Home / Transcripts / Bharat Electronics Limited (500049) · July 30, 2025

Bharat Electronics Limited (500049) Earnings Call Transcript

July 30, 2025

BSE Limited IN Industrials Aerospace and Defense earnings 63 min

Earnings Call Speaker Segments

operator operator
#1

Hello everyone, and welcome to the Bharat Electronics Q1FY26 earnings conference call, which is being hosted by Alara Securities Private Limited. Just to remind everyone, all participant lines are in listen-only mode, and once the presentation wraps up, you'll have a chance to ask questions. If you need any help during the call, please signal an operator by pressing star on your touchtone phone. Also, please be aware that this conference is being recorded. I'll now hand things over to Harshit Kaparia from Elara Securities Private Limited. Thank you. Over to you.

Harshit Kapadia analyst
#2

Thank you, Vishaka, and good afternoon, everyone. On behalf of Elara Securities, we're glad to welcome all of you to the Q1FY26 conference call for Bharat Electronics Limited. I'd like to take this chance to welcome Bharat Electronics' management, represented by Shri Manoj Jain, Chairman and Managing Director; Shri Damodar Bhattan, S Director Finance and CFO; and Mr. Srinivas, S Company Secretary, together with their team. The call will start with a short overview from the management, and after that we'll move to the Q&A session. I'll now hand things over to Manoj sir for his opening remarks. Over to you, sir.

Manoj Jain executive
#3

Thanks. Good afternoon, everyone. These are the financial highlights for Q1 of the year 2526. Revenue from operations rose to Rs. 4,417 crore through Q1, compared with last year's figure of Rs. 4,199 crore, a growth of 5.19%. Profit before tax also increased, reaching rupees 1289 crore through Q1 versus rupees 1,037 crore in the previous year's Q1, a growth of 24.28. Profit after tax likewise climbed to rupees 969 crore in Q1 from rupees 776 in the prior year's Q1, a growth of 24.87%. EBITDA also went up to 29.86% through Q1 compared with 22.82% last year. Earnings per share increased to rupees 1.33 from rupees 1.06. The order book position as on 172025 stands at rupees 74,859 crore. Of course, after that we've received, I think, roughly 2,600 crore more in orders following the 1st of July, so you may be aware of this through our various disclosures from time to time, including one that came out today of around 500 plus crore. So that's a brief overview of the Q1 financial highlights for Bharat Electronics.

operator operator
#4

Hello?

Manoj Jain executive
#5

Yes, ma'am. You can go ahead with your questions now.

operator operator
#6

All right, thanks so much. We're going to start the Q&A portion now. If you'd like to pose a question, just hit star and one on your Touchstone phone. Should you want to take yourself out of the queue, press star and. We ask that two participants use handsets when posing a question. Ladies and gentlemen, we'll hold briefly while the. While the queue is put together. Our first question comes from Omesh Raut at Nomura. Go right ahead.

Umesh Raut analyst
#7

Hello sir, good afternoon, and thanks a great deal for giving me this chance. My first question concerns how our margins did during the quarter. We've witnessed quite a steep rise. These margins are measured year on year. So would you kindly offer some perspective on what drove these gains? How much came from savings on materials, localization, and digitization? And what portion resulted from product mix?

Manoj Jain executive
#8

All right, on overall margins — last year alone, we were at almost 27%. So this is a bit better than that, and I'd say that's a good sign, so that's where it stands. So it is. Though in last year's first quarter, it was lower. I agree. But overall, by the year end, we had almost 27-plus percent. And this year's guidance itself was 27. So we're trying to stick to the guidance that's been given to you. So that's the first thing I want to mention — DF sir, do you want to say something?

Damodar Bhattad executive
#9

On gross margins — they came in stronger for the first quarter, because the product composition leaned more toward renowned manufacturing. That's how it played out. Margins improved in Q1. And Jimin, exactly as you pointed out, the driver is the product mix.

Umesh Raut analyst
#10

Understood. Sir, my next question concerns opportunities for large-ticket orders. Could you give us updated timelines on the following programs? First, an update on the QRSM program — where exactly do you now see it reaching finalization in terms of signing the order? Second, regarding the Ms. Star program and the exit now being finalized through the shipyard. And third, on project Kusha, which is currently in the finance phase of development.

Manoj Jain executive
#11

Alright, QRFM — as we asked for previously, we've also made a lot of progress. Now, you may already be aware of this.

operator operator
#12

Hello. There’s actually an echo coming through on your line—could you please check that? And there’s also some background interference.

Manoj Jain executive
#13

We're seeing that as well. Yeah, it's clear at this point. Though while we were talking, we kept picking up background noise from the other end, I think.

operator operator
#14

Hold on one moment. Mr. Umesh, could you take a look around where you are? On your end, on the speaker phone.

Umesh Raut analyst
#15

My line is muted at this point.

Manoj Jain executive
#16

I believe it's improved now. Yeah, since at that point, madam, and we were talking, both sides came through clearly.

operator operator
#17

Sure, sure, okay.

Manoj Jain executive
#18

Should we proceed?

operator operator
#19

Yeah, yeah, thanks a lot.

Manoj Jain executive
#20

So, QR Sam, as you're probably aware, the DSE approval came through on 3 July 2025. So there's been solid progress on that front. So at this point, all that's left is for the RFP to be issued to us, and internally there are certain processes around that. We keep chasing it up, and we're confident of securing this order by February, March. As things stand, it may not even slip into Q1 of next year. We're confident we might land it within Q4 of this year itself, QRSM, because the progress looks really good on our side. And the DSE approval has already arrived concerning NFSTAR and the other subsystems. It was also mentioned previously that our shipbuilders have already received the order. So we've already begun talking with them about finalising the configuration and about the final bomb. So those activities are moving along at a good pace. So we're hoping that within the next three to six months, a considerable portion of the subsystem orders will be with us. So there is good progress there. But this involves some five, six different types of subsystems. So for each subsystem, the configuration and other details, the finer details, are being worked out. After that, we'll have PNC CNCs, and then order placement will happen by them.

