B2Gold Corp. (BTO) Earnings Call Transcript
November 5, 2026
Earnings Call Speaker Segments
Thanks, Operator, and good morning, everyone. I believe the third quarter was a strong one for B2Gold, and it reinforces the progress we've made in strengthening the business over recent months. As you saw, we delivered solid operating results, producing more than 193,000 ounces of gold. I think that puts us well on track to deliver our full-year production guidance. And based on that strong year-to-date performance, I'm also pleased to announce that we're lowering our consolidated all-in sustaining cost guidance for the year by more than $100 an ounce at the midpoint. During the period we generated $48 million in free cash flow, which I think reflects the improving trajectory of the business. Now that Goose's big construction and ramp-up expenditures are finished, and our gold prepaid obligations wrapped up by the end of June this year, the company is moving into a stretch of growing free cash flow. A couple of notable accomplishments also stood out in the third quarter, I'd say. The first, at Fekola, as you're aware: we obtained the Menankoto exploitation permit and have begun stripping work there since. That's clearly a meaningful move toward getting Fekola Regional ore into the mine plan, which we've guided would start early in 2027. Then at Goose, the Phase 1 crushing circuit upgrades were finished shortly after the quarter closed. That marks one more significant milestone as we continue ramping up that operation. Earlier in the year we outlined those as two of the main goals, and it's really encouraging to watch the progress we're making on them. Bill will share more in his remarks shortly, giving added detail on the Fekola Regional permit as well as the Goose crushing circuit plans. Beyond that, we kept up our return of capital to shareholders, distributing $59 million during the quarter via dividends and share repurchases, $33 million of which came from share buybacks, so that program remains underway. As our free cash flow profile keeps expanding, I believe we'll stay committed to a disciplined stance on capital allocation, balancing shareholder returns against investments in our current operations and, as previously discussed, exploration prospects throughout our portfolio. On the exploration front, at the end of September we published results from the exploration program underway at Goose and the Back River District. Those results also included some outstanding infill drilling at Llama and Umwelt, which boosts our confidence in the underground resource base at those sites. In addition, we reported a new high-grade mineralization discovery on the western limb of the banded iron formation that hosts Nuvuyak. This find sits roughly 150 meters down plunge from the mineralization we already knew about, and it's been given the name Tattuk. In my view, both the grade and the host rock at that Tattuk intersection were pretty encouraging, and it's also Goose's first new discovery since we picked up the project. So it's something we're genuinely excited about. You'll see us continuing exploration work there. Looking at the remainder of the year, we still expect a stronger fourth quarter, largely driven by Goose, where mill throughput ought to improve thanks to the extra crushing capacity, since Phase 1 of the crusher upgrades has now been commissioned. Looking forward to 2027, we anticipate several major catalysts that should continue strengthening our production and cash flow profile. Fekola Regional, for example, is expected to begin contributing early in the year. The Phase 2 upgrades at Goose should increase throughput further around the middle of the year. Development work at Antelope, a deposit at Otjikoto, is progressing well. We are also exploring opportunities to extend the mine life at Masbate, with the idea of potentially higher gold price assumptions there. So some work remains on that front, but we are reviewing it and hope to advance it over the course of next year. One last point: as I noted, the prepaids were already delivered into by June, and we still hold some gold collar contracts, though the final one is set to roll off in January '27. Overall, I'd say I'm quite pleased with where the business is heading. We're meeting our operational objectives. Our financial flexibility and balance sheet strength are getting better; and as I just said, we have several important catalysts coming in '27. Taken together, I believe these put the company in a good position to produce stronger free cash flow and to keep creating value for all our shareholders. With that, I'll pass the call to Michael McDonald to go through the financial highlights for the quarter. Over to you, Michael.
