Thanks, operator. Good afternoon, everyone, and welcome to the Riot Platforms Fiscal Year 2025 Earnings Conference Call. This is Josh Kane, Head of Investor Relations. Joining us on today's call from Riot are our Chief Executive Officer, Jason Les, and our Chief Financial Officer, Jason Chung. Our Fiscal Year 2025 earnings press release and the accompanying earnings presentation can be found on the Riot Investor Relations website; those materials are meant to supplement today's prepared remarks, and they contain a discussion of certain non-GAAP items. Our non-GAAP figures aren't meant to serve as a substitute for, or be considered superior to, results prepared under GAAP. We're offering them as extra clarifying details so investors can gain a clearer picture of how the company performed in Fiscal Year 2025. When it comes to forward-looking statements, these might cover things like predictions about upcoming events or trends, along with performance projections, and they could feature terms such as believe, expect, intend, project, plan, or similar wording. What we report might end up being quite different from what we've projected, and that's because of items we've covered in the earnings press release issued today, things said and answered on this call, and the Risk Factors portion of our Form 10-K covering the year that closed on December 31st, 2025 — a document set to be submitted later today — along with additional submissions to the Securities and Exchange Commission. Having said that, I'll now hand things over to Jason Les, who serves as CEO of Riot Platforms.

Jason Les executive
#2

Thank you, Josh. For Riot Platforms, 2025 stood out as a year of transformation. During those twelve months, we repositioned this business from the ground up so that it sits at the leading edge of the data center sector. Right now, it gives me enormous pride to recount the major milestones we reached and to lay out where we go next, as we keep carrying out our plan to extract the greatest possible value from our power portfolio on behalf of shareholders. What was once a Bitcoin mining firm with data center upside has become a demonstrated data center builder with a record of moving quickly. Let me spend a moment taking you through several of the key wins that made 2025 such a transformative year for Riot. We closed the fee simple purchase of the Rockdale site, which locks in 200 acres of vital land that we now wholly own. We likewise finished our bases of design platform, which puts us in position to supply data center capacity at the scale and pace the market requires. By bringing on seasoned data center talent in every essential function, we developed considerable in-house know-how. Our roster today features leaders spanning product development, construction, engineering, sales, and marketing, whose combined track record covers more than 200 data center projects and almost 4.8 gigawatts of design and construction experience. That level of expertise matters enormously. It is precisely what let us give prospective tenants confidence that we can deliver mission-critical infrastructure against aggressive timelines. Talent for building data centers is highly sought after, and we take tremendous pride in how deep the capabilities and experience are that we have managed to draw to Riot. The caliber of our data center team represents a crucial edge in making sure that potential tenants and partners feel certain we can deliver at scale. We have also broadened our land holdings considerably so that our approved power capacity can be fully utilized. Three more parcels were acquired next to and close to our initial Corsicana site, which raises the total land footprint there to roughly 900 acres. That deal makes planning and building out our entire one gigawatt of approved power capacity at Corsicana simpler and faster, since it all sits on land Riot owns in a connected campus configuration; during the fourth quarter of 2025, we completed the purchase of the 200-acre Rockdale site we had previously leased, paying total consideration of $96 million, financed completely by selling about 1,080 Bitcoin from our balance sheet; that acquisition was a strategic necessity. By turning our interest from a ground lease into outright ownership, we unlocked the ability to build data centers at Rockdale and removed roughly $130 million in future rental payments that would otherwise have come due across the remaining lease term and extension options. Last of all, we finished our standard bases of design, a vital step toward engaging prospective tenants in both technical and commercial conversations. Taken together, these accomplishments have set Riot up for significant data center development in 2026 and afterward; when it comes to leasing, we announced our first lease with AMD in January of 2026, which shows Riot's abilities as a credible developer and operator. When a firm of AMD's standing picks Riot to handle infrastructure that's mission-critical, that tells the market something unmistakable about how strong our capabilities and our team really are. Looking at 2026, our priorities are set. First, we deliver the complete 25 megawatts of compute tied to our AMD lease. Second, we execute further leases at Corsicana and Rockdale alike, starting with building our first core and shell at Corsicana. Third, we lock in appealing, inexpensive financing that mirrors the caliber of our tenants and sites. Right now, talks are actively happening with several top-tier tenants who've shown serious appetite at both Corsicana and Rockdale. Having absolute certainty around large-scale power at our sites is something exceptionally uncommon in the current market, and that's drawn many interested parties into active engagement. Our approach to sales supports leasing outcomes yielding either single-tenant or multi-tenant campuses at either location, which keeps our flexibility at its peak; when it comes to development, our track record already makes the case. We handed AMD the first phase of power capacity right on schedule and within budget, and revenue is already coming in. In a sector where slippage is routine, hitting deadlines for a world-class tenant stands as strong proof of what our execution can do. Core and shell work is moving forward and advancing at Corsicana. At Corsicana, our substation expansion is still on track, with overall power capacity hitting 1 gigawatt across the coming 12 months. Turning to capital management, Riot keeps a disciplined framework in place to fund our data center business efficiently. We're putting our solid balance sheet to work covering upfront development costs, avoiding any reliance on equity financing that would dilute shareholders. We'll tap project finance and debt capital markets efficiently to fulfill high credit quality leases. Once our assets stabilize, the plan is to refinance through permanent debt so capital gets recycled into projects with better returns, forming a compounding flywheel of development. Early efforts are already in motion to evaluate financing choices for the AMD lease, encompassing added capacity for potential future expansions should AMD exercise their options. Turning to slide 8, I'd like to highlight the philosophy behind our leasing approach. Filling capacity isn't our aim. What we want are strong, highly creditworthy tenants that fit our high-quality assets. That emphasis traces back to capital efficiency and how assets get valued. Within digital infrastructure, the cost of capital tracks closely with a tenant's credit quality, frequently priced off their underlying credit rating. Teaming with counterparties of high creditworthiness lets us obtain the most favorable, cheapest financing the market offers. This lowers what we must put in as equity and raises our return on invested capital. Seen through a capital markets lens, it also produces premium valuation multiples, generating meaningful value for shareholders. Our AMD lease stands as proof our strategy works. AMD ranks among the world's leading players in the AI ecosystem, holding an S&P credit rating of A. When a tenant like AMD puts its trust in Riot to build out infrastructure that is mission-critical, that tells the wider market something unmistakable: our people, our locations, and the way we execute sit at the very top tier, and that opens the door to continued conversations with other premium partners. At this point I want to stop and draw attention to how significant what Riot has accomplished really is. Phase 1 of the AMD lease kicked off on schedule in January, and we are still positioned to hand over phase 2 in May as originally planned. Carrying this out proves what our data center group is capable of and shows we can hit the tough deadlines that leading technology tenants require. How quickly we moved was striking. The lease was announced in January, and capacity for the first phase came online that same month — a feat conventional greenfield builders just are not able to replicate. We are bringing capacity on in 2 phases to reduce execution risk. Rent began in January of 2026 on the initial 5-megawatt phase once it was delivered. Another 20 megawatts come online in May 2026, which takes the total initial deployment to 25 megawatts of critical IT load.