Manoj Jain executive
#21

So we’re hoping that in Q3 and Q4, a major portion of that comes through, with a small piece spilling over into Q1 of next year as well, and some small subsystems may also move. But the bulk of the order we expect in Q3 and Q4 — Q2 may see nothing happen, because we’re still in those discussions and in that mode, and the PNC TMC will take time. So typically in Q3 and Q4 we expect the majority of the portion. For this, and for the kusha, we’ll be knowing — we’re still in the developmental phase jointly with the drdo. So with drdo, only those development-related trials are going on. So order conversion, as we said last time too, will take a minimum of three to four years. Until that time we are developing systems and testing the subsystems and their performances jointly with the drdo. That’s briefly about all three systems.

Umesh Raut analyst
#22

Understood, sir—many thanks. If I might fit in just one more. So, if.

operator operator
#23

My apologies for cutting in, Mr. Umesh. What I’d actually ask is that you get back into the queue for follow-up questions.

Umesh Raut analyst
#24

Thanks. Thanks a lot.

operator operator
#25

Thank you. Ladies and gentlemen, so that management can take questions from everyone on the conference, please keep your questions to two per participant. If you have a follow-up question, we would ask you to rejoin the queue. The next question comes from the line of Amit Dixit from Goldman Sachs. Please go ahead.

Amit Dixit analyst
#26

Hello there, good afternoon everybody, and thank you for giving me the chance to ask. I have a couple of questions. My first one concerns Dhiru Paksha. A testimony from the company has come out suggesting they got an order covering the Exciter unit along with some other components for Veeru Paksha. So I just want to get clarity on whether we have received that order as well, or which phase we are in — VR. That is my first question.

Manoj Jain executive
#27

No — that Virupaksha radar is primarily for 230. So within it there are multiple subsystems, and for one of them we hold a developmental order from DRDO, and that order is currently in the execution stage. But these are known as development orders. So following the development order — and what you're also referring to — that company has likewise received a developmental order for a couple of subsystems, as we call them. So they do have some order, but the main order has not gone to them. The main order, I think, if I'm not mistaken, is Bell and Extra Microwave — if I'm not mistaken, for the main systems. So we are building these prototypes. Once these prototypes are evaluated and tested, and I am confident we will qualify, only then will the production phase or bulk orders come. So at present it is prototype development jointly with DRDO for this virus.

Amit Dixit analyst
#28

Thanks. Appreciate you clearing that up. On the second question, it's basically about emergency procurement. In the last concord, of course, right after the skirmish, we figured there might be — the media articles were pointing to somewhere around 40 to 50,000 crores of emergency procurement. But on that front, things seem to have cooled off somewhat. So what are you hearing? And those orders we picked up in the recent quarter, are they also tied to emergency procurement, or would any emergency procurement sit on top of this?

Manoj Jain executive
#29

All right, on emergency procurement, the activity overall got underway as we mentioned last time. As part of emergency procurement, we've already gotten 1 or 2 orders. I believe it was when we issued our public statement — we also wrote about some of the items, such as the Triple LR radar, which we received, plus one more item, I think — so we've begun receiving orders tied to emergency procurement as was said previously, and I think September is the cutoff as of now for them. So over the next 2 months we expect many more orders. But let me assure you that all these orders will form part of the 27,000 plus crore order book we wanted to obtain. During this total financial year we have already received more than 10,000 crores. So the remaining 17 plus thousand crore — EP will definitely help us in crossing that target.

Amit Dixit analyst
#30

Alright sir, that's excellent. Many thanks, and best of luck.

Manoj Jain executive
#31

I appreciate that.

operator operator
#32

Thanks. Our next question comes from Amit Anwani at PL Capital. Go ahead, please.

Amit Anwani analyst
#33

Hello sir, thank you for taking the question. First, regarding any supply chain effects: this quarter we achieved roughly 5% growth even with quite strong order books. So the first thing I'd like to understand is whether anything affected revenue booking because of a supply chain issue. And second, how are we handling the rare earth magnet ban that came from China? Is there any exposure there, and how are we dealing with that situation?

Manoj Jain executive
#34

Right, yes. On your first point, it's accurate that we managed to register just 5.19% growth. We had anticipated roughly 200 crore more in order execution. But at the very last minute, owing to the geopolitical situation — particularly the Israel-Iran conflict — that hit at least 200 crore of our revenue. So it's because of that alone that we thought we'd land in double-digit growth. But for that same reason, we ended up falling short of it. In any case, quarter two will make up for this. I'm confident of that. And as for real world magnets, they aren't impacting us directly, since that's mainly for EV and other segments. At present we aren't a big player in the EV segment. We've only carried out some partial R and D in the EV segment for chargers and such. So it isn't affecting us at all — the real earth magnet related issues are not affecting Bell IT merge me affecting the automobile sector and other companies.

Amit Anwani analyst
#35

Sure. So I wanted to get a handle on the current order book, plus.

Manoj Jain executive
#36

Please, you’ve already told a Madam—I told you before—to please join the queue, and we’ve been available since 4 o’clock, please.

Amit Anwani analyst
#37

That's fine. Thanks.

operator operator
#38

Much appreciated. Thanks to the management team. Our following question comes from Harshit Patel of Aquarius Securities, who is on the line. Kindly proceed.

Harshit Patel analyst
#39

Hello sir, and thanks a lot for giving me the chance. So, first off, I'd like to ask whether you could give us some timelines regarding the orders for the Chatrugad and Shamgat electronic warfare systems. And also, what size will those orders be?