Thanks, Mike, and good morning, everyone. Quarterly revenue came in at $836 million, powered by consolidated gold sales of roughly 195,000 ounces at an average realized price of $4,287 per ounce. Importantly, as Mike noted, this marked our first full quarter of selling at spot gold prices once the gold prepaid deliveries wrapped up in June 2026 — a major milestone for the company. Net income attributable to shareholders stood at $409 million, or $0.31 per share. Our net income benefited from a $253 million impairment reversal at the Fekola Complex, driven by our receipt of the Fekola Regional permit in August of this year, plus $40 million of unrealized gains on derivative instruments and $14 million in insurance recoveries. After accounting for those items and other non-recurring impacts, adjusted net income attributable to shareholders came to $183 million, or $0.14 per share — a very strong result in what was always forecast to be the lowest gold production quarter of the year for B2Gold. It's important to note that adjusted net income was also reduced by $47 million of realized losses related to our gold collar contracts during the quarter. Absent those realized losses, adjusted net income would have come in substantially greater. The gold collar contracts still outstanding wrap up in December 2026, and once that happens B2Gold will carry no gold prepay or gold collar obligations at all throughout 2027. Cash flow from operations prior to working capital adjustments totaled $387 million, equal to $0.29 per share for the quarter, whereas operating cash flow after working capital adjustments amounted to $239 million. As anticipated, the advantages of finishing the gold prepaid contracts are starting to show, letting us capture full prevailing gold prices on every ounce we sell. Free cash flow during the quarter reached $48 million. This number reflects ongoing spending on Goose as the operation moves through ramp-up, along with support from better realized gold prices and strengthening operational results portfolio-wide. One thing to note is that Goose's all-in sustaining costs for the quarter took a hit from roughly 10,000 ounces of production still unsold when the period closed, plus about $29 million tied to buying the mobile crusher and fire remediation work. Of that, around $12 million went to the mobile crusher and $17 million to remediation tied to the fire earlier this year. Our balance sheet is still very strong. When the quarter wrapped up, our cash and cash equivalents totaled $294 million, working capital stood at $497 million, and roughly $705 million remained accessible through our revolving credit facility. That liquidity gives us considerable room to maneuver while Goose keeps ramping up and while we push forward with growth opportunities throughout the business. Turning to the outlook, as Mike noted, we've reduced our consolidated all-in sustaining cost guidance for the year to a range of $2,230 to $2,410 per gold ounce sold. This brighter forecast stems from solid operating results year-to-date across the portfolio—especially at Masbate and Otjikoto—along with anticipated lower costs at Fekola. Masbate's improved performance stems largely from the strong output we achieved throughout the year, which enabled the operation to spread fixed costs over more ounces; consequently, cash costs fell to $800–$900 per gold ounce produced, $100 per ounce below our prior guidance range, while all-in sustaining costs declined to $1,250–$1,400 per gold ounce sold, compared with the earlier $1,430–$1,580 per gold ounce sold. Similarly, at Otjikoto, healthy production brought lower unit costs, and we reduced our all-in sustaining cost guidance by $200 per ounce, to $1,630–$1,780 per gold ounce sold. For Fekola, all-in sustaining cost guidance now stands at $2,350 to $2,500 per gold ounce sold, against the prior range of $2,670 to $2,820 per gold ounce sold. Those lower costs largely stem from reduced royalties, which come from a gold price below what we assumed back when guidance was set at the beginning of the year. That's a favorable place to be at this point in the year, and it shows both how strongly our operations have performed year to date and our confidence in delivering through the rest of 2026; with that, I'll hand the call to Bill now for the operational update. Thanks, Michael.
