Thank you for holding. I'm Betsy, the operator for this conference. Welcome to the Fortis Inc. 2025 Annual Results Conference Call. Just a reminder that everyone is in listen-only mode and this call is being recorded. Following the presentation, you'll have a chance to ask questions. To get into the question queue, press star, then one on your telephone keypad. If you need help at any point during the call, you can reach an operator by pressing star, then zero. At this time, I'd like to hand the conference over to Stephanie Amaimo, Vice President, Investor Relations. Please go ahead, Ms. Amaimo.
Thank you, Betsy, and good morning to all of you. It's a pleasure to welcome you to the conference call covering Fortis's results for both the fourth quarter and the full year of 2025. Along with me are David Hutchens, our President and CEO, Jocelyn Perry, Executive VP and CFO, additional members of the senior management team, and the CEOs of certain subsidiaries. Before we get started on today's call, please note that forward-looking information will be part of our discussion, and that information carries the cautionary statement found in the supporting slide show. The actual results may differ materially from the forecast projections that are included in the forward-looking information we present today. Any non-GAAP financial measures mentioned in our prepared remarks are reconciled to the related US GAAP financial measures in our 2025 MD&A. And unless we say otherwise, every financial figure we reference is stated in Canadian dollars. With that, I'll hand the call over to David.
Thank you, and good morning, everyone. Before we begin, I want to pause and thank Linda Apsey, CEO of ITC, for the outstanding leadership she has shown as she prepares to retire next month. During her time as CEO, she has led ITC with clarity, integrity, and a profound dedication to the people and communities ITC serves. Her steady hand has reinforced ITC's foundation and helped put the company in position for continued success well into the future. We wish her the very best in retirement. Looking ahead, we are pleased that a longtime executive at ITC, Krista Tanner, will follow Linda as President and CEO, and she joins us on the call today. Her experience and insight will be essential as ITC keeps meeting the shifting demands of the energy landscape. Moving to our business highlights slide, 2025 was another strong chapter in the Fortis story. Over the year, we kept providing safe and reliable service to the millions of people who count on us every day. Our utilities put $5.6 billion into capital, which made our systems stronger, improved our resilience, and supported the long-term needs of our customers and communities.
Those investments turned into robust growth in our rate base and earnings, and they underpinned a record of dividend increases that now stretches to 52 consecutive years — evidence of what our regulated growth strategy is worth. Fortis additionally earned recognition in the Globe and Mail's annual Board Games report, taking the top governance ranking among 206 companies on the S&P/TSX Composite Index, a reflection of how committed our board is to best-in-class practices. Earlier today, our 2026 climate resiliency report came out, and it lays out the ways our utilities are addressing climate risks and drawing on data-driven insights to make our energy network stronger. Reliability and safety remain the bedrock of how we run our utilities, and a strong culture around both persists. Indeed, 2025 ranked among our strongest years ever for safety and for reliability, and it shows ongoing improvement when measured against Canadian and US industry averages. Operating cost-effectively, for our customers' benefit, sits at the heart of our strategy. Although cost and supply chain pressures have hit us during the last few years, we have managed to hold controllable operating costs at or under inflation. Approaches such as deploying grid-enhancing technology and applying AI to targeted vegetation management and equipment inspections are bringing costs down while making reliability better for our customers.
When it comes to our utilities, capital investment decisions still get driven first by what operations require, with the effect on customer bills factored in. We also run energy efficiency programs that let customers cut their own bills directly, and at several of our utilities there are low-income discounts plus customer bill assistance programs for those who need help. Our track record of strong shareholder returns carried into 2025, when total shareholder return for the one-year period came in at nearly 24%. If you look back across a 20-year timeframe, Fortis has produced average annual total shareholder returns of approximately 10%, which is more than what the benchmark indices generated. During the fourth quarter, we introduced our new $28.8 billion five-year capital plan, the biggest we have ever put forward. That plan is made up of a diverse mix of regulated investments spread across our utilities, with the main focus on transmission and distribution assets. It is highly executable and low risk, since only 21% of it involves major capital projects. Across the coming five years, we expect rate base to grow by $16 billion, which supports average annual rate base growth of 7%. Beyond the plan itself, our attention is on incremental growth opportunities both near term and long term. At ITC, our efforts are aimed at pursuing additional customer connections and MISO LRTP projects.
