Operator operator
#1

Thank you for holding. I'm Betsy, the operator for this conference. You're welcome to the Fortis Inc. call covering third quarter 2025 earnings along with a new five-year capital outlook. Please note that everyone attending is in listen-only mode and that this conference is being recorded. Once the presentation wraps up, you'll have a chance to ask questions. If you'd like to enter the question queue, press star followed by one on your phone's keypad. If you need help at any point during this call, you can reach an operator by pressing star, then zero. At this time, I'd like to hand the conference over to Stephanie Amaimo, Vice President, Investor Relations. Please go ahead.

Stephanie Amaimo executive
#2

Thank you, Betsy, and good morning to all of you. It's great to have you on this call covering Fortis' results for the third quarter of 2025 as well as our new capital outlook spanning five years. Along with me are David Hutchens, our President and CEO; Jocelyn Perry, Executive VP and CFO; additional senior management team members; and chief executives from a number of our subsidiaries. Ahead of getting started on today's call, please note that forward-looking information will be part of our discussion, and it carries the cautionary statement found in the supporting slideshow. Forecast projections within the forward-looking information we present today could differ materially from actual results. Non-GAAP financial measures mentioned in our prepared remarks have been reconciled to the corresponding U.S. GAAP financial measures in the MD&A for our third quarter of 2025. And unless we say otherwise, every financial figure we reference is stated in Canadian dollars. With that said, David, over to you.

David Hutchens executive
#3

Thank you, and good morning to all of you. We're proud today to report yet another solid quarter, one defined by strong execution and by momentum coming from the regulated growth strategy we've been pursuing. On the operational side, we keep providing service that is safe and reliable for our customers, and through September our utilities put CAD 4.2 billion into our systems. Across the full year, we anticipate investing roughly CAD 5.6 billion. On the financial side, adjusted earnings per share came in at CAD 0.87 for the third quarter. During September, we finished the divestiture of Fortis TCI. That transaction bolsters our balance sheet and lowers the risk profile of the company. More recently, we signed an agreement to sell our investments in Belize — including the hydro generation facilities that are non-regulated — to the government of Belize. I'm pleased to share that the transition closed last Friday, and that Fortis is now made up of 100% regulated assets. We know these were assets held by the Fortis family for a long time, and we send our very best wishes to the teams in Turks and Caicos and in Belize as they carry on serving their customers and communities. Today, we're glad to reveal our five-year capital plan and to announce that our board of directors has declared an increase to the fourth quarter dividend of approximately 4%.

David Hutchens executive
#4

Our fresh five-year capital plan of CAD 28.8 billion is CAD 2.8 billion larger than the one it replaces. It backs rate-based growth of 7% along with dividend growth guidance of 4%-6% each year through 2030. When we built this plan, we put a lot of weight on keeping bills affordable for customers. We favor capital investments whose cost savings get passed along to the people we serve. One example is the coal-to-natural gas conversion at the Springville Generating Station in Arizona, which comes out cheaper than the new energy resources that were part of the earlier plan. Beyond that, our utilities keep working on operating costs, hunting for efficiencies via innovation and better processes. The slide shows that higher transmission investments account for most of the growth in our five-year plan. Over at ITC, the CAD 2 billion step-up came mainly from new interconnections, such as the Big Cedar Load Expansion Project, plus the MISO Long-Range Transmission Plan and baseline reliability projects. At UNS, transmission and distribution spending rose CAD 1 billion, and FERC-regulated transmission accounts for CAD 700 million of that. Most of it traces to a new transmission line at TEP. Generation investments at UNS came down by CAD 900 million, mostly because of the planned switch of the Springville Generating Station to natural gas, which I mentioned earlier.