Operationally, the third quarter came in pretty much as we expected. We're still on course to hit our full-year guidance for production, costs, and capital. Consolidated production for the quarter came to roughly 193,000 ounces. Solid results at Masbate and Otjikoto, plus ongoing gains at Goose, helped make up for weaker output at Fekola, where mining moved forward as planned. At Fekola, output of about 78,000 ounces mirrors the shift in open pit work from ore into the Phase 8 waste stripping campaign, which will run through the balance of this year and most of next year. On August 7, we secured the Menankoto exploitation permit, which clears the way for mining to start at Fekola Regional. Not long after the third quarter closed, stripping got underway at Fekola Regional, and we're now moving forward to unlock this key ore source for the Fekola Complex. The company expects Phase 1 mining, pre-stripping work, and finalization of a tolling agreement to wrap up over the next few months, with ore production from Fekola Regional anticipated to begin in early 2027. After a ramp-up year in 2027, we still estimate that Fekola Regional will contribute roughly 150,000 ounces annually at steady-state production levels starting in 2028. At Goose, the team kept carrying out repair and upgrade work on the fixed crushing plant. During the quarter, we brought a mobile crushing unit successfully into service, giving us extra processing flexibility and helping lift throughput while Phase 1 of the fixed crushing circuit upgrades moved ahead. With that work in progress, Goose turned out about 40,000 ounces for the quarter. Importantly, soon after the quarter ended, we finished the Phase 1 upgrade of the fixed crushing plant; now that Phase 1 is complete, throughput was averaging around 3,200 tonnes per day after commissioning in mid-October. And we expect those rates to keep supporting Goose in delivering a much stronger fourth quarter so we can reach our production guidance range. Looking past 2026, we remain on schedule for Phase 2 crusher upgrades in the second quarter of 2027. As a reminder, that will involve a 10-week shutdown of the fixed crusher, and during that period we expect to feed the mill with stockpiled crushed ore; we intend to build that inventory over the winter with the mobile crusher, which is being winterized so it can operate reliably all winter long. Once Phase 2 upgrades finish at mid-year 2027, we expect the crusher to reliably average 4,000 tonnes per day; that's an important milestone for us in progressing toward our targeted annual production of 300,000 ounces per year at Goose. Masbate and Otjikoto each turned in another strong quarter of operations, extending the excellent performance of 2026. These operations remain key contributors to the company's production profile and cash flow generation. Across the portfolio, our teams stay focused on safety, operational discipline, and cost, and we continue to expect full-year results to land within our guidance.
Bill, I believe the connection dropped for you. It appears the line went dead. For everyone listening on the call, I think Bill was restating that, given how we've performed so far this year and our view of the rest of the year, we anticipate full-year results will land inside the guidance ranges we published with our results. I think the other point Bill intended to make was a brief update on the Gramalote project in Colombia. As we've mentioned previously, we're making steady progress working through the modifications to our permits there, reducing the risk, and carrying out the resettlement work that we expect will continue into the middle or possibly the second half of next year; and until that is complete — and I think you can look to the second half of '27 for when we'll have finalized those matters — that's when we'll revisit whether to make a construction decision or at least determine what the next steps are for Gramalote. So that's roughly what you should expect at some point in the second half of next year. Overall, then, I think based on Bill's remarks, we're confident in our operating outlook for Fekola, Masbate, and Otjikoto, all of which are performing well, and Goose is moving into the next stage of its ramp-up after the Phase 1 crushing upgrade. So we're looking forward to a stronger fourth quarter and a really solid finish to the year. With that said, I'll hand things back to myself; and thank you, Bill and Michael, for your comments. That essentially wraps up our initial remarks, and I'll turn it back to you for questions.
A bit more detail on what this toll milling arrangement actually involves would help. From what Bill said, the expectation is that it gets finalized at some point in Q1 of '27. So I'm wondering whether this is mostly an administrative process now, or are there elements that depend on guidance, and is there still some negotiation happening over terms?
No, I'll take that one. It's an administrative exercise, in my view. We have the agreements drafted, you know; it simply moves through the usual process. As you'd handle things with the state, the various steps involved in establishing a new company in this instance, putting a tolling agreement in place for Fekola Regional; so I think we've allowed ourselves plenty of room to get that done. As you know, we removed regional guidance from '26 and we expect it to begin early '27. And right now we're working through each of the steps you have to complete to bring all of that online with the state; it's proceeding as planned. So I think it's, like you said yourself at the outset, mainly an administrative exercise at this point.
All right, great. And only as a follow-up, I appreciate the response on that. Just to follow up, we've had the Goose permit at 3,200 tons a day. It's going to remain at that level until the middle of '27. I'm just wondering whether you've had consecutive days running above that. Is there any upside to that figure? And how are you thinking about any possible disruptions or risks tied to weather or temperature between now and the middle of 2027?
Maybe I'll hand it over. I think there's a bit of an issue with Bill's line, but we've also got Peter Montano, our VP Ops, who has responsibility for Goose, on the line. So maybe I'll turn that one over to you, Peter.
