Home / Transcripts / Fortis Inc. (FTS) · November 3, 2026

Fortis Inc. (FTS) Earnings Call Transcript

November 3, 2026

Toronto Stock Exchange CA Utilities Electric Utilities earnings 52 min

Earnings Call Speaker Segments

Operator operator
#1

Appreciate everyone holding. I'm Betsy, running the conference line. Glad to have you on the Fortis Inc. call covering third quarter 2026 results along with the new 5-year capital outlook. <<operator_script>> This session is being recorded. <<operator_script>> At this point I'll hand things over to Stephanie Amaimo, Vice President, Investor Relations. The floor is yours, Ms. Amaimo.

Stephanie Amaimo executive
#2

Thanks, Betsy, and good morning to all of you. Welcome to the conference call covering Fortis' Third Quarter 2026 results as well as our new 5-year capital outlook. Joining me are David Hutchens, President and CEO; Jocelyn Perry, Executive VP and CFO; additional members of the senior management team, and CEOs from certain subsidiaries. Before today's call gets underway, I'd like to remind everyone that this discussion will contain forward-looking information, and that information is subject to the cautionary statement found in the supporting slide show. Actual results may differ materially from the forecast projections included in the forward-looking information presented today. Non-GAAP financial measures that we reference in our prepared remarks are reconciled to the related U.S. GAAP financial measures in our third quarter 2026 MD&A. Also, unless otherwise specified, all financial information referenced is in Canadian dollars. With that, I'll hand the call over to Dave.

David Hutchens executive
#3

Thank you, and good morning to all of you. During my time as CEO, this past quarter ranks as 1 of the busiest and most popular member, and it has produced meaningful progress along with significant opportunities for our business going forward. We're also glad to have another strong quarter behind us. On the operational side, we keep delivering safe and reliable service to our customers, and we have invested $4.2 billion in our systems year-to-date. For the full year, we expect to invest approximately $6 billion, which is up $400 million from our plan, and we delivered earnings per share for the third quarter of $0.92, and today, we are unveiling our new 5-year capital plan, our largest to date. Big news hit in the quarter with respect to our Tilbury site in British Columbia, and ITC has been awarded a competitive bid project in Iowa. And today, we announced that our Board of Directors declared a fourth quarter dividend increase of 4%, marking 53 years of dividend increases. Before getting into the details of our new 5-year outlook, I will turn the call over to Jocelyn to speak to our third quarter results.

Jocelyn Perry executive
#4

Thanks, David, and good morning to everyone. Reported earnings for the quarter came in at $474 million, or $0.92 per common share, while on a year-to-date basis reported earnings were $1.4 billion, or $2.69 per common share. As the slide shows, reported earnings in 2025 included income taxes and closing costs of $0.06 per share tied to the disposition of FortisTCI. Once you exclude that impact, adjusted EPS for the quarter rose $0.05, and year-to-date adjusted EPS rose $0.06. Moving to the next slide, you'll see the adjusted EPS drivers for the quarter broken out by segment. At ITC, EPS rose by $0.03, driven by rate base growth and lower stock-based compensation expense, partly offset by higher finance costs. Our U.S. electric and gas segment added a $0.02 increase, mainly from UNS Energy. Growth in Arizona reflected higher electricity sales tied to residential and industrial usage along with customer growth. The timing of operating costs and lower income taxes related to amortization of investment tax credits on the battery storage project also added to the increase. Tempering this was the effect of milder weather quarter-over-quarter and regulatory lag from rate base growth not yet reflected in rates.

Jocelyn Perry executive
#5

At Central Hudson, earnings came in mostly flat compared with the prior quarter, since rate base growth, the timing of costs and a contribution to a customer benefit fund in 2025 were offset by a favorable regulatory adjustment made in the third quarter of 2025 upon implementation of the most recent rate order. EPS at our Western Canadian utilities rose by $0.02 in the quarter, driven by rate base growth as well as lower income tax expense at FortisAlberta. For our Other Electric segment, EPS fell by $0.01, largely due to the disposition of FortisTCI in September 2025. The Corporate and Other segment reflects net unrealized losses on derivative contracts compared to unrealized gains in 2025, the timing of income tax recoveries and the disposition of Fortis in the fourth quarter of 2025. Foreign exchange had a $0.01 favorable impact for the quarter, and higher weighted average shares issued under the dividend reinvestment plan and ATM program impacted EPS by $0.01. And as noted on the slide, the 2025 disposition of our assets in Turks and Caicos and lowered EPS by $0.02 in the quarter net of finance cost savings. Year-to-date results were mainly driven by the same factors discussed for the quarter with a few additional items to note.