David Hutchens executive
#5

The rest of that increase comes from expansion at the regulated utilities we own outside ITC, plus a more favorable assumed FX rate. Execution risk on this new plan is very low: roughly 77% goes to transmission and distribution and to critical infrastructure, which produces steady and predictable returns. The capital program carries little risk and rests entirely on regulated projects—100%—and it contains just 11 major capital projects, which account for 21% of the plan. We expect consolidated rate base to grow by CAD 16 billion, from about CAD 42 billion in 2025 to CAD 58 billion in 2030, which works out to average annual rate-based growth of 7%. That is 50 basis points above the 6.5% under the previous plan. It will take a few minutes now to go a bit deeper into the larger capital plans at our utilities. At CAD 9.8 billion, ITC's capital plan is the biggest in the company's history, and it underpins robust rate-based growth of 8%, which is 100 basis points higher than the prior plan. Among the main components of ITC's plan are spending on base infrastructure, MISO's long-range transmission plan, customer connections, and grid security. At ITC there are meaningful opportunities beyond the base plan as well, such as roughly $3.3 billion-$3.8 billion after 2030 for tranche 2.1 projects awarded through rights of first refusal.

David Hutchens executive
#6

At ITC, efforts are likewise in progress to assess projects in the tranche 2.1 portfolio that fall under competitive bidding. Should ITC be awarded any of those projects, that would add to ITC's plan. Additional growth paths at ITC involve customer connections tied to more than 8,000 MW of load growth for proposed data centers and economic development projects at various stages across their footprint. That figure is 3,000 MW higher than just one quarter ago. ITC might also capture future opportunities linked to the MISO LRTP process now under way. Overall, ITC is in a very exciting period with a substantial transmission buildout. Now let's move to UNS Energy. A capital plan of CAD 5.6 billion at that utility underpins roughly 7% average yearly rate-based growth. Because it is a vertically integrated utility, investments span the value chain. Of note, one-third of the capital plan sits in transmission, while the remainder is made up of generation and distribution investments. Regulated generation covers the coal-to-natural gas conversion of 800 MW at the Springville Generating Station, consistent with TEP's coal exit by 2032, and the Black Mountain Generation Project at UNS Electric. Although the plan reflects no new generation tied to data centers or other large load growth, a new period of demand is nearing, accompanied by a sizable interconnection queue.

David Hutchens executive
#7

Like we mentioned during the prior quarter, TEP signed an energy supply agreement aimed at serving demand of roughly 300 MW, which begins ramping up during 2027 and draws on both existing and planned capacity. That agreement is still pending ACC approval along with other contractual contingencies. Active negotiations continue over an additional 300 MW of capacity, which would support a complete 600 MW buildout at this first site. TEP is likewise negotiating actively for further capacity at a second location, somewhere in the 500 to 700 MW range. Should those later-phase agreements get finalized, we estimate that new generation totaling approximately $1.5 billion to $2 billion through 2030 would be needed, along with new transmission. We anticipate the supply mix will bring together renewable energy, natural gas generation, and energy storage. Every agreement will be structured so reliability is maintained and financial protections exist for both our customers and the company. Opportunities outside the plan include new energy resource investments that TEP and UNS Electric will need as part of their next integrated resource plans, which are expected to be filed in 2026. Turning to British Columbia, our natural gas infrastructure is a key focus. FortisBC's capital plan of CAD 4.9 billion backs projects ensuring system reliability and integrity, plus major capital projects for LNG and advanced metering infrastructure.

David Hutchens executive
#8

On top of the base plan, there are a number of opportunities we see. The BCUC gave its approval to the Tilbury LNG storage expansion project just last week. Since our capital plan is built around a smaller storage tank, that leaves us with potential upside of roughly CAD 300 million. That project depends on an environmental assessment, which we expect next year. Additional opportunities include expanding LNG at Tilbury for marine bunkering, plus customer and load growth in the Okanagan Electric Service Territory. A few of these could land inside the planned period. It is an exciting and dynamic moment to be an energy delivery utility in North America. While we carry out our base five-year capital plan, we are at the same time concentrating on unlocking growth opportunities beyond that plan throughout all the jurisdictions where we operate. Moving to our favorite slide now. Our board of directors declared a fourth quarter dividend of CAD 0.64 today, which is a 4.1% increase. That takes us to 52 consecutive years of dividend increases paid, a record that speaks for itself. Given our strong dividend history and regulated growth strategy, we are extending guidance of 4%-6% annual dividend growth through 2030. I will now hand the call to Jocelyn for an update on our third quarter financial results.