Manoj Jain executive
#40

So yes, Chatrugath and Samagat — that order is already moving along nicely. We've actually received an RFP for one of the programs, since Chatrogat and Samagat are fairly interrelated programs. So for one Samagat program, the RFP has already been issued to us, and we're in the process of responding to it. Typically, in the public domain, we only pursue things once we receive the order. So at this intermediate stage, we generally don't disclose. But anyway, just to give you confidence that it has reached that stage. And following this, the next order will be for Shatrugarh. An RFP will be issued for Shatrugas, with more or less similar configurations. One is for plain and desert, one is for mountain requirements, that kind of thing. So the total order, I think, for Shatrugar and Samagat put together will be around 6,500 crore plus.

Harshit Patel analyst
#41

Got it. My second question concerns the next-generation Corvettes program. You mentioned that we would receive subsystem-related orders valued at 60 to 100 billion rupees. Sir, what is the total addressable electronics pie within this order, of which we are getting this 60 billion to 100 billion? I am simply trying to understand what the import content is in this program.

Manoj Jain executive
#42

Every one of those is a subsystem, with the exception of MF star. As I see it, only the MF star MrFem involves a work-share split of roughly 50 50% with our partner abroad. Every other subsystem is entirely made at home. So the only dependencies are at the level of ICs or certain other components whose manufacturing capacity isn't available in India. Apart from that, from an indigenous-content standpoint, they're fully homegrown. MSR, MRFM. Usually the work share is about 50, 50% between the US and the foreign OEM. Roughly, typically. That covers the whole NGC program. So within the overall program itself, I'd say a minimum of around 60 to 70% indigenous content will be there. It could be higher — the exact value I don't know. But here you can roughly reach about 70% indigenous content on the NGC program for Bell.

Harshit Patel analyst
#43

Got it, sir — I really appreciate you taking my questions, and I wish you all the best.

Manoj Jain executive
#44

Thanks.

operator operator
#45

Thanks. We'll take our next question from Atul Tiwari at JP Morgan. Your line is open.

Atul Tiwari analyst
#46

Thanks, I appreciate it. My question looks a bit further out, maybe medium term. On an annualized basis, your revenues are now getting close to 300 billion rupees. And if you set aside some of those bigger orders, your inflows are roughly 270 billion. Even during this quarter, the order book was roughly flat, perhaps a touch lower. So if we look ahead three or four years, is it realistic to keep growing revenue at 15% or more from such a large revenue base?

Manoj Jain executive
#47

Sure, absolutely. 16% is no problem at all for us. In fact, as we mentioned last time as well, internally we're targeting 17.5% plus. On top of that, there are plenty of projects in the pipeline where we made solid investments at the right moment. Two programs, QRFM and Kusha — which you're familiar with — are certainly in the 30,000 to 40,000 crore plus range. Beyond those, there are many additional missile programs. We're now a DPP partner for DRDO — for instance, one of the missiles tested yesterday, that's BDL and Bell Harga 2 DPPT. So in that manner, there are numerous other missile programs. We're confident our share in these programs is going to grow. That's alongside our core equipment in electronic variety across ships, submarines, and air force radars. So across all these programs, we have a strong pipeline. We're looking at a minimum of the next 3 to 4 years for both order inflow and execution. As things stand right now, execution-wise, we already hold an order book of around 80,000 plus crore today, and including QRFM, we're about to receive orders worth roughly 40,000 to 50,000 crore. So 16% or 17% won't pose a challenge for me, I don't see it.

Manoj Jain executive
#48

But it definitely won't drop under 15 — that much I can promise you. It'll land somewhere between 15 and 17, 17.5, 18. Given the order inflow and the kinds of projects we're engaged in at the moment, we'll aim to keep growth steady around that kind of pattern.

Atul Tiwari analyst
#49

Thanks, sir. And my final question concerns margins. Margin performance has been really robust this quarter as well, even against last year’s base, when margins were above 28% at the EBITDA level. So could we see additional margin expansion over the next 2 or 3 years beyond 28%?

Manoj Jain executive
#50

Right now, for this year we've guided to an EBITDA margin of 27%, and we're holding to that. Because the product mix composition differs quarter to quarter, it looks a little higher this time around. Still, for the full current year we're keeping it at 27%, and 27 is a healthy number over the longer term as well. In any case, when we review our product mix next year, we'll return with a revised figure that could land on the left side or the right side — I can't say at this moment, since it hinges on the overall product composition. But it will sit around this range, that much I can assure you.

Atul Tiwari analyst
#51

Appreciate it, sir — and good luck to you too.

Manoj Jain executive
#52

Yes.

operator operator
#53

Thanks. Our next question comes from Manish Oswal at Nirvana Bank. Go ahead.

Manish Ostwal analyst
#54

Yes sir. Thanks for the chance. I have 2 questions, the first about the employee base. So what's the current headcount, and regarding additions over the last 3, 4 years, how many people have we brought on on the technical side, and how much are we spending yearly on the innovation R&D side as a percentage of revenue.

Manoj Jain executive
#55

All right. Our workforce stood at roughly 9,000 — a bit under 9,000 during this year. As we mentioned earlier, we will also go past approximately 9,600 plus. And for next year, we are planning to definitely exceed 10,000 plus. So that's because, overall, and for most of the employees, what we are adding right now is on the technology side — almost 70% plus of our fresh hiring is going into R and D, since we know we need ever stronger R and D to handle this new technology. Related products such as AI as a technology, ML as a technology, Quantum as a technology, which are imbibed inside all these new developments. So we are bringing in solid technical manpower, almost 200 scientists. We are also taking people from premier institutes for our CRLs as part of this activity. So in total we put into R and D around 6.2%. Last time it was turnover of our turnover on R and D. This year too we are expecting a bit more than that only. So between 6 to 7% of our turnover we wanted to invest on R and D. And as was told last time also, total R and D investment this year will be between 1600 crore plus.

Manoj Jain executive
#56

We’ll plan for something only in the 1600 to 1800 crore range, and it won’t go under 1600. That much I can assure you when it comes to carrying out this innovative R D across every domain in which band operates.

