Vow ASA (VOW) Earnings Call Transcript
November 18, 2026
Earnings Call Speaker Segments
Hello, everyone, and thanks for joining Vow's presentation for the third quarter. Unfortunately, our CEO Gunnar Pedersen has the flu, so today's agenda had to be changed. We're very glad to be joined by Ivar Homme, our EVP of Maritime Solutions, and Per Carlsson, our CTO; together they'll walk you through the business update and offer their perspectives on recent developments. I'll start with the main highlights for the quarter. Following three exceptionally strong quarters, Q3 was softer, mainly because equipment deliveries in the Maritime Solutions segment were lower for a period. That, along with a combination of legacy contracts and new ones that went against us this quarter, is squeezing margins in Maritime and at the group level. Aftersales keeps growing steadily, and its margin trend is still positive. Industrial Solutions has an update on the major projects at Follum and Rhode Island. Our sales pipeline is expanding, and heat treatment is doing better. We completed the first phase of the DNB refinancing in September, which provided extended facilities and a covenant waiver for the quarter. Order intake for the quarter came in at 186 million, leaving a backlog of 1.6 billion plus 162 million in options. Right after the quarter ended, we announced a solid cruise contract worth €7.7 million covering equipment deliveries to two vessels, plus options on three additional ships valued at €13.1 million. Before we get into the numbers, we'd like to share a few more updates. We're in close dialogue with key customers in every segment, and Ivar and Per will speak to that later. What we're hearing in those customer meetings confirms the revised strategy — so let me recap what it involves: we'll strengthen our maritime business and what we offer toward both newbuilds and the aftersales market, and we'll make sure our pricing is competitive, cut costs, and deliver in line with customer expectations. When it comes to Industrial Solutions, our approach is more selective. Heat treatment still serves the markets it operates in today, though our top circular-solution priorities are end-of-life tires along with biocarbon for metallurgical industries. Our offering centers on core technology, not turnkey solutions. At ETIA, we're adjusting the organization's size to fit present activity levels, and the strategic review of the food safety business remains underway. The profit improvement program is carrying on across the whole group. In February, during the Q4 presentation, we described our intention to legally separate Scanship's maritime and industrial activities — Scanship being the group's largest entity. Given that the new organizational structure has been in place since January, this marks a logical next step. Execution of the carve-out is happening now, effective the 1st of December. Industrial activities are transferred to the 100% owned entity Vow Industries, with C.H. Evensen as subsidiary. After the carve-out, Scanship will continue as a pure maritime player, and Vow Industries will be a dedicated platform for future growth for Industrial Solutions. I'll now walk you through how we performed financially in the third quarter, focusing on the key developments and the financial metrics that matter most. We report in Norwegian kroner. Let's begin with revenue. On the left-hand chart you can see that third quarter revenue came in at 191 million, which is 24 million lower than Q3 last year and under the levels we posted in recent quarters. The softer top line came mainly from the Maritime Solutions segment, which is the middle section of the stacked bars. After several quarters with exceptionally high delivery activity, this segment has moved into a period with fewer equipment deliveries and, correspondingly, less revenue recognition, which mirrors the timing and phasing of project execution. We expect activity levels to pick up again from the summer of 2027. The aftersales segment, at the bottom of the stacked bars, keeps giving us a stable and resilient revenue base, helped by a growing installed base of vessels in operation carrying Scanship equipment on board and by rising recurring business; this segment has shown structural year-on-year growth and remains an important contributor to both profitability and cash generation; in Industrial Solutions, at the top of the bars, commissioning work ahead of handover on the two large circular solution projects has taken longer than we anticipated, and that has led to updated cost-to-completion estimates, which weighed on revenue recognition in the quarter. Turning to the middle chart, adjusted EBITDA for the quarter was 9 million. That compares with -29 million in Q3 last year. The year-on-year improvement is significant, though it should be noted that last year's results were heavily affected by a major cost revision tied to the two circular solution projects. Adjusted EBITDA was lower than in the previous quarter, but we believe the underlying development remains encouraging, with better execution, and that we are heading in the right direction. The chart on the right shows how the order backlog developed at quarter-end. The backlog is up year-on-year, helped by contracts won during the quarter for equipment deliveries to the three newbuild cruise vessels I mentioned earlier. At quarter-end, backlog stood at 1.6 billion, giving us good visibility in the periods ahead. Now let's dig into the operational key figures a bit more. Take a look at the Q3 column in the chart on the left, and I'll walk you through it. Third-quarter revenue came in at 191 million, which is 24 million lower than Q3 of last year. Despite