Jason Les executive
#3

For this first build-out, we need about $90 million in capital. That works out to around $3.6 million for each critical IT megawatt, and that's well under what you'd normally see for traditional new build projects. There's a lot of room to grow here. AMD has an option to add another 75 megawatts of critical IT load, and we can fit that inside the rest of building G and building F using the same capital-efficient retrofit approach. On top of that, AMD holds a right of first refusal over another 100 megawatts of capacity. Should AMD exercise both that expansion option and the ROFR in full, their total footprint at Rockdale would come to 200 megawatts of critical IT load; this slide walks through the key terms of the deal we announced previously. Through this lease, we've signed a 10-year agreement to deliver customized data center space at our Rockdale site, which we now fully own. There are three five-year extension options in the lease, which opens the door to a 25-year partnership. On the financial side, the total contract value for this initial 25-megawatt deployment across the 10-year base term comes to $311 million; we anticipate that will produce average annual net operating income of roughly $25 million, which means highly visible contracted cash flows with an investment-grade counterparty. Our power-first strategy is the foundation of everything we do at Riot. Right now, most of Riot's operating power capacity is monetized through Bitcoin mining, and that brings in strong cash flows to fund our operations and development work. Looking ahead, we'll keep converting power capacity and chasing data center leases that maximize value for our shareholders. The AMD lease shows this strategy working; we took existing infrastructure and delivered at speed and at scale, which turns into highly profitable and predictable long-term contracted cash flows with an investment-grade counterparty. The economic comparison is compelling. Per megawatt, the AMD lease produces 2.5 times more gross profit than Bitcoin mining. This economic framework will shape how we allocate capital going forward. Wherever data center leasing with creditworthy counterparties can deliver higher risk-adjusted returns, we'll put data center development first. Wherever Bitcoin mining is still the highest and best use of our power, we'll keep mining while staying flexible enough to convert that capacity to data center use. Slide 14 highlights the significant scale and quality of Riot's power portfolio in Texas. Across our Corsicana and Rockdale sites, Riot holds 1.7 gigawatts of fully approved firm power. This isn't a prospective pipeline or speculative capacity — it's power that is in use and available for development and utilization today. At Rockdale, our total approved capacity is 700 megawatts. That power was originally approved in the fourth quarter of 2019 and energized in the second quarter of 2020. In FY 2025, our average load at Rockdale was 351 megawatts. The site has a direct, non-interruptible evergreen connection to the grid, with no intermediaries between Riot and the utility, backed by a 700-megawatt substation that's already on-site and operating. When it comes to Corsicana, our total approved capacity sits at 1,000 megawatts — that's one gigawatt. Approval for that power came through in Q4 of 2022, and it was energized during Q2 of 2024. At Corsicana, our average load across FY 2025 reached 335 megawatts. Delivering the entire one gigawatt of capacity within the coming 12 months remains on track, thanks to the substation expansion. With firm power, Rockdale along with Corsicana are completely approved sites, sitting in a few of the country's most appealing data center markets. In a power-constrained landscape like today's, that distinction hands us a significant competitive edge. Right now, estimates for securing new power inside the Texas Triangle run to four years or longer, which means owning large-scale energized power in the correct spots today carries extraordinary value; an asset this scale of energized power is in extremely high demand and serves as the basis for our financial profile. At this point, I'll hand the call to Jason Chung, who will walk through our FY 2025 financial update.

Jason Chung executive
#4

