That creates this peak in the working capital requirement. Roughly 100 million is what we need to pay upfront before we can actually collect the cash. Collection will happen in June and July. Things are progressing according to plan. Because of that, we can now really forecast in quite fine detail how liquidity will develop over the period ahead, and we could begin talks with the bank about how to solve this. We see that we have a working capital issue. That's the reason we then had this increase in the overdraft. Having such high activity is very positive, but given where we stand right now, we didn't have the capacity in the working capital. With the cost improvements we're making and to follow our strategy, it's important that the working capital allows for such fluctuations. Liquidity will fluctuate. By a normalized level, I mean that the working capital allows for these fluctuations in project deliveries and that it has a comfortable headroom to the covenants.

Cecilie Hekneby executive
#25

There's a question that's somewhat connected, and it begins with the fact that equity has fallen from over 500 million down to roughly 200 million over a fairly short span. The equity ratio is now under 20%. What specific covenant levels or lender requirements does the company have to stay in compliance with so it can avoid renegotiations or needing to bring in more equity? At the end of '25 we had an impairment, so that is, of course, the primary reason for the drop in equity. The covenant level sits at 15%, and that's also disclosed in the annual report. Yeah. Do you not see any immediate need to raise additional equity? We're working on improving performance and steering clear of any need for that. That is the priority. The company has now gone back to positive EBIT, but it still reports losses after financial items. What concrete plan does management have for bringing down net interest-bearing debt, and how sensitive is the present capital structure to interest rates staying high? Naturally, net interest-bearing debt is affected by the fact that we had to draw on the overdraft facility here, along with the payment and with the debt collection after the quarter. Net interest-bearing debt was clearly affected by that. We're paying down the term loan quite heavily, so that will rise quarter for quarter.

Cecilie Hekneby executive
#26

Handling the liquidity side of things will have a strongly favorable effect there as well. There are a few more questions we have, and we'd urge those of you online—if any last questions remain, please submit them at this point while we take the final two. Do you believe an EBITDA margin near 20% is achievable on new maritime contracts, or at such levels would rivals win those contracts instead?

Gunnar Pedersen executive
#27

With a 20% EBITDA in the contracts, I don't believe that's achievable in the current market. And if they read our annual report too, well, they'll look really bad. One last question — you may have already addressed this, but just to be safe: are you doing more work on improving working capital management so similar liquidity squeezes can be avoided down the road, for example through larger prepayments, or do you see further

Cecilie Hekneby executive
#28

That's also a tool where we've actually been in dialogue with suppliers regarding this situation now this summer. We're using every tool available to us to strengthen working capital. For example, reducing prepayments and also deferring payments toward an interest, to ensure we can get through this in good shape. Then there's one last question that has just come in. Total non-current assets stay high compared with the company's current market value and equity base, especially in intangible assets and goodwill. Does management perceive any risk of additional impairments or write-downs should profitability, cash flow, or order intake fail to improve as anticipated? At the end of 2025 we ran a very thorough process that also resulted in an impairment. We have adopted a far more prudent approach to how we expect order intake and margin development for the 10-year period feeding into that model. Yeah. That question is difficult to comment on, but we did take a very prudent approach in the impairment we carried out. Naturally, as a listed company, we must review each quarter, and there are no indications of that at present. I believe that wraps up the questions from the audience online.

Cecilie Hekneby executive
#29

Now let's return to the presenters, who may have some closing remarks.

Gunnar Pedersen executive
#30

That's everything on our side, I believe. Thanks to all of you for tuning in. You can download our report and read it whenever you like. Thank you, and have a good day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Vow ASA transcript - plus 131,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Vow ASA earnings transcripts and 131,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.