Alright, good afternoon, and operator, thanks. I'd like to welcome all of you to ClearSign Technologies Corporation's First Quarter 2026 Corporate Update Call. On this call, forward-looking statements are going to be made by the company. If a statement isn't one of historical fact, then it counts as forward-looking. That covers comments regarding projections, expectations, plans, beliefs and prospects of the company. Judgments and analysis as of today's date form the basis for these statements, and they carry a great many significant risks and uncertainties, which might lead actual results to diverge materially from what those forward-looking statements describe. Among the risks and uncertainties tied to the forward-looking statements on this call are — though not limited to — whether sales and field testing of ClearSign products are going to be finished successfully, whether ClearSign manages to grow the market for what it sells, plus additional risks laid out in ClearSign's SEC filings, such as those addressed in the Risk Factors section of the Form 10-K annual report covering the period that ended December 31, 2025. Unless the law demands otherwise, ClearSign takes on no obligation to revise these forward-looking statements so they reflect later events or what actually happens, and it has no plan to do so; joining me on today's call are Jim Deller, who serves as ClearSign's Chief Executive Officer, along with Brent Hinds, ClearSign's Chief Financial Officer. And with that, I'll hand things over to Jim.
Thanks, Matthew. Once again, I want to express appreciation to all of you for being with us on today's call and for the ongoing interest you show in ClearSign. Similar to what we've done on our more recent quarterly calls, this session will follow a Q&A format. A number of you submitted questions in advance. Those questions were indeed incorporated into the materials we'll be covering today. So throughout today's call, Matthew will guide a Q&A session in which we'll walk through the various best units, just as we did on our prior calls. Should you want to, you're welcome to direct any questions to our Investor Relations at mselinger@firmirgroup.com. To get things started today, I'm turning things over to Brent Hinds, who will walk through the financial figures for the first quarter of 2026.
Thanks, Jim, and I appreciate all of you being with us on the call today. I want to mention before getting started that last week our financial results on Form 10-Q were filed with the SEC; having said that, I'd like to walk through our financial results for the first quarter of 2026. In Q1 2026, the company recognized revenues of roughly $200,000, versus approximately $400,000 during the same period in 2025; the drop in revenues year-over-year was mostly the result of fewer spare part deliveries in this year's first quarter. Gross profit for the quarter came in lower than the comparable period in 2025; that decline stems largely from reduced revenues along with a $40,000 warranty accrual we recorded in anticipation of potential modifications to some installed equipment at a California refinery. Consequently, the gross profit decline year-over-year came to roughly $539,000. Our net loss in Q1 rose by $114,000 relative to the same period in 2025. The gross profit impact on our net loss was offset by a $369,000 increase in general and administrative expenses. Our G&A expenses were down versus 2025, largely because of lower legal fees incurred during 2025 related to a special committee of our Board of Directors that was decommissioned after our 2025 stock. Now let's shift focus to cash. Net cash used in operations for Q1 2026 totaled approximately $1.3 million, compared with approximately $1.1 million during the same period in 2025. Those year-over-year gains were mainly the result of a reduction in our current liabilities. As of March 31, 2026, cash and cash equivalents stood at approximately $7.7 million, and we had approximately 5.4 million shares of common stock outstanding. With that, I'd like to hand the call over to our CEO, Jim Deller. Jim?
Appreciate that, Brent. And once more, thanks to all of you for being here with us today. What I'll do now is pass things along to Matthew Selinger, and he will be the one running the question-and-answer portion. One quick reminder as we move through that, though. Should any questions come up for you, they can be sent to mselinger@firmirgroup.com. So with that said, Matthew, over to you.
All right. Jim, Brent, appreciate you being with us today. We actually spoke on a call only a few weeks back. That said, things have been hectic since that point, and there are particular developments we need to go over. So, with that said, let's jump straight in. Jim, only last week, we put out word about an order covering the following stage of a 32 burner project at a California refinery. Let's dig into that and explain what we mean when we say the following stage of this order?
Yeah. I believe that's helpful, particularly for investors who are just getting acquainted with ClearSign. So, late in 2025, roughly 2 quarters back, we received an award for almost 4 to 6 burners headed to a Texas refinery, plus 1 covering 32 burns intended for a California refinery. As typically happens with our projects, these come out in stages. The initial stage covered reinitialengineering along with the computation modeling, in which we essentially simulate the burners, their effects, and flow performance using a computer modeling system. That stage has now wrapped up for the California order. The following stage of the project involves us fabricating, or rather doing the detailed engineering and fabricating, the first article of those burners; after that we'll install it and show whether any optimization is needed, but demonstrate it working in a for-scale test furnace at the Zika facility.
