We appreciate you holding on. I'm the conference operator speaking. Welcome to the B2Gold Corporation call covering the financial results for the second quarter of 2026. <<operator_script>> Please note that this conference is being recorded. <<operator_script>> At this point I'd like to hand things over to Mike Cinnamond, who serves as President and CEO of BT Gold. The floor is yours.
Thank you, operator. Good morning, everyone, and thanks for being with us on B2Gold's Second Quarter 2026 Conference Call. I think the first order of business, before we get into discussing the quarter, is that I want to touch on the trading hold put in place earlier this morning. Just a short time before this call, we got confirmation that the Menankoto exploitation permit has been granted by the government of Mali. Given how significant this development is, and our duty to make sure all investors get material information at the same time, we asked for a temporary trading halt while the news release is being examined, and I believe that release will go out shortly. For the Fekola Complex, this permit is a very important milestone — it gives us the framework to begin mine activities in the Menankoto permit area and supports continued development of the Fekola regional deposit — and we appreciate the efforts of the government of Mali and all stakeholders involved in moving this permitting process forward. So that is why the trading halt happened. And while we're very pleased to have this approval, today's call will stay focused mainly on our second quarter results and operating performance, though we will of course offer additional comments about the Menankoto permit during the call and take questions after our formal remarks.
With that said, I'll now hand things over to Kelvin, our Chairman, who'll offer a few opening comments.
Thanks, Mike, and good morning. You've now heard the excellent news about Mali. And before Mike and the team walk through that quarter in detail, I'd like to spend a few minutes giving a broader view of the principles that keep guiding our business. Before I do that, I want to recognize 3 important leadership milestones. First, on behalf of the Board, I want to thank Clive Johnson for his extraordinary contribution to B2Gold, from founding the company to building it into the international gold producer it is today; Clive's leadership and determination have been instrumental. And while he stepped down as Chief Executive Officer, we're very pleased that he will continue to support the company as Chair Emeritus, and we look forward to benefiting from his experience and insight. I also want to speak to Mike Cinnamond's appointment as Chief Executive Officer. The Board and I have tremendous confidence in Mike and the leadership team. This transition represents continuity more than a change in direction. Mike has been deeply involved in the execution of our strategy and the development of our business over many years. We believe the company is in very capable hands, and we're excited about the leadership he will provide in the next chapter of B2Gold's evolution.
We're also happy to share that Michael McDonald has agreed to serve as Chief Financial Officer. Michael's performance and business acumen have set him apart again and again, and the finance team has already started the handover, with an eye toward a smooth succession. From where the Board sits, we could not feel better about Michael holding this position and about how well he will keep working side by side with Mike, whose many years in the job give him a deeper grasp of the B2Gold CFO function than anyone else. Our approach is still simple. We stayed focused on delivering on 1 bank. Chasing short-term opportunities or reacting to market cycles has never been what our strategy is about. As a reminder, I very much look forward to collaborating even more closely with Mike and the management team, concentrating on disciplined execution and on delivering value. On that note, it matters to acknowledge that our share price performance as of late has fallen short of the standards we hold ourselves to and of what our shareholders expect. While our confidence in the quality of our assets is very strong and deep, this is a great team. We get it that shareholders care about results, and they are entirely entitled to. The board and management are wholly devoted to the work needed to produce the forms expected of us.
The way we operate is still the bedrock of everything we do out there. Over time, we've built trust with shareholders, most nations, staff, and the communities around us by defining clear goals and putting in steady effort to reach them. We see ourselves as operators above all, with a disciplined emphasis on safety, getting things done, constant enhancement, and generating value from the assets we possess and run. We further hold the belief that putting money back into the company builds value over the long haul — whether that means maintaining current operations, funding exploration, or moving strong development projects forward. Simultaneously, we understand that robust cash generation has to turn into returns that matter — keeping a balanced path between funding tomorrow's growth and giving capital back to shareholders. We know our achievements are tightly linked to the nations and communities in which we operate; being a preferred partner involves more than safe and responsible operation. I mean it involves collaborating with host governments and communities to produce enduring benefits. I believe today's announcement formally highlights that very point. Scanning our portfolio, we keep seeing the payoff of this steady method. Our priority is on executing energetically, meeting our promises, and building the trust that has forever been gained via diligent effort and results.