As you may remember, ITC anticipates further Tranche 2.1 investments of between $3.3 billion and $3.8 billion US for projects granted through rights of first refusal in Michigan and Minnesota, plus system upgrade projects in Iowa that aren't open to competitive bidding. The bulk of these investments should come after 2030. ITC keeps assessing competitive bidding opportunities, and any project won would come on top of this estimate. Turning to retail load growth in Arizona, in December the Arizona Corporation Commission gave approval to the energy supply agreement for roughly 300 megawatts to back a planned data center in Tucson Electric Power's service territory. The project will draw on existing and planned capacity, ramping up starting in 2027 and running through 2029. The customer will receive service under TEP's commission-approved large power service tariff at full tariff rates, with no discount. The 10-year contract carries a 75% minimum billing requirement, which provides revenue stability no matter the actual energy use, and it also has strong credit and security provisions. The energy supply agreement is still subject to contractual contingencies and keeps moving forward, with the developer closing its land lease with Pima County in December 2025, which keeps the project on track. Past this initial phase, negotiations are ongoing for an additional 300 megawatts of capacity to support a full build-out of 600 megawatts at this site.
TEP is likewise in ongoing talks regarding extra capacity at a second location, somewhere between 500 and 700 megawatts. As recently as last month, over 600 acres in Marana received approval for rezoning tied to that second site. Should deals be completed for these later phases, our estimate remains that new generation needs of roughly $1.5 billion to $2 billion US through 2030 would be necessary. Over at FortisBC, the BCUC's green light for the Tilbury LNG storage expansion project late last year opens up as much as $300 million in possible incremental capital, depending on when environmental assessment approvals come through. During 2025, dividends paid per common share rose 4% versus 2024, which makes 52 years in a row of dividend increases paid. Going forward, we stay dedicated to extending that record by executing our growth strategy, underpinning our guidance of 4% to 6% yearly dividend growth through 2030. I'll now hand the call to Jocelyn for an update on our fourth quarter and annual financial results.
Thanks, David, and good morning, everyone. Before I discuss the annual results, I'd like to briefly address our fourth quarter. For the quarter, reported earnings per common share came in at 83 cents, which is 4 cents above the fourth quarter of last year. The fourth quarter's reported earnings were affected by losses tied to the disposition of our investments in Belize, and reported earnings for the fourth quarter of 2024 reflect a refund liability at ITC connected with the MISO base ROE decision. Excluding those items, adjusted EPS came in 7 cents above the fourth quarter of 2024. A key driver for the quarter was strong rate base growth across our utilities. Unrealized gains on derivative contracts and a favorable foreign exchange impact also added to the quarter-over-quarter increase. That increase was tempered by lower earnings at UNS, which were driven by regulatory lag and milder weather. Higher holding company finance costs, along with lower earnings contributions from FortisTCI and Belize, also weighed on the quarterly results. As David noted, we delivered strong EPS growth in 2025. Reported EPS was $3.40, which is 16 cents above 2024. Reported EPS for 2025 reflects losses associated with the disposition of Turks and Caicos and Belize, totaling 13 cents per share, with roughly half of that amount related to income taxes.
Adjusted EPS came in at $3.53, which is 25 cents above 2024. If you turn to slide 12, we break out the adjusted EPS drivers for the year by segment. At our Western Canadian utilities, EPS rose by 10 cents, mostly on rate base growth, including earnings tied to FortisBC's investment in the Eagle Mountain Pipeline project. That gain was partly offset by the sunset of the PBR efficiency mechanisms and a lower allowed ROE at FortisAlberta starting January 1, 2025. Our US electric and gas utilities added 8 cents to EPS. Higher earnings at Central Hudson reflected rate base growth and the rebasing of costs that took effect in July 2024. Earnings were also affected by a change in how we recognize a regulatory deferral for uncollectible accounts, effective July 1st, 2025, along with a contribution to a customer benefit fund tied to the settlement of an enforcement proceeding. At UNS Energy, earnings were lower because of regulatory lag on more than $700 million US of rate base that isn't yet in rates, plus weaker retail sales from milder weather and lower margin on wholesale sales. That was partly offset by higher transmission revenues and AFUDC from major capital projects. Turning to ITC, ongoing capital investments and the associated rate base growth lifted EPS by 4 cents.