Manish Ostwal analyst
#57

Yes. Second, sir, regarding what you mentioned about technology such as AI, ML, and quantum technology: when it comes to modern warfare, where do you see the significant shift occurring in terms of — I mean — the technological trend? And second, do those technologies we currently have in India need to be had together with other countries? So could you speak in somewhat more detail about where we stand on the technological side compared with other players, like in the US or China?

Manoj Jain executive
#58

I want to reassure you that in this new aiml technology area, we're nearly on equal footing with those countries. We're collaborating tightly with our defense forces to figure out how this modern warfare can gain from the new aiml technology. The primary hurdle there, typically in AI ML, is the data. So, on how to obtain the right data for our training, we've done substantial work. We have a very, very tight relationship with our defence forces. At Bell, we've set up an AI incubation center for the Navy and Army so that users and startups can all collaborate and develop this technology — this cutting edge technology — in good time. So we've made a solid investment, and we've put in place solid infrastructure and a solid framework for developing these technologies for modern warfare. As you might know, every major C4I program that we've used, including recently, came mainly from Bell, with DRDO supporting as the initial technology provider. But now Bell is chiefly leading it. Plenty of AI ML components were present in these systems. Yet many additional ones are now planned as a value addition for these C4I programs built on AIML technology.

Manoj Jain executive
#59

So we're confident that, together with our startup ecosystem, and together with our defense users on the ground — working closely alongside them — we can deliver this. We can provide cutting-edge technological solutions tied to modern warfare without any support from foreign countries. That much I can assure you.

Manish Ostwal analyst
#60

Much appreciated, sir. Thanks. Thanks. Thanks for responding to what I asked. I appreciate it.

operator operator
#61

Thanks. Our following question comes from Jyoti Gupta at Nirmal Bang, whose line is now open. Please proceed.

Jyoti Gupta analyst
#62

Thanks for having me. Those are impressive figures. I’ve got two questions. First, on the export portion of revenue: what’s it likely to look like? How will it shape up over the coming five years? Will it rise? Second, we’re discussing missiles, but on LCA Mark One, where the CMBO has stated we’ll complete five LCAs. It appears, though, that we got two engines in July and expected to receive approximately 12. My impression is that in the best case we should finish seven LCAs. So what would your contribution be from the LCS this year? How will that affect your margin or revenue from the high platforms?

Manoj Jain executive
#63

So on exports, we've been seeing steady growth of nearly 20% year over year. And we're confident that over the next five years we'll try to get to about 10% of our turnover from exports. At the moment it's roughly 4 to 5%. So we keep putting in effort, and the company overall is growing at about 15 to 16%. But for exports, our internal target is above 20. So over time, the export share of total turnover will rise steadily. And we want to hit around 10% of turnover from exports in the next five years. That's our vision on exports. We're heading in the right direction at a reasonably good pace, I'd say, on the export side. On LCA. Yeah, there were some delays in engine availability to SAL. But our components, the electronic components that go into these platforms, since those go and are used for their testing and for making the total LCA ready for engine fitment, on their side we haven't seen any challenges. We've regularly started supplying to HAL and we continue to supply. So HAL eventually supplying LCs to the user isn't impacting us as such.

Manoj Jain executive
#64

Our regular production is aligned with their expectations under the contractual timelines that HAL and we committed to between us. We're more or less on target for that. And per se, it's not going to affect our revenues.

Jyoti Gupta analyst
#65

But how much of your revenue might be coming from HAL?

Manoj Jain executive
#66

For SL this year, I believe we're providing the LCA component, and beyond that a few other helicopter parts as well. So those are in place. On the whole, I think our plan is roughly—you can take it as somewhere around 1,000 crore plus in total, combining LCA with HAL's other helicopter programs. Usually it lands at 1,000 crore give or take 100 crore, since we're also delivering some radars to them this year for their airport operations. So you can assume tentatively about 1,000 crore plus.

Jyoti Gupta analyst
#67

Just one more question, and can I add something here? All right, thanks.

operator operator
#68

Thanks. Our following question comes from Depend Wakeel at Philip Capitan. The floor is yours.

Dipen Vakil analyst
#69

Thanks a lot for having me, sir, and well done on a solid set of numbers. My first question is aimed at getting a bit more clarity on your order book. Sir, could you break down for us what makes up the orders still pending in the order book you hold right now? Perhaps the main ones — roughly 510 contracts — that carry large value within that book.

Manoj Jain executive
#70

So as of today, July 1. Technically, the biggest one in the major order book is the LRC program. You may be aware that we also received one order this year from that. So the LR program is around 5,000-plus crore. QS is roughly 4,500-plus crore. Akash Army is the third one, which you may know about. The Akash Prime trial was successfully carried out recently. It nearly made the media as well. So that's approximately 3,000 crore. BMP upgrade is around 3,000 crore. Ashwini Arudra radar comes to about 2,500 crore. Shakti is around 2,000 crore. The Shakti EW system is around 2,000 crore. So in that fashion, the top 10–12 programs alone make up roughly 35 to 40,000 crore of order book for us.

Dipen Vakil analyst
#71

Understood, sir. And I also wanted to get a sense of this, sir. You recently took delivery of an Atulia air defense radar from the Indian army. So what kind of execution cycle would an order like that have?

Manoj Jain executive
#72

My guess is roughly 3 years, if I’m not mistaken. That’s because we’ve already delivered an early production model for it as well, and under this effort we need to provide 24 radars in total over about 3 years. I can’t give you the precise specifics. Typically, though, since there’s no FOPM or anything else involved here, you must begin supplying right away. We’ve already developed the prototype and now have what we call the production version ready. So we expect to finish this within approximately a 3-year window.

Dipen Vakil analyst
#73

Understood, sir. So it's safe to assume that the electronic office suite for the Mi 17 helicopters, along with the execution cycle, will also run three years.