Jocelyn Perry executive
#9

Thank you, David, and good morning to all of you. Reported earnings for the quarter came in at CAD 409 million, which works out to CAD 0.81 per common share. Looking at a year-to-date basis, reported earnings stood at CAD 1.3 billion, or CAD 2.57 per common share. As this slide shows, those reported earnings take in income taxes and closing costs of roughly CAD 0.06 per share tied to the disposition of Fortis TCI. Once you exclude that impact, Adjusted EPS for the quarter came to CAD 0.87 per common share, which is up CAD 0.02 from the third quarter of last year. Through September on a year-to-date basis, Adjusted EPS reached CAD 2.63, an increase of CAD 0.18 per common share versus the same period a year earlier. Adjusted EPS growth so far in 2025 reflects strong performance across all of our regulated utilities. Turning to slide 14, you'll find the adjusted EPS drivers for the quarter broken out by segment. Our U.S. Electric and Gas Utilities posted a CAD 0.03 increase in EPS. The higher earnings at UNS reflected an increase in transmission revenue and higher AFUDC associated with ongoing major capital projects. As we discussed last quarter, earnings at UNS are tempered by regulatory lag, driven largely by over $700 million of rate base not reflected in rates. The increase in earnings at Central Hudson was due to rate-based growth, as well as a change in the recognition of a regulatory deferral for uncollectible accounts effective July 1st, 2025.

Jocelyn Perry executive
#10

Growth faced a tempering effect from a payment into a customer benefit fund tied to the joint settlement agreement that brought a pending enforcement matter to a close. Taken together, those regulatory items reduced Adjusted EPS by CAD 0.01. Turning to ITC, ongoing capital spending and the associated rate-based expansion lifted EPS by CAD 0.02. That gain was partly offset by greater stock-based compensation expense and higher finance costs at the holding company. At our Western Canadian utilities, EPS rose CAD 0.01, mainly from rate-based growth, including earnings tied to FortisBC Energy's investment in the Eagle Mountain pipeline project. Earnings for this segment were held back by the expiry of a PBR efficiency mechanism and a reduced allowed ROE taking effect January 1st, 2025, at FortisAlberta. Although the slide does not show it, EPS at our other electric segment was broadly in line with the third quarter of 2024. Rate-based growth there was offset by the September 2 disposition of Fortis TCI. For the full year, we anticipate that the Fortis TCI sale will affect Adjusted EPS by CAD 0.02. A stronger U.S. dollar relative to the Canadian dollar also added CAD 0.01 to EPS for the quarter. In the corporate and other segment, the CAD 0.03 decline reflects greater holding company finance costs, unrealized losses on foreign exchange contracts, and smaller unrealized gains on total return swaps.

Jocelyn Perry executive
#11

Like David said, we completed the sale of our Belize assets in October, and we don’t anticipate that deal will materially affect adjusted earnings in future periods. Last, a higher weighted average share count reduced EPS by CAD 0.02, largely from shares issued through our dividend reinvestment plan. Most of the quarter’s drivers carry over to the year-to-date period, but the nine-month earnings increase also includes growth at Central Hudson from cost rebasing and a higher allowed ROE that took effect July 1st, 2024, plus the timing of operating costs in 2025. Year-to-date earnings also include lower wholesale sales margins at UNS Energy and the timing of operating costs at . Through September, we issued more than CAD 2 billion of debt, among it an inaugural corporate hybrid issue of CAD 750 million at 5.1%. We used proceeds from that hybrid issuance and from the Fortis TCI sale completed during the quarter to repay our corporate credit facilities, including the non-revolving term loan, which gave us funding flexibility as we concentrated on delivering our capital program. As I noted earlier, thanks to the recent hybrid issuance and asset sales, growth in our capital plan should be financed mostly by cash from operations, utility debt, and our dividend reinvestment plan.