All right. And Jim, this involves ClearSign Core Gen 2 technology, correct?
That's right, though it's been altered somewhat. What makes this particular order so compelling is the burner itself — the circular burner we created under the SBIR program followed our typical design, a scalable acid that could be tailored to flat plans, alternative shapes, or formats, allowing it to suit the many different types of heads found in a refinery instead of only working with the round burner we'd settled on. So this order concerns a heater requiring a long, slender burner that can actually fire upward for a distance of a stay or beyond. When you look at that work, it's simply the kind of heat — this is...
And that's been — what we called a flat plane application in the press release.
Yes.
So now I want to go back slightly on this. You've previously described ClearSign Core Gen 2 as — and it truly is — a burner platform.
Yes, exactly.
You brought up that term a moment ago — configurable architecture, right?
Yes, that's the phrase we used. I'd say it's a solid way to put it. What I mean is — the burner functions through a set of parts that generate the flow field, which governs the ox and lets combustion happen the way it does. — but depending on what the client needs further, we're able to position those parts so as to shape the flame and shape the burner; so this technology is quite adaptable, letting us tailor it for various heater types that handle 2 distinct processes at refineries and chemical plants, wherever they be.
All right, returning to what we were saying about that order — as it moves forward, could you put a dollar figure on it?
Yes, I can. What I'd say is that this specific project involves a greater amount of engineering, since it's a highly technical kite, and it's also the initial flat-link setup of the kind of bone being used. As a result, the engineering plus testing piece comes in at just under $0.5 million, and that falls within this order — the one we booked.
So can we take a step back here? Could we lay out what an average process burner order looks like, broken down by those phases, and what the possible dollar figures are for each one? Can we map that out?
Yes, I believe we can. That's probably helpful. I'm aware that many of our investors are new to ClearSign. Let me frame this as Egypt — let's use a hypothetical project. The orders we began at the end of last year, postaural at 36%, are going down Texas 1, the California investor — take a hypothetical burner order. We've provided guidance of roughly $100,000 as the average price for a process earnings; so for 30 burner order, the equipment comes to approximately $3 million. Beyond that, there's usually around $300,000 for engineering, computer modeling and testing that goes into a product's initial phase while we refine the further details. So to walk through the typical process, as we've seen with this California order, roughly $150,000 would cover the initial engineering and moving the bonus and on the competition platform, showing the customer how they work, how they operate and indeed what they should expect. The phase after that is usually about $250,000 — $100,000 of that will be the first burner, because that next phase takes our first production article, puts it into the test furnace, and then demonstrates it to the customer. That's their opportunity to come and see it firing for real — the burner through spaces — check emissions, check the operation, make sure it does everything they need. Once that phase is complete, we will then be released for the fabrication orders. So in this instance, with this 30 burner order, we've manufactured one for the test. We'd be released to manufacture the other 29 and, naturally, refurbish the word we use for testing.
And finally, I recall that previously we described you as sort of the equipment order, the majority of it.
Right; and when it comes to finance and revenue, that represents the main portion of the project for us. The early engineering stages are truly about fine-tuning that design; and after that, naturally, manufacturing is the significant part, the big revenue generator.
Now regarding that equipment manufacturer, what sort of terms do we usually receive — is it 50% upfront on that?
Yeah, I'd say a solid — we receive stage payments as well, and those can differ; a reasonable estimate is 50% upfront at the point where, at least, obviously — our process pens are provocated by Zika, they need to go ahead and purchase materials, and after that they begin working with them. And then, for that portion of the project, we receive the remaining 50% of the payment, typically once a product has been created and is ready to be picked up from
All right. So, Brent, I'll direct this question your way. So essentially, these projects pay for themselves. Is that accurate?
Yeah, that's right. Prior to us recognizing revenue, we'll get cash from the customer to add to the cost that we take on.
Good. However, we aren't...
Let me also make one additional remark regarding what you brought up — the crucial thing from where I sit is that, as a rule, we can bring in the money before we've spent on a given project. Therefore, when we examine projects particularly those sitting in the neighborhood of $3-plus million, dipping into our cash reserves to carry those out isn't necessary. The cash arrives from the client before our own money heads out over 2 years to complete the work. So in effect, the project pays for itself.