Manoj Jain executive
#74

If I’m not mistaken, that was 4 years. All right, what you’re saying now is that this depends not just on how much we can produce, but also on what the user wants, since the user has to carry out something like an upgrade. They’re already flying these helicopters, so the question is when those aircraft will become available to us for the upgrades. They have their own plan covering the next 3 to 4 years. So if I’m not wrong, it was nearly, nearly 4 years, with 3 more years within that. So the delivery schedule comes to 4 years in total, if I have that right. But that’s mainly a result of the joint overall planning between us and the airport. That schedule was put together on that basis, and we’re on time in supplying these subsystems to them. Look, all of this is taken into account when we present our exhibition programs. Everything we’re stating is taken into account in our exhibition programs. Everything we’re forecasting.

Dipen Vakil analyst
#75

Understood? Thanks a lot for taking my questions, and best of luck.

Manoj Jain executive
#76

I appreciate that.

operator operator
#77

Thanks. Our following question comes from Hardik Rawat at IIFL Capital. The line is yours.

Hardik Rawat analyst
#78

Appreciate the chance to ask a question. Good afternoon, and congratulations to the team on a very strong set of numbers. My first question concerns how the order book is made up — given our guidance, the conservative guidance of 15% out of 22,000 crores of balance revenue to come in over the next nine months, which are the major programs that will contribute to this?

Manoj Jain executive
#79

There's just a single large order that needs to come in, or be fulfilled, within the coming nine months. What was it you asked?

Hardik Rawat analyst
#80

Orders to be carried out, sir.

Manoj Jain executive
#81

Orders that need to be executed. After that, it’s fine. So LRPM is, naturally, always the biggest item for us. LRFEM comes to roughly 3,000 crore. We expect to carry that out this year. Shakti is another major program, where we intend to book revenue of about 1,700-plus crore. Akash Army is around 1,300 crore. D29 LRU for LCA, DSS and Arudra is about 600 to 800 crore each. Then there’s Links You to IACS, Shakti EW, and the BMP2 upgrade at around 500-plus crore. The rest are smaller items. So altogether we have laid out exactly how we will execute over the next 3/4 remaining period to deliver this growth of at least 15% for this year.

Hardik Rawat analyst
#82

Understood — that's quite useful. One final question on the margin side. We've now witnessed a pronounced increase in operating margins, driven mostly by gross margins. Even so, our other expenses rose as a share of sales by about 215bps, reaching 9.5 percentage. Is there a particular cause — the reason behind this jump as a proportion of sales? Did we make any extra provisioning during this quarter?

Manoj Jain executive
#83

Right. So regular provisioning is going to be part of whatever action we have to take at that specific moment, based on when products are scheduled for delivery. However, in some instances we receive the DD extension without ldos, and without the penalties as well. That means we can reverse it. So provisioning exists within other expenses. Yet it's a regular feature.

Hardik Rawat analyst
#84

Yes, nothing beyond the usual.

Manoj Jain executive
#85

Yeah.

Hardik Rawat analyst
#86

I really appreciate it.

operator operator
#87

Thanks. Our next question comes from Andre Pushatam at Cogito Advisors. Go ahead, please. Hello. Your voice isn't coming through. Hello. I'd ask you to rejoin the queue. Our next question comes from Ajinkya Jadhav at KRIIS Portfolio. Please go ahead.

Ajinkya Jadhav analyst
#88

Yeah, thanks for the chance to ask. Yeah, I just wanted to check, are we involved in the sonar system? Like, did we take part in the tender for the ATAS sonar Sonar?

Manoj Jain executive
#89

I believe we're the biggest sonar supplier out there, and for NPOL — the primary sonar designer in India — we serve as the trusted partner. So we've been linked with them from the very start, and jointly with them we're also making some proactive investments in sonars. We additionally run our own program for developing subsystems and indigenization for sonars such as side scan sonar and others. We're also planning a version of sonar that would be worthy of export. So on the sonar side overall, I think we're a solid technology provider for our defense process, and we're now adding more value there by bringing in AI ML type technologies or integrating them for larger strategic platforms. So as such, I don't see any problem with our role changing for that. We will only excel further in this domain. We're bringing on some additional advisors in this domain to make sure we keep maintaining this strong position in sonar development. And from the sonar perspective, we hardly depend on foreign countries. A few foreign origin sonars do exist, yes, but they came as part of the platform earlier itself.

Manoj Jain executive
#90

As far as new sonar goes, I doubt we're bringing any in at this point.

Ajinkya Jadhav analyst
#91

Yes, good to have that information. And my second question relates to that. Could you tell me what the sales mix is between the component assembly, you could say, and the product, within our total sales?

Manoj Jain executive
#92

Basically, we only make products as a piece of the product itself. We handle the assembly. Fine. That assembly on its own isn’t something we treat as a business case. Okay. So typically what we sell is modules, certain modules, systems, or systems of systems. The same applies to our components on their own. Components are direct business, since we also have a component foundry. But that buyback business is extremely, extremely small, because it exists only for some strategic ISRO and other requirements — only that, which I should say is very, very insignificant as a portion of the business. At present it’s more strategic in nature. So right now, our sales mix is mostly products and solutions.

Ajinkya Jadhav analyst
#93

Understood, understood, understood. Yes, thank you.

operator operator
#94

Thanks. Our next question comes from Karan Gupta at asv. Please go ahead.

Karan Gupta analyst
#95

Hi, this is Audible. Yeah, yeah. I joined a bit late, so I only caught your comments on that one question about revenue and margins. So what's—what product exchange took place? No—roughly 4, 5% of revenue growth this quarter, and on the margin side, gross margin improved by around 9 to 10%. So which product mix changes drove that? You also mentioned something about doing more in-house manufacturing of some components that you previously outsourced. So what impact will in-house manufacturing and product mix have on margin going forward? I mean, if you could just quantify: if we do more in-house manufacturing, how will that positively affect margin?

