Thanks for joining Lundin Mining's Q3 2026 earnings call. We released our operating and financial results yesterday, and the news release, presentation, and webcast replay are all available on our website. Unless otherwise stated, all amounts are in US dollars. Following the prepared remarks and presentation, we'll open the floor for questions, as we always do. Today's results include forward-looking statements that carry risks and uncertainties, and we encourage you to review the cautionary notes in our presentation and in our filings on SEDAR+. With me on the call today are our Chief Operating Officer, Juan Andrés Morel, and our CFO, Teitur Poulsen. Ahead of discussing our results, I'd like to address the difficulties at Caserones that have affected the company's performance during this year. The Atacama region experienced an unusually severe winter, and two significant storms in July and August caused damage to transmission line towers, cutting power to the operation for approximately 30 days. During these incidents, the Caserones team maintained a firm commitment to safety and worked hard to bring operations back in a controlled and responsible way. The effects have extended into the fourth quarter, as snowmelt has slowed haulage rates and constrained ore deliveries to the mill. Because of this, Caserones' full-year copper output guidance has been lowered to 105,000–115,000 tons, down from the earlier 120,000–130,000 tons. Juan Andrés will cover these difficulties in more depth during the operations portion. Our consolidated full-year copper production forecast now stands at 285,000–310,000 tons, and the cash cost outlook is still $1.95-$2.15 per pound. Even with these issues, favorable commodity prices and rigorous operational execution delivered a fourth consecutive quarter with revenue above $1 billion along with robust cash flow. Equally important, we keep achieving significant strides in our growth plan. At Chapada, we approved building one more ball mill as part of the Saúva growth project. Work on earthmoving and pouring concrete is in progress, fabrication of the ball mill has begun, and we're aiming for commissioning in late 2027. The improved, finer grind is expected to boost recovery rates and let us extract more value from the higher-grade Saúva deposit, contributing roughly 15,000 tons of copper output per year along with 45,000 oz of gold. This quarter at Vicuña, we hit two key milestones. The first was finalizing a long-term royalty deal at the provincial level with the San Juan government, which merges our infrastructure commitments into one royalty framework and gives us a five-year holiday on trust contributions. The second was obtaining approval from Argentina's electricity regulator, ENRE, to build the high-voltage transmission line that links the project to the national grid. Along with the RIGI approval that came through earlier this year, these milestones mark meaningful headway in moving Vicuña toward a sanction as planned. Even as we keep working through the difficulties at Caserones, the core of our business is holding up well. Our balance sheet is solid, we have an attractive set of organic growth opportunities in the pipeline, and there is a clear route ahead at Vicuña. Our priorities are unchanged: we remain focused on safe operations, on delivering steady operational results, and on pushing our growth strategy forward as we work toward our goal of ranking among the top 10 copper producers globally. This quarter, Candelaria and Chapada were the standout operations, producing 37,000 oz of gold — our largest output of the year — and that helped push consolidated C1 cash costs down quarter over quarter to $2.01 per pound, once you set aside the $66 million in storm-related effects at Caserones. Despite the operational difficulties we dealt with during the period, Q3 still counts as one of the company's strongest financial quarters ever. Revenue surpassed $1 billion for a fourth straight quarter on the back of record realized copper prices, adjusted EBITDA reached $650 million, free cash flow from operations totaled $418 million, and we finished the quarter with a net cash position of $237 million. So far this year, our adjusted EBITDA and free cash flow from operations have both already surpassed the totals we recorded for all of 2025, and we're anticipating that 2026 will be yet another record financial year for Lundin Mining. Turning to capital returns, we repurchased roughly 2.4 million shares for a total of $62 million through our normal course issuer bid, and we declared our 39th quarterly dividend in a row. Back in August, the board gave approval to add as much as $100 million to our share repurchase program for the rest of 2026. At this point I'll pass things over to Juan Andrés, who will take you through the operational results in greater detail.