Jocelyn Perry executive
#12

To date, we haven't drawn on our CAD 500 million ATM program, and it stays available to give us funding flexibility when needed. Broadly, our funding plan is largely in line with the prior one and supports average cash flow to debt metrics above 12% across the period, with plenty of cushion in the plan's later portion. This balanced funding approach underpins both our growth goals and our strong credit profile. Now to recent regulatory developments, with one item worth noting. In August, the New York State Public Service Commission approved Central Hudson's three-year rate plan, applied retroactively to July 1st, 2025, and it includes continuation of an allowed ROE of 9.5% and a common equity ratio of 48%. That wraps up my remarks. I'll hand the call back to David now.

David Hutchens executive
#13

Thanks, Jocelyn. Fundamentally, we're a utility with solid foundations and a straightforward, disciplined strategy for regulated growth, featuring a lengthy CapEx runway backed by FERC-regulated transmission and opportunities tied to retail load growth in Arizona. When it comes to our customers, we stay dedicated to putting safety, reliability, affordability, and cleaner energy delivery first. For shareholders, we provide an appealing low-risk return profile strengthened by our capital investment plan and dividend growth guidance through 2030. That wraps up what I wanted to say. I'll hand the call back to Stephanie now.

Stephanie Amaimo executive
#14

Thanks, David. That brings the presentation to a close. We’d now like to begin the call and take questions from the investment community.

Operator operator
#15

We’re moving into the Q&A portion now. If you’d like to ask a question, press star followed by one on your phone’s keypad. A tone will confirm your request. If you’re on a speakerphone, lift the handset first, then press your keys. Should you need to pull your question, press star and then two. We’ll take a brief pause while callers line up. Our first question comes from Maurice Choy at RBC Capital Markets. Go ahead, please.

Maurice Choy analyst
#16

Thanks, and good morning to all of you. My first question concerns the timing and probability of certain opportunities that sit above the base plan yet fall inside this five-year plan period. More specifically, you said earlier that TEP has roughly $1.5 billion-$2 billion in incremental generation opportunities. Those may be needed through 2030, and there is also another $300 million tied to upside from the LNG Tilbury storage expansion. If I'm calculating correctly, that comes to roughly $2.5 billion-$3 billion of incremental investments, or an additional 100 basis points on top of your rate-based CAGR. Is there any reason you believe these two items might not materialize in the months ahead, so that we could potentially include them as part of our base estimates?

David Hutchens executive
#17

Your optimism is appreciated, Maurice, though quite a bit of work remains before we reach that point, correct? Agreements with those counterparties still need to be finalized. We clearly must have the capability to construct the necessary infrastructure within the timeframe they're seeking. Every one of those items is certainly achievable, yet generation still has to be sited, projects need to move through the queue, and all those elements matter — and above all, these customers must commit to every protection we're after, both for ourselves on the credit side and for our customers on the rate side, and then the regulatory process has to be navigated. A great many steps sit between now and then, particularly where the data centers are concerned. Beyond that, the storage tank in British Columbia still has to clear the EA process there. We're clearly enthusiastic and bullish about these projects to the fullest extent we can be, but as you're aware, nothing goes into our capital plan until the dotted line has signatures on it. We'll keep you updated as those negotiations proceed and once we've reached agreements with some of those third parties.

Maurice Choy analyst
#18

Alright, I believe the last item is the question about the funding plan on slide 17. It referenced the remainder of equity funding that would be met from asset sales, among other sources. Clearly, you've divested several assets here — Turks and Caicos, plus Fortis Belize and Belize Electricity, and Aitken Creek Gas Storage previously as well. So at present you're 100% regulated, as you noted. What are your thoughts on what else could be trimmed or optimized, or do you think this avenue is no longer worth pursuing?

David Hutchens executive
#19

Right, so our main focus is on carrying out that five-year capital plan, plus the long list of extra opportunities beyond the plan that we just walked through. Nothing from the deals we just closed carries any read-through. Our portfolio is a strong one, and 100% of our assets are regulated at this point. That sentence was a look back, not a look ahead. That is how we think about funding. The funding plan on the slide sets out our capital plan clearly. I would repeat that the DRIP is the sole source. There is no discrete equity in there. Equity comes only from the DRIP. We have the ATM and HOT standby, but in the current capital plan process those aren't needed.