All right, that's great. Turning to the other big projects you brought up — the order for 36. And this one, like we said on the previous call, is also different, and it's different from the 32. It's not the same as what we announced before, right? Could you walk us through what's happening here?
Well, speaking technically, without burning, we truly provide two separate offerings to our customers. The first one is clear. Our customers must comply with tough new emissions rules, and our burner technology lets them achieve that at a far lower expense than the older technology that involves buying a selective catalytic reduction. So for all emissions, our clients get a far more cost-effective way to comply. Thanks to our burner technology, we can structure, frame, and shape them, which lets us control the flame shape, the way they interact, and how heat gets transferred into the client's heater — in practical terms, that means we can make Hedis run better, whether that's cutting maintenance needs or, in certain cases, raising the throughput of a heater. On projects such as the hands, we're able to give our clients a strongly positive return on investment. So they aren't merely purchasing burners to satisfy commission requirements. They're actually — and we're actually letting them either cut downtime through maintenance alone or get additional production out of the heaters, meaning they make more money. What makes this donor heading up to Texas exciting is that although there is, obviously, an emissions limit on that job, what's really driving it is improved performance of that client's heater. The burner arrangement in this instance, once again, is not the same. If you picture this specific heater as a set of square boxes pressed against one another, our burners are fired through opposing walls, so they're on one side or pointing inward toward each other; this is yet another adaptation of the burn technology to suit this lead, with the added benefit that the goal is really better heater performance along with emissions that can be controlled.
So does that open up either a bigger market, bigger heaters, or possibly both at once? How does that play out for...
There's a bit of each happening here. When it comes to heaters running on the platform, certain processes carry heavy burdens and rely on pipeline technology — anyone examining such a process could point to Delayed Coke as a modest illustration within refineries, where most units of that kind typically run flat. That means we can now place burners into heaters we previously couldn't touch, something made possible once we wrapped up the SBA program using this Gen 2 technology, which effectively widened ClearSign's addressable market. Another thing we've noticed lately is far greater interest in ClearSign, plus genuine engagement from the industry's majors — the household names, the global players — and since these refineries push through much more volume, the heat involved is correspondingly larger. They also have far more — so take the orders we just mentioned: the California one has 32 beds and has come down. Texas has 36. Earlier ClearSign orders involved far fewer beds and much smaller heaters, so stepping into and adjusting these larger projects brings considerably more revenue as orders flow through and we process them.
All right. One thing I want to raise and discuss — we brought it up during our previous call — is the process burner demo over at Zeeco, and it was great that it took place. Could you share how that went? I realize you can't go into specifics, but maybe you could tell us about the attendees.
Sure can. For anybody who joined the prior call, we had identified 2 big events for the proton this year: first, this launch and demonstration of our new Gen 2 process burner technology, and second, the start-up of a significant order shipped at the end of last year. Those units are down at the customer site along the U.S. Gulf Coast, and the Watson start-up is set for October. When we held the last call, we were preparing for the first of those 2 — the demonstration. Now we can discuss it as something already finished. It went extremely well. The burner completed every test, the Mox performed nicely. We went from 100% natural gas up to 100% hydrogen, then showed a smooth transition back to natural gas. We pushed the unit to its limits. We also demonstrated additional criteria, proving the safety of the burn, plus held some informational sessions for customers. Attendance mattered a lot to me, as a signal of our industry traction: roughly 100% of those who replied — not exactly everyone, but nearly — who said they'd attend actually came. That's significant. As I recall, 23 people showed up that day. Within that group of 23 were reps from big refiners and national energy companies, as well as consultants and 2 manufacturers. Another thing that pleased me: we have a collaborative partnership with a very important partner — a $1 billion-plus company — that builds our burners. That's the location where the demonstration happened. Don Zinc, Zeeco's President and CEO, came down personally and delivered a welcome and introduction to ClearSign at the beginning of the demo for our customers, which showed their interest in what we're doing and the technology we're creating. I found that very pleasing and a strong message to the clients and those present. Then, what kind of feedback came in after the event? It's been favorable. I believe — yes — we actually got the chance to speak with customers who attended, and also with others people have talked to. We're regulated there twice a year, and there's the American Petroleum Institute conference where refining equipment standards get reviewed and updated. That conference took place the week following the demonstration. So, we were present — I myself attended, and during that time, we ended up, you know, encountering individuals who had come to our demonstration, along with folks who had spoken with others who had been present at that demonstration. So we received overall feedback from the industry, and it turned out to be very favorable. So I feel quite sure that we reached the market with this demonstration. In my view, it was a tremendous success.