Juan Andrés Morel executive
#2

Thanks, Jack, and good morning, everyone. We produced 63,000 tons of copper on a consolidated basis. Candelaria and Chapada both posted strong quarters, and Caserones was the sole site materially hit by the weather-related disruption. Gold output came in at 37,000 oz — the strongest quarterly gold figure so far this year — driven mainly by Candelaria and Chapada. On a year-to-date basis, our three mines have delivered 219,000 tons of consolidated copper. As I noted, Candelaria carries a back-half weighting, and we anticipate grades rising into the fourth quarter, setting us up for a strong finish to the year. Let's now go site by site, beginning with Candelaria. That operation had an excellent third quarter, turning out 35,000 tons of copper, which is 13% above the second quarter. The gain came from a larger contribution of ore out of Phase 12, which yielded higher average head grades consistent with the planned grade profile for the back half of the year. Output is tracking in line with full-year guidance of 135,000 to 145,000 tons. A key milestone at Candelaria during the quarter was the substantial completion of our underground mining insourcing initiative. Mining grades and unit costs have come in better than planned, and we anticipate underground mining rates stabilizing at roughly 14,000 tons per day by the end of 2027; this expansion offers a meaningful path to growing production at Candelaria. Moving on to Chapada. That operation turned out 12,600 tons of copper during the quarter, 5% above the second quarter — the largest quarterly output in two years — plus 16,900 oz of gold. We anticipate similar levels in the fourth quarter as well. Throughput gained from high plant availability and better blast fragmentation. Chapada is still tracking to its full-year copper production guidance of 45,000 to 50,000 tons. As we discussed, Caserones had a difficult quarter. A series of severe winter storms triggered two extended production stoppages in July and August, amounting to roughly 30 days of suspended operations once you account for the time needed to safely restart, including thawing the flotation banks and turning over the mills. I want to acknowledge the Caserones team for their outstanding work navigating these conditions safely and efficiently. Copper production for the quarter was 15,000 tons, reflecting the storm's impact. As we come out of winter in the Southern Hemisphere, the operation kept facing weather events of lesser severity; in October, the site received 1.4 m of snow. Snow melt has left extremely muddy conditions in the pit; this has cut haulage rates and limited the volume of ore delivered to the mill. Haulage speeds have fallen by 20%, along with truck availability. The past two months of difficult conditions have affected maintenance schedules and reduced fleet availability. Given the mining rates we saw in September and October, we re-forecasted production for the rest of the year, factoring in the lower haulage speeds and maintenance time needed to improve fleet availability. So because of that, we've lowered our full-year copper production guidance for Caserones once more — it now sits at 105,000 to 115,000 tons, down from the earlier range of 120,000 to 130,000 tons. That's a hard pill to swallow, though it doesn't say anything bad about the asset itself or about the team. What drove it was squarely the storm events behind Chile's weakest copper output in 20 years. Consolidated guidance for the full year now stands at 285,000 to 310,000 tons, and our cash cost guidance stays where it was, at $1.95-$2.15 per pound. With that, I'll hand things over to Teitur, who will take you through the financial results.