Thanks, Jason. I'm glad to walk through Riot's FY 2025 financial results, which show how solid our operating model is and how much headway we've made in setting the company up to create value over the long term. Across the full year, Riot's total revenue came in at $647 million, up 72% compared with the prior year. That sizable growth came mainly from a robust showing in our Bitcoin mining business, which added $576 million, equal to 89% of total revenue, along with support from engineering and other revenues, which kicked in another $71 million, roughly 11% of total revenues. Our Bitcoin mining business posted its best-ever annual revenue and gross profit, with FY 2025 revenue of $576.3 million and gross profit of $294 million once power curtailment credits are included. Those results speak to the scale we've built and the efficiency gains we keep making across our operations, including our power strategy, which leads the industry. Net loss for the year totaled $663 million, or $1.95 per diluted share. Investors really need to grasp what sits behind that figure; the net loss includes a number of sizable non-cash charges and mark-to-market pricing adjustments on Bitcoin we hold on our balance sheet. That covers depreciation and amortization expense of $346.8 million, stock-based compensation expense of $125.7 million, a $158.1 million loss on contract settlement with Rhodium, and unrealized mark-to-market adjustments on our Bitcoin holdings of $115.9 million, as FASB accounting standards require. Non-GAAP adjusted EBITDA for the year came to $13 million after adjusting for non-cash and unusual items. Non-GAAP adjusted EBITDA strips out the impact of certain non-cash and non-recurring items that aren't reflective of our ongoing strategic business operations, giving investors a clearer picture of our underlying operational performance. Our net cost of power for 2025 was $0.037 per kilowatt hour, among the lowest power costs in our industry. Our power strategy produced power curtailment credits of $56.7 million for the full year, close to $10,000 per Bitcoin mined. That power strategy continues to be a key competitive advantage for Riot. Turning to our Bitcoin mining operational metrics, we mined 5,686 Bitcoin during 2025, which works out to an average of 15.3 Bitcoin per day; that's an 18% gain over the 4,828 Bitcoin we produced in FY 2024; we finished the year holding 18,005 Bitcoin on our balance sheet, worth $1.6 billion at year-end based on the December 31st, 2025 closing price of $87,498 per Bitcoin. Our deployed hash rate hit 38.5 exahash by year-end, representing about 3.5% of the global network hash rate; that's a 22% rise from the 31.5 exahash we closed fiscal year 2024 with, roughly keeping pace with global network hash rate growth and preserving our substantial share of the overall network. Our cost to mine per Bitcoin was $49,645 for 2025. Although that's up from $32,216 in 2024, it's worth putting in the context of the broader industry environment. The average global network hash rate rose 47% year-over-year, from 630 exahash to 923 exahash. Even with network difficulty rising sharply, our approach of owning more of the stack and our power strategy kept delivering cost efficiency that leads the industry when measured against our competitors. For the year, hash rate utilization came in at 87% on average, which is a big step up from the 70% utilization we saw in 2024. That gain shows the operational excellence programs our teams have rolled out at our sites. Our engineering business keeps proving how strategically valuable it is for Riot and stands as a core piece of our vertical integration approach. At the close of 2025, engineering backlog hit a record $224.6 million, a dramatic jump from $55.9 million at the close of 2024, which works out to a 302% increase across the year. Data centers account for 90% of the backlog we hold right now, which speaks both to how strong demand is in the industry and to how our engineering business is positioned to capture it. ESS Metron builds low and medium voltage switchgear along with power distribution centers. Such components are indispensable for developing data centers and distributing power. As analysts covering the industry have pointed out, lead times for transformers and switchgear have quietly turned into one of the key constraints on modern data center development. These bottlenecks, largely unseen, are what shape project schedules across the industry in 2026. Riot gains meaningful operational advantages from our engineering business. When we vertically integrate production of these crucial components, we lower procurement risk, speed up our path to market, and keep control over equipment that is scarce throughout the industry. On top of that, our expertise in servicing and maintenance sharpens startup and commissioning, boosts uptime, and lengthens the life cycle of our equipment. This effort produces substantial CapEx savings throughout Riot Platforms' development activities. Since we acquired ESS Metron in December 2021, Riot has realized $23.2 million in cumulative CapEx savings from equipment purchases alone, and we anticipate these synergies will keep scaling as we broaden the scope of our data center development even more. With that, I'll hand the call back to Jason Les so he can walk through how this all connects to Riot's valuation re-rating opportunity and where we go from here.