That gain was partly offset by increased stock-based compensation and greater finance costs. Within Corporate and Other, the penny-per-share rise came from unrealized foreign exchange contract gains, partially offset by higher finance costs and a smaller earnings contribution from Fortis Belize. For the full year, favorable foreign exchange added 8 cents. A larger weighted average share count trimmed EPS by 6 cents, largely because of shares issued through our dividend reinvestment plan. And although the slide doesn't show it, other electric earnings for the year felt the benefit of rate base growth, partly offset by the sale of FortisTCI. Over the last 3 years, Fortis has posted average annual rate base and EPS growth of roughly 6.5%, extending our strong growth record. In that period, we also brought our adjusted dividend payout ratio down successfully to about 70%, which shows we can grow responsibly. Our liquidity is solid: $2.7 billion of long-term debt was issued in 2025, and close to $4 billion remained available under our credit facilities at year-end. Given the hybrid debt issuance and asset sales in 2025, growth in our capital plan should still be funded mostly by cash from operations, utility debt, and our dividend reinvestment plan.
That $500 million ATM program of ours hasn't been drawn on at all so far, and it stays on hand to give us funding flexibility whenever it's needed. Turning to the rating agencies, we're pleased to share that S&P affirmed our A- issuer rating and our BBB+ senior unsecured debt rating in November, and moved the outlook to stable from negative, citing better financial metrics and steps taken at our utilities to reduce physical risks — specifically wildfires. Also worth mentioning: last month, Moody's pulled its ratings for Fortis Inc. because we asked them to. We reached that decision once we'd weighed the costs and benefits of carrying that rating, and it has no effect on the standalone ratings Moody's assigns to our utilities. All in all, our core credit strengths, together with our funding plan, underpin the solid investment-grade ratings we hold with S&P, Fitch, and Morningstar DBRS. Down in Arizona, the general rate applications for both UNS and TEP keep moving forward. Last month, the ACC administrative law judge released a recommended opinion and order on the UNS Gas general rate application, which proposes an allowed ROE of 9.57% and a 56% common equity component of capital structure. The order also proposed a formula, though it included some changes to that formula, among them post-test year adjustments.
On Monday, UNS Gas submitted its response, which included its objection to the changes made to the formula. ACC approval is still required for the rate application, and that is anticipated during the first quarter. Under the order, new rates would be implemented by March 1, 2026. At TEP, staff filed testimony earlier in the week recommending a 9.75% ROE and a 55% common equity component of capital structure. Staff's rate design testimony, including the formula, is scheduled for filing in late February, and hearings are anticipated to begin in April. According to the most recent procedural schedule, we anticipate an order in the fall. That brings my remarks to a close. I'll now hand the call back to David.
Thanks, Jocelyn. In short, 2025 proved to be yet another excellent year. Our capital investments came to over $5.6 billion, and we achieved healthy growth in both EPS and rate base. Safety and reliability performance was strong, and we produced attractive returns for shareholders. None of these results would have been achievable without our people's ongoing dedication. Looking ahead, our attention is on carrying out the $28.8 billion capital plan, which is set to generate 7% rate base growth and underpin our dividend growth guidance of 4% to 6% through 2030. That wraps up my comments. Stephanie, I'll now hand the call back to you.
Thanks, David. That brings the presentation to a close. We'd now like to open up the call and take questions from the investment community. The question-and-answer session starts at this point. If you'd like to join the question queue, press star followed by one on your telephone keypad. A tone will sound to confirm your request. Should you be on a speakerphone, please lift your handset before you press any keys. If you wish to withdraw your question, press star, then two. We'll take a brief pause while callers join the queue. Our first question today is from Maurice Choy of RBC Capital Markets. Please go ahead.