Maurice Choy analyst
#20

That's really helpful context — I appreciate it.

David Hutchens executive
#21

Happy to have you with us.

Operator operator
#22

Rob Hope from Scotiabank has the next question. Go ahead, please.

Robert Hope analyst
#23

Good morning, everyone — nice to see the update on the capital plan. Perhaps, following up on that $1.5 billion to $2 billion for new generation in Arizona, could you help us get a sense of the timing for when that capital might be secured, given that many of these items carry fairly long lead times, and when they could come into service?

David Hutchens executive
#24

So, honestly, if you talk to the customers requesting this, they basically want it by tomorrow. But clearly, data centers don’t get built overnight. Securing the site and permits takes time, and naturally, adding generation does too. You’ll need to join the queue for combustion turbines or combined cycles—whatever the resource portfolio calls for. Yet at this stage, it’s also somewhat undefined, since you can examine what’s currently available. As I noted in my prepared remarks, we anticipate a blend of different energy resources, including battery storage, which can be deployed fairly fast. Renewables, naturally, can provide a substantial share of energy. Then you consider the best capacity resource—a combustion turbine or a combined cycle—depending on load characteristics. I still believe that over the longer term, such as the timeline we currently have for the Arizona project’s first 300 MW, which is expected online in 2027 and ramping up over roughly the following year, I would expect other timelines to resemble that one.

David Hutchens executive
#25

Yet if we consider the roadmap extending through 2030, subject to whether items such as combustion turbines can be secured—likely the key long-lead component in this effort—we remain of the view that completing it within that following five-year window is achievable.

Robert Hope analyst
#26

Okay, thanks. Let’s turn to ITC for a moment. You noted that data centers could drive 8 gigawatts of load growth, and Big Cedar is already secured. Could you give us a bit more detail on how many opportunities make up that 8 gigs, and is it possible we’ll see some sanctioning within the next 12 months?

David Hutchens executive
#27

Absolutely, I’ll hand that to Linda for more detail, though let me remind everyone listening that DTE, CMS, and Alliant make up our three biggest customers. I’m sure you’ve caught some of the discussion on those earnings calls regarding this development too. Linda, over to you.

Speaker unknown
#28

Thanks, Dave. And thanks for the question, Rob. Yes, absolutely — those eight gigawatts are certainly something we have visibility into through the conversations we've had with customers, and planning studies are underway to accommodate them. We're definitely still hopeful. I'd say there's a great deal of activity going on. As Dave mentioned, we're working closely with our customers. I mean, we're really not in a position to say or pin down anything just from a timeline standpoint. What I think we can say is that we keep seeing that queue of prospective data center projects, as well as other economic development projects, keep growing. So we stay hopeful and optimistic that we'll keep seeing further announcements. Honestly, at this point, it's too early for us to speculate about which projects, where, or precisely when. I'd say the queue keeps getting bigger, and we remain optimistic.

Robert Hope analyst
#29

Thanks. I appreciate that.

Operator operator
#30

Ben Pham from BMO has the next question. Go ahead, please.

Ben Pham analyst
#31

Hello, and thanks for joining us this morning. Would you be able to share your current thinking on initiating an EPS CAGR target, if there is one?

David Hutchens executive
#32

Sure, we still keep weighing whether to take that next step and provide earnings guidance. That said, we've been quite pleased with all the specifics we share, and we hope our investors and analysts feel the same about the details we provide on rate-based growth and can see how clearly our capital plan and funding plan connect. We also provide dividend guidance. We've always assessed this — I believe the last time I spoke with all of you was probably around then. The one item we're waiting on, since earnings in Arizona vary quite a bit, is the result of the Tucson Electric Power rate case. Formula rates would give us a far more stable earnings outlook, which would let us offer all of you somewhat more visibility and detail. I'm not saying that if formula rates come through, we'll provide earnings guidance — but that is one factor preventing us from doing so at present.