Jason Les executive
#5

Thanks, Jason. On slide 19, you'll see how enterprise value per megawatt stacks up among a hand-picked group of peers in our space — a lens we find helpful for understanding how the market prices power portfolios these days. Riot's current multiple sits at roughly $2.2 million for each 2027 available megawatt, a notable discount relative to companies holding signed data center leases, even though our power portfolio ranks among the industry's biggest, fully approved, and readily available. To us, that isn't merely a discount. It's a plainly visible path toward creating shareholder value. Signing the AMD lease marks milestone number one on the road to a re-rating of what our power portfolio is worth through a data center lens. As we keep executing our data center strategy and turn more megawatts into contracted data center leases with creditworthy tenants, we expect the market will progressively re-rate our assets' value, driving multiple expansion on our valuation. Let me wrap up today's call by underscoring why we think Riot holds a unique position to generate substantial long-term value for shareholders. The opportunity ahead of us is considerable. Demand for data centers keeps climbing fast, fueled by the AI revolution and the growing need for high-density compute. Meanwhile, power stays the binding constraint, as timelines for new capacity stretch further out each year. Riot sits on the right side of both trends. We hold one of North America's most compelling, fully approved power portfolios, sited in precisely the right markets and ready for development today. Our Rockdale and Corsicana campuses together provide 1.7 GW of firm energized power, handing us a scalable strategic platform that would be extremely hard to replicate. Executing our strategy means systematically converting that power into long-term contracted data center cash flows with creditworthy tenants. The AMD lease stands as an important proof point for this approach; it validates our team, our sites, and our development model, and it represents the first step toward a diversified portfolio of high-quality leases capable of supporting potential portfolio NOI between $1.6 billion and $2.1 billion once fully built out. Our focus going forward is clear: keep executing with discipline, deepen and expand tenant relationships, secure attractive long-term project financing, and recycle capital into the next wave of development. As we show repeatable execution of this model, we expect the market to increasingly recognize the quality and scale of our platform and to re-rate Riot's valuation so it better reflects the strength of our underlying assets and contracted cash flows. We're in the early innings of transforming Riot into one of the industry's most meaningful digital infrastructure platforms. On behalf of our entire management team, I want to thank our shareholders, our partners, and our employees for their continued support as we execute against this opportunity. Before we start taking questions, I want to pause and acknowledge a significant change in leadership here at Riot. To begin, I'd like to express genuine gratitude to Colin Yee for the guidance and dedication he has shown as our chief financial officer starting in 2022. Colin was essential in making Riot's financial base stronger, developing our internal reporting systems, and steering the business through a number of critical growth stages. We appreciate that Colin is staying on to assist Riot in the role of senior advisor, and we're eager to gain from his advice as we carry out our long-term strategy. I'm also delighted to formally introduce Jason Chung as the incoming chief financial officer of Riot. Jason came aboard at Riot during 2022 as head of corporate development and carries close to twenty years of experience across investment banking and corporate finance. He has already made major contributions to forming our capital market strategy, corporate development, and investor relations work. Bringing our finance and strategy functions together under Jason's direction will better connect our capital allocation framework to the growth goals of our data center platform; with that said, we'll now begin the question portion of the call. Operator.