Thanks, and good morning, all. I'll begin with a question about Arizona and data centers. In your prepared remarks, you noted that the commission gave the green light to the complete tariff rates without any discounts, a 75% minimum billing requirement, and robust credit and security provisions. Given that affordability is such a big theme this year, I was hoping you could speak holistically about why you believe this arrangement works in Arizona, and perhaps why other power markets across North America keep having trouble with tariff design or cost allocation.
Thanks for raising that, Maurice. Affordability is clearly on everyone's mind right now—how we grow while making sure we do so in a way that's affordable and responsible from the customer's standpoint. This is actually a prime illustration of the right way to handle it. With this energy supply agreement, when we look at TEP's current portfolio, that roughly 300 megawatts comes from existing capacity and energy, so nothing extra needs to be built for them. The modest investment required on our side for interconnection and so forth will be covered by this customer. If you compare what TEP's rates and customer base would look like with this data center versus without it, you'll find a substantial amount of new kWh with no added dollars in investments we'd otherwise make on their behalf, which translates into considerable additional fixed cost recovery from all those kWh. Actually, I keep saying kWh, but as I noted, the 75% minimum billing demand is also in place, and it doesn't necessarily even hinge on how much energy they consume.
I think this stands as a real showcase for the right way to handle it. And naturally, going forward, when we add more capacity for the subsequent stages of those data centers, we'll follow that same approach — making certain those facilities bear every cost and essentially all the investments we must make on their behalf, plus a bit more, correct? Since, when you consider their energy consumption once again and the way they'll rely on the remainder of the grid, the kilowatt-hour fees they pay are going to distribute the costs we carry in our system across a far larger pie. Handled properly, this becomes an excellent customer affordability story, and we will ensure we handle it properly.
Thanks. As a fast follow-up, what gating factors apply to the other 300 megawatts at this first site? Is the only issue that we must wait for the initial 300 megawatts to get built before reaching the next 300, or are there additional considerations?
For the next 300 megawatts, we'll require extra capacity to be brought online. Naturally, the method we use for that, when it happens, and the talks around every contractual element tied to those items I listed — ensuring protection for us, the company, and so on, along with the customers — all of that remains to be settled.
Got it. I'll wrap up with ITC — has anything new come from FERC, especially given the new chair there, regarding progress on any of the FERC matters currently underway?
No, we haven't. I'm aware of some chatter out there suggesting there could be something, but nothing has reached us. I'll hand that over to Krista, since she's been wandering the FERC halls lately and might have more to add. Krista?
Morning, and thank you, Dave. You're exactly right on that. Plenty of talk has been circulating, yet nothing specific has reached us regarding ROEs or incentives. What I can tell you, though, is that in my view this chair and this commission are intensely focused on operating the commission effectively, and toward that goal, the chair has spoken quite openly about her desire to clear up matters that have simply been sitting unresolved for some time. We're hopeful that the items that have been sitting unresolved — essentially the very questions all of you raise with us whenever we meet, about what will happen — we're hopeful that some progress will occur there. Another thing we're observing from this FERC is that, as part of operating the agency effectively, they place great emphasis on ensuring their decisions endure. The ping-ponging between administrations does not serve anyone well, and so this chair has been extremely deliberate about ensuring they adhere to the record, adhere to the law, and secure bipartisan backing. Although we lack any insight into what they'll be taking up, I think we're quite hopeful that they will be clearing away the cobwebs and shutting down some of these older dockets, and doing so in a highly considered manner that gives us a measure of regulatory certainty going forward.
That’s great. Thanks so much for that, and congratulations to Linda and Krista.
I appreciate that.
Much appreciated, Maurice.
Our following question is from Rob Hope at Scotiabank. You have the floor.
