Operator operator
#1

Good day, ladies and gentlemen, and welcome to the Q4 FY ’25 and FY ’25 Post-Results Conference Call for PSP Projects Limited, hosted by Smiths Limited. Just a reminder that every participant line will remain in listen-only mode, and once the presentation wraps up, you’ll have a chance to ask questions. If you require assistance at any point during this call, please signal an operator by pressing star then zero on your touchtone phone. Kindly be aware that this conference is being recorded. At this time, I’ll hand the conference over to Lokesh Kashikar. Thank you, and over to you, sir.

Lokesh Kashikar analyst
#2

Thanks. Yeah.

Operator operator
#3

Thanks. Good afternoon, everyone. Apologies for the interruption, but management's line dropped. Everyone, kindly stay on the line while we reconnect them. Thank you all for waiting — management is back with us now. Mr. Lokesh, the floor is yours.

Lokesh Kashikar analyst
#4

Yes. Thank you. Good afternoon, ladies and gentlemen. I’m pleased to welcome all of you, on behalf of SMIFS Limited, to the PST Projects Q4 FY ’25 and FY ’25 earnings conference call. From the management side, we have Mr PS Patel, Chairman, Managing Director and CEO; and Ms Patel, CFO of the company. I’ll now hand the floor over to Ms Gujar Dru, Company Secretary, for the disclaimer, and then the management will have the opening remarks. This will be followed by alternative — interactive Q&A. Thank you and over to ma’am.

Pooja Dhruve executive
#5

Thank you, and good evening to everyone. It’s a pleasure to welcome all of you to the PHP Projects Limited earnings call for analysts and institutional investors, where we’ll discuss the financial results for the quarter and year ended 31st March 2025. A copy of the disclosure is available in the Investors section of the website as well as on the stock exchange. Any statement made on this call that reflects future outlook or that could be construed as forward-looking must be reviewed together with the risks the company faces. I’ll now hand the call over to our Chairman, Shah, for his opening remarks. Over to you, Shah.

Prahaladbhai S. Patel executive
#6

Thank you. Good evening, everyone. I'm speaking on behalf of PSP project management, and I welcome each of you to this earnings conference call, where we'll discuss the company's performance for the quarter and the full year. Our Board meeting wrapped up this afternoon. Looking back at the financial year 2025, I'd describe it as a tough year for PSU Projects Limited, even though the company ended it with an all-time-high outstanding order book of INR7,266 crores, which represents a 20% increase year on year, along with a record order inflow of INR3,506 crores, excluding GST. That figure got three. Those numbers have not converted into results and growth over the course of the year from the current outstanding order book. Adani projects accounts for 25% in-balance are projects. The company finished FY ’25 with revenue from operations of INR2,468 crores, roughly on par with FY ’24. The company was unable to achieve the growth guidance it wanted; this subdued revenue growth occurred because several new projects — Royal, Dem Fintech Building at City, GBRC, SRFDCL, GDC, SNC, Scient City, EDC — did not get off the ground according to our plan, and there were delays in receiving drawings as well as in in-land acquisition, and land allotment was delayed in client unit sales ETC.

Prahaladbhai S. Patel executive
#7

Altogether, the revenue effect from every one of these projects comes to more than INR300 crores. On profitability: during FY ’25, the company posted EBITDA of INR78 crores, versus INR260 crore in FY ’24. That drop in EBITDA largely stemmed from costs tied to the seven UP projects — seven projects. FY ’25 was the period when those projects reached closure and handover, which generated extra costs during the year. Additional spending totaling INR62 crores went toward these EV projects; leaving aside those one-time expenses, adjusted EBITDA margin for FY ’25 comes to 9.7%, which shows the underlying operational strength of our core business and is in line with our probability — profitability guidance on a consolidated basis. As for the definitive agreement with Adani Infra, approval for the open offer has been received, and its stage of period began on 22nd May 2025 and runs through 4th June 2025. Once the pending period ends, the acquisition takes effect from June 2025. Let me now share some operational highlights for the quarter and the year. To date, the company has finished 235 projects overall since inception, with 83% private projects and a balanced share of government projects. As of 31st March 2025, 58 ongoing projects exist — projects, 91 ongoing projects — 91% of projects are located in Gujarat, 5% in Karnataka, 2% in and 2% in Rajasthan.