Manoj Jain executive
#96

Let me clarify that point again. I believe we've said each time as well that the issue isn't a lack of manufacturing capacity—it's in-house design or indigenization, which is a drive we're actively pursuing. When it comes to manufacturing, we handle it on a case-by-case basis. Typically, we bring in our MSME and other partners more and more wherever they're available, and we make sure their quality output is assured. We generally source from them only in cases where we can't find any MSME partners to do the manufacturing. Only those items do we manufacture in house. Otherwise, our motto and vision is to promote our MSME partners and take their help whenever needed, as much as possible. But what I was referring to was in-house design and indigenous designs. So we're putting more and more effort into indigenization. Indigenization is a bit different—it means designing in India, but manufacturing at Bell or outside Bell, which we look at on a case-by-case basis. And as I said, wherever possible, if there's a NAM vendor or an MSME vendor, we opt for that first. And that alone will actually give us more and more margins. Because definitely, when we involve our MSME vendor Ecobase, it will be overall beneficial for them and for us as well.

Manoj Jain executive
#97

The one thing we must guarantee is that deliveries are both high-quality and on time, which is why we put our vendor base through a strict evaluation process and choose them on that basis alone. After selection, though, we genuinely support them hand in hand, making sure they thrive alongside us. So that covers the in-house manufacturing and in-house design side of things. On your second point about revenue: yes. In the first quarter of this year, our revenue growth came in at just about 5%, chiefly around 200-plus crore, sales we had expected to realize by June. Due to the geopolitical situation, particularly the Israel-Iran conflict, certain critical components from Israel were unable to arrive, and for that reason we fell short; otherwise, our target was at minimum 10%-plus within the first quarter itself. On the whole, we will certainly exceed 15% regardless. Even so, in Q1 our internal goal was 10-plus percent, yet we ended up below it thanks to these last-minute surprises, as we call them. That sort of thing is routine these days given the geopolitical landscape worldwide. Still, a specific item can sometimes hit us somewhat harder in one quarter, and the next quarter will make up for it, since our product mix overall is very, very broad.

Manoj Jain executive
#98

This broad product mix won’t hit us very hard. In this case as well, the impact amounted to only about 200 crore, and I’m definitely confident we’ll make that up in quarter two. On margins overall, as was mentioned before, our product mix is so wide that we can’t put a number on which mix will show up or what margin will accompany it. Average it out, and our margins should land around the guidance we’ve already provided—that’s where they’ll be. The so-called geopolitical situation, or the product mix in any single month, won’t move things much.

Karan Gupta analyst
#99

Alright, alright, fair enough. Whatever we're doing with their life simulation, we're delivering services to you, perhaps on the export side or domestically for certain companies. Live simulation.

Manoj Jain executive
#100

Live simulation. The simulator business. We're running simulators. We supply them, and we're now exporting to a few countries as well — and definitely in India, large complex systems and solutions tied to the radar or missile segment. We're building an advanced simulator for our Indian requirements. But we've found plenty of export opportunities, and in the recent past we've exported some two, three good deeds as well. We have exported too, and we're doing marketing for our simulator business further across many more countries. So we're confident the simulator business is really going great for us, and good growth prospects exist in this business. We're adding some more manpower in this particular segment as well, and then watching that some of the large programs — because any large program needs the high-end simulator too. So we wanted to develop those simulators well in time itself, so it can be used while the equipment itself is being supplied. These emulators can be used for good training from day one itself. So we're working toward that.

Karan Gupta analyst
#101

A portion of the business is that portion of the business.

Manoj Jain executive
#102

That piece of the business is probably about 2 to 3% of our overall business — under 5%. For sure. One of our SBUs mainly handles that work, and 2 of our R&D houses back them up. So of the total 29s views, one SV is actually more focused on the simulator, and one other SBU partially supports them. So you can see the overall business also hinges on how many SBs are involved with it. You could say roughly 2% of our business.

Karan Gupta analyst
#103

Alright, thanks.

operator operator
#104

Much appreciated. Our following question comes from Nikhil Purohit at Fiden Asset Management, who is on the line. Kindly proceed.

Nikhil Purohit analyst
#105

Yeah, hi. Thanks for the chance to speak. Can you hear me? Yeah, just 2 questions. So, what was the — I joined the call. What was that ratio of defense to non-defense?

Manoj Jain executive
#106

Once more? Normally the defense versus non-defense split comes in at 88 to 90%, with about 10% being non-defense — that's roughly our standard figure.

Nikhil Purohit analyst
#107

Understood. Alright, and is our guidance for export order inflows still unchanged?

Manoj Jain executive
#108

Yeah. Yes, yes, yes. We feel confident. Regarding your question about the target, we feel confident. We’ve been given roughly 120 million plus. We feel confident we’ll achieve that. Progress has already been made. That said, we don’t provide a direct breakdown of how many export orders we’ve received from quarter to quarter. We don’t provide that. We only provide overall consolidated figures. But in this order that we’ve received right now, there’s also some portion of export orders. And we feel confident we’ll meet our guidance on export.

Nikhil Purohit analyst
#109

Appreciate it.

operator operator
#110

Thanks. Our next question comes from Umesh Raut at Nomora. Go ahead.

Umesh Raut analyst
#111

Thanks again for the chance to speak with you.

Manoj Jain executive
#112

Yeah.

Umesh Raut analyst
#113

The first question, sir, has to do with a possible rise in employee cost stemming from the 8th Pay Commission — specifically in FY28. Because from what I can tell, if I look at the early assessment of what they're recommending, it seems to come to roughly a 3x sort of increase in basic pay. So is there any assessment, any early assessment, of what kind of increase we might expect when it comes to employee cost?