Jocelyn Perry executive
#6

During the 9-month period, Central Hudson contributed an increase of $0.04, largely driven by rate base growth and cost timing, though this was partly offset by the favorable regulatory adjustment in 2025 that we mentioned earlier. At UNS, EPS declined by $0.01, reflecting lower margin on wholesale sales and elevated operating costs, along with the other items we noted for the quarter. Finally, foreign exchange had an impact of $0.03, while the 2025 dispositions, net of finance cost savings, came to $0.05 year-to-date. Moving on to our regulatory update: in October, the ACC administrative law judge released a recommended opinion and order concerning TEP's general rate application, which recommends an allowed ROE of 9.65% along with a 55% common equity component of capital structure. Our current allowed ROE stands at 9.55%, with a 54% equity component of capital structure. That order additionally recommended an annual formulaic rate adjustment mechanism spanning plus or minus 50 basis points around the allowed ROE. It also addressed inclusion of post test year adjustments, elimination of certain adjustor mechanisms, and deferral of certain costs tied to Roadrunner Reserve 2 for future recovery. The ALJ's recommendation calls for new rates to take effect by December 1 and remains subject to ACC approval, which is expected later this month.

Jocelyn Perry executive
#7

At this point I'll hand things back over to David, who will walk through the main pieces of the new capital plan covering 5 years.

David Hutchens executive
#8

Thank you, Jocelyn. The fresh $32.2 billion capital plan covering five years sits $3.4 billion above the one it replaces. Our rate base CAGR over that five-year span comes to 7.5%, which is 50 basis points better than the earlier plan. We've likewise carried forward our guidance for yearly dividend growth of 4% to 6%, now running through 2031. This updated plan rests on the momentum we're seeing throughout our high-quality footprint, and customer affordability stays front of mind. Transmission and LNG investments account for most of the growth in the five-year plan. Over at ITC, the $1.7 billion step-up came mainly from projects tied to MISO's tranche 2.1 long-range transmission plan, together with larger baseline reliability projects and new interconnections. At FortisBC, the $1 billion increase largely mirrors spending on LNG infrastructure, among them the Tilbury Phase Ib liquefaction expansion and the new Tilbury LNG storage tank. Customer growth and reliability investments across our footprint account for the rest of the increase. This new plan is highly executable, with roughly 75% aimed at transmission and distribution investments and critical infrastructure that underpins stable and predictable returns. The capital program carries low risk, consists entirely of regulated projects, and takes in 11 major capital projects. Consolidated rate base should climb from $45 billion in 2026 to roughly $56 billion in 2029 and $64 billion in 2031, producing 3- and 5-year compound average growth rates of 7.7% and 7.5%, respectively.

David Hutchens executive
#9

Last month, we were glad that MISO selected ITC for the tranche 2.1 competitive bid project in Iowa, which is called the Mars project. This selection lets ITC handle the design, construction, ownership, and operation of that project, and it covers roughly 300 miles of fresh 345 and 765 kV transmission lines located in ITC service territory. Total investment for the project is projected at USD 1 billion, with approximately USD 500 million folded into our new 5-year capital plan and the remainder anticipated after 2031. Now I'll spend a few minutes going into greater detail about the capital plans at our 3 largest utilities. At $11.6 billion, ITC's capital plan is the biggest in the history of the company, and it underpins 5-year rate base growth of 8.6%, which is 50 basis points higher than the prior plan. ITC's regulated assets right now make up about 1/3 of our consolidated rate base, and that share should move upward across the plan as ITC keeps delivering our strongest rate base growth. There are substantial opportunities at ITC beyond the base plan, including approximately USD 2.9 billion to USD 3.4 billion post 2031 for tranche 2.1 projects assigned through rights of first refusal, as well as approximately USD 500 million for the Myers project that I mentioned earlier.

David Hutchens executive
#10

ITC could additionally capture upcoming opportunities tied to projects within the transmission planning efforts MISO and SPP are currently conducting. Additional growth prospects involve customer hookups linked to more than 10,000 megawatts of load expansion from proposed data centers, industrial users, and economic development efforts at various stages across their service area. That figure has risen from 8,000 megawatts in the prior quarter. With substantial investments already moving forward and a strong pipeline of future growth prospects, ITC stands in a solid position to achieve sustained long-term growth throughout this transformative stretch of transmission buildout. Shifting to UNS Energy. A capital plan of $5.6 billion underpins 5-year rate base growth of 7.4%. As with the earlier plan, investments are distributed throughout the value chain. Of note, more than 2/3 of the capital plan sits in transmission and distribution infrastructure, with the remainder made up of generation and other investments. Regarding opportunities beyond the plan, we keep seeing robust interest from new and existing customers throughout our service territory. At TEP, we hold 1 approved energy supply agreement tied to roughly 300 megawatts of data center load that should start ramping in 2027 and will be backed by existing and planned resources, among them renewable generation and energy storage already in service or under development.