Prahaladbhai S. Patel executive
#8

In FY ’25, the company finished 13 projects. The major ones completed were SV came NIM instituted San Nhmedabad, seven medical colleges in-hospital completed in UP, two project completed with a national icepeed project, and the residential building for project Akansa at Ahmedabad. During the year, the company was awarded 22 projects. The major projects were ever airport development and city, cityside development work containing and water hotel, project at Sanand, and center at Ahmedabad, two commercial and one hotel building in Bangalore, and the biggest residential project of Siban at City. After successful completion of Mall Ahmedabad, we received a repeated order from clients from Mall in Surat, leadership guest house and training center with Prikas Technology in Shantsegram, residential project at and residential project of R5 in San. Now let me share the project-level updates. One of the largest projects which we are going on the pass is Coca-Cola project. Few days back, I was on the site and I saw almost the structuring is over. Infra work is also going on and the finishing work is going on. So probably that project is almost on timeline and we are doing much faster project for the company. Mutual Corporation, Building at Surat, we have reached to 14 story.

Prahaladbhai S. Patel executive
#9

Right now, the finishing work has received approval. The facade contractor is on board, so the building is proceeding in parallel starting from 14 onward on the structure side, with the remaining area on one side. At the sports complex, the main work is finished and it's ready to open anytime soon, and some extra work of about INR20 crores for the pool is underway at the sports complex. Rathi, we have pretty much come out of the basement for all the buildings that are meant to be done for the inner city. And now the major work is going into the superstructure; we are also there on track, with a slight slippage of about one up to two months simply because of the seasonal labor shortage in April and May. For our FY ’26 outlook, we believe FY ’26 holds strong potential for the PSU project. The company begins the new financial year with a healthy order book, laying a solid foundation for growth. Our primary focus will be on execution. The entire team of FPS projects is aligned toward delivering high-quality outcomes and ensuring timely completion across all projects. Looking ahead, we recognize that our future success will be driven by our ability to execute efficiently and scale up our operations across an increasing number of projects.

Prahaladbhai S. Patel executive
#10

We have faith in what our team can do, and we are absolutely dedicated to reaching — to reaching these targets. On the dividend headlines, we are expecting in excess of INR3,000 crores, though I will be able to provide a precise number by the close of this quarter, since most of the Adani projects that we have launched are either at the stage of work or acceleration. So, once two months have passed from now, we will be in a stronger position to give you a clear guideline on what it will be up to be at INR3,000 crores. That brings my remarks to a close, and I would now like to pass the call to Ms Patel so she can walk us through the financials in detail.

Hetal Patel executive
#11

Thanks very much, sir, and good afternoon to everybody. Let me take you through how we performed financially in the quarter that closed on 31 March 2025, comparing quarter-four FY ’25 against quarter-four FY ’24. Revenue from operations came in at INR655 crores for the quarter, against INR649 crores, a marginal Y-o-Y rise of 1%. EBITDA for the quarter stood at INR30 crores, compared with INR52 crores, down 41% on a Y-o-Y basis. EBITDA margin was 4.65%, against 7.98%. Net profit for the quarter was INR4.8 crores, versus INR15 15cr, a Y-o-Y reduction of 68%. PAT margin came in at 0.7%, versus 2%. In the quarter under review, the company had to incur additional expenses on UP projects amounting to INR9 crores. Other expenses include an asset written-off of INR2 crores and an ECL provision made for retention receivable from a project — one of the UP projects — of INR1 crores INR87 lakhs. During the quarter, a project performance bank guarantee of INR8.02 crores was invoked, and that amount has been expensed off to the P&L account. In quarter-four FY ’25, the company incurred capex of INR16 crores, and for FY ’24-’25 in totality, capex incurred stands at INR61 crores.