that decline in revenue for the quarter, gross profit increased by 33 million. Gross margin moved from 6% in Q3 last year to 24% this quarter, though it's being held back by a larger proportion of legacy contracts during the quarter, a stronger NOK, and the cost update in the Industrial Solutions. Although last year's substantial cost revision helps the year-on-year gross profit comparison, the gain additionally shows that the underlying business is still getting stronger. Employee costs and other operating expenses combined were 5 million lower than a year earlier, which yielded adjusted EBITDA of 9 million for the quarter — 38 million above last year. The non-recurring items excluded from EBITDA relate solely to management changes and to the downsizing done earlier this year. EBITDA excluding non-recurring items came to 6.5 million, up 38 million from one year before. Lower headcount and operating expenses, along with improved project delivery and a stricter operating approach, indicate that the steps we've taken during the last year are starting to produce results. Turning to the year-to-date column, gross profit comes in at 107 million, an increase of 111 million versus last year, and adjusted EBITDA of 64 million is higher by another 18 million. To sum up, revenue was down this quarter, but the underlying fundamentals of the business continue to strengthen. Before turning to the financial performance, I should point out that since this business is project-driven, activity will fluctuate from one quarter to the next. Aftersales continues to generate solid, consistent profit, and our ongoing focus on operational agility, margin-boosting programs, a rising backlog, and what we offer customers remains central to achieving profitable growth over the long run. The bottom row on the left of this table shows that pre-tax result for the quarter came in at -25 million.
EBIT was 6.5 million, well above the year-earlier level, but it still falls short of covering depreciation and amortization along with financial costs. Depreciation and amortization stayed flat: a rise in amortization of intangible assets that had been expected was offset by reduced lease depreciation, since the profit improvement program cut our use of leased assets. Net financial items were -20 million this quarter, compared with -13 million a year before. Interest expenses were 2 million lower than in Q3 last year, yet the result is weighed down by a net unrealized foreign exchange loss of 11 million, which stemmed from a stronger NOK against the euro during the quarter. We haven't set up a formal FX hedging program at this point, because our focus has been on developing a clear understanding of the group's net currency exposure throughout the lifecycle of our projects. Given that natural hedging is at a significant level, gross exposures don't necessarily reflect the group's actual risk. FX exposure, along with its potential impact on covenant headroom, is also being evaluated as part of the refinancing process that is currently underway. Last quarter, I was glad to share that we had returned to positive figures. The results for this quarter are plainly short of our ambitions, though they also capture the reality of a business driven by projects. What matters here is that the operational changes we've put in place are beginning to gain traction, and we keep carrying out the revised strategy, with a firm belief that we're heading in the right direction. Turning to cash flow, the chart on the left shows how things have developed since Q2. I'll walk through a few of the bigger movements. We entered the quarter with 118 million in available liquidity. As you likely remember from the Q2 presentation, we faced a liquidity strain tied to a large maritime project, with deliveries and supplier payments falling in May, and customer milestone payments coming 30 and 60 days after delivery. We eased this through a temporary bump in the overdraft facility. We've gotten the milestone payments, and during the quarter we paid back the additional 60 million overdraft facility. Operating cash flow for the quarter came in positive at 37 million. Cash flow going to investing activities stayed low, in line with the tighter capital allocation policy we put in place last year. I'd also point out that a large share of our R&D work is now done through operational activities, which supports ongoing technology development while keeping our cash profile disciplined. Financing cash outflows were mostly installment and interest payments, totaling 31 million for the quarter, which shows we're still focused on paying down debt and honoring our financial commitments; we finished the quarter with 63 million of available liquidity. The cash on hand comes from the group's smaller companies. The overdraft facility covers the larger companies. Turning to the balance sheet, total assets declined from 1 billion and 66 million at year-end '25 to 855 million at quarter close, driven primarily by lower working capital, as contract assets and trade receivables from completed project deliveries were invoiced and collected. When it comes to interest-bearing debt, the figure stayed roughly flat compared with the end of '25, since heavier reliance on the overdraft facility cancelled out the term loan installments. We saw a substantial drop in trade payables during the period, reflecting both reduced activity levels and the settling of obligations to suppliers. By quarter-end, the equity ratio was 21%, which is roughly where it stood at the close of '25. As CFO, making the balance sheet stronger remains a top priority for me. Over the past year, we've rolled out initiatives aimed at boosting liquidity and improving cash