David Hutchens executive
#11

Beyond that first agreement and the later phases we're still negotiating with the customer, demand across our Arizona service territories is strong, tied to mining, industrial development, electrification, and wider commercial and residential growth. Over time, these opportunities could drive further investment in generation, transmission, and distribution infrastructure. Last week, TEP and UNS Electric each submitted their 2026 integrated resource plans to the Arizona Corporation Commission, laying out how they intend to serve customers' projected energy needs across the next 15 years. TEP's base case puts affordability first and assumes average annual sales growth of 5.7% through 2031. It also includes up to USD 1.3 billion of opportunity beyond the capital plan through 2031, subject to RFP processes. In addition, to assess the significant growth potential I mentioned earlier, TEP built a high-growth scenario into its integrated resource plan that would call for roughly 800 megawatts of new generation and up to USD 1.5 billion in incremental investments. Those opportunities aren't in our base capital plan right now, but they represent meaningful long-term growth potential for the business. Worth noting: this high-growth scenario is very beneficial to TEP's customers, with the lowest rates of all scenarios, as the graph to the right shows.

David Hutchens executive
#12

So what comes next? The stakeholder process kicks off next year, and we're looking for ACC acknowledgment during the third quarter of 2027. Now shifting to British Columbia, where spending on natural gas and LNG infrastructure is producing robust growth at FortisBC. FortisBC's capital plan of $6 billion covers investments aimed at keeping the system reliable and sound, together with significant LNG and advanced metering infrastructure projects. That capital plan underpins rate base growth of 7.9%, compared with 6% under the previous plan. At our Tilbury site, several projects are in progress, with further growth opportunities as well. Back in July, an order and counsel came through for a larger Phase Ib liquefaction project, plus a marine jetty that will support LNG marine fueling in the Port of Vancouver. Investments for this project, in total, are projected at roughly $1.7 billion. During September, FortisBC obtained environmental approvals for its Phase II expansion, which includes putting as much as $1.1 billion into the Tilbury LNG storage tank expansion project. This 3 Bcf storage tank, along with the associated regasification, boosts resilience and helps keep rates affordable for our customers. Phase 2 additionally offers the potential for as much as 2.5 million tonnes per annum of extra liquefaction capacity to serve emerging domestic and export LNG markets.

David Hutchens executive
#13

There's flexibility on our end to build this project out in phases, and we see an investment opportunity of roughly $2 billion to $4 billion, with the figure hinging on what market demand turns out to be, and most of that spending is expected to come after 2031. We're still working through permitting as well as our final investment decision. Development at the Tilbury site has taken many years to reach this point and reflects the exceptional work our team in British Columbia has done to expand the use of their gas network to produce regulated LNG that lowers carbon emissions and improves customer affordability. Tying it all together, our focus is on executing our new 5-year plan while working to advance our robust growth pipeline. I'll now hand the call back to Jocelyn.

Jocelyn Perry executive
#14

Customer affordability stays a top priority as we put together the new 5-year outlook. Beyond funding the capital plan efficiently, our key affordability efforts for customers include targets for O&M savings, low-growth projects such as those in Iowa and Arizona, lease cost capital projects like the Springerville repowering project, and ongoing delivery of customer conservation programs. Also, with more LNG sold as we expand the Tilbury facility, we anticipate continuing to deliver rate benefits to customers. We keep taking a disciplined approach to funding the $3.4 billion increase in the new 5-year plan, along with the $400 million increase in our 2026 capital plan. We got ahead on part of our 2026 funding needs by issuing USD 1 billion of hybrids and roughly $260 million of ATM equity in the third quarter. Across the next 5 years, as the funding pie chart shows, cash from operations and debt issued at our regulated utilities are expected to fund the capital plan mainly. Our dividend reinvestment plan continues to serve as the foundation of our equity needs throughout the 5-year plan. We do expect to issue about $250 million of ATM equity in the coming 12 months, subject to market conditions.