With that said, I’ll now hand things over to Mike and the management team so they can walk us through the second quarter results. Thank you.
Thank you, Kelvin. The second quarter was a significant one for B2Gold. We achieved consolidated gold production of roughly 204,000 ounces, which matched our expectations, and this was driven in particular by strong operating results at Fekola and the <<inaudible>> mines. Goose production, meanwhile, was affected by the pressure fire in April, as we announced earlier — the team on site handled it remarkably well, and repairs are still moving ahead as planned. Another major execution priority for us in 2026 is getting Fekola Regional into operation. We recently held meetings in Bamako with Mali state officials, and they confirmed that nothing stood in the way of approving the Menankoto exploitation permit, since every required step in the approval process had been completed and validated by the various ministries. And as you have now heard, the Council of Ministers in Mali has granted the permit. So the state's issuance of this Menankoto exploitation permit means we can advance one of B2Gold's most important near-term growth opportunities. Mining pre-stripping activities can begin now, and Fekola Regional should ramp up operations through the end of 2027, producing more than 150,000 ounces annually from 2028 onward through the mid-2030s.
Beyond Mali, we kept making our portfolio and balance sheet stronger over the quarter. Our 70% stake in Fingold TgnicoEagle was sold, bringing in $325 million. Under our renewed NCIB, we bought back 19 million shares for $92 million, and we finished the last deliveries under our gold prepaid contracts — Mike will cover that in a bit more detail shortly. So although the second quarter carried some temporary pressures on free cash flow from taxes, prepaid deliveries and novated production costs, those headwinds should definitely ease. And now that the prepaid delivery goal is behind us and every remaining gold sale is exposed to spot prices, we anticipate a meaningful gain in free cash flow generation going forward. With that, I'll hand the call to Michael MacDonald, who will discuss our financial results for the second quarter.
Thank you, Mike. On a consolidated basis, the second quarter's financial results came in as we had expected for the period. Strong performance at Fekola, Masbate and Otjikoto made up for a more difficult quarter at the goose mine, which was ramping up milling operations after the fire reported earlier in certain areas of the crushing circuit in April 2026. Net income attributable to shareholders came to $417 million for the second quarter, or $0.31 per share, helped by the gain on the sale of our Finland properties along with unrealized gains on derivatives. Once those gains and other nonrecurring adjustments are backed out, adjusted net income attributable to shareholders was $41 million, or $0.03 per share. It's worth noting that our adjusted net income figures included roughly $71 million of realized losses tied to our gold collar contracts during the quarter. Absent that impact, adjusted net income per share would have come in at just over $0.08 per share. The gold collar contracts wrapped up in December of this year, and B2Gold will enter 2027 entirely free of gold prepayment and gold collar contracts. Operating cash flow before working capital adjustments was $94 million in the second quarter. If current gold prices hold, operating cash flow is expected to increase substantially in the second half of 2026 relative to the second quarter, mainly because the gold prepaid contracts were completed in June 2026.
During the quarter, free cash flow came in at negative $258 million, which matched what we had anticipated when our guidance was issued at the beginning of 2026. The main driver of that free cash flow impact was elevated cash tax payments — this includes the priority dividend payment made to the state of Mali tied to their 20% ownership of Fekola, as well as the effect of the gold prepaid contracts, which touched just over 30% of ounces sold in the quarter. Regarding cash taxes, the amount paid in the second quarter of 2026 represented just under 45% of what we expect to pay in cash tax for all of 2026. As a result, you'll see the cash tax figure moderate in the third and fourth quarters relative to the second quarter. That negative free cash flow figure also excludes the $325 million in cash proceeds we received from selling our Finnish properties during the quarter. Even so, our balance sheet remains very strong. At quarter end, we held $287 million in cash and cash equivalents, along with working capital of $405 million. We are in a very strong financial position, and at these gold prices it will only get stronger over the coming quarters. Lastly, we continued returning capital to shareholders through our normal course issuer bid and common share dividends.
So far in 2026, we've bought back roughly 35 million shares, spending $172 million in total. Beyond that, during the first half of the year, dividends of $52 million were paid out. Taken together, shareholder returns for the first 2 quarters of 2026 add up to $224 million — more than 4% of our present market cap. Those figures came about even with the effects from the gold prepayment contracts and the gold color contracts. As 2026 wraps up and we move into 2027 with those 2 financial instruments no longer weighing on us at all, we expect free cash flow to climb sharply at today's gold prices, and that ought to permit higher shareholder returns too. With that said, I'll hand the call to Bill for an operational update.