collection throughout the group; we've developed a solid partnership with DNB, and our ongoing dialogue with them is both positive and constructive. The refinancing process is taking more time than we had expected, though it is still on schedule to wrap up ahead of year-end. Following the extensions of current credit arrangements and the covenant relief we obtained during recent quarters, our focus now is on building a funding framework aligned with our strategic goals. That involves verifying our long-range projections, bringing additional outside borrowings into the DNB financing structure — the French loans in particular are something we're examining — striking the right balance between long-term debt and liquidity facilities, and evaluating how planned FX hedging could affect our covenants. That covers the main financial developments for the quarter. Ivar and Per will now provide a business update, beginning with Ivar.
Thank you, Cecilia, and good morning to all of you. I'm Ivar Homme, executive vice president of Maritime Solutions. I came to Scanship in 2017, spending the bulk of my time in project management and operational management, up until my appointment to this role in January of this year. Before we get into the substance of Maritime Solutions, I'd like to offer a quick update on the market and the business, taken more broadly across three separate business segments. Activity on equipment deliveries has been exceptionally high through the first half of 2026, with our attention on delivering in line with the customer's plan and expectations. It's genuinely gratifying to see that we managed that this year, with a better delivery position, lower transportation costs, and reduced CO2 emissions from our transportation. During the quarter we met a number of yards and cruise lines, keeping a close dialogue going with customers. The cruise market remains strong. Yards are booked out for 10 years, something we have never witnessed before. There is active dialogue around new technologies, their strategy, and what they expect from us as a supplier, along with their vision of zero-emission vessels, partnering, and more. Some of our management team just visited a new ship that is about to enter operation, a vessel emitting 50% less CO2 than the previous series. The cruise lines are focused on cutting energy consumption, but also on reducing food waste, and so on. We've also held meetings with our main industrial customers to learn about their strategies, their plans, and their needs going forward. Turning to the details of Maritime Solutions, equipment deliveries fluctuate over time in line with the delivery schedules from the yards, and Q3 brought lower delivery volumes and revenue. Together with a larger share of legacy contracts and a stronger NOK, that weakened margins; even so, the year-to-date margin came in at 14.8%. Order intake was 152 million, and the order backlog stood at 1.5 billion before the €7.7 million order was formalized in October. Revenue in the maritime segment made up 51% of the group's revenue year-to-date. From the graph on the right-hand side, you can see how the project mix has developed, and how we expect it to develop further. As of year-to-date Q3, 36% of revenue came from legacy contracts. In the quarter alone, though, that share was 52%. The final option defined as a legacy contract was exercised in Q3; this raised the legacy share of the backlog and had an impact on the upcoming periods; however, orders secured after the close of Q3 have offset this somewhat. As for the maritime order backlog, its composition, and the current pipeline, the graphics on the left show how it translates into revenue. Q4 and 2027 combined account for 34% of the backlog. The center graph shows the number of vessels in the backlog as options or actively being bid for, and the horizontal axis represents the year the ship enters into operation. Equipment deliveries normally come 18 to 24 months ahead of this. In short, the market is very strong and provides good visibility. Over on the right side, you can see an image of the MSC Poesia, which belongs to what is known as the Musica Class. That ship carries 4,600 people in total, counting both crew and passengers. Its construction took place in 2008, and at that time it was delivered with a Scanship waste disposal system. During this year, it underwent retrofitting with our wastewater systems. As we have presented in earlier quarters, we continue to be a trusted technology provider to the shipyards and cruise lines. Every major cruise line and shipyard counts as our customer. The graphics at left and center display the key deliveries and commissioning work planned for 2026 for the respective shipyards and cruise lines. Through Q3, we completed 12 of 13 main system deliveries, and year-to-date we have commissioned 8 of 11 ships. During Q3, we signed contracts covering three vessels, with options executed at €13.6 million. After Q3 ended, we signed contracts for two vessels at €7.7 million, along with three options at €13.1 million. The initial stage of equipment delivery begins in late 2027. A short update as well on aftersales. Aftersales covers spare parts, chemicals, and technical services. This segment delivers stable recurring revenue, as the right-hand graphics illustrate. Growth comes mainly from new ships entering service. In addition, the right-hand graphics show our efforts to enhance margins over time, and those margins now sit at a healthy level. As the left-hand pie chart indicates, the aftersales segment made up 27% of group revenue year-to-date. I will now pass the presentation to my colleague Per, who will give an update on behalf of Industrial Solutions. Thank you.