Jocelyn Perry executive
#15

To sum up, the way we intend to raise money is structured so that it keeps our credit ratings strong at investment grade. A varied, top-quality set of regulated utilities forms the foundation of our credit standing, and 95% of our assets sit in transmission and distribution within regulatory jurisdictions that are constructive, which gives us cash flows that are stable and predictable. Under this plan, average S&P FFO to debt metrics stay above 12% across the 5-year period, with financial flexibility improving in the later years, and average Fitch FFO leverage comes in at roughly 5.9x. When you put all of that together — our high-quality regulated portfolio, our disciplined approach to funding and credit metrics that keep improving — we are positioned to carry out the capital plan while keeping a strong credit profile. Earlier today, we announced that our Board of Directors has declared a fourth quarter dividend of $0.665, which works out to a 4% increase. That takes us to 53 consecutive years of increases in dividends paid, and this is a track record we take a lot of pride in. Given our strong dividend history and our regulated growth strategy, we are extending our guidance of 4% to 6% annual dividend growth through 2031. With that, I'll hand the call back to David for the wrap-up.

David Hutchens executive
#16

If you look at what makes Fortis an attractive investment, it really boils down to growth that can be sustained, backed by our portfolio of regulated utilities, which is high quality. Rate base growth is strong, we have a robust pipeline for growth and a funding plan that is transparent. Our investments are aimed at making our systems more resilient and making sure they can meet customers' changing energy needs reliably and affordably. And we're doing this from a position of strength. Fully 100% regulated utilities, solid investment-grade credit ratings, diversity across regulators and geographies and a proven track record — all the right elements to deliver long-term value to our customers and shareholders. That's all I have to say. I'll hand the call back to Stephanie now.

Stephanie Amaimo executive
#17

Thanks, David. That brings the presentation to a close. At this point, we want to open up the call so members of the investment community can ask their questions.

Operator operator
#18

<<operator_script>> Our initial question this afternoon is from Maurice Choy at RBC.

Maurice Choy analyst
#19

I see plenty of solid growth at both ITC and FortisBC, but I also want to bring up the sizable load opportunity over at UNS Energy. Previously, you mentioned the possibility of added generation running roughly $1.5 billion to $2 billion by 2030. Looking at today's presentation, Slide 14, I notice there's as much as $1.5 billion of investment shown. So if those figures are truly comparable, would it be fair to say your updated plan captures some large-load-related CapEx, though still not a great deal of it? And as a quick follow-up, assuming that holds true, given the spirit of today's U.S. elections, how do you expect the election to shape your view of that remaining growth CapEx, should it unfold the way the polls indicate?

David Hutchens executive
#20

Yes. Thanks, Maurice, and I appreciate the question. No, in fact, our plan doesn't include any extra capital tied to data center expansion in Arizona. What's different is simply the size we had been assuming. So, when we discuss the estimated USD 1.5 billion in additional investment opportunities, that figure came from adding a particular amount of load into our integrated resource plan. Basically, we ran a model to derive numbers from roughly the midpoint of the range we had been considering earlier. So, when we speak about the Arizona projects, there's the existing 300-megawatt ESA. At that site we have further investment potential, which we've typically pegged at around 300 megawatts to expand the whole site to, say, 500 or 600 megawatts. And then we've consistently mentioned a second site too, which is still being evaluated for development up in the northern part of the Tucson area. For that one, our estimate was 500 to 700 megawatts. So, when we included that $1.5 billion to $2 billion, it really represented that entire collection of projects.

David Hutchens executive
#21

And at this point, for that high-growth scenario, we're simply taking a somewhat smaller share of it. So then — to give a view on how the election turns out and whether that matters, and what it could mean for building data centers, I think as we're sitting here today while people head to the polls in the U.S., clearly the data center issue has been top of mind for many voters and many politicians. My hope is that we can find a path away from the rhetoric and instead focus on the genuine positive benefits we see coming from data centers. Provided they're built the right way, provided there's no shifting of costs, provided there's a net benefit for our customers, and the environmental, water, and other such matters are dealt with by the communities where they're located. Yet when these big loads arrive, that improves the efficiency of your system and reduces costs for customers. We're witnessing that in Iowa, as the slide showed, where we discussed a 20% cut in those rates. We see it in Arizona too — although we aren't putting any more investment into the first 300 megawatts of data center capacity we have there, we're seeing a benefit of $13 per month.

David Hutchens executive
#22

Hopefully all of that comes through, and people will see the evidence and the upside of what these — what some of these large loads are capable of. And it isn't only big data centers; it's large loads and customers with high capacity factors, like what we're seeing for LNG in British Columbia. So there are some real benefits, but I think nobody wants to discuss them until tomorrow.