Manoj Jain executive
#114

I believe that is acceptable. Additionally, during the previous call, we also gave you an indirect indication that these airpay commission matters do not directly pertain to us. Even though it will influence our prp in an indirect manner. A separate pay revision committee will be set up by the government for PSUs, and that committee will receive certain inputs from this HP commission. However, it will not be identical. And within the PRC, a great deal of flexibility is granted to PSUs to make decisions grounded in their profitability and viability from a financial standpoint. So at that point we will certainly see — we want to provide the very best to our employees. Yet I do not foresee any major difficulty in the FY28 for that. From 27 end onwards, we will begin making some small provisioning and monitor that. But I do not think it will affect us excessively. Since our overall growth, turnover growth will offset this minor rise in employee cost. That much I can assure you.

Umesh Raut analyst
#115

Understood. For my second question, looking at our services business, I believe we've now also established a new SBU tied to the SaaS business. However, the contribution of our service business to overall turnover remains at roughly 10% to 11%. And considering our defense installed base, it appears we now have considerable exposure there, and indigenization is rising as well. So how do you see this services turnover, as a share of total revenue, increasing over the medium to longer term?

Manoj Jain executive
#116

As you mentioned, services makes up 10% to 11% for us.

operator operator
#117

Apologies for interrupting, sir. Your line is echoing once more. There is an echo on your line.

Manoj Jain executive
#118

That's the Madamura line. Someone needs to mute her, I think. Should I proceed?

operator operator
#119

Sure, go right ahead.

Manoj Jain executive
#120

Yeah. So, as you mentioned, 10 to 11% — we're trying to raise that to 13 14% over the next two years. So there will definitely be a slight increase in services. Because from the new areas too, we're now pursuing services, especially one order that we received even today. Whatever we've put in the public domain regarding the financial services-related business from our software — we've got a good order. So these orders, non-defense variety as well, will increase. So we'll have a 3 to 4% overall increase in our overall product mix, because of services — we're expecting 1011 will become 13 to 15% over a period of time.

Umesh Raut analyst
#121

Understood. Sir, I just need one clarification: when it comes to defense offset contracts, do services fall within that as more of a potential export opportunity?

Manoj Jain executive
#122

All of it has the potential to fall under offset for exports. That said, as things stand, we aren't seeing any major services-type leads through offset at the moment. What offset usually involves is contract manufacturing, or certain subsystems that we're required to provide to them as bne. So services as such and offset—those two aren't meshing right now. Still, there's definitely room there.

Umesh Raut analyst
#123

Thanks, sir. Wishing you all the best. Thank you.

operator operator
#124

Thanks. Our next question comes from Harshit Patel. You have the floor.

Harshit Patel analyst
#125

Thanks a lot for the follow-up. Sir, we received an order valued at nearly 2000 crore from HL for the electronics LR for LCA mark.

operator operator
#126

My apologies for the interruption, sir. There's a whistling sound coming through in the background on your end.

Harshit Patel analyst
#127

Hello there. Can you hear me clearly?

operator operator
#128

Yeah.

Manoj Jain executive
#129

There's a bit of noise — is there an echo? But we'll deal with it, and while we're talking, I think he'll need to mute, so we'll take care of that.

Harshit Patel analyst
#130

We actually received an order valued at 2000 crore from HL covering the electronics LRUs for the first 83 units under the LCA Mark 1A program. How big might the follow-on order be for the remaining 97 units? And with the enhanced offerings, how much additional wallet share will we capture in this upcoming order?

Manoj Jain executive
#131

It'll pretty much follow that same sequence, around 83 to 97, and on escalation HL can't offer us anything beyond that. So it comes down to quantity versus quantity, and normally escalation applies year over year, so that piece will be in there. From that you can work out roughly what the total comes to — it should land near 3,000 crore. I'd say with escalations included, approximately 3,000 crore, plus or minus. We need to sit down with ETL and negotiate smartly, and only that process will reveal the final number. Once we finalize the contract, we'll certainly share it with all of you. But you can take a ballpark of about 3,000 plus or minus 200 crores, give or take.

Harshit Patel analyst
#132

My question was framed around the idea that we'll surely be providing a lot more subsystems compared with what we supply at present — take the UTTAM ASA Radar, for instance, which is going to be among our offerings. Once we move to those extra 97 units, there may well be considerably more on the electronic warfare subsystems side too. So is it that we'll provide the same subsystems, or will we also expand our share within this newer order?

Manoj Jain executive
#133

You're right to bring up what I was pointing to, since you mentioned the electronic subsystems we provided for 83 — so for 97 we'll supply all of those same ones, but naturally EW and Radar are the two new subsystems whose configuration, or at least the minor details, still isn't finalized. And I think in each of those two there are two partners, so we don't know which one will end up as L1. So we're bidding, but we can't be confident about winning the full order. So for EW, maybe I should say there's a 50% probability — though as management I ought to sound 100% confident, I know my competitor wants it too. And second, HL may decide to award it to both L1 and L2, because often when systems are complex and schedules are tight, they split the order between L1 and L2. As of now, those discussions on EW and Radar — the draft RFPs or contract talks — haven't begun with ETL. So I can't quantify at this point what kind of terms and conditions they'll write for it. Once we get some draft RFP, then I can provide a more revised figure for this EW0R.

Manoj Jain executive
#134

At the moment, I’ve left EW0R out of that, and it’s only the remaining sub electronic subsystems—roughly 1111 to 16 kinds of subsystems that we supply to them. So for those subsystems alone, I said the order value is around plus minus 3000, plus minus a few hundred crores.

Harshit Patel analyst
#135

Got it, sir. I really appreciate the detailed answer.

operator operator
#136

Thanks. Our next question comes from Darshan Parmar at Jeffreys. Go right ahead.

Darshan Parmar analyst
#137

Hello, sir, and congratulations on the strong results. I've had most of my questions answered already. I just have one question about the possible opportunity on the drone side. Could you give us some sense of that, please?