Hetal Patel executive
#12

As of 31st March ’25, gross block stands at INR599 crores, while the net block comes to INR307 crores. I'd like to highlight some key balance sheet figures as of 31st March ’25. Long-term borrowings are INR52 crores, and that includes a short-term maturity of INR34 crores. Short-term borrowings total INR219 crores, excluding the INR34 crores of short-term maturity; net unbilled is INR522 crores and retention is 175 crores. Mobilization advance stands at INR335 crores. Inventory is INR322 crores, made up of INR145 crores in construction materials, INR156 crore in work-in progress, and 21 CR of finished goods. Against total sanctioned credit facilities of INR1,497 crores, the company has utilized INR1001 crores, which includes fund-based utilization of INR122 crores, and INR496 crores of facilities remain available for utilization. As of 31 March ’25, the company holds total fixed deposits of INR265 crores, of which deposits account for INR60 crores. INR180 crores are under-bank for credit facilities, and FT worth INR25 crores has been provided to the client as a security deposit. Work on-hand as of 31st March ’25 ranges from INR700 to INR7,266 crores. A detailed bifurcation is available in the uploaded presentation. That wraps up the update on the financials, and we are now open for the question-and-answer session. Thank you.

Operator operator
#13

I appreciate that. At this point we're going to open things up for questions. If you'd like to ask something, just hit star and one on your touch-tone phone. Should you want to drop out of the queue, press star and two. We ask that the 2 participants use their handsets when posing a question. Folks, we'll hold for a moment while the queue fills up. Hello, our first question comes from Navid Virani at Bastion Research. Go right ahead.

Navid Virani analyst
#14

Hello. Hi, sir. Thanks for the chance to ask. So I’ve got a few questions. The first one concerns the whole of FY ’25 and now FY ’23 going forward. So could you speak a bit louder now? Can you — is this better now? Is it better now, sir?

Pooja Dhruve executive
#15

Yeah. Yeah.

Navid Virani analyst
#16

My first question is about how we should view FY ’23. Now, FY ’25 was a washout year — everyone knows that. But could you give a picture of just how dramatically different FY ’26 might be, both in terms of scale growth and profitability? How should we think about FY ’26, and how do you expect it to panel?

Prahaladbhai S. Patel executive
#17

As I said before, we should be in a stronger position in FY ’26, since the problems the company faced were tied mostly to UP and to UP projects. When you look at total revenue and at all the other projects, we have already delivered what we said we would and what we gave as guidance for the other projects. The sole issue was UP, and that is why we could not make up the gap. And if you look at the total expense we incurred in UP across the year, it came to roughly INR60 crores. So if you fold that into EBITDA, the margin will be the same as last year, FY ’24. Starting from here, we no longer carry that much pressure from government projects. At present we are handling mostly Adani Group projects, where we are — we are focused only on the construction portion. So in my own view, we will be in a better position to execute the project, because we now rely solely on the Adani Group’s management, and they too want their project to proceed on a fast track without any interest sir.

Navid Virani analyst
#18

Following that, what I'd like to get clarity on is the project side. So across the whole of FY ’25, the EBITDA margin pressure came largely from util projects been. So going forward, say over the next couple of quarters, do you still expect some pressure from these projects? And aren't we able to just take it once and for all — absorb all the pain in one go and be done with it — is that something that isn't coming?

Prahaladbhai S. Patel executive
#19

Look, the reality is that the big-ticket items — the greenfield medical college and hospital projects — were completed and handed over six to nine months ago. What's left is mostly renovation work on the existing hospital, which formed part of this contract, and getting those hospitals delivered on schedule by the government is what's causing delays on both our side and theirs. So whatever unfolds now, my own view is that most of what remains is tied solely to the medical colleges at this point. So we should probably be in a stronger position going forward from here. That said, every so often — last quarter too I mentioned INR5 crore, yet I wound up at INR9 crore. So probably with — we still believe that in the coming quarter as well, we ought to be in a better position and not spend too heavily on that front. So as far as the UP chapter goes, it's now pretty much finished.

Navid Virani analyst
#20

Absolutely, sir. That's useful. Sir, my final question concerns working capital days. Looking at how things have moved over the past several years, we've stayed within a 30 to 35 day range, yet this time in FY ’25 the figure has reached roughly 65 days. It also appears that receivables and, more significantly, inventory were somewhat elevated in both FY ’24 and FY ’25 when I compare against prior history. So what's behind each of those figures, if you could share some insight on that.

Prahaladbhai S. Patel executive
#21

Okay, so if we look at these receivables, they've gone up compared with last year. Previously it stood at INR335 crores, and right now it's above INR500 crores. Yeah. The bulk of this comes from government projects, and a portion of the UP payment is still outstanding as well — outstanding — plus there are other government projects in there. SEBs are also part of it, and last year they weren't in receivables at all. So that's the reason receivables have gone up. And on inventory, man — inventory, I think it's about the same so far. Last year it was roughly INR300 cred, and this year too there isn't much of an increase.