Maurice Choy analyst
#23

That's clear, and it all makes sense. Perhaps I can wrap up with a funding question, especially since you now have greater growth ahead. I understand the DRIP program remains your primary tool for common equity needs. Previously, you mentioned that every option is on the table when CapEx rises, including asset sales and weighing alternatives there. How should we view your use of the ATM going forward? You launched it during your Q3 period. Using that facility rather than discrete issuances — and perhaps more broadly, I see the 12.3% FFO debt average, but how do you think about sizing the appropriate buffer versus your 12% threshold?

Jocelyn Perry executive
#24

Thanks, Maurice. Yeah, so the ATM program is indeed available to us. And the DRIP, like you mentioned, has held up really well and covered the bulk of our equity requirements. Look, we tie everything back to those credit metrics you brought up, and to what constitutes an adequate buffer — given how large Fortis is, it takes quite a lot to shift those metrics. That said, yes, we've indicated we want a buffer of 50 to 75 basis points on top of those metric thresholds. And honestly, it isn't any single thing that I'd expect to occur at Fortis that would push us beyond those buffer limits. It's more a question of whether conditions shift globally and the thresholds themselves get revised by the rating agency, with nothing to do with Fortis. But we do build our funding plan around maintaining that sort of buffer level. So when I think about the ATM going forward, having heard David describe all those opportunities — I suppose above and beyond the plan — across each of our regulated utilities, to return to your point, Maurice, we'll be examining everything. The ATM will be 1 component of funding that, but again, tying back to our credit profile and our credit metrics.

Jocelyn Perry executive
#25

Additionally, our capital structure could accommodate additional hybrids — currently hybrids make up just roughly 6% of it. As you're aware, there's capacity to increase that further. So once more, there isn't any particular mystery behind our approach to funding. We aim to preserve the buffer, yet once we begin to observe and gain visibility into expansion that exceeds the plan we currently have in place, we'll evaluate which options lie before us and select one as soon as the fresh growth profile for the new capital plan becomes clear.

Maurice Choy analyst
#26

That kind of flexibility is excellent — and congratulations.

Operator operator
#27

Our next question is from Rob Hope at Scotia Bank.

Robert Hope analyst
#28

Thanks for laying out the revised capital plan in such detail. If we turn to Slide 17 and Tilbury LNG, and look at how the spending breaks down there — given that the federal government and the provincial government are far more open to what you might call conventional energy investment, and there's a real push to speed projects along — as you look at these projects, is there room to do more at that site? Or might we see some of the time lines brought forward there?

David Hutchens executive
#29

Yes. I’ll hand it to Roger to discuss the timeline, since I know he’s got — they’re really pushing hard to complete these projects as fast as possible, and that’s what the table on Page 17 shows. But I also want to make certain it’s very loud and clear that the second phase, that Phase 2 expansion capable of adding as much as 2.5 million TPA to the liquefaction there, is a massive project with a tremendous amount of opportunity. We know we have to work out the FID and a whole bunch of other things in permitting them and everything we have to do on consultations, et cetera. On that one, we’re hoping we might see it squeezed in at the start of the next 5-year plan. But Roger, can you give your view on some of those details?

Roger Dall'Antonia executive
#30

Yes. Thank you, Dave. Rob, I appreciate the question. Absolutely — as Dave mentioned, there are 3 separate projects at Tilbury. First is Tilbury 1B, the ordering council effort we got in the summer, and its main focus is the marine fueling sector as that sector expands. Second is the storage tank — a 3 billion cubic foot storage tank — which really provides on-site gas storage for system resiliency and reliability plus managing gas supply costs. Then Tilbury 2 involves liquefaction, and it can serve 1 of 2 markets. It could supply the expanded Tilbury via the expanded bunker market for marine fueling, or it could be LNG export. That represents the full build-out. I believe, Rob, what you're getting at is whether we could do more at that site. This environmental assessment certificate we just received covers the potential there. On timing, Tilbury 1b and TSC are part of this plan, we're now in design and contracting, and we expect construction to begin at some point in 2027 with in-service at the end of 2031 into 2032. We'll share more details as we work through development and planning. Tilbury 2 is the larger opportunity.

Roger Dall'Antonia executive
#31

As Dave mentioned, this might be carried out in stages, or we might see a significant offtake; however, upstream spending on gas supply also needs handling. So realizing that opportunity requires somewhat more effort. Still, with the bunkering market expanding, a portion could be completed sooner over the coming few years to supply that market, while we pursue wider opportunities past BC involving export LNG.

Robert Hope analyst
#32

Okay, that's great. So maybe shifting to a somewhat broader question now. There have been some big and noteworthy M&A deals in the utility sector. Dave, could you perhaps give us an update on how you're viewing the potential for M&A in this environment? Or does the focus remain on organic growth?