And at this moment, are these clients, or perhaps other folks, sort of talking about what the regulators are doing?
They certainly are — I mean, that's exactly why so many of the refineries, plus the consequent and the other people attending, showed up at the demonstration. A good number of them were describing the projects they've got underway; they came to take a look at the technology. So it was a fantastic opportunity for them to check out some tech they hadn't encountered previously, and to follow up on that afterward. So yes, they're very focused on what steps they need to take, attempting to figure out their optimal strategies for achieving compliance with the regulations and the new rules currently being formalized for Texas, and naturally, the refineries in California already understand what they're facing. They've got plans ready to get there, or to bring refineries to the condition they require.
Also, there's a project you skipped over or brought up, which is that order of 26 units that went out in December.
Correct.
So that's still on track to begin soon?
Yeah, so regarding carat, the project wrapped up in September. It actually moved ahead in January. What we decided was to build the be purely for specifics. The piers have arrived at the site. Installation is expected shortly. Circumstances have shifted, and now delivery is anticipated around mid-year, in July, while the project should kick off in October.
You've consistently mentioned this is for a petrochemical business. So does this open the door for us into the chemicals sector, the chemical market?
Yes, it does — in fact, this is our second capital customer. The initial one was a midstream company, also located along the Gulf Coast of Texas. If I may, I believe some clarity would be useful here. When we consider the long term, the broader picture for ClearSign. Getting into high center applications is part of our future strategy. By that, I'm referring to ethylene furnaces, downside reforms — that represents a very large potential market for participants in; those are difficult chemical processes. Additionally, on the chemical plant side of the more refinery type heirs, those serve as a stepping stone toward those high applications. The heaters we're commissioning in October are of the refinery process type, yet they're situated in a chemical plant; and given the flat plan configurations we've discussed regarding the California project, — we view that as a highly significant stepping stone toward entering the high temperature work that we're planning for ClearSign's longer-term growth.
Okay, it's interesting that you mentioned Jim and that M1 setup at a chemical facility. That happened roughly 12 months back, and Tulsa Midstream was involved.
Tulsa Heaters midstream. Right.
Right, and we also put out news today about an additional M1 order coming from that. Did I get that right?
You did. That's right.
And they were the first to adopt the M1 Series product — is that right?
Actually, that heat down on the U.S. Gulf Coast was the initial one we shipped. That's correct.
It's great to see them return, shall we say, 12 months afterward; so what's your overall feeling regarding the M-Series items?
My feeling is quite positive. I realize incoming orders have been scarce, and this topic has come up often between us. Yet I had concerns about whether any interest existed at all. Plenty of interest has come our way, including several substantial price points arriving just this week; so the — regarding what we have with M1 — there's an M25 startup located down in Midland. An M1 has already been dispatched and is awaiting installation; a second 25 has gone out; installation is needed — numerous M1 cores along with M25 cores keep arriving. So my outlook on that market is quite optimistic. I believe it's simply a matter of time before things begin moving at a faster pace. As for interest levels, there's plenty of it, and I hold strong confidence that a market exists for these values.
Speaking of start-ups, you brought up a few that are still pending. And there's a flare project that's set to kick off quite soon as well, right?
Correct, or to put it more precisely, the formal source testing is what begins. The equipment itself is already finished on our end, but we weren't able to conduct the formal source testing until a specific component — one that falls outside our scope — arrived in store. My understanding is that it's in store at this point; and what we've most recently been told is that the source testing is on the schedule for next month. That will mark the first source testing for our new generation of players, or within the California market. Beyond that, this has been a solid product line for us as well. We've discussed systems projects in which we took our burden technology and were able to grow it into a 4 system in the $750 million to $1 million range. This pure starting up is of that order. Meanwhile, our first 4-system project is actually in fabrication right now, weighted, and it's due to ship later on this year; so — but completing the source testing and having that signed off for recognition of former technology, I think, is going to power that a market.
Right, and I believe on that earlier call we noted that the most recent one, as I recall, is the fifth unit installed. That means this customer keeps coming back with additional orders. Also, could you confirm whether you're having a comparable discussion with the rest of our clients and across the other product lines too? I remember it came up regarding some of the process payers we're engaged with, that it was, I think, a $32-order, and you were already talking with that customer about what might come next.