Thank you, Michael. Looking at how we operated, the quarter came in pretty much as we had anticipated. Total consolidated output was roughly 204,000 ounces. Fekola, Masbate and Otjikoto each did better than forecast, showing the steady, dependable performance investors have grown to count on from those operations. At Fekola, things keep running smoothly, and we are concentrating on running the Fekola and Cardinal pits efficiently while getting ready to start mining at the Fekola regional. Now that the Menankoto exploitation permit has been issued, we have a clear route ahead for developing the cocoa Regional. Just to reflect on that for a moment. Keep in mind that we had already secured approval, built and readied all the site infrastructure and every road, begun pre-stripping, and brought on all the staff needed to start mining. At Goose, the crusher fire in April hurt output in the quarter. Safety is still our top priority, and I am pleased with how the team responded to the incident. Repairs and remediation work are moving ahead as scheduled, and we expect remediation plus Phase 1 of the crusher upgrades to wrap up by the close of third quarter. Meanwhile, an extra mobile crusher was sourced and arrived at the site in July -- we anticipate it will be running in early August.
We anticipate the new mobile crusher, combined with the crushers already at the site, will have crushing capacity above 3,000 tonnes per day. <<inaudible>> and Otjikoto bulk posted another strong quarter of operations that beat expectations, with solid operating performance at both sites that we expect to continue through the rest of the year. The company has raised production guidance for these operations. Given year-to-date operating performance and our updated outlook for the remainder of the year, we have narrowed our guidance range across the portfolio. Consolidated gold production is now expected to be between 820,000 and 920,000 ounces in 2026. The biggest change is at Fekola Regional, reflecting delays and the issuance of the Menankoto exploitation permit, along with a narrower production range at the Goose mine due to the fire that occurred in certain areas of the crushing circuit in April this year. Those changes are partly offset by the guidance increases at both Masbate and Otjikoto that we mentioned earlier. Importantly, our consolidated cash operating cost guidance is unchanged, at between 1,155 and $1,280 per ounce produced. We have also reduced our all-in sustaining cost guidance range to between $2,370 and $2,550 per ounce sold, and we currently expect full year results to be at or below the low end of that range.
All told, our confidence in the operating outlook is unchanged, and our attention is on producing a solid performance in the second half of the year. With that said, I'll hand the call back to Mike Cinnamond now.
Thank you, Bill. And thanks to all of you for the quarter overview. We're clearly happy with these results and with how things look as we head into the rest of this year. And of course, getting the Menankoto permit this morning marks a major step forward for us. We had said there were two key things we intended to deliver on during this year. The first was to move Fekola Regional <<inaudible>>. So we're now well positioned to do that, to start moving ahead there. And the second item we flagged as key was completing our remediation and fire damage repair work and the remediation work on Goose at the crushing plant, so that we can reach steady state of roughly 300,000 ounces a year by mid 27. So I believe you've seen in the materials we've put out that we now have a solid plan for that, and that plan is well underway. . With those comments, I'd like to open it up for questions.
<<operator_script>> Our initial question is from Wayne Lam at TD Securities.
Congrats on reaching such a momentous milestone. On Fekola, could you perhaps give us a little more detail on what exactly shifted with the latest round of discussions in the country? And has anything altered the relationship there that led to the permits being issued at this point?
I can speak to that. What I mean is, over the past few months we made a number of trips to meet with the ministries. And my sense is that the message came through very consistently. Throughout this period, they implemented the new mining code, and the agreements with every one of the operating mining companies were negotiated. After that, they added some fresh layers of governance regarding how they supervise mining activity across the country as a whole, and that included, most recently, establishing the new mining commission that we discussed earlier this year. And so, with all those government bodies, they've also set up a state mining company, Sofferman, which oversees the intra stakeholds. So my sense is that the consistent message to us across the last couple of visits, certainly this year, was that the state has been working hard simply to harmonize how each of these ministries interact, who is responsible for which pieces of the 23 mining code as it relates to the operating companies and then, obviously, the mining commission that oversees on an overall basis. So my sense is that the message we received most recently when we traveled there was that they have now harmonized all of that, they're comfortable with it, we've got the right structures set up, and they're ready to move forward.