David Hutchens executive
#33

Yes. I'd say organic growth remains our main focus, obviously, and we're doing plenty of it, as you can see. Our 5-year capital plan has gone up annually. I believe it moved from 6% to 6.5% to 7% to 7.5%. So we're truly seeing that extra organic growth pay off. I think we and our investors would agree that if we have a dollar available, the finest use of it is additional organic growth, since it's a dollar put into rate base and you receive $1 in rate base. So for us it's the most efficient means of adding value. It's also an excellent way for us to deliver value to our customers, particularly by investing in the infrastructure they require for energy, or infrastructure that delivers more efficient, lower and more affordable power for them. So that's still the primary focus. We do observe a lot of the M&A activity occurring across the sector. And there's always the sense that some potential opportunities might exist there, whether through a balance of synergies, a bigger balance sheet, better credit, all of those things. We keep looking at all of that.

David Hutchens executive
#34

That said, it isn't a priority for us, since it's not something we have to do. Still, it is something we keep evaluating on an ongoing basis.

Operator operator
#35

Our following question is from John Mould at TD Securities.

John Mould analyst
#36

Perhaps we could begin with the Tucson Electric rate case. I understand you'd rather not get out in front of the commission and its deliberations over a possible final order, but I was wondering whether you could describe, from where you sit, the pluses and minuses contained in the ALJ's recommendation. And how are you viewing possible regulatory lag, specifically in light of the recommended post-test year plan and the first adjustment in April 2028, pardon me, in the form it's currently proposed?

David Hutchens executive
#37

Yes. So to begin with, yes, the rate case process is still ongoing, and the recommended opinion order is really just one step along the way. And we're really eager and excited to reach the open meeting, put the rate case behind us, and hopefully have rates take effect on the 1st of December, which is the current plan. So yes, it's moving through the usual process. We filed exceptions last week on a couple of issues that remain in dispute, such as ROE, et cetera. So it's simply in that normal process. I wouldn't comment any further than that. And then from the regulatory lag standpoint, we did receive the recommendation for an adjustment mechanism. And that's -- it essentially resembles UNS gases and other ones that have been recommended in the state, and it will not take effect. The first actual adjuster will come in April of 2028. So we'll see a bit of regulatory lag between the period when these rates take effect and that April time frame, which will reflect the costs and investments made through the end of 2027.

David Hutchens executive
#38

There's still some regulatory lag, though. This is one of those situations where it might not be absolutely perfect — it isn't a mechanism built around a forward-looking test year — but from the standpoint of leveling out and smoothing earnings in Arizona, it's a really great result.

John Mould analyst
#39

Okay, so turning to ITC and those 10 gigawatts of possible low-growth customer connections, mostly data centers and economic development. I realize that goes past the current plan. Could you help us understand how that potential low growth would be paced? What might the timing look like? And how should we think about the possible investment on your side that could arise from that set of projects? Maybe it's aspirational to say this, but if all of them came to fruition, how are you viewing the potential incremental investment opportunity that could result if you do see a high conversion rate?

David Hutchens executive
#40

Yeah, I’ll hand it to Chris, since he’s able to sort of walk through the various components we’ve got in place for interconnections, and then the further transmission investments that could arrive via some of the other planning processes.

Executive executive
#41

Yes. Thanks, Dave. And John, I appreciate the question. I think you should view that as incremental. So there's already a fair amount included in the plan. We've got $800 million allocated for data centers in the plan. And that's for 4 data centers that have been publicly announced and have approvals. So everything in that 10 gigawatt bucket consists of items in our pipeline, and they range from being further down the pipeline and having negotiations on agreements to the early stages of planning work. So I think you can expect that not all of it will come to fruition, but it's real enough that we felt good about projecting that. And as Dave always says, we never put anything in the plan until it's real.

Operator operator
#42

Our following question is from Ben Pham at BMO.

Ben Pham analyst
#43

Let me begin with the increased CapEx plan. I realize you've said it's highly executable for a range of reasons. Could you expand on that for us a bit more, and perhaps speak specifically to your views on labor availability and material availability, and then more broadly, what you see as the hardest piece of carrying out a larger plan?