Thanks, Michael. Yes, regarding that question — the primary crusher, now that Phase 1 is complete, keeps running at 3,200 tons per day on a consistent basis. We also still have the mobile crusher available, which gives us some added flexibility beyond that. On the mill side, it's been shown to handle up to 4,000 tons per day — there were a couple of different grind tests — and those went successfully. So that really provides the flexibility we need for our 2026 targets, and also to build stockpiles for next year. When it comes to winter, the Phase 1 primary crusher is an all-weather facility, so there are no issues with it now. And for the mobile crusher, we've put a tent over it, so it likely won't reach the full capacity we had in the summer season, but it will still run consistently through the winter as well.
Great. Thanks for those helpful answers.
Thanks, Ralph.
Michael, Bill, I just want to ask something about Fekola and the grade you're expecting as we go into the back half of this year and then into next year from the open pit. I suppose it came in a bit lighter than I was looking for this quarter, and I think that ties to, as I said, not being able to pull regional ore, but is that specific to the 0.85? Is that roughly what we should expect even in Q4, or was that just specific to the sequence?
Well, I believe Bill's back on the line again. Bill, do you want to take that one?
Honestly, I'm having trouble picking up what you two are saying. I'm not sure whether my voice is coming through on your end, but Peter, perhaps you could repeat that one more time if you still have it in front of you.
Apologies, I also got that wrong when I said 0.85 — what I meant was 1.35 grams per ton in the open pit.
Alright, I can sort of hear him. Let me just take a quick look through here. Peter, are you there?
Are you able to hear me? Yes, Bill, I can hear you, though I don't currently have that information available.
I'm able to offer something on that. So yes, Anita, I believe the grade we fed through — or rather that we mined from the open pit and fed through the mill — ought to stay consistent across Q4. As we flagged at the beginning of the year, the first half of the year performed more strongly than the second half. And then, if you remember, we adjusted our guidance to a modified range after removing Fekola Regional. So for Q4, I think you can work with parameters very much like Q3, and that should bring us inside our guidance range for the year. Then looking ahead to next year, as we move into 2027, we're in the middle of finalizing budgets right now. That's something we'll lay out in more detail in February, when we release our 2027 numbers. Just as well as...
Yes, and perhaps I could just build on that point too. As you’re aware, at present it’s mostly waste-stripping in Phase 8 at the Fekola pit; so that’s where we are now, and we’ll remain there through the bulk of 2027, when we’ll be running primarily low-grade stockpile through the mill, along with the contribution at first—certainly at first—from Fekola Underground, until we get regional online.
All right, yes — so perhaps, at this point I can sort of make out that for Q4, 1.2 grams is roughly the figure we have in mind.
Okay. All right. Yes.
Okay, yes, okay. So I think I had something similar in mind for 2027, but not during Q4. My second question concerns Goose. You delivered pretty solid grades to the mill, and there are plenty of high-grade zones in that pit and underground — it's hard to tell the underground apart from the open pit. Could you give us a sense of what the Q4 grades would be for the open pit and the underground? I figure you need something a bit above the 7.3 you achieved this quarter going to the mill in order to reach the low end of the guidance.
Yeah, and again, that's Peter Montano handling Goose.
Yes, so your calculation is right there, though we do have a bit of room to maneuver thanks to the additional crushing capacity from the mobile crusher. So essentially, 3,200 tons per day is our base level, and from there we can adjust it upward as needed to handle the grade and the tonnage over the course of the year. Regarding the open pit and underground, those will be pretty much in line with what we've had previously. What really changes is that we'll have a full quarter of steady output instead of commissioning the crushing circuit.
Okay, and with that flexibility you mentioned, does that mean you can essentially overmine and then feed the mill selected higher-grade material — is that what you're getting at?
There are sort of two aspects. To begin with, yes, at the mine we can produce more and then process the higher grades, but beyond that we can crush more by drawing on some of the mobile crusher's capacity, and the mill has demonstrated it can run at roughly 4,000 tons a day. So we have that range from 3,200 to 4,000 a day to work with in managing the tons grade analysis.