In a sense, we were starting to secure the first significant new permit issued under the 2023 mining code. Both sides, and sales in the state, needed some patience to reach that point. But as you can see, we have now arrived there. That is how I would describe it.
All right, that's excellent. And then perhaps just: what does the timeline look like going forward for stripping, mobilizing, and getting into or at the regional — the guidance at the year's start was roughly an 8-ounce contribution, given the permits at the end of Q1 and stripping through Q2. So should we simply take that guidance and move it forward? I'm just wondering how to think about the months ahead and the ramp up to the 150,000 ounce run rate.
Yes. I think when we put the budget together for '27, we'll provide some guidance on how we expect that ramp-up to look. But the way I'd frame this year is that we'll be in there quite soon, and pre-stripping can begin, which will take a few months. So that essentially carries us to the end of this year. I think, to get things up and running. I mean, there's a chance of some production toward the end of the year, but I think for balance sheet purposes, we'll just assume that we do this year and then ramp up next year through '27. With the aim of being ready by the end of '27 to have another area producing 150,000 ounces a year from regional.
All right, great. And maybe just one final one on Back River. Could you take us through a few of the difficulties with the mold crushers and how the tonnage splits up across the year, especially in Q3 — should we still be looking for fairly low tonnage until you can get that newest mobile crusher online this month? And then, I suppose, on the mining side, do we also expect a step change in grades over the rest of the year?
I’ll hand things over to Bill for this one.
All right, a few questions there. So regarding the crusher ramp-up, what we're really referring to through Q3 and Q4 is more than 3,000 tonnes per day. And then on grade, I don't believe you'll keep seeing the ramp increase in grade. I think you'll see it fall back to roughly what we had forecast before, mainly because right now we're in the process of building stockpiles essentially heading into 2027.
Our following question is from Fahad Tariq at Jefferies.
Regarding the revised Fekola guidance for 2026, did that take into account securing the permit today, I suppose? Or does the guidance contain upside — that's really what I'm asking.
Michael, would you like to handle that one?
Right. No — what I'd say is the cleanest way to frame it is that we're at ease with a bit of output showing up late in the year, or if that formally kicks off in 2027. The 390 to 420 range we've issued is one we're comfortable with. So I'd put it this way: just view it as the complex landing inside that band, and whether we capture a small quantity at year-end or not, it won't move the numbers in any material way regardless.
Alright. Great. And now turning to Goose. Regarding the new mobile crushers — I believe the expectation was that they'd be up and running in early August. Could you let us know whether that's actually happened — are they operational — and just remind us what sets this mobile crusher apart from the prior one when it comes to any technical specifications that differ.
Bill, the floor is yours.
Yes. So first off, we're commissioning right now — there's a site crew doing the commissioning. So we figure a quite brief order will get us up to our nameplate run rate. What's different is really just that this Metso mobile crusher is larger, though quite close to the unit we previously had at the site. So essentially, we've sort of duplicated what's running there already. We simply have additional horsepower.
All right, understood. Then as we look ahead to '27, should we expect those mobile crushers to still be in use, or would they simply become redundant?
That's a solid operational question. The answer definitely falls within the first half of the year. Those mobile pressures will be needed as we ramp up Phase 2 of the repairs at the goose site, and following that, there's some debate about whether you'd deploy it as backup, or whether we would actually then boost some of the regional civil work we currently have underway.
Ovais Habib from Scotiabank has the next question.
Thanks, operator. Michael and the B2Gold team. Yes, absolutely. — congratulations on the Pakola permit. That's a huge achievement, so congrats to the whole team. A lot of my questions have already been answered — specifically on the Fekola side, the Fekola ramp-up kind of thing, as well as the goose structure. But just on the Fekola side and the regional side, obviously there's some decent mineralization already delineated on the 6 areas — is there more potential, or more opportunity, when it comes to looking at additional satellite pits around that area? Now that you have the permit, is there a plan for some sort of exploration program in that area as well? Any color on that would be great.