Thank you, Ivar, and good morning to all of you. I'm Per Carlsson. I came on board as Vice President of Innovation back in '21, and in '24 I moved into the role I hold now, Chief Technology Officer. I'm here to give you an update on the Industrial Solutions segment. We're seeing that the complexity of the circular solutions projects, meaning Follum Phase 1 and Rhode Island, is nearing the end of commissioning, and costs are coming in higher than we projected earlier, though we're also seeing those costs are lower than they were at the same point last year. We're resolving the issues together with our clients and our collaboration partners. In the heat treatment segments, we see ourselves as well-positioned for growth. Orders in the pipeline are increasing, but we also see that we need to get stronger at moving from pipeline to backlog. Once again, and I'll repeat it, the heat treatment segment is well-positioned for growth. Total backlog now stands at 111 million NOK, down from 212 million last year, and we expect a reduction before things pick up again with the revised strategy and new management in Fredrikstad at C.H. Evensen. On a revenue basis, the Industrial Solutions segment now accounts for 161 million within the company, which equals 22%. Our collaboration partners, Arba One?, Danieli Corus, and Murfitts, along with the collaboration and continued development of current and future projects, represent significant opportunities for us. Focusing specifically on Follum Phase 1, one highlight is the performance test achieved for all four lines, where they passed testing related to both capacity and quality of the biocarbon. We're working closely now with Arba One? on how we can support them in a future project and how we need to prepare for that. In the early stages of '27, we're looking at commissioning of the large-scale reactor for biocarbon production at Follum Phase 2. Installation is ongoing, and we're looking at commissioning early next year. Again, we still see large potential for biocarbon in the metallurgical industry. For the food safety segment, we've communicated earlier that a strategic review is ongoing, and as soon as it's concluded, we'll communicate that to the market. On ELT, there have been several management meetings with Murfitt Industries on how to develop existing projects and future projects; we're still awaiting the final investment decision from Murfitts here. In the traditional heat treatment segment, the sales pipeline has been growing, as industries want more electric solutions or hybrid solutions combining electric and gas. With that, I'd like to hand the word back to Cecilia for some concluding remarks. Thank you.
Thanks, Per and Ivar, for joining on such short notice — that’s impressive. So, to recap: Maritime Solutions remained profitable in the quarter even though volumes were lower, and our backlog has been strengthened by three newbuild contracts plus a subsequent contract. Aftersales continues to deliver margin gains and stable earnings. Industrial Solutions was hurt by project revisions, yet it reached an important milestone, because all four lines at Follum Phase 1 passed the performance test. Looking ahead, we see a strong cruise market supporting future demand and aftersales growth. Visibility in the maritime order backlog reaches into 2034. Delivery volumes should rise again beginning in the summer of 2027. The profit improvement program is delivering, and the second refinancing phase is targeted for completion before year-end; through the legal separation, Scanship becomes a pure-play maritime company, while Vow Industries is positioned as a growth platform for the Industrial segment. With that, I believe we can move to the Q&A portion, and I’d like to welcome Ivar and Per back on stage. I can take that one. The way we report to the market will not change. Just to clarify as well, the aftersales segment today relates purely to the maritime business, and any future aftersales business in Industrial Solutions will sit within those companies. I’m sorry, but I can’t share details on that. We haven’t disclosed it. Margin will fluctuate quarter to quarter because of the mix of legacy and new contracts. That share is coming down, though it was somewhat higher this quarter. Currency effects played a part too. I’m sorry, I can’t provide more detail on that. Yes, that was actually two questions; we are aiming to finish the refinancing now. Clearly, as I mentioned, we’re looking at the overall need for long-term financing in that process, along with the split between long-term and liquidity facilities. I’m pleased with the progress we’re making with DNB, and as I said last time, our plan is to do this through a bank loan. Yes. Since I started, we’ve taken many steps to boost liquidity, and total assets decreased from NOK 1.066 billion at year-end '25 to NOK 855 million at quarter-end. We’re seeing clear improvements. We’re seeing the profit improvement measures show traction in the numbers. I have nothing further to add on that.