We certainly think this flatline has requirements going forward. Beyond that, within the same industry there are additional clients, and those are headed toward the California market. For the most part, we think there are further applications beyond this particular customer as well.
Great. I'd like to build on that, Jim — to begin with, how are you viewing where things stand with the Carson business? And could you maybe follow up on that? Then, do you remain confident about the proposal pipeline we talked about on earlier calls?
On the second part — the response there also relates to the timing — first, Minor, I'm grateful; orders have come in slowly across the past few months. What hasn't slowed is the inquiries and customer engagement. We keep receiving inquiries regarding process burners, and plenty is arriving for midstream, which remains an area where active players are involved, including the recent 1 with the flat start up happening next week, following the process success demonstrated only a couple of weeks ago. Looking at it from a big picture standpoint, I genuinely believe our revenues will be lumpy, correct? Our order intake has been lumpy; we're stating that we do have the 36, or rather the other 32 of those orders, in-house and being processed right now. A substantial backlog exists in the prior process bonus. We're aware that many of those customers are likewise looking toward installation down in the U.S. Gulf Coast, you start up and on paver. So although we have a few words at the moment, I believe we'll witness a significant pickup once that project is up and running, and clients currently talking with us who haven't engaged will view that with a lot of confidence once startup has occurred, and that matches the conversation we've actually had with...
Understood. And so on that note, Jim, is there anything else you might want to mention, any final points, before we open things up to questions?
Yes, one thing. Just — and this is fairly broad, really — we've discussed the standout items during these calls. We cover how the cortisols arrive along with the other larger banks. I've spoken about numerous sales efforts, preparations for demonstration, many customer events. There's considerable engineering. There is a — plenty of effort happening inside ClearSign, a great deal inside finance, and the function simply keeping operations going. We do maintain our headcount balance. There aren't many of us at ClearSign. And I simply want to take this moment publicly to offer my thanks and appreciation to the team here at ClearSign for all that they do. they genuinely believe in ClearSign, and I truly value their efforts. And I'd just like to say that pumping, I think that necessarily appropriate.
With that said, we'll now use the time to begin the Q&A portion and also go over and read aloud a few questions that were submitted in advance; so then, operator?
Matt covered a great deal of the teams that I was also planning to mention. But only 1 point of clarification, Jim. It appears that your 5 or 6 project starts fall between 1Q and 2Q. Are at least some of those already in progress as of right now?
Amit, I apologize, would you mind repeating that question?
So like I was mentioning, it looks like you might have around 5 or 6 projects kicking off from 1Q to 2Q. At this point, are those already moving forward, or are at least a few of them coming your way?
Yes, they are — we're actively engaged on them. The major start-ups for us right now, I'd say, involve a flare meant for source testing. What we're seeing is that the real events, once you fire up the unit, usually take place across only a handful of days; however, a great deal of preparation and planning clearly goes into it beforehand. Still, that flare is going to be a big deal for us. The major burner starter in the Gulf Coast comes later in the year; it's set for October, though we'll be assisting with the installation planned for July. So that alone — given the nature of that project and how big it is — will matter a great deal to us. With the M-Series start-ups, we assist at the point of agent with repeat clients who've grown quite comfortable with those products. So even though we provide technical support, they don't always need us present at the job site. As a result, we'll be waiting to hear back from them. There's other work underway too. A very large flare order is also in production — the first one starts up next month; the second big one was set to finish fabrication later in Q3 and then head to the job site. So we anticipate that one starting up this year as well. < > So I'm just walking you through those; the start-ups matter a lot to us, yet for most of these clients — take the flare, for instance — we actually have, within our proposal pipeline, further close-outs with those same customers. The start-up we expect next month, along with the source testing, we think, will serve as a major check mark for them prior to their considering what comes next. We have one more quote; we think they've got extra ones permitted and waiting to be advanced too. So we really do see enormous importance in the start-ups, not only for wrapping up those specific projects, but for what it signals regarding our upcoming orders and growth.
Excellent. Operator, I can take a few — actually, one has just come in from New Zealand. The inquiry is this: several reductions in EPA rules have been announced covering a broad set of areas. Jim, do you see that as a negative for adoption down the road?