Navid Virani analyst
#22

So I mean, aren't we — I just wanted to get a handle on this: does any pre-cash component figure into that inventory increase? Because when I look at FY ’24 and ’25, that inventory figure has crept up a bit. So is there some pre-cash piece in there on the goods?

Prahaladbhai S. Patel executive
#23

No, look — as I said, I covered the bifurcation. So roughly INR21 crore relates to finished goods, that's the inventory figure. And that belongs to the finish book.

Navid Virani analyst
#24

Great. One final question about receivables. Of all the receivables currently outstanding on our books, do you see any that are slow-moving or disabled? If so, could you quantify that?

Prahaladbhai S. Patel executive
#25

All right. So when we look at the slow-moving piece, that's the item where we've reached the 17th year, and against it we've already made a provision of 13 CR. Then there are SBB receivables, which come to 90 CR, though under the agreement that amount is actually due by this October ’25. Yes, the first government payment is due, but that's a receivable we're chasing, and for the most part by October ’25 we should be collecting it.

Navid Virani analyst
#26

Thanks. And apologies for the responses there. Yeah.

Prahaladbhai S. Patel executive
#27

Yeah, and there’s also a 40 CR receivable from UP that’s part of receivables.

Navid Virani analyst
#28

That’s great. Thanks. I appreciate your responses. All the best to everyone.

Operator operator
#29

Thanks a lot. Many thanks. Anyone who wants to ask something can press star and one right now. Our following question comes from Shah at JM Financial Limited. Please proceed.

Vaibhav Shah analyst
#30

Regarding the receivables piece, you brought up that SGB and UP are INR90 crores and INR40 crores. What about the one you might have — right? I missed the figure for that. Yeah, that one is INR17 crores. And besides that, which others are there?

Prahaladbhai S. Patel executive
#31

Yes. There’s a 98 receivable from the Corporation tied to the Sports Complex.

Vaibhav Shah analyst
#32

Is that slow-moving?

Prahaladbhai S. Patel executive
#33

It's not slow-moving, but we have the last 2 months in one risk pending, and even 3 months in moving, so that will be the case. Yeah. So that will be perfect.

Vaibhav Shah analyst
#34

So what sort of normalization should we be expecting when it comes to working capital?

Prahaladbhai S. Patel executive
#35

So roughly speaking, if we set aside SVB and the other moving pieces, it comes to about INR450, or thereabouts — meaning it'll land at roughly INR400 cred. So at this level, that ought to be the normal receivables.

Vaibhav Shah analyst
#36

Therefore, INR400 crores ought to be booked by March ’26. All right. And regarding that SDB receivable worth INR90 crores, the whole sum comes due in October.

Prahaladbhai S. Patel executive
#37

Yeah. By October ’25, that ought to be investment for the.

Vaibhav Shah analyst
#38

Right. And then, regarding guidance — earlier we said we're aiming for revenue of INR4,000 crores in FY ’26. So where do we stand on that?

Prahaladbhai S. Patel executive
#39

As I mentioned, it's going to fall in the range of beyond INR3,000 crores, but once this first quarter wraps up and all of the Group's projects are streamlined — since it's at the stage of or stage, and we're also moving toward monsoon — then we'll be in a better position to provide you with clear guidance after the first quarter.

Vaibhav Shah analyst
#40

So that should fall somewhere in the INR3,000 to INR4,000 range. All right. And is there anything you can share regarding margins?

Hetal Patel executive
#41

As I've said for a while now, margin will hold steady at 8% to 9%, and that's the extent of it.

Vaibhav Shah analyst
#42

And as David mentioned, with 9% to 10%, we're bringing that guidance down once more.

Hetal Patel executive
#43

What would you say?

Vaibhav Shah analyst
#44

Previously, our guidance was for margins of 9% to 10%. So we're bringing that down to 8% to 9%.

Hetal Patel executive
#45

Given where the project stands and how we've performed over the last 1 year, we're simply being a bit more cautious in the margin guidance we're providing to you.

Vaibhav Shah analyst
#46

Alright, alright. And finally, regarding capital expenditure, what will capex be for FY ’26?