All right. Thank you; that covers my questions.
Thanks, Anita.
My first question concerns Goose. I mean, it's clear that AISC and sustaining CAPEX came in high. That's not a shock. I mean, you have the crusher repairs, the underground development, spending that got pushed out, and so forth. But what would count as a sensible — and perhaps, Mike, this is one for you — sensible normalized yearly AISC and sustaining CAPEX level once the operation hits its design throughput?
Yes, that's a good question, Don. So I think for Q4, what you'll see is that all-in sustaining costs will come in significantly below where we were earlier in the year, as we pointed out in Q3: if you had normalized for selling what we had produced and if you had removed some of those one-time costs that landed in sustaining capital tied to the mobile crusher purchase and the fire, we would have been much nearer the top end of our yearly range. And I think on your question about where the path forward lies, as the site ramps up gold production on a quarterly and annual basis, you really do see a large benefit from that bigger production base. As you can imagine, Goose carries a fairly steady fixed cost across the year, so by growing that production base, you gain the advantage of scale, and I think we are absolutely aiming at slightly just above $2,000 per ounce on a steady-state basis given the mine plans and the sequencing that we see going forward.
Okay, great. So just looking across the assets then, Fekola — with Phase 8 waste stripping carrying on through the bulk of next year, and Fekola Regional ramping up over the same period, could you talk about how production might vary from quarter to quarter? Anita had mentioned grades, but presumably we're looking at a year that's weighted toward the back half. Still, what sort of variability should we be expecting by quarter?
Well, obviously we'll be publishing that as part of next year's guidance. But I think what we've been saying is, bear in mind, Fekola Regional is in a ramp-up year. So I think you can expect — if we think about steady state, once it's up and running fully after '27, we'll be averaging somewhere around 150,000 ounces annually; so as a rule of thumb, you'd probably take roughly half that figure for next year when it comes to regional's contribution as we ramp up; but we'll provide full-year guidance in early May.
All right, and regarding that goal of 150,000 ounces per year from Fekola Regional, which mining rates and grades underpin it, and what further CAPEX is still needed before reaching that steady-state run rate in 2028 or later?
I'll toss that question over, Bill. Would you like to handle it?
Yes, well, again, Peter, you took part in that study. I’m not sure whether you have it available, regarding what we ended up with on the mining rates and the grade.
That study isn't with me right now. Could we follow up with you on it?
Sure — that particular one, we're able to discuss it with him on the call.
Yeah, I can hear you fine; we'll absolutely follow up on that. All right, great.
Yeah, so Don, I'd say that since we're carrying out waste stripping, that's clearly the biggest CAPEX piece we're seeing in Q4. Throughout the year, as you've observed, we've bought equipment for Fekola Regional; but as you'll remember, we'd already made a lot of those CAPEX investments and built the infrastructure back in 2023, when we expected the permit to arrive imminently. So looking ahead at Fekola Regional, much of the capital would simply be equipment rebuilds as the different fleets depreciate, and there'll be some capitalized stripping going forward too, but not of any significant amount. So really, when you think about Fekola next year, as Mike pointed out, Phase 8 is a major stripping campaign, but after that we get several years of a far lower strip ratio, considerably better grade, and much greater ore contributions; and Fekola Regional then holds steady at roughly 150,000 ounces. But as you move into the mid-2030s, once the Fekola open pit begins to decline, the Fekola Regional open pit then starts to ramp up. So we view it on a complex basis, and there's variability from one year to the next, but I'm glad to take that offline for a further discussion if you'd like.
Alright. Do you folks intend to release a refreshed mine plan at some stage, so it sort of captures a number of these moving pieces and integrated parts?
Yeah, that's definitely something we have our eye on. We're aware the current Fekola Complex technical report is dated, and clearly it projected a different timeline for Fekola Regional coming online, so giving you an updated version is very much on our radar, to better provide a sense of visibility into what we see internally.
All right. Well, we'll keep an eye out for that when it shows up; that's really useful, folks. Many thanks, Michael and team. Best of luck for the remainder of the year.
Thank you, Don.