Teitur Poulsen executive
#3

Thanks, Juan Andrés, and good morning to all of you. Quarterly revenue came in at $1.1 billion, which represents the fourth quarter in a row that we've generated more than a billion. Favorable metal prices persisted, and that let the company maintain a very healthy revenue picture. So far this year, revenue stands at nearly $3.5 billion, which is more than 25% higher than what we saw in the first nine months of 2025. In the third quarter, copper accounted for 87% of revenue, while gold made up 11%. Candelaria delivered the biggest share at 53% of quarterly revenue, then Chapada at 24%, and Caserones at 23%, and Caserones' revenue contribution took a hit from the severe winter storms we discussed earlier; as a point of reference, over the preceding three quarters Caserones had been the top revenue source, normally accounting for more than 40% of the company's quarterly revenue contribution. Although Caserones brought in $255 million of revenue in the third quarter, lower than the same quarter a year ago because of weather-related interruptions to production and sales volumes, its revenue for the year to date, at $1.3 billion, stacks up well against the $1 billion produced in the first nine months of 2025. Now on to sales volumes and pricing: total payable copper sold during the quarter reached 64,000 tons, a touch above production, since we drew down inventory levels in the period. Our realized copper price, which includes adjustments from prior period provisional pricing, came to $6.85 per pound — the highest quarterly realized copper price in the company's history. Where gold is concerned, the realized price in the third quarter was $4,321 per ounce. For the year to date, realized copper price was $6.32 per pound and realized gold price was $4,590 per ounce. At September's close, roughly 69,000 tons of copper carried provisional pricing of $6.55 per pound and stay open for final pricing adjustments, and most of that volume will be priced during the fourth quarter of this year. Third-quarter production costs were $441 million, versus $530 million in the quarter before. As I noted earlier, Caserones recorded $66 million of mine standby cost in the quarter tied to the weather-related suspension of operations, and $58 million of that is operating costs. Those costs appear separately in the income statement as mine standby costs, so they are excluded from our adjusted EBITDA and adjusted earnings calculations. If you exclude the reclassification of certain costs into standby costs, consolidated production costs would have come in closer to where they were in prior quarters. For the quarter, consolidated cash cost was $2.01 per pound, which is roughly 5% lower than the prior quarter. The standby cost we incurred during the quarter is not included in the cash costs. That said, the cash cost metric was still negatively affected by lower sold volume, although higher gold byproduct credits compared with the previous quarter more than offset that. Year to date, consolidated cash cost was $1.92 per pound, a little below our revised guidance range of $1.95-$2.15 per pound. Chapada has posted a year-to-date cash cost of $0.57 per pound, which is still a major outperformance, helped by high gold prices that are throwing off robust byproduct credits. At Candelaria, the year-to-date cash cost of $2.27 per pound mirrors the effect of planned lower grades during the first half; those grades are getting better as higher-grade Phase 12 ore becomes more available in the second half, which brings the cash cost per pound down. Candelaria remains on track to hit its cash cost guidance for the year of $2.05 to $2.25 per pound of copper. We remain closely focused on the broader environment for input costs, and this slide shows that diesel, electricity, and labor are among the largest factors driving what we pay for inputs. Of those, labor is the biggest single input cost, and the majority of our labor expenses in Chile and Brazil are paid in local currencies. Consequently, shifts in foreign exchange rates significantly influence our C1 cash costs measured in US dollars. Because Chile's workforce is much bigger than Brazil's, and because we pay other routine operating expenses in local currency too, a 10% swing in the Chilean peso affects our US dollar C1 cash cost by an order of magnitude more than any other input cost factor. Diesel also matters a lot as an input cost for the company. During the last year, diesel has climbed from roughly 5% of the input cost structure to somewhere between 7% and 8% of the total input costs tied to our operating activities. When it comes to diesel used in our operations, we go through roughly 175 million liters annually, so each $0.10 per liter rise in the price works out to about $18 million in extra direct costs per year, which moves cash costs by around $0.03 per pound. Sulphuric acid costs have gotten a lot of attention across the industry lately, but as you can see, that's a really small piece of what the company spends on inputs. Our yearly sulphuric acid usage is typically around 40,000 tons, which at today's prices comes to somewhere between $10 million and $15 million a year — under 1% of the company's overall production costs. After we factor in all of these elements, along with the costs we have actually incurred so far this year and our projections for foreign exchange and diesel over the rest of the year, our full-year cost guidance remains unchanged at $1.95-$2.15 per pound. Cash capital expenditure for the quarter came to $220 million, split between $123 million for sustaining capital and $97 million for expansionary capital. The $123 million of sustaining capital in the quarter went mainly toward open pit waste stripping and underground mine development at Candelaria, plus TSF construction at Caserones. Sustaining capital stands at $359 million year-to-date, which is running a little behind plan. So because of that, we've cut sustaining capital at Caserones by $20 million, largely because we pushed back the purchase of a hydraulic shovel. Expansionary capital for the quarter was $97 million, and most of it — $81 million — went to Vicuña. That shows a big step-up in the work needed to get the project ready, including detailed design and engineering, execution planning, and early earthworks at the site as we move toward a sanctioning decision. The rest of the expansionary capital goes toward early-stage construction at the Chapada ball mill under the Saúva project, plus other initiatives at the site level. We trimmed expansionary CapEx on the Chapada ball mill by $30 million because payment timing for fabrication of the mill now falls into next year. Expansionary capital year-to-date stands at $234 million. Our updated full-year capital guidance is $980 million, made up of $530 million in sustaining capital, $55 million in expansionary capital at operating mines, and $395 million for the Vicuña spend, which equals 50% of our equity share. Now on to the quarter's key financial metrics. Adjusted EBITDA reached $648 million, an adjusted EBITDA margin of roughly 58% on revenue of $1.1 billion. Adjusted operating cash flow for the quarter came in at $430 million, including a working capital release of $101 million. Now regarding free cash flow and adjusted earnings: our operations generated $418 million in free cash flow this quarter, which represents a 16% gain over the $360 million recorded in the second quarter, despite the elevated sustaining CapEx we took on during the third quarter. On a year-to-date basis, free cash flow from operations stands at almost $1.2 billion, which is 50% higher than the $774 million posted for the entire year 2025. Adjusted earnings attributable to shareholders came in at $277 million, equal to $0.32 per share, marking an 8% rise from $257 million in the prior quarter. As I mentioned before, those adjusted earnings leave out $66 million in mine standby costs at Caserones; shifting now to the balance sheet, our financial position continued to get stronger throughout the quarter. Net cash climbed to $237 million, up from $79 million when the previous quarter ended — a gain of roughly $160 million so far this year. Yesterday, net cash was approximately $200 million, which reflects capital spending at Vicuña along with the usual cash outflows seen in October. During the quarter, we collected $23 million in contingent payments connected to the Neves-Corvo and Zinkgruvan deal that closed last year. That deal included contingent consideration of as much as $115 million, tied to copper and zinc prices. To date, we have received about $28 million in cash consideration under that contingent component. Overall, our balance sheet is still very strong, and once a sanction decision is reached, we're in good shape to fund Vicuña. At quarter end our revolver had no balance outstanding, compared with $60 million drawn at the close of last year. As a reminder, in February of this year we upsized that revolving credit facility, taking total commitments to $4.5 billion — meaning the company now has full funding for the very exciting Vicuña project. In summary, it was another financially solid quarter, even with the headwinds Caserones has faced from the two severe winter storms that struck during the period. With that, I'll hand the call back over to Jack for his closing remarks.