Ben Pham analyst
#33

All right, got it. So perhaps moving to the asset sale topic. Perhaps without commenting specifically on how Caribbean assets are valued, could you describe what you've been seeing regarding buyer interest in those assets? It looks as though you're more open to transactions that are neutral or maybe a bit dilutive, possibly. How are you thinking about CUC and the broader Fortis portfolio going forward today?

David Hutchens executive
#34

Sure, I'd say interest, as in any market, ebbs and flows. I mean, we've witnessed that across many years as people came to us regarding the Caribbean assets, et cetera. There isn't necessarily any kind of consistency in that regard. And naturally, the pool of buyers shifts nearly year by year. Again, specifically regarding CUC, this shouldn't be interpreted as us leaving the Caribbean. Those are two separate and distinct deals that we completed, and it doesn't signify that we're seeking to do anything further.

Ben Pham analyst
#35

Got it. Thanks.

David Hutchens executive
#36

Correct.

Operator operator
#37

Mark Jarvi from CIBC has the following question — go right ahead.

Mark Jarvi analyst
#38

Morning to you all. I wanted to return briefly to the friction points that could drive higher spending. From what I can see, customer affordability doesn't appear to be one of them, nor does the balance sheet. So is it really just a matter of equipment availability and permitting, Dave?

David Hutchens executive
#39

I'm glad you raised the question of affordability, since with these new large load customers, it's actually possible — and it really should be, if you structure things properly, if you do it right, you'd have the new customer, the large data center, covering the cost of the infrastructure growth that's required. That's essentially the growth-pays-for-growth idea. We absolutely want to set these arrangements up that way so that ultimately, affordability for customers is affected positively. Either they receive better reliability without paying anything more, or you keep the excellent reliability we always deliver and in fact see some rate reduction, because a portion of all that energy and infrastructure is now being covered by those bigger customers — they're essentially paying a larger share of the pie. Now, that's a really tough conversation — not necessarily tough to state, but tough for people to hear and grasp, because there are lots of mixed messages circulating that tell people in various markets that data centers will push your costs higher. Well, when you control the entire value chain the way you do at a vertically integrated utility, you're able to guarantee that won't happen, and your regulators will guarantee it won't happen either.

David Hutchens executive
#40

That's the approach we're adopting in Arizona. At the end of the day, there are always extra considerations, such as ensuring the community is on board, and making sure you grasp what it means from a resource standpoint whether you're using water-cooled or air-cooled systems — which is among the reasons that in Arizona everyone is moving toward air cooling for data centers rather than water cooling, so that particular point can be removed from the debate. It comes down to all of those elements: permitting and siting. They're excellent for economic development and jobs locally, and for the tax base. I mean, that's a wonderful story to share, but at times it's somewhat difficult to guarantee that everyone hears the whole thing.

Mark Jarvi analyst
#41

You mentioned the move toward air cooling. On that initial 300 MW site specifically, has everything progressed as planned? Are any further approvals still needed for those 300 MW? And regarding additional municipal backing or other clearances, what would be required at that point to reach an investment decision on the following 300 MW of data center load?

David Hutchens executive
#42

Right, I'll hand things over to Susan. As I said, the energy supply agreement has been filed with the Arizona Corporation Commission, and that's the first hurdle we need to clear. That said, I'll pass it to Susan so she can walk through any of the other pieces that may need to happen.

Speaker unknown
#43

Okay, morning everyone, and thanks Mark for that question. Sure — like Dave said, from where we sit the key approval we're waiting on is the one from the Arizona Corporation Commission, and we're expecting that before this year wraps up. Over on the data center front, the main thing they need, I believe, is a well-drilling permit, and that's issued at the state level. The land there is county land. The water itself would be approved by the state. That water is only for ordinary building purposes — kitchens, bathrooms, that sort of thing. It covers the initial 300 MW. Beyond that, I'd say we're still in contract negotiations. I can't really say what kinds of approvals would be required, though anything past this initial contract would definitely mean constructing a new energy generation resource. That will take a longer stretch of time. As Dave said earlier, the resource mix is what determines it. Some generation resources, certainly, can be built far faster than others.

Mark Jarvi analyst
#44

The customer wants to extend the timelines, but you have to run your own sort of analysis on generation mix so you can come back to them with a solution. Is that correct?