Let me start with a couple of quick remarks. We've got some exploration activity lined up on regional for this year. You'll see us — we've actually just gotten started now, simply because the rainy season has only just wrapped up. So we'll be doing some extra — I mean, I think there's certainly room for additional work to be done there, right? But we've put plans together based on what we already know exists there. So as far as any further pits go, I think we'll be in a position to offer a bit more guidance later this year on how we expect regional to roll out across the coming year.
All right. So turning back to Goose — more specifically, toward the underground portion of the bill — how are things coming along on that underground side, both with regard to mining rates and the equipment that's already in place? Are you comfortable with the pace of progress? And what else do we need to see when it comes to ramping that up?
No. Ovais, that's a really good question. We're definitely at ease with what we're seeing. Our projection was that we needed to reach 12 meters per day of development. Right now we're at slightly above 11. So we don't perceive any genuine problems — things are progressing quite well.
Our next question is from Lawson Winder at Bank of America.
Mike, Michael, and Bill—thanks for the update today, and congratulations on finally getting those permits sorted in Mali. Looking ahead to 2027 and thinking about gold output that year, with all the moving pieces around grades and volumes from the Fekola and Cardinal open pits, from the Fekola underground, and now with regional operations ramping up—directionally versus 2026, it seems we'd be heading higher than the current range of 390 to 420 million. But could you talk us through some of those moving parts? And maybe just give us a sense of directionally where we should be thinking about Fekola production for 2027?
Michael, would you mind providing us with a brief overview?
Yes. Yeah, I can address that. So for the Fekola complex, I think, as you'd expect, given where we are right now — we've had the permit for the last few years — if you look at our guidance for the Fekola complex in '24 and '25, we did very well even though at the beginning of each year we were anticipating some contribution from regional. Now, obviously, we have the permit and we'll be undertaking activities there. But Fekola still has to complete the Phase 8 stripping campaign, which is underway at the moment, and that genuinely opens up what is a very strong and productive stretch of years for the Fekola Main pit, and then you'll have regional ramping up plus underground operating as well. But I think it's probably too early to speculate about '27. The team will work through the budget process to determine precisely what contribution we believe we can get from each of the components. But I wouldn't expect '27 to be higher than '26 simply because we do need to complete Phase 8 stripping at Fekola. I think the other moving parts as you consider '27, though, is Goose will have a significant ramp-up into '27.
Looking at it across the whole company, we really believe there's a strong possibility that, as they work through the budget process, it comes in higher in '27 than in '26 for the company as a whole. With Fekola, though, there's still work left for us to do, and we'll provide more clarity on that when we give guidance next year.
Yes. And when we look at the permits, over the coming — let's say 3 years — will any further approvals be required before we can run any of the operations, or mine any of the deposits, at Fekola? And on that same point, perhaps you could speak to whether you believe that from here on, there is now an expectation that the permitting process ought to be considerably more streamlined at this stage.
Perhaps I'll hand this one to Randall, I think.
Yes. I believe the one permit you'd be aware we'll have to secure is the <<inaudible>> permit, and that's a process expected to get underway probably later next year, for 28. But yes, I agree that governance in Mali is now established. We're fully confident the process will go much more smoothly from here on.
All right, and could I follow up with one more question about sustaining CapEx? So let's discuss the sustaining CapEx guidance in millions, if we could. Back in February, the initial guidance was roughly $540 million, covering deferred stripping, underground development, and maintenance. -- and there was approximately $27 million for sustaining exploration. So since our all-in sustaining cost guidance is now anticipated to come in below the initial guide -- what absolute level of sustaining CapEx would you suggest we model, compared with that original $540 million? And has anything changed regarding the $27 million for sustaining exploration?
Yes, I can handle that question. So, as some of our disclosures have shown, essentially every site apart from goose is sitting below where we had expected them to land on sustaining capital—they still have to make it through the year, and what you sometimes observe is that sites wind up catching up, which we've disclosed and which we anticipate for their sustaining capital balance. Still, the first 6 months of the year have shown a good trend. So there's a possibility we land somewhat lower at Fekola, Masbate and Ojikoto for goose—as you can appreciate, given the fire's impacts, sustaining capital will likely run above what we would have anticipated at the start of the year. So overall it should net out near what we thought, within your numbers, at the start of the year.
Our following question is from Josh Wolfson at RBC.