Jack Lundin executive
#4

Thanks, Teitur. Moving on to Vicuña — this quarter brought two major milestones. The first was a long-term provincial royalty agreement signed with San Juan's government. That deal folds our infrastructure obligations into one royalty framework and gives the project a five-year holiday on infrastructure trust contributions, in return for an upfront commitment of $250 million on a 100% basis, or $125 million for Lundin Mining's 50% share. The second was regulatory approval from ENRE, Argentina's electricity regulator, to build the high-voltage transmission line linking the project to the national grid. Along with the RIGI approval we obtained earlier this year, these milestones mark meaningful progress toward putting in place the conditions needed to move Vicuña toward sanction. In the slide's background, there's a picture of 150-ton haul trucks on their way to site; they'll be part of the civil construction and earthworks fleet. So far this year, 12 have been bought and delivered to site. We're also excited to report strong progress on the technical and commercial definition of stage one. Engineering continues to advance, and the Vicuña team is wrapping up the bottom-up stage one capital estimate while further refining the execution strategy and integrated project schedule. That work is now going through extensive independent peer reviews, which will in the end support a robust, executable capital cost and delivery plan. Our priority is finishing this work, making sure the project is mature and well-defined enough, and putting ourselves in position to take a stage one sanction decision before year-end. Although significant operational challenges arose from the super El Niño winter at Caserones, our business has shown resilience — delivering strong financial results, generating solid cash flow, and keeping a robust balance sheet. Meanwhile, we keep advancing organic growth opportunities at Chapada and are making important progress at Vicuña. We're exceptionally well-positioned to take advantage of the copper market's long-term strength. With demand accelerating, supply increasingly constrained, and a strong operating foundation at Lundin Mining, we have an exceptional pipeline of growth opportunities ahead. Our focus stays on delivering sustainable value to our shareholders and moving toward our ambition of becoming a top 10 global copper producer; with that, I'll now open the floor for questions.