Hetal Patel executive
#47

I don't think we've given an exact capex figure, but like I've said all along, it'll land somewhere between 3% and 4% of revenue, and that's what we've delivered this year as well. So it will likely stay in that same band, or perhaps come in a bit above 4%, since most of the Adani projects involve large volumes. There could therefore be slightly higher capex, though it can't exceed 5% over the next three months.

Vaibhav Shah analyst
#48

What guidance would you give us on order inflows for FY ’26?

Hetal Patel executive
#49

Order inflow is going to be in that same band, from INR4,000 crores up to INR5,000 crores.

Vaibhav Shah analyst
#50

All right. All right. Thanks. That covers everything I wanted to ask.

Operator operator
#51

Thanks. Many thanks. Our following question comes from Prachi Gazam at Dolat Capital. You have the floor.

Prachi Kadam analyst
#52

Hello, sir. Thanks for the chance to speak. Sir, regarding that INR4,000 crores to INR5,000 crores of order inflow we're anticipating in FY ’26, I just wanted to ask how much of it would come from the Adani Group?

Hetal Patel executive
#53

My guess is that the bulk of it — somewhere between 80% and 90% — will come from Adani Group alone.

Prachi Kadam analyst
#54

80% to 90% from Adani Group only.

Hetal Patel executive
#55

Right.

Prachi Kadam analyst
#56

Alright, alright. And sir, what would the adjusted margin come in at for Q4 ’25? I believe you mentioned an adjusted margin of roughly 9% for FY ’25. So what would it be for Q4?

Prahaladbhai S. Patel executive
#57

Yeah. See, when we look at the expenses we've booked for this Q4 that aren't routine in nature — one is 8cr related to this TBG invoked, and we've also provided for margin, which is that ECL provision as well. So that's there. And beyond that, we wrote off certain assets, which is part of the whole-year process. So roughly around 20 cr, we can say, is the additional expenditure we've incurred. So on average, EBITDA is INR30 30 crores, which may be — which would come to around INR50 if you take out the impact of these expenses. So it falls within the range of last year's EBITDA margin.

Prachi Kadam analyst
#58

All right, ma’am. That helps. Okay. Thanks.

Operator operator
#59

Thanks a lot. Anyone who’d like to ask a question can press star and one now. Our following question comes from Deval Shah, on the line with RBSA Investment Managers. Go right ahead.

Deval Shah analyst
#60

Hello there. Hi.

Operator operator
#61

Yeah.

Deval Shah analyst
#62

My question is about the recent personnel changes. We've noticed that several long-standing K personnel are leaving at the same time. Could you elaborate on why this is happening and what steps we're taking to make sure these departures don't materially affect our project commitments and on-time completion? Also, are we seeing similar attrition at the mid-level as well? Just your thoughts on this, sir.

Hetal Patel executive
#63

The departure of these two individuals, who had been connected with my organization for the past 15 years, was largely voluntary, because following this agreement with Group, they were feeling a bit of pressure from the order book and perhaps on the execution side. And over the last year, they had seen that pressure when it came to securing labor on time and so on. So it was a personal decision to exit the company due to workload, with no impact on the company's road, because most of the people are still on tech, and if you have seen, since they decided to leave in January and from January until now, we have been performing at the same pace without their presence?

Deval Shah analyst
#64

All right, thanks. And sir, my second question is only about Adani Group. So I — from what we understand, the orders likely coming from Adani Group will lean more toward construction rather than EPC. Is that understanding of mine right, sir?

Pooja Dhruve executive
#65

No, it's more of an item-rate contract rather than being — it won't be an EPC contract, though the majority of the contract type will resemble EPC, in which we'll handle each and everything starting from some portion; the design will come from their side, and for some of the projects we're doing, we'll design, but civil MEP and finishing.

Deval Shah analyst
#66

And okay, sir, about that recent announcement from the Adani Group — they're also planning a township in Navi Mumbai across 1,200 acres. So just to get a sense of it: are we also a preferred player in the Mumbai region for similar opportunities, or — I'd just like your thoughts on that.

Pooja Dhruve executive
#67

Yeah, we've already kicked off projects in Dharavi, and we're also involved in the airport at Mial, at terminal T1. We've already started one small building worth INR50 crores, and we're going to begin the office as well. Plus two projects of Daravi too. So it really comes down to my availability and my strength — how we're able to prove ourselves over the next one and a half year. There will always be opportunities for PSP from the Group side. Otherwise, if their order book or their expansions are larger, we'll always go for a different contract. It all hinges on my capacity to execute the work contract.