Good morning, everyone — I'll add my congratulations too. Perhaps staying with Arizona, regarding the ALJ ruling on the formula mechanisms going forward, there was some commentary in the release about certain things that were put forward and certain things that weren't. Could you perhaps just share your perspective on what the ALJ's decision amounts to, and what you like about it as well as what you don't?
I'll hand things over to Susan to respond to that. As a bit of a lead-in, I'll note that we clearly have a couple of rate cases underway — UNS Gas and TEP. Right at the start, I'd like to point out that these are certainly two separate companies, two separate dockets, two separate proposed mechanisms, and two separate ALJs. It's difficult to draw, since this may be your follow-up question, Rob — apologies if I've gotten ahead of it — the point being that drawing read-through from one of these cases to the other is hard. I'll let Susan give her view on the UNS Gas case here.
Thanks, Dave, and I appreciate the question, Rob. This has been a long process, going through the rate case with several rounds of testimony and collaborating with ACC staff on a design they could accept, and we reached a fairly solid position where, apart from the deadband, we agreed with staff. What the recommended opinion and order contained differed somewhat from our filing. You asked what we liked in what I'll refer to as the ROO — the judge recommended describing it as a pilot program, and we consider that positive, since this marks Arizona's first round of formula rates, so we want the chance to keep refining the design as we gain experience with it and observe how it works for both our customers and the company. There are a few other relatively minor items in the judge's recommendation that we support. The changes that were genuinely beneficial were getting things restored to how we had proposed them and how staff had agreed the formula rate design should look, because the approval period was extended, we filed a request for 6 months of post-test year plant recovery, and I believe that matters a great deal as the recovery period is lengthened to cover those costs and to lessen regulatory lag, which is really the purpose behind having a formula rate.
We can accept the wider deadband, provided we secure that plant in the year following the test. Another point: in our view, the 9.77 ROE is warranted and shouldn't be cut down owing to a formula rate. As for the efficiency credit, I believe this may simply reflect a misreading — we had put forward an efficiency credit tied to the system improvement benefit, which is fairly standard for such a benefit, yet it doesn't truly connect to a formula rate or to this ARAM that we put forward. That 5% efficiency credit, in my view, warrants another look. Our record with this commission, I'd say, is solid. On Monday we filed an amendment proposing a return essentially to what staff had recommended, including a deadband range of plus or minus 40 bps. There's, I believe, a solid chance for discussion with the commission as we work through what follows from how the recommended order was drafted, so that we can return to what staff recommended.
Okay, thanks for that. Yeah, my follow-up was going to be about the read-through. But instead, I’ll ask about BC. LNG and expanding energy exports — LNG expansions, let’s call them — look like a priority for the government. Is there any progress on the next set of projects at Tilbury with the government and the approvals there?
At this point in time, apart from the update I provided during prepared remarks about the LNG tank we got approval for late last year — beyond that, clearly there are a few other projects under consideration there, though nothing further can be announced at the moment. There's clearly, in my view, a solid focus in British Columbia on pursuing some of the big projects. Our hope is that this leads to further investment chances for us in that region.
I appreciate that.
Mark Jarvi from CIBC Capital Markets has the next question, so please go ahead.
Thank you. Morning, all. I’d like to return to the Arizona data center opportunity. The Commission has been supportive, though more recently the Attorney General made some comments. Is there any risk that this creates a delay or puts some of the planned expansions in jeopardy?
When it comes to the pushback from the AG at this point, our view is that it isn't really a major problem or a danger to this initial contract we've worked out. In our opinion, the remarks that were perhaps made about it reflected a lack of full understanding of precisely how the contract came together — that it was entirely a tariff approved 100% by the Arizona Corporation Commission. No discounts were involved. As for all the objections we saw raised against the energy supply agreement, we believe we have the correct responses to each of them. With everything about those terms out in the clear light of day, I don't believe we'll have a problem.
Dave, given that the AG is the one who made those comments, have you managed to engage in any dialogue with them, share evidence, or communicate your position so as to clear up some of the possible misperceptions there?
We've put some effort into getting that same message out publicly, through letters to the editor in the paper and that sort of thing. I'm not sure, Susan, whether we've actually sat down with the AG about this topic or not, but feel free to weigh in if you have.