Alain Gabriel analyst
#5

Yes, sir. Thank you for taking my question, and hello, everyone. Jack, I have one question to begin with, and it concerns the spending on Vicuña. You've kept your full-year CapEx at $395 million, which suggests a very considerable increase in Q4. How likely do you think it is that this increase carries over into 2027? That's my first question. I have a second, follow-up one. I'll pause here for now.

Jack Lundin executive
#6

Hi, thank you for your question. On Vicuña, we kept our forecasted expenditure guidance unchanged. What I mean is, at Vicuña, given the weather we've run into and the work that's underway as this year draws to a close, we will keep ramping up expenditures as we head into what will hopefully be a 2027 during which we would officially begin construction. So, on the whole, I think expenditures keep trending upward month-over-month, and that's the reason we held our projections for Vicuña expenditures in place.

Alain Gabriel analyst
#7

Thank you; that's quite clear. My second question concerns Caserones. You've reduced the CapEx there—I assume that's largely tied to stripping work due to the weather—and yet you've kept your volume guidance for 2027. How much risk do you see to that guidance range now that certain maintenance work has been delayed or pushed into 2027? Thanks.

Teitur Poulsen executive
#8

Hi, Alain; Teitur speaking. We've lowered guidance by $20 million for sustaining CapEx at Caserones, and that's because some equipment purchases are being deferred to 2027.

Alain Gabriel analyst
#9

Thanks. Is there any risk you see —

Teitur Poulsen executive
#10

Yes, that comes to $20 million —

Alain Gabriel analyst
#11

— relative to the range you've provided?

Teitur Poulsen executive
#12

Well, I mean, we'll need to watch how the weather plays out across the remaining few months of this year. I mean, in the past, Caserones hasn't really matched the projects as budgeted over the last two or three years. Of course, on top of that this year, we've been hit by these severe weather effects. Let's see where we land, but so far we've made the decision to cut guidance by $20 million for the full-year sustaining CapEx figure.

Alain Gabriel analyst
#13

All right, thank you.

Orest Wowkodaw analyst
#14

Good morning, and thanks. My question likewise concerns Vicuña. I'm curious about what remains regarding the steps still ahead prior to an FID decision, particularly considering the anticipated timing before the close of the year?

Jack Lundin executive
#15

Hi, Orest. Appreciate the question; we're nearing the conclusion of this year, and as you've observed and as we've been keeping the market updated, we've stayed very disciplined and managed to reach every one of our key milestones, be it assorted permits, assorted fiscal stability agreements, at both the federal level and the provincial level; we keep advancing toward that sanction decision prior to the close of this year. Truly, the final step left is the bottom-up capital estimate, the execution plan, the schedule, and simply obtaining all of the details that will support stage one for the execution of stage one. After we finish that, after the Vicuña team finishes that, it will then go to the shareholders for approval. It's truly only internal work being carried out now that will support the favorable sanction decision prior to the close of this year.

Orest Wowkodaw analyst
#16

All right, thanks for that. Regarding the phase one CapEx, I understand it isn't fully finalized yet, but you've got to be fairly far along by now. Would it be reasonable to think that CapEx is seeing some inflation-driven pressure, given the conditions we're facing, beyond the earlier $7.2 billion figure?

Jack Lundin executive
#17

You could reasonably say that, Orest. What we're doing is going through those independent peer reviews and stress testing every aspect of the project — CapEx, execution, and schedule. All the recent input pricing assumptions are going to be incorporated. So we're also moving the CapEx forward by more than a year; the PEA came out in Q1, but those prices were really from the end of 2025. We're now advancing this to a January 1, 2027 estimate, and we'll factor in inflation and escalation in Argentina. Everything will be updated prices feeding into this bottom-up estimate.

Orest Wowkodaw analyst
#18

Oh, wow. So even with diesel prices where they are right now, looking at the effect on, say, stripping and all of that, the whole thing will be priced according to today's conditions?

Jack Lundin executive
#19

That's right.

Orest Wowkodaw analyst
#20

Wow. Okay. Thank you very much.