Deval Shah analyst
#68

Sir, I really appreciate it, and I hope you have the best.

Operator operator
#69

Thank you very much. Our next question comes from Adity Jaswal at Smith Limited. Go right ahead, Mister Aditya, please proceed. Aditya, go ahead with your question. As that participant isn’t responding, we’ll proceed to the following question. The following question is from Navid Virani at Bastian Research. Please go ahead.

Navid Virani analyst
#70

Yeah, hi. Thanks for taking the follow-ups. I've got a few additional questions. Sir, could you give us a sense of the bid book as it stands right now and what it consists of?

Pooja Dhruve executive
#71

When you mention movement, are you asking what kind of work makes it up, or which zone it covers — what exactly do you mean?

Navid Virani analyst
#72

No, sir — each time you share a view of the total big book figure and which major projects make up a portion of that big book, that's the thing I was hoping to learn.

Pooja Dhruve executive
#73

Let me give you a quick rundown. The residential project comes to INR110 crore. Temple development stands at INR800 crores, and non-daily development work is INR1,200 crore. That's an improvement. Then there's front development work of INR400 crores. The residential project at Ahmeda was INR350 crore, corporate at INR480 crore, residential at Mundra INR1,250 crore, a township at Mundrad INR2,300 crore, the museum at Ahmedabad INR100 crores, and in Tier-1 for the industrial plant, INR120 crores. So that's roughly INR7,101. A big pipeline.

Navid Virani analyst
#74

So that's what makes up the outstanding big book.

Pooja Dhruve executive
#75

No, I mean the pipeline item. You're asking about the outstanding orders? Go ahead. Sorry, sorry, sir. Sorry. All right — outstanding orders, at minimum.

Prahaladbhai S. Patel executive
#76

Yeah. So that's already included. The bifurcation is already present in the presentation.

Navid Virani analyst
#77

Ma'am, what I was asking about is the bid book — the outstanding bid book, not the order book.

Prahaladbhai S. Patel executive
#78

That, then, is what accounts for the pipeline that is possible only.

Navid Virani analyst
#79

Right, okay, got it. Perfect, that's great. Moving on, sir — I believe on the previous call you said we're looking at projects from Adani Group itself worth roughly INR10,000 crores across the coming two years. So, are we on track to hit that?

Pooja Dhruve executive
#80

Right, it really comes down to execution and performance—how the project is designed and how the work actually goes at the ground level. So as projects come up, we discuss them broadly in terms of a larger order book. But as each project materializes, one after another, it gets converted into orders.

Navid Virani analyst
#81

That's useful. And sir, one final point on the work you brought up. So are we actively involved — I mean, have we already begun taking part in it?

Pooja Dhruve executive
#82

No, no — we've already begun some initial mobilization at one of the projects. The land has been made available by Adani Group, and there we're going to build 5,200 houses. Right now there's no development on that land as such. It'll be on the outskirts, where people will be relocated afterward. So there are two projects already being discussed that relate to Dharav development.

Navid Virani analyst
#83

All right, all right. So this is a project in which the current population is going to be relocated, and after that, construction gets underway.

Pooja Dhruve executive
#84

Right, right. Okay. Okay. Thanks. I really appreciate it.

Operator operator
#85

Much appreciated, and thanks again. We now take a question from Shafam Jay M Financial Limited, whose line is open — please go ahead.

Vaibhav Shah analyst
#86

Regarding our total order book, sir, what portion comes from fixed-price contracts?

Pooja Dhruve executive
#87

How much of that

Analyst analyst
#88

You're asking about fixed-price contracts?

Pooja Dhruve executive
#89

On that, Peaks price — regarding exactly which ones are the fixed-price project, I’ll get back to you.

Analyst analyst
#90

Alright.

Pooja Dhruve executive
#91

Since several of those projects involve high items, we haven't prepaid that list — which covers the outstanding order booking, the fixed rises, and once item rated. I need to verify that.

Analyst analyst
#92

Alright, and second, when it comes to that bid pattern of INR7,100 crores, how much would be Adani's share?

Pooja Dhruve executive
#93

My guess would be roughly 50%, with 60% being Adani.