Paul Golding analyst
#6

I really appreciate you answering my question, and congratulations on everything you've achieved in getting that initial 5 megawatts delivered. What I'd like to know is, regarding the AMD lease and where that stands right now, have you picked up any best practices or notable insights — things like gating factors around conversion with the first 5 megawatts that you're now applying to the following delivery phase? And maybe as part of that, how are the talks going concerning the expansion and right of first refusal with AMD? I have one more question after that. Thanks a lot.

Jason Les executive
#7

Appreciate that, Paul. The first major takeaway, I'd say, is that it confirms our commercial strategy, in which we open the dialogue by discussing and grasping what the customer needs and precisely how we'll provide it. We view that as a crucial basis for handling these conversations, so we can be sure we deliver precisely what the customer wants on the schedule they require. That's the method we used with AMD, I'd say, and the reality that we managed to deliver on such an aggressive timeline confirms it. Something else this confirms, I think, is the strategic benefit of our in-house engineering strength. A major factor in how we delivered for AMD on such an accelerated timeline was having the internal ability to engineer and manufacture low, medium-voltage switchgear along with other critical power components for data center development. Among the largest suppliers to the development, for the capacity being leased to AMD, was Riot's ESS Metron. I'd say this confirms our approach more than anything else, and it's a playbook we intend to use for leasing across the remainder of our pipeline — applying that same playbook, that same strategy, to make sure we give customers what they want and hit the timelines we agree to. Regarding expansion, I'd rather not speak to specific discussions. What I can say is that our partnership leaves us very encouraged. Delivering on the initial 2 phases within our aggressive timeline, I believe, is a significant step toward growing that partnership. We don't view the AMD relationship as a one-off deal. Our goal is to establish a sophisticated long-term infrastructure partnership with a well-capitalized and high creditworthy company like AMD as they build out infrastructure supporting their AI roadmap. Delivering and honoring our commitments to our customer, AMD, is the only route to building that partnership; that's where our focus is. Naturally, should expansion options come to fruition later on, we'll update the market once those announcements are possible.

Paul Golding analyst
#8

Thank you, Jason. You brought up that talks regarding financing are underway. I suppose, with everything being said in the market about private credit, how are those talks moving along? Any further detail you could share would be extremely useful regarding the liquidity that's available out there, what capital costs look like, or anything along those lines. Many thanks.

Jason Les executive
#9

Of course. I'll hand that question to Jason Chung, our CFO.

Jason Chung executive
#10

Thanks, Jason. We've been talking with quite a few banks on all fronts and, at the same time, watching what's happening in the debt capital markets very carefully. As I see it, with the AMD lease itself, what we're dealing with is really 2 separate risk profiles inside one lease. First there's the stabilized initial piece of the deployment, and then there's the expansion option for the future. On that first piece, the stabilized deployment, we expect that because the contracted cash flows from the initial 25-megawatt deployment are highly predictable and backed by AMD's strong credit, we can achieve a very low cost of capital, which basically takes away the development or execution risk that lenders would normally build into their pricing. On the second piece, the expansion option, that one could potentially be set up as a kind of separate delayed draw facility, meant specifically to back AMD's 75-megawatt expansion development. By keeping these 2 separate credit profiles apart, we're able to steer clear of paying a blended construction premium over the whole facility, and we believe that leads to 3 specific results. First, we ought to be able to achieve a meaningfully lower overall cost of capital for a facility like this. Second, it lets us take out our initial equity. And third, it lets us efficiently recycle that capital to fund additional growth CapEx down the road. As for where talks with the banks stand right now, that's our main area of focus; we're seeing an enormous amount of liquidity and depth in the project finance markets, and we believe the appetite to explore partnering with Riot on a facility of this kind is very strong.

Paul Golding analyst
#11

Thanks to you both.

John Todaro analyst
#12

Hi, appreciate you taking my question. Congratulations on what's been achieved with AMD, plus some of the other developments happening at Corsicana. I'd like to dig a bit deeper into that leasing pipeline, the demand landscape, how those talks have been progressing, any sort of timeline boundaries, or simply how far along those discussions stand. I have a follow-up too.