Jack Lundin executive
#21

Thank you.

Richard Garchitorena analyst
#22

Great. Thanks, and congratulations on those results. My first question concerns Caserones — it seems the copper grades went down during the third quarter. Could you perhaps explain how the hauling problems affected that, and then how we ought to think about it as we head into 2027?

Juan Andrés Morel executive
#23

Yeah. Hi, Richard. It's Juan Andrés here. Thanks for asking. Yes, certainly, because we ran into those muddy conditions late in the third quarter, we had to rely on stockpiles, which affects the grades. Naturally, the pit development delay also meant we couldn't access some of the high grades located at the bottom of Phase 6 and 6B. However, those high grades will be shifted into 2027, so we should anticipate improved grades during the first half of next year.

Richard Garchitorena analyst
#24

All right, thanks. Perhaps I could just ask a follow-up about Candelaria — it came in above expectations, I suppose, or above what we saw in the second quarter. Could you perhaps walk us through what drove that, and then more broadly, any early indications about how the 2027 impacts of those feed into the mine plans for that operation?

Juan Andrés Morel executive
#25

Yes. With Candelaria, as I said earlier, we've been aware since the start of the year that it would be weighted toward the second half. We attempted to shift some of the high grade out of Q4 and into Q3, which partly accounts for the stronger Q3 results. Still, we're confident Q4 will deliver the high grade coming from Phase 12. That high grade sits near some old stopes, so we have real confidence it's there; so, 2026 will be strong at Candelaria, and we're also expecting a very strong 2027.

Richard Garchitorena analyst
#26

Great, thank you.

Daniel Major analyst
#27

Hi there. Thanks for the presentation and the questions. I suppose I have two questions. First, on CapEx, as we look toward next year — and of course we appreciate we'll get the Vicuña numbers once you reach the FID — but thinking about a kind of baseline CapEx, with $530 million sustaining and diesel pricing, I guess, running higher going into next year for stripping, could you give us a directional steer on CapEx ex-Vicuña across the remainder of the portfolio, and whether there are any offsetting factors that would keep it from being pushed up by the sort of inflation in some of the input costs we're seeing?

Teitur Poulsen executive
#28

Yeah, so we're in the middle of putting the budget together at the moment, and it'll go to the board for approval in December. Once that's done, we'll issue guidance — whether that happens later in December or early in January hasn't been settled yet. That said, I'd say broadly there shouldn't be any major shifts when it comes to sustaining CapEx as such. Of course, diesel prices are higher at present, so we'll watch how that develops. We've also seen the Chilean peso weaken a bit over the past several weeks and months, which could have some effect at the margins too. Still, I wouldn't anticipate any step changes in sustaining CapEx as such.

Daniel Major analyst
#29

Alright, thanks. So I've got a few questions about Vicuña. First, on the royalties: you said the provincial royalty agreement was signed, with a five-year holiday and capped at 3%. Could you remind me what the total revenue-based royalty would be — including any other associated royalties — on a normalized basis during those first five years, while the provincial royalty holiday applies?

Teitur Poulsen executive
#30

Yes, we'll have 1.5% on that provincial, and on top of that there's a 3% provincial royalty. So those are the royalties that apply at Vicuña.

Daniel Major analyst
#31

All right, so 4.5% applies across the entire lifespan, sort of, throughout the whole operation, on a normalized basis?

Teitur Poulsen executive
#32

That's right.

Daniel Major analyst
#33

Okay, thank you. So for the final one, I'm just thinking about what information we'll receive when Vicuña reaches FID. Obviously, a CapEx figure will come our way. Are you going to give us an updated medium-term production profile, or is it just the Josemaria development? And the second one: you've mentioned before the wish to speed up phases two and three so the high grades arrive sooner, maximizing NPV. At this stage, would there be any extra capital sanction beyond phase one?