Speaker unknown
#45

My view is that we have to examine the impact on the grid as a whole and confirm the full set of infrastructure is ready so that both new and existing customers get served with maximum reliability at the most affordable cost. As for what gets built, customers will shape that in a major way, correct? If a customer's preference is mainly renewable, that call belongs to them, and it hinges on what they will pay regarding the resource mix. So whatever they require, whatever they favor, we will build it, provided the customer accepts paying that incremental cost, perhaps from raising the share of renewable resources.

Mark Jarvi analyst
#46

Got it. Jocelyn, I’ve got a question for you. Regarding the funding plan covering the next five years, does it include any additional hybrid issuances? If so, could you give us a rough outline of the quantum?

Jocelyn Perry executive
#47

Thanks, Mark. No, we don't have any additional hybrid in there at this point, but we do have the capacity. So if that growth we're discussing today isn't in the plan and it ends up being included, then there's a chance we'd look into the hybrid market. As we consider that growth, we might examine it anyway, depending on the market and on how hybrids are priced compared with other instruments. So yes, it's certainly an area we're exploring.

Mark Jarvi analyst
#48

Alright, thank you all.

Operator operator
#49

Our following caller is John Mould from TD Cowen. You have the floor.

John Mould analyst
#50

Morning, everyone. I want to revisit the large load topic in a few areas, perhaps beginning with ITC. I'm not looking for a view on in-service dates, but I'm curious whether you could give a bit more detail on how the timing of those connection requests is paced and on the three gigawatts of growth you've seen since last quarter — specifically, the pacing of at least what customers are seeking.

David Hutchens executive
#51

Is your question about how far ahead of needing it they arrive, or just—right, how early they start looking.

John Mould analyst
#52

And how quickly are they looking to be hooked up? If I were attempting to chart when all those requests come in, is there a specific window that carries more weight?

David Hutchens executive
#53

Honestly, I can't see anything on that front. Linda, do you have a perspective on the specific queue — the CODs they're after, I mean?

Speaker unknown
#54

Well, I mean, I'd probably be oversimplifying things, but I keep coming back to something Dave said earlier — that all of them want to get connected as fast as they possibly can. Of course, there are practical realities involved, simply in terms of where they plan to put their facilities. Are they situated alongside transmission infrastructure that already exists? If they aren't, then what infrastructure would be required? And there's the MISO approval process for getting that infrastructure through the MISO queue. It's a tough question. I suppose I'd put it broadly this way: for most of the discussions we're having with prospective customers, I'd say a lot of what they're asking for, along with what can realistically be done, falls in the later years of that five-year plan we already have. Naturally, there are different ramp perspectives on those, since some want to move more aggressively and faster, while others are willing to take whatever they can get as quickly as possible. I think pinning down any specifics on this is genuinely hard, but I'd say that at least for the conversations we're currently engaged in, most of those requests point toward the latter portion of our current five-year plan — so out into the 2028, 2029, 2030 timeframe.

Speaker unknown
#55

That should give you a bit of background.

John Mould analyst
#56

Yeah, that's really useful context, thanks. Then turning to Arizona and those new IRPs you plan to file in 2026 — how early would you need something more firm on the large-load front so it can be reflected in the wider IRP, and so you're able to potentially show the rate advantages that might come out of that across the different IRP portfolios? I'm just curious what that timeline looks like.

David Hutchens executive
#57

So the IRP is moving through its process. A few workshops have already happened, and more will take place throughout 2026, with a goal of filing those integrated resource plans — I believe — in August of next year. There are going to be a number of different resource portfolios built around various load growth scenarios, both with and without data centers. I think that even if we file an integrated resource plan and later find it's missing something we need, we simply update it, correct? What that really amounts to is laying down a marker for the core, bread-and-butter resources required to serve our load growth. When it comes to any of these extra investments we'd see and need and require for further data center growth, I tend to view it as almost its own small-scale IRP and rate base, which would carry its own revenue requirement that would be served by — or met by — those customers. So it's somewhat of a different model. You wouldn't necessarily have to combine them all. It's not as though we file this in August and then declare, "Alright, we have to shut things down. If more data centers come to us asking for energy, we can't work it out." What this really is, is essentially what we've been doing over the last couple of years while the 2023 integrated resource plan has been in effect: we continue having those conversations, examining how we can meet the load, and then adjusting as needed.