Manoj Jain executive
#138

On drones specifically — we're engaged across roughly 4 or 5 major league opportunities in that space. One of the main ones is the Archer UAV, where trials and other development work are underway, and as soon as that wraps up we anticipate a sizable order for Archer UAV. Beyond that, there's loitering ammunition, a logistics drone, and requirements that have come in for a male variant of drone. So across drones we're chasing 3 or 4 additional opportunities. Mailwala and Archer are certainly strong leads for us. We're therefore confident that by year end we'll secure at least 1 order from among these 4 or 5 leads, and over the coming 2 to 3 years we certainly expect further orders from that pipeline. Right now, though, I can't give you quantified figures, because all of these are at differing stages of evaluation — none has reached the contract finalization stage where I could clearly hand you numbers. That said, drones, drone warfare, and anti-drone capabilities are definitely priority areas for Bell. We're committed to this particular segment, since we know we can deliver very strong solutions to our defense forces in it.

Darshan Parmar analyst
#139

Okay, thanks.

operator operator
#140

Thank you. Our following question comes from Girish with Ms. Please continue.

Girish Achhipalia analyst
#141

Thanks for the chance, sir. I have a couple of questions. First, regarding the order book: of the 75,000 crores you hold today, what share can be recognized as revenue past FY27 — that is, in terms of contractual obligations and your execution that will fall beyond FY27, whether in FY28 or 29 — if you could quantify that. And my second question was about the order book: at present, how much of it is nomination versus competitive bid? Those were the two questions.

Manoj Jain executive
#142

So when you look at the order book for the coming two years, the bulk of what we'll execute is just about 23 large programs — fuses, for instance, which actually runs for the next 10 years — and eW systems solutions usually have a delivery schedule of roughly 4 to 5 years, so those are only somewhat bigger. That means beyond three years, about 14,000 crore of this order book sits with more than three years still to go. Everything else can be executed within three years. As for nomination versus competitive bidding, the split is roughly 90-10, plus or minus 10% — call it 90% / 10% competition at present.

Girish Achhipalia analyst
#143

And when you say competition, does that cover the non-defense side as well, or are you referring just to defense? Sir, 1910 ratio.

Manoj Jain executive
#144

When you combine things, even certain non-defense areas have brought us nominations. That isn't the sole distinction. Nominations come our way because of the strength we've built up over a number of years. Among the nominated projects are efforts such as this platform screen door, and we have numerous other projects in the non-defense space as well. So this mix applies to defense and non-defense alike.

Girish Achhipalia analyst
#145

You mentioned that 3 years plus comes to 14,000 crores. So for 2 years plus, what would that figure be, sir — around 25,000-odd crores, or is there any ballpark number you can give?

Manoj Jain executive
#146

Yeah, 2 to 3 years comes to roughly 8,000 crore and above. Adding 8 to 14 gives about 22 to 23,000 crore, which is 2 years plus.

Girish Achhipalia analyst
#147

All right, thank you, sir.

S. Sreenivas executive
#148

There's time for one final question.

operator operator
#149

Alright, thank you sir. The following question comes from Hardik Rawat at IIFL Capital, who is on the line. Kindly proceed.

Hardik Rawat analyst
#150

Thanks for the chance to follow up. I have two quick questions. First, on the export opportunity, which of the main projects that Bell has developed are gaining good traction in export markets?

Manoj Jain executive
#151

For us, essentially every radar, missile, communication system, and software solution sits within our export-related portfolio. When it comes to US drones and counter-drone platforms—particularly anti-drone systems—there are also plenty of opportunities at present, and one emerging area is the P4I solution. Following Ops Indoor, you may have noticed that many of our C4I solutions have been proven in the field. As a result, numerous countries are now approaching us to request a tailored C4I solution. Beyond that, our contract manufacturing involving TR modules and NPRAX—all eight of those types of items—is also growing for us. So we have a solid range of products and solutions spanning nearly every domain in which Bell operates. That means strong export leads exist today, which is why we are confident we will deliver whatever we have guided to at year-end—we are going to hit that. These products therefore touch practically all of Bell's major areas of operation.

Hardik Rawat analyst
#152

Understood, sir. And one final question, sir: what would the capex number be for FY26?

Manoj Jain executive
#153

On capex, the number comes to more than a thousand crore. That's what we'll see this time — over a thousand crore, nothing lower. We've committed to that this year, since we have a big expansion going on and other plans are already in motion. Plenty of capital equipment is also needed for our new-generation test instruments and so on. Taken all together, we've planned this out well, and we're confident we will certainly go past a thousand crore.

Hardik Rawat analyst
#154

That's helpful. Thanks very much, and best wishes.

Manoj Jain executive
#155

I appreciate that.

operator operator
#156

Appreciate it, everyone. That wraps up the final question. At this point I'll turn the conference over to Harshit Kaparia, who has some closing remarks. Harshit, over to you.

Harshit Kapadia analyst
#157

Thanks, Vishakha. We also want to express our appreciation to Manoj sir, Damodar sir, and Srinivasa for giving us the chance to hold this call. Sir, do you have any closing remarks for the investor community?

Manoj Jain executive
#158

Alright, regarding the same thing — the future outlook for FY25 26 — we are keeping all of those parameters. Let me just repeat them. Revenue growth of more than 15%, EBITDA margin of more than 27%, and order inflow of 27,000 plus crore excluding QRFM. If QRSM comes in — and we are still confident about Q4 for that — then it will reach 30,000 plus crore. R&D investment, as was committed, will be 1600 plus crore only. Capex of 1000 plus crore, and exports of 120 plus million dollars. So those are our future outlook figures for 2526, and we are confident of achieving them.

operator operator
#159

Appreciate it, everyone. This is Elara Securities Private Limited, together with Bharat Electronics. That brings our conference to a close. Thanks for being with us. You're welcome to disconnect your lines at this point. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Bharat Electronics Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Bharat Electronics Limited earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.