I get that you've had maybe an hour to work through a lot of the questions we're asking about the 2027 numbers. So let me put it in perhaps a different form. The grades at Fekola, given the updated guidance, seem to be on the lower side. When we think about 2027 and that Phase 8 stripping campaign that was discussed, should we expect growth next year versus the back half of this year to be flat? Or will they decline during that stripping campaign?
Bill, may I hand this one to you regarding Fekola? I think that could be great for '27.
Yes. Again, you've nailed it exactly. We're still sort of figuring out how much we'll be able to bring in from the regional sources versus how much we can bring in from Fekola proper — so I'd rather not say precisely what I expect the grade to be for 2027.
Alright, I figured it was worth asking regardless. Still, everyone here is really enthusiastic. Then, regarding the Fekola regional capital, it seems you've spent approximately $40 million so far this year to date. How should we view the capital needs that remain in the latter half of this year and perhaps for 2027 during ramp-up?
Sure, I can address the second half of the year. What you’ll notice is that, clearly, once we start stripping, some deferred stripping capital will come through during that latter six months. So I think you can reasonably expect that what we did in the first half gives a good indication of what will happen in the second half, though the first half involved more equipment purchases, while the second half will involve more deferred stripping capital as we get down into the ore. And then for ’27, again, the likely answer is that it’s too early at this point. I think as Bill and the team work through their budgeting process and we assess what contribution regional can deliver in ’27, we’ll then have a better estimate of sustaining capital and growth capital for regional at that time.
And regarding goose, to follow up on one of the earlier answers about third-quarter grades perhaps not being as high because of stockpiling, could you discuss a little more the reasoning behind that? My thinking would be that normally, if you were stockpiling, you would stockpile the lower-grade material, but maybe there's something behind that in terms of what the strategy is going into next year?
Yes. So the grade will be plus 8%. I think what I had in mind when I gave that answer previously is that during Q2, some very high-grade material came through. So we're going to see plus 8 grams. And definitely, what we're going to see is that we'll be in line with our earlier projection. But when I mentioned stockpiling for the mobile carrier, you want to be sure that as we move into the Phase II ramp-up, you have material that can carry us through Q1 and Q2. So how do we make it through the winter with the right nonmaterial and the mobile pressure?.
Don DeMarco from National Bank Financial has the next question.
Thanks, operator, and morning to everyone, plus congratulations on the permit announcement. I'll begin with Fekola. So in what way does Fekola align with the company's strategy? I mean, with the permitting holdups, there was a degree of uncertainty, but does the news that the permits have been awarded, together with your relationship with the state at present, bring Fekola back as a cornerstone asset?
I'd say, Don — Fekola has really been a cornerstone asset for us. If you look at it, it's been a terrific asset over the years since we've operated it as a world-class mine. We've enjoyed great success there. It has run without — it has performed well through — from when we started it up, through COVID, through some of the political shifts we witnessed in that country. So we're simply delighted that this permit allows us to make long-term plans now, allows us to optimize how we blend mill feed from Fekola and from regional sources, and has the potential to extend Fekola's mine life in its middle years. And yes, getting this permit took us somewhat longer than we originally anticipated, as you know. But we're very pleased that we've worked closely with the state, I think. We're happy now that they've completed their process. And hopefully, this creates more opportunities for new permits or for other mining companies in the country. So it remains — it's a cornerstone asset for us. Historically it has been half of our production, and we can see ourselves getting back to 0.5 million ounces from the complex. It's an important asset.
So Mike, does that also mean you could ramp up exploration in the region? My guess is that activity was mostly paused until the permits come through.
Yeah, I'd expect a bit more of a regional emphasis going forward, particularly as we search for additional sulfide material within the original permit, since Fekola is mainly a sulfide mill.
Alright, great. And regarding buybacks — I mean, the valuation today is at a discount compared with peers, but given that, what's your approach to repurchases across the coming 12 months? I mean, is it — do you intend to be somewhat more aggressive in the near term so as to capitalize on this dislocation?
Would you like to continue, Michael?
Yes. Yes. No, we'd completely concur with that point — we believe the value the market currently assigns to us fails to capture what our business is genuinely worth underneath. So without question, buying back shares using the free cash flow we project at these gold prices, which we'll be able to generate across roughly the next 12 to 24 months, will definitely be something we consider. Those are conversations held each quarter with our Board and with our management team. But absolutely, that's an instrument we'll put to use going forward, depending on where we trade today and even later on when we hope and believe we'll be trading at a higher level. Okay.