John Mould analyst
#58

All right, that covers everything I wanted to ask. I really appreciate the added detail.

Operator operator
#59

Our following question is from Patrick Kenny at National Bank Financial. Your line is open.

Patrick Kenny analyst
#60

Thanks. Morning, everybody. I was just going through the rate base CAGRs for each utility, and Alberta and BC are still trailing that 7% portfolio average. You mentioned there’s some upside in the Okanagan, but I’m curious whether any other macro or political tailwinds are on your radar that could help those two utilities narrow the gap with the group’s average growth profile, maybe across the next three to five years.

David Hutchens executive
#61

Sure, absolutely. The Okanagan piece is really a smaller component of the BC utility portfolio, but I believe it offers some solid opportunities for meaningful growth. I realize we don't typically spend much time discussing the electric side in BC, given how large the gas business is, yet there are definitely some further opportunities there. Regarding LNG, what this really comes down to isn't only the larger storage tank—an upsized one, I'd say—that the BCUC just approved. That represents one element of added investment, but there's also the extra LNG liquefaction capacity we could add at that location to support more bunkering, primarily additional bunkering at the Tilbury site. Some political tailwinds exist. I know there's been plenty of discussion about several major projects throughout Canada aimed at getting the economy moving again. Perhaps more of those specifics will emerge later today once the budget comes out. There is decent emphasis on LNG investments in BC. We're hopeful some of that trickles down and creates a positive effect when we consider further LNG investments for bunkering in BC. There are some investments in play there. I should mention, I'll offer a bit of defense for BC here as well.

David Hutchens executive
#62

This kind of thing moves in cycles, doesn't it? With load growth, once you finish a batch of large projects and then put together a fresh five-year plan, it may not appear as strong as the previous one. Take it from me, there's plenty in there. They've done a good job historically and intend to build on that going forward.

Patrick Kenny analyst
#63

Alright, thank you for that, David. Moving to Jocelyn, I'd like to revisit the funding plan. When we consider the five-year average cash flow-to-debt ratio of 12.4%, does that sit 40 basis points above S&P's threshold regardless? Is that the level you'd want to maintain on a sustained basis, or would you prefer to build a bit more cushion over time? Perhaps another way to frame it: given your debt metrics, how much dry powder could you have available to flex the capital program or to manage any additional weakness in the Canadian dollar?

Jocelyn Perry executive
#64

Thanks, Patrick. Yes, that's correct. Across the five years, the S&P metric averages 12.4%. But once you reach the later portion of the plan, we're really driving closer to 100 basis points. You may have heard me mention previously that this is roughly where we've aimed for our cushion. That provides substantial dry powder, giving us flexibility to fund projects outside our capital plan that we're discussing here today. So this plan positions us well to reach that sufficient, robust cushion in the later portion of the plan. I'd say 100 basis points really is a considerable cushion. So I'm comfortable having something like 75 to 100 basis points over the 12% threshold. We're getting there. This plan has in fact improved relative to the prior year's plan, which is a positive. Much of that came from the fact that we've completed some asset dispositions and we've kept up our DRIP. So yes, the cushion is definitely achieved at the 12.4% average, but we do reach what I'll call the ideal cushion by the later portion of the plan.

Patrick Kenny analyst
#65

All right, that's great. Thank you, everyone.

Operator operator
#66

That wraps up the question-and-answer portion. Ms. Amaimo, I'll hand the conference back to you for any closing remarks.

Stephanie Amaimo executive
#67

Thanks, Betsy. That's all we have for now. Appreciate all of you joining us for this call on our third quarter results and the new five-year capital outlook. If you need anything more, please reach out to IR, and have a great day.

Operator operator
#68

That wraps up today's conference call. You can go ahead and disconnect your lines. Thanks for joining us, and have a pleasant day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Fortis Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Fortis Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.