That sounds right to me, Dave. We haven't had a sit-down with the AG, though whatever parts of the agreement we're able to share, we've been making public.
Got it.
I'd say that's accurate. Yeah.
All right. Now, regarding a few of those positive factors you laid out — I believe that's on slide 8 — specifically the elements that might exceed the plan: if you consider where things stood last quarter when you presented your five-year plan and the headway made since, how would you rank them? Is the data center chance in Arizona the strongest? Or is it load in ITC? Broadly, how would you describe these opportunities taking shape as possible added upside to the plan?
If I were to rank them, I'd say there are clearly more opportunities in ITC tied to what used to be called Tranche 2.2 — it's now referred to as MTEP 26. Those are obviously a big chance for us, if and when we decide to take part, and we're still looking at the competitive bidding process in Iowa. Those items are fairly near-term as well. As for the data centers in Arizona, absolutely, we're in those discussions right now. If we can get that message across and do a good job explaining how these projects can help the rest of our customers, then I believe our industry is right at the point of putting that information out there and making that case, so that ideally we get past this and people recognize that some of these large load growth opportunities are in fact a route to more affordable rates. Once that dam breaks, I think we'll see a lot of positive backing for those kinds of projects. Then, as with the earlier question about BC, there are solid opportunities in that jurisdiction for more LNG investment, and again, with the government's emphasis there on major projects and some solid chances to deliver economic benefits to that province.
Beyond that, we see a fair number of investment possibilities in the Okanagan, including at our small electric utility there, which we're hoping will come to fruition. The list is quite long, but we're pleased with how full it is.
Got it. Appreciate you making room this morning. Thank you, Mark.
Our following question is from Benjamin Pham at BMO. You have the floor.
Morning, and thanks for joining. Regarding the yearly formula mechanism for UNS Gas as well as TEP, do you believe the commission is able to issue a ruling on that mechanism while a Court of Appeals case is still pending?
Our view is that they can. That Court of Appeals decision leans more toward procedure. What it was really assessing was whether the policy statement had to be treated as something requiring a rulemaking process, which simply takes somewhat more time and involves a more elaborate process. The nice thing here is that, in my view, the record supports us, since mechanisms of this kind have been adopted before, including the system improvement benefit charge and other trackers we have used. There was a decoupling statement, a policy statement, years ago. What matters most is that the policy statement was exactly that. It gave utilities the option to file, within a fully litigated rate case, formula rates, which of course were then fully litigated in that rate case. It was not a rulemaking containing any shalls. It provided that a utility may apply for a formula rate grounded in a handful of principles. We do not regard that as an obstacle to our going through a rate case and securing it. As a matter of fact, there is no reason we even needed a policy statement in place before requesting these kinds of mechanisms in a rate case.
Provided that a rate case goes through full litigation and stays inside what Arizona statutes permit, you're free to make the request, and whatever falls within those limits is something the commission has the authority to approve.
Got it. Thanks for clearing that up. As for a follow-up on what customers can afford, you gave a fairly solid set of steps there for how you intend to handle that down the road. I'm wondering: are you picking up anything from customer feedback in particular states or provinces where this is somewhat more pronounced, when you look across your franchises throughout North America?
My sense is that this likely varies across each state and province, shaped by what politicians and governments tend to emphasize—often pressing on the affordability issue, which is something everyone ought to be doing. What we need is to be certain we grasp completely the drivers behind affordability and the effects they produce. Within our own organizations, and across the sector from an even broader angle, we're working to communicate what steps we're taking to tackle it.
All right. It sounds like a wide-ranging discussion, though nothing that’s getting sharper around one specific area for Fortis?
No, I mean, I believe that for us as an organization, and across all of our utilities, this has to be—this is a hugely significant subject. And I'd say it's likely the top question that all of you, from an analyst standpoint, ask us, which is, I think, a great outcome that everyone is concentrated on the same objective: making sure that ultimately, we're doing the best we can to give our customers the service quality they require and to deliver that as affordably as we can. All of us are aligned on this. We simply need to ensure we're examining it consistently throughout our Fortis footprint—we don't say, "Oh, in this jurisdiction, it hasn't been a major concern or it hasn't arisen. Let's not pay attention." This is something we're focused on around the clock in every jurisdiction.