Then one more question, shifting to boost. I heard Bill mention that the crushers will be in use into next year, and someone — and I appreciate all the detail you've provided on Goose, but I'm curious whether you can give us a sense of how throughput rates will progress over the next 12 months. Also, is there any early indication on Goose cost or production in 2027? I believe we've moved fairly far from the technical board at this point.
Let me walk through throughput quarter by quarter. When we ramp into Q3, we're at plus 2,500 tons per day. After that, in Q4, we exceed 3,000 tonnes daily. Then in H1 — again, H1 2027 — we're above 3,000 tonnes, and in H2 we'll reach 4,000. That's the plan for hitting run rate by the close of Q2. On costs, I don't — I'm not sure what guidance we've provided there. So Michael, could you take that one?
Yeah, Don, I think you've got a point there — we're likely a bit off from the tech report, simply given how the ramp-up has played out compared with when that report was issued. That said, I don't think it's quite the right time to speculate on it. Still, we firmly believe next year will be a big growth year, building on the production base we'll reach this year. But perhaps we should wait for the guidance to come out early next year.
All right, and just to bridge off that point — I mean, the Goose ASIC guidance is still the same even with the higher number you posted in Q2. So should we basically read that as confidence that you'll get back to a lower cost run rate in H2?
Absolutely, absolutely, 100%. I think what you'll see is that, as Bill outlined for the close of the year, we ought to get the primary crushing circuit operational again. And some very strong grade is expected to feed through the mill during Q4. I think that ought to provide a solid picture of what we're capable of delivering in the first half of next year. Then in the second half of next year, we'll be averaging that 4,000 tonnes per day, and that will offer a genuinely good indication of what we believe the coming few years will look like, since that represents steady state for the Goose plant.
<<operator_script>> Our following question is from Carey MacRury at Canaccord Genuity.
Let me pick up on that same theme, and congratulations on the permit. Moving over to Dose and exploration, though — roughly a year back, you reduced the reserves at that asset, I believe with the intention of tightening the drill spacing. As I recall, there are 6 million ounces of reserves there. So I'm just curious whether we ought to expect some portion of those ounces to begin returning to reserves by the end of this year.
There's something we can't make out on our end, so I'll hand things off to the person we also can't quite identify.
Yes. A big chunk of the money we're spending goes toward deterilling and infill drilling, especially over at the Lama deposit. What we're trying to do there is take material that got downgraded to inferred and move it back into indicated, and then of course that feeds through into reserves. On the exploration side, there's this area we refer to as the Lama gap at Lama, and we're pushing toward being able to fill that gap and pick up ounces. My sense is those will be pretty marginal during this year — that's what we'll get over the course of this year. And then of course there's the upside from down plunge extension at both Lama and at <<inaudible>>, plus what we call the <<inaudible>> deposit, which is another deep one but with very good grade — all of that will contribute to the picture at Goose.
And how many drills do you have for an okay. And then, pivoting to something perhaps longer term with the Fekola permit now and getting those up and running at full capacity next year — I was just wondering how things are going with Gramalote. Is that something that — or just how are you thinking about that product? Is that something you'd look at potentially starting next year, or rather work on capital allocation anytime?
I believe we're moving things forward at <<inaudible>>. So we'll keep reducing the risk on it. We have the modifications, and those are ongoing. From the latest updates I've seen, that process is going well — and we're also moving the resettlement program forward, as you saw in our budget. So that will carry us into the first half of next year, Carey, regardless. And after that we can step back and see where we stand. . Meanwhile, the other main focus is to keep executing on our 2 top priorities for this year.
The next question is from Anita Soni at CIBC Markets.
Mike, Mike, and Bill — congratulations on getting that permit. I know all of us are really pleased for you. I just have one question about the throughput levels at Goose this quarter. Bill, I believe you mentioned 3,000 tonnes per day in — what is it — before the mobile crusher went in, what level has throughput been running at since Q3 began? My assumption is it was roughly comparable to how it ran during Q2. Did it do better than that?