The answer to the first part is no, and the answer to the last part is yes. The final legacy option that remained has now been exercised by our customer. Naturally, we must now perform under that contract over the periods ahead, but no further legacy options exist at this point in the pipeline or in the backlog. In my view, there is a quite natural explanation for why cruise owners are turning their attention toward China at this time. During the presentation I noted that the conventional European shipyards we partner with have their slots completely reserved as far as 10 years out. Whenever shipowners wish to speed up construction of their newbuild fleet, they naturally look toward slots that are open elsewhere, in China, for instance; in fact, we have been collaborating with a Chinese shipyard for 4, no, 5 to 6 years on two vessels already. That kind of arrangement is familiar to us.
I think it's worth noting that Follum Phase 1 was set up back in '21, and that work has run alongside the development — particularly line seven, the early production line — plus various transitions in, shall we say, the pure location itself and in how the system ought to be configured. Now that we're nearing the final stages of commissioning, we're finding that minor tweaks are required; that's only expected given how long this project has been in development. Set against '25, the changes needed are considerably fewer than was previously the case. As I mentioned, these are smaller, should we say, adjustments to work that already exists and that have to be dealt with. I won't get into the technical specifics on this, but we're seeing that we're holding to the timelines set by the joint projects, and we're working alongside Arba One? to clear the small remaining punch that's left.
When we first told you about the strategic review, that was actually at the Q4 presentation, and we didn't really expect it would take this long, but it does. One factor that stretches out the timeline is how complex the ETIA business is; we have the food safety business, which is the one under strategic review, but it shares some IP with technology that matters for our core technology in end-of-life tires. Getting this right matters, and so does genuinely backing the growth of both the food business and the end-of-life tires business. We hope to bring you an update at the Q3 presentation, and we'll let you know once we have more to share, but this is really where our focus is.
On that graph's pipeline, naturally, across the years when we've held these sessions, we've generally given a report on every bid currently at the bid stage. A portion of those bids involve, say, ferries, and compared with the main cruise building business those aren't truly core for us; we've adjusted certain figures there regarding the actual potential prospects. What I'd say is that the graph at present shows the absolute core of Scanship business, namely the cruise newbuilding segment. It's actually more relevant now than it was previously, I would say.
It's hard to answer that, since there is always more work to do. No, what I'd say is that the project has at least reached the level of engineering that's needed in order to take an FID, but naturally the client has to evaluate the information, and that takes some time; that's essentially what I can say about it.
Yeah, I can add as well that we are seeing progress when it comes to this cooperation with Murfitt. I personally had a couple of meetings with the top management about it. We're making real progress, but it's also an important decision for the customer, and we're doing everything we can to help them reach the right decision.
Like I said in my presentation, it's in the early stages of commissioning right now; we expect to wrap up commissioning early next year, and we're working alongside Arba One? to keep the project plans and so on on track, and to support Arba One?'s ambitions. ETIA has an agreement with Kobelco; that's a long-standing one, and and that work keeps developing with us as a sub-supplier to them of our equipment. As for Repsol, this that was previously developed within an EU project. Repsol has currently abandoned that project, and we're we're that's where that stands at the moment.
Yes. Thanks to everyone for being here, and I want to add an extra thank-you to Ivar and Per for being with us today. Should you have any other questions, please reach out to us.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Vow ASA transcript - plus 131,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Vow ASA earnings transcripts and 131,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.