Understood, and thanks. That's quite helpful.
Appreciate that, Ben.
John Mould from TD Cowen has the next question. Go ahead, please.
Thanks. Good morning, everyone. I want to return to the UNS Gas rate case, and I understand you don't want to get ahead of your regulator. How should we think about what might result from the upcoming ACC open meeting? Might that give us some clarity on the finalized details of the formulaic rate structure in the form of an order, or is that simply too short a timeline given the exceptions filed by both QN and others? Any insight on that?
I could go on at length about this, but I think holding off for a week makes more sense. It was only just scheduled, and one week from today falls on the 19th's open meeting. There's a dedicated open meeting set for the UNS Gas case, and rather than risk getting front-run on that, since it's coming up so soon, I'll just leave it there.
Right, that's fair. I appreciate it. So maybe just turning to Ontario — you're on the list of possible participants in competitive transmission procurements, and one is being launched. There's also the potential for changes to the LDC landscape in the province, with this government's false expert panel that's underway. How are you thinking about the potential for more investment in Ontario by Fortis?
We've been operating in that province for three decades, and we have our utilities there plus our experience from constructing the Wataynikaneyap project. Ontario is a place we genuinely like. We want to put more money in there. We're exploring whether that's possible. It's a solid opportunity, and if it comes together, wonderful. That's the kind of thing we'd be eager to take part in—bringing some of our capital into the province and assisting with their buildout. Their energy plan is truly excellent, and we'd be glad to play a role in it, even if only in a minor capacity.
All right, I appreciate it. I'll stop right there.
We’ll go through that one more time: if you’d like to ask something, hit star and then 1 to get into the queue. Our following question is from Eli Johnson at JP Morgan. You’re up.
Morning, everyone — thanks for the detail on how regulation is developing in the Arizona rate cases. As the process unfolds over the course of this year, how should we view the greater clarity building toward a possible point down the road when earnings guidance could be issued? Thank you.
Yeah, clearer rules that let us predict things a bit more effectively — smoothing out the highs and lows at the Arizona utilities — does give us somewhat better visibility on the earnings side. That said, I'd note it isn't the sole factor. Sure, it's clearly something that would sit on the positive side of the ledger and could let us provide earnings guidance, but ultimately there are plenty of other things to weigh as well. It's kind of one fewer item to worry about, though that doesn't automatically mean it takes us directly to giving earnings guidance.
Thank you. I realize you've already covered the large load outlook in Arizona at some length, but could you describe how you're taking part in the IRP workshops that are currently underway? I know many stakeholders are participating in that process, but I'd just like your view on those IRP workshops, and could you remind us when an update on them might be expected? Thanks.
We are at the beginning stages of the integrated resource plan. There have been a few public meetings already. We assembled a sizable stakeholder group that works through the whole process. You can actually track things — there is a section on our TEP website where you can keep up with what's developing, including once we begin posting load forecasts and similar estimates. I appreciate your raising that point, since one of the major items I intended to mention is somewhat longer term: beyond the capital plan, there is an extra opportunity — as we observe that and begin constructing the integrated resource plan, we will then be able to determine how much more generation and transmission investment is required to serve Arizona's growing load. It remains early, but I believe we filed that in August of this year, and it will become quite active in the coming few months.
Excellent. Everything’s fine, then. Appreciate it.
That brings the Q&A portion to a close. I'd now like to hand the conference back to Ms. Amaimo for any closing remarks.
Thanks, Betsy. That's all we have for now. Thanks to all of you for joining us on this call about our fourth quarter and full-year results. If you need anything else, please reach out to Investor Relations, and enjoy the rest of your day.
That wraps up today’s conference call. You’re welcome to disconnect your lines. Thanks for joining us, and enjoy the rest of your day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Fortis Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Fortis Inc. earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.