Jack Lundin executive
#34

Yeah, thanks for the question. As we look toward sanctioning stage one, we'll be putting out an update covering CapEx and the schedule for executing stage one. All of that will feed into an eventual district update. Remember, in Q1 we released a district PEA, so we're now heading toward a district PFS, which we're targeting for completion in the second half of 2027. With this interim step of sanctioning stage one, we'll release information specifically about stage one plus any relevant details we believe we can update on stages two and three, though all of it feeds into a district PFS study. On your second question, of course, everything we're doing involves looking for places where we can maximize the project's value, bringing in higher-grade material and bringing later-stage production in as soon as reasonably possible. All of that is being worked through right now with the Vicuña team. Overall, I think we're doing a very good job continuing to de-risk Vicuña, but what you should expect to see is really just an interim update on stage one as we look to sanction it, followed by a district-level study toward the back half of next year.

Daniel Major analyst
#35

All right, great. Thanks; so at this stage what we really should be expecting is just the CapEx phase one figure along with some scheduling of that CapEx.

Jack Lundin executive
#36

Yes, and should any expenditures be directed toward stages two and three, then obviously we would point out what those costs relate to. So as much clarity as we can will be given, though honestly the update — the full update — is going to come through a district study later on.

Daniel Major analyst
#37

Great. Thanks a lot.

Matthew Murphy analyst
#38

Hi. Could you go into a little more detail about the preparation at Vicuña? I'm somewhat interested, with winter and all, in what condition the site is in right now. Is there still snow on the ground? Did the winter give you any lessons or challenge any of your assumptions regarding what building or operating there will actually be like? I'm also curious about the hiring situation. How are workforce preparations progressing?

Jack Lundin executive
#39

Hey, Matt. Thanks for asking. Naturally, we're still in this El Niño season. Winter has run longer down in the southern hemisphere, so the difficulties we're running into at Caserones and the weather we're seeing at Caserones are much the same over at the Vicuña project, since the two are just 40 km apart; even so, conditions are somewhat better on the Argentinian side of the district, and a fair amount of snow does still cover some of the assets, but we've managed to move personnel and equipment. As I said in the presentation, 12 of our haul trucks are now being assembled at site, and we're carrying out earthwork activities, so progress keeps being made; yet when it comes to the lessons learned from what we're experiencing at Caserones, I'll pass it to Juan Andrés, because there are a number of them that we're looking to apply to the execution plan for Vicuña stage one.

Juan Andrés Morel executive
#40

Thanks, Jack. Hi, Matt. As Jack mentioned, and as you're aware, Caserones had an extremely harsh winter — the one with the largest snowfall ever recorded there. So we seized the chance to carry out an independent review, bringing in some specialists to assist us in gathering all the lessons learned, and those are being documented in a report that we'll give to Vicuña so the lessons can be shared and then incorporated either while construction is underway and, naturally, afterward during operations.

Matthew Murphy analyst
#41

Great. Thanks. And then just on the hiring?

Jack Lundin executive
#42

Yeah, so as I think I said in response to an earlier question, we've been increasing our spending month by month, and hiring is following the same pattern. I mean, we've managed to build a fairly robust program for capacity building, preparing for construction readiness activities. And so, since the Vicuña project will be sort of the first big one to get going, I think we aren't running into major difficulties when it comes to drawing in talent. But more widely across this industry, of course, we are seeing strains when it comes to securing the right experts in the field; we're dealing with that, though. We've got a solid team; we've already managed to scale up with a substantial number of staff, and so we'll keep working through that as we head into the new year.

Matthew Murphy analyst
#43

Great. May I raise one more separate topic — the corporate tax cut in Chile? My guess is Candelaria is the one most likely to feel that effect, right? The tax stability agreement for Caserones finishes, I believe, in 2028, and you may also have some tax loss pools sitting there. Could you share any thoughts on how that will show up in the financials?

Teitur Poulsen executive
#44

Yeah. Hi, Matt. That's right; it was enacted in October, so after the close of the third quarter. You're correct that it will hit at asset level, and obviously it will hit Candelaria, where we do pay corporation tax QoQ, whereas at Caserones, as you said, we still carry significant tax losses, so we aren't projecting to pay any cash taxes there for the foreseeable future. Ultimately, this will obviously be cash flow accretive at the asset level. But the withholding tax on dividends when you move the money out of the country still stands at 35%. Our structure at the moment involves intercompany loans going into Chile, so we are still repaying those loans, which obviously in the near term means we will avoid those dividend withholding taxes. Ultimately, once those loans have been repaid, we will move into a 35% withholding tax on dividends. As such, the lower corporation tax rate at asset level, when that phase kicks in, will not benefit the company as such.