Analyst analyst
#94

Alright. Alright. And finally, regarding the Budao project, we wrote off INR8 crores of VG during this quarter in the P&L. So what remaining items could still be written off down the road? And what's the current status there?

Pooja Dhruve executive
#95

Right, yeah — of course. I’ll speak to what’s outstanding from the project. That 8 CR was the performance bank guarantee that had been taken, and so we’ve expensed it off. Now, on the balance sheet, there’s a 6 CR receivable from the project. The CR is 1.81 CRE — that’s against retention — and the other 4 CREs are against the mobilization advance, which they’ve recovered in excess. So they’ve also recovered with normalization guarantees, which they already recovered from our RABs. So that’s still something we’re carrying on our books, because it’s receivable by us, whereas the retention money of 1.87 we’ve already provided for. So we’re showing it on the receivables, and a similar amount of provision has been made in ECL — expected credit loss.

Analyst analyst
#96

Right now, that project can only generate an incremental loss of INR6 crore.

Prahaladbhai S. Patel executive
#97

Just 4 CR, nothing more. So if we assume that additional mobilization can't be recovered, that leaves us at 4.

Analyst analyst
#98

Alright. Alright. And ma'am, where does that project stand at the moment? Has it moved ahead, or what's happening with it in the courts right now — what's the status?

Pooja Dhruve executive
#99

That project is completely finished. Since they've already ended our portion, they might proceed as planned, so they'll likely be re-tendering, but as of now the project remains at status quo.

Vaibhav Shah analyst
#100

All right. And sir, are there any other projects of a similar kind, or where we might see some dated receivables or write-offs — anything besides those UP projects?

Pooja Dhruve executive
#101

I'd say, honestly, they shouldn't do that going forward either. The truth is, we can't really picture a scenario like that—sometimes circumstances take things down a different path depending on the situation—but that wasn't anticipated, and I don't expect any of that project to head that way in the future.

Vaibhav Shah analyst
#102

Okay. And finally, about margins — you lowered the guidance once more. So is there any potential upside there, for above 8% to 9%?

Pooja Dhruve executive
#103

This isn't really about cutting anything back. It's more about how the labor performs and whether it's available, plus the crisis the construction industry has been going through over the last 1.5 years, 2 years, or the next year or so. So I'm just being a bit cautious with the percentage — shaving off 1%. Other than that, we'd already given you 9% to 10%. Now I'm saying 8% to 9%.

Analyst analyst
#104

Alright. Alright. Appreciate it, sir. That covers what I wanted to ask.

Operator operator
#105

Thanks. Thanks a lot. Before we move on to the next question, we'd like to remind anyone who wants to ask something that they can press star and then 1 right now. Our next question comes from Sanjay Kohli of Goldstone Capital on the line. Please go ahead.

Sanjay Kohli analyst
#106

Good afternoon, and thanks. So my first question concerns the current coordination with the Adani Group — are they pretty hands-off when it comes to the management structure, letting you operate the way you always have, or have there been some meaningful changes?

Pooja Dhruve executive
#107

Look, the entire correlation has been built on the baseline that we’re the only ones who can grasp execution and the pace of execution and how a construction company should be managed. So the group has no desire to get into the execution side at all. It will be the financial side. They were there, and they’d like to help us so that our cash flow is maintained and the order book is maintained and we’re in a better position to execute at a faster pace. Otherwise any — any interference from their end on the execution side, today it is also zero and for the next 5 years, they have added that they do not want to enter into the existing management as far as execution is concerned.

Sanjay Kohli analyst
#108

Okay, so that's something they're looking to avoid. In the presentation, one slide references the eight-year CAGR for revenue, EBITDA, and then PAT — it goes from 25%, to 13%, and then falls all the way down to under 4%. So in the next phase of our journey, will I turn this around somewhat and reverse it so that profitability begins to climb? And are we adding, for instance, some new skills in the near future, like bridge building or road building? Can we see — will we see that within the company, so that, you know, this profitability goes up?