David Hutchens executive
#44

Yes. Thanks, Ben. I think these are fairly typical questions that come up whenever we undertake large projects—confirming we've got the resources, confirming we can secure our place in the supply chain queue, since that's what determines the project timeline. Every one of those elements has been part of how we've run projects forever. And this is no different. It's simply that we have many more projects, and much bigger ones. So obviously it takes somewhat more—it demands a bit more attention and focus when it comes to those large projects. But this isn't something we're changing overnight in a drastic way. I said earlier that we've been gradually raising our rate base growth. So this isn't us jumping from 3% to 7.5% and asking ourselves how we're going to get all of that executed. This is all comfortably within our companies' capabilities and represents things we've been planning for a long time, and we'll stay focused on that. So that's the reason we consider them highly executable—because it's work that we do and have done for decades and decades. So aside from supply chain, labor, and those same sorts of concerns you'll see across really any sector these days.

David Hutchens executive
#45

Our belief is that we can get that resolved.

Ben Pham analyst
#46

All right, understood. Perhaps I’ll ask my follow-up now. That follow-up concerns the federal mega deduction. Does your plan include that at all? And if it does, would there be any effects on credit metrics or on rate base for the Canadian utilities?

Jocelyn Perry executive
#47

Yes, Ben. As you know, that hasn’t yet been incorporated into legislation. So the final specifics of it remain to be determined. From what we’ve observed so far, though, we don’t anticipate a material effect on our credit metrics. And if you consider what this deduction does, it lets you write things off somewhat faster for tax purposes, which lowers your taxable income and the taxes you owe, but it would also lower—particularly at our Western utilities—the amount we collect from customers. So on balance, we aren’t expecting a material impact on credit. That said, we’ll keep watching for the final rules regarding the PMD. And once we have them, we’ll return with greater certainty about the impact.

Operator operator
#48

Our following question is from Mark Jarvi at CIBC Capital Markets.

Mark Jarvi analyst
#49

Jocelyn, I want to circle back to what you said about funding. I'm just wondering how far you might be able to go with the hybrid issuances? And then, what would be a sensible assumption regarding ATM usage over the past 2 years to carry out the plan that lies ahead of you?

Jocelyn Perry executive
#50

Mark, regarding where we could push the hybrid capital — as I mentioned, we currently have roughly 6% in our capital structure. I mean, if you limit it, I believe it's 10%, and S&P's is 15%. If we pushed it to 10%, then yes, we'd definitely have more than $2.5 billion available for hybrid capital to fund any growth beyond the plan. As for ATM usage, we've laid out what's needed for the plan we currently have. We have no intention of using the ATM program, except for additional capital being added to the plan you're looking at. The ATM would be one thing we'd examine alongside hybrids and everything else in our toolkit. So there are no plans to use the ATM beyond what we've stated here today. But as we firm things up beyond the capital plan investments, if some of those were to come to fruition, then the ATM would be one option we'd consider using.

Mark Jarvi analyst
#51

Is there anything you could see potentially entering the picture over the next couple of years that would call for the ATM? Or does it seem more like it's later on in the 5-year plan that things might shift?

Jocelyn Perry executive
#52

I mean, you know, these aren't things we can put together overnight — they're big projects — and David essentially noted that they evolve gradually, and we've been steadily raising our rate base growth. My inclination would be that we'd see more toward the later years of the plan rather than at its front end.

Mark Jarvi analyst
#53

Right, that's clear. Dave, turning back to what you said about planning and ramping toward growth: how should we view the IRP base case in Arizona, which could be a sizable load? Would you simply scale up at the existing sites where the combined cycle units are planned for 2031? Are there further sites you have there? How far along are you, then, on what amounts to a faster IRP planning effort at this point?

David Hutchens executive
#54

Yes. We've been reviewing and assessing quite a few sites and options for that, so there are a good number of them. There are also other sites for generation development. There are transmission needs. A lot of different things come out of the integrated resource plan, especially if we see that high-growth scenario. So we do have some options set out and we're evaluating them.

Mark Jarvi analyst
#55

I'm just wondering, with regard to the discussion about the expanded 300 megawatts and then a further 300 megawatts at the second site, how are customers viewing time lines? We're getting some questions about time lines slipping? Do your customers feel there's a chance to move faster if you've got a utility here that's accommodating and communities that back this project?

David Hutchens executive
#56

Yeah, good question. Susan, I think you should weigh in on that.

Susan Gray executive
#57

Absolutely, and thanks for asking, Mark. So we are collaborating very closely with our customers to get a clear picture of what they need, and to move at whatever pace they require from us. That is exactly why, as Dave noted, there are plenty of options under evaluation on our side to ensure we can hit the schedules that arise. Nothing has been presented to us so far that we are unable to handle. Naturally, with Project Blue, in this initial phase we already have the generation in place. So as we lay out the following site, we will coordinate very tightly with the customer to guarantee that the added capability is brought online in line with what they need.