Yeah. Right now it's coming in bits and pieces, honestly, as we shift material in and out. So the answer is that on certain days we can actually run as high as 4,000 tons. But then things back up on you. As you're aware, we're working on repairing that whole line. So we've sort of been sitting at 1,500 tons when we run 1,500, 2,000. But obviously, we'll be ramping up before long to considerably larger figures.
All right. I believe the grades are already somewhat clearer to me thanks to the other questions. Would you also remind me, regarding the regional permits, what the taxation — the 2023 code — but which extra taxes and royalties would apply there, as opposed to what we see under the main permit? I'm aware the tax rates are — sorry, the royalty rates sit around 17%. But is there anything more tied to this regional one, or anything else we ought to factor into our modeling?
All right, I'm happy to hand this over to our new tax official, okay? But I can offer a comment. Yes. So I think the main differences we observed overall when we shift from one code to the other. The income tax rate under the new mining code, it doesn't get that reduced mining rate for very long, like the 25% accommodation that you get in Fekola, that's a significant reduced period. So we basically can assume it's going to be a 30% corporate income tax rate for regional. And in additional, on ISP, which is special tax, there was a bump of 2% versus what Fekola pays. The royalty structures are basically the same between the two. Those are kind of really the primary difference.
I'd just like to add one thing on top of what Mike mentioned regarding corporate income taxes: we also treat the priority dividend we pay as part of our taxes. So Cold Proper ends up with an effective rate of roughly 40% once the 20% priority dividend is factored in. Fekola Regional will come in higher than that as well. Ultimately, once the final ownership structure is in place, you can deduct the priority dividend from your corporate income tax. That said, it does push up the effective rate we report in our financials and what runs through our current and deferred tax income line.
Yes, and just to make that clear once more. The 20% stake in Fekola held by the state is a priority, and under the trust arrangement characterized — it's been challenged in Fekola regional, where we anticipate the state holding a 35% interest. So that will amount to a net higher figure.
All right. Then my final question, I believe, concerned certain costs over at Goose — so there was, I think, $16 million for buying that mobile equipment, which has been shipped and is presently being installed, and then 11 for the installation — and I was simply trying to get a handle on where those costs are flowing through within the total cash cost? Or are they arriving via a different line and therefore left out of the total cash cost and ASIC calculations?
Right, so the costs for fire remediation are going to run through sustaining capital — meaning they'd land in your all-in sustaining costs. The Phase 1 and Phase 2 capital, though, would go through the growth capital line, so it wouldn't be included there.
Okay. All right. So none of those costs ran through your — as I was just mentioning, the down, the — clearly, your processing facility, did you incur any expenses tied to the fire? You pulled some of them out from the fire, since at first, I believe we were discussing cash costs that were much higher this quarter?
Anita, if you check our financial statements, yes, there is a line item for other cost of sales that came in just under in the quarter, and those were costs tied to the downtime we had in Q2, and that was left out of our per ounce costs.
Okay, all right. And about that 16 and 11 — I was referring to the purchase, and that won't carry through to the cost. The $11 million for installation also won't be included in the cost, correct?
That wraps up the question-and-answer portion. Now I'd like to hand the conference back to Mike Penniman for some closing remarks. Please go ahead.
Alright, thank you so much, everyone, for all of your questions. Should any further follow-up questions come up, of course, please don't hesitate to get in touch. To wrap up today, I simply want to say that we are, of course, delighted by this news. Delighted for ourselves, as well as for investors, our shareholders, stakeholders — and, I suppose, for the state of Mali too, that all of us can move forward. We see this as highly constructive. And it helps carry us along once more, back to those 2 key things, but we said we would do what you've heard discussed on this call, how far along our plans are for Goose and all the remediation work and the upgrade work we're carrying out, and we have a solid plan for that, and we will keep focusing very clearly on delivering it. And then regionally, we are pretty much ready to get started on the stripping activity. So we're excited to do that. We've been positioned to do that for some time. Now we have the opportunity to get out there and make it happen. And so I know there's been a wait for that. But now here we are, so excited about that, very optimistic about the future here as we move the company forward and grow.
Thank you everyone for joining us and for the excellent questions. And — we look forward to speaking with you — thank you.
You may now hang up. We appreciate your joining us, and we hope the rest of your day goes well.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete B2Gold Corp. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to B2Gold Corp. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.