Well, in ClearSign's case, we interpret the easing of those regulations — for ClearSign, I should say — as, rather, CO2 emission rules don't truly have an effect on us; what they influence is hydrogen use in fuel. ClearSign's technology, though, targets NOx emissions, and those have with, continue to be pushed; they're mostly governed at the state level, driven within the U.S. by the EPA and ground level zone. Based on what we've observed broadly across the globe, emissions keep being timed — everybody places value on clean air as populations increase. And we — although our business sits predominantly in the United States right now, we have one installation in Europe. Through our relationship with Zeeco, we are very much eyeing the broader worldwide market in our future plans. Zeeco operates globally, with support and manufacturing spanning the world. So via them, we certainly possess the capability to serve a global market, and we in fact gained from that Zeeco relationship when we serviced the single installation we have over in Europe; so that serves as a problem model for us. So yes, we do monitor the global market. The regulations do shift regarding the kinds of equipment that clients use, but on the whole I view the timing of emissions out in the Far East and in Europe as a highly positive signal for ClearSign.
All right. Here's another one, and it's fairly straightforward. Tim, how much does a typical M-Series burner go for?
Good question. We've provided broad guidance that a burner averages $100,000, just to keep it simple and make the math easy. I believe that figure still applies to the M Series. That said, as you'd expect, there's some variation — the M1 is the low emissions burner; it's our more advanced technology, and it commands a premium price. There's also somewhat more engineering and manufacturing involved in that burner. The typical size of that burner spans from roughly 80,000 up to beyond 200. The M25 is a D2 version with less engineering and less IP to leverage, so those go for lower price points. Again, the usual size runs from about 50,000 up to — a few of them hit 150 to 200 million for the common sizes. So I'd say the $100,000 average is fine; but there's another thing to keep in mind with all of these, what we're discussing here is that they're standard burners. So unlike process burners, which require a great deal of engineering and must be dialed in on the test furnace, and come with very long order durations, the M-Series uses a standard burner configuration. And what we're seeing is that within those size ranges, there are also common sizes. What that means is once we have, say — if you look at this reason are, as we build this one and one for this application for Toledos Midstream, when we get more applications for that same burn, the engineering drawings are already done, so it's simply a matter of manufacturing those same burners. That lets us achieve a very high degree of efficiency and really concentrate on profitability for ClearSign. So this is — it's a — we can discuss the revenue and the sales price. But when we consider the profitability of what this means for ClearSign, I really like the M-Series burners.
All right, that wraps up the queue on my end. Back over to you, operator.
Sorry about that — my line was on mute earlier. Congrats on the numbers; the order momentum this month is really encouraging. I also want to say thanks for the thorough presentation, and several of the things I was going to ask have already been covered, which I appreciate. My question is more of an industry-level one. You've discussed at length how you stack up against the incumbent technologies, and that edge is quite evident. I'm wondering whether you could offer any perspective on what the landscape looks like for competing new technologies, if there are any out there?
Thanks, Pete. And thanks for your questions and comments. To me, the incumbent selected CAC production technology is clearly the primary competitor for ClearSign, and I believe our product is far more efficient and, without question, far more cost-effective for customers. Put simply, our aim in this market is to replace SCRs as we move forward. There are, of course, other burner manufacturers attempting to develop products. From others, we don't see much. There's obviously the advertising and marketing side. But right now, I do believe ClearSign holds by far the dominant share and is the leading name in the SCR level — market across the industry. For anyone new attempting to enter with a burner technology, the barriers are substantial. First, you need people with expertise in this industry, which is a highly specialized area. of engineering. Beyond that, customers certainly require one thing: demonstrating burners in a Fortscale furnace. Their manufacturing needs are very specific. ClearSign got past that barrier thanks to our abeta arrangement with Zeeco. For anyone else lacking those connections, I think simply getting into this market would prove extremely difficult.
Appreciate it, operator. And thanks to all of you for being interested in ClearSign and for making time to be with us on today's call. I'm also grateful for the questions you submitted and for the ones you posed live here. Getting feedback is always a positive thing. We're eager to share news about what we've been working on and to talk with you again on our next call. Until then, we do post updates on LinkedIn; we do put out a less formal message through that channel, so please keep an eye out for our developments on our website, and please give us a follow on LinkedIn.
Thanks so much. That brings us to the end of what we had for you today, folks. You're welcome to hang up now, and we hope the rest of your day is great. We appreciate you joining us.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete ClearSign Technologies Corporation transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to ClearSign Technologies Corporation earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.