Jason Les executive
#13

Of course, John. To lay the groundwork, in Texas we hold 1.7 gigawatts of approved power capacity. As the industry evolves, that asset grows scarcer and more valuable. Our duty to shareholders here is to get the most out of that capacity, and that's where our attention is. Let me step back and look at, and reflect on, the path we've traveled. During our second quarter 2025 earnings call, we described that our next move was finishing our basis of design, which would then lead to technical talks with the market; on our Q3 2025 earnings call, we told you our basis of design was done, and that we were starting technical and engineering discussions with a range of customer segments. That's been accomplished; those conversations allowed us to improve our design. At this point we've entered the commercial stage. We're in active talks with several parties, spanning hyperscaler, enterprise, neocloud, and AI customer segments. The AMD deal proved we're a credible counterparty, and I'd say that has substantially raised both the quality and the seriousness of the inbound interest coming our way; naturally, though, pinning down precisely when leases will land is hard. We're ready. Such deals can move through various phases; we've heard peers describe deals starting and stopping before reaching the final one. We are definitely aiming for further announcements in 2026. We think our position to deliver on that is extremely strong, and we'll share additional details once we're able to.

John Todaro analyst
#14

That's excellent, and quite useful. From what you mentioned in your prepared remarks, these locations might be leased to a single tenant or to multiple tenants. Do you have a leaning one way or the other? Would you like to blend in a few of these various segments? If a hyperscaler wants the entire property, would that be your preference?

Jason Les executive
#15

Yes, fair question. What we aimed to emphasize in those prepared remarks is the flexibility we possess. Given how our campuses are designed, they work either as single tenant or multi-tenant sites; this gives us optionality to get the most value out of our assets. With that said, we're targeting counterparties with strong credit; take Corsicana — although we can accommodate multiple tenants there, I can share that every bit of genuine interest from prospective customers thus far has centered on the full site. My inclination is that leasing the whole thing is the likeliest scenario at Corsicana. Maybe it turns out otherwise in the end. Maybe Rockdale sees some combination. What matters is securing solid leases with solid counterparties, and we can structure things flexibly to arrive at the site's ultimate tenant mix, whether that means a single tenant or several.

John Todaro analyst
#16

Understood. That's great. Really useful. Thanks. I appreciate that.

Jason Les executive
#17

Thanks.

Mike Grondahl analyst
#18

Hi, everyone. Thanks. Given all the recent discussion regarding ERCOT, my understanding is that Riot's power has been approved at Corsicana, but could you verify that? And second, going forward, does ERCOT's batch process have any effect on Riot, whether positive or negative?

Jason Les executive
#19

Mike, thanks for asking. To answer your questions briefly, the power at Corsicana is fully approved. That approval came to us in Q4 2022; the site is operational, those approvals were obtained at that time, and whenever we're ready, we can scale all the way up to our 1 gigawatt there. Riot is not affected by the batch process. The proposed new ERCOT batch process — not implemented — related to loads that were already at various stages of planning or approval prior to final approval and definitely prior to energization. Sites that are new and have not been energized would be impacted; Riot sites that have had approval for years and are already operating would not be; in our view, this simply reinforces how valuable these sites are, since they're already approved and we don't face that same degree of risk with them.

Mike Grondahl analyst
#20

Great. Thanks, guys.

Stephen Glagola analyst
#21

Hey, thanks for the question. Just a quick one from me; on the financing side, can you just talk about how Bitcoin sales are going to continue or not continue to play a role in funding the CapEx going forward here?

Jason Les executive
#22

Thanks, Stephen. I'll turn that over to Jason Chung.

Jason Chung executive
#23

Thanks, Jason. Regarding how we plan to finance things, the way we prioritize our funding begins with the Bitcoin treasury. Beyond liquidating everything we generate in Bitcoin each month, we also have sold, and intend to keep selling, Bitcoin straight out of our balance sheet so that we can cover operational requirements and expand CapEx. A good illustration of that approach came when we made public the purchase of the Rockdale site. The $96 million price tag was covered completely by selling close to 1,100 Bitcoin from the balance sheet, and that practice will carry on in the future; that said, as we strategically move toward developing data centers, it also gives us entry to fresh sources of cheap capital. You ought to anticipate that we will pursue these cheaper, non-dilutive debt arrangements too, in order to finance our build-out alongside the Bitcoin we sell off the balance sheet. In our view, for shareholders moving forward, this blend represents the financing approach that adds the most value.