Hetal Patel executive
#109

On that point — I'm not sure where the perception comes from that building bridges and roads carries better margins. But when you look at our company profile and our track record, we will never enter any infrastructure projects. We don't have that expertise either. On margins, I believe the figure started at 25%, though we never committed to 25%. We had a profit of 16% back when there was no GST — it was service tax — when most materials were supplied free of course, and that profit was on the overall project side with cement not included, so margins were around 16%. After that, they settled at 11% to 12% over the last three years. And in this last year only, we took a bad hit of 4% purely because of expenses of about INR60 crores. If you seriously add INR60 crores to INR170 crores, it lands in that same range of 9%, which is what we have been doing the last two quarters — and last year as well.

Sanjay Kohli analyst
#110

And so, since we come from that space, from a metro market where you've seen real estate come back here. And the standalone developers in cities such as Delhi, the level of profitability they're achieving. So we aren't a development company, but yes, we will kind of look at — I mean, it's an extremely profitable area to think about entering, because a PAT CAGR of 4% across eight years is — you know, this has to get better.

Prahaladbhai S. Patel executive
#111

Look, that’s been mostly impacted because of this year’s profitability, and even a certain part of last year too. So this could get better if we — I mean, since those CUP projects have already wrapped up. So in this current financial year as well, it’ll be at a different stage; maybe you could say it’s different — it’s not on the same level as what we had earlier, yes.

Sanjay Kohli analyst
#112

All right, thanks. Hello, and I appreciate the chance to be here.

Operator operator
#113

Much appreciated. Our following question comes from Adity Jaswal at Smiths Limited. Please proceed.

Aditya Jaiswal analyst
#114

Thanks for the chance to ask, sir. I just wanted to check: out of that INR7,000 crores total order book, how much will get converted in FY ’26? And on the revenue side, how much will come from the new orders?

Hetal Patel executive
#115

Could you say that question again, please?

Aditya Jaiswal analyst
#116

Sir, of that INR7,000 crores order book you hold, how much revenue do you expect to convert from the INR7,000 — or 7,000 is the order book — for FY ’26, and how much revenue will come from new orders for FY ’26?

Hetal Patel executive
#117

So from that INR7,000 crore, I believe we should be able to realize roughly 30% to 14% at minimum during this year, and the remaining revenues that will arrive through the full order book for next year will fall in the range of INR400. Typically, projects that come in after the first quarter don't turn into revenue until the following quarter. I think that means next year. So revenue from the new orders will be quite small, and it will mostly come from the existing order book, which is what we're expecting.

Aditya Jaiswal analyst
#118

Sir, regarding the most recent orders we've received — one came from City Research Center and the other from Guest House — could you shed some light on these two?

Prahaladbhai S. Patel executive
#119

Could you say that again, please?

Aditya Jaiswal analyst
#120

Sir, regarding that PPD you brought up, you've gotten 2 new orders.

Pooja Dhruve executive
#121

One, for is very low, sir, your voice is very low. We are not able to understand.

Aditya Jaiswal analyst
#122

Hi. Hi. Hi. Yes. Regarding those 2 orders you recently received — 1 for Medicity Research Center and the other being the guesthouse at Shanthiram — could you shed some light on those 2 orders?

Hetal Patel executive
#123

Looking at Medi City, and Ahmedabad is the other new group coming—two medical hospitals, one located in Khmedabad and the other in Mumbai. So the order has been secured for Ahmedabad—the medical college plus the medical hospital. And the guest house work, which I mentioned is also a group leadership building where people need to stay back—so that's the hostel guest house serving their leadership course, which is situated in Santi.

Aditya Jaiswal analyst
#124

Sir, do you have any timeline you're expecting for getting this order finished?

Hetal Patel executive
#125

My understanding is that each of those orders comes with an 18-month timeline.

Vaibhav Shah analyst
#126

All right, that’s all.

Operator operator
#127

Thank you, sir. Thank you. Many thanks indeed. Since participants have no more questions, I’ll now pass the conference to PSP, sir, for closing remarks.

Pooja Dhruve executive
#128

Thanks. Thanks to everyone for being on today’s earnings conference call. We appreciate your backing and your interest in us. We hope we’ve managed to answer most of the questions you raised. If anything further comes up, you can get in touch with Investor Relation Advisor and Young, and they’ll follow up with you offline. Thanks once more, everyone.

Prahaladbhai S. Patel executive
#129

I appreciate that.

Operator operator
#130

Smith Limited would like to thank everyone for being with us; that brings this conference to a close. We appreciate your participation, and at this point you're free to hang up.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete PSP Projects Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to PSP Projects Limited earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.