Matthew Murphy analyst
#45

Understood. Alright, thank you, Teitur.

Matt Greene analyst
#46

Hello, everyone. I've just got one question, and it's probably one for you. Regarding the standby charges that you took in the quarter, could you walk us through how that figure is arrived at? Is it downtime, or costs incurred, or lost revenue? I'm just eager to understand how you arrive at that number. Was it all contained within Q3, or should we anticipate some kind of charge in Q4 too?

Teitur Poulsen executive
#47

Yeah. I mean, how we arrive at it is by taking all the standard direct costs and then prorating them based on the uptime we achieved in the third quarter. You can't charge that to inventory, because there wasn't any production to carry the inventory against, so it has to be expensed straight away; we were looking at mill uptime in certain cases, and simply normal production efficiency on certain other cost items. It was somewhat of a blend of factors feeding into that. Of the $58 million directly relating to OpEx, roughly $21 million were in fact costs incurred as a result of recovery exercises when the snow hit. That was over and above the usual production costs, so to speak. We had $21 million of direct snow recovery costs, and then the delta of roughly $37 million was reclassified out of normal production costs into standby costs. The other figure that brings the $66 million together is then the depletion charge of $8 million, which we likewise prorated in line with uptime performance over the quarter. As for the impact on Q4, I'd say it's early days, but I don't think we'll see any additional charges in Q4.

Matt Greene analyst
#48

Understood. That's clear. And obviously, the weather isn't something you can control. Would insurance cover this? Are you looking to explore that?

Teitur Poulsen executive
#49

Yeah, no. The stoppages haven't lasted long enough for business interruption insurance to kick in here, so there won't be any insurance.

Matt Greene analyst
#50

Understood. That's very clear. Many thanks.

Christopher LaFemina analyst
#51

Thank you, operator. Morning, everyone. My questions have been answered. There's just one left. Have you considered the possibility of hedging a portion of your copper sales so as to lock in cash flows? I'm aware that your policy in the past, your philosophy in the past, has been not to hedge, but might you think about hedging to secure cash flows before what could be a sizable CapEx pipeline? Thanks.

Jack Lundin executive
#52

Hi, Chris. Appreciate the question. I'd say we're constantly reviewing those kinds of opportunities. We haven't done so in the past. I mean, we currently hold some gold hedges that are rolling off at the end of this year; but when it comes to copper, since it's our primary commodity, we haven't historically done that. We always check whether there are opportunities in the market, but as things stand, we've stayed away from it. I mean, we're seeing a robust copper price environment. On a fundamental basis, we do believe prices will stay strong. There is some short-term volatility, and we've also observed some of our peers and certain other Lundin Group companies considering hedging their main commodity as they head into periods of heavy CapEx. So it's something we examine, but nothing has been locked in as of yet.

Christopher LaFemina analyst
#53

All right, I appreciate that.

Anita Soni analyst
#54

Hello, and thanks for taking my question. Most of them have already been asked and answered, but I wanted to follow up on Caserones. Are there any knock-on effects going into 2027 that we should consider in terms of the ore haulage delays? Will that change where you would have originally thought you would have been in grade sequencing?

Juan Andrés Morel executive
#55

Hi, Anita. This is Juan Andrés. Thanks for the question. As I mentioned before, we were considering some high grades to be mined in the fourth quarter, but given this delay of approximately one month, those high grades are going to be pushed into 2027. Next year's first quarter should bring a better grade profile. Overall, though, our mine sequencing stays aligned with the long-term mine plan, so nothing significant is shifting on that front.

Anita Soni analyst
#56

Okay. All right. Thank you very much.

Operator operator
#57

Thanks. Since it looks like nothing else is queued up, that brings today's conference call to a close. We appreciate everyone joining in. You're free to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Lundin Mining Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Lundin Mining Corporation earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.