Stephen Glagola analyst
#24

Okay, thanks.

Nick Giles analyst
#25

I want to give Colin credit and say congratulations to Jason Chung on the new role. What I really wanted to ask is how you're looking at acquisitions of additional locations and whether that thinking has changed lately. Has what's happened in ERCOT affected that? A number of companies in your position are either discussing or have already moved toward bringing generation capacity onsite. Would that be something you'd explore? Or are you focused strictly on deals involving grid interconnection, or ones where you wouldn't need to run the generating asset yourself? Thanks.

Jason Les executive
#26

Yeah, Nick, I appreciate that. Regarding building out the pipeline, someone asked earlier about the ERCOT batch process. Beyond that, getting approvals for new interconnections to the grid has become harder and harder, in our view. For us, that cuts both ways. It becomes more difficult to secure approval for new grid interconnections. But at the same time, it raises the value of the huge portfolio we already have. When it comes to our pipeline, the first thing we keep in mind is that there's a huge amount ahead of us. We've got close to two gigawatts — 1.7 gigawatts — just from Rockdale and Corsicana, two flagship mega sites we can move on, and that alone represents a huge chance for Riot to create value. Even so, we're planning with the long term in mind. We aren't merely attempting to cash in on two locations; we're creating a lasting platform, a lasting data center operation, and we want a process we can repeat for upcoming locations, doing it the way we showed with AMD. We've been assessing a huge number of possibilities. As you'd expect, there are plenty available. It moves through a very rigorous process inside our company, we narrow it to a handful, and right now we're in several live processes aimed at buying potential new developments. I believe your point about generation is a strong one. Given the setting we're operating in, where getting extra power capacity is hard, you have to be more inventive about how you address that issue. You can't simply depend on power from the grid. This sector's future plainly involves supplying your own power. That's an area where I believe Riot holds a huge edge. Many people on our engineering and operations teams have a generation background. I can say this is something we're examining quite closely and treating quite seriously, and we're using every resource available to us to help create that lasting pipeline so we can keep repeating our success.

Nick Giles analyst
#27

Excellent. Thanks for sharing that viewpoint, Jason. For my follow-up, you've demonstrated that you can bring in revenue rapidly via the AMD agreement. Even so, the market still shows a tremendous amount of urgency regarding additional megawatts. What I really want to know is whether there are approaches to speed up the eventual energization of data center megawatts at either location. We roughly have the 112-megawatt goal at Corsicana, but could you provide some indication of approximately how many energized data center megawatts might come online by 2027? Thanks.

Jason Les executive
#28

Nick, the exact reason we kicked off that core and shell development without having a lease signed was so we could guarantee delivering capacity beginning in 2027 and remain highly competitive with what we offer there; those initial two buildings represent only the start; clearly we are engaged in a commercial process, we are actively marketing and trying to lease the whole site. In the end, our build approach will mirror whatever our customers need. These processes are already in motion. To boost further our capacity to deliver on time, we have started acquiring long lead equipment. As a matter of fact, we obtain the majority of the more supply-constrained long lead equipment required for those first two buildings. During commercial negotiations, the focus isn't on 112 megawatts, it's on how we deliver the complete capacity, the 1 gigawatt of utility load accessible at that site, and those are merely the opening phases of that rollout. We are making sure we can stay very competitive on a delivery timeline.

Nick Giles analyst
#29

Great. I appreciate all the detail, keep up the good work.

Reginald Smith analyst
#30

Thanks. I've got a question. My first one kind of builds on the last point you made, Jason. Obviously, you have a huge site; it's located just outside of Dallas. Your peers have mentioned, I guess, contract terms and discussions seem to be improving, with operators getting better and better economics. A question for you is, thinking about that site and something I've been telling investors for a while now, and I kind of want to verify, your closeness to Dallas, is there a premium or can you extract or get a premium for that proximity? When you consider assigning value to that piece—including the acreage involved—how do you approach it? After all, properties in the gigawatt range rarely come up for purchase or rent, frankly. What's your thinking on those aspects of your land and the way you'd set pricing for them? Clearly, the tenants you're working with are top-tier, so there's bound to be some haggling and exchange of offers. Is there anything you can tell us about your approach to this and how it ought to be reflected in whatever agreement you ultimately reach?