Mark Jarvi analyst
#58

Susan, do you see any sign that their schedules have shifted — either moved up or pushed back?

Susan Gray executive
#59

There hasn't really been a move in either direction that we've observed. We're still in talks about expanding Project Blue further. Copper World just announced they intend to be online later within our 5-year plan, and South32 continues to progress on their original time line. So nothing has shifted one way or the other, as far as we can tell.

Operator operator
#60

Michael Lonegan of Barclays has the next question.

Mike Lonegan analyst
#61

So you increased the dividend by 4% following a 4% raise the prior year as well. Guidance remains at 4% to 6% growth, and that now runs through 2031. Naturally, this is subject to Board approval, but what's the thinking here? Should we anticipate the low end of that 4% holding over the plan? Or is an acceleration in the dividend growth rate expected? Is there anything you can share on that? For instance, do you have a targeted payout ratio over time? Any details you could give would be helpful.

David Hutchens executive
#62

Right. We're not yet at a stage where we can share a specific payout ratio target. For the past several years, our consistent message has been that we're aiming for that 4% to 6% range. At the same time, we want to ensure we're bringing our payout ratio down, and we've managed to do that fairly effectively over the last 3 or 4 years. So we'd like to keep pushing it a little lower, but beyond the 4% to 6% guidance on the dividend going forward, we really don't have anything else to offer.

Mike Lonegan analyst
#63

And then in Alberta, clearly, the third PBR term appeal has been dismissed. I understand the contention was that the commission improperly grounded its capital funding. I'm just curious how you're viewing the prospects in Alberta moving forward with respect to the regulatory environment. And do you have any concerns about outcomes that may be less favorable down the road?

David Hutchens executive
#64

Yeah. That's the great thing about how our business models work. In every jurisdiction where we operate, we've got people who can speak to exactly what's happening in their own part of the world, so I'll hand that over to Janine.

Janine Sullivan executive
#65

Thanks for asking that. Yeah, the appeal outcome didn't really catch us off guard. We thought it was important to take it to the court so there could be a discussion about the way it was designed. But we were ready for the possibility that this is how the court might go, consistent with what the AUC decided before. As for how we work with the AUC, our relationship with the regulator is very, very constructive. We're running things very effectively under the PBR plan that's in place now, and we've been talking with them about what each basin opportunity could look like and what the prospects for future rate-making might be — whether that means PBR continues, or we go back to cost of service, or some other regulatory approach gets taken up. So we're having those conversations with them constructively and proactively, and our relationship makes that possible. A lot is going on in Alberta, and there are certainly plenty of opportunities for economic growth. Fortis Alberta operates in 8 of the 10 fastest-growing communities in Alberta. So we're seeing a great deal when it comes to new load interconnections, large loads, commercial, industrial and some data center. So on every front, I'd say we feel very, very positive about the opportunities to keep investing in the fair large system we have here — I mean, even to keep investing in reliability and wildfire, new technologies, to make sure we're leveraging the grid for affordability.

Janine Sullivan executive
#66

There are plenty of potential customers out there, and plenty of enthusiasm for us to keep carrying out those activities. Our constructive ties with the regulator put us in a strong position to do so. Also, we're increasingly viewed as a trusted adviser by the Government of Alberta, since they too want to see these developments take place within the province. So it's certainly a matter of working alongside them and the ISO to ensure all of this gets done.

Operator operator
#67

<<operator_script>> Our following question is from Hana Velasquez at JPMorgan.

Hana Velasquez analyst
#68

I just wanted to return to the TEP rate case. So given that the ALJ's recommendation is following fairly closely what you originally requested, I know you've talked before about possibly revisiting the issuance of EPS guidance. Is that still something you would consider? Or how are you viewing that in light of how this rate case has come out?

David Hutchens executive
#69

Yes. We're still looking at that — well, one of the earlier questions concerned regulatory lag tied to the coming 1.5 years, until the initial adjuster takes effect at TEP. So essentially we'll need to handle that timing, but it's certainly something we take into account.

Operator operator
#70

That wraps up the Q&A portion. I'll now hand things back to Ms. Amaimo for any closing remarks she'd like to offer.

Stephanie Amaimo executive
#71

Appreciate that, Betsy. That's all we have for now. Thanks to all of you for joining us on this call covering our third quarter 2026 results as well as the new 5-year capital outlook. If you need anything else, please reach out to Investor Relations. Thanks again, and enjoy the rest of your day.

Operator operator
#72

That wraps up the conference call for today. You can now disconnect your lines. Thanks for joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Fortis Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Fortis Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.