I'd like to get some clarity on this: during next year's second quarter, when the Phase 2 upgrades are taking place at Goose, my recollection is that the most recent guidance mentioned a 10-week shutdown. Is it still appropriate for us to model 3,200 tons per day for that quarter? Thank you.
I think that's one for you, Peter.
Yeah, thanks. Yes, that's a good question. So yes, that's partly what we're dealing with — the mobile crusher stockpiles are also beginning to generate a crushed ore stockpile for use during that shutdown. It will also keep running through the shutdown. So it's not the case that the whole stockpile has to be in place ahead of the 10 weeks. Basically, we're aiming for — you know, the maximum would be roughly 200,000 tons, but really we need much less than that. And then we'd continue processing, or continue crushing, with the mobile crusher all the way through those 10 weeks.
Okay. I got it.
And then, actually, on your question, yes, 3,200 would be a fair assessment in your model.
Okay, thank you. And then, just since the sealift just happened, could you talk a bit about the diesel prices that you, I guess, pre-purchased for Goose compared with what your budget would have been at the start of this year? Thanks.
Do you want to take that one, Michael?
Yes, I’ll address that question. The Goose diesel purchase ultimately happened in Q3. As everyone knows, it came at elevated prices, given where global oil prices stand. I think the fortunate part for us — and we’ve pointed this out before — is that, operationally, the site is using less fuel than had been anticipated previously. So our actual cost this year for buying fuel and shipping it to site was very similar to last year, but that was because the quantity we purchased was lower than last year. And so compared with what we did last year, it was probably about 50% to 60% higher. And that is simply due to the global movement in fuel prices that we saw, based on where global prices stood when the purchase was made or at the time of purchase.
All right, that's great — many thanks.
Perhaps just one more question regarding Fekola, specifically about the underground. Could you remind us what tonnage you are extracting from underground, and has it now fully ramped up to a steady state?
Bill, would you like to handle that one?
Sure, I’ll take that one — and Peter can jump in if I get anything wrong. At present, we’re at roughly 4,000 tons per day, and that operation has completed its ramp-up. And again, what stands out most in the Fekola project today is the underground, where grades are much higher than in the open pit and performance is going very well.
Could you remind us what that grade looks like?
Oh, I believe we're certainly in the neighborhood of 3 to 3.5 grams.
Great. And then perhaps just one question regarding cash taxes at Goose. Do you have any thoughts on when those would become payable?
I assume you have a bit of a view on that.
Yes, that's right. And with Goose, certainly for the remainder of the decade, much of this, as you'd expect, hinges on the gold price that ends up being realized. Still, from what we're seeing at $4,000 gold, Goose will not be cash tax payable for roughly five years. So it's into the early 2030s when it works through those losses and finally turns cash tax payable.
All right, thanks. I realize you're still finalizing the budget, but do you have any view on cash taxes for 2027? Will those come in above this year, if we assume $4,000?
Assuming $4,000 gold, my guess is they'd actually be lower, since Goose is going to ramp up production substantially — though that isn't cash tax payable. So yes, I mean, we still need to work through the budgets, but my expectation would be somewhat lower, simply based on what we're seeing preliminarily for 2027. So probably, with luck, a bit under $600 million for the year once withholding taxes are included as well.
Okay, great. Thanks, guys.
Thanks, Carey.
Alright, thanks to the team here, and thank you all for joining the call and for the good questions. Just to recap once more, I think we delivered a strong quarter. The results we saw pleased me — in-line production overall, better cost, and you know, we've brought down our all-in sustaining cost guidance for the year, so that's pleasing. I think we're executing on the things we said we'd execute on, as laid out earlier in the year. I think we've demonstrated good progress there as we move forward. I'm excited about what's possible in Q4 — I anticipate a robust fourth quarter, followed by a solid year in '27 and past that, once all these measures are fully underway at both Fekola Regional and Goose. So once more, I appreciate your time, and I'm eager to connect with each of you one-on-one. Thanks.
That concludes the conference call for today. You can go ahead and disconnect your lines now. Thanks for joining us, and we hope you have a pleasant day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete B2Gold Corp. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to B2Gold Corp. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.