Jason Les executive
#31

Reggie, I appreciate the question. The characteristics of the locations, their dimensions, how close they sit to tier 1 markets—Corsicana especially—those factors don't carry as much weight when it comes to the economics of a deal. There's likely a certain effect from that. What matters more, though, is how it shapes the kind of renters we can draw in at that property. These are the renters we'd like to sign agreements with, the ones that let us secure solid lending terms and achieve the strongest valuation multiples. Such renters tend to be pickier about where they sit, and they want to be positioned nearer to tier 1 markets. In my view, that's the key element here — it has opened up conversations with the top-tier names in a way that wasn't possible before.

Reginald Smith analyst
#32

Understood, that's clear. Could I squeeze in a single brief follow-up? When I think about the various milestones, both on the development front and even when it comes to contract talks — what are a few of the main items that you folks internally watch for regarding the contract side, the ones that tell you, hey, things are moving forward? Perhaps walk us through how those conversations develop and unfold. And once more, regarding development, what ought we to watch during the coming few quarters to signal that, hey, this site is getting built on schedule, and so forth. Any details you could offer would be great. Thanks.

Jason Les executive
#33

In my view, a key gauge of how serious talks are is the extent to which they shift into a technical or product conversation, plus how fast that happens. To me, that serves as a robust signal of how committed the counterparty is to proceeding; that's the reason we've adopted the strategy we have. We aimed to guarantee we possessed a technically solid offering — a product that hyperscaler and high creditworthy, investment-grade tenants were seeking. The degree of technical curiosity, the depth of specifics we're delving into, tells us, in our view, how serious matters truly are. We're highly intent on leasing these sites under the right agreements as fast as possible; we've been careful to preserve our optionality; we're engaging, clearly, with numerous counterparties simultaneously so we can proceed promptly and produce a top-quality result for shareholders as swiftly as we can.

Reginald Smith analyst
#34

Understood. Thanks very much.

Greg Lewis analyst
#35

Hi there, thanks. Good afternoon, and I appreciate you fitting me in. Jason, you brought up a few times during this call the advantages tied to ESS Metron and that deal. So I'm kind of wondering — obviously it's nice having that within the portfolio, but when we consider what ESS Metron brings, is it mostly about getting to market faster, or might we also see it make projects more attractive economically, meaning perhaps lower upfront costs compared with certain rivals?

Jason Les executive
#36

Great question, Greg. From our perspective, the primary advantage has come in the form of strategy plus visibility into the supply chain. I addressed this during the earlier question Paul asked regarding delivering from AMD. The sole method by which we managed to accomplish that, to hit the timeline AMD required, involved possessing in-house engineering and manufacturing know-how, letting us create a tailored solution and give it priority above every other job out there. No other third-party OEM could pull that off for Riot, nor would they have any interest in doing so for Riot. It has genuinely transformed what kinds of solutions we can provide to customers. I'll say this — when it comes to recruiting, assembling a top-tier team here is clearly crucial for delivery and execution on the data center strategy. Many of the talented people we've brought on board were especially drawn in and intrigued by what we're capable of through ESS Metron and E4A. The individuals who live and execute this for us, they definitely recognize the upside here too. Strategic on the supply chain side, but there's a cost benefit as well. One of our slides indicated that after acquiring ESS Metron, we've saved roughly $23 million in CapEx since that deal. We made that acquisition 4 years ago, for about $52 million in consideration, and we've already recovered close to half of that purely through CapEx savings. Those savings have only been achieved on fairly smaller-scale Bitcoin mining developments and now this AMD development too. When you consider the larger development ahead of us — constructing one gigawatt of utility capacity at Corsicana, and then ultimately all 700 megawatts of capacity at Rockdale — that represents far more business than we've previously done with ESS Metron. Presumably, the CapEx savings would be even more substantial across the duration of that bigger and longer-term project.

Greg Lewis analyst
#37

All right, that's really useful. Thanks a lot, both of you. Enjoy your evening.

Jason Les executive
#38

Appreciate it, Greg.

Jason Les executive
#39

I'd like to express my gratitude to every shareholder, investor, and analyst who joined us on this call today. Thank you for all the questions. The materials can be found on our website. Should you have any follow-up questions, our IR team is here to help. We're eager to keep delivering on the tremendous opportunity that lies ahead of us. We'll be talking with you again in the next quarter.

Operator operator
#40

This concludes today's conference call. Thank you for participating. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Riot Platforms, Